BR112023005777A2 - Sistema de controle de energia, e, programa - Google Patents

Sistema de controle de energia, e, programa

Info

Publication number
BR112023005777A2
BR112023005777A2 BR112023005777A BR112023005777A BR112023005777A2 BR 112023005777 A2 BR112023005777 A2 BR 112023005777A2 BR 112023005777 A BR112023005777 A BR 112023005777A BR 112023005777 A BR112023005777 A BR 112023005777A BR 112023005777 A2 BR112023005777 A2 BR 112023005777A2
Authority
BR
Brazil
Prior art keywords
energy
consumption
unit
threshold value
predetermined time
Prior art date
Application number
BR112023005777A
Other languages
English (en)
Inventor
Nakagawa Yoshihiro
Furui Shuji
Nakao Takuya
Original Assignee
Daikin Ind Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Ind Ltd filed Critical Daikin Ind Ltd
Publication of BR112023005777A2 publication Critical patent/BR112023005777A2/pt

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Program-control systems
    • G05B19/02Program-control systems electric
    • G05B19/04Program control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Program control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/13Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network
    • H02J13/1337Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network involving the use of Internet protocols
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/13Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in networks by storage of energy
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2639Energy management, use maximum of cheap power, keep peak load low
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2105/00Networks for supplying or distributing electric power characterised by their spatial reach or by the load
    • H02J2105/50Networks for supplying or distributing electric power characterised by their spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2105/52Networks for supplying or distributing electric power characterised by their spatial reach or by the load for selectively controlling the operation of the loads for limitation of the power consumption in the networks or in one section of the networks, e.g. load shedding or peak shaving
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2105/00Networks for supplying or distributing electric power characterised by their spatial reach or by the load
    • H02J2105/50Networks for supplying or distributing electric power characterised by their spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2105/52Networks for supplying or distributing electric power characterised by their spatial reach or by the load for selectively controlling the operation of the loads for limitation of the power consumption in the networks or in one section of the networks, e.g. load shedding or peak shaving
    • H02J2105/53Networks for supplying or distributing electric power characterised by their spatial reach or by the load for selectively controlling the operation of the loads for limitation of the power consumption in the networks or in one section of the networks, e.g. load shedding or peak shaving for partial power limitation, e.g. entering degraded or current limitation modes
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2105/00Networks for supplying or distributing electric power characterised by their spatial reach or by the load
    • H02J2105/50Networks for supplying or distributing electric power characterised by their spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2105/54Networks for supplying or distributing electric power characterised by their spatial reach or by the load for selectively controlling the operation of the loads according to a non-electrical condition, e.g. temperature
    • H02J2105/55Networks for supplying or distributing electric power characterised by their spatial reach or by the load for selectively controlling the operation of the loads according to a non-electrical condition, e.g. temperature according to an economic condition, e.g. tariff-based load management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • Y04S20/244Home appliances the home appliances being or involving heating ventilating and air conditioning [HVAC] units

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Power Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Automation & Control Theory (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Educational Administration (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Control Of Eletrric Generators (AREA)
  • Selective Calling Equipment (AREA)
  • Direct Current Feeding And Distribution (AREA)

Abstract

SISTEMA DE CONTROLE DE ENERGIA, E, PROGRAMA. [Problema] No caso de controlar o consumo de energia por um grupo composto por uma pluralidade de unidades de consumo de energia, ajustar o controle, para cada unidade de consumo de energia de acordo com a situação de uso de energia de cada unidade de consumo de energia para cada tempo, e reduzir a energia não usada para todo o grupo. [Solução] É provido um sistema que controla a energia, de modo a não exceder uma energia alvo definida para um grupo composto por uma pluralidade de unidades de consumo de energia, e que compreende: uma unidade de definição de valor limite 330 que, com base na energia alvo, define o valor limite do consumo de energia por um tempo predeterminado, para cada unidade de consumo de energia; e uma unidade de ajuste de valor limite 370 que ajusta o valor limite da unidade de consumo de energia no tempo predeterminado, com base no consumo de energia real no tempo predeterminado, dentro do tempo predeterminado.
BR112023005777A 2020-09-30 2021-08-13 Sistema de controle de energia, e, programa BR112023005777A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020165452A JP7152678B2 (ja) 2020-09-30 2020-09-30 電力制御システムおよびプログラム
PCT/JP2021/029823 WO2022070633A1 (ja) 2020-09-30 2021-08-13 電力制御システムおよびプログラム

Publications (1)

Publication Number Publication Date
BR112023005777A2 true BR112023005777A2 (pt) 2023-04-25

Family

ID=80949964

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112023005777A BR112023005777A2 (pt) 2020-09-30 2021-08-13 Sistema de controle de energia, e, programa

Country Status (8)

Country Link
US (1) US12093007B2 (pt)
EP (1) EP4224655A4 (pt)
JP (1) JP7152678B2 (pt)
CN (1) CN116325408A (pt)
AU (1) AU2021353150B2 (pt)
BR (1) BR112023005777A2 (pt)
MX (1) MX2023003691A (pt)
WO (1) WO2022070633A1 (pt)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112524746B (zh) * 2019-09-17 2021-11-26 青岛海尔空调电子有限公司 多联机空调系统中室外机均衡结霜的控制方法
JP7116348B2 (ja) * 2020-09-30 2022-08-10 ダイキン工業株式会社 電力制御システムおよびプログラム
US11817711B1 (en) 2022-03-30 2023-11-14 United Services Automobile Association (Usaa) Systems and methods for adjusting electric power to devices
JP2023148975A (ja) 2022-03-30 2023-10-13 日本碍子株式会社 ハニカム構造体、電気加熱型担体及び排気ガス浄化装置
US12283813B1 (en) * 2022-03-30 2025-04-22 United Services Automobile Association (Usaa) Systems and methods for adjusting electric power distributed to consumers
US20240403125A1 (en) * 2024-08-13 2024-12-05 Lemon Inc. Method, device, and medium for placing information

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5440135B2 (pt) * 1974-01-30 1979-12-01
JPS63121431A (ja) * 1986-11-07 1988-05-25 株式会社日立製作所 最大需要電力調整装置
JP3814116B2 (ja) 2000-01-27 2006-08-23 株式会社日立製作所 電力供給方法
JP2002247757A (ja) * 2001-02-16 2002-08-30 Mitsubishi Electric Corp デマンド監視制御システム
JP2003022887A (ja) * 2001-07-09 2003-01-24 Midori Anzen Co Ltd コロナ放電装置の異常検出装置及びコロナ放電装置の異常検出方法
JP2003032887A (ja) * 2001-07-12 2003-01-31 Nippon Telegr & Teleph Corp <Ntt> 広域電力融通取引方法および広域電力融通取引システム
WO2008111467A1 (ja) * 2007-03-09 2008-09-18 Sanyo Electric Co., Ltd. デマンド制御システム、デマンドコントローラ、デマンドプログラム及びデマンド制御方法
JP5758763B2 (ja) * 2011-09-29 2015-08-05 三菱電機株式会社 電力制御システム、全体電力制御装置、個別電力制御装置及び電力制御方法
US20130211752A1 (en) * 2012-02-14 2013-08-15 Wayne State University Software power analysis
US9766679B2 (en) 2012-04-16 2017-09-19 Hitachi Appliances, Inc Power monitoring device and power monitoring system
JP5914860B2 (ja) * 2012-10-12 2016-05-11 パナソニックIpマネジメント株式会社 管理装置
JP6302197B2 (ja) * 2013-09-20 2018-03-28 株式会社東芝 電力需給制御装置及び電力需給制御方法
US10677484B2 (en) * 2015-05-04 2020-06-09 Johnson Controls Technology Company User control device and multi-function home control system
WO2017131026A1 (ja) * 2016-01-26 2017-08-03 日本電気株式会社 電力管理装置及びシステムと方法並びにプログラム
US11366455B2 (en) * 2016-05-09 2022-06-21 Strong Force Iot Portfolio 2016, Llc Methods and systems for optimization of data collection and storage using 3rd party data from a data marketplace in an industrial internet of things environment
JP6778891B2 (ja) * 2016-08-08 2020-11-04 パナソニックIpマネジメント株式会社 電力管理システム、電力管理方法及びプログラム
JP6303054B1 (ja) * 2017-07-27 2018-03-28 東京瓦斯株式会社 電力制御システム
US12463424B2 (en) 2020-09-11 2025-11-04 Ihi Corporation Power regulation method and power regulation device

Also Published As

Publication number Publication date
MX2023003691A (es) 2023-04-21
US20230273580A1 (en) 2023-08-31
AU2021353150A1 (en) 2023-05-18
JP2022057283A (ja) 2022-04-11
EP4224655A4 (en) 2024-04-10
WO2022070633A1 (ja) 2022-04-07
EP4224655A1 (en) 2023-08-09
AU2021353150A9 (en) 2024-02-08
CN116325408A (zh) 2023-06-23
AU2021353150B2 (en) 2023-09-28
US12093007B2 (en) 2024-09-17
JP7152678B2 (ja) 2022-10-13

Similar Documents

Publication Publication Date Title
BR112023005777A2 (pt) Sistema de controle de energia, e, programa
BR112019006193A2 (pt) método, dispositivo sem fio e nó de rede para o controle síncrono das configurações de sincronismo.
BR112017000141A2 (pt) controle de trilho de potência dinâmica para agrupamentos de cargas
BR112015001114A2 (pt) método para controlar uma usina eólica, usina eólica, e, instalação de energia eólica
MX2018006564A (es) Sistema de control de iluminacion a prueba de fallas.
WO2002048615A3 (en) Fault-tolerant multi-node stage sequencer and method for energy systems
BR112021018057A2 (pt) Aparelho para um dispositivo gerador de aerossol, dispositivo gerador de aerossol, sistema gerador de aerossol, método para um controlador de aparelho, conjunto de instruções legíveis por máquina e meio legível por máquina
PT2350747E (pt) Sistemas e métodos para controlar eficiência de consumo de energia
BRPI0404151A (pt) Método e dispositivo para o controle de uma pluralidade de locomotivas
BR0308702A (pt) Sistema e método de gerenciamento de suprimento de energia, dispositivo de termostato e método de desvio de pedidos de energia
BR0200537A (pt) Sistema e processo de controle para instalação
KR970707704A (ko) 타겟 에너지 소비 레벨에 대한 빌딩 시스템의 에너지 효율을 최적화하는 시스템 및 방법(system and method for optimizing energy efficiency of a building system for a target energy consumption level)
BR112015031305A2 (pt) sistemas e métodos para controle de evento de cátodo anômalo com controle de corrente de soldagem de acordo com o estado de voltagem detectada
NZ713649A (en) Method for controlling a wind park
BRPI0709485A8 (pt) Sistema de controle de vôo
BR112015029803A2 (pt) método e aparato para estabilizar pressão em um conjunto regulador inteligente
BR112014018659A8 (pt) Controle dinâmico automático de sistemas de cabine de aeronave
BR112014019653A8 (pt) Sistema de controle para uma instalação física e método para controle variável múltiplo
EP4235023A3 (en) Method for controlling the light distribution of a luminaire
BR112012012508A2 (pt) sistema é método para controlar uma lâmpada de posição traseira de combinação traseira de um veículo
BR112022006868A2 (pt) Sistemas para uma cadeira médica e de controle de conjunto de cadeira e método para controlar uma sala de exame tendo um conjunto de cadeira médica
BR112017001068A2 (pt) montagem de usina geradora de energia multi-gerador, rede de alimentação que tem uma montagem de usina geradora de energia multi-gerador, e método para distribuir geração de potência reativa em uma montagem de usina geradora de energia multi-gerador
BR112014020241B8 (pt) Método para controlar o suprimento de combustível para queimadores de um grupo de queimadores e controlador de queimador
BRPI0418174A (pt) dispositivo e método para controle de temperatura em uma cabine de aeronave
BR112014008521A2 (pt) sistema de lâmpada de despertar

Legal Events

Date Code Title Description
B07A Application suspended after technical examination (opinion) [chapter 7.1 patent gazette]
B09B Patent application refused [chapter 9.2 patent gazette]