CH494320A - Tie rod, method of manufacturing the same and device for carrying out the method - Google Patents

Tie rod, method of manufacturing the same and device for carrying out the method

Info

Publication number
CH494320A
CH494320A CH1106868A CH1106868A CH494320A CH 494320 A CH494320 A CH 494320A CH 1106868 A CH1106868 A CH 1106868A CH 1106868 A CH1106868 A CH 1106868A CH 494320 A CH494320 A CH 494320A
Authority
CH
Switzerland
Prior art keywords
tie rod
tension member
formwork
anchor
prestressed
Prior art date
Application number
CH1106868A
Other languages
German (de)
Inventor
Simon Dipl Ing Stump
Original Assignee
Stump Bohr Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stump Bohr Ag filed Critical Stump Bohr Ag
Priority to CH1106868A priority Critical patent/CH494320A/en
Publication of CH494320A publication Critical patent/CH494320A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/808Ground anchors anchored by using exclusively a bonding material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

  

  
 



   Zuganker, Verfahren zur Herstellung desselben und Einrichtung zur Durchführung des Verfahrens
Es ist üblich, Zuganker zur Verankerung von Bauwerken im Erdreich oder im Fels in schlaffem bzw. nicht vorgespanntem Zustand einzubauen. Bei der Beanspruchung der Zuganker durch Zugkräfte verlängern sich die Zugglieder, so dass sich am Beginn der Haftstrecke eine Kraftkonzentration einstellt, die ein fortschreitendes Lösen der Zugglieder von der dieselben umgebenden erhärteten Masse zur Folge hat. Es können Risse in der erwähnten Masse entstehen, welche auch die Korrosion der Zugglieder begünstigen.



   Diese Mängel können durch den Zuganker gemäss vorliegender Erfindung dadurch vermieden werden, dass bei einem Anker mit mindestens einem Zugglied, z.B.



  einem oder mehreren Zugstäben oder Kabeln, das metallische Zugglied auf einem Teil seiner Länge vorgespannt ist und in diesem Bereich mit erhärteter Masse, z.B. Beton oder Mörtel, umgeben ist.



   Die Herstellung des neuen Zugankers erfolgt zweckmässigerweise in der Art, dass man das Zugglied auf einem Teil seiner Länge, vorgängig dem Einbau in das Erdreich, vorspannt, diesen Teil mit einer Schalung umgibt und letztere mit erhärtender Masse, z.B. Beton oder Mörtel, füllt.



   Die Einrichtung zur Durchführung des Verfahrens umfasst Mittel zum Vorspannen des Zuggliedes auf einem Teil seiner Länge, wobei dieser Teil durch aufgesetzte Abschlussplatten begrenzt ist, und eine zwischen den Abschlussplatten angebrachte Schalung.



   Die Erfindung soll nun unter Bezugnahme auf ein in der Zeichnung schematisch dargestelltes Ausführungsbeispiel erläutert werden. In dieser Zeichnung zeigt:
Fig. 1 einen einbaufertigen Zuganker im Längsschnitt, und
Fig. 2 einen eingebauten Zuganker, ebenfalls im Längsschnitt.



   Der in Fig. 1 dargestellte, einbaufertige Zuganker weist Zugstäbe 1 auf, die durch Abschlussplatten 2 in ihrer gegenseitigen Lage geführt sind. Diese Abschlussplatten 2 sind durch Schrauben 3 auf den Zugstäben 1 gehalten. Im Bereich zwischen den Abschlussplatten 2 sind die Zugstäbe 1 z.B. auf einem Spanntisch vorgespannt worden. Bei der dargestellten Ausführungsform ist die nach dem Vorspannen aufgebrachte Schalung 4, die aus Metall oder Kunststoff bestehen kann, am Anker verblieben und wirkt entweder einfach als bleibendes Hüllrohr oder als Druckglied. Der von der Schalung umgebene Raum ist mit erhärtender Masse 5, z.B. Beton oder Mörtel gefüllt, welcher Masse ein die Festigkeit des Betons oder Mörtels verbessernder und die Korrosion der Zugglieder hindernder Zusatz beigefügt werden kann.



   Der Anker enthält ein einziges Zugglied oder beliebig viele z.B. Zugstäbe aus Metall. Es können auch Kabel als Zugglied vorgesehen sein. Die Schalung 4 kann auch nach dem Erhärten der Masse 5 vor dem Einbau des Ankers 6 entfernt und erneut verwendet werden.



   Vor dem Einbau des beschriebenen Ankers wird die Masse 5 auf Druck beansprucht. Es werden daher beim eingebauten Anker keine Risse in der Masse 5 entstehen.



  Die Spannungsverteilung längs der Haftstrecke des Ankers ist gleichmässig. Gleichzeitig sind die Zugglieder stets mit Sicherheit korrosionssicher mit erhärtender Masse umhüllt.



   Die Herstellung des beschriebenen Ankers erfolgt zweckmässig unter Verwendung eines Spanntisches, auf welchem die Zugglieder im gewünschten Bereich vorgespannt werden können. Nach dem Aufbringen der Abschlussplatten 2 und der Schalung wird die erhärtende Masse 5 eingefüllt. Nach erfolgtem Abbinden kann die Schalung entweder entfernt und neu verwendet werden oder sie kann auf der Masse 5 verbleiben und mit dem Anker eingebaut werden.

 

   Fig. 2 zeigt den Anker gemäss Fig. 1 in, in einem Bohrloch im Felsen, eingebautem Zustand. Gleiche Teile sind mit gleichen Hinweiszeichen bezeichnet. Über die nicht vorgespannte Länge der Zugglieder 1 ist in Hüllrohr 6 gezogen, welches als Schutz gegen die Berührung mit der Füllmasse 7 dient. Als Abschluss der Haftstrecke dient ein Trennkörper 8, welcher die Verpressmasse 9 im Bereich der Haftstrecke von der Füllmasse 7 im vorderen Ankerteil trennt. Die Verpressmasse 9 dient zur Übertragung der Zugkräfte vom Anker auf den Felsen 10.  



   Ist der Anker nach einem der bekannten Verfahren verpresst und die Verpressmasse genügend erhärtet, so wird der Anker z.B. mittels der Muttern 11, die auf der Platte 12 aufliegen, in üblicher Weise vorgespannt werden. 



  
 



   Tie rod, method of manufacturing the same and device for carrying out the method
It is customary to install tie rods for anchoring structures in the ground or in the rock in a slack or non-prestressed state. When the tie rods are stressed by tensile forces, the tension members lengthen, so that a force concentration occurs at the beginning of the adhesive path, which results in the tension members gradually becoming detached from the hardened mass surrounding them. Cracks can arise in the mass mentioned, which also promote corrosion of the tension members.



   These deficiencies can be avoided by the tie rod according to the present invention in that in an anchor with at least one tension member, e.g.



  one or more tension rods or cables, the metallic tension member is prestressed over part of its length and in this area with hardened mass, e.g. Concrete or mortar.



   The new tie rod is expediently manufactured in such a way that the tension member is pretensioned over part of its length prior to installation in the ground, this part is surrounded with formwork and the latter is covered with a hardening compound, e.g. Concrete or mortar, fills.



   The device for carrying out the method comprises means for prestressing the tension member over part of its length, this part being delimited by attached end plates, and a formwork attached between the end plates.



   The invention will now be explained with reference to an exemplary embodiment shown schematically in the drawing. In this drawing shows:
Fig. 1 shows a ready-to-install tie rod in longitudinal section, and
2 shows a built-in tie rod, also in longitudinal section.



   The ready-to-install tie rod shown in FIG. 1 has tie rods 1 which are guided in their mutual position by end plates 2. These end plates 2 are held on the tension rods 1 by screws 3. In the area between the end plates 2, the tension rods 1 are e.g. been prestressed on a clamping table. In the embodiment shown, the formwork 4 applied after the prestressing, which can consist of metal or plastic, has remained on the anchor and acts either simply as a permanent jacket tube or as a pressure member. The space surrounded by the formwork is covered with hardening compound 5, e.g. Concrete or mortar filled, to which mass an additive that improves the strength of the concrete or mortar and prevents the corrosion of the tension members can be added.



   The anchor contains a single tension member or any number of e.g. Tension bars of metal. Cables can also be provided as a tension member. The formwork 4 can also be removed and used again after the mass 5 has hardened before the anchor 6 is installed.



   Before installing the anchor described, the mass 5 is subjected to pressure. There will therefore be no cracks in the compound 5 when the anchor is installed.



  The stress distribution along the anchor's adhesion path is uniform. At the same time, the tension members are always safely coated with hardening compound to prevent corrosion.



   The described anchor is expediently manufactured using a clamping table on which the tension members can be prestressed in the desired area. After the end plates 2 and the formwork have been applied, the hardening mass 5 is poured in. After setting, the formwork can either be removed and re-used, or it can remain on the compound 5 and be installed with the anchor.

 

   FIG. 2 shows the anchor according to FIG. 1 installed in a borehole in the rock. The same parts are labeled with the same symbols. Over the non-prestressed length of the tension members 1 is drawn into the cladding tube 6, which serves as protection against contact with the filling compound 7. A separating body 8, which separates the grouting compound 9 in the area of the adhering distance from the filler compound 7 in the front anchor part, serves to terminate the adhesive path. The grouting compound 9 is used to transfer the tensile forces from the anchor to the rock 10.



   If the anchor is pressed according to one of the known methods and the grout has hardened sufficiently, the anchor is e.g. by means of the nuts 11, which rest on the plate 12, are pretensioned in the usual way.

 

Claims (1)

PATENTANSPRÜCHE PATENT CLAIMS I. Zuganker mit mindestens einem Zugglied zum Einbau in den Erdboden oder Fels, dadurch gekennzeichnet, dass das metallische Zugglied auf einem Teil seiner Länge vorgespannt und in diesem Bereich von erhärteter Masse umgeben ist II. Verfahren zur Herstellung eines Zugankers nach Patentanspruch 1, dadurch gekennzeichnet, dass man das Zugglied auf einem Teil seiner Länge, vorgängig dem Einbau in das Erdreich, vorspannt, diesen Teil mit einer Schalung umgibt und letztere mit erhärtender Masse füllt. I. Tie rod with at least one tension member for installation in the ground or rock, characterized in that the metallic tension member is prestressed over part of its length and surrounded by hardened mass in this area II. A method for producing a tie rod according to claim 1, characterized in that the tension member is pretensioned over part of its length, prior to installation in the ground, this part is surrounded with formwork and the latter is filled with hardening compound. III. Einrichtung zur Durchführung des Verfahrens nach Patentanspruch II, dadurch gekennzeichnet, dass Mittel zum Vorspannen eines Teiles des Zuggliedes vorgesehen sind und an den Enden des vorzuspannenden Teiles des metallischen Zuggliedes Abschlussplatten angebracht sind, zwischen welchen sich eine Schalung befindet. III. Device for carrying out the method according to claim II, characterized in that means for prestressing a part of the tension member are provided and end plates are attached to the ends of the part of the metallic tension member to be prestressed, between which there is a formwork. UNTERANSPRüCHE 1. Zuganker nach Patentanspruch 1, dadurch gekennzeichnet, dass sich die erhärtete Masse in einer Schalung befindet, 2. Zuganker nach Patentanspruch I, dadurch gekennzeichnet, dass der nicht vorgespannte Teil des Ankers von einem Hüllrohr umgeben ist. SUBCLAIMS 1. Tie rod according to claim 1, characterized in that the hardened mass is in a formwork, 2. Tie rod according to claim I, characterized in that the non-prestressed part of the anchor is surrounded by a cladding tube. 3. Zuganker nach Unteranspruch 1, dadurch gekennzeichnet, dass die Schalung als Druckglied dient. 3. Tie rod according to dependent claim 1, characterized in that the formwork serves as a pressure member. 4. Einrichtung nach Patentanspruch III, dadurch gekennzeichnet, dass die Abschlussplatten durch Schraubenmuttern, Keile oder Konusse auf dem Zugglied gehalten sind. 4. Device according to claim III, characterized in that the end plates are held on the tension member by screw nuts, wedges or cones.
CH1106868A 1968-07-24 1968-07-24 Tie rod, method of manufacturing the same and device for carrying out the method CH494320A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CH1106868A CH494320A (en) 1968-07-24 1968-07-24 Tie rod, method of manufacturing the same and device for carrying out the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH1106868A CH494320A (en) 1968-07-24 1968-07-24 Tie rod, method of manufacturing the same and device for carrying out the method

Publications (1)

Publication Number Publication Date
CH494320A true CH494320A (en) 1970-07-31

Family

ID=4369708

Family Applications (1)

Application Number Title Priority Date Filing Date
CH1106868A CH494320A (en) 1968-07-24 1968-07-24 Tie rod, method of manufacturing the same and device for carrying out the method

Country Status (1)

Country Link
CH (1) CH494320A (en)

Similar Documents

Publication Publication Date Title
WO2014166003A2 (en) Method for building prestressed concrete structures by means of profiles consisting of a shape-memory alloy, and structure produced using said method
DE2530420B2 (en) Method and device for tensioning inclined tensioning or the like. for buildings
DE3204417A1 (en) Method of setting a rock nail
DE3644551A1 (en) Anchoring for a non-pretensioned tendon
DE69007934T2 (en) Anchoring for tendon and method for its manufacture.
DE69002007T2 (en) Method and device for anchoring the scales of a reinforced earth wall.
DE102012017704A1 (en) Arrangement for the high-strength anchoring of a tensioning rod having a tension member in a component and method for producing such an anchorage
AT402534B (en) METHOD FOR DRIVING A TUNNEL OR THE LIKE AND REMOVAL REINFORCEMENT FOR IMPLEMENTING THE METHOD
DE69410035T2 (en) Process for facilitating the pulling out of the reinforcement of a tensionable anchor and corresponding anchor
CH603919A5 (en) Releasing free section of tie anchor
CH494320A (en) Tie rod, method of manufacturing the same and device for carrying out the method
DE1904371A1 (en) Method for producing a tie rod for anchoring components in the ground and injection anchors, in particular for carrying out the method
AT166309B (en) Method and device for generating prestressing in concrete reinforcement
AT380502B (en) METHOD AND DEVICE FOR WIDING RUNWAY PANELS, BRIDGE ROADWAYS OR THE LIKE.
DE1908951A1 (en) Ground anchor
DE801407C (en) Anchoring structure of pre-stressed steel inserts in prestressed concrete bodies
DE2703822A1 (en) Rhythmic staged prestressed concrete bridge forwarding - using stress members periodically providing eccentric stresses for alternating moment absorption
DE695137C (en) Method for tensioning the reinforcement of structural elements made of concrete or the like and reinforcement for carrying out this method
DE1184368B (en) Process for pre-tensioning and installing a joint insert for expansion joints in streets or sidewalks as well as joint insert for performing the process
AT166560B (en) Anchoring pieces for reinforcement layers of prestressed concrete and process for the production thereof
DE2532964A1 (en) Large framed wall block set in concrete - has tubes between glass blocks for rods and transport anchors
DE2161500B2 (en) METHOD AND DEVICE FOR ASSEMBLING A PRE-TENSIONED STRUCTURE FROM PRECAST CONCRETE PARTS
AT222320B (en) Method for anchoring wire bundles in prestressed concrete structures
DE829124C (en) Process for the production of beam-shaped prestressed concrete bodies
DE1634554A1 (en) Injection tie rods

Legal Events

Date Code Title Description
PL Patent ceased