CN2155405Y - steel pipe support - Google Patents

steel pipe support Download PDF

Info

Publication number
CN2155405Y
CN2155405Y CN 93215226 CN93215226U CN2155405Y CN 2155405 Y CN2155405 Y CN 2155405Y CN 93215226 CN93215226 CN 93215226 CN 93215226 U CN93215226 U CN 93215226U CN 2155405 Y CN2155405 Y CN 2155405Y
Authority
CN
China
Prior art keywords
pipe
outer tube
adjustment part
long
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93215226
Other languages
Chinese (zh)
Inventor
杨庆宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 93215226 priority Critical patent/CN2155405Y/en
Application granted granted Critical
Publication of CN2155405Y publication Critical patent/CN2155405Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A steel pipe strut is formed by combining an inner pipe and an outer pipe; the top end of the inner pipe is fixedly connected with an upper top plate, and the inner pipe wall of the inner pipe is provided with an adjusting hole; the lower section of the outer pipe forms a long pipe part, the upper section of the outer pipe forms an adjusting part, the long pipe part and the adjusting part are made of the same pipe body and are formed by rolling, the adjusting part is made into a thread section with a bead tooth shape and can be matched with the screw arrangement of a screw cap, the bottom end of the long pipe part is fixedly connected with a lower supporting plate, and the adjusting part is provided with a long groove; when the inner pipe is placed into the outer pipe, the fixing bolt is inserted into the strip groove and the adjusting hole for fixing, and when the nut is rotated, the nut props the fixing bolt, so that the inner pipe is propped upwards, and the supporting function of the steel pipe strut is achieved; the structure is strong, and is not easy to be brittle under load, thereby saving materials and reducing processing cost.

Description

本实用新型涉及一种钢管支柱,特别是涉及一种外管调整部的钢管支柱。The utility model relates to a steel pipe support, in particular to a steel pipe support of an outer pipe adjustment part.

一般建筑制造工程,常应用到钢管支柱来支载板模,而一般的钢管支柱1,请参阅图1所示,其钢管支柱1大体上是由内管2及外管3所组合而成,而内管2是具有适当的管长,其顶端焊固上顶板21,且其内管2的管壁径向开设有呈等轴距排列的调整孔240;外管3(请参阅图2所示)则是由下段的长管部31与上段的调整部340焊固而构成,调整部340并可配合螺帽4的螺设,而长管部31底端则固接下撑板33,而调整部340沿轴向开设有长条槽34,外管3可供内管2的置入,且藉由固定栓5的插入外管3的长条槽34及内管2的调整孔240上,则当旋动螺帽4时,将使螺帽4能主上顶撑固定栓5,以迫使内管2顺势往上顶持移动,而达到钢管支柱1的支载功能;上述的钢管支柱虽具有结构简单的使用方便性,然而,在实际的应用中仍有很多未尽理想的缺陷而需解决:In general construction and manufacturing projects, steel pipe pillars are often used to support the formwork, and the general steel pipe pillar 1, please refer to Figure 1, the steel pipe pillar 1 is generally composed of inner pipe 2 and outer pipe 3, And interior pipe 2 is to have suitable pipe length, and its top end is welded solid upper top plate 21, and the pipe wall radially of its interior pipe 2 is provided with the adjustment hole 240 that is equiaxial arrangement; (shown) is formed by welding the long tube part 31 of the lower segment and the adjusting part 340 of the upper segment. The adjusting part 340 can also be screwed with the nut 4, and the bottom end of the long tube part 31 is fixedly connected with the lower support plate 33. The adjustment part 340 is provided with a long slot 34 in the axial direction, the outer tube 3 can be inserted into the inner tube 2, and the fixing bolt 5 is inserted into the long slot 34 of the outer tube 3 and the adjustment hole 240 of the inner tube 2. When the nut 4 is rotated, the nut 4 can mainly support the fixed bolt 5, so as to force the inner pipe 2 to move up and support the supporting function of the steel pipe pillar 1; the above-mentioned steel pipe Although the pillar has a simple structure and is easy to use, however, there are still many unsatisfactory defects that need to be solved in practical applications:

1、通常外管3的调整部340因制成方螺牙状的螺纹段,而方螺牙在车制时因具有一定的齿深,所以外管3上段的调整部340管壁厚度必较外管3下段的长管部31管壁厚度大(若较小则螺纹段的强度会不够),所以,外管3的调整部340与长管部31因管径的不同(如长管部与调整部的管径相同,则将浪费材料),而必须采用焊接加工,以将其焊固为一体,如此,则将因为焊接处6有容易脆断的现象,会使外管3不具有结构上的强度,而无法发挥其支载功能。1. Usually, the adjustment part 340 of the outer tube 3 is made into a square screw-shaped thread section, and the square screw has a certain tooth depth when it is machined, so the wall thickness of the adjustment part 340 on the upper part of the outer tube 3 must be relatively thick. The long tube part 31 of the lower part of the outer tube 3 has a large wall thickness (if it is smaller, the strength of the threaded section will not be enough), so the adjustment part 340 of the outer tube 3 is different from the long tube part 31 due to the difference in pipe diameter (such as the long tube part The pipe diameter of the adjustment part is the same as that of the adjustment part, then the material will be wasted), and welding must be used to weld it into one body. In this way, the outer pipe 3 will not have the Structural strength, but unable to play its supporting function.

2、外管3的调整部340与长管部31是用焊接处理,因多一道焊接过程而使得加工成本增高。2. The adjustment part 340 of the outer tube 3 and the long tube part 31 are processed by welding, and the processing cost is increased due to one more welding process.

3、因外管3的调整部340是制成方螺牙状的螺纹段,所以在实际使用时,调整部340的螺纹段所沾附的泥浆往往因调整部340呈方螺牙状的关系,而不易将泥浆剥落、使其脱离,如此一来将造成整个外管3的调整部340沾满包覆上的泥浆,而未能达到拆卸便捷的使用;在追求理想、实用与进步的今日,上述的卸陷就成为努力追求改善的目标。3. Because the adjustment part 340 of the outer tube 3 is a thread section made of a square thread shape, in actual use, the mud attached to the thread section of the adjustment part 340 is often due to the relationship that the adjustment part 340 is a square thread shape. , and it is not easy to peel off the mud, so that it will cause the adjustment part 340 of the entire outer tube 3 to be covered with mud, and the convenient use of disassembly cannot be achieved; in today's pursuit of ideals, practicality and progress , the above-mentioned unloading traps become the goal of striving for improvement.

本实用新型的主要目的,是在于提供一种钢管支柱,其外管的长管部及调整部是由同一管体制作而成,所以使整体的外管具有极佳的结构强度,而不易受负载脆断,可发挥其支载功能。The main purpose of this utility model is to provide a steel pipe pillar, the long pipe part and the adjustment part of the outer pipe are made of the same pipe body, so that the overall outer pipe has excellent structural strength and is not easily affected. The load is brittle and can play its supporting function.

本实用新型的次要目的,是在于提供一种钢管支柱,其外管的调整部是经辊压成型,而制成珠牙状的螺纹段,所以外管调整部在使用中所沾附的泥浆容易被剥落、使其去除。The secondary purpose of this utility model is to provide a steel pipe pillar, the adjustment part of the outer tube is formed by rolling to form a pearl-shaped thread section, so the adjustment part of the outer tube is attached during use. The mud is easily peeled off, making it easy to remove.

本实用新型的又一目的,是在于提供一种钢管支柱,其外管的长管部及调整部,为相同管径的管材料所一体制成,所以可节省材料的浪费,且可避免多一道焊接加工,而可降低加工成本。Another object of the present utility model is to provide a steel pipe pillar, the long pipe part and the adjustment part of the outer pipe are integrally made of pipe materials with the same pipe diameter, so the waste of materials can be saved, and multiple One welding process can reduce the processing cost.

本实用新型的目的是由以下技术方案实现的。The purpose of this utility model is achieved by the following technical solutions.

一种钢管支柱,其是由内管及外管所组合而成;所述内管的顶端固接有一上顶板,且其内管壁径向开设有呈等轴距排列的调整孔;所述外管的下段形成长管部,而其上段则形成调整部,所述调整部受螺帽的螺设,所述长管部底端固接有一下撑板,而所述调整部沿轴向开设有长条槽,所述内管置入所述外管,且藉由固定栓插置入所述外管的长条槽及所述内管的调整孔上,因此,当旋动螺帽时,将使所述螺帽能往上顶撑所述固定栓,以迫使所述内管顺势往上顶持移动,以达到所述钢管支柱的支载功能;其主要特征是:A steel pipe pillar, which is composed of an inner pipe and an outer pipe; an upper top plate is fixedly connected to the top of the inner pipe, and the inner pipe wall is radially provided with adjustment holes arranged in an equiaxial distance; the The lower part of the outer tube forms a long tube part, while its upper part forms an adjustment part. The adjustment part is screwed by a nut. There is a long slot, the inner tube is inserted into the outer tube, and the fixing bolt is inserted into the long slot of the outer tube and the adjustment hole of the inner tube. Therefore, when the nut is turned At the same time, the nut will be able to support the fixing bolt upwards, so as to force the inner tube to support and move upwards, so as to achieve the supporting function of the steel pipe pillar; its main features are:

所述外管的长管部及调整部是由同一管体一体成型制作而成,且其中所述调整部是制成具有珠牙状的螺纹段。The long tube part and the adjusting part of the outer tube are integrally formed by the same tube body, and the adjusting part is made of a pearl-shaped thread segment.

本实用新型的目的还可以由以下技术方案进一步实现。其中所述外管的调整部所形成的螺纹段,其珠牙是形成半圆弧状。The purpose of the utility model can also be further realized by the following technical solutions. Wherein the threaded section formed by the adjustment part of the outer tube has a semi-circular arc shape.

本实用新型与现有技术相比,优点是十分明显的。由于采用了新的技术方案,其是由内管及外管所组合而成;而内管具有预定的管长,且其顶端固接一上顶板,其内管壁径向开设有呈等轴距排列的调整孔;而外管的下段形成长管部,而上段则形成调整部,并可配合螺帽的螺设,长管部底端固接一下撑板,而调整部沿轴向开设有长条槽,外管可供内管的置入,且藉由固定栓的插入外管的长条槽及内管的调整孔上,当旋动该螺帽时,将可使螺帽能往上顶撑固定栓,以迫使内管顺势往上顶持移动,以达到钢管支柱的支载功能;其主要特征是:外管的长管部及调整部是由同一管体制作而成,且其中调整部是经辊压成型,并制成具有珠牙状的螺纹段;因此,藉由外管的特殊结构设计,可使其具有很好的支载强度而不易脆断,且可使外管调整部所沾染的泥浆容易被剥落、去除。因此综上所述,本实用新型的钢管支柱,藉由外管的特殊结构设计、可使得本实用新型在实际应用上、具有下列的优点及功效:Compared with the prior art, the utility model has obvious advantages. Due to the adoption of a new technical scheme, it is composed of an inner tube and an outer tube; the inner tube has a predetermined length, and its top is fixed to an upper top plate, and the inner tube wall is radially opened with equiaxed Adjustment holes arranged at a distance; the lower part of the outer tube forms a long tube part, while the upper part forms an adjustment part, which can be screwed with the nut. The bottom end of the long tube part is fixed to a support plate, and the adjustment part is opened along the axial direction There is a long slot, the outer tube can be inserted into the inner tube, and by inserting the fixing bolt into the long slot of the outer tube and the adjustment hole of the inner tube, when the nut is turned, the nut can be moved Support the fixed bolt upwards to force the inner pipe to move upwards to achieve the supporting function of the steel pipe pillar; its main features are: the long pipe part and the adjustment part of the outer pipe are made of the same pipe body, In addition, the adjustment part is formed by roll forming and made into a bead-shaped thread section; therefore, with the special structural design of the outer tube, it can have a good supporting strength and is not easy to be brittle, and can make the The mud stained on the adjustment part of the outer pipe is easily peeled off and removed. Therefore, in summary, the steel pipe pillar of the present invention, through the special structural design of the outer tube, can make the present utility model have the following advantages and effects in practical application:

1、外管的长管部及调整部是由同一管体制作而成,所以具整体性的外管具有极佳的结构强度,而不易受负载脆断(以往的外管极易从焊接长管部与调整部的焊接处断裂),可发挥其良好的支载功能。1. The long tube part and the adjustment part of the outer tube are made of the same tube body, so the integral outer tube has excellent structural strength and is not easy to be brittle under load (the previous outer tube was very easy to be welded from a long The weld between the pipe part and the adjustment part is broken), which can play its good supporting function.

2、外管的调整部是经辊压成型,而制成珠牙状(半圆弧状)的螺纹段,所以外管的调整部在使用中所沾附的板模泥浆极易被剥落、使其被去除,因调整部形成具有半圆弧状的螺纹,所以泥浆沾附上时,只要轻轻敲击即可使其脱落,而不像以往的方螺牙状的调整部,难以剥落、去除。2. The adjustment part of the outer tube is formed by rolling to form a bead-shaped (semi-arc-shaped) thread section, so the formwork mud attached to the adjustment part of the outer tube is easily peeled off during use, making it It is removed, because the adjustment part is formed with a semi-arc-shaped thread, so when mud adheres, it can be easily knocked off with a light tap, unlike the conventional square screw-shaped adjustment part, which is difficult to peel off and remove.

3、因为外管的长管部及调整部,为相同管径的管材料所一体制成,所以可节省材料的浪费,且可避免多一道的焊接加工,而降低加工成本。3. Because the long pipe part and the adjustment part of the outer pipe are integrally made of pipe materials with the same pipe diameter, material waste can be saved, and one more welding process can be avoided, thereby reducing the processing cost.

下面通过较佳实施例及附图对本实用新型的钢管支柱进行详细说明。The steel pipe pillar of the present invention will be described in detail below through preferred embodiments and accompanying drawings.

图1是以往钢管支柱的装设示意图。Fig. 1 is a schematic diagram of installation of a conventional steel pipe support.

图2是以往钢管支柱的外管调整部立体结构图。Fig. 2 is a three-dimensional structural view of an outer tube adjustment part of a conventional steel tube support.

图3是本实用新型较佳实施例的分解立体图。Fig. 3 is an exploded perspective view of a preferred embodiment of the present invention.

图4是本实用新型较佳实施例的外管调整部的局部放大图。Fig. 4 is a partial enlarged view of the outer tube adjustment part of the preferred embodiment of the present invention.

图5是本实用新型较佳实施例的组合剖视图。Fig. 5 is a combined sectional view of a preferred embodiment of the present invention.

请参阅图3、图4、图5所示,本实用新型的钢管支柱10是由内管20及外管30所组合而成;而内管20具有预定的管长,其顶端固接有上顶板201,上顶板201是用以顶撑上板模(图未示),且其内管20的管壁径向开设有呈等轴距排列的调整孔202;外管30的下段形成长管部301,而上段则形成调整部302,并可配合螺帽40的螺设,长管部301底端固接有下撑板304,而调整部302沿轴向开设一长条槽303,使得外管30可供内管20的置入,且藉由固定栓50的插置入外管30的长条槽303及内管20的调整孔202上,当旋动螺帽40时,将使螺帽40能往上顶撑固定栓50,以迫使内管20顺势往上顶持移动,以达到钢管支柱10的支载功能;以上所述的构造原理大致与以往的相同,在此不再作进一步的叙述;而现仅就本实用新型的特征部份加以特别说明如下:Please refer to Fig. 3, Fig. 4 and Fig. 5, the steel pipe pillar 10 of the present invention is composed of an inner pipe 20 and an outer pipe 30; The top plate 201 and the upper top plate 201 are used to support the upper plate formwork (not shown in the figure), and the tube wall of the inner tube 20 is radially provided with adjustment holes 202 arranged in equiaxes; the lower section of the outer tube 30 forms a long tube part 301, while the upper section forms an adjustment part 302, which can be screwed with the nut 40. The bottom end of the long tube part 301 is fixedly connected with a lower support plate 304, and the adjustment part 302 is provided with a long groove 303 in the axial direction, so that The outer tube 30 can be inserted into the inner tube 20, and by inserting the fixing bolt 50 into the elongated groove 303 of the outer tube 30 and the adjustment hole 202 of the inner tube 20, when the nut 40 is turned, the The nut 40 can support the fixing bolt 50 upwards, so as to force the inner pipe 20 to support and move upwards, so as to achieve the supporting function of the steel pipe pillar 10; Do further narration; And now only be specially explained as follows with regard to the characteristic part of the present utility model:

本实用新型的外管30的长管部301及调整部302为相同壁厚的管材料所制设成一体,且其中调整部302是配合内模且经辊轮(图未示)作辊压成型,而制成具有珠牙状(半圆弧状)的螺纹段。The long pipe portion 301 and the adjustment portion 302 of the outer pipe 30 of the present utility model are made of pipe materials with the same wall thickness and integrated into one body, and the adjustment portion 302 is matched with the inner mold and rolled by a roller (not shown). Forming to make a thread segment with a pearl tooth shape (semi-arc shape).

本实用新型的外管30的调整部302因为经辊压成型,所以,调整部302所形成的螺牙具有一定的牙深,且因为外管30的上段经辊轮重力辊压后,其外管30的管壁材料因受压挤可延伸形成具有螺牙的上半部份,所以不会有以往用车制螺纹产生的浪费材料的情形,因此,当本实用新型的外管30上段欲辊压形成具有螺牙的调整部302时,其外管30上段的壁厚与下段的长管部301壁厚一样即可,也就是说调整部302与长管部301是采用相同壁厚的管材料一体制成即可。The adjustment part 302 of the outer tube 30 of the present utility model is formed by rolling, so the screw teeth formed by the adjustment part 302 have a certain tooth depth, and because the upper section of the outer tube 30 is rolled by the gravity of the roller, its outer The pipe wall material of pipe 30 can be extended to form the upper half part that has thread because of being squeezed, so can not have the situation of the waste material that produces with car screw thread in the past, therefore, when outer pipe 30 upper section of the utility model wants When forming the adjustment part 302 with screw teeth by rolling, the wall thickness of the upper section of the outer tube 30 is the same as the wall thickness of the long tube part 301 of the lower section, that is to say, the adjustment part 302 and the long tube part 301 adopt the same wall thickness. The pipe material can be made in one piece.

Claims (2)

1, a kind of tubular steel post, it is combined by interior pipe and outer tube; The top of pipe is connected with a upper plate in described, and its inner tubal wall radially offers the adjustment hole of wheelbase arrangements such as being; The hypomere of described outer tube forms long tube portion, its epimere then forms the adjustment part, described adjustment part is established by the spiral shell of nut, described long tube portion bottom is connected with fagging, and described adjustment part offers rectangular groove vertically, pipe is inserted described outer tube in described, and by dead bolt plant described outer tube rectangular groove and described on the adjustment hole of pipe, therefore, when the turn nut, to make described nut can up shore described dead bolt, with force described in pipe take advantage of a situation up hold mobile, to reach the function of carrying of described tubular steel post; Its principal character is:
The long tube portion of described outer tube and adjustment part are to be made by same body is one-body molded, and wherein said adjustment part is to make the thread segment with pearl tooth shape.
2, tubular steel post according to claim 1 is characterized in that: the formed thread segment in the adjustment part of described outer tube, its pearl tooth are to form the semicircle arcuation.
CN 93215226 1993-06-16 1993-06-16 steel pipe support Expired - Fee Related CN2155405Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93215226 CN2155405Y (en) 1993-06-16 1993-06-16 steel pipe support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93215226 CN2155405Y (en) 1993-06-16 1993-06-16 steel pipe support

Publications (1)

Publication Number Publication Date
CN2155405Y true CN2155405Y (en) 1994-02-09

Family

ID=33795796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93215226 Expired - Fee Related CN2155405Y (en) 1993-06-16 1993-06-16 steel pipe support

Country Status (1)

Country Link
CN (1) CN2155405Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102439249A (en) * 2009-04-24 2012-05-02 斯克佛姆国际公司 Building supporting piece
CN102459785A (en) * 2009-05-29 2012-05-16 斯克佛姆国际公司 building support

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102439249A (en) * 2009-04-24 2012-05-02 斯克佛姆国际公司 Building supporting piece
CN102439249B (en) * 2009-04-24 2014-10-22 斯克佛姆国际公司 building support
CN102459785A (en) * 2009-05-29 2012-05-16 斯克佛姆国际公司 building support
CN102459785B (en) * 2009-05-29 2014-04-09 斯克佛姆国际公司 Construction prop and method for manufacturing same

Similar Documents

Publication Publication Date Title
CN2155405Y (en) steel pipe support
CN200964688Y (en) Early-detaching top plate
CN2189255Y (en) Pipe end thread combined with pipe and threaded collar
CN117966953A (en) A prefabricated steel truss floor deck and its construction technology
CN201162350Y (en) Water stop screw in underground shearing force wall
CN216009989U (en) Bolt installation positioning anti-rotation structure special-shaped gasket for pipeline repair device
CN2260134Y (en) Screw adjusting device for construction strut
CN2408410Y (en) Socket rack for solar water heater
CN214461662U (en) Ready-package steel construction based on building energy saving technology
CN2493327Y (en) Welding stainless steel composite pipe
CN215106113U (en) Steel structure supporting steel column connecting component
CN214998650U (en) A steel structure connector with stable connection
CN216078644U (en) Rectangular common-plate flange air pipe
CN222390732U (en) Unit body split type upper cross beam
CN221682073U (en) Column base connecting component of steel tube concrete column
CN213316895U (en) Cleaning device of continuous extrusion machine
CN2435451Y (en) Large-diameter steel strand ground tackle
CN216420858U (en) A high pressure resistant stainless steel seamless steel pipe diameter reducing device
CN221680552U (en) Square tube oblique hanging clamp
CN223241854U (en) Anti-loose fastening nut
CN216666877U (en) Metal sleeve with strong heat dissipation capacity
CN222476790U (en) Oxidation equipment for aluminum material processing
CN220168763U (en) A drainage pipe bracket with auxiliary connection function
CN215671179U (en) Detachable discharging platform pull ring
CN219471209U (en) Assembled steel structure crossbeam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee