EP1344877A1 - Method for providing a hoisting hook in a prefabricated concrete element such as a hollow-core slab floor - Google Patents

Method for providing a hoisting hook in a prefabricated concrete element such as a hollow-core slab floor Download PDF

Info

Publication number
EP1344877A1
EP1344877A1 EP03075766A EP03075766A EP1344877A1 EP 1344877 A1 EP1344877 A1 EP 1344877A1 EP 03075766 A EP03075766 A EP 03075766A EP 03075766 A EP03075766 A EP 03075766A EP 1344877 A1 EP1344877 A1 EP 1344877A1
Authority
EP
European Patent Office
Prior art keywords
concrete
passage
hoisting hook
hoisting
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP03075766A
Other languages
German (de)
French (fr)
Other versions
EP1344877B1 (en
Inventor
Cornelis Iman Breel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BETON SON BV
Original Assignee
BETON SON BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BETON SON BV filed Critical BETON SON BV
Publication of EP1344877A1 publication Critical patent/EP1344877A1/en
Application granted granted Critical
Publication of EP1344877B1 publication Critical patent/EP1344877B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/003Apparatus or processes for treating or working the shaped or preshaped articles the shaping of preshaped articles, e.g. by bending
    • B28B11/006Making hollow articles or partly closed articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/005Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with anchoring or fastening elements for the shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/0062Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects forcing the elements into the cast material, e.g. hooks into cast concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • E04G21/145Means in or on the elements for connecting same to handling apparatus specific for hollow plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3223Means supported by building floors or flat roofs, e.g. safety railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G2021/3257Safety or protective measures for persons during the construction of buildings against falling down specific for floors made of prefabricated hollow plates

Definitions

  • the invention relates to a method for fitting a hoisting hook in a prefabricated concrete element which includes at least one channel extending substantially parallel to a surface of the concrete element, the method comprising:
  • the known method is used to enable for instance a so-called hollow-core slab floor to be displaced with a hoisting device.
  • Such hollow-core slab floors are frequently used in house and utility building.
  • a concrete element in the form of a so-called wing slab floor such as it is described, for instance, in EP 0 825 307.
  • hoisting hooks are fitted according to the known method for the purpose of displacement and stacking in the factory.
  • loose uncured concrete material When using a ram, loose uncured concrete material will end up in the channel when making the passage. Preferably, with the aid of, for instance, vibrations, this is compacted and adhered to the inner walls of the channel. These vibrations can optionally be transmitted using the ram also.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

A method for fitting a hoisting hook in a prefabricated concrete element which includes at least one channel (3) extending substantially parallel to a surface (2) of the concrete element, the method comprising:
  • placing an uncured concrete-like material (5) via a passage to the channel, in a part of the channel (3) located at least near the passage;
  • placing the hoisting anchor (25) in the uncured concrete-like (5) material, characterized in that the method further comprises
  • dosing the uncured concrete-like (5) material in a predetermined amount.

Description

  • The invention relates to a method for fitting a hoisting hook in a prefabricated concrete element which includes at least one channel extending substantially parallel to a surface of the concrete element, the method comprising:
    • placing an uncured concrete-like material, via a passage to the channel, in a part of the channel located at least near the passage;
    • placing the hoisting anchor in the uncured concrete-like material.
  • It is noted that the at least one channel extending substantially parallel to a concrete surface is provided in the element during the forming of the concrete element. In other words, no material needs to be removed from the concrete element for the purpose of forming such a channel.
  • Such a method is known from practice.
  • The known method is used to enable for instance a so-called hollow-core slab floor to be displaced with a hoisting device. Such hollow-core slab floors are frequently used in house and utility building. Also to be considered in this connection is a concrete element in the form of a so-called wing slab floor such as it is described, for instance, in EP 0 825 307. Especially in hollow-core slab floors and in a concrete element formed as a wing slab floor having width dimensions that deviate from standard width dimensions, hoisting hooks are fitted according to the known method for the purpose of displacement and stacking in the factory. To that end, especially in the case of non-standardized slabs, as a rule shortly after the forming of the concrete slab, locally openings are made in the still fresh concrete of one of the surfaces for forming the passage to one or more of the channels. Next, via the passage, in the part of the channel located adjacent the passage, a concrete-like material having a particular flowability is poured or pressed. The hoisting hook is placed in this uncured concrete-like material. These activities are performed manually and so are not sufficiently reproducible.
  • A problem here is that each time after fitting a hoisting hook, it is difficult to establish to what extent the anchorage of the hoisting hook meets stated safety requirements. As a result, the slabs may only be lifted to a height such that it is clear that no one could find himself under the slab. Before such a hollow-core slab floor or different concrete element may be delivered at the site where the slab is to be assembled, it is required, according to regulations, that measures be taken to make impermissible and hazardous use of the hoisting hook during assembly impossible. This is typically done by grinding off the parts of the hoisting hook that project outside the surfaces.
  • An object of the invention is to provide a method for fitting a hoisting hook in a concrete element with channels, such that the hoisting hook is anchorable in the concrete element in a manner which is safer and more reproducible compared with the known method.
  • The stated object has been achieved with the method according to the invention, which is characterized in that the method further comprises the dosing of the uncured concrete-like material in a predetermined amount.
  • It can be determined beforehand what amount of uncured concrete-like material is necessary to obtain an anchorage of the hoisting hook that meets safety requirements. This determination may have been done on the basis of previously performed tests with such combinations of, for instance, a hollow-core slab floor, a hoisting hook and an amount of concrete-like material for anchoring the hoisting hook. By dosing, that is, supplying the uncured concrete-like material in a predetermined amount, it is possible, for instance on the basis of the previously performed tests, to readily determine in advance whether the hoisting hook is anchorable according to the safety requirements imposed. Moreover, at least a considerable part of the method is highly reproducible.
  • A further embodiment of a method according to the invention is characterized in that dosing comprises: filling a reservoir with the predetermined amount of uncured concrete-like material and completely emptying the reservoir.
  • This provides the possibility of a simple check. For if the reservoir is empty, sufficient uncured concrete-like material will have been supplied for a safe anchorage of the hoisting hook. Preferably, dosing is done in an automated manner, so that a natural variation in the amount of uncured concrete-like material that accompanies human action is precluded. Dosing can be done, for instance, with the aid of a conveyor screw. Automation moreover enhances the reproducibility and hence the reliability of the method.
  • A particular embodiment of the method according to the invention is characterized in that the method comprises: checking the complete emptying of the reservoir.
  • This makes it possible to make sure that the uncured concrete-like material has been supplied completely and hence can end up in a part of the channel located at least near the passage. This means that the anchorage can meet the safety requirements imposed. An anchorage that meets the safety standards generally provides the advantage that the hoisting hook may also be used in the assembly and hence it is not necessary anymore, to prevent impermissible and hazardous use of the hoisting hook, to grind off the hoisting hook before it is transported from the factory to the site of assembly. When the anchorage of the hoisting hooks meets the safety requirements, the current use of hoisting clamps in general, and in particular the necessity for special hoisting means and hoisting methods for slabs deviating from, for instance, the standard width dimensions, has become redundant. Also the use of safety chains, to be fitted under the slabs and the safety clamps, can be dispensed with. This provides as an important advantage that the assembly operations can take place more readily and faster. An anchorage that meets the safety requirements imposed moreover makes it possible to use it for constructional purposes as well. To be considered here is the constructional jointing of construction parts, fixing temporary shores and safety provisions and for fixing so-called life lines of executive personnel at the moment when other provisions are still lacking.
  • Preferably, the check of the complete evacuation of the reservoir takes place automatically. Thus, for instance, the reservoir may be weighed electronically. If the weight as determined after the evacuation of the reservoir is higher than the weight of the reservoir itself, it will be clear that the reservoir is not completely empty. In that case, the weighing device can produce a signal to indicate that the reservoir is not completely empty. Thereupon, measures can be taken that are aimed at preventing an unchanged progress of the fitting of the hoisting hook in the concrete element.
  • In a further elaboration, accordingly, the method further comprises: automatically interrupting the placement, via the passage, of the concrete-like material and/or the placement of the hoisting anchor if the reservoir has not been evacuated completely. This provides the possibility of preventing a deficit of uncured concrete-like material being used for anchoring the hoisting anchor.
  • Such an embodiment comprises in particular: if necessary, supplementing an amount of concrete-like material already evacuated from the reservoir with concrete-like material left behind in the reservoir, for enabling the predetermined amount of the concrete-like material to be placed via the passage to the channel in the part of the channel located closed to the passage.
  • A method according to this embodiment leads to a guarantee with regard to, for instance, the amount of uncured concrete-like material that is received in a channel of, for instance, a hollow-core slab floor, for anchoring the hoisting hook.
  • A more particular embodiment of the method according to the invention is characterized in that placing the hoisting hook in the uncured concrete-like material is done with the aid of a movable holder with which a part of the hoisting hook is detachably connected.
  • Preferably, placing the hoisting hook is done automatically. Thus, for instance, the holder with the hoisting hook detachably connected thereto can be automatically suspended above a position on the surface of the concrete element so as to be displaced from there into the, or even with the, uncured concrete-like material into the channel. After placement in the uncured concrete material, the holder can be uncoupled from the hoisting hook. The holder is then reusable for placing a next hoisting hook at a different position. The hoisting hooks, albeit at mutually different positions, are all placed in the uncured concrete material in the same manner, with a same orientation. This orientation can naturally be chosen such that the anchorage thereby meets the safety requirements. When placement is automatic, reproducibility is high and hence it is possible to determine in advance that anchorage will meet the pertinent safety requirements in that regard as well.
  • A particular embodiment of the method comprises: pressing the predetermined amount of the concrete-like material through a surface of the concrete element for forming the passage and for placing the uncured concrete-like material via the passage to the channel in the part of the channel located at least near the passage.
  • This provides the advantage that forming the passage and placing the uncured material via the passage in the part of the channel located near the passage take place in one step. This accelerates and simplifies the fitting of the hoisting hook. The dose of the uncured material in this case is preferably predetermined such that, together with the concrete material pressed out of the surface, sufficient material is present for anchoring the hoisting anchor.
  • In an alternative embodiment of the method, the passage to the channel is formed in the prefabricated concrete element when the concrete element is still uncured. Forming the passage then takes relatively little energy. Further, loose uncured concrete material produced for the purpose of making the passage, is compacted in the channel using vibrations. This improves inter alia the bonding of this concrete material with the inner walls of the channel.
  • An advantageous variant of the method comprises: vibrating the holder of the hoisting hook during at least a part of the placement of the hoisting anchor in the uncured concrete-like material.
  • This entails the uncured concrete material being further compacted with a relatively light pressure. This prevents, for instance, a laterally unsupported partition wall between channels being deformed. This also enhances reproducibility of the anchorage. In particular when this takes place simultaneously with the placement of the uncured concrete-like material in the part of the channel located near the passage, the method for fitting a hoisting hook, for instance in a hollow-core slab floor, can be carried out fast, simply and reliably.
  • A still more advantageous variant of the method comprises: providing a constructional hoisting hook. This provides the possibility for the hook to be used additionally for assembly of the concrete element.
  • Furthermore, the method may further comprise: fitting the hoisting hook in the prefabricated concrete element in such a manner that the hoisting hook is disposed wholly between the outer surfaces of the concrete element.
  • This provides the advantage that it is not necessary anymore to grind off the hoisting hooks after use. The open space formed by the lugs, which space is situated between the upper part of the hoisting hook and the amount of concrete-like material provided in the channel, can, after this space has first been utilized for fitting fixing means for hoisting and/or mounting the concrete element, be further filled up with a cement-like layer which comes to lie flush with the surface of the concrete element.
  • The invention will presently be elucidated with reference to a drawing. In the drawing:
  • Figs. 1a, 1b and 1c show, by way of example, schematically and in cross section, an embodiment of the method according to the invention; and
  • Fig. 2 shows, by way of example, in cross section a first product of the method according to the invention;
  • Fig. 3 shows, by way of example, the hoisting of a product of the method according to the invention;
  • Fig. 4 schematically shows an example of a concrete element formed as a wing slab floor, in which a hoisting hook can be fitted using the method according to the invention; and
  • Fig. 5 shows, by way of example, in cross section, a second product of the method according to the invention.
  • In the drawing, equal parts have been provided with equal reference characters, unless indicated otherwise.
  • Fig. 1a shows a cross section of a concrete hollow-core slab floor 1 which is provided with two opposed surfaces 2. Situated between the surfaces 2 are channels 3 which extend parallel to the surfaces 2. Fig. 1a further shows a hopper 4 which will typically be included in a mobile machine frame (not shown). In the hopper 4 moist mortar 5 has been included. Disposed under the hopper 4 is a supply element, such as, for instance, the conveyor screw 6 or a conveyer belt (not shown). Fig. 1a further shows a reservoir 7 that is provided with a sealing element 9. The reservoir 7 with the sealing element 9 is attached to a weighing element 8. From the hopper 4, the reservoir 7 can be filled, using the conveyor screw 6, with a predetermined amount of moist mortar. This amount can be predetermined on the basis of many factors. What plays a role here, for instance, are the dimensions of the channels 3 and the material properties of the uncured concrete-like material, in this case the moist mortar. The desired amount can have been predetermined with the aid of calculations and/or tests. An important criterion for the prior determination in the method of the amount of moist mortar to be supplied to the reservoir 7 are the safety requirements to be met by the anchorage of the hoisting hook 25. The weighing element 8 is preferably provided with a control element that stores a database including the predetermined amount of mortar for every current combination of the above-mentioned factors. After the data of the hollow-core slab floor 1 and, for instance, the number of hoisting hooks 25 to be fitted, have been entered in the control element, not shown, the weighing element 8 indicates, on the basis of the database, when the reservoir 7 is filled with the required predetermined amount 10. Here, timely, a signal is given to the conveyor screw 6, so that the supply of the moist mortar 5 is stopped in time. In this way, in this example, the moist mortar 5 is dosed.
  • Using the mobile machine frame, not shown, a guiding chute 17 is moved along a longitudinal edge of the concrete slab 1 to a position from where, through a displacement of the guiding chute 17 across the concrete slab 1, the guiding chute 17 can end up above a desired position 20 at one of the surfaces 2. Similarly, the reservoir 7, if necessary, is also moved across the concrete slab 1. Upon arrival above a desired position of the guiding chute 17, the sealing element 9 at the bottom 21 of the reservoir 7 is opened.
  • Fig. 1b shows a movable holder 11 which is provided with hinging parts 13 and 14 to which lugs 12 are attached. A hoisting hook 25 is mechanically coupled in the holder 11 between the lugs 12. In the part of Fig. 1b surrounded by a broken line 22, a side elevation of the holder 11 with the hoisting hook 25 is shown. The hoisting hook 25 in this example is clamped between the hinged parts 13 and 14 by moving these out of a closed position, then placing the hoisting hook 25 between the parts 13 and 14 and bringing the parts 13 and 14 into the closed position again.
  • The holder 11 with the hoisting hook 25 mechanically coupled thereto is placed above the guiding chute 17. To that end, the holder 11 may be connected with the guiding chute 17 so as to be vertically movable. The sealing element 9 is removed from a position between the reservoir 7 and the upper side 28 of the guiding chute 17, for instance by sliding it clear. By weighing the reservoir 7 with weighing element 8, it is checked whether all of the concrete-like material has ended up in the guiding chute 17. If necessary, the progress of the method halts and/or a signal is delivered until, for instance through manual tapping, all mortar has left the reservoir 7. The signal produced can mean, for instance, that the reservoir 7 cannot be moved away anymore. Next, the hoisting hook 25 together with the predetermined amount of moist mortar 10 is pressed through the surface 2, whilst preferably the holder 11 with the hoisting hook 25 is caused to vibrate during at least a part of a downward movement, for further compacting the mortar. The holder 11 with the hoisting hook 25 is preferably, as shown in Fig. 1c, pressed downwards so far that the hoisting hook 25 is situated preferably just below the surface 2 and the lugs 12 of the holder 11, after uncoupling of the hoisting hook 25, leave an open space 18 under a topmost point of the hoisting hook 25. Into this open space 18, a hoisting means 16 having a fixing means 26 attached thereto can be inserted for fixing a hoisting device, not shown, to the hoisting hook 25.
  • Fig. 2 shows a situation in which the hoisting hook 25 fitted in the concrete slab 1 is additionally employed for constructional purposes. Thus, the hollow-core slab floor 1 can be attached to a wall part 24. A temporary upstand 27 can optionally be attached as an edge protection.
  • Fig. 3 shows a situation where the concrete hollow-core slab floor 1 which is provided with four hoisting hooks 25, is hoisted with the aid of a cross-line 16.
  • The prefabricated concrete element can comprise a concrete element formed as a wing slab floor 41. An example of such a shaped concrete element is shown in Fig. 4. The shape of a wing slab floor 41 is further described in EP 0 825 307. Such a wing slab floor 41 can be manufactured according to a method with which the hollow-core slab floor can also be manufactured. In that case, the concrete element formed as wing slab floor is not provided with reinforcement wires.
  • In a concrete element formed as a wing slab floor that has been manufactured according to a method for manufacturing the hollow-core slab floor, a hoisting hook can likewise be provided with the aid of a method according to the invention. Fig. 4 shows analogously to Fig. 1c what a product produced according to the method may look like in that case. Fig. 4 shows a cross section of a concrete wing slab floor 41 which is provided with two opposed surfaces 2 and two "wings" 40 which can be relatively narrow. It is also possible for the wing slab floor to be provided with just one wing which is arranged on one side of the concrete element. The wings 40 can also "frame" the concrete element 41. On a top surface 43, in use, after assembly on the construction site, conduits are laid, whereupon a channel formed partly by the top surface 43, and a side face 44 is filled with concrete-like material for finishing and reinforcing the constructed floor. The concrete element 41 can further, as stated earlier, be in the form of a wing slab floor as described in EP 0 825 307.
  • Many variants on the above-discussed example are possible. For instance, in case of a thick upper deck 29 above the channel, the bottomless guiding chute 17 can be provided with a cutting edge 30 to weaken the upper deck 29 during positioning or during the downward movement of the holder 11 with the hoisting hook 25. Instead of making a passage in the surface 2 to the channel 3 located under the surface 2 by pressing the concrete-like material 10 and the hoisting hook 25 through the surface 2, it is also possible first to provide the passage and subsequently to place the predetermined amount of mortar 10 in the passage and the part of the channel 3 located near the passage. In this case, the concrete element may already be cured when the passage is made. Such placement can take place simultaneously with the hoisting hook 25. However, the hoisting hook 25 can also be pressed later in the uncured concrete-like material 10, such as, for instance, moist mortar.
  • The order of the steps does not need to be entirely as described hereinabove. For instance, as stated, first a passage can be made, which is subsequently filled with mortar. It may be advantageous to provide the passage to a channel shortly after the manufacture of the concrete element, since the concrete element is then still uncured and the provision of the passage can take relatively little energy. In that case, the passage can be formed with the aid of a means for making recesses in an uncured concrete element. Such a means can be, for instance, a ram or a piston.
  • When using a ram, loose uncured concrete material will end up in the channel when making the passage. Preferably, with the aid of, for instance, vibrations, this is compacted and adhered to the inner walls of the channel. These vibrations can optionally be transmitted using the ram also.
  • In that case, when determining the predetermined amount of uncured concrete-like material that is placed in the part of the channel located at least near the passage, the material having ended up in the channel for the purpose of making the passage, as well as any compaction thereof, should be taken into account.
  • It is conceivable that the hoisting hook 25 is first placed in the passage and that subsequently the mortar is placed in the passage. It is also possible that an upper side of the channel 13 is free of concrete material 29. In other words, the channel 13 is present as a kind of gutter in the surface 2 of the concrete element. In that case, the passage is of course already present. Preferably, the passage is relatively small with respect to the channel 3, so that through this design too, an anchoring effect can be obtained.
  • All these variants can be simply reduced to practice by the skilled person. The flowability and moistness of the mortar can play a critical role in determining the optimum sequence of the steps. In any case, an uncured concrete material is to be involved, which is used for anchoring the hoisting hook 25. The moist mortar, mortar and the like fall within the term uncured concrete material. In general, this concrete material is of the same kind as the concrete material from which the concrete element has been manufactured. The use of a different type of concrete, however, is not precluded. Thus, it is possible to use a low-shrink or shrink-free concrete-like material. Even concrete-like materials that expand during curing are conceivable.
  • The hollow-core slab floor and the concrete element designed in the form of a wing slab floor can have any desired dimension. The number of channels can differ per slab. Also, the cross section of the channels can differ per slab. The predetermined amount of uncured concrete material that is used for anchorage of the hoisting hook is determined inter alia by the dimensions and other characteristics of the hollow-core slab floor or the concrete element designed in the form of a wing slab floor. The invention is furthermore not limited to the use in hollow-core slab floors and the concrete element designed in the form of a wing slab floor. The method can be carried out for the purpose of hoisting any prefabricated concrete element that is provided with such channels. The hoisting hook can also be provided for constructional purposes as represented in Fig. 2.
  • All such variants are understood to belong to the invention.

Claims (21)

  1. A method for fitting a hoisting hook in a prefabricated concrete element which includes at least one channel extending substantially parallel to a surface of the concrete element, the method comprising:
    placing an uncured concrete-like material via a passage to the channel in a part of the channel located at least near the passage;
    placing the hoisting anchor in the uncured concrete-like material, characterized in that the method further comprises
    dosing the uncured concrete-like material in a predetermined amount.
  2. A method according to claim 1, characterized in that dosing comprises:
    filling a reservoir with the predetermined amount of uncured concrete-like material and completely emptying the reservoir.
  3. A method according to claim 1 or 2, characterized in that dosing takes place in an automated manner.
  4. A method according to claim 2 or 3, characterized in that the method comprises:
    checking the complete emptying of the reservoir.
  5. A method according to claim 4, characterized in that the checking of the complete emptying of the reservoir takes place automatically.
  6. A method according to claim 5, characterized in that the method comprises:
    automatically interrupting the placement, via the passage, of the concrete-like material and/or the placement of the hoisting anchor if the reservoir has not been emptied completely.
  7. A method according to any one of claims 4-6, characterized in that the method comprises:
    if necessary, supplementing an amount of concrete-like material already evacuated from the reservoir, with concrete-like material left behind in the reservoir, for enabling the predetermined amount of the concrete-like material to be placed, via the passage to the channel, in the part of the channel located near the passage.
  8. A method according to any one of the preceding claims, characterized in that placing the hoisting hook in the uncured concrete-like material is done with the aid of a movable holder with which a part of the hoisting hook is detachably connected.
  9. A method according to claim 8, characterized in that the method further comprises:
    vibrating the holder of the hoisting hook during at least a part of the placement of the hoisting anchor in the uncured concrete-like material.
  10. A method according to any one of the preceding claims, characterized in that the placement of the hoisting hook takes place automatically.
  11. A method according to any one of the preceding claims, characterized in that the method comprises:
    pressing the predetermined amount of the concrete-like material through a surface of the concrete element for forming the passage and for placing the uncured concrete-like material via the passage to the channel in the part of the channel located at least near the passage.
  12. A method according to any one of claims 1-10, characterized in that the passage to the channel is formed in the prefabricated concrete element when the concrete element is still uncured.
  13. A method according to claim 12, characterized in that the passage is formed using a means for making recesses in an uncured concrete element.
  14. A method according to claim 13, characterized in that the means comprises a piston.
  15. A method according to claim 13, characterized in that the means comprises a ram.
  16. A method according to claim 15, characterized in that loose uncured concrete material produced for the purpose of making the passage is compacted in the channel using vibrations.
  17. A method according to claim 16, characterized in that the vibrations are carried out using the ram which has been caused to vibrate.
  18. A method according to any one of the preceding claims, characterized in that the method comprises:
    fitting a constructional hoisting hook.
  19. A method according to any one of the preceding claims, characterized in that the method further comprises:
    fitting the hoisting hook in the prefabricated concrete element, such that the hoisting hook is situated wholly within the outer surfaces of the concrete element.
  20. A method according to any one of the preceding claims, characterized in that the prefabricated concrete element comprises a hollow-core slab floor.
  21. A method according to any one of claims 1-19, characterized in that the prefabricated concrete element is formed as a wing slab floor.
EP03075766A 2002-03-15 2003-03-17 Method for providing a hoisting hook in a prefabricated concrete element such as a hollow-core slab floor Expired - Lifetime EP1344877B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1020183 2002-03-15
NL1020183A NL1020183C2 (en) 2002-03-15 2002-03-15 Method for installing a lifting hook in a prefabricated concrete element such as a channel slab floor.

Publications (2)

Publication Number Publication Date
EP1344877A1 true EP1344877A1 (en) 2003-09-17
EP1344877B1 EP1344877B1 (en) 2009-05-20

Family

ID=27764675

Family Applications (1)

Application Number Title Priority Date Filing Date
EP03075766A Expired - Lifetime EP1344877B1 (en) 2002-03-15 2003-03-17 Method for providing a hoisting hook in a prefabricated concrete element such as a hollow-core slab floor

Country Status (5)

Country Link
EP (1) EP1344877B1 (en)
AT (1) ATE431885T1 (en)
DE (1) DE60327677D1 (en)
ES (1) ES2327624T3 (en)
NL (1) NL1020183C2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2885548A1 (en) * 2005-05-10 2006-11-17 Guimard Ets Lifting and handling pin incorporating method for concrete hollow slab, involves introducing pins in each opening in slab and subjecting gripping ring of pin to rotation perpendicular to slab so that branches pass below reinforcement strand
US7992281B2 (en) 2006-07-12 2011-08-09 Elematic Group Oy Method and apparatus for attaching a lifting lug to a concrete product

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2911224A1 (en) * 1979-03-22 1980-10-02 Kind Karl Heavy natural stone block crane hanger - is inserted in plastic concrete filling in downward widening cavity from top
DE8813324U1 (en) * 1988-10-22 1988-12-15 Simo Blechverarbeitung GmbH, 7239 Epfendorf Tension anchors for prefabricated hollow core slabs
FR2712268A1 (en) * 1993-11-10 1995-05-19 Rector Sa Handling method for thin or extruded concrete products
EP0825307A1 (en) 1996-08-22 1998-02-25 Beton Son B.V. Concrete wing floor element

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3219139A1 (en) * 1982-05-21 1983-11-24 DETEC Fertigung GmbH, 6080 Groß-Gerau Process and apparatus for introducing transporting anchors into prefabricated concrete parts

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2911224A1 (en) * 1979-03-22 1980-10-02 Kind Karl Heavy natural stone block crane hanger - is inserted in plastic concrete filling in downward widening cavity from top
DE8813324U1 (en) * 1988-10-22 1988-12-15 Simo Blechverarbeitung GmbH, 7239 Epfendorf Tension anchors for prefabricated hollow core slabs
FR2712268A1 (en) * 1993-11-10 1995-05-19 Rector Sa Handling method for thin or extruded concrete products
EP0825307A1 (en) 1996-08-22 1998-02-25 Beton Son B.V. Concrete wing floor element

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2885548A1 (en) * 2005-05-10 2006-11-17 Guimard Ets Lifting and handling pin incorporating method for concrete hollow slab, involves introducing pins in each opening in slab and subjecting gripping ring of pin to rotation perpendicular to slab so that branches pass below reinforcement strand
US7992281B2 (en) 2006-07-12 2011-08-09 Elematic Group Oy Method and apparatus for attaching a lifting lug to a concrete product

Also Published As

Publication number Publication date
ES2327624T3 (en) 2009-11-02
NL1020183C2 (en) 2003-09-16
DE60327677D1 (en) 2009-07-02
EP1344877B1 (en) 2009-05-20
ATE431885T1 (en) 2009-06-15

Similar Documents

Publication Publication Date Title
CN106150001B (en) A kind of fabricated assembly overall stair construction method
KR101842474B1 (en) Reinforcement for cast in place top pile, monolithically poured top pile foundation using the same, and construction method of top pile foundation
CN109611123B (en) Tunnel secondary lining concrete pouring control system and control method
US10053833B2 (en) Pre-cast decorative retaining wall system
KR20140047118A (en) Foundation system for bridges
KR20180036061A (en) Manufacturing apparatus for concrete product by the dry method and manufacturing method for concrete product using the same
CN106320706A (en) Masonry-wall line-pipe, line-groove and line-box burying construction method
CN107268878A (en) The fabrication and installation method of prefabricated sandwich wallboard
CN109537895A (en) Method for mounting beam-slab column of cast-in-place core tube structure of assembled integral frame
CA2927834A1 (en) Thermal insulation element
US10267011B2 (en) Pre-cast decorative retaining wall system
CN109648696A (en) Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method
JP2019056286A (en) Wall construction method and wall construction structure
CN103669868B (en) The recursion cross construction method of ultra-long concrete floor structure
EP1344877B1 (en) Method for providing a hoisting hook in a prefabricated concrete element such as a hollow-core slab floor
US5074095A (en) Pre-cast concrete panel and joist assembly and method of construction
CN217353043U (en) Connecting structure of cast-in-place concrete wall and PC member wall
CN106968398A (en) A kind of process that support column is poured below balcony
AU5193398A (en) Method and apparatus for forming a concrete block
CN113149583B (en) Spliced autoclaved aerated concrete plate and preparation method thereof
KR101705310B1 (en) Precast concrete panels and precast concrete panels with cast-in-place concrete composite road paving method
US5063723A (en) Masonry inspection block
KR100550469B1 (en) Precasting member of material entrance and construction method using same
CN115711005B (en) A prefabricated box-type ribbed floor slab and its construction method
SU1009773A1 (en) Method of stuffing voids in face ends of freshly moulded floor slabs

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

17P Request for examination filed

Effective date: 20040311

AKX Designation fees paid

Designated state(s): BE DE DK FR NL

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 60327677

Country of ref document: DE

Date of ref document: 20090702

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090920

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090520

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090520

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2327624

Country of ref document: ES

Kind code of ref document: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090820

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090520

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090520

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090520

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090520

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090520

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090520

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090820

26N No opposition filed

Effective date: 20100223

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100331

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090821

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20101130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100317

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100331

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090520

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090520

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100317

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091121

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090520

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 60327677

Country of ref document: DE

Representative=s name: ARNOLD & SIEDSMA, DE

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20150305 AND 20150311

REG Reference to a national code

Ref country code: ES

Ref legal event code: PC2A

Owner name: BETONSON PREFAB B.V.

Effective date: 20150415

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 60327677

Country of ref document: DE

Representative=s name: ARNOLD & SIEDSMA, DE

Effective date: 20150312

Ref country code: DE

Ref legal event code: R081

Ref document number: 60327677

Country of ref document: DE

Owner name: BETONSON PREFAB B.V., NL

Free format text: FORMER OWNER: BETONSON PREFAB B.V., DA GOUDA, NL

Effective date: 20150414

Ref country code: DE

Ref legal event code: R082

Ref document number: 60327677

Country of ref document: DE

Representative=s name: ARNOLD & SIEDSMA, DE

Effective date: 20150414

Ref country code: DE

Ref legal event code: R081

Ref document number: 60327677

Country of ref document: DE

Owner name: BETONSON PREFAB B.V., NL

Free format text: FORMER OWNER: BETON SON B.V., SON, NL

Effective date: 20150312

REG Reference to a national code

Ref country code: NL

Ref legal event code: SD

Effective date: 20150526

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20200426

Year of fee payment: 18

Ref country code: DE

Payment date: 20200429

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20200427

Year of fee payment: 18

Ref country code: GB

Payment date: 20200427

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20200701

Year of fee payment: 18

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 60327677

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20210401

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210317

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20210331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210317

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211001

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210401

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20220523

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210318

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210331