EP1344877A1 - Method for providing a hoisting hook in a prefabricated concrete element such as a hollow-core slab floor - Google Patents
Method for providing a hoisting hook in a prefabricated concrete element such as a hollow-core slab floor Download PDFInfo
- Publication number
- EP1344877A1 EP1344877A1 EP03075766A EP03075766A EP1344877A1 EP 1344877 A1 EP1344877 A1 EP 1344877A1 EP 03075766 A EP03075766 A EP 03075766A EP 03075766 A EP03075766 A EP 03075766A EP 1344877 A1 EP1344877 A1 EP 1344877A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- concrete
- passage
- hoisting hook
- hoisting
- channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 70
- 239000000463 material Substances 0.000 claims abstract description 68
- 238000003825 pressing Methods 0.000 claims description 3
- 230000001502 supplementing effect Effects 0.000 claims description 2
- 239000004570 mortar (masonry) Substances 0.000 description 17
- 238000004873 anchoring Methods 0.000 description 6
- 238000005303 weighing Methods 0.000 description 6
- 238000007789 sealing Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 231100001261 hazardous Toxicity 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000005056 compaction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000006735 deficit Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/003—Apparatus or processes for treating or working the shaped or preshaped articles the shaping of preshaped articles, e.g. by bending
- B28B11/006—Making hollow articles or partly closed articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/005—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with anchoring or fastening elements for the shaped articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/0062—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects forcing the elements into the cast material, e.g. hooks into cast concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/142—Means in or on the elements for connecting same to handling apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/142—Means in or on the elements for connecting same to handling apparatus
- E04G21/145—Means in or on the elements for connecting same to handling apparatus specific for hollow plates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
- E04G21/3223—Means supported by building floors or flat roofs, e.g. safety railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
- E04G2021/3257—Safety or protective measures for persons during the construction of buildings against falling down specific for floors made of prefabricated hollow plates
Definitions
- the invention relates to a method for fitting a hoisting hook in a prefabricated concrete element which includes at least one channel extending substantially parallel to a surface of the concrete element, the method comprising:
- the known method is used to enable for instance a so-called hollow-core slab floor to be displaced with a hoisting device.
- Such hollow-core slab floors are frequently used in house and utility building.
- a concrete element in the form of a so-called wing slab floor such as it is described, for instance, in EP 0 825 307.
- hoisting hooks are fitted according to the known method for the purpose of displacement and stacking in the factory.
- loose uncured concrete material When using a ram, loose uncured concrete material will end up in the channel when making the passage. Preferably, with the aid of, for instance, vibrations, this is compacted and adhered to the inner walls of the channel. These vibrations can optionally be transmitted using the ram also.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Manufacturing & Machinery (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Joining Of Building Structures In Genera (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
Abstract
- placing an uncured concrete-like material (5) via a passage to the channel, in a part of the channel (3) located at least near the passage;
- placing the hoisting anchor (25) in the uncured concrete-like (5) material, characterized in that the method further comprises
- dosing the uncured concrete-like (5) material in a predetermined amount.
Description
- The invention relates to a method for fitting a hoisting hook in a prefabricated concrete element which includes at least one channel extending substantially parallel to a surface of the concrete element, the method comprising:
- placing an uncured concrete-like material, via a passage to the channel, in a part of the channel located at least near the passage;
- placing the hoisting anchor in the uncured concrete-like material.
- It is noted that the at least one channel extending substantially parallel to a concrete surface is provided in the element during the forming of the concrete element. In other words, no material needs to be removed from the concrete element for the purpose of forming such a channel.
- Such a method is known from practice.
- The known method is used to enable for instance a so-called hollow-core slab floor to be displaced with a hoisting device. Such hollow-core slab floors are frequently used in house and utility building. Also to be considered in this connection is a concrete element in the form of a so-called wing slab floor such as it is described, for instance, in EP 0 825 307. Especially in hollow-core slab floors and in a concrete element formed as a wing slab floor having width dimensions that deviate from standard width dimensions, hoisting hooks are fitted according to the known method for the purpose of displacement and stacking in the factory. To that end, especially in the case of non-standardized slabs, as a rule shortly after the forming of the concrete slab, locally openings are made in the still fresh concrete of one of the surfaces for forming the passage to one or more of the channels. Next, via the passage, in the part of the channel located adjacent the passage, a concrete-like material having a particular flowability is poured or pressed. The hoisting hook is placed in this uncured concrete-like material. These activities are performed manually and so are not sufficiently reproducible.
- A problem here is that each time after fitting a hoisting hook, it is difficult to establish to what extent the anchorage of the hoisting hook meets stated safety requirements. As a result, the slabs may only be lifted to a height such that it is clear that no one could find himself under the slab. Before such a hollow-core slab floor or different concrete element may be delivered at the site where the slab is to be assembled, it is required, according to regulations, that measures be taken to make impermissible and hazardous use of the hoisting hook during assembly impossible. This is typically done by grinding off the parts of the hoisting hook that project outside the surfaces.
- An object of the invention is to provide a method for fitting a hoisting hook in a concrete element with channels, such that the hoisting hook is anchorable in the concrete element in a manner which is safer and more reproducible compared with the known method.
- The stated object has been achieved with the method according to the invention, which is characterized in that the method further comprises the dosing of the uncured concrete-like material in a predetermined amount.
- It can be determined beforehand what amount of uncured concrete-like material is necessary to obtain an anchorage of the hoisting hook that meets safety requirements. This determination may have been done on the basis of previously performed tests with such combinations of, for instance, a hollow-core slab floor, a hoisting hook and an amount of concrete-like material for anchoring the hoisting hook. By dosing, that is, supplying the uncured concrete-like material in a predetermined amount, it is possible, for instance on the basis of the previously performed tests, to readily determine in advance whether the hoisting hook is anchorable according to the safety requirements imposed. Moreover, at least a considerable part of the method is highly reproducible.
- A further embodiment of a method according to the invention is characterized in that dosing comprises: filling a reservoir with the predetermined amount of uncured concrete-like material and completely emptying the reservoir.
- This provides the possibility of a simple check. For if the reservoir is empty, sufficient uncured concrete-like material will have been supplied for a safe anchorage of the hoisting hook. Preferably, dosing is done in an automated manner, so that a natural variation in the amount of uncured concrete-like material that accompanies human action is precluded. Dosing can be done, for instance, with the aid of a conveyor screw. Automation moreover enhances the reproducibility and hence the reliability of the method.
- A particular embodiment of the method according to the invention is characterized in that the method comprises: checking the complete emptying of the reservoir.
- This makes it possible to make sure that the uncured concrete-like material has been supplied completely and hence can end up in a part of the channel located at least near the passage. This means that the anchorage can meet the safety requirements imposed. An anchorage that meets the safety standards generally provides the advantage that the hoisting hook may also be used in the assembly and hence it is not necessary anymore, to prevent impermissible and hazardous use of the hoisting hook, to grind off the hoisting hook before it is transported from the factory to the site of assembly. When the anchorage of the hoisting hooks meets the safety requirements, the current use of hoisting clamps in general, and in particular the necessity for special hoisting means and hoisting methods for slabs deviating from, for instance, the standard width dimensions, has become redundant. Also the use of safety chains, to be fitted under the slabs and the safety clamps, can be dispensed with. This provides as an important advantage that the assembly operations can take place more readily and faster. An anchorage that meets the safety requirements imposed moreover makes it possible to use it for constructional purposes as well. To be considered here is the constructional jointing of construction parts, fixing temporary shores and safety provisions and for fixing so-called life lines of executive personnel at the moment when other provisions are still lacking.
- Preferably, the check of the complete evacuation of the reservoir takes place automatically. Thus, for instance, the reservoir may be weighed electronically. If the weight as determined after the evacuation of the reservoir is higher than the weight of the reservoir itself, it will be clear that the reservoir is not completely empty. In that case, the weighing device can produce a signal to indicate that the reservoir is not completely empty. Thereupon, measures can be taken that are aimed at preventing an unchanged progress of the fitting of the hoisting hook in the concrete element.
- In a further elaboration, accordingly, the method further comprises: automatically interrupting the placement, via the passage, of the concrete-like material and/or the placement of the hoisting anchor if the reservoir has not been evacuated completely. This provides the possibility of preventing a deficit of uncured concrete-like material being used for anchoring the hoisting anchor.
- Such an embodiment comprises in particular: if necessary, supplementing an amount of concrete-like material already evacuated from the reservoir with concrete-like material left behind in the reservoir, for enabling the predetermined amount of the concrete-like material to be placed via the passage to the channel in the part of the channel located closed to the passage.
- A method according to this embodiment leads to a guarantee with regard to, for instance, the amount of uncured concrete-like material that is received in a channel of, for instance, a hollow-core slab floor, for anchoring the hoisting hook.
- A more particular embodiment of the method according to the invention is characterized in that placing the hoisting hook in the uncured concrete-like material is done with the aid of a movable holder with which a part of the hoisting hook is detachably connected.
- Preferably, placing the hoisting hook is done automatically. Thus, for instance, the holder with the hoisting hook detachably connected thereto can be automatically suspended above a position on the surface of the concrete element so as to be displaced from there into the, or even with the, uncured concrete-like material into the channel. After placement in the uncured concrete material, the holder can be uncoupled from the hoisting hook. The holder is then reusable for placing a next hoisting hook at a different position. The hoisting hooks, albeit at mutually different positions, are all placed in the uncured concrete material in the same manner, with a same orientation. This orientation can naturally be chosen such that the anchorage thereby meets the safety requirements. When placement is automatic, reproducibility is high and hence it is possible to determine in advance that anchorage will meet the pertinent safety requirements in that regard as well.
- A particular embodiment of the method comprises: pressing the predetermined amount of the concrete-like material through a surface of the concrete element for forming the passage and for placing the uncured concrete-like material via the passage to the channel in the part of the channel located at least near the passage.
- This provides the advantage that forming the passage and placing the uncured material via the passage in the part of the channel located near the passage take place in one step. This accelerates and simplifies the fitting of the hoisting hook. The dose of the uncured material in this case is preferably predetermined such that, together with the concrete material pressed out of the surface, sufficient material is present for anchoring the hoisting anchor.
- In an alternative embodiment of the method, the passage to the channel is formed in the prefabricated concrete element when the concrete element is still uncured. Forming the passage then takes relatively little energy. Further, loose uncured concrete material produced for the purpose of making the passage, is compacted in the channel using vibrations. This improves inter alia the bonding of this concrete material with the inner walls of the channel.
- An advantageous variant of the method comprises: vibrating the holder of the hoisting hook during at least a part of the placement of the hoisting anchor in the uncured concrete-like material.
- This entails the uncured concrete material being further compacted with a relatively light pressure. This prevents, for instance, a laterally unsupported partition wall between channels being deformed. This also enhances reproducibility of the anchorage. In particular when this takes place simultaneously with the placement of the uncured concrete-like material in the part of the channel located near the passage, the method for fitting a hoisting hook, for instance in a hollow-core slab floor, can be carried out fast, simply and reliably.
- A still more advantageous variant of the method comprises: providing a constructional hoisting hook. This provides the possibility for the hook to be used additionally for assembly of the concrete element.
- Furthermore, the method may further comprise: fitting the hoisting hook in the prefabricated concrete element in such a manner that the hoisting hook is disposed wholly between the outer surfaces of the concrete element.
- This provides the advantage that it is not necessary anymore to grind off the hoisting hooks after use. The open space formed by the lugs, which space is situated between the upper part of the hoisting hook and the amount of concrete-like material provided in the channel, can, after this space has first been utilized for fitting fixing means for hoisting and/or mounting the concrete element, be further filled up with a cement-like layer which comes to lie flush with the surface of the concrete element.
- The invention will presently be elucidated with reference to a drawing. In the drawing:
- Figs. 1a, 1b and 1c show, by way of example, schematically and in cross section, an embodiment of the method according to the invention; and
- Fig. 2 shows, by way of example, in cross section a first product of the method according to the invention;
- Fig. 3 shows, by way of example, the hoisting of a product of the method according to the invention;
- Fig. 4 schematically shows an example of a concrete element formed as a wing slab floor, in which a hoisting hook can be fitted using the method according to the invention; and
- Fig. 5 shows, by way of example, in cross section, a second product of the method according to the invention.
-
- In the drawing, equal parts have been provided with equal reference characters, unless indicated otherwise.
- Fig. 1a shows a cross section of a concrete hollow-
core slab floor 1 which is provided with twoopposed surfaces 2. Situated between thesurfaces 2 arechannels 3 which extend parallel to thesurfaces 2. Fig. 1a further shows ahopper 4 which will typically be included in a mobile machine frame (not shown). In thehopper 4moist mortar 5 has been included. Disposed under thehopper 4 is a supply element, such as, for instance, theconveyor screw 6 or a conveyer belt (not shown). Fig. 1a further shows areservoir 7 that is provided with a sealingelement 9. Thereservoir 7 with the sealingelement 9 is attached to a weighingelement 8. From thehopper 4, thereservoir 7 can be filled, using theconveyor screw 6, with a predetermined amount of moist mortar. This amount can be predetermined on the basis of many factors. What plays a role here, for instance, are the dimensions of thechannels 3 and the material properties of the uncured concrete-like material, in this case the moist mortar. The desired amount can have been predetermined with the aid of calculations and/or tests. An important criterion for the prior determination in the method of the amount of moist mortar to be supplied to thereservoir 7 are the safety requirements to be met by the anchorage of the hoistinghook 25. The weighingelement 8 is preferably provided with a control element that stores a database including the predetermined amount of mortar for every current combination of the above-mentioned factors. After the data of the hollow-core slab floor 1 and, for instance, the number of hoisting hooks 25 to be fitted, have been entered in the control element, not shown, the weighingelement 8 indicates, on the basis of the database, when thereservoir 7 is filled with the requiredpredetermined amount 10. Here, timely, a signal is given to theconveyor screw 6, so that the supply of themoist mortar 5 is stopped in time. In this way, in this example, themoist mortar 5 is dosed. - Using the mobile machine frame, not shown, a guiding
chute 17 is moved along a longitudinal edge of theconcrete slab 1 to a position from where, through a displacement of the guidingchute 17 across theconcrete slab 1, the guidingchute 17 can end up above a desiredposition 20 at one of thesurfaces 2. Similarly, thereservoir 7, if necessary, is also moved across theconcrete slab 1. Upon arrival above a desired position of the guidingchute 17, the sealingelement 9 at the bottom 21 of thereservoir 7 is opened. - Fig. 1b shows a
movable holder 11 which is provided with hinging 13 and 14 to which lugs 12 are attached. A hoistingparts hook 25 is mechanically coupled in theholder 11 between the lugs 12. In the part of Fig. 1b surrounded by a broken line 22, a side elevation of theholder 11 with the hoistinghook 25 is shown. The hoistinghook 25 in this example is clamped between the hinged 13 and 14 by moving these out of a closed position, then placing the hoistingparts hook 25 between the 13 and 14 and bringing theparts 13 and 14 into the closed position again.parts - The
holder 11 with the hoistinghook 25 mechanically coupled thereto is placed above the guidingchute 17. To that end, theholder 11 may be connected with the guidingchute 17 so as to be vertically movable. The sealingelement 9 is removed from a position between thereservoir 7 and theupper side 28 of the guidingchute 17, for instance by sliding it clear. By weighing thereservoir 7 with weighingelement 8, it is checked whether all of the concrete-like material has ended up in the guidingchute 17. If necessary, the progress of the method halts and/or a signal is delivered until, for instance through manual tapping, all mortar has left thereservoir 7. The signal produced can mean, for instance, that thereservoir 7 cannot be moved away anymore. Next, the hoistinghook 25 together with the predetermined amount ofmoist mortar 10 is pressed through thesurface 2, whilst preferably theholder 11 with the hoistinghook 25 is caused to vibrate during at least a part of a downward movement, for further compacting the mortar. Theholder 11 with the hoistinghook 25 is preferably, as shown in Fig. 1c, pressed downwards so far that the hoistinghook 25 is situated preferably just below thesurface 2 and thelugs 12 of theholder 11, after uncoupling of the hoistinghook 25, leave anopen space 18 under a topmost point of the hoistinghook 25. Into thisopen space 18, a hoisting means 16 having a fixing means 26 attached thereto can be inserted for fixing a hoisting device, not shown, to the hoistinghook 25. - Fig. 2 shows a situation in which the
hoisting hook 25 fitted in theconcrete slab 1 is additionally employed for constructional purposes. Thus, the hollow-core slab floor 1 can be attached to awall part 24. Atemporary upstand 27 can optionally be attached as an edge protection. - Fig. 3 shows a situation where the concrete hollow-
core slab floor 1 which is provided with four hoisting hooks 25, is hoisted with the aid of a cross-line 16. - The prefabricated concrete element can comprise a concrete element formed as a wing slab floor 41. An example of such a shaped concrete element is shown in Fig. 4. The shape of a wing slab floor 41 is further described in EP 0 825 307. Such a wing slab floor 41 can be manufactured according to a method with which the hollow-core slab floor can also be manufactured. In that case, the concrete element formed as wing slab floor is not provided with reinforcement wires.
- In a concrete element formed as a wing slab floor that has been manufactured according to a method for manufacturing the hollow-core slab floor, a hoisting hook can likewise be provided with the aid of a method according to the invention. Fig. 4 shows analogously to Fig. 1c what a product produced according to the method may look like in that case. Fig. 4 shows a cross section of a concrete wing slab floor 41 which is provided with two
opposed surfaces 2 and two "wings" 40 which can be relatively narrow. It is also possible for the wing slab floor to be provided with just one wing which is arranged on one side of the concrete element. Thewings 40 can also "frame" the concrete element 41. On a top surface 43, in use, after assembly on the construction site, conduits are laid, whereupon a channel formed partly by the top surface 43, and a side face 44 is filled with concrete-like material for finishing and reinforcing the constructed floor. The concrete element 41 can further, as stated earlier, be in the form of a wing slab floor as described in EP 0 825 307. - Many variants on the above-discussed example are possible. For instance, in case of a thick
upper deck 29 above the channel, thebottomless guiding chute 17 can be provided with acutting edge 30 to weaken theupper deck 29 during positioning or during the downward movement of theholder 11 with the hoistinghook 25. Instead of making a passage in thesurface 2 to thechannel 3 located under thesurface 2 by pressing the concrete-like material 10 and the hoistinghook 25 through thesurface 2, it is also possible first to provide the passage and subsequently to place the predetermined amount ofmortar 10 in the passage and the part of thechannel 3 located near the passage. In this case, the concrete element may already be cured when the passage is made. Such placement can take place simultaneously with the hoistinghook 25. However, the hoistinghook 25 can also be pressed later in the uncured concrete-like material 10, such as, for instance, moist mortar. - The order of the steps does not need to be entirely as described hereinabove. For instance, as stated, first a passage can be made, which is subsequently filled with mortar. It may be advantageous to provide the passage to a channel shortly after the manufacture of the concrete element, since the concrete element is then still uncured and the provision of the passage can take relatively little energy. In that case, the passage can be formed with the aid of a means for making recesses in an uncured concrete element. Such a means can be, for instance, a ram or a piston.
- When using a ram, loose uncured concrete material will end up in the channel when making the passage. Preferably, with the aid of, for instance, vibrations, this is compacted and adhered to the inner walls of the channel. These vibrations can optionally be transmitted using the ram also.
- In that case, when determining the predetermined amount of uncured concrete-like material that is placed in the part of the channel located at least near the passage, the material having ended up in the channel for the purpose of making the passage, as well as any compaction thereof, should be taken into account.
- It is conceivable that the hoisting
hook 25 is first placed in the passage and that subsequently the mortar is placed in the passage. It is also possible that an upper side of thechannel 13 is free ofconcrete material 29. In other words, thechannel 13 is present as a kind of gutter in thesurface 2 of the concrete element. In that case, the passage is of course already present. Preferably, the passage is relatively small with respect to thechannel 3, so that through this design too, an anchoring effect can be obtained. - All these variants can be simply reduced to practice by the skilled person. The flowability and moistness of the mortar can play a critical role in determining the optimum sequence of the steps. In any case, an uncured concrete material is to be involved, which is used for anchoring the hoisting
hook 25. The moist mortar, mortar and the like fall within the term uncured concrete material. In general, this concrete material is of the same kind as the concrete material from which the concrete element has been manufactured. The use of a different type of concrete, however, is not precluded. Thus, it is possible to use a low-shrink or shrink-free concrete-like material. Even concrete-like materials that expand during curing are conceivable. - The hollow-core slab floor and the concrete element designed in the form of a wing slab floor can have any desired dimension. The number of channels can differ per slab. Also, the cross section of the channels can differ per slab. The predetermined amount of uncured concrete material that is used for anchorage of the hoisting hook is determined inter alia by the dimensions and other characteristics of the hollow-core slab floor or the concrete element designed in the form of a wing slab floor. The invention is furthermore not limited to the use in hollow-core slab floors and the concrete element designed in the form of a wing slab floor. The method can be carried out for the purpose of hoisting any prefabricated concrete element that is provided with such channels. The hoisting hook can also be provided for constructional purposes as represented in Fig. 2.
- All such variants are understood to belong to the invention.
Claims (21)
- A method for fitting a hoisting hook in a prefabricated concrete element which includes at least one channel extending substantially parallel to a surface of the concrete element, the method comprising:placing an uncured concrete-like material via a passage to the channel in a part of the channel located at least near the passage;placing the hoisting anchor in the uncured concrete-like material, characterized in that the method further comprisesdosing the uncured concrete-like material in a predetermined amount.
- A method according to claim 1, characterized in that dosing comprises:filling a reservoir with the predetermined amount of uncured concrete-like material and completely emptying the reservoir.
- A method according to claim 1 or 2, characterized in that dosing takes place in an automated manner.
- A method according to claim 2 or 3, characterized in that the method comprises:checking the complete emptying of the reservoir.
- A method according to claim 4, characterized in that the checking of the complete emptying of the reservoir takes place automatically.
- A method according to claim 5, characterized in that the method comprises:automatically interrupting the placement, via the passage, of the concrete-like material and/or the placement of the hoisting anchor if the reservoir has not been emptied completely.
- A method according to any one of claims 4-6, characterized in that the method comprises:if necessary, supplementing an amount of concrete-like material already evacuated from the reservoir, with concrete-like material left behind in the reservoir, for enabling the predetermined amount of the concrete-like material to be placed, via the passage to the channel, in the part of the channel located near the passage.
- A method according to any one of the preceding claims, characterized in that placing the hoisting hook in the uncured concrete-like material is done with the aid of a movable holder with which a part of the hoisting hook is detachably connected.
- A method according to claim 8, characterized in that the method further comprises:vibrating the holder of the hoisting hook during at least a part of the placement of the hoisting anchor in the uncured concrete-like material.
- A method according to any one of the preceding claims, characterized in that the placement of the hoisting hook takes place automatically.
- A method according to any one of the preceding claims, characterized in that the method comprises:pressing the predetermined amount of the concrete-like material through a surface of the concrete element for forming the passage and for placing the uncured concrete-like material via the passage to the channel in the part of the channel located at least near the passage.
- A method according to any one of claims 1-10, characterized in that the passage to the channel is formed in the prefabricated concrete element when the concrete element is still uncured.
- A method according to claim 12, characterized in that the passage is formed using a means for making recesses in an uncured concrete element.
- A method according to claim 13, characterized in that the means comprises a piston.
- A method according to claim 13, characterized in that the means comprises a ram.
- A method according to claim 15, characterized in that loose uncured concrete material produced for the purpose of making the passage is compacted in the channel using vibrations.
- A method according to claim 16, characterized in that the vibrations are carried out using the ram which has been caused to vibrate.
- A method according to any one of the preceding claims, characterized in that the method comprises:fitting a constructional hoisting hook.
- A method according to any one of the preceding claims, characterized in that the method further comprises:fitting the hoisting hook in the prefabricated concrete element, such that the hoisting hook is situated wholly within the outer surfaces of the concrete element.
- A method according to any one of the preceding claims, characterized in that the prefabricated concrete element comprises a hollow-core slab floor.
- A method according to any one of claims 1-19, characterized in that the prefabricated concrete element is formed as a wing slab floor.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NL1020183 | 2002-03-15 | ||
| NL1020183A NL1020183C2 (en) | 2002-03-15 | 2002-03-15 | Method for installing a lifting hook in a prefabricated concrete element such as a channel slab floor. |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP1344877A1 true EP1344877A1 (en) | 2003-09-17 |
| EP1344877B1 EP1344877B1 (en) | 2009-05-20 |
Family
ID=27764675
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP03075766A Expired - Lifetime EP1344877B1 (en) | 2002-03-15 | 2003-03-17 | Method for providing a hoisting hook in a prefabricated concrete element such as a hollow-core slab floor |
Country Status (5)
| Country | Link |
|---|---|
| EP (1) | EP1344877B1 (en) |
| AT (1) | ATE431885T1 (en) |
| DE (1) | DE60327677D1 (en) |
| ES (1) | ES2327624T3 (en) |
| NL (1) | NL1020183C2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2885548A1 (en) * | 2005-05-10 | 2006-11-17 | Guimard Ets | Lifting and handling pin incorporating method for concrete hollow slab, involves introducing pins in each opening in slab and subjecting gripping ring of pin to rotation perpendicular to slab so that branches pass below reinforcement strand |
| US7992281B2 (en) | 2006-07-12 | 2011-08-09 | Elematic Group Oy | Method and apparatus for attaching a lifting lug to a concrete product |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2911224A1 (en) * | 1979-03-22 | 1980-10-02 | Kind Karl | Heavy natural stone block crane hanger - is inserted in plastic concrete filling in downward widening cavity from top |
| DE8813324U1 (en) * | 1988-10-22 | 1988-12-15 | Simo Blechverarbeitung GmbH, 7239 Epfendorf | Tension anchors for prefabricated hollow core slabs |
| FR2712268A1 (en) * | 1993-11-10 | 1995-05-19 | Rector Sa | Handling method for thin or extruded concrete products |
| EP0825307A1 (en) | 1996-08-22 | 1998-02-25 | Beton Son B.V. | Concrete wing floor element |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3219139A1 (en) * | 1982-05-21 | 1983-11-24 | DETEC Fertigung GmbH, 6080 Groß-Gerau | Process and apparatus for introducing transporting anchors into prefabricated concrete parts |
-
2002
- 2002-03-15 NL NL1020183A patent/NL1020183C2/en not_active IP Right Cessation
-
2003
- 2003-03-17 EP EP03075766A patent/EP1344877B1/en not_active Expired - Lifetime
- 2003-03-17 ES ES03075766T patent/ES2327624T3/en not_active Expired - Lifetime
- 2003-03-17 DE DE60327677T patent/DE60327677D1/en not_active Expired - Lifetime
- 2003-03-17 AT AT03075766T patent/ATE431885T1/en not_active IP Right Cessation
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2911224A1 (en) * | 1979-03-22 | 1980-10-02 | Kind Karl | Heavy natural stone block crane hanger - is inserted in plastic concrete filling in downward widening cavity from top |
| DE8813324U1 (en) * | 1988-10-22 | 1988-12-15 | Simo Blechverarbeitung GmbH, 7239 Epfendorf | Tension anchors for prefabricated hollow core slabs |
| FR2712268A1 (en) * | 1993-11-10 | 1995-05-19 | Rector Sa | Handling method for thin or extruded concrete products |
| EP0825307A1 (en) | 1996-08-22 | 1998-02-25 | Beton Son B.V. | Concrete wing floor element |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2885548A1 (en) * | 2005-05-10 | 2006-11-17 | Guimard Ets | Lifting and handling pin incorporating method for concrete hollow slab, involves introducing pins in each opening in slab and subjecting gripping ring of pin to rotation perpendicular to slab so that branches pass below reinforcement strand |
| US7992281B2 (en) | 2006-07-12 | 2011-08-09 | Elematic Group Oy | Method and apparatus for attaching a lifting lug to a concrete product |
Also Published As
| Publication number | Publication date |
|---|---|
| ES2327624T3 (en) | 2009-11-02 |
| NL1020183C2 (en) | 2003-09-16 |
| DE60327677D1 (en) | 2009-07-02 |
| EP1344877B1 (en) | 2009-05-20 |
| ATE431885T1 (en) | 2009-06-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106150001B (en) | A kind of fabricated assembly overall stair construction method | |
| KR101842474B1 (en) | Reinforcement for cast in place top pile, monolithically poured top pile foundation using the same, and construction method of top pile foundation | |
| CN109611123B (en) | Tunnel secondary lining concrete pouring control system and control method | |
| US10053833B2 (en) | Pre-cast decorative retaining wall system | |
| KR20140047118A (en) | Foundation system for bridges | |
| KR20180036061A (en) | Manufacturing apparatus for concrete product by the dry method and manufacturing method for concrete product using the same | |
| CN106320706A (en) | Masonry-wall line-pipe, line-groove and line-box burying construction method | |
| CN107268878A (en) | The fabrication and installation method of prefabricated sandwich wallboard | |
| CN109537895A (en) | Method for mounting beam-slab column of cast-in-place core tube structure of assembled integral frame | |
| CA2927834A1 (en) | Thermal insulation element | |
| US10267011B2 (en) | Pre-cast decorative retaining wall system | |
| CN109648696A (en) | Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method | |
| JP2019056286A (en) | Wall construction method and wall construction structure | |
| CN103669868B (en) | The recursion cross construction method of ultra-long concrete floor structure | |
| EP1344877B1 (en) | Method for providing a hoisting hook in a prefabricated concrete element such as a hollow-core slab floor | |
| US5074095A (en) | Pre-cast concrete panel and joist assembly and method of construction | |
| CN217353043U (en) | Connecting structure of cast-in-place concrete wall and PC member wall | |
| CN106968398A (en) | A kind of process that support column is poured below balcony | |
| AU5193398A (en) | Method and apparatus for forming a concrete block | |
| CN113149583B (en) | Spliced autoclaved aerated concrete plate and preparation method thereof | |
| KR101705310B1 (en) | Precast concrete panels and precast concrete panels with cast-in-place concrete composite road paving method | |
| US5063723A (en) | Masonry inspection block | |
| KR100550469B1 (en) | Precasting member of material entrance and construction method using same | |
| CN115711005B (en) | A prefabricated box-type ribbed floor slab and its construction method | |
| SU1009773A1 (en) | Method of stuffing voids in face ends of freshly moulded floor slabs |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: AL LT LV MK |
|
| 17P | Request for examination filed |
Effective date: 20040311 |
|
| AKX | Designation fees paid |
Designated state(s): BE DE DK FR NL |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REF | Corresponds to: |
Ref document number: 60327677 Country of ref document: DE Date of ref document: 20090702 Kind code of ref document: P |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090920 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090520 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090520 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2327624 Country of ref document: ES Kind code of ref document: T3 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090820 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090520 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090520 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090520 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090520 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090520 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090520 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090820 |
|
| 26N | No opposition filed |
Effective date: 20100223 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100331 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090821 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20101130 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100317 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100331 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090520 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090520 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100317 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20091121 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090520 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 60327677 Country of ref document: DE Representative=s name: ARNOLD & SIEDSMA, DE |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E Free format text: REGISTERED BETWEEN 20150305 AND 20150311 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: PC2A Owner name: BETONSON PREFAB B.V. Effective date: 20150415 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 60327677 Country of ref document: DE Representative=s name: ARNOLD & SIEDSMA, DE Effective date: 20150312 Ref country code: DE Ref legal event code: R081 Ref document number: 60327677 Country of ref document: DE Owner name: BETONSON PREFAB B.V., NL Free format text: FORMER OWNER: BETONSON PREFAB B.V., DA GOUDA, NL Effective date: 20150414 Ref country code: DE Ref legal event code: R082 Ref document number: 60327677 Country of ref document: DE Representative=s name: ARNOLD & SIEDSMA, DE Effective date: 20150414 Ref country code: DE Ref legal event code: R081 Ref document number: 60327677 Country of ref document: DE Owner name: BETONSON PREFAB B.V., NL Free format text: FORMER OWNER: BETON SON B.V., SON, NL Effective date: 20150312 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: SD Effective date: 20150526 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20200426 Year of fee payment: 18 Ref country code: DE Payment date: 20200429 Year of fee payment: 18 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20200427 Year of fee payment: 18 Ref country code: GB Payment date: 20200427 Year of fee payment: 18 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20200701 Year of fee payment: 18 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 60327677 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20210401 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20210317 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20210331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210317 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211001 Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210401 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20220523 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210318 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210331 |