JPH054490B2 - - Google Patents

Info

Publication number
JPH054490B2
JPH054490B2 JP27317089A JP27317089A JPH054490B2 JP H054490 B2 JPH054490 B2 JP H054490B2 JP 27317089 A JP27317089 A JP 27317089A JP 27317089 A JP27317089 A JP 27317089A JP H054490 B2 JPH054490 B2 JP H054490B2
Authority
JP
Japan
Prior art keywords
shield machine
side wall
wall plate
shaft
underground structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP27317089A
Other languages
Japanese (ja)
Other versions
JPH03137319A (en
Inventor
Koichi Uemura
Makoto Uemura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP27317089A priority Critical patent/JPH03137319A/en
Publication of JPH03137319A publication Critical patent/JPH03137319A/en
Publication of JPH054490B2 publication Critical patent/JPH054490B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、市街地に上下水道、共同溝、受信、
電話等の布設地下道等の地下構造物を施工するオ
ープンシールド工法に関する。
[Detailed Description of the Invention] [Industrial Application Field] The present invention provides water supply and sewerage systems, public drains, reception,
Concerning the open shield construction method for constructing underground structures such as underground passages for laying telephones, etc.

〔従来の技術〕[Conventional technology]

オープンシールド工法は、開削工法(オープン
工法)とシールド工法の長所を生かした合理性に
富む工法である。
The open shield construction method is a highly rational construction method that takes advantage of the advantages of the cut-and-cover construction method (open construction method) and the shield construction method.

第5図〜第7図にその概略を示すと、図中1は
オープンシールド機で、これは左右の側壁板1
a,1bとその間を連結する底板1cからなり、
前後端面及び上面を開口したU型シールド機であ
る。
The outline is shown in Fig. 5 to Fig. 7. In the figure, 1 is an open shield machine, and this is the left and right side wall plate 1.
It consists of a, 1b and a bottom plate 1c connecting them,
It is a U-shaped shield machine with openings on the front, rear, and top surfaces.

該オープンシールド機1は推進ジヤツキ2を後
方に向けて上下に並べて配設する。図中3は、シ
ールド機1内に設けた隔壁を示す。
The open shield machine 1 has propulsion jacks 2 arranged vertically and facing rearward. 3 in the figure indicates a partition wall provided within the shield machine 1.

発進坑7内にこのシールド機1を設置し、発進
坑7の土留め支持工材8は部分的に除去してか
ら、シールド機1の前面又は上面開口より発進坑
7の前方の土砂を掘削し、かつ排土する。そし
て、スペーサー10を介在させてシールド機1の
推進ジヤツキ2を伸長して発進坑7内の反力壁9
に反力をとつてシールド機1を前進させ、この前
進分にコンクリート函体等による第1番目の地中
構造物4を上方から吊り降し、シールド機1のテ
ール部1d内で縮めた推進ジヤツキ2の後方にセ
ツトする。
This shield machine 1 is installed in the launch shaft 7, and after partially removing the earth retaining support material 8 of the launch shaft 7, earth and sand in front of the launch shaft 7 is excavated from the front or top opening of the shield machine 1. and remove soil. Then, the propulsion jack 2 of the shield machine 1 is extended with the spacer 10 interposed therebetween, and the reaction wall 9 in the launch shaft 7 is extended.
The shield machine 1 is moved forward by taking the reaction force, and the first underground structure 4 made of a concrete box or the like is suspended from above and retracted within the tail part 1d of the shield machine 1. Set it behind jack 2.

次いで、同様にシールド機1の前面又は上面か
らシヤベル、オーガ、バケツト等の掘削手段6で
土砂を掘削しかつ排土してシールド機1を前進さ
せ、前記第1番目の地中構造物4の前に第2番目
の地中構造物4を吊り降す。以下、同様の掘進及
び地中構造物4のセツト工程を繰返して、順次地
中構造物4を縦列に地中に埋設し、後方の地中構
造物4上に埋戻し5を施し、オープンシールド機
1が到達坑まで達したならばこれを撤去して工事
を完了する。
Next, earth and sand are similarly excavated from the front or upper surface of the shielding machine 1 using an excavating means 6 such as a shovel, an auger, or a bucket, and the earth is discharged to move the shielding machine 1 forward. First, the second underground structure 4 is suspended. Thereafter, the same excavation and setting process of the underground structures 4 is repeated to sequentially bury the underground structures 4 in the ground in columns, backfill 5 is applied on the rear underground structures 4, and open shielding is performed. Once Machine 1 reaches the destination shaft, it will be removed and the construction will be completed.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

第8図、第9図は前記発進坑7の詳細を示すも
のであるが、いわゆる山止め構造を採用してシー
トパイル等により壁体状とした土留め支保工材8
とH型鋼等による腹起し11や切張12で補強す
る。
FIGS. 8 and 9 show details of the starting shaft 7, and the earth retaining shoring material 8 adopts a so-called heap structure and has a wall shape made of sheet piles, etc.
Reinforce it with braces 11 and cut tensions 12 made of H-shaped steel or the like.

ところで、前記のごときオープンシールド機1
は左右側壁板1a,1bの上部は常に地上に突出
して前進するものであり、このような高さの左右
側壁板1a,1bを有するオープンシールド機1
を発進坑7内にセツトし、かつ前進させるには上
部の腹起し11や切張12はこのオープンシール
ド機1の左右側壁板1a,1b上端よりも上方に
位置させなければならず、その分αだけ土留め支
保工材8も上部を地上から突出させている。
By the way, the open shield machine 1 as mentioned above
The upper parts of the left and right side wall plates 1a and 1b always protrude above the ground and move forward, and the open shield aircraft 1 having the left and right side wall plates 1a and 1b of such height
In order to set the machine in the starting shaft 7 and move it forward, the upper riser 11 and shear 12 must be located above the upper ends of the left and right side wall plates 1a and 1b of the open shield machine 1. The upper part of the earth retaining shoring material 8 also protrudes from the ground by the amount α.

オープンシールド機1は部材を発進坑7に吊り
降ろして内部で組み立てるが、土留め支保工材8
の先端が突き出ていると、発進坑7内への人の出
入りもこれを越えなければならず面倒であるし、
発進坑7の開口に蓋をして交通の要に供すること
もできない。
The open shield machine 1 lowers the components into the launch shaft 7 and assembles them internally, but the earth retaining shoring material 8
If the tip of the starting shaft protrudes, people will have to cross over to enter and exit the starting shaft 7, which is troublesome.
It is also not possible to cover the opening of the starting shaft 7 and use it as a transportation hub.

本発明の目的は前記従来例の不都合を解消し、
発進坑を地上から上に突出しないで設けることが
できるオープンシールド工法を提供することにあ
る。
The purpose of the present invention is to eliminate the disadvantages of the conventional example,
To provide an open shield construction method in which a starting shaft can be provided without protruding above the ground.

〔課題を解決するための手段〕[Means to solve the problem]

本発明は前記の目的を達成するため、内部に推
進ジヤツキを設けた前後端及び上面を開口したシ
ールド機を発進坑内に設置して、シールド機の前
面又は上面開口より発進坑の前方の土砂を掘削排
土して、シールド機の推進ジヤツキを伸長して発
進坑内の反力壁に反力をとつてシール機を発進坑
から前進させ、コンクリート函体等による第1番
目の地中構造物を上方から吊り降してシールド機
のテール部内で縮めた推進ジヤツキの後方にセツ
トし、さらにシールド機前面又は前部上面から掘
削しかつ推進ジヤツキを伸長して第1番目の地中
構造物及び反力壁に反力をとつてシールド機を前
進させ、この前進分に新たな地中構造物を吊り降
して既設地中構造物の最前列に位置させ、以下同
様な掘削、地中構造物の設置、前進工程を繰返し
てシールド機を掘進させるオープンシールド工法
において、シールド機は左右側壁板は下部側壁板
と上部側壁板との上下の分割体で構成し、発進坑
内で腹起しや切張にかからないように下部側壁板
のみのシールド機を組立て、該シールド機の周囲
を埋戻してから腹起しや切張を撤去し、さらに下
部側壁板に上部側壁板を継足して全体を地上に突
出する高さとしてから発進坑から前進させること
を要旨とするものである。
In order to achieve the above-mentioned object, the present invention installs a shield machine with an internal propulsion jack and openings at the front and rear ends and top surface in a launch shaft, and removes earth and sand in front of the launch shaft from the front or top opening of the shield machine. After excavating and removing the earth, the shield machine's propulsion jack is extended to apply a reaction force to the reaction wall in the launch shaft, and the seal machine is advanced from the launch shaft, building the first underground structure made of concrete boxes, etc. It is suspended from above and set behind the propulsion jack that is retracted within the tail of the shield machine, and then excavated from the front or top of the front of the shield machine and the propulsion jack is extended to construct the first underground structure and reactor. The shield machine is moved forward by taking the reaction force from the force wall, and the new underground structure is lowered by this forward movement and placed in the front row of the existing underground structure. In the open shield construction method, in which the shield machine excavates by repeating the installation and advancement process, the shield machine consists of left and right side wall plates that are vertically divided into a lower side wall plate and an upper side wall plate. Assemble the shield machine with only the lower side wall plate to avoid tension, backfill the area around the shield machine, remove the uprights and shearing, and then add the upper side wall plate to the lower side wall plate and raise the whole thing above ground. The main idea is to raise the height so that it protrudes above the ground, and then move it forward from the launch shaft.

〔作用〕[Effect]

本発明によれば、発進坑内に初めにセツトする
シールド機は分割体で構成される左右側壁板が下
部側壁板で構成した低い高さのものであり、発進
坑を形成する土留め支保工材はその上端を地上に
突出しないで設け、上部の腹起しや切張もこの支
保工材の内側でシールド機の左右側壁板高さより
も上に組むことができる。
According to the present invention, the shield machine that is initially set in the starting shaft has a low height in which the left and right side wall plates composed of divided bodies are composed of the lower side wall plate, and the earth retaining shoring that forms the starting shaft is is installed so that its upper end does not protrude above the ground, and the upper part's uprights and shears can also be assembled inside this shoring material above the height of the left and right side wall plates of the shield machine.

このようにして、背の低いシールド機の側方等
の周囲を埋持せば、腹起しや切張を撤去しても支
保工材は土圧で倒れるおそれはなく、安定した状
態を保つ。
In this way, if you bury the area around the sides of a short shield machine, the shoring material will remain stable even if the uprights and shearings are removed, and there is no risk of it collapsing due to earth pressure. .

腹起しや切張の撤去後、上部をさえぎるものが
無くなるのでシールド機の左右下部側壁板に上部
側壁板を継足して全体を地上に突出する高さとし
てから、発進坑から前進させる。
After the lifting and cutting are removed, there will be nothing blocking the upper part, so the upper side wall plates will be added to the left and right lower side wall plates of the shield machine to make the whole structure project above the ground, and then it will be advanced from the launch shaft.

〔実施例〕〔Example〕

以下、図面について本発明の実施例を詳細に説
明する。
Embodiments of the present invention will be described in detail below with reference to the drawings.

先に本発明のオープンシールド工法で使用する
オープンシールド機1について述べると、第4図
に示すようにオープンシールド機1は、左右の側
壁板1a,1bはその先端を断面三角形状の刃口
2を含めて上部側壁板1a2,1b2と下部側壁板1
a1,1b1の上下の分割体の結合として構成するよ
うにする。これら上部側壁板1a2,1b2と下部側
壁板1a1,1b1との結合方法は種々考えられる
が、ブラケツト13や当板を設けてボルト止めす
るのが一例である。
First, the open shield machine 1 used in the open shield construction method of the present invention will be described. As shown in FIG. Including upper side wall plate 1a 2 , 1b 2 and lower side wall plate 1
Construct it as a combination of the upper and lower parts of a 1 and 1b 1 . There are various ways to connect the upper side wall plates 1a 2 and 1b 2 and the lower side wall plates 1a 1 and 1b 1 , but one example is to provide a bracket 13 or a contact plate and fasten them with bolts.

さらに、隔壁3もこれらの側壁板に合わせて上
下に分割できるようにする。
Furthermore, the partition wall 3 can also be divided into upper and lower parts according to these side wall plates.

その他の構成は従来例と同じであり、図示は省
略するが、第5図〜第7図に示すように内部に推
進ジヤツキを設け、左右の下部側壁板1a1,1b1
はその間を底板1cで連結し、前後端面及び上面
を開口したU型シールド機である。
Other configurations are the same as the conventional example, and although not shown, a propulsion jack is provided inside as shown in FIGS. 5 to 7, and the left and right lower side wall plates 1a 1 , 1b 1
This is a U-shaped shield machine with a bottom plate 1c connecting the two, and openings at the front and rear end faces and the top face.

次に、前記オープンシールド機1を用いた本発
明のオープンシールド工法について説明する。
Next, the open shield construction method of the present invention using the open shield machine 1 will be explained.

第1図〜第3図は本発明工法の工程を示すもの
で、発進坑7は従来と同じく山止め構造を採用し
てシートパイル等により壁体状とした土留め支保
工材8とH型鋼等による腹起し11や切張12で
補強するが、土留め支保工材8の上端は地上ライ
ンとして上方に突出しないようにする。
Figures 1 to 3 show the steps of the construction method of the present invention, in which the starting shaft 7 adopts the same structure as the conventional one, and is made of earth retaining shoring material 8 made of sheet piles etc. into a wall shape, and H-shaped steel. The upper end of the earth retaining shoring material 8 should not protrude upward as a ground line.

そして、この土留め支保工材8の内側で上端付
近に腹起し11や切張12を設けた。
Then, on the inside of this earth retaining shoring material 8, a bulge 11 and a shear 12 are provided near the upper end.

このように発進坑7を形成し、その内部で組立
セツトするオープンシールド機1は、第1図に示
すように左右の側壁板は下部側壁板1a1,1b1
みとし、腹起し11や切張12の高さよりも背の
低いものとする。
The open shield machine 1, which has the starting shaft 7 formed in this way and is assembled and set inside thereof, has only the left and right side wall plates 1a 1 and 1b 1 , as shown in FIG. The height shall be lower than the height of the cut bar 12.

次いで、第2図に示すようにオープンシールド
機1の下部側壁板1a1,1b1の外側と土留め支保
工材8との間を初めとして所要の周囲に土砂を埋
戻す。
Next, as shown in FIG. 2, earth and sand is backfilled around the required area, including the area between the outside of the lower side wall plates 1a 1 and 1b 1 of the open shield machine 1 and the earth retaining shoring material 8.

それから、腹起し11や切張12を撤去する
が、前記埋戻し14があるので土留め支保工材8
は土圧を受けてもこの埋戻し14とシールド機1
で支えられ倒れるおそれはなく安定した状態を保
つ。
Then, the uprights 11 and cut-offs 12 are removed, but since the backfill 14 is present, the earth retaining shoring material 8
Even if subjected to earth pressure, this backfill 14 and shield machine 1
It maintains a stable condition with no risk of falling due to support.

腹起し11や切張12の撤去後、上部をさえぎ
るものが無くなるのでシールド機1の左右下部側
壁板1a1,1b1に上部側壁板1a2,1b2を継足し
て全体を地上に突出する高さとしてから、シール
ド機1の前方の土留め支保工材8を除去し、発進
坑7から発進させる。
After removing the trundle 11 and the cut bar 12, there will be nothing blocking the upper part, so add the upper side wall plates 1a 2 and 1b 2 to the left and right lower side wall plates 1a 1 and 1b 1 of the shield machine 1 and project the whole thing above the ground. After the height is reached, the earth retaining shoring material 8 in front of the shield machine 1 is removed and the shield machine 1 is launched from the launch shaft 7.

この発進は、シールド機1の前面又は上面開口
より発進坑7の前方の土砂を掘削し、かつ排土す
る。そして、スペサー(図示せず)を介在させて
シールド機1の推進ジヤツキ2を伸長して発進坑
7内の反力壁(図示せず)に反力をとつてシール
ド機1を前進させ、この前進分にコンクリート函
体等による第1番目の地中構造物を上方から吊り
降し、シールド機1のテール部1d内で縮めた推
進ジヤツキの後方にセツトする。
During this starting, earth and sand in front of the starting shaft 7 is excavated and removed from the front or top opening of the shield machine 1. Then, the propulsion jack 2 of the shield machine 1 is extended through a spacer (not shown), and a reaction force is applied to the reaction wall (not shown) in the launch shaft 7 to advance the shield machine 1. During the forward movement, the first underground structure made of a concrete box or the like is suspended from above and set behind the propulsion jack that has been retracted within the tail portion 1d of the shield machine 1.

次いで、同様にシールド機1の前面又は上面か
らシヤベル、オーガ、バケツト等の掘削手段で土
砂を掘削しかつ排土してシールド機1を前進さ
せ、前記第1番目の地中構造物の前に第2番目の
地中構造物を吊り降す。
Next, earth and sand are similarly excavated from the front or upper surface of the shielding machine 1 using excavating means such as a shovel, an auger, a bucket, etc., and the earth is discharged, and the shielding machine 1 is moved forward and placed in front of the first underground structure. Lower the second underground structure.

このようにシールド機1が発進坑7から完全に
出たならば、以下、従来の工程と同じく掘進及び
地中構造物のセツト工程を繰返して、順次地中構
造物4を縦列に地中に埋設し、後方の地中構造物
4上に埋戻し5を施し、オープンシールド機1が
到達坑まで達したならばこれを撤去して工事を完
了する。
Once the shield machine 1 has completely come out of the launch shaft 7, the steps of digging and setting the underground structures are repeated in the same way as in the conventional process, and the underground structures 4 are sequentially placed vertically into the ground. The tunnel is buried, backfilling 5 is performed on the underground structure 4 at the rear, and when the open shield machine 1 reaches the reaching shaft, it is removed and the construction is completed.

〔発明の効果〕〔Effect of the invention〕

以上述べたような本発明のオープンシールド工
法は、発進坑を地上から上に突出しないで設ける
ことができるので、材料費も減少するとともに、
発進坑内への人の出入りも楽になり、発進坑の開
口に蓋をして交通の要に供することなどもできる
ものである。
In the open shield construction method of the present invention as described above, the starting shaft can be installed without protruding above the ground, so the material cost is reduced, and
It also makes it easier for people to go in and out of the starting shaft, and the opening of the starting shaft can be covered and used as a transportation hub.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第3図は本発明のオープンシールド工
法の1実施例を示す各工程の縦断正面図、第4図
は使用するオープンシールド機の斜視図、第5
図、第6図はオープンシールド工法の一般例を示
す縦断側面図、第7図は同上横断平面図、第8図
は従来の発進坑の平面図、第9図は同上縦断側面
図である。 1……オープンシールド機、1a,1b……側
壁板、1a1,1b1……下部側壁板、1a2,1b2
…上部側壁板、1c……底板、1d……テール
部、2……推進ジヤツキ、3……隔壁、4……地
中構造物、5……埋戻し、6……掘削手段、7…
…発進坑、8……土留め支保工材、9……反力
壁、10……スペーサー、11……腹起し、12
……切張、13……ブラケツト、14……埋戻
し。
Figures 1 to 3 are longitudinal sectional front views of each process showing one embodiment of the open shield construction method of the present invention, Figure 4 is a perspective view of the open shield machine used, and Figure 5 is a perspective view of the open shield machine used.
6 is a vertical side view showing a general example of the open shield construction method, FIG. 7 is a cross-sectional plan view of the same, FIG. 8 is a plan view of a conventional starting shaft, and FIG. 9 is a vertical side view of the same. 1...Open shield machine, 1a, 1b...Side wall plate, 1a 1 , 1b 1 ...Lower side wall plate, 1a 2 , 1b 2 ...
... Upper side wall plate, 1c ... Bottom plate, 1d ... Tail section, 2 ... Propulsion jack, 3 ... Partition wall, 4 ... Underground structure, 5 ... Backfill, 6 ... Excavation means, 7 ...
... Starting shaft, 8 ... Earth retaining shoring material, 9 ... Reaction wall, 10 ... Spacer, 11 ... Raise, 12
...Kirihari, 13...Bracket, 14...Backfill.

Claims (1)

【特許請求の範囲】[Claims] 1 内部に推進ジヤツキを設けた前後端及び上面
を開口したシールド機を発進坑内に設置して、シ
ールド機の前面又は上面開口より発進坑の前方の
土砂を掘削排土して、シールド機の推進ジヤツキ
を伸長して発進坑内の反力壁に反力をとつてシー
ルド機を発進坑から前進させ、コンクリート函体
等による第1番目の地中構造物を上方から吊り降
してシールド機のテール部内で縮めた推進ジヤツ
キの後方にセツトし、さらにシールド機前面又は
前部上面から掘削しかつ推進ジヤツキを伸長して
第1番目の地中構造物及び反力壁に反力をとつて
シールド機を前進させ、この前進分に新たな地中
構造物を吊り降して既設地中構造物の最前列に位
置させ、以下同様な掘削、地中構造物の設置、前
進工程を繰返してシールド機を掘進させるオープ
ンシールド工法において、シールド機は左右側壁
板は下部側壁板と上部側壁板との上下の分割体で
構成し、発進坑内で腹起しや切張にかからないよ
うに下部側壁板のみのシールド機を組立て、該シ
ールド機の周囲を埋戻してから腹起しや切張を撤
去し、さらに下部側壁板に上部側壁板を継足して
全体を地上に突出する高さとしてから発進坑から
前進させることを特徴としたオープンシールド工
法。
1. A shield machine with internal propulsion jacks and openings at the front and rear ends and top is installed in the launch shaft, and earth and sand in front of the launch shaft is excavated and removed from the front or top opening of the shield machine to propel the shield machine. The shield machine is advanced from the launch shaft by extending the jack and absorbing the reaction force on the reaction wall in the launch shaft, and the first underground structure made of a concrete box is lowered from above and the tail of the shield machine is lifted. It is set behind the propulsion jack that has been retracted inside the shield machine, and is further excavated from the front or top of the front part of the shield machine, and the propulsion jack is extended to take the reaction force to the first underground structure and the reaction wall, and the shield machine The shield machine is moved forward, and a new underground structure is lowered to the front of the existing underground structure. In the open shield construction method for excavating a tunnel, the shield machine consists of left and right side wall plates divided into upper and lower parts, a lower side wall plate and an upper side wall plate, and only the lower side wall plate is used to avoid upheaving or shearing in the starting hole. After assembling the shield machine, backfilling the area around the shield machine, removing the uprights and shearing, and adding the upper side wall plate to the lower side wall plate to make the entire structure protrude above the ground, from the starting shaft. Open shield construction method characterized by forward movement.
JP27317089A 1989-10-20 1989-10-20 Open shield construction method Granted JPH03137319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27317089A JPH03137319A (en) 1989-10-20 1989-10-20 Open shield construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27317089A JPH03137319A (en) 1989-10-20 1989-10-20 Open shield construction method

Publications (2)

Publication Number Publication Date
JPH03137319A JPH03137319A (en) 1991-06-11
JPH054490B2 true JPH054490B2 (en) 1993-01-20

Family

ID=17524075

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27317089A Granted JPH03137319A (en) 1989-10-20 1989-10-20 Open shield construction method

Country Status (1)

Country Link
JP (1) JPH03137319A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5351125B2 (en) * 2010-10-28 2013-11-27 誠 植村 Open shield machine start method of open shield method
AU2012325674B2 (en) * 2011-10-19 2017-08-31 Paul Breen Shoring box system and method

Also Published As

Publication number Publication date
JPH03137319A (en) 1991-06-11

Similar Documents

Publication Publication Date Title
GB1561053A (en) Construction of concrete walls
KR100289256B1 (en) Tunnel construction method in shallow toffee area
JP3194192B2 (en) Open shield method
US4875807A (en) Method and means for basement construction
JPH054490B2 (en)
JPH0762436B2 (en) Open shield method
JP7597777B2 (en) Method of entering the vertical shaft of an open shield machine in the open shield construction method
JPH0249896A (en) Open shield method and machine thereof
JPS6117696A (en) Construction of underground head
JP3766423B2 (en) Retaining wall construction method
JPS6018769B2 (en) Construction method of underground structure
JP3302661B2 (en) Open shield machine and construction method of underground structure using it
JPS5851092B2 (en) Earth retaining installation method using advance shoring frame
JP2587309B2 (en) Protective structure of concrete underground structure and its construction method
JP7595329B1 (en) Construction method of guide tunnel and steel protective shelter structure
JP3041434B2 (en) Open shield method
JPH041811B2 (en)
JPH0575880B2 (en)
JPS6016535B2 (en) How to form retaining walls and underground walls
JPS6317999B2 (en)
JP2673940B2 (en) How to build a horizontal plate-like structure in the ground
JP2026060281A (en) Open shield aircraft and its assembly method
JPS58199925A (en) Construction of underground wall and underground foundation pile with brace
JPS5921831A (en) Reverse placement work
JPH05140940A (en) Soil retaining method for deep drilling

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 15

Free format text: PAYMENT UNTIL: 20080120

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090120

Year of fee payment: 16

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 17

Free format text: PAYMENT UNTIL: 20100120

EXPY Cancellation because of completion of term