JPH0681577A - Device for drilling deep pile shaft and drilling method using thereof - Google Patents

Device for drilling deep pile shaft and drilling method using thereof

Info

Publication number
JPH0681577A
JPH0681577A JP25202092A JP25202092A JPH0681577A JP H0681577 A JPH0681577 A JP H0681577A JP 25202092 A JP25202092 A JP 25202092A JP 25202092 A JP25202092 A JP 25202092A JP H0681577 A JPH0681577 A JP H0681577A
Authority
JP
Japan
Prior art keywords
guide pipe
vertical shaft
shaft
machine frame
excavator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP25202092A
Other languages
Japanese (ja)
Other versions
JP3303115B2 (en
Inventor
Satoru Omori
了 大森
Toshitsugu Horisaki
敏嗣 堀崎
Atsunori Numata
淳紀 沼田
Tetsuya Kawamura
哲也 川村
Toshiharu Saegusa
俊治 三枝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tobishima Corp
Original Assignee
Tobishima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tobishima Corp filed Critical Tobishima Corp
Priority to JP25202092A priority Critical patent/JP3303115B2/en
Publication of JPH0681577A publication Critical patent/JPH0681577A/en
Application granted granted Critical
Publication of JP3303115B2 publication Critical patent/JP3303115B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

(57)【要約】 【目的】 ガイドパイプ昇降装置を小型化でき、同一敷
地内の複数の立坑を施工時には当該装置の解体、組立お
よび再設置の必要をなくして移動可能とする。 【構成】 立坑施工位置に設置する機枠1,6にガイド
パイプ保持装置aとガイドパイプ昇降装置bとを架設
し、そのガイドパイプ昇降装置bによってガイドパイプ
3を垂直に懸架するとともに、これの内側を上下動して
立坑5a〜5fの底面中心部33を先行掘削する重力式
バケット掘削機14を設け、上記ガイドパイプ3の外周
に上記立坑5a〜5fの内壁面を掘削する全旋回式掘削
装置16を旋回自在に装備し、上記重力式バケット掘削
機14と同様にガイドパイプ3の内側を上下動し、該ガ
イドパイプ3の先端から下方に突出して掘削された立坑
5a〜5fの内壁面にモルタルまたはコンクリートを吹
き付けて土留めを行う吹付マニピュレータ25を設けた
ものである。
(57) [Summary] [Purpose] A guide pipe lifting device can be miniaturized and can be moved without the need for disassembling, assembling, and re-installing multiple vertical shafts on the same site. [Structure] A guide pipe holding device a and a guide pipe elevating device b are installed on machine frames 1 and 6 installed at a vertical shaft construction position, and the guide pipe elevating device b suspends the guide pipe 3 vertically. A gravity bucket excavator 14 that moves up and down inside to vertically excavate the bottom center portion 33 of the shafts 5a to 5f is provided, and a full swing excavation that excavates the inner wall surface of the shafts 5a to 5f on the outer periphery of the guide pipe 3. An inner wall surface of the vertical shafts 5a to 5f which is equipped with a device 16 so as to be rotatable, vertically moves inside the guide pipe 3 in the same manner as the gravity type bucket excavator 14, and protrudes downward from the tip of the guide pipe 3. Further, a spray manipulator 25 for spraying mortar or concrete to retain the soil is provided.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、深礎立坑の掘削・排
土(坑外への搬出)・土留めを順次繰り返し行う深礎立
坑施工装置とそれを使用した施工方法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a deep pit shaft construction apparatus for sequentially excavating, unloading earth (exporting to the outside of the pit) and retaining soil, and a construction method using the same.

【0002】[0002]

【従来の技術】従来、立坑施工装置として、例えば、特
開平4−153495号公報に記載のものがある。この
立坑施工装置は、地上に設けたケーシングパイプ駆動装
置に、先端に掘削用の刃先を有するケーシングパイプを
支持するとともに、そのケーシングパイプの先端より所
定距離を隔てた上部位置に該ケーシングパイプの回りの
地盤を掘削する掘削機を設け、さらにこの掘削機より上
部位置に掘削した坑壁にモルタルやコンクリート等のラ
イニングを施す吹付装置を備えたものである。
2. Description of the Related Art Conventionally, as a vertical shaft construction device, for example, there is one described in JP-A-4-153495. This shaft construction device supports a casing pipe having a cutting edge for excavation at a casing pipe driving device provided on the ground, and surrounds the casing pipe at an upper position separated by a predetermined distance from the casing pipe tip. An excavator for excavating the ground is provided and a spraying device for lining mortar, concrete or the like on the excavated wall at a position higher than the excavator.

【0003】このように構成された立坑施工装置は、ケ
ーシングパイプ駆動装置を作動させてケーシングパイプ
を一方向に回転運動させ、その先端の刃先で地盤を先行
掘削し、一定深度掘進する毎に、土中に貫入した先端と
ケーシングパイプ駆動装置に支持される基端とでケーシ
ングパイプを固定した状態で、上記掘削機を操作してケ
ーシングパイプの回りの地盤を掘削し、発生した掘削土
砂をケーシングパイプを通して坑外へ排出する作業をす
るとともに、ケーシングパイプの回りの掘削面の土留め
をモルタルまたはコンクリートを吹き付けて行うもの
で、この手順を繰り返して立坑を施工する。
In the shaft construction device thus constructed, the casing pipe drive is operated to rotate the casing pipe in one direction, and the tip of the shaft excavates the ground in advance, and each time a certain depth is dug, With the casing pipe fixed with the tip penetrating into the soil and the base end supported by the casing pipe drive, the excavator is operated to excavate the ground around the casing pipe, and the excavated soil generated is casing. The work is to discharge it through the pipe to the outside of the mine, and the excavation surface around the casing pipe is earthed by spraying mortar or concrete. This procedure is repeated to construct a shaft.

【0004】[0004]

【発明が解決しようとする課題】上記した従来の立坑施
工装置を掘削位置に設置するには、先ずケーシングパイ
プ駆動装置によりケーシングパイプを土中に圧入し、そ
の状態でケーシングパイプ駆動装置を一旦撤去し、その
周囲の初期掘削を掘削機と吹付装置とを取付けられる深
さまで行って当該掘削機と吹付装置とを取付け、さらに
地上に突出しているケーシングパイプにケーシングパイ
プ駆動装置を再度取付けていたために、その設置に手間
取るのみならず、掘削機と吹付装置とをケーシングパイ
プに取付けるには初期掘削を比較的深く行う必要があっ
た。
In order to install the above-described conventional shaft construction device at the excavation position, first, the casing pipe driving device is used to press the casing pipe into the soil, and in that state, the casing pipe driving device is once removed. However, because the initial excavation around it was carried out to a depth where the excavator and the spraying device could be attached, the excavator and the spraying device were attached, and the casing pipe drive device was attached again to the casing pipe protruding above the ground. In addition to the time-consuming installation, the initial excavation had to be carried out relatively deeply in order to attach the excavator and the spraying device to the casing pipe.

【0005】また、ケーシングパイプ駆動装置はケーシ
ングパイプの回転用および昇降用に供するものであるの
で、その構造が非常に大規模となる。
Further, since the casing pipe drive device is used for rotating and raising and lowering the casing pipe, its structure becomes very large.

【0006】さらに、同一敷地内に複数の立坑を施工す
る場合であっても、各立坑毎に装置全体の解体、組立お
よび上記設置を繰り返し行う必要があった。
Further, even when a plurality of vertical shafts are constructed on the same site, it is necessary to repeatedly disassemble and assemble the entire apparatus and install the above-mentioned vertical shafts.

【0007】吹付装置が掘削機上部に固定されているた
め、掘削終了後その部分に吹付を行うまでにかなりの時
間差が生じ、その間の掘削面の安定に問題がある。
Since the spraying device is fixed to the upper part of the excavator, there is a considerable time difference between the end of excavation and the spraying of the part, and there is a problem in stability of the excavated surface during that time.

【0008】この発明の目的は、ガイドパイプ昇降装置
を小型化でき、さらに同一敷地内に複数の立坑を施工す
る場合には当該装置の解体、組立および再設置の必要が
なく、そのまま移動して使用できるようにした深礎立坑
施工装置とそれを使用した施工方法を提供することにあ
る。
An object of the present invention is to reduce the size of the guide pipe elevating device, and when constructing a plurality of vertical shafts in the same site, it is not necessary to disassemble, assemble and re-install the device, and the device can be moved as it is. An object is to provide a deep foundation shaft construction device that can be used and a construction method using the same.

【0009】[0009]

【課題を解決するための手段】この発明に係る施工装置
は、立坑施工位置に設置する機枠1,6にガイドパイプ
保持装置aとガイドパイプ昇降装置bとを架設し、その
ガイドパイプ昇降装置bによってガイドパイプ3を垂直
に懸架するとともに、これの内側を上下動して立坑5の
底面中心部33を先行掘削する重力式バケット掘削機1
4を設け、上記ガイドパイプ3の外周に上記立坑5の内
壁面を掘削する全旋回式掘削装置16を旋回自在に装備
し、掘削終了後は全旋回式掘削装置を上昇させ、上記重
力式バケット掘削機14と同様にガイドパイプ3の内側
を上下動し、該ガイドパイプ3の先端から下方に突出し
て掘削された立坑5の内壁面にモルタルまたはコンクリ
ートを吹き付けて速やかに土留めを行う吹付マニピュレ
ータ25を設けたものである。
In the construction apparatus according to the present invention, a guide pipe holding device a and a guide pipe lifting device b are installed on machine frames 1 and 6 installed at a vertical shaft construction position, and the guide pipe lifting device is installed. Gravity bucket excavator 1 that vertically suspends the guide pipe 3 by b and moves up and down inside the guide pipe 3 to excavate the bottom center portion 33 of the vertical shaft 5 in advance.
4 is provided, and a full swing excavator 16 for excavating the inner wall surface of the vertical shaft 5 is provided on the outer circumference of the guide pipe 3 so as to be rotatable, and after completion of excavation, the full swing excavator is raised to move the gravity bucket. A spray manipulator that moves up and down inside the guide pipe 3 similarly to the excavator 14 and sprays mortar or concrete on the inner wall surface of the vertical shaft 5 that is projected downward from the tip of the guide pipe 3 to quickly earth-retain it. 25 is provided.

【0010】複数の立坑施工位置の周囲に敷設されるレ
ール4,4上を転動する車輪7,7をリフト装置8,8
を介して垂設し、そのリフト装置8,8は、車輪7,7
を持ち上げることによって、上記機枠1,6を立坑施工
位置の地表面に直接設置するとともに、車輪7,7を上
記レール4,4上に降すことによって上記機枠1,6を
地表面から浮上させ移動可能にするようにしてなるもの
である。
Wheels 7 and 7 rolling on rails 4 and 4 laid around a plurality of vertical shaft construction positions are provided with lift devices 8 and 8.
And the lift devices 8 and 8 are installed on the wheels 7 and 7.
The machine frames 1 and 6 are directly installed on the ground surface at the vertical shaft construction position by lifting the wheel, and the machine frames 1 and 6 are moved from the ground surface by lowering the wheels 7 and 7 on the rails 4 and 4. It is designed to float and move.

【0011】上記ガイドパイプ昇降装置bは、ガイドパ
イプ3を把持する把持部材9を昇降させるガイドパイプ
昇降ジャッキ10と、このガイドパイプ昇降ジャッキ1
0を水平スライドさせるスライドジャッキ12とからな
るとともに、上記機枠1,6が、上記ガイドパイプ昇降
装置bに懸架されたガイドパイプ3の心だしを行う複数
個のガイドシリンダー13……を放射状に架設してなる
ものである。
The guide pipe elevating device b is a guide pipe elevating jack 10 for elevating and lowering a holding member 9 for holding the guide pipe 3, and the guide pipe elevating jack 1.
0 is horizontally slid, and the machine frames 1 and 6 radially guide a plurality of guide cylinders 13 for centering the guide pipe 3 suspended by the guide pipe lifting device b. It is constructed by erection.

【0012】この発明に係る施工方法は、地上に設置し
た機枠に支持したガイドパイプ昇降装置bに垂直に懸架
したガイドパイプ3の先端を立坑5の掘削底面に接地固
定すること、そのガイドパイプ3内を上下動する重力式
バケット掘削機14により立坑5の底面中心部33を先
行掘削するとともに排土すること、上記ガイドパイプ3
の外周で旋回する全旋回式掘削装置16により立坑5の
内面周辺部を掘削し、その掘削土を既に掘削した上記底
面中心部33に集土し、それを上記重力式バケット掘削
機14で排土すること、上記ガイドパイプ3内を上下動
し、該ガイドパイプ3の先端から下方に突出して掘削さ
れた立坑5の内壁面にモルタルまたはコンクリートを吹
き付けて土留めを行うこと、からなる。
In the construction method according to the present invention, the tip of the guide pipe 3 vertically suspended by the guide pipe elevating device b supported on the machine frame installed on the ground is grounded and fixed to the excavated bottom surface of the vertical shaft 5, and the guide pipe is fixed. 3. The gravity type bucket excavator 14 which moves up and down in the inside 3 to excavate the bottom center part 33 of the vertical shaft 5 in advance and to discharge the soil.
The inner peripheral portion of the shaft 5 is excavated by the all-swing excavator 16 that swivels around the outer periphery of the shaft, and the excavated soil is collected in the bottom center portion 33 that has already been excavated, and the excavated soil is discharged by the gravity bucket excavator 14. Soiling is carried out by vertically moving in the guide pipe 3 and spraying mortar or concrete on the inner wall surface of the vertical shaft 5 which is protruded downward from the tip of the guide pipe 3 to carry out earth retaining.

【0013】上記ガイドパイプ昇降装置bを支持した機
枠1,6を複数の立坑施工位置の周囲に敷設したレール
4,4に沿って次順位の立坑施工位置に移動し、当該位
置で立坑施工を行うこと。
The machine frames 1 and 6 supporting the guide pipe lifting device b are moved to the next vertical shaft construction position along the rails 4 and 4 laid around a plurality of vertical shaft construction positions, and the vertical shaft construction is carried out at the positions. To do.

【0014】[0014]

【作用】地上に設置した機枠に支持したガイドパイプ昇
降装置に垂直に懸架したガイドパイプの先端を立坑の掘
削底面に接地固定し、重力式バケット掘削機を上記ガイ
ドパイプ内を上下動させることにより立坑の底面中心部
の先行掘削と排土ができる。
[Operation] A tip of a guide pipe vertically suspended by a guide pipe lifting device supported on a machine frame installed on the ground is grounded and fixed to an excavation bottom surface of a vertical shaft, and a gravity bucket excavator is vertically moved in the guide pipe. This allows for pre-excavation and soil removal in the center of the bottom of the shaft.

【0015】上記ガイドパイプの外周に旋回自在に全旋
回式掘削装置を設けたことにより立坑の内面周辺部を掘
削できるとともに、その掘削土を既に掘削した上記底面
中心部に集土し、それを上記重力式バケット掘削機で排
土することができる。
By providing a fully swivel excavator which can swivel around the outer circumference of the guide pipe, it is possible to excavate the peripheral portion of the inner surface of the shaft, and collect the excavated soil in the center portion of the already excavated bottom surface. The gravity bucket excavator can be used for soil removal.

【0016】上記ガイドパイプを引上げ、該ガイドパイ
プの先端から下方に吹付マニピュレータを突出させるこ
とにより掘削された立坑の内壁面にモルタルまたはコン
クリートを吹き付けて速やかに土留めを行うことができ
る。
By pulling up the guide pipe and projecting the spraying manipulator downward from the tip of the guide pipe, mortar or concrete can be sprayed on the inner wall surface of the excavated vertical shaft to quickly carry out earth retaining.

【0017】複数の立坑施工位置の周囲に敷設されるレ
ール上を転動する車輪をリフト装置を介して垂設し、そ
のリフト装置により車輪を持ち上げることによって、上
記機枠を立坑施工位置の地表面に直接設置させ、また車
輪を上記レール上に降すとともに機枠を浮上することに
よって、その機枠を移動させることができる。
Wheels rolling on rails laid around a plurality of vertical shaft construction positions are hung vertically via a lift device, and the wheels are lifted by the lift device, whereby the machine frame is grounded at the vertical shaft construction position. The machine frame can be moved by placing it directly on the surface, or by lowering the wheels on the rails and by levitating the machine frame.

【0018】上記機枠に複数個のガイドシリンダーを放
射状に架設することにより上記ガイドパイプ昇降装置に
懸架されたガイドパイプの心だしを行うことができる。
By radially mounting a plurality of guide cylinders on the machine frame, it is possible to center the guide pipe suspended by the guide pipe elevating device.

【0019】[0019]

【実施例】以下、この発明の実施例を図面を参照して説
明する。図において、aは図示を省略したパワーショベ
ルなどで表層部を掘削し、これを補強して根固めした立
坑施工位置に設置されるガイドパイプ保持装置である。
このガイドパイプ保持装置aは下側の機枠1に対して左
右一対のガイドパイプ挾持杆2,2を同じくガイドパイ
プ保持ジャッキ2a,2aにより開閉スライド可能に設
置してなり、そのガイドパイプ保持杆2,2はガイドパ
イプ3をX軸水平方向から挾持する。
Embodiments of the present invention will be described below with reference to the drawings. In the figure, a is a guide pipe holding device which is installed at a vertical shaft construction position where the surface layer portion is excavated by a power shovel (not shown) and the root portion is reinforced and solidified.
In this guide pipe holding device a, a pair of left and right guide pipe holding rods 2 are installed on the lower machine frame 1 so as to be opened and closed by guide pipe holding jacks 2a and 2a. Reference numerals 2 and 2 hold the guide pipe 3 from the horizontal direction of the X axis.

【0020】4,4は、例えば図9に示すように同一敷
地内に複数の立坑5a〜5fを掘削する場合に、その各
立坑5a〜5fの両側に位置するところに敷設したレー
ルである。6はガイドパイプ保持装置aの機枠1に重合
設置した上側の機枠で、この機枠6には旋回可能な車輪
7,7がリフト装置8,8を介して設けられている。上
記車輪7,7は通常リフト装置8,8によってレール
4,4の上方に吊り上げられ、ガイドパイプ保持装置a
が上記立坑設置位置の地表面に直接設置される。しか
し、リフト装置8,8を作動することによって、車輪
7,7をレール4,4上に降すとともに、機枠1を地表
面から浮上させることができる。
When a plurality of vertical shafts 5a to 5f are to be excavated in the same site, for example, as shown in FIG. 9, 4 and 4 are rails laid on both sides of each vertical shaft 5a to 5f. Reference numeral 6 denotes an upper machine frame which is superposed on the machine frame 1 of the guide pipe holding device a, and wheels 7 and 7 which can be turned are provided on the machine frame 6 through lift devices 8 and 8. The wheels 7 and 7 are usually lifted above the rails 4 and 4 by the lift devices 8 and 8 and the guide pipe holding device a
Is installed directly on the ground surface at the vertical shaft installation position. However, by operating the lift devices 8 and 8, the wheels 7 and 7 can be lowered onto the rails 4 and 4, and the machine casing 1 can be floated above the ground surface.

【0021】bは機枠6に設置したガイドパイプ昇降装
置で、このガイドパイプ昇降装置bはガイドパイプ3を
把持する把持部材9,9をZ軸方向に昇降させるガイド
パイプ昇降ジャッキ10,10を収納したガイドパイプ
昇降マスト11,11、そのガイドパイプ昇降マスト1
1,11をY軸方向に水平スライドさせるスライドジャ
ッキ12,12により構成されている。なお、ガイドパ
イプ3はガイドパイプ昇降装置bから垂直に懸架され、
その先端には掘削土を集土する切欠部3aが穿設されて
いる。
Reference numeral b is a guide pipe lifting device installed on the machine frame 6. The guide pipe lifting device b is provided with guide pipe lifting jacks 10 for lifting the gripping members 9, 9 holding the guide pipe 3 in the Z-axis direction. The stored guide pipe lifting masts 11, 11 and the guide pipe lifting masts 1
It is composed of slide jacks 12 and 12 that horizontally slide 1 and 11 in the Y-axis direction. The guide pipe 3 is suspended vertically from the guide pipe lifting device b,
A cutout portion 3a for collecting excavated soil is provided at the tip thereof.

【0022】13……は、ガイドパイプ3をガイドパイ
プ保持装置aのX軸スライド方向とガイドパイプ昇降装
置bのY軸スライド方向との交点となる中心にガイドパ
イプ3の中心を合わせるのに使用するガイドシリンダー
で、このガイドシリンダー13……は基端を機枠6に取
付けてガイドパイプ3を放射方向から支持する。
13 ... is used to align the center of the guide pipe 3 with the center of the intersection of the X-axis sliding direction of the guide pipe holding device a and the Y-axis sliding direction of the guide pipe lifting device b. The guide cylinder 13 has a base end attached to the machine frame 6 to support the guide pipe 3 from the radial direction.

【0023】14は図2に示すようにガイドパイプ3内
を案内されて地山の掘削および掘削土を坑外に搬出する
のに使用する重力式バケット掘削機で、この重力式バケ
ット掘削機14はクレーン装置15を巻き上げ、巻き下
げ操作することにより立坑5aのガイドパイプ3内を先
行掘削する。
As shown in FIG. 2, reference numeral 14 denotes a gravity type bucket excavator that is used to guide the inside of the guide pipe 3 to excavate the ground and to carry the excavated soil out of the mine. Winds up and lowers the crane device 15 to perform pre-excavation in the guide pipe 3 of the vertical shaft 5a.

【0024】16は、立坑5aの内面周辺部の掘削、そ
の集土および内壁面の整形などを行うのに使用する回転
式掘削機17やブレーカ18などをそれぞれ揺動シリン
ダー17a,18aおよび伸縮アーム17b,18bに
より取付けて、ガイドパイプ3の回りに旋回自在に架設
した全旋回式掘削装置である。なお、全旋回式掘削装置
16には多種多様な地質に対応するため、ショベル系掘
削機や削岩機などを適宜選択装備できるようになってい
る。
Reference numeral 16 denotes a rotary excavator 17 and a breaker 18 used for excavating the inner peripheral portion of the vertical shaft 5a, collecting the soil and shaping the inner wall surface thereof, respectively, by rocking cylinders 17a, 18a and a telescopic arm. It is a full swing excavator which is attached by 17b and 18b and is installed so as to swing freely around the guide pipe 3. The full-swing excavator 16 can be equipped with a shovel excavator, a rock drill, or the like as appropriate in order to cope with a wide variety of geology.

【0025】19は全旋回式掘削装置16をガイドパイ
プ3の回りに旋回させるための回転駆動装置である。2
0,20はガイドパイプ3を立坑5a〜5f内に垂直に
支持するために設けた一対のグリッパー装置で、このグ
リッパー装置20,20はグリッパー板20a,20a
とグリッパー用伸縮シリンダー20b,20bとで構成
されている(図6)。
Reference numeral 19 denotes a rotary drive device for rotating the full-swing excavator 16 around the guide pipe 3. Two
Reference numerals 0 and 20 denote a pair of gripper devices provided to vertically support the guide pipe 3 in the vertical shafts 5a to 5f. The gripper devices 20 and 20 are gripper plates 20a and 20a.
And gripper telescopic cylinders 20b, 20b (FIG. 6).

【0026】21,21は立坑5a〜5fの内面周辺部
の掘削および土留めなどの坑内作業監視用のTVカメラ
で、このTVカメラ21,21は全旋回式掘削装置16
に取付けられている。22はTVカメラ21,21によ
り撮影した作業現場を映すTVモニタ、23は機枠6に
設置され、マンゲージ24をガイドパイプ3内に案内昇
降させる昇降設備である(図5)。
Reference numerals 21 and 21 are TV cameras for monitoring underground work such as excavation and earth retaining around the inner surfaces of the vertical shafts 5a to 5f. The TV cameras 21 and 21 are all-swivel type excavator 16
Installed on. Reference numeral 22 is a TV monitor showing the work site photographed by the TV cameras 21 and 21, and reference numeral 23 is an elevating equipment installed in the machine frame 6 to guide and elevate the mangage 24 into the guide pipe 3 (FIG. 5).

【0027】25は立坑5a〜5fの内壁の土留めをす
るのに使用する吹付マニピュレータで、この吹付マニピ
ュレータ25は吹付材料ホース26、吹付用回転装置2
7および吹付ノズルを揺動する吹付用揺動装置28など
で構成されている。29は吹付マニピュレータ25をガ
イドパイプ3に固定させるための吹付用グリッパーで、
この吹付用グリッパー29はグリッパー板をグリッパー
用伸縮シリンダーにより進退させる構成である(図
4)。
Reference numeral 25 is a spraying manipulator used for earth retaining of the inner walls of the vertical shafts 5a to 5f. The spraying manipulator 25 is a spraying material hose 26 and a spraying rotating device 2.
7 and a spray rocking device 28 for rocking the spray nozzle. 29 is a spraying gripper for fixing the spraying manipulator 25 to the guide pipe 3,
The spraying gripper 29 has a structure in which the gripper plate is moved forward and backward by the gripper telescopic cylinder (FIG. 4).

【0028】30はガイドパイプ保持ジャッキ2a、ガ
イドパイプ昇降ジャッキ10、スライドジャッキ12な
どの各油圧装置の駆動源である油圧ユニット、31は換
気装置である。
Reference numeral 30 is a hydraulic unit which is a drive source of each hydraulic device such as the guide pipe holding jack 2a, the guide pipe lifting jack 10 and the slide jack 12, and 31 is a ventilation device.

【0029】32は全旋回式掘削装置16をガイドパイ
プ3に吊設する旋回ベアリング装置で、この旋回ベアリ
ング装置32は、全旋回式掘削装置16側に一体に設け
られたベアリング旋回外輪32aとガイドパイプ3側に
一体に設けられたベアリング旋回内輪32bとの間にベ
アリング鋼球32cを介入させるとともに、ベアリング
旋回外輪32aに回転駆動装置19のピニオン19aを
噛合している。
Reference numeral 32 denotes a slewing bearing device for suspending the full slewing excavator 16 on the guide pipe 3, and the slewing bearing device 32 includes a bearing slewing outer ring 32a integrally provided on the side of the full slewing excavator 16 and a guide. A bearing steel ball 32c is interposed between a bearing swirling inner ring 32b integrally provided on the pipe 3 side, and a pinion 19a of a rotary drive device 19 is meshed with the bearing swirling outer ring 32a.

【0030】上記構成の立坑施工装置は、当該立坑施工
位置に以下のように設置され、立坑の掘削を行う。すな
わち、最初の立坑施工位置に機枠1を設置し、その機枠
1にガイドパイプ保持装置aを設置するとともに、機枠
6を載置し、その機枠6にガイドパイプ昇降装置bを設
置する。
The vertical shaft construction device having the above-mentioned structure is installed at the vertical shaft construction position as follows, and excavates the vertical shaft. That is, the machine frame 1 is installed at the first vertical shaft construction position, the guide pipe holding device a is installed on the machine frame 1, the machine frame 6 is placed, and the guide pipe lifting device b is installed on the machine frame 6. To do.

【0031】一方、ガイドパイプ3の外周所定位置に全
旋回式掘削装置16およびグリッパー装置20、TVカ
メラ21,21を装備する。
On the other hand, the full swing excavator 16, the gripper device 20, and the TV cameras 21 and 21 are installed at predetermined positions on the outer circumference of the guide pipe 3.

【0032】そして、ガイドパイプ3をガイドシリンダ
ー13……によって案内させながらガイドパイプ昇降装
置bから垂直に懸架させ、グリッパー装置20によりガ
イドパイプ3の先端側の位置を立坑5aの中心に対して
調整しながら,その先端を掘削底面に接地させる。
Then, the guide pipe 3 is vertically suspended from the guide pipe elevating device b while being guided by the guide cylinders 13 ... And the position of the tip end side of the guide pipe 3 is adjusted by the gripper device 20 with respect to the center of the vertical shaft 5a. Meanwhile, the tip is grounded to the bottom of the excavation.

【0033】これによって、ガイドパイプ3は、その上
部基端と下部基端とがガイドパイプ昇降装置bと掘削底
面との間に固定される。そこでまず、中心先行掘削を次
のようにして行う。すなわち、ガイドパイプ3を案内と
して、その内側をクレーン装置15により高速で、しか
も安定した状態で重力式バケット掘削機14を上下させ
ることによって、立坑5aの底面中心部33を所要深さ
先行掘削し、その掘削土を坑外に搬出し、掘削自由面3
4を形成する(図2,3)。
As a result, the upper end and the lower end of the guide pipe 3 are fixed between the guide pipe lifting device b and the excavation bottom surface. Therefore, first, the center leading excavation is performed as follows. That is, the guide pipe 3 is used as a guide, and the inside of the guide pipe 3 is vertically moved at a high speed and in a stable state by vertically moving the gravity bucket excavator 14 to excavate the bottom surface central portion 33 of the vertical shaft 5a to a predetermined depth. , The excavated soil is carried out of the mine, and the excavation free surface 3
4 is formed (FIGS. 2 and 3).

【0034】次に、全旋回式掘削装置16に装備された
TVカメラ21,21により回転式掘削機17およびブ
レーカ18による作業状況を写し、地上に設置されたT
Vモニタ22により監視し、これに基づいて地上からの
遠隔操作により回転式掘削機17あるいはブレーカ18
の作動を適宜制御しながら、立坑5aの内面周辺部の掘
削を行い、掘削土を先行掘削された底面中心部33に集
土する。
Next, the work status of the rotary excavator 17 and the breaker 18 is photographed by the TV cameras 21 and 21 equipped on the full swing excavator 16, and the T installed on the ground.
It is monitored by the V monitor 22, and based on this, the rotary excavator 17 or the breaker 18 is remotely operated from the ground.
While appropriately controlling the operation of (1), the inner peripheral portion of the vertical shaft 5a is excavated, and the excavated soil is collected in the central portion 33 of the bottom surface previously excavated.

【0035】そして、底面中心部33に集土した掘削土
を、ガイドパイプ3の内側に沿って重力式バケット掘削
機14を繰り返し、上げ下げして坑外に搬出、すなわち
排土する。
Then, the excavated soil collected in the central portion 33 of the bottom surface is repeatedly moved up and down along the inner side of the guide pipe 3 by the gravity bucket excavator 14 to be carried out to the outside of the mine, that is, to be discharged.

【0036】そののち、土留めを施工する位置までガイ
ドパイプ3を引き上げてグリッパー装置20によりこれ
を立坑5aの内壁に固定させる。そして、周辺部掘削時
と同様に地上からの遠隔操作で、吹付マニピュレータ2
5をガイドパイプ3の先端より突出させるとともに、そ
の内面に吹付用グリッパー29で固定させ、かつ掘削し
た立坑5aの内壁面に図4に示すごとくコンクリート3
5またはモルタルを吹き付けて土留めを行う。
After that, the guide pipe 3 is pulled up to a position where earth retaining works are to be carried out, and is fixed to the inner wall of the vertical shaft 5a by the gripper device 20. Then, as in the case of excavating the peripheral part, the spray manipulator 2 can be remotely operated from the ground.
5 is projected from the tip of the guide pipe 3 and is fixed to the inner surface of the guide pipe 3 by a spraying gripper 29, and the concrete 3 as shown in FIG.
5 or mortar is sprayed for earth retaining.

【0037】立坑5aの内壁面の土留めが完了したのち
は、ガイドパイプ3より吹付マニピュレータ25を抜取
り、再度ガイドパイプ3の先端を掘削底面に接地させ、
その内側を重力式バケット掘削機14を進行させて立坑
5aの底面中心部33を先行掘削する。
After the earth retaining on the inner wall surface of the vertical shaft 5a is completed, the spraying manipulator 25 is removed from the guide pipe 3, and the tip of the guide pipe 3 is again grounded to the excavated bottom surface.
The gravitational bucket excavator 14 is advanced on the inner side thereof to excavate the bottom center portion 33 of the vertical shaft 5a in advance.

【0038】このような掘削、排土、土留め作業サイク
ルの継続は、ガイドパイプ昇降ジャッキ10を繰り返し
伸縮させ、かつスライドジャッキ12とガイドパイプ保
持ジャッキ2aとを交互に作動させてガイドパイプ3を
把持するとともに、その上昇・下降を行い、さらに必要
に応じてクレーン装置15でガイドパイプ3の継ぎ足し
を行い、所定の支持地盤まで施工する。
To continue such a cycle of excavation, earth removal and earth retaining work, the guide pipe elevating jack 10 is repeatedly expanded and contracted, and the slide jack 12 and the guide pipe holding jack 2a are alternately actuated to move the guide pipe 3. While gripping, ascending / descending of the guide pipe 3, and if necessary, the crane pipe 15 is added to the guide pipe 3 to construct a predetermined supporting ground.

【0039】支持地盤付近の硬岩掘削時は、図示を省略
した重錘の落下によってクラックを生じさせたり、ブレ
ーカ18で岩盤を破砕したり、図示を省略した削岩機に
よって削孔を穿設したのち、人力による破砕剤の注入あ
るいは発破の充填によって岩盤破砕を行う。そして、前
記と同様に、全旋回式掘削装置16によって立坑5aの
底面中心部33へ掘削土を集土したのち、重力式バケッ
ト掘削機14によりこれを坑外に搬出して行う。
When excavating hard rock near the supporting ground, cracks are caused by dropping a weight (not shown), the rock is crushed by a breaker 18, and a drilling hole is drilled by a rock drill (not shown). After that, the rock is crushed by manually injecting a crushing agent or filling the blast. Then, similarly to the above, after the excavated soil is collected in the central portion 33 of the bottom surface of the vertical shaft 5a by the full swing excavator 16, the gravity type bucket excavator 14 carries the excavated soil out of the mines.

【0040】発破作業時には、ガイドパイプ保持装置a
と、ガイドパイプ昇降装置bにより全旋回式掘削装置1
6、グリッパー装置20およびTVカメラ21,21が
装着されたガイドパイプ3を所要の安全位置まで上昇退
避させる。
During the blasting work, the guide pipe holding device a
With the guide pipe lifting device b, the full swing excavator 1
6. The guide pipe 3 on which the gripper device 20 and the TV cameras 21 and 21 are mounted is lifted and retracted to a required safety position.

【0041】また、計画どおりの立坑5aの掘削および
土留め完了後には、ガイドパイプ保持装置aとガイドパ
イプ昇降装置bとにより全旋回式掘削装置16、グリッ
パー装置20およびTVカメラ21,21を装着したま
まガイドパイプ3を引上げ、これを図1に示す設置状態
に戻す。
After the vertical shaft 5a is excavated and earth retaining is completed as planned, the full swing excavator 16, the gripper device 20, and the TV cameras 21, 21 are mounted by the guide pipe holding device a and the guide pipe lifting device b. The guide pipe 3 is pulled up as it is and returned to the installed state shown in FIG.

【0042】図9に示すように同一敷地内で複数の立坑
5a〜5fを施工する場合は、リフト装置8,8を伸張
させて車輪7,7をレール4,4上に降すとともに機枠
1を地表面から浮上させ、装置全体をレール4,4に沿
って次の立坑施工位置まで移動させ、その位置におい
て、リフト装置8,8を収縮して車輪7,7をレール
4,4から浮き上がらせ、機枠1を当該施工位置の地表
面に接地定着し、再度前記同様の立坑掘削作業を行う。
When constructing a plurality of vertical shafts 5a to 5f on the same site as shown in FIG. 9, the lifting devices 8 and 8 are extended to lower the wheels 7 and 7 onto the rails 4 and 4 and the machine frame. 1 is levitated from the ground surface, and the entire device is moved along rails 4 and 4 to the next vertical shaft construction position. At that position, the lift devices 8 and 8 are contracted to move wheels 7 and 7 from rails 4 and 4. The machine frame 1 is lifted, and the machine frame 1 is grounded and fixed on the ground surface at the construction position, and the same vertical shaft excavation work is performed again.

【0043】なお、昇降設備23によりガイドパイプ3
内をマンゲージ24を上下動させることにより図5に示
すように地上と掘削底面との間で人員を昇降させること
ができる。
The guide pipe 3 is lifted by the lifting equipment 23.
By moving the mangage 24 up and down inside, the personnel can be moved up and down between the ground and the excavation bottom as shown in FIG.

【0044】上記において、底面中心部33の外周の内
面周辺部の掘削は、ガイドパイプ3の上部基端をガイド
パイプ昇降装置bに支持し、また下部先端を掘削底面に
垂直に接地させて、そのガイドパイプ3に装架した全旋
回式掘削装置16によって行うので、特に立坑5a〜5
fの内壁面の施工精度を向上させることができるもの
で、この場合、既設の土留めコンクリート35に反力を
とる必要がないから、その土留めコンクリート35を損
傷するような恐れがない。
In the above, when excavating the inner peripheral portion of the outer periphery of the bottom center portion 33, the upper base end of the guide pipe 3 is supported by the guide pipe elevating device b, and the lower end is grounded vertically to the excavated bottom surface. Since it is carried out by the full swing excavator 16 mounted on the guide pipe 3, the vertical shafts 5a-5
The construction accuracy of the inner wall surface of f can be improved. In this case, since it is not necessary to apply a reaction force to the existing earth retaining concrete 35, there is no fear of damaging the earth retaining concrete 35.

【0045】また、立坑5a〜5fの内面周辺部と底面
中心部とがガイドパイプ3によって仕切られているた
め、全旋回式掘削装置16による立坑5a〜5fの内面
周辺部の掘削および掘削土の底面中心部33への集土と
底面中心部33の重力式バケット掘削機14による排土
とを同時に施工可能となり、立坑5a〜5f内の掘削土
を坑外へ搬出する処理能率が向上する。
Further, since the guide pipe 3 partitions the inner peripheral portion of the vertical shafts 5a to 5f from the central portion of the bottom surface, the excavation of the inner peripheral portion of the vertical shafts 5a to 5f by the all-swivel excavator 16 and the excavated soil are excavated. It is possible to simultaneously construct the soil collection to the bottom surface central portion 33 and the soil discharge by the gravity type bucket excavator 14 of the bottom surface central portion 33, and the processing efficiency of carrying out the excavated soil in the vertical shafts 5a to 5f to the outside of the shaft is improved.

【0046】ガイドパイプ3の外周に装備された全旋回
式掘削装置16およびガイドパイプ3内に装備された吹
付マニピュレータ25を、TVモニタ22を監視しなが
ら地上から遠隔操作することにより坑内の狭隘な空間で
の人力作業に起因する苦渋作業が排除でき、作業の安全
性が向上する。
The full-swing excavator 16 mounted on the outer circumference of the guide pipe 3 and the spray manipulator 25 mounted on the guide pipe 3 are remotely controlled from the ground while monitoring the TV monitor 22, thereby narrowing the inside of the mine. The labor-intensive work caused by manual work in the space can be eliminated, and the work safety is improved.

【0047】[0047]

【発明の効果】以上の説明から明らかなように、この発
明には、次のような効果がある。地上に設置した機枠に
支持したガイドパイプ昇降装置に垂直に懸架したガイド
パイプの先端を立坑の掘削底面に接地固定し、重力式バ
ケット掘削機を上記ガイドパイプ内を上下動させるよう
にしたので、立坑の施工精度、施工速度とも向上し、か
つ立坑の底面中心部を先行掘削し掘削自由面を作ること
により立坑の内面周辺部の掘削効率を向上させることが
できる。
As is apparent from the above description, the present invention has the following effects. Since the tip of the guide pipe suspended vertically by the guide pipe lifting device supported on the machine frame installed on the ground was grounded and fixed to the excavation bottom of the vertical shaft, the gravity bucket excavator was moved up and down in the guide pipe. The construction accuracy and the construction speed of the shaft can be improved, and the excavation efficiency around the inner surface of the shaft can be improved by forming the free surface for excavating the center of the bottom surface of the shaft in advance.

【0048】上記ガイドパイプの外周に旋回自在に全旋
回式掘削装置を設けたことにより立坑の内面周辺部を掘
削できるとともに、その掘削土を既に掘削した上記底面
中心部に集土し、そのとき同時にそれを上記重力式バケ
ット掘削機で排土することにより立坑掘削排土の施工能
率を向上させることができる。
By providing an all-rotation type excavating device which can freely rotate on the outer circumference of the guide pipe, the inner peripheral portion of the shaft can be excavated, and the excavated soil is collected in the already excavated bottom central portion. At the same time, by excavating it by the gravity type bucket excavator, it is possible to improve the construction efficiency of shaft excavation and excavation.

【0049】上記ガイドパイプを引上げ、該ガイドパイ
プの先端から下方に吹付マニピュレータを突出させ、掘
削された立坑の内壁面にモルタルまたはコンクリートを
吹き付けて土留めを行うことができるようにしたため、
その土留めを立坑の掘削底面至近位置まで施工でき、掘
削内壁面を速やかに安定した状態にできる。
Since the guide pipe is pulled up, the spraying manipulator is projected downward from the tip of the guide pipe, and mortar or concrete can be sprayed on the inner wall surface of the excavated shaft for earth retaining.
The earth retaining works can be constructed up to the position near the bottom of the excavation of the vertical shaft, and the inner wall surface of the excavation can be promptly stabilized.

【0050】複数の立坑施工位置の周囲に敷設されるレ
ール上に車輪を降しかつそれによって機枠を地表面から
浮上でき、ガイドパイプ昇降装置によりガイドパイプを
引上げることができるので、レールを敷設しているかぎ
り本装置全体を次順位の立坑施工位置へそのまま移動で
きるもので、従来装置のように各立坑毎に装置全体を解
体したり組み立てたりする必要がない。
Since the wheels can be lowered onto the rails laid around a plurality of vertical shaft construction positions and thereby the machine frame can be floated from the ground surface, and the guide pipe can be pulled up by the guide pipe lifting device, As long as it is laid, the entire device can be moved to the next vertical shaft construction position as it is, and there is no need to disassemble or assemble the entire device for each vertical shaft as in the conventional device.

【0051】上記機枠に複数個のガイドシリンダーを放
射状に架設することにより上記ガイドパイプ昇降装置に
懸架されたガイドパイプの心だしを行うことができるの
で、ガイドパイプを正確に垂下でき、垂直方向の掘削精
度の確保が容易である。
Since the guide pipes suspended by the guide pipe elevating device can be centered by radially arranging a plurality of guide cylinders on the machine frame, the guide pipes can be hung accurately, and the vertical direction can be improved. It is easy to secure excavation accuracy.

【0052】また、この発明は、立坑の底面中心部の先
行掘削を重力式バケット掘削機で行うもので、ガイドパ
イプを回転させてその先端刃先で行うものではないから
ガイドパイプを回転させる機構を必要としない。このた
め、ガイドパイプ昇降装置を、その構成を簡単にしてか
つ小型化できるというメリットがある。
Further, according to the present invention, the preceding excavation of the central portion of the bottom surface of the vertical shaft is performed by the gravity type bucket excavator, and the guide pipe is not rotated by the tip edge of the guide pipe, so a mechanism for rotating the guide pipe is provided. do not need. Therefore, there is an advantage that the structure of the guide pipe lifting device can be simplified and downsized.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明に係る深礎立坑施工装置の一実施例を
示し、ガイドパイプ昇降装置を立坑施工位置に設置する
時の縦断面図である。
FIG. 1 is a vertical cross-sectional view showing an embodiment of a deep foundation shaft arranging device according to the present invention when a guide pipe lifting device is installed at a shaft arranging position.

【図2】同上の立坑の底面中心部を先行掘削する時の縦
断面図である。
FIG. 2 is a vertical cross-sectional view when the center of the bottom surface of the shaft is excavated in advance.

【図3】同上の立坑の内面周辺部を掘削する時の縦断面
図である。
FIG. 3 is a vertical cross-sectional view when excavating the peripheral portion of the inner surface of the vertical shaft.

【図4】同上の立坑の内壁面の土留めを行う時の縦断面
図である。
FIG. 4 is a vertical cross-sectional view when earth retaining of the inner wall surface of the vertical shaft is performed.

【図5】同上の立坑に作業員を昇降させる時の縦断面図
である。
FIG. 5 is a vertical cross-sectional view when a worker is moved up and down on the same vertical shaft.

【図6】同上の立坑にガイドパイプを固定するグリッパ
ー装置を示す横断面図である。
FIG. 6 is a cross-sectional view showing a gripper device for fixing the guide pipe to the vertical shaft.

【図7】同上のガイドパイプに装備される全旋回式掘削
装置を示す縦断面図である。
FIG. 7 is a vertical cross-sectional view showing a full-swivel excavator mounted on the above guide pipe.

【図8】図7の回転駆動装置の部分拡大縦断面図であ
る。
8 is a partially enlarged vertical sectional view of the rotary drive device of FIG.

【図9】複数の立坑施工位置の周囲に敷設されたレール
に載置されるガイドパイプ昇降装置を示す概略平面図で
ある。
FIG. 9 is a schematic plan view showing a guide pipe lifting device mounted on a rail laid around a plurality of vertical shaft construction positions.

【図10】同上のガイドパイプ昇降装置を示す平面図で
ある。
FIG. 10 is a plan view showing the above guide pipe lifting device.

【図11】同上のガイドパイプ保持装置を示す平面図で
ある。
FIG. 11 is a plan view showing the above guide pipe holding device.

【符号の説明】[Explanation of symbols]

a ガイドパイプ保持装置 b ガイドパイプ昇降装置 1 機枠 3 ガイドパイプ 4 レール 5a〜5f 立坑 6 機枠 7 車輪 8 リフト装置 9 把持部材 10 ガイドパイプ昇降ジャッキ 12 スライドジャッキ 13 ガイドシリンダー 14 重力式バケット掘削機 16 全旋回式掘削装置 25 吹付マニピュレータ 33 底面中心部 35 コンクリート a guide pipe holding device b guide pipe lifting device 1 machine frame 3 guide pipe 4 rails 5a to 5f vertical shaft 6 machine frame 7 wheels 8 lift device 9 gripping member 10 guide pipe lifting jack 12 slide jack 13 guide cylinder 14 gravity bucket excavator 16 Full-swivel excavator 25 Spray manipulator 33 Bottom center 35 Concrete

───────────────────────────────────────────────────── フロントページの続き (72)発明者 川村 哲也 東京都千代田区三番町2番地 飛島建設株 式会社内 (72)発明者 三枝 俊治 東京都千代田区三番町2番地 飛島建設株 式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Tetsuya Kawamura 2 Sanbancho, Chiyoda-ku, Tokyo, Tobishima Construction Co., Ltd. (72) Inventor Shunji Saegusa 2 Sanbancho, Chiyoda-ku, Tokyo Tobishima Construction Co., Ltd. Within

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 立坑施工位置に設置する機枠にガイドパ
イプ保持装置とガイドパイプ昇降装置とを架設するとと
もに、そのガイドパイプ昇降装置によって垂直に懸架さ
れるガイドパイプの内側を上下動して立坑の底面中心部
を先行掘削する重力式バケット掘削機と、上記ガイドパ
イプの外周に旋回自在に装備され、上記立坑の内面周辺
部を掘削する全旋回式掘削装置と、上記重力式バケット
掘削機と同様にガイドパイプの内側を上下動し、該ガイ
ドパイプの先端から下方に突出して掘削された立坑の内
壁面にモルタルまたはコンクリートを吹き付けて土留め
を行う吹付マニピュレータとを備えてなることを特徴と
する深礎立坑施工装置。
1. A vertical shaft is constructed by installing a guide pipe holding device and a guide pipe lifting device on a machine frame installed at a vertical shaft construction position, and vertically moving inside a guide pipe suspended vertically by the guide pipe lifting device. Gravity bucket excavator that excavates the center of the bottom surface of the front, and a fully swivel excavator that is swivelly mounted on the outer periphery of the guide pipe and excavates the inner peripheral portion of the shaft, and the gravity bucket excavator. Similarly, a spraying manipulator that vertically moves inside the guide pipe and sprays mortar or concrete onto the inner wall surface of the vertical shaft that projects downward from the tip of the guide pipe to perform earth retaining is provided. Deep foundation shaft construction equipment.
【請求項2】 上記機枠が、複数の立坑施工位置の周囲
に敷設されるレール上を転動する車輪をリフト装置を介
して垂設し、そのリフト装置が、車輪を持ち上げること
によって、上記機枠を立坑施工位置の地表面に直接設置
するとともに、車輪を上記レール上に降しかつ上記機枠
を地表面から浮上させ移動可能にするようにしてなるこ
とを特徴とする請求項1記載の深礎立坑施工装置。
2. The machine frame vertically hangs wheels that roll on rails laid around a plurality of vertical shaft construction positions via a lift device, and the lift device lifts the wheels, whereby 2. The machine frame is directly installed on the ground surface at the vertical shaft construction position, and the wheels are lowered onto the rails and the machine frame is floated from the ground surface so as to be movable. Deep foundation shaft construction equipment.
【請求項3】 上記ガイドパイプ昇降装置が、ガイドパ
イプを把持する把持部材を昇降させるガイドパイプ昇降
ジャッキと、この昇降ジャッキを水平スライドさせるス
ライドジャッキとからなるとともに、上記機枠が、上記
ガイドパイプ昇降装置に懸架されたガイドパイプの心だ
しを行う複数のガイドシリンダーを放射状に架設してな
ることを特徴とする請求項1または請求項2記載の深礎
立坑施工装置。
3. The guide pipe elevating device comprises a guide pipe elevating jack for elevating and lowering a grip member for grasping the guide pipe, and a slide jack for horizontally sliding the elevating jack, and the machine frame comprises the guide pipe. The deep foundation shaft arranging device according to claim 1 or 2, wherein a plurality of guide cylinders for centering a guide pipe suspended by the elevating device are radially installed.
【請求項4】地上に設置した機枠に支持したガイドパイ
プ昇降装置に垂直に懸架したガイドパイプの先端を立坑
の掘削底面に接地固定すること、そのガイドパイプ内を
上下動する重力式バケット掘削機により立坑の底面中心
部を先行掘削するとともに排土すること、上記ガイドパ
イプの外周で旋回する全旋回式掘削装置により立坑の内
面周辺部を掘削し、その掘削土を既に掘削した上記底面
中心部に集土し、それを上記重力式バケット掘削機で排
土すること、上記ガイドパイプ内を上下動し、該ガイド
パイプの先端から下方に突出して掘削された立坑の内壁
面にモルタルまたはコンクリートを吹き付けて土留めを
行うこと、を特徴とする深礎立坑施工方法。
4. A gravity-type bucket excavation in which the tip of a guide pipe vertically suspended by a guide pipe lifting device supported on a machine frame installed on the ground is grounded and fixed to the excavation bottom of a vertical shaft, and the guide pipe moves up and down. Machine excavates the center of the bottom of the shaft in advance and removes the soil, and excavates the periphery of the inner surface of the shaft with a full-swing type excavator that rotates around the outer circumference of the guide pipe. Gravel on the inner wall of the shaft and excavate it by the gravity bucket excavator, move up and down in the guide pipe, and project mortar or concrete on the inner wall surface of the shaft excavated downward from the tip of the guide pipe. A method for constructing a deep foundation shaft, which is characterized by spraying soil to keep the soil.
【請求項5】ガイドパイプ昇降装置を支持した機枠を複
数の立坑施工位置の周囲に敷設したレールに沿って次順
位の立坑施工位置に移動し、当該位置で立坑施工を行う
ことを特徴とする請求項4記載の深礎立坑施工方法。
5. A machine frame supporting a guide pipe lifting device is moved to a vertical shaft construction position of a next order along a rail laid around a plurality of vertical shaft construction positions, and vertical shaft construction is performed at the positions. The method for constructing a deep foundation shaft according to claim 4.
JP25202092A 1992-08-28 1992-08-28 Underground shaft construction equipment Expired - Fee Related JP3303115B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25202092A JP3303115B2 (en) 1992-08-28 1992-08-28 Underground shaft construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25202092A JP3303115B2 (en) 1992-08-28 1992-08-28 Underground shaft construction equipment

Publications (2)

Publication Number Publication Date
JPH0681577A true JPH0681577A (en) 1994-03-22
JP3303115B2 JP3303115B2 (en) 2002-07-15

Family

ID=17231474

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25202092A Expired - Fee Related JP3303115B2 (en) 1992-08-28 1992-08-28 Underground shaft construction equipment

Country Status (1)

Country Link
JP (1) JP3303115B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9297137B2 (en) 2012-08-30 2016-03-29 Bauer Maschinen Gmbh Guide frame for guiding a cutting apparatus
CN108756888A (en) * 2018-07-25 2018-11-06 中铁工程装备集团有限公司 A kind of minor diameter hard rock shaft excavation machine
CN116163735A (en) * 2023-03-23 2023-05-26 中铁广州工程局集团市政环保工程有限公司 Curve jacking pipe construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101487650B1 (en) * 2014-07-04 2015-01-29 주식회사 삼안 Barge and boring excavation device separated marine boring system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9297137B2 (en) 2012-08-30 2016-03-29 Bauer Maschinen Gmbh Guide frame for guiding a cutting apparatus
CN108756888A (en) * 2018-07-25 2018-11-06 中铁工程装备集团有限公司 A kind of minor diameter hard rock shaft excavation machine
CN108756888B (en) * 2018-07-25 2024-02-20 中铁工程装备集团有限公司 Small-diameter hard rock shaft heading machine
CN116163735A (en) * 2023-03-23 2023-05-26 中铁广州工程局集团市政环保工程有限公司 Curve jacking pipe construction method

Also Published As

Publication number Publication date
JP3303115B2 (en) 2002-07-15

Similar Documents

Publication Publication Date Title
CN115263315B (en) Vertical shaft downward shield construction method and device
CN110093916A (en) Rotary digging pile construction method
CN116575467B (en) A modular multi-device foundation pit excavation support equipment system and method
JP3303115B2 (en) Underground shaft construction equipment
JP6559374B1 (en) Low head excavator and its assembly method
JP2797244B2 (en) Shaft excavation device and shaft construction method
CN116816257B (en) A low-headroom drilling device and method for rock formations
CN118292886A (en) Deep underground space vertical shaft excavation tunneling equipment and cast-in-situ construction method thereof
CN217734010U (en) Bearing diagonal construction equipment for foundation ditch
CN116695721B (en) A modular multi-device foundation pit excavation and support method and its equipment system
CN107288640A (en) A kind of steady rope self-supporting modularization vertical shaft driving and masonry construction device of nothing
JP3263743B2 (en) Ventilation equipment in shaft construction
CN222848208U (en) A new type of vertical shaft integrated drilling and blasting platform
JPH05248163A (en) Deep foundation foundation excavation construction method
JP2638723B2 (en) Vertical excavator
JPH0534475B2 (en)
JP3898561B2 (en) Mobile scaffolding device for shaft excavator
JP3898562B2 (en) Mobile formwork device in shaft excavator
JP2553987B2 (en) Deep foundation foundation excavation construction method
CN120251075A (en) A high and steep slope drilling device
JPH0133636B2 (en)
CN120830522A (en) An integrated trolley for inclined well drilling and protection
JP5809397B2 (en) Drilling equipment
JPH09165990A (en) Deep foundation method and its equipment
CN119041927A (en) Rotary supporting structure in large-diameter tunnel boring machine hole and construction method

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090510

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100510

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100510

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110510

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees