JPH07127310A - Method of installation construction of columnar structure - Google Patents
Method of installation construction of columnar structureInfo
- Publication number
- JPH07127310A JPH07127310A JP27695493A JP27695493A JPH07127310A JP H07127310 A JPH07127310 A JP H07127310A JP 27695493 A JP27695493 A JP 27695493A JP 27695493 A JP27695493 A JP 27695493A JP H07127310 A JPH07127310 A JP H07127310A
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- columnar structure
- anchor bolts
- distillation column
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 18
- 238000009434 installation Methods 0.000 title abstract description 15
- 238000010276 construction Methods 0.000 title description 7
- 238000004821 distillation Methods 0.000 abstract description 56
- 238000005504 petroleum refining Methods 0.000 description 3
- 239000000126 substance Substances 0.000 description 3
- 239000003949 liquefied natural gas Substances 0.000 description 2
- 239000000470 constituent Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、柱状構造物の据付工法
に関するものであり、詳しくは基礎土台に設けられた多
数本のアンカーボルトを、柱状構造物に形成された多数
個のボルト孔に嵌合させて、基礎土台に柱状構造物を締
結させる据付工法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of installing a columnar structure, and more specifically, to a large number of anchor bolts provided on a foundation foundation in a large number of bolt holes formed in the columnar structure. The present invention relates to an installation method for fitting and fastening a columnar structure to a foundation.
【0002】[0002]
【従来の技術】例えば、石油精製化学プラントを建設す
る際において、蒸留塔等の各種柱状構造物を設置する場
合には、基礎土台に多数本のアンカーボルトを設ける一
方、蒸留塔の基台に上記各アンカーボルトに対応する多
数個のボルト孔を形成しておき、クレーン作業によって
蒸留塔を吊り上げて上記各ボルト孔に各アンカーボルト
をそれぞれ挿入したのち、上記アンカーボルトにナット
を螺着させて締め込むことにより、蒸留塔を基礎土台に
固定して所定の位置に据付けている。2. Description of the Related Art For example, in constructing a petroleum refining chemical plant, when various columnar structures such as a distillation column are installed, a large number of anchor bolts are provided on the foundation base while the base of the distillation column is installed. After forming a large number of bolt holes corresponding to the above anchor bolts, hoisting the distillation column by crane work and inserting each anchor bolt into each of the above bolt holes, then screwing a nut onto the above anchor bolts. By tightening, the distillation column is fixed to the foundation base and installed at a predetermined position.
【0003】[0003]
【発明が解決しようとする課題】ところで、上述した如
き従来の据付工法においては、蒸留塔を基礎土台に着座
させる際、それぞれ多数に及ぶアンカーボルトとボルト
孔とを、同時に全箇所において合致させる必要があり、
このため基礎土台に対する蒸留塔の位置決めに慎重かつ
熟練した作業を要し、もって多大な作業時間を必要とす
る不都合を生じていた。本発明は上記実状に鑑みて、基
礎土台に対する柱状構造物の据付け作業を、容易に実施
し得る柱状構造物の据付工法を提供することを目的とす
る。By the way, in the conventional installation method as described above, when the distillation column is seated on the foundation, a large number of anchor bolts and bolt holes must be aligned at all positions at the same time. There is
For this reason, the positioning of the distillation column with respect to the foundation base requires careful and skilled work, resulting in the inconvenience of requiring a great deal of work time. The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a method for installing a columnar structure that can easily perform an operation of installing a columnar structure on a foundation.
【0004】[0004]
【課題を解決するための手段】本発明では、基礎土台に
おける多数本のアンカーボルトのうちの一本を、他のア
ンカーボルトよりも長く形成しておき、柱状構造物にお
ける多数個のボルト孔のうちの1つに、長く形成した上
記アンカーボルトを挿入したのち、長く形成した上記ア
ンカーボルトを軸として柱状構造物を旋回させて、基礎
土台の各アンカーボルトを柱状構造物の各ボルト孔にそ
れぞれ嵌合させている。また本発明では、基礎土台にお
ける多数本のアンカーボルトの一部を構成する2本以上
のアンカーボルトを長く形成しておき、柱状構造物にお
ける複数個の上記ボルト孔に、長く形成した複数本の上
記アンカーボルトをそれぞれ嵌合させたのち、基礎土台
の各アンカーボルトを柱状構造物の各ボルト孔にそれぞ
れ嵌合させている。According to the present invention, one of a large number of anchor bolts on a foundation is formed longer than the other anchor bolts so that a large number of bolt holes in a columnar structure can be formed. After inserting the long-formed anchor bolt into one of them, the pillar-shaped structure is turned around the long-formed anchor bolt as an axis, and the anchor bolts of the foundation foundation are respectively inserted into the bolt holes of the pillar-shaped structure. It is fitted. Further, in the present invention, two or more anchor bolts forming a part of a large number of anchor bolts on the foundation are formed long, and the plurality of long bolts are formed in the plurality of bolt holes in the columnar structure. After fitting the anchor bolts, the anchor bolts of the foundation are fitted in the bolt holes of the columnar structure.
【0005】[0005]
【作用】上記構成によれば、それぞれ多数に及ぶアンカ
ーボルトとボルト孔とを、同時に全箇所において合致さ
せる作業を必要としないので、基礎土台に対する柱状構
造物の据付け作業を容易に行なうことができる。According to the above construction, since it is not necessary to simultaneously match a large number of anchor bolts and bolt holes at all positions at the same time, it is possible to easily install the columnar structure on the foundation. .
【0006】[0006]
【実施例】以下、一実施例を示す図面に基づいて、本発
明を詳細に説明する。図1ないし図3は、石油精製化学
プラントの建設時において、柱状構造物としての蒸留塔
を設置する際に、本発明に関わる柱状構造物の据付工法
を適用した例を示している。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the drawings showing one embodiment. 1 to 3 show an example in which a columnar structure installation method according to the present invention is applied when a distillation column as a columnar structure is installed during the construction of a petroleum refining chemical plant.
【0007】図2において明示するように、柱状構造物
としての蒸留塔1は、垂直方向に沿って延びる塔本体2
を有するとともに、該塔本体2の下端部に形成された基
台としてのフランジ3を有しており、さらに上記フラン
ジ3には、その全周に亘る計16箇所において、上下に
貫通するボルト孔4,4…が互いに等しい間隔を持って
貫通形成されている。As clearly shown in FIG. 2, a distillation column 1 as a columnar structure has a column main body 2 extending in a vertical direction.
And has a flange 3 as a base formed at the lower end of the tower body 2, and the flange 3 further has bolt holes vertically penetrating at a total of 16 positions along the entire circumference thereof. 4, 4 ... Are formed so as to penetrate at equal intervals.
【0008】また、図2に示すように基礎土台10は、
建設敷地内の所定箇所に敷設されたベース11を有して
いるとともに、このベース11の上面には蒸留塔1にお
ける各ボルト孔4,4…に対応する位置に、15本のア
ンカーボルト12および1本のガイドアンカーボルト1
2′が、それぞれ上方へ向けて突出する態様で植設され
ている。Further, as shown in FIG. 2, the foundation base 10 is
It has a base 11 laid at a predetermined place in the construction site, and 15 anchor bolts 12 and 15 are provided on the upper surface of the base 11 at positions corresponding to the bolt holes 4, 4 ... In the distillation column 1. One guide anchor bolt 1
2'is planted in such a manner as to project upward.
【0009】上記15本のアンカーボルト12は、各々
の上端部が互いに同じ高さ位置に占位するよう長さが設
定されている一方、上記1本のガイドアンカーボルト1
2′は、その長さが上記各アンカーボルト12よりも長
く設定されており、これによって上記1本のガイドアン
カーボルト12′の上部は、各アンカーボルト12の上
端部よりも上方に突出した位置に占位している。The length of each of the 15 anchor bolts 12 is set so that the upper ends of the anchor bolts 12 occupy the same height as each other.
The length of 2'is set to be longer than each of the anchor bolts 12, so that the upper portion of the one guide anchor bolt 12 'is located above the upper end portion of each anchor bolt 12. Have been occupied by.
【0010】なお、上記各アンカーボルト12、および
ガイドアンカーボルト12′には、後述する据付作業時
にネジ山が損傷することを防止するべく、それぞれ図示
していない保護キャップを嵌めておいても良い。A protective cap (not shown) may be fitted to each of the anchor bolts 12 and the guide anchor bolts 12 'in order to prevent the threads from being damaged during the installation work described later. .
【0011】図1に示す如く、建設敷地内の所定箇所に
敷設された基礎土台10に、柱状構造物としての蒸留塔
1を据付ける際には、先ず蒸留塔1をクレーン30によ
り吊り上げて基礎土台10の近傍に移動させる。As shown in FIG. 1, when installing a distillation column 1 as a columnar structure on a foundation foundation 10 laid at a predetermined location in a construction site, first, the distillation column 1 is lifted by a crane 30 to form a foundation. It is moved to the vicinity of the base 10.
【0012】このとき上記蒸留塔1は、クレーン30の
ブーム31にウインチワイヤ32を介して垂直に吊り下
げられ、基礎土台10の上方域であって上記クレーン3
0に接近した位置、具体的には蒸留塔1が基礎土台10
とクレーン30との間に占位し、かつ蒸留塔1における
フランジ3の一部が基礎土台10におけるベース11の
上方域を覆う位置まで移動させる。At this time, the distillation column 1 is vertically suspended by the boom 31 of the crane 30 through the winch wire 32, and is located above the foundation base 10 in the crane 3.
A position close to 0, specifically, the distillation column 1 is the foundation base 10
And the crane 30 are occupied, and the flange 3 of the distillation column 1 is moved to a position where a part of the flange 3 covers the upper area of the base 11 of the foundation base 10.
【0013】次いで、オペレータの手作業により蒸留塔
1を微動させ、上記蒸留塔1のフランジ3に形成された
16個のボルト孔4のうちの1つを、基礎土台10にお
ける1本のガイドアンカーボルト12′に合致させたの
ち、ウインチワイヤ33を繰り出して蒸留塔1を下降さ
せ、図1において実線で示す如く上記ガイドアンカーボ
ルト12′をボルト孔4に貫入させる。Next, the distillation column 1 is finely moved by an operator's manual operation, and one of the 16 bolt holes 4 formed in the flange 3 of the distillation column 1 is connected to one guide anchor on the foundation base 10. After matching with the bolt 12 ', the winch wire 33 is fed out to lower the distillation column 1, and the guide anchor bolt 12' is inserted into the bolt hole 4 as shown by a solid line in FIG.
【0014】蒸留塔1のボルト孔4にガイドアンカーボ
ルト12′を貫入させたのち、クレーン30のブーム3
1を図1中の実線位置から鎖線位置まで徐々に傾倒させ
るとともに、上記蒸留塔1を図3(a)中の矢印Rで示
すように、上記基礎土台10のガイドアンカーボルト1
2′を中心軸として旋回移動させる。After inserting the guide anchor bolt 12 'into the bolt hole 4 of the distillation column 1, the boom 3 of the crane 30 is inserted.
1 is gradually tilted from the solid line position in FIG. 1 to the chain line position, and the distillation column 1 is guided by the guide anchor bolt 1 of the foundation base 10 as shown by an arrow R in FIG.
It is swiveled around 2'as a central axis.
【0015】このとき、クレーン30におけるブーム3
1の傾倒動作に伴って、ウインチワイヤ32を徐々に巻
き上げることにより、上記蒸留塔1は図1中の実線位置
から鎖線位置へ、高さ位置を変化させることなく上記ガ
イドアンカーボルト12′を中心軸として旋回移動され
ることとなる。At this time, the boom 3 in the crane 30
By gradually winding up the winch wire 32 in accordance with the tilting movement of No. 1, the distillation column 1 moves from the solid line position in FIG. 1 to the chain line position without changing the height position to center the guide anchor bolt 12 '. It will be pivotally moved as an axis.
【0016】上記蒸留塔1を旋回移動させ、基礎土台1
0における各アンカーボルト12,12…と、蒸留塔1
における各ボルト孔4,4…とを合致させたのち、ウイ
ンチワイヤ33を繰り出して蒸留塔1を下降させ、図3
(b)に示す如く上記各アンカーボルト12,12…を
上記各ボルト孔4,4…に貫入させることによって、上
記蒸留塔1は基礎土台10のベース11上に着座するこ
ととなる。The distillation tower 1 is rotated to move the foundation base 1
No. 0 anchor bolts 12, 12 ... and distillation column 1
After matching the respective bolt holes 4, 4, ... In Fig. 3, the winch wire 33 is fed out to lower the distillation column 1,
By inserting the anchor bolts 12, 12, ... Into the bolt holes 4, 4, ... As shown in (b), the distillation column 1 is seated on the base 11 of the foundation base 10.
【0017】ここで、上記ガイドアンカーボルト12′
を中心軸として蒸留塔1を旋回移動させることにより、
必然的に基礎土台10の各アンカーボルト12,12…
と、蒸留塔1の各ボルト孔4,4…とは一時に合致する
こととなり、もって基礎土台10に対する蒸留塔1の据
付け作業が極めて容易に実行される。Here, the guide anchor bolt 12 '.
By rotating the distillation column 1 about the center axis,
Inevitably, the anchor bolts 12, 12 of the foundation 10 are ...
, And the bolt holes 4, 4, ... Of the distillation column 1 coincide with each other at a time, and thus the installation work of the distillation column 1 on the foundation 10 can be performed very easily.
【0018】上記基礎土台10のベース11に蒸留塔1
を着座させたのち、各アンカーボルト12,12…、お
よびガイドアンカーボルト12′に、それぞれボルト
(図示せず)を螺着させて締め込むことにより、基礎土
台10に対する蒸留塔1の据付け作業が完了する。The distillation column 1 is installed on the base 11 of the foundation base 10 described above.
After the seats have been seated, bolts (not shown) are screwed onto the anchor bolts 12, 12 ... And the guide anchor bolts 12 ', respectively, so that the distillation column 1 can be installed on the foundation base 10. Complete.
【0019】ところで、クレーンの吊上げ能力がクレー
ンの強度と安定度に関連して、作業半径の増大に伴って
低下することは良く知られているが、上述した据付工法
では最も時間の掛かるガイドアンカーボルト12′とボ
ルト孔4との位置決めおよび嵌合作業が、ブーム31を
図1中の実線で示す如く立ち上げた状態で実施されるた
め、クレーン30の定格総荷重も大きく安定性も良好な
ものとなる。By the way, it is well known that the hoisting ability of a crane decreases with an increase in working radius in relation to the strength and stability of the crane. However, in the above-mentioned installation method, the guide anchor which takes the longest time is required. Positioning and fitting work between the bolt 12 'and the bolt hole 4 is performed with the boom 31 raised as shown by the solid line in FIG. 1, so that the crane 30 has a large total rated load and good stability. Will be things.
【0020】また、上述した据付工法では、基礎土台1
0よりもクレーン30側に接近した位置において、ガイ
ドアンカーボルト12′とボルト孔4との位置決めおよ
び嵌合作業が行なわれるため、基礎土台10に対してク
レーン30を一定の距離以上近付けられない作業現場に
は特に有効な工法となる。In the installation method described above, the foundation base 1
Since the guide anchor bolt 12 'and the bolt hole 4 are positioned and fitted at a position closer to the crane 30 side than 0, the crane 30 cannot be brought closer to the foundation 10 for a certain distance or more. This is a particularly effective construction method on site.
【0021】図4に示した蒸留塔1は、図1ないし図3
に示した蒸留塔1と同じもので、塔本体2とフランジ
(基台)3とを有するとともに、このフランジ3には全
周に亘って計16箇所にボルト孔4,4…が形成されて
いる。The distillation column 1 shown in FIG.
Is the same as the distillation column 1 shown in FIG. 1, and has a column main body 2 and a flange (base) 3, and the flange 3 has bolt holes 4, 4 ... There is.
【0022】一方、基礎土台20は建設敷地内に敷設さ
れたベース21を有するとともに、このベース21の上
面には、蒸留塔1の各ボルト孔4,4…と対応する位置
に、13本のアンカーボルト22と、3本のガイドアン
カーボルト22′,22″,22″とが、それぞれ上方
へ向けて突出する態様で植設されている。On the other hand, the foundation base 20 has a base 21 laid inside the construction site, and 13 bases are provided on the upper surface of the base 21 at positions corresponding to the bolt holes 4, 4 ... Of the distillation column 1. The anchor bolt 22 and the three guide anchor bolts 22 ', 22 ", 22" are planted in such a manner as to respectively project upward.
【0023】上記13本のアンカーボルト22は、互い
に同じ長さに設定されている一方、上記3本のガイドア
ンカーボルト22′,22″,22″は、その長さが上
記各アンカーボルト22より長く設定されており、さら
に上記ガイドアンカーボルト22″,22″は、互いに
同じ長さに設定されているとともに、1本のガイドアン
カーボルト22′は、上記一対のガイドアンカーボルト
22″,22″よりもさらに長く設定されている。While the 13 anchor bolts 22 are set to have the same length as each other, the three guide anchor bolts 22 ', 22 ", 22" are longer than the anchor bolts 22 in length. The guide anchor bolts 22 ″ and 22 ″ are set to be long, and the guide anchor bolts 22 ″ and 22 ″ are set to have the same length as each other. Is set even longer than.
【0024】上記構成の基礎土台20に柱状構造物して
の蒸留塔1を据付ける際には、先ずクレーン30により
蒸留塔1を吊り上げて、この蒸留塔1を基礎土台20の
直上域、詳しくは基礎土台20と蒸留塔1とをラフに芯
合せし、蒸留塔1のフランジ3が基礎土台20における
ベース21の上方域を覆う位置にまで移動させる。When the distillation column 1 having a columnar structure is installed on the foundation base 20 having the above-mentioned structure, first, the distillation column 1 is lifted by the crane 30, and the distillation column 1 is directly above the foundation base 20. Roughly aligns the base 20 and the distillation column 1 and moves the flange 3 of the distillation column 1 to a position where the flange 3 of the distillation column 1 covers the upper region of the base 21 on the base 20.
【0025】次いで、基礎土台20において最も長いガ
イドアンカーボルト22′と蒸留塔1のボルト孔4とを
合致させたのち、クレーン操作により蒸留塔1を下降さ
せて上記ガイドアンカーボルト22′をボルト孔4に貫
入させる。Next, after the longest guide anchor bolt 22 'on the foundation 20 and the bolt hole 4 of the distillation column 1 are aligned with each other, the distillation column 1 is lowered by a crane operation to attach the guide anchor bolt 22' to the bolt hole. Penetrate into 4.
【0026】次いで、基礎土台20における一対のガイ
ドアンカーボルト22″,22″と蒸留塔1のボルト孔
4,4とを合致させたのち、蒸留塔1を下降させること
により上記ガイドアンカーボルト22″,22″をボル
ト孔4,4に貫入させ、さらに基礎土台20における各
アンカーボルト22,22…を、蒸留塔1における各ボ
ルト孔4,4…に貫入させて、上記蒸留塔1を基礎土台
20のベース21上に着座させる。Next, after the pair of guide anchor bolts 22 ", 22" on the base 20 and the bolt holes 4, 4 of the distillation column 1 are aligned with each other, the distillation column 1 is lowered to guide the guide anchor bolts 22 ". , 22 ″ are inserted into the bolt holes 4 and 4, and further, the anchor bolts 22 and 22 ... In the foundation base 20 are inserted into the bolt holes 4 and 4 ... Sit on the base 21 of 20.
【0027】ここで、上記複数本のガイドアンカーボル
ト22′,22″,22″を、これに対応する各ボルト
孔4に貫入させることで、蒸留塔1は上記各ガイドアン
カーボルト22′,22″,22″に案内されて下降
し、これによって基礎土台20の各アンカーボルト2
2,2が蒸留塔1の各ボルト孔4,4…に貫入すること
となり、しかも基礎土台20に対する蒸留塔1の厳密な
位置合わせ作業は、上記各ガイドアンカーボルト2
2′,22″,22″と各ボルト孔4との間においての
み実施すれば良く、もって基礎土台20に対する蒸留塔
1の据付け作業が極めて容易に実行される。Here, the plurality of guide anchor bolts 22 ', 22 ", 22" are inserted into the corresponding bolt holes 4 so that the distillation column 1 can have the guide anchor bolts 22', 22 ". The anchor bolts 2 of the foundation base 20 are guided by the ", 22" and descend.
2 and 2 penetrate into the bolt holes 4, 4 ... Of the distillation tower 1, and the exact alignment work of the distillation tower 1 with respect to the foundation 20 is performed by the guide anchor bolts 2 described above.
It suffices to carry out only between 2 ′, 22 ″, 22 ″ and each bolt hole 4, so that the installation work of the distillation column 1 on the foundation 20 can be carried out very easily.
【0028】また、上述した基礎土台20においてはガ
イドアンカーボルト22′と一対のガイドアンカーボル
ト22″,22″とを有しているが、上記各ガイドアン
カーボルトを互いに同じ長さに設定することも、更には
ガイドアンカーボルト22′をアンカーボルト22に換
えて、一対のガイドアンカーボルト22″,22″のみ
とすることも可能であり、要は基礎土台20における全
数のアンカーボルトの一部を構成する2本以上のアンカ
ーボルトを、ガイドアンカーボルトとして長く形成する
構成であれば、蒸留塔の規模や形状に応じて様々な態様
を採用することが可能である。Further, although the above-mentioned foundation base 20 has the guide anchor bolts 22 'and the pair of guide anchor bolts 22 ", 22", the respective guide anchor bolts should be set to have the same length. Further, it is also possible to replace the guide anchor bolts 22 ′ with the anchor bolts 22 and use only a pair of guide anchor bolts 22 ″, 22 ″. As long as the two or more constituent anchor bolts are long as guide anchor bolts, various modes can be adopted according to the scale and shape of the distillation column.
【0029】上記基礎土台20のベース21に蒸留塔1
を着座させたのち、各アンカーボルト22,22…、お
よびガイドアンカーボルト22′,22″,22″に、
それぞれ図示していないボルトを螺着させて締め込むこ
とにより、基礎土台20に対する蒸留塔1の据付け作業
が完了する。The distillation tower 1 is installed on the base 21 of the foundation 20.
, And the guide anchor bolts 22 ′, 22 ″, 22 ″,
The operation of installing the distillation column 1 on the foundation 20 is completed by screwing and tightening bolts (not shown).
【0030】なお、本発明に関わる柱状構造物の据付工
法は、実施例に示した石油精製化学プラントにおける蒸
留塔の据付け作業時のみならず、LNG(液化天然ガ
ス)や一般化学等の各種プラントにおける貯溜槽や熱交
換器の据付け作業時においても適用可能であり、さらに
は各種プラントの建設時以外においても、様々な柱状構
造物を据付ける際に本発明が有効に適用されることは言
うまでもない。The method of installing the columnar structure according to the present invention is applicable not only to the installation work of the distillation column in the petroleum refining chemical plant shown in the examples but also to various plants such as LNG (liquefied natural gas) and general chemistry. It is needless to say that the present invention can be effectively applied when installing various columnar structures even when the storage tank and the heat exchanger are installed at the time of installation, and also when not constructing various plants. Yes.
【0031】[0031]
【発明の効果】以上、詳述したように、本発明に関わる
柱状構造物の据付工法では、基礎土台における多数本の
アンカーボルトのうちの一本を、他のアンカーボルトよ
りも長く形成しておき、柱状構造物における多数個のボ
ルト孔のうちの1つに、長く形成した上記アンカーボル
トを挿入したのち、長く形成した上記アンカーボルトを
軸として柱状構造物を旋回させて、基礎土台の各アンカ
ーボルトを柱状構造物の各ボルト孔にそれぞれ嵌合させ
ている。また、本発明に関わる柱状構造物の据付工法で
は、基礎土台における多数本のアンカーボルトの一部を
構成する2本以上のアンカーボルトを長く形成してお
き、柱状構造物における複数個の上記ボルト孔に、長く
形成した複数本の上記アンカーボルトをそれぞれ嵌合さ
せたのち、基礎土台の各アンカーボルトを柱状構造物の
各ボルト孔にそれぞれ嵌合させている。上述した何れの
構成においても、各々多数に及ぶアンカーボルトとボル
ト孔とを、同時に全箇所において合致させる作業を必要
としておらず、もって本発明に関わる柱状構造物の据付
工法によれば、基礎土台に対する柱状構造物の据付け作
業を容易に実施することが可能となる。As described above in detail, in the method of installing the columnar structure according to the present invention, one of the many anchor bolts on the foundation is formed longer than the other anchor bolts. Every time, after inserting the long-formed anchor bolt into one of a large number of bolt holes in the pillar-shaped structure, the pillar-shaped structure is turned around the long-formed anchor bolt as an axis, and each of the foundation foundations is rotated. The anchor bolt is fitted into each bolt hole of the columnar structure. In addition, in the method of installing a columnar structure according to the present invention, two or more anchor bolts that form a part of a large number of anchor bolts in the foundation are formed long, and the plurality of bolts in the columnar structure are formed. After the plurality of long-formed anchor bolts are fitted in the holes, the anchor bolts of the foundation are fitted in the bolt holes of the columnar structure. In any of the above-mentioned configurations, it is not necessary to simultaneously match a large number of anchor bolts and bolt holes at all locations at the same time, and according to the method for installing a columnar structure according to the present invention, the foundation foundation It becomes possible to easily carry out the installation work of the columnar structure with respect to.
【図1】本発明に関わる柱状構造物の据付工法を示す概
念図。FIG. 1 is a conceptual diagram showing a method of installing a columnar structure according to the present invention.
【図2】据付け作業の態様を示す基礎土台および柱状構
造物の全体斜視図。FIG. 2 is an overall perspective view of a foundation and a columnar structure showing a mode of installation work.
【図3】(a)および(b)は、本発明における柱状構
造物の据付工法を概念的に示す平面図。3 (a) and 3 (b) are plan views conceptually showing a method of installing a columnar structure in the present invention.
【図4】据付け作業の態様を示す基礎土台および柱状構
造物の全体斜視図。FIG. 4 is an overall perspective view of a foundation and a columnar structure showing a mode of installation work.
1…蒸留塔(柱状構造物)、 2…塔本体、 3…フランジ(基台)、 4…ボルト孔、 10,20…基礎土台、 11,21…ベース、 12,22…アンカーボルト、 12′,22′,22″…ガイドアンカーボルト、 30…クレーン、 31…ブーム、 32…ウインチワイヤ。 DESCRIPTION OF SYMBOLS 1 ... Distillation tower (columnar structure), 2 ... Tower main body, 3 ... Flange (base), 4 ... Bolt hole, 10, 20 ... Foundation base, 11, 21 ... Base, 12, 22 ... Anchor bolt, 12 ' , 22 ', 22 "... Guide anchor bolt, 30 ... Crane, 31 ... Boom, 32 ... Winch wire.
Claims (2)
ボルトを、柱状構造物の基台に設けられた多数個のボル
ト孔に各々嵌合させて、上記基礎土台に上記柱状構造物
を締結させる柱状構造物の据付工法であって、 上記柱状構造物における上記ボルト孔の1つに、上記基
礎土台において1本のみ長く形成された上記アンカーボ
ルトを挿入したのち、上記柱状構造物を1本のみ長く形
成された上記アンカーボルトを軸として旋回させ、上記
基礎土台における各アンカーボルトを上記柱状構造物に
おける各ボルト孔に各々嵌合させることを特徴とする柱
状構造物の据付工法。1. A columnar structure for fastening a plurality of anchor bolts on a foundation to a plurality of bolt holes provided in a base of the columnar structure to fasten the columnar structure to the foundation. A method for installing an object, wherein one of the bolt holes in the columnar structure is inserted into the anchor bolt, which is formed long in the foundation, and then only one columnar structure is formed long. A method for installing a columnar structure, wherein the anchor bolt is rotated about the axis, and each anchor bolt in the foundation is fitted into each bolt hole in the columnar structure.
ボルトを、柱状構造物の基台に設けられた多数個のボル
ト孔に各々嵌合させて、上記基礎土台に上記柱状構造物
を締結させる柱状構造物の据付工法であって、 上記基礎土台における多数本のアンカーボルトの一部を
構成する2本以上のアンカーボルトを長く形成し、上記
柱状構造物における複数個の上記ボルト孔に長く形成し
た複数本の上記アンカーボルトをそれぞれ嵌合させたの
ち、上記基礎土台における各アンカーボルトを上記柱状
構造物における各ボルト孔に各々嵌合させることを特徴
とする柱状構造物の据付工法。2. A columnar structure for fastening a plurality of anchor bolts on a foundation to a plurality of bolt holes provided on a base of the columnar structure to fasten the columnar structure to the foundation. A method of installing an object, wherein two or more anchor bolts forming a part of a large number of anchor bolts in the foundation base are formed long, and a plurality of bolt holes are formed long in the plurality of bolt holes in the columnar structure. A method for installing a columnar structure, comprising fitting the anchor bolts of a book respectively, and then fitting the anchor bolts of the foundation base into the bolt holes of the columnar structure.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP27695493A JPH07127310A (en) | 1993-11-05 | 1993-11-05 | Method of installation construction of columnar structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP27695493A JPH07127310A (en) | 1993-11-05 | 1993-11-05 | Method of installation construction of columnar structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH07127310A true JPH07127310A (en) | 1995-05-16 |
Family
ID=17576731
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP27695493A Pending JPH07127310A (en) | 1993-11-05 | 1993-11-05 | Method of installation construction of columnar structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH07127310A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2020516526A (en) * | 2017-04-11 | 2020-06-11 | ナバル エネルジ | Especially floats for offshore wind turbines |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6160969A (en) * | 1984-08-31 | 1986-03-28 | ナショナル住宅産業株式会社 | Building of wall panel |
| JPS61233131A (en) * | 1985-04-05 | 1986-10-17 | Dainichi Concrete Kogyo Kk | Foundation structure of pole |
| JPH01235748A (en) * | 1988-03-12 | 1989-09-20 | Michio Kuramochi | Assembling and disassembling work of multi-layer structure using self-elevating jackup device |
| JPH02236362A (en) * | 1989-03-08 | 1990-09-19 | Taisei Corp | Steel framed column erecting method |
-
1993
- 1993-11-05 JP JP27695493A patent/JPH07127310A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6160969A (en) * | 1984-08-31 | 1986-03-28 | ナショナル住宅産業株式会社 | Building of wall panel |
| JPS61233131A (en) * | 1985-04-05 | 1986-10-17 | Dainichi Concrete Kogyo Kk | Foundation structure of pole |
| JPH01235748A (en) * | 1988-03-12 | 1989-09-20 | Michio Kuramochi | Assembling and disassembling work of multi-layer structure using self-elevating jackup device |
| JPH02236362A (en) * | 1989-03-08 | 1990-09-19 | Taisei Corp | Steel framed column erecting method |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2020516526A (en) * | 2017-04-11 | 2020-06-11 | ナバル エネルジ | Especially floats for offshore wind turbines |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4701047B2 (en) | Wind power tower construction method | |
| US4769959A (en) | Temporary power line tower assembly and method of installing same | |
| CN107816209A (en) | The large-scale Roof Truss construction technology of installation is lifted across outer both sides | |
| JPH07127310A (en) | Method of installation construction of columnar structure | |
| US6267201B1 (en) | Work platform for roof construction work | |
| US4276733A (en) | Method of constructing and erecting a dome-shaped structure | |
| JP3700306B2 (en) | Wind power generator construction method | |
| JPH07310460A (en) | Lighthouse | |
| US5305574A (en) | Method for erection of absorber towers using jacking system | |
| US4076777A (en) | Method and apparatus for forming a concrete roof | |
| US4669154A (en) | Support elements for vertical members | |
| KR102570378B1 (en) | Lift car for installing deck plate and installing method of deck plate using the same | |
| JP4126474B2 (en) | Concrete dome roof | |
| JPS6239355Y2 (en) | ||
| CN114776035A (en) | Construction method of oblique spoke type cable truss structure | |
| KR100277608B1 (en) | Three-dimensional truss floor structure and its construction method | |
| US4679374A (en) | Building construction method | |
| JP7813459B2 (en) | Temporary scaffolding foundation | |
| KR200186212Y1 (en) | Trussed floor structure | |
| AU2020102139A4 (en) | Wall panel stabilisation apparatus and method | |
| JP7470011B2 (en) | Method for constructing underground structures and lifting equipment | |
| KR102793409B1 (en) | Supporting apparatus for rebar and insulaing material structure using the same | |
| JP3671242B2 (en) | How to install the equipment | |
| JP2590671B2 (en) | Construction method of steel frame using overhead crane frame | |
| JPS6233383B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 19980113 |