JPH07144885A - Crane boom assembly - Google Patents
Crane boom assemblyInfo
- Publication number
- JPH07144885A JPH07144885A JP32106593A JP32106593A JPH07144885A JP H07144885 A JPH07144885 A JP H07144885A JP 32106593 A JP32106593 A JP 32106593A JP 32106593 A JP32106593 A JP 32106593A JP H07144885 A JPH07144885 A JP H07144885A
- Authority
- JP
- Japan
- Prior art keywords
- boom
- stay
- rope
- tube
- crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007599 discharging Methods 0.000 claims abstract description 4
- 239000012530 fluid Substances 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 abstract description 9
- 230000008878 coupling Effects 0.000 description 11
- 238000010168 coupling process Methods 0.000 description 11
- 238000005859 coupling reaction Methods 0.000 description 11
- 239000002184 metal Substances 0.000 description 6
- 238000004873 anchoring Methods 0.000 description 4
- 230000007935 neutral effect Effects 0.000 description 4
- 230000009194 climbing Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
(57)【要約】
【目的】 親綱の張出,収納作業を簡単に行うことがで
きるようにし、作業性を大幅に向上させる。
【構成】 中間ブーム8の上側に位置する連結パイプ1
7,17および補強パイプ18にステーシリンダ31の
チューブ32を取付け、基端側が前記チューブ32内に
挿入されると共に、チューブ32内でピストンに固着さ
れ、先端側がチューブ32外に突出して、その先端に親
綱25を繋留する繋留リング36Aが設けられたロッド
36をステーとして設ける。そして、各ステーシリンダ
31に油圧配管42,43および給排配管38,39等
を介して圧油を給排することにより、ステーとしてのロ
ッド36をチューブ32から進出させ、親綱25を張出
位置に位置決めする。
(57) [Summary] [Purpose] The work of projecting and storing the main rope is facilitated and workability is greatly improved. [Structure] Connection pipe 1 located above intermediate boom 8
The tube 32 of the stay cylinder 31 is attached to the 7, 17 and the reinforcing pipe 18, the proximal end side is inserted into the tube 32, and is fixed to the piston in the tube 32, and the distal end side projects outside the tube 32, and the distal end thereof is provided. A rod 36 provided with a mooring ring 36A for mooring the master rope 25 is provided as a stay. Then, by supplying / discharging pressure oil to / from each stay cylinder 31 via hydraulic pipes 42, 43 and supply / discharge pipes 38, 39, etc., the rod 36 as a stay is advanced from the tube 32, and the master rope 25 is extended. Position in position.
Description
【0001】[0001]
【産業上の利用分野】本発明は、例えばクローラ式クレ
ーンやタワークレーン等に好適に用いられるクレーンブ
ーム組立体に関し、特に、上ブームと下ブームとの間に
中間ブームを現場作業等で分解・組立できるようにした
クレーンブーム組立体に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a crane boom assembly suitably used in, for example, a crawler type crane, a tower crane, etc. The present invention relates to a crane boom assembly that can be assembled.
【0002】[0002]
【従来の技術】図5ないし図10に従来技術のクレーン
ブーム組立体が設けられたクローラ式クレーンを示す。5 to 10 show a crawler type crane provided with a crane boom assembly of the prior art.
【0003】図において、1は下部走行体、2は該下部
走行体1上に旋回可能に設けられたクレーン本体を構成
する上部旋回体を示し、該上部旋回体2にはA型フレー
ム3およびカウンタウェイト4等が設けられると共に、
巻上用ドラム5およびブーム俯仰動用ドラム(図示せ
ず)等が設けられている。In the drawing, 1 is a lower traveling body, 2 is an upper revolving body which constitutes a crane main body provided on the lower traveling body 1 so as to be rotatable, and the upper revolving body 2 has an A-shaped frame 3 and With the counter weight 4 etc.,
A hoisting drum 5 and a boom / elevation drum (not shown) are provided.
【0004】6は上部旋回体2の前部に俯仰動可能に設
けられたクレーンブーム組立体を示し、該クレーンブー
ム組立体6は、上部旋回体2の前部に回動可能に取付け
られた下ブーム7と、該下ブーム7の先端側に連結ピン
(図示せず)等を介して一体的に連結された例えば3個
の中間ブーム8,8,…と、該各中間ブーム8のうち先
端側の中間ブーム8に連結ピン等を介して連結された上
ブーム9とから構成され、該上ブーム9の先端側には巻
上ロープ10用のシーブ11が取付けられている。そし
て、巻上ロープ10は巻上用ドラム5によって巻上げ、
巻下げられ、シーブ11の下側からフック12を昇降さ
せるようになっている。Reference numeral 6 denotes a crane boom assembly which is provided on the front part of the upper swing body 2 so as to be able to move up and down. The crane boom assembly 6 is rotatably attached to the front part of the upper swing body 2. Of the intermediate booms 8, the lower boom 7 and, for example, three intermediate booms 8, 8, ... Which are integrally connected to the tip end side of the lower boom 7 via a connecting pin (not shown) or the like. The upper boom 9 is connected to the intermediate boom 8 on the front end side via a connecting pin or the like, and the sheave 11 for the hoisting rope 10 is attached to the front end side of the upper boom 9. Then, the hoisting rope 10 is hoisted by the hoisting drum 5,
The hook 12 is wound down, and the hook 12 is moved up and down from the lower side of the sheave 11.
【0005】13は上部旋回体2のブーム俯仰動用ドラ
ムからA型フレーム3を介して繰出,入される俯仰動用
ロープを示し、該俯仰動用ロープ13は先端側がブライ
ドル14を介してペンダントロープ15に接続され、該
ペンダントロープ15の先端側は上ブーム9の先端側に
連結されている。そして、前記ブーム俯仰動用ドラムに
より俯仰動用ロープ13を繰入れるときには、クレーン
ブーム組立体6がペンダントロープ15を介して上向き
に仰動され、俯仰動用ロープ13を繰出すときにはクレ
ーンブーム組立体6が下向きに俯動される。なお、ペン
ダントロープ15はクレーンブーム組立体6を図6,図
7に示す如く分解した状態では、複数本のペンダントロ
ープ15,15,…に分割され、該各ペンダントロープ
15は組立時に金具(図示せず)等を用いて互いに連結
される。Reference numeral 13 denotes a depression / elevation rope which is fed out from the boom / elevation drum of the upper revolving structure 2 through the A-shaped frame 3 and is inserted therein. The front end side of the pendant rope 15 is connected to the front end side of the upper boom 9. The crane boom assembly 6 is lifted upward through the pendant rope 15 when the boom raising / lowering rope 13 is fed by the boom raising / lowering drum, and the crane boom assembly 6 is lowered when feeding the downward raising / lowering rope 13. Be moved to. The pendant rope 15 is divided into a plurality of pendant ropes 15, 15, ... When the crane boom assembly 6 is disassembled as shown in FIG. 6 and FIG. (Not shown) or the like.
【0006】次に、図8ないし図10を参照してクレー
ンブーム組立体6の中間ブーム8について詳述する。Next, the intermediate boom 8 of the crane boom assembly 6 will be described in detail with reference to FIGS.
【0007】図中、16,16,…は上,下、左,右に
離間して前後方向に伸長した長尺の枠パイプ、17,1
7,…は該各枠パイプ16の両端側で該各枠パイプ16
間を連結した連結パイプを示し、該各連結パイプ17は
各枠パイプ16と共に四角形状の枠構造をなし、中間ブ
ーム8の枠体を構成している。In the figure, 16, 16, ... Are long frame pipes 17, 17 which are spaced apart from each other at the top, bottom, left and right and extend in the front-rear direction.
7, ... Are provided at both ends of each frame pipe 16
The connecting pipes connecting the two are shown, and each connecting pipe 17 forms a quadrangular frame structure together with each frame pipe 16 and constitutes a frame body of the intermediate boom 8.
【0008】18,18,…は各枠パイプ16間に斜め
に接合された補強パイプを示し、該各補強パイプ18は
前,後の各連結パイプ17とともに各枠パイプ16間で
略三角形のトラス構造をなし、各枠パイプ16および各
連結パイプ17の曲げ強度や捩り強度等を高めるように
なっている。また、各枠パイプ16の両端側には上,下
の枠パイプ16,16間を斜めに連結する他の補強パイ
プ19,19が設けられ、該各補強パイプ19は前,後
の各連結パイプ17の対角線方向に伸長している。Reference numerals 18, 18, ... Indicate reinforcing pipes obliquely joined between the frame pipes 16. The reinforcing pipes 18 together with the front and rear connecting pipes 17 are substantially triangular trusses between the frame pipes 16. The frame pipes 16 and the connecting pipes 17 have a structure to increase the bending strength and the torsional strength. Further, other reinforcing pipes 19, 19 for obliquely connecting the upper and lower frame pipes 16, 16 are provided on both ends of each frame pipe 16, and each reinforcing pipe 19 is a front and rear connecting pipe. It extends in the diagonal direction of 17.
【0009】20,21は枠パイプ16の前,後両端に
接合された連結金具を示し、該各連結金具20,21は
各枠パイプ16の両端にそれぞれ設けられ、各中間ブー
ム8を互いに連結するとき、連結金具20を二又状の連
結金具21内に挿入して両者を連結ピン等で結合するも
のである。また、下ブーム7の先端側および上ブーム9
の基端側にも図7に示す如く同様の連結金具20(2
1)が接合して設けられている。Reference numerals 20 and 21 denote connecting fittings joined to the front and rear ends of the frame pipe 16. The connecting fittings 20 and 21 are provided at both ends of the frame pipe 16, respectively, and connect the intermediate booms 8 to each other. At this time, the connecting fitting 20 is inserted into the bifurcated connecting fitting 21 and the two are joined by a connecting pin or the like. In addition, the tip side of the lower boom 7 and the upper boom 9
As shown in FIG. 7, a similar coupling fitting 20 (2
1) is provided by being joined.
【0010】22,22,…は上側の連結パイプ17,
17および補強パイプ18に取付けられたブラケットを
示し、該各ブラケット22は緊締金具22Aおよびホル
ダ22B等からなり、緊締金具22Aを連結パイプ17
または補強パイプ18の長さ方向中間部にナット23等
を介して締着することにより取付けられている。そし
て、該各ブラケット22のホルダ22Bは後述の各ステ
ー24を上,下にスライド可能に保持し、これらの各ス
テー24が図9,図10に示す如く中間ブーム8から昇
降するのを許すようになっている。22 are connected to the upper connecting pipe 17,
17 and a bracket attached to the reinforcing pipe 18, each bracket 22 is composed of a tightening metal fitting 22A, a holder 22B and the like.
Alternatively, the reinforcing pipe 18 is attached by being fastened to the middle portion in the longitudinal direction via a nut 23 or the like. The holder 22B of each bracket 22 holds each stay 24 described later slidably up and down, and allows each stay 24 to move up and down from the intermediate boom 8 as shown in FIGS. It has become.
【0011】24,24,…は各ブラケット22のホル
ダ22Bにスライド可能に保持されたステーを示し、該
ステー24は小径のパイプ材から所定長さをもって形成
され、その先端側となる上端側には親綱25を繋留する
ための繋留リング24Aが設けられている。また、該各
ステー24には上下方向に所定間隔をもって一対のピン
穴24B,24Cがそれぞれ形成され、該各ピン穴24
B,24Cには各位置決めピン26が選択的に装着され
る。そして、該各位置決めピン26は、図9に示す如く
各ステー24を中間ブーム8から上向きに突出させると
きには、下側のピン穴24Cに装着され、各ステー24
を図9に示す張出位置で各ホルダ22Bに位置決めす
る。Reference numerals 24, 24, ... Show stays slidably held by the holders 22B of the brackets 22. The stays 24 are formed from a small-diameter pipe material with a predetermined length and are provided on the upper end side which is the tip end side. An anchoring ring 24A for anchoring the master rope 25 is provided. Further, each stay 24 is formed with a pair of pin holes 24B and 24C at predetermined intervals in the vertical direction.
Positioning pins 26 are selectively attached to B and 24C. The positioning pins 26 are mounted in the lower pin holes 24C when the stays 24 are projected upward from the intermediate boom 8 as shown in FIG.
Is positioned on each holder 22B at the projecting position shown in FIG.
【0012】また、各ステー24を図10に示す収納位
置へと降下させるときには、各位置決めピン26を各ピ
ン穴24Cから抜取り、各ステー24を自重によって中
間ブーム8内に降下させた状態で、各ピン穴24Bに各
位置決めピン26を装着する。そして、このときには各
位置決めピン26が各ホルダ22Bの下端側に係合する
ことにより、各ステー24を収納位置に保持するように
なっている。一方、親綱25は図9,図10に示す各ス
テー24のうち中間のステー24の繋留リング24Aに
挿通され、その両端側が両側のステー24の繋留リング
24Aに止め具25A,25Aを介して繋着(掛止め)
されている。Further, when lowering each stay 24 to the storage position shown in FIG. 10, each positioning pin 26 is pulled out from each pin hole 24C, and each stay 24 is lowered into the intermediate boom 8 by its own weight. Each positioning pin 26 is mounted in each pin hole 24B. Then, at this time, each positioning pin 26 is engaged with the lower end side of each holder 22B to hold each stay 24 at the storage position. On the other hand, the master rope 25 is inserted into the mooring ring 24A of the middle stay 24 among the stays 24 shown in FIGS. 9 and 10, and both ends thereof are connected to the mooring rings 24A of the stays 24 on both sides via the fasteners 25A and 25A. Attachment (hanging)
Has been done.
【0013】27は中間ブーム8の上側で、前,後の連
結パイプ17,17間に架け渡された渡し板を示し、該
渡し板27は作業者が中間ブーム8上を歩くために着脱
可能に設けられ、後述の如くクレーンブーム組立体6の
分解・組立作業を行うときの便宜を図るものである。こ
こで、中間ブーム8は図6に示す如くその高さ寸法Hが
2〜3mに及び、渡し板27上での作業は高所作業とな
る。そこで、作業者は渡し板27上に登ったときには命
綱(図示せず)を親綱25に引掛けておき、高所作業で
の安全性を確保するようにしている。Reference numeral 27 denotes an upper plate of the intermediate boom 8 which is a bridge plate bridged between the front and rear connecting pipes 17, 17. The bridge plate 27 is detachable for an operator to walk on the intermediate boom 8. It is provided for the convenience of disassembling and assembling the crane boom assembly 6 as described later. Here, the intermediate boom 8 has a height dimension H of 2 to 3 m as shown in FIG. 6, and the work on the bridge plate 27 is performed at a high place. Therefore, the worker hooks a lifeline (not shown) on the master line 25 when climbing on the bridge 27 so as to ensure safety in high-place work.
【0014】このように構成される従来技術では、クレ
ーンブーム組立体6の全長が10m以上となるから、作
業現場に運搬するときには各中間ブーム8および上ブー
ム9等を互いに分解した状態で運搬するようにしてい
る。そして、作業現場ではクレーン作業に先立って図
6,図7に示す如く各中間ブーム8および上ブーム9を
組立てるようにしている。In the prior art thus constructed, the crane boom assembly 6 has a total length of 10 m or more, and therefore, when the crane boom assembly 6 is transported to the work site, the intermediate boom 8 and the upper boom 9 are transported in a disassembled state. I am trying. At the work site, the intermediate boom 8 and the upper boom 9 are assembled before the crane work as shown in FIGS.
【0015】この場合、まず各中間ブーム8に設けた各
ステー24を図10に示す収納位置に収納した状態で、
各中間ブーム8上に図6に示すようにそれぞれペンダン
トロープ15を載置しておく。そして、この状態で小型
の補助クレーン(図示せず)によりフック28およびワ
イヤ29等を介して中間ブーム8を吊上げ、所望位置に
配置する。In this case, first, with each stay 24 provided on each intermediate boom 8 stored in the storage position shown in FIG.
The pendant ropes 15 are placed on the respective intermediate booms 8 as shown in FIG. Then, in this state, the intermediate boom 8 is lifted by a small auxiliary crane (not shown) via the hook 28, the wire 29, etc., and is placed at a desired position.
【0016】次に、中間ブーム8を現場に接地させた状
態では各ステー24を図9に示す張出位置に上昇させ、
図8に示す如く各ステー24を中間ブーム8上に所定高
さをもって突出させると共に、この中間ブーム8上には
渡し板27を架け渡すようにし、この渡し板27に登っ
た作業者が命綱を親綱25に引掛けて、その後の組立て
作業を安全に行いうるようにする。そして、この状態で
図6に示すように次なる中間ブーム8を補助クレーンの
フック28およびワイヤ29等を介して吊上げ、先に接
地させた中間ブーム8の位置へと移送する。このとき
に、次なる中間ブーム8の連結金具21を先の中間ブー
ム8の連結金具20に矢示A方向から差込むようにし、
差込んだ状態で両者を連結ピンで一体的に結合する。Next, in a state where the intermediate boom 8 is grounded at the site, each stay 24 is raised to the extended position shown in FIG.
As shown in FIG. 8, each stay 24 is projected on the intermediate boom 8 with a predetermined height, and a bridge 27 is bridged over the intermediate boom 8. An operator climbing the bridge 27 attaches a lifeline. It is hooked on the main rope 25 so that the subsequent assembling work can be performed safely. Then, in this state, as shown in FIG. 6, the next intermediate boom 8 is hoisted via the hook 28 and the wire 29 of the auxiliary crane, and is transferred to the position of the intermediate boom 8 which was previously grounded. At this time, the connecting fitting 21 of the next intermediate boom 8 is inserted into the connecting fitting 20 of the previous intermediate boom 8 from the direction of arrow A,
In the inserted state, both are integrally connected with a connecting pin.
【0017】この場合、図6中で下側に位置する連結金
具20,21をピン結合するのは地面からの作業で行う
ことが可能である。しかし、上側の連結金具20,21
の結合作業は、先に接地した中間ブーム8(渡し板2
7)の上に作業者が登り、前記親綱25に命綱を引掛け
た状態で連結金具20,21を確実に連結ピンにより結
合する必要がある。そして、2個の中間ブーム8,8を
連結した状態でも、それぞれの各ステー24を図8,図
9に示す如く張出位置におき、親綱25に命綱を掛止め
できるようにし、その後に次なる中間ブーム8を前記と
同様に連結してゆく。In this case, the connecting fittings 20 and 21 located on the lower side in FIG. 6 can be pin-connected by working from the ground. However, the upper coupling fittings 20, 21
The connecting work of the intermediate boom 8 (the bridge 2
7) It is necessary for the worker to climb onto the top of the above 7) and to securely connect the connecting fittings 20 and 21 with the connecting pin while the life rope is hooked on the master rope 25. Even when the two intermediate booms 8 and 8 are connected, each stay 24 is placed in the extended position as shown in FIGS. 8 and 9 so that the life rope can be hooked on the master rope 25, and then The next intermediate boom 8 is connected in the same manner as described above.
【0018】次に、図7に示すように中間ブーム8の先
端側に上ブーム9を連結した状態で、これらの組立体を
補助クレーンのフック28等で吊上げ、上部旋回体2に
予めに取付けた下ブーム7の先端側へと移送し、中間ブ
ーム8の基端側に設けた連結金具21(20)を下ブー
ム7の連結金具20(21)に差込むようにして両者を
連結ピンで結合する。また、各中間ブーム8上に載置し
た各ペンダントロープ15を金具等で互いに連結してゆ
くようにする。そして、このときの作業も中間ブーム8
上で各ステー24を介して突出させた親綱25に命綱を
引掛けて行い、組立作業の安全性を確保する。また、ク
レーン作業を終了した後にクレーンブーム組立体6を再
び分解するときにも、前述の組立て時とほぼ同様に行
い、これらの分解・組立作業が終わると、中間ブーム8
の各ステー24を図10に例示した収納位置へと収納す
るようにしている。Next, as shown in FIG. 7, with the upper boom 9 connected to the tip end side of the intermediate boom 8, these assemblies are hoisted by the hooks 28 of the auxiliary crane and attached to the upper swing body 2 in advance. It is transferred to the tip side of the lower boom 7, and the connecting metal fittings 21 (20) provided on the base end side of the intermediate boom 8 are inserted into the connecting metal fittings 20 (21) of the lower boom 7 to connect them with a connecting pin. . Also, the pendant ropes 15 placed on the respective intermediate booms 8 are connected to each other by metal fittings or the like. And the work at this time is also the middle boom
The safety rope of the assembling work is secured by hooking the life rope on the master rope 25 protruding above each stay 24. Also, when the crane boom assembly 6 is disassembled again after the crane work is completed, it is carried out in substantially the same manner as the above-described assembly, and when the disassembly / assembly work is completed, the intermediate boom 8
Each stay 24 is stored in the storage position illustrated in FIG.
【0019】[0019]
【発明が解決しようとする課題】ところで、上述した従
来技術では、各中間ブーム8上に親綱25を張り出すた
めに、上端側の繋留リング24Aにそれぞれ親綱25を
繋着させた各ステー24を中間ブーム8に各ブラケット
22を介してスライド可能に設け、該各ステー24には
上,下に所定間隔をもってピン穴24B,24Cを形成
すると共に、該各ピン穴24B,24Cに各位置決めピ
ン26を選択的に装着することにより、各ステー24を
図9に示す張出位置と図10に示す収納位置とに手作業
でスライドさせつつ、位置決めするようにしている。By the way, in the above-mentioned prior art, in order to project the master rope 25 on each intermediate boom 8, each stay in which the master rope 25 is connected to the mooring ring 24A on the upper end side is connected. 24 is slidably provided on the intermediate boom 8 via the brackets 22. The stays 24 are formed with pin holes 24B and 24C at predetermined intervals on the upper and lower sides thereof, and the pin holes 24B and 24C are respectively positioned. By selectively mounting the pins 26, the stays 24 are positioned by manually sliding them to the extended position shown in FIG. 9 and the storage position shown in FIG.
【0020】このため、従来技術では、クレーンブーム
組立体6の分解・組立作業を現場において行うときに、
作業者は中間ブーム8上に登って例えば図10の収納位
置にある各ステー24から位置決めピン26を抜取り、
各ステー24をそれぞれ上向きに引上げるようにして中
間ブーム8から突出させつつ、各ステー24を図9に示
す張出位置に位置決めすべく、各ステー24のピン穴2
4Cに各位置決めピン26を装着する必要があり、各ス
テー24を中間ブーム8から張出したり、収納したりす
る作業に多大な労力と時間を費すことになり、作業性が
非常に悪いという問題がある。Therefore, in the prior art, when disassembling and assembling the crane boom assembly 6 at the site,
The operator climbs on the intermediate boom 8 and pulls out the positioning pin 26 from each stay 24 at the storage position in FIG. 10, for example.
The pin holes 2 of each stay 24 are positioned so that each stay 24 is positioned at the projecting position shown in FIG. 9 while projecting from the intermediate boom 8 by pulling each stay 24 upward.
It is necessary to attach each positioning pin 26 to 4C, and a great amount of labor and time are required for the work of overhanging and storing each stay 24 from the intermediate boom 8, resulting in very poor workability. There is.
【0021】本発明は上述した従来技術の問題に鑑みな
されたもので、本発明は親綱を中間ブームから張出すた
めの各ステーを収納位置と張出位置とに簡単に変更する
ことができ、分解・組立時の作業性を大幅に向上できる
ようにしたクレーンブーム組立体を提供することを目的
としている。The present invention has been made in view of the above-mentioned problems of the prior art, and according to the present invention, each stay for extending the master rope from the intermediate boom can be easily changed between the storage position and the extension position. The purpose of the present invention is to provide a crane boom assembly capable of greatly improving workability during disassembly and assembly.
【0022】[0022]
【課題を解決するための手段】上述した課題を解決する
ために本発明は、クレーン本体に取付けられる下ブーム
と、先端側に巻上ロープ用のシーブが取付けられる上ブ
ームと、該上ブームと下ブームとの間に着脱可能に設け
られる中間ブームとからなるクレーンブーム組立体にお
いて、前記中間ブームには、該中間ブームの長さ方向に
離間して取付けられ、外部から圧力流体を給排すること
によりステーとなるロッドを進,退させる複数のステー
シリンダを設け、該各ステーシリンダのロッド先端側に
は親綱を設けるようにしたことを特徴としてなる構成を
採用している。SUMMARY OF THE INVENTION In order to solve the above problems, the present invention relates to a lower boom attached to a crane body, an upper boom to which a sheave for a hoisting rope is attached on the tip side, and an upper boom. In a crane boom assembly including an intermediate boom detachably provided between the lower boom and the lower boom, the intermediate boom is attached to the intermediate boom at a distance from each other in the longitudinal direction of the intermediate boom to supply and discharge the pressure fluid from the outside. Thus, a plurality of stay cylinders for advancing and retracting the rods that become stays are provided, and a master rope is provided at the rod tip end side of each stay cylinder.
【0023】[0023]
【作用】上記構成により、当該クレーンブーム組立体の
分解・組立作業には、外部から各ステーシリンダに圧力
流体を供給すれば、ステーとして用いられるロッドが各
ステーシリンダから突出するように進出し、該各ロッド
の先端側に設けた親綱を中間ブームから自動的に張出す
ことができる。また、各ステーシリンダから圧力流体を
排出すれば、各ステーシリンダ内へとロッドを後退させ
ることができ、親綱を中間ブーム内へと自動的に収納す
ることができる。With the above structure, in disassembling and assembling the crane boom assembly, if pressure fluid is supplied from the outside to each stay cylinder, the rod used as a stay advances so as to project from each stay cylinder, The master rope provided on the tip side of each rod can be automatically extended from the intermediate boom. Further, when the pressure fluid is discharged from each stay cylinder, the rod can be retracted into each stay cylinder, and the master rope can be automatically stored in the intermediate boom.
【0024】[0024]
【実施例】以下、本発明の実施例を図1ないし図4に基
づき説明する。なお、実施例では前述した図5ないし図
10に示す従来技術と同一の構成要素に同一の符号を付
し、その説明を省略するものとする。Embodiments of the present invention will be described below with reference to FIGS. In the embodiment, the same components as those of the prior art shown in FIGS. 5 to 10 are designated by the same reference numerals and the description thereof will be omitted.
【0025】31,31,…は各中間ブーム8の長さ方
向に離間して配設された複数のステーシリンダを示し、
該各ステーシリンダ31は、後述するチューブ32,ロ
ッド36およびピストン37等を備えた油圧シリンダ装
置により構成されている。Denoted by 31, 31, ... are a plurality of stay cylinders spaced apart in the lengthwise direction of each intermediate boom 8.
Each stay cylinder 31 is composed of a hydraulic cylinder device including a tube 32, a rod 36, a piston 37, and the like, which will be described later.
【0026】32,32,…は上側の連結パイプ17,
17および補強パイプ18に取付けられたチューブを示
し、該各チューブ32は有底円筒状に形成され、その先
端側には溶接等によって取付板33が固着されている。
そして、該各取付板33はそれぞれ緊締金具34が挿着
され、該各緊締金具34の先端側にそれぞれナット35
等を締着することにより各チューブ32は連結パイプ1
7または補強パイプ18の長さ方向中間部に固定されて
いる。32, 32, ... are upper connecting pipes 17,
The tubes attached to the reinforcement pipe 17 and the reinforcing pipe 18 are shown. Each of the tubes 32 is formed in a cylindrical shape with a bottom, and a mounting plate 33 is fixed to the tip end side by welding or the like.
Then, the tightening metal fittings 34 are inserted into the respective mounting plates 33, and the nuts 35 are respectively attached to the front ends of the respective tightening metal fittings 34.
Each tube 32 is connected to the connecting pipe 1 by tightening etc.
7 or the reinforcing pipe 18 is fixed to the middle portion in the length direction.
【0027】36,36,…は基端側が各チューブ32
内に挿嵌され、先端側がチューブ32外に伸長してステ
ーとなったロッドを示し、該各ロッド36の先端側には
親綱25を繋留するための繋留リング36Aが設けられ
ている。また、該各ロッド36の基端側には図3に示す
如くピストン37が固着され、該各ロッド36はチュー
ブ32内でピストン37が摺動変位することにより伸,
縮し、各チューブ32の先端側から進,退するようにな
っている。The tubes 36, 36, ... Have proximal ends.
The rods are inserted into the rods 32 and the ends thereof extend outside the tube 32 to form stays, and anchoring rings 36A for anchoring the master rope 25 are provided on the distal ends of the rods 36. Further, as shown in FIG. 3, pistons 37 are fixed to the proximal ends of the rods 36, and the rods 36 are extended by sliding displacement of the pistons 37 in the tube 32.
The tube 32 is contracted, and is advanced and retracted from the tip end side of each tube 32.
【0028】ここで、前記ピストン37は図3に示す如
く、チューブ32内を2つの油室A,Bに画成してい
る。また、チューブ32の軸方向両端側には、該油室
A,Bにそれぞれ連通する給排ポート32A,32Bが
形成され、該各給排ポート32A,32Bにはチューブ
32外を軸方向に伸長する給排配管38,39の一端側
がそれぞれ接続されている。さらに、該給排配管38,
39の他端側には後述の各油圧配管42,43がジョイ
ント40,41を介して取付けられている。Here, the piston 37 defines the inside of the tube 32 into two oil chambers A and B, as shown in FIG. Further, supply / discharge ports 32A, 32B communicating with the oil chambers A, B are formed on both axial ends of the tube 32, and the supply / discharge ports 32A, 32B extend axially outside the tube 32. One ends of the supply / discharge pipes 38, 39 are connected to each other. Further, the supply / discharge pipe 38,
Hydraulic pipes 42, 43 described later are attached to the other end of 39 via joints 40, 41.
【0029】そして、各油圧配管43からの圧油が給排
配管39を介して給排ポート32Bからチューブ32内
の油室Bに供給されると、これによりピストン37が油
室A側へとチューブ32の先端側に向けて摺動変位する
ので、ロッド36は上向きに伸長し、図1に示す如く親
綱25を張出位置に保持するようになる。When the pressure oil from each hydraulic pipe 43 is supplied to the oil chamber B in the tube 32 from the supply / discharge port 32B via the supply / discharge pipe 39, the piston 37 is moved to the oil chamber A side. Since the tube 32 is slidably displaced toward the tip end side, the rod 36 extends upward and holds the master rope 25 in the extended position as shown in FIG.
【0030】一方、各油圧配管42内に高圧の圧油が供
給され、この圧油が給排配管38を介して給排ポート3
2Aからチューブ32内の油室Aに供給されると、これ
によりピストン37が油室B側へとチューブ32の基端
側(底側)に向けて摺動変位するので、ロッド36はチ
ューブ32内へと縮小し、親綱25を図2に示す収納位
置に保持するようになる。On the other hand, high-pressure pressure oil is supplied into each hydraulic pipe 42, and this pressure oil is supplied to the supply / discharge port 3 via the supply / discharge pipe 38.
When the oil is supplied from 2A to the oil chamber A in the tube 32, the piston 37 is slidably displaced toward the oil chamber B side toward the base end side (bottom side) of the tube 32. The main rope 25 is contracted inward and held in the storage position shown in FIG.
【0031】42,42,…は各チューブ32の給排配
管38にそれぞれ各ジョイント40を介して接続された
油圧配管、43,43,…は該各油圧配管42と並行に
配設され、各チューブ32の給排配管39に各ジョイン
ト41を介して接続された他の油圧配管を示し、該各油
圧配管42,43は、中間ブーム8に取付けられた全て
の各ステーシリンダ31の油室A,Bに圧油を給排する
ようにステーシリンダ31間を接続している。The hydraulic pipes 42, 42, ... Are connected to the supply / discharge pipes 38 of the tubes 32 via the joints 40, 43, 43, ... are arranged in parallel with the hydraulic pipes 42, and Another hydraulic pipe connected to the supply / discharge pipe 39 of the tube 32 via each joint 41 is shown. The hydraulic pipes 42 and 43 are the oil chambers A of all the stay cylinders 31 attached to the intermediate boom 8. , B are connected between the stay cylinders 31 so that pressure oil is supplied to and discharged from the stay cylinders B.
【0032】44,44,…、45,45,…は各中間
ブーム8の両端側に位置して各油圧配管42,43の端
部に設けられたカップリングを示し、該各カップリング
44,45は逆止弁を内蔵し、常時は閉弁することによ
り油圧配管42,43の圧油が外部に流出するのを防止
し、図1,図2および図4に示す如く他の中間ブーム8
の油圧配管42,43等と接続したときでは、該各カッ
プリング44,45の前後に圧油が流通するのを許すよ
うになる。.., 45, 45, ... Denote couplings provided at both ends of each intermediate boom 8 and provided at the end portions of the respective hydraulic pipes 42, 43. Reference numeral 45 denotes a built-in check valve, which is normally closed to prevent pressure oil in the hydraulic pipes 42 and 43 from flowing out to the outside, and as shown in FIG. 1, FIG. 2 and FIG.
When connected to the hydraulic pipes 42, 43, etc., the pressure oil is allowed to flow before and after the couplings 44, 45.
【0033】46は上部旋回体2内の機械室に設けられ
た油圧ポンプを示し、該油圧ポンプ46は図4に示す如
く、タンク47と共に各ステーシリンダ31用の圧力源
を構成し、該油圧ポンプ46,タンク47は一対の管路
48,49を介して各ステーシリンダ31に接続され
る。Reference numeral 46 denotes a hydraulic pump provided in a machine room in the upper swing body 2. The hydraulic pump 46 constitutes a pressure source for each stay cylinder 31 together with the tank 47 as shown in FIG. The pump 46 and the tank 47 are connected to each stay cylinder 31 via a pair of pipelines 48 and 49.
【0034】50は管路48,49の途中に設けられた
方向切換弁を示し、該方向切換弁50は運転室内に設け
られた操作レバー50Aによって中立位置(イ)から切
換位置(ロ),(ハ)に切換操作される。Reference numeral 50 designates a directional control valve provided in the middle of the pipelines 48, 49. The directional control valve 50 is operated from the neutral position (a) to the switching position (b) by an operating lever 50A provided in the driver's cab. The operation is switched to (C).
【0035】51はオーバーロードリリーフ弁を示し、
該リリーフ弁51は油圧ポンプ46等に過剰圧が作用す
るのを防止している。51 indicates an overload relief valve,
The relief valve 51 prevents excessive pressure from acting on the hydraulic pump 46 and the like.
【0036】52,53は管路48,49の先端側に設
けられたカップリングを示し、該カップリング52,5
3は各中間ブーム8の油圧配管42,43に設けられた
カップリング44,45に着脱可能に接続される。Reference numerals 52 and 53 denote couplings provided on the tip ends of the pipe lines 48 and 49, respectively.
3 is detachably connected to couplings 44 and 45 provided in the hydraulic pipes 42 and 43 of each intermediate boom 8.
【0037】本実施例によるクレーンブーム組立体は上
述の如き構成を有するもので、その基本的動作等につい
ては従来技術によるものと格別差異ない。The crane boom assembly according to this embodiment has the above-mentioned structure, and its basic operation is not different from that of the prior art.
【0038】そこで、本実施例の特徴となる親綱25の
張出操作または収納操作について図4を参照して説明す
る。Therefore, the operation of projecting or storing the master rope 25, which is a feature of this embodiment, will be described with reference to FIG.
【0039】まず、中間ブーム8の油圧配管42,43
を上部旋回体2側の管路48,49に互いのカップリン
グ44,45、カップリング52,53を介して接続す
る。そして、この中間ブーム8に他の中間ブーム8を連
結する場合には、それぞれ油圧配管42,43を互いの
カップリング44,45を介して接続する。First, the hydraulic pipes 42, 43 of the intermediate boom 8
Is connected to the conduits 48, 49 on the upper revolving structure 2 side via mutual couplings 44, 45 and couplings 52, 53. When connecting another intermediate boom 8 to this intermediate boom 8, the hydraulic pipes 42 and 43 are connected via mutual couplings 44 and 45, respectively.
【0040】次に、親綱25を中間ブーム8上に張出す
場合には、油圧ポンプ46を駆動しつつ、運転室内の操
作レバー50Aを操作して方向切換弁50を中立位置
(イ)から切換位置(ロ)に切換えれば、油圧ポンプ4
6からの圧力流体となる圧油が管路49,各油圧配管4
3および各ステーシリンダ31のチューブ32に設けら
れた給排配管39等を介して油室Bに供給される。これ
により、各ロッド36はチューブ32から上向きに伸長
し、図1に示す張出位置となって中間ブーム8上に突出
して、親綱25を所定の高さ位置に張出すようになる。Next, when the master rope 25 is extended onto the intermediate boom 8, the hydraulic pump 46 is driven and the operation lever 50A in the operator's cab is operated to move the direction switching valve 50 from the neutral position (a). By switching to the switching position (b), the hydraulic pump 4
The pressure oil, which is the pressure fluid from 6, is the conduit 49, each hydraulic pipe 4
The oil is supplied to the oil chamber B via the supply / discharge pipes 39 provided in the tube 32 of the stay cylinder 31 and the stay cylinder 31. As a result, each rod 36 extends upward from the tube 32, reaches the extended position shown in FIG. 1 and projects onto the intermediate boom 8, and the master rope 25 is extended to a predetermined height position.
【0041】そして、このように張出位置に突出したロ
ッド36は、方向切換弁50を切換位置(ロ)から中立
位置(イ)に戻したときにも、油室A,B内に圧油が封
じ込まれることによって張出位置に固定され、この状態
で図6,図7に例示した中間ブーム8の分解・組立作業
を行えば、この作業時に命綱を所定高さ位置の親綱25
に確実に掛止めでき、高所作業での安全性を確保でき
る。The rod 36 protruding to the projecting position in this way is pressurized oil in the oil chambers A and B even when the direction switching valve 50 is returned from the switching position (b) to the neutral position (a). When the intermediate boom 8 illustrated in FIGS. 6 and 7 is disassembled and assembled in this state, the life rope is fixed at the overhanging position, and the life rope 25 at the predetermined height position is used during this work.
It can be securely hooked to, and it is possible to secure safety when working in high places.
【0042】一方、親綱25を中間ブーム8へと収納す
る場合には、運転室内の操作レバー50Aを操作して方
向切換弁50を中立位置(イ)から切換位置(ハ)に切
換えれば、油圧ポンプ46から圧油が管路48,各油圧
配管42および各ステーシリンダ31のチューブ32に
設けられた給排配管38等を介して油室Aに供給され
る。これにより、各ロッド36はチューブ32内へと縮
小し、親綱25を図2に示す収納位置に戻すことができ
る。On the other hand, when the master rope 25 is stored in the intermediate boom 8, the operation lever 50A in the driver's cab is operated to switch the direction switching valve 50 from the neutral position (a) to the switching position (c). Pressure oil is supplied from the hydraulic pump 46 to the oil chamber A through the pipe line 48, the hydraulic pipes 42, the supply / discharge pipes 38 provided in the tubes 32 of the stay cylinders 31, and the like. This allows each rod 36 to shrink into the tube 32 and return the master rope 25 to the storage position shown in FIG.
【0043】また、各中間ブーム8を分解して親綱25
を収納した後に、各カップリング44,45,52,5
3等を取外すときには、各カップリング44,45,5
2,53に内蔵された逆止弁によって、各ステーシリン
ダ31,油圧配管42,43および管路48,49等内
の圧油が外部に流出するのを防止でき、また、各ロッド
36を収納位置に固定した状態で保持することができ
る。The intermediate booms 8 are disassembled and the main rope 25 is disassembled.
After storing each coupling 44, 45, 52, 5
When removing 3 etc., each coupling 44, 45, 5
The check valves built in 2, 53 can prevent the pressure oil in each stay cylinder 31, the hydraulic pipes 42, 43, and the pipelines 48, 49 from flowing out, and store each rod 36. It can be held fixed in position.
【0044】かくして、本実施例によれば、各中間ブー
ム8に複数のステーシリンダ31,31,…を設け、該
各ステーシリンダ31のステーとなるロッド36を圧油
の給排によって伸縮させる構成としたから、各ステーシ
リンダ31に油圧ポンプ46からの圧油を給排すること
によって、それぞれのロッド36を進,退させ、親綱2
5を図1に示す張出位置と図2に示す収納位置とに選択
的に位置決めすることができると共に、従来技術のよう
にピン26等を用いることなく、各ロッド36を張出位
置または収納位置に簡単に固定することができる。Thus, according to the present embodiment, each intermediate boom 8 is provided with a plurality of stay cylinders 31, 31, ..., And the rod 36 which becomes the stay of each stay cylinder 31 is expanded and contracted by the supply and discharge of pressure oil. Therefore, by supplying / discharging the pressure oil from the hydraulic pump 46 to / from each stay cylinder 31, the respective rods 36 are advanced and retracted, and the main rope 2
5 can be selectively positioned between the extended position shown in FIG. 1 and the retracted position shown in FIG. 2, and each rod 36 can be extended or retracted without using the pins 26 or the like as in the prior art. Can be easily fixed in position.
【0045】これにより、クレーンブーム組立体の分解
・組立作業の際には、各ロッド36および親綱25の張
出,収納作業を、運転室内から操作レバー50Aを操作
するだけで簡単に行うことができ、従来技術のように各
中間ブーム8上に登って行う必要がなくなる。As a result, when disassembling and assembling the crane boom assembly, each rod 36 and master rope 25 can be easily extended and stored by simply operating the operation lever 50A from the cab. Therefore, it is not necessary to climb on each of the intermediate booms 8 as in the prior art.
【0046】また、複数の中間ブーム8を連結するのに
先立って、各中間ブーム8の油圧配管42,43をそれ
ぞれ接続し、油圧ポンプ46から圧油を給排すれば、各
中間ブーム8に配設された全てのロッド36を同時に張
出位置へと突出させることができるから、各ロッド36
および親綱25の張出、収納作業を瞬時に行うことがで
き、作業時間を大幅短縮することができる。Before connecting the plurality of intermediate booms 8, the hydraulic pipes 42 and 43 of each intermediate boom 8 are connected to supply and discharge the pressure oil from the hydraulic pump 46. Since all the arranged rods 36 can be projected to the projecting position at the same time, each rod 36
Further, the work of projecting and storing the master rope 25 can be performed instantaneously, and the work time can be greatly shortened.
【0047】従って、従来技術のように親綱25の張
出、収納作業に余分な労力や時間を費やすことなく、ク
レーンブーム組立体6の分解・組立作業の作業性を大幅
に向上させることができる。Therefore, the workability of disassembling / assembling work of the crane boom assembly 6 can be greatly improved without spending extra labor and time for projecting and storing the master rope 25 as in the prior art. it can.
【0048】なお、前記実施例では、ステーシリンダ3
1を油圧シリンダ装置によって構成し、油圧ポンプ46
からの圧油によってロッド36を進退させるものとして
述べたが、本発明はこれに限らず、ステーシリンダを空
圧シリンダ装置によって構成し、外部からエアコンプレ
ッサ等によってエアを供給し、ロッドを進,退させるよ
うにしてもよい。In the above embodiment, the stay cylinder 3
1 is constituted by a hydraulic cylinder device, and a hydraulic pump 46
However, the present invention is not limited to this, and the stay cylinder is configured by a pneumatic cylinder device, and air is supplied from the outside by an air compressor or the like to advance the rod. You may make it retire.
【0049】また、前記実施例では、クローラ式クレー
ンを例に挙げて説明したが、本発明はこれに限らず、例
えばタワークレーン等にも適用できる。In the above embodiment, the crawler type crane has been described as an example, but the present invention is not limited to this and can be applied to, for example, a tower crane.
【0050】[0050]
【発明の効果】以上詳述した通り本発明によれば、中間
ブームには、該中間ブームの長さ方向に離間して複数の
ステーシリンダを設け、該各ステーシリンダのロッド先
端側には親綱を設ける構成としたから、各ステーシリン
ダに外部から圧力流体を給排するだけで、各ロッドを親
綱と共に中間ブーム上に簡単に張出したり、収納したり
することができ、作業性を大幅に向上できると共に、作
業時の安全性を確保でき、クレーンブーム組立体の分解
・組立作業の省力化を図ることが可能となる。As described above in detail, according to the present invention, the intermediate boom is provided with a plurality of stay cylinders which are spaced apart from each other in the lengthwise direction of the intermediate boom, and the stay cylinders have parent rods on the rod tip side. Since the rope is configured, each rod can be easily extended and stored on the intermediate boom together with the parent rope simply by supplying / discharging pressure fluid to / from each stay cylinder from the outside, greatly improving workability. In addition, it is possible to ensure safety during work and save labor for disassembling and assembling the crane boom assembly.
【図1】本発明の実施例によるクレーン組立体の中間ブ
ームおよびステーシリンダ等を親綱の張出位置で示す縦
断面図である。FIG. 1 is a vertical cross-sectional view showing an intermediate boom, a stay cylinder and the like of a crane assembly according to an embodiment of the present invention in a projecting position of a main rope.
【図2】各ロッドをそれぞれチューブ内に縮小させた親
綱の収納位置を示す図1と同様位置の縦断面図である。FIG. 2 is a vertical cross-sectional view of the same position as in FIG. 1 showing the storage position of the master rope in which each rod is contracted into the tube.
【図3】図1に示すステーシリンダの拡大断面図であ
る。FIG. 3 is an enlarged cross-sectional view of the stay cylinder shown in FIG.
【図4】各ステーシリンダおよび油圧ポンプ等を示す油
圧回路図である。FIG. 4 is a hydraulic circuit diagram showing each stay cylinder, a hydraulic pump, and the like.
【図5】従来技術によるクローラ式クレーンを示す全体
図である。FIG. 5 is an overall view showing a crawler type crane according to the prior art.
【図6】図5に示す各中間ブームの組立状態を示す説明
図である。6 is an explanatory view showing an assembled state of each intermediate boom shown in FIG. 5. FIG.
【図7】上ブームを組付けた各中間ブームを下ブームに
組付ける状態を示す説明図である。FIG. 7 is an explanatory diagram showing a state in which each intermediate boom to which the upper boom is attached is attached to the lower boom.
【図8】中間ブームの斜視図である。FIG. 8 is a perspective view of an intermediate boom.
【図9】図8中の矢示IX−IX方向拡大断面図である。9 is an enlarged cross-sectional view taken along arrow IX-IX in FIG.
【図10】各ステーを中間ブーム内に収納した状態を示
す図9と同様位置の断面図である。FIG. 10 is a cross-sectional view of the same position as FIG. 9 showing a state where each stay is stored in the intermediate boom.
1 下部走行体 2 上部旋回体(クレーン本体) 6 クレーンブーム組立体 7 下ブーム 8 中間ブーム 9 上ブーム 10 巻上ロープ 11 シーブ 13 俯仰動用ロープ 15 ペンダントロープ 16 枠パイプ 17 連結パイプ 18 補強パイプ 25 親綱 31 ステーシリンダ(シリンダ装置) 32 チューブ 36 ロッド(ステー) 1 Lower Traveling Body 2 Upper Revolving Structure (Crane Main Body) 6 Crane Boom Assembly 7 Lower Boom 8 Middle Boom 9 Upper Boom 10 Hoisting Rope 11 Sheave 13 Depression Rope 15 Pendant Rope 16 Frame Pipe 17 Connecting Pipe 18 Reinforcement Pipe 25 Parent Rope 31 stay cylinder (cylinder device) 32 tube 36 rod (stay)
Claims (1)
と、先端側に巻上ロープ用のシーブが取付けられる上ブ
ームと、該上ブームと下ブームとの間に着脱可能に設け
られる中間ブームとからなるクレーンブーム組立体にお
いて、前記中間ブームには、該中間ブームの長さ方向に
離間して取付けられ、外部から圧力流体を給排すること
によりステーとなるロッドを進,退させる複数のステー
シリンダを設け、該各ステーシリンダのロッド先端側に
は親綱を設ける構成としたことを特徴とするクレーンブ
ーム組立体。1. A lower boom attached to a crane main body, an upper boom to which a sheave for a hoisting rope is attached at a tip side, and an intermediate boom detachably provided between the upper boom and the lower boom. In the crane boom assembly, a plurality of stay cylinders, which are attached to the intermediate boom so as to be spaced apart from each other in the length direction of the intermediate boom, and which advance and retract a rod serving as a stay by supplying and discharging a pressure fluid from the outside. A crane boom assembly, characterized in that a main rope is provided on the rod tip side of each stay cylinder.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32106593A JPH07144885A (en) | 1993-11-26 | 1993-11-26 | Crane boom assembly |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32106593A JPH07144885A (en) | 1993-11-26 | 1993-11-26 | Crane boom assembly |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH07144885A true JPH07144885A (en) | 1995-06-06 |
Family
ID=18128418
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP32106593A Pending JPH07144885A (en) | 1993-11-26 | 1993-11-26 | Crane boom assembly |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH07144885A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009149438A (en) * | 2007-11-29 | 2009-07-09 | Manitowoc Crane Companies Ltd | Connection system for crane boom segment |
| CN103174179A (en) * | 2013-03-12 | 2013-06-26 | 中国十七冶集团有限公司 | Hydraulic multifunctional suspension arm |
| WO2013139116A1 (en) * | 2012-03-20 | 2013-09-26 | 中联重科股份有限公司 | Arm joint for truss arm, truss arm, and crane with truss arm |
| JP2022155626A (en) * | 2021-03-31 | 2022-10-14 | 住友重機械建機クレーン株式会社 | Crane, Crane Boom Laying Method |
-
1993
- 1993-11-26 JP JP32106593A patent/JPH07144885A/en active Pending
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009149438A (en) * | 2007-11-29 | 2009-07-09 | Manitowoc Crane Companies Ltd | Connection system for crane boom segment |
| WO2013139116A1 (en) * | 2012-03-20 | 2013-09-26 | 中联重科股份有限公司 | Arm joint for truss arm, truss arm, and crane with truss arm |
| CN103174179A (en) * | 2013-03-12 | 2013-06-26 | 中国十七冶集团有限公司 | Hydraulic multifunctional suspension arm |
| JP2022155626A (en) * | 2021-03-31 | 2022-10-14 | 住友重機械建機クレーン株式会社 | Crane, Crane Boom Laying Method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4108727B2 (en) | Counterweight handling equipment | |
| EP1619159B1 (en) | Boom hoist cylinder crane | |
| JP5999902B2 (en) | Method for connecting components of a crane suspension assembly and frame mounting assembly used for the method | |
| EP1507735B1 (en) | Removable hydraulic hose carrier | |
| JP6324934B2 (en) | Watering attachment, work machine and watering system | |
| JP5513820B2 (en) | Trunnion transport system and crane using the same | |
| US6481202B1 (en) | Hydraulic system for boom hoist cylinder crane | |
| JP2010013880A (en) | Boom mechanism for force-feeding concrete | |
| JPH07144885A (en) | Crane boom assembly | |
| JP2011236653A (en) | Front attachment of work machine | |
| JP6525717B2 (en) | Boom attaching / detaching device and attaching / detaching method | |
| JPH10316366A (en) | Luffing jib assembling method | |
| JP2824033B2 (en) | Mast mechanism | |
| US8413828B2 (en) | Hoist attachment for skid steer | |
| JP4077281B2 (en) | Shaft excavator | |
| JP3329719B2 (en) | Pile driver | |
| JP3678592B2 (en) | Telescopic cylinder mounting structure in boom device | |
| JP5004977B2 (en) | Construction machinery | |
| JP2001115483A (en) | Multi-stage telescopic arm | |
| JPH0582982U (en) | Counterweight attachment / detachment equipment for construction work machines | |
| JP2023069408A (en) | Boom attachment and concrete distributor | |
| JPH0940372A (en) | Jig installing and removing device of crain | |
| JPS5978092A (en) | Crane for concrete structure building | |
| JPH09208184A (en) | Work method in assembling and disassembling boom | |
| JPH04103953U (en) | Boom device for transporting fresh concrete |