WO2002029196A3 - Improved well testing system - Google Patents

Improved well testing system Download PDF

Info

Publication number
WO2002029196A3
WO2002029196A3 PCT/GB2001/004393 GB0104393W WO0229196A3 WO 2002029196 A3 WO2002029196 A3 WO 2002029196A3 GB 0104393 W GB0104393 W GB 0104393W WO 0229196 A3 WO0229196 A3 WO 0229196A3
Authority
WO
WIPO (PCT)
Prior art keywords
well
string
formation
formation fluid
well testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/GB2001/004393
Other languages
French (fr)
Other versions
WO2002029196A2 (en
Inventor
Jeffrey Charles Edwards
Andrew Richards
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Expro North Sea Ltd
Original Assignee
Expro North Sea Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to BR0114452-9A priority Critical patent/BR0114452A/en
Priority to EP01972284A priority patent/EP1322837B1/en
Priority to AU2001292062A priority patent/AU2001292062B2/en
Priority to AU9206201A priority patent/AU9206201A/en
Priority to CA002423232A priority patent/CA2423232C/en
Priority to DE60124934T priority patent/DE60124934D1/en
Priority to US10/398,262 priority patent/US7086464B2/en
Application filed by Expro North Sea Ltd filed Critical Expro North Sea Ltd
Publication of WO2002029196A2 publication Critical patent/WO2002029196A2/en
Publication of WO2002029196A3 publication Critical patent/WO2002029196A3/en
Priority to NO20031300A priority patent/NO326503B1/en
Anticipated expiration legal-status Critical
Priority to US11/416,269 priority patent/US7261161B2/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells
    • E21B49/087Well testing, e.g. testing for reservoir productivity or formation parameters
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/18Pipes provided with plural fluid passages
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/066Valve arrangements for boreholes or wells in wells electrically actuated

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Selective Calling Equipment (AREA)
  • Diaphragms For Electromechanical Transducers (AREA)
  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
  • Pipeline Systems (AREA)
  • Measuring Volume Flow (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)
  • Hydrogen, Water And Hydrids (AREA)

Abstract

A well testing system and well testing method is described which can be operated as a closed system with no production of hydrocarbons outside the well with the liquid hydrocarbon being re-injected. This is achieved by providing a string with at least two well conduits. One conduit is used to produce formation fluids to surface or to produce/store unrepresentative initial flow products and the other conduit is used to store formation fluid. A flow control valve is provided at the lower end of the string or at surface and the size of the valve opening is controllable to allow formation fluid to enter the storage string at a controlled rate, so that the formation fluid flowing time is increased to maximise the radius of investigation into the formation to a similar order of magnitude of existing production test and extended well tests.
PCT/GB2001/004393 2000-10-05 2001-10-04 Improved well testing system Ceased WO2002029196A2 (en)

Priority Applications (9)

Application Number Priority Date Filing Date Title
EP01972284A EP1322837B1 (en) 2000-10-05 2001-10-04 Improved well testing system
AU2001292062A AU2001292062B2 (en) 2000-10-05 2001-10-04 Improved well testing system
AU9206201A AU9206201A (en) 2000-10-05 2001-10-04 Improved well testing system
CA002423232A CA2423232C (en) 2000-10-05 2001-10-04 Improved well testing system
DE60124934T DE60124934D1 (en) 2000-10-05 2001-10-04 TEST SYSTEM FOR OIL OR GAS SOURCES
BR0114452-9A BR0114452A (en) 2000-10-05 2001-10-04 Well test system, method for performing a well test, and flow control valve
US10/398,262 US7086464B2 (en) 2000-10-05 2001-10-04 Well testing system
NO20031300A NO326503B1 (en) 2000-10-05 2003-03-21 System and method for well testing
US11/416,269 US7261161B2 (en) 2000-10-05 2006-05-02 Well testing system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GBGB0024378.2A GB0024378D0 (en) 2000-10-05 2000-10-05 Improved well testing system
GB0024378.2 2000-10-05

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US11/416,269 Division US7261161B2 (en) 2000-10-05 2006-05-02 Well testing system

Publications (2)

Publication Number Publication Date
WO2002029196A2 WO2002029196A2 (en) 2002-04-11
WO2002029196A3 true WO2002029196A3 (en) 2002-08-08

Family

ID=9900724

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2001/004393 Ceased WO2002029196A2 (en) 2000-10-05 2001-10-04 Improved well testing system

Country Status (10)

Country Link
US (2) US7086464B2 (en)
EP (1) EP1322837B1 (en)
AT (1) ATE347021T1 (en)
AU (2) AU2001292062B2 (en)
BR (1) BR0114452A (en)
CA (1) CA2423232C (en)
DE (1) DE60124934D1 (en)
GB (1) GB0024378D0 (en)
NO (1) NO326503B1 (en)
WO (1) WO2002029196A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10030492B2 (en) 2015-06-25 2018-07-24 Saudi Arabian Oil Company Well testing through a generated exothermic reaction in the wellbore

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7083009B2 (en) 2003-08-04 2006-08-01 Pathfinder Energy Services, Inc. Pressure controlled fluid sampling apparatus and method
EP1875043A1 (en) * 2005-04-28 2008-01-09 EDI Exploration Drilling International GmbH Method and sample removal device for obtaining a water and/or oil and/or gas and or solids-containing sample medium from a borehole
US8132621B2 (en) * 2006-11-20 2012-03-13 Halliburton Energy Services, Inc. Multi-zone formation evaluation systems and methods
US9488752B2 (en) * 2013-06-04 2016-11-08 Saudi Arabian Oil Company System for computing the radius of investigation in a radial, composite reservoir system
WO2009024545A1 (en) 2007-08-17 2009-02-26 Shell Internationale Research Maatschappij B.V. Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches
US8086431B2 (en) * 2007-09-28 2011-12-27 Schlumberger Technology Corporation Method and system for interpreting swabbing tests using nonlinear regression
WO2009085395A1 (en) * 2007-12-31 2009-07-09 Exxonmobil Upstream Research Company Methods and systems for determining near-wellbore characteristics and reservoir properties
US8899339B2 (en) * 2008-02-29 2014-12-02 Exxonmobil Upstream Research Company Systems and methods for regulating flow in a wellbore
US8051910B2 (en) * 2008-04-22 2011-11-08 Baker Hughes Incorporated Methods of inferring flow in a wellbore
US8666717B2 (en) 2008-11-20 2014-03-04 Exxonmobil Upstream Resarch Company Sand and fluid production and injection modeling methods
CA2789221C (en) * 2010-02-21 2019-06-04 Teraspan Networks Inc. Duct system for fibre optic components
US8584749B2 (en) 2010-12-17 2013-11-19 Exxonmobil Upstream Research Company Systems and methods for dual reinjection
US9057252B2 (en) 2011-11-22 2015-06-16 Vetco Gray Inc. Product sampling system within subsea tree
WO2015065387A1 (en) * 2013-10-30 2015-05-07 Halliburton Energy Services, Inc. Abandoned well monitoring system
CN103982176B (en) * 2014-06-04 2015-08-19 东北石油大学 A kind of automatically controlled memory-type oil well delamination pressure gauge
US9891131B1 (en) * 2015-02-19 2018-02-13 Bay Worx Laboratories, Llc Blowout preventer test system
CN105221134B (en) * 2015-10-19 2017-11-10 中国石油大学(北京) A kind of Fractured Gas Wells return the method for discrimination that discharge opeing is formed with stratum water
WO2017196303A1 (en) * 2016-05-10 2017-11-16 Halliburton Energy Services Inc. Tester valve below a production packer
US20180171740A1 (en) * 2016-12-20 2018-06-21 Baker Hughes Incorporated Dual Bore Swell Packer
WO2019148279A1 (en) * 2018-01-30 2019-08-08 Ncs Multistage Inc. Method of optimizing operation one or more tubing strings in a hydrocarbon well, apparatus and system for same
US11365607B2 (en) * 2020-03-30 2022-06-21 Saudi Arabian Oil Company Method and system for reviving wells
CN111852410A (en) * 2020-08-12 2020-10-30 中海石油(中国)有限公司湛江分公司 An offshore gas well multi-production channel completion string structure and completion process method
CN114562249A (en) * 2021-11-09 2022-05-31 贵州航天凯山石油仪器有限公司 Permanent oil well single layer flow tester structure
NO347602B1 (en) 2021-12-23 2024-01-29 Testall As Intelligent well testing system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5638904A (en) * 1995-07-25 1997-06-17 Nowsco Well Service Ltd. Safeguarded method and apparatus for fluid communiction using coiled tubing, with application to drill stem testing
NO991577L (en) * 1999-03-30 2000-10-02 Norske Stats Oljeselskap Method and system for testing a borehole using a movable plug
WO2000065199A1 (en) * 1999-04-22 2000-11-02 Schlumberger Technology Corporation Method and apparatus for continuously testing a well

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3646995A (en) * 1969-12-08 1972-03-07 Halliburton Co Method and apparatus for testing offshore wells
US3762219A (en) * 1971-09-20 1973-10-02 Halliburton Co Apparatus for conducting controlled well testing operations
US4691778A (en) 1987-02-09 1987-09-08 Pyne R David G Downhole water flow controller for aquifer storage recovery wells
US5896924A (en) 1997-03-06 1999-04-27 Baker Hughes Incorporated Computer controlled gas lift system
WO1999005395A1 (en) 1997-07-24 1999-02-04 Camco International Inc. Full bore variable flow control device
US6325146B1 (en) * 1999-03-31 2001-12-04 Halliburton Energy Services, Inc. Methods of downhole testing subterranean formations and associated apparatus therefor
US6289911B1 (en) * 1999-04-16 2001-09-18 Smith International, Inc. Mud saver kelly valve
CA2431280A1 (en) * 2003-06-05 2004-12-05 Thomas Hubert Vermeeren Bypass valve for a flow through gas lift plunger

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5638904A (en) * 1995-07-25 1997-06-17 Nowsco Well Service Ltd. Safeguarded method and apparatus for fluid communiction using coiled tubing, with application to drill stem testing
NO991577L (en) * 1999-03-30 2000-10-02 Norske Stats Oljeselskap Method and system for testing a borehole using a movable plug
WO2000058604A1 (en) * 1999-03-30 2000-10-05 Den Norske Stats Oljeselskap A.S Method and system for testing a borehole by the use of a movable plug
WO2000065199A1 (en) * 1999-04-22 2000-11-02 Schlumberger Technology Corporation Method and apparatus for continuously testing a well

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10030492B2 (en) 2015-06-25 2018-07-24 Saudi Arabian Oil Company Well testing through a generated exothermic reaction in the wellbore

Also Published As

Publication number Publication date
NO20031300L (en) 2003-05-23
NO326503B1 (en) 2008-12-15
AU2001292062B2 (en) 2006-11-16
EP1322837B1 (en) 2006-11-29
US20060196670A1 (en) 2006-09-07
US7086464B2 (en) 2006-08-08
CA2423232C (en) 2008-07-15
US7261161B2 (en) 2007-08-28
GB0024378D0 (en) 2000-11-22
ATE347021T1 (en) 2006-12-15
EP1322837A2 (en) 2003-07-02
WO2002029196A2 (en) 2002-04-11
US20040094296A1 (en) 2004-05-20
AU9206201A (en) 2002-04-15
BR0114452A (en) 2003-10-21
NO20031300D0 (en) 2003-03-21
DE60124934D1 (en) 2007-01-11
CA2423232A1 (en) 2002-04-11

Similar Documents

Publication Publication Date Title
CA2423232A1 (en) Improved well testing system
US20070256840A1 (en) Method and Actuator Device
RU2007116163A (en) BIDIRECTIONAL PULSE GENERATOR FOR BOREHOLE MEASUREMENTS IN THE DRILLING PROCESS, WORKING IN THE RING FLOW, CLOSE TO THE LAMINAR
NO336835B1 (en) An apparatus and method for fluid flow control
CN103470201B (en) Fluid control system
NO313895B1 (en) Apparatus and method for limiting the flow of formation water into a well
WO2000000716A3 (en) System and method for controlling fluid flows in oil or gas wells
CN104948149B (en) A kind of multimedium dispensing system suitable in mining site complexity oil reservoir
NO20141190A1 (en) Apparatus and method for providing a fluid sample in a well
NO162529B (en) CONTROL DEVICE FOR A TOOL, EX. A VALVE PLACED IN THE PRODUCTION STRING IN A BROWN.
EA200200395A1 (en) SAFETY VALVE FOR DOWNSTREAM WELL
CA2334964A1 (en) Physiological stress detector device and method
CN111879674B (en) Testing device and method for determining reasonable well closing time based on shale imbibition permeability
CA2367075A1 (en) Method and system for testing a borehole by the use of a movable plug
CN202735216U (en) Drilling fluid semipermeable membrane evaluation device
CA2426560A1 (en) Bore-hole jet device for formation testing and a prestarting procedure for said device
CN1793820B (en) Electric water harvesting device
US3093267A (en) Dual chemical dispenser
RU2003131243A (en) DEVICE FOR MEASURING OIL WELL DEBIT
CN202467827U (en) Downhole layered direct reading tester
CN210152643U (en) Oil well sampling device
CN206816877U (en) A kind of novel pipeline liquid sampling valve
CN102052072A (en) Sand-filled pipe device simulating two-dimensional drill core and provided with circular truncated cone shaped cylinder body
CN211784191U (en) Fracturing fluid pipeline rubs and hinders testing arrangement
CN220395671U (en) Split type axial force-free loop switching valve for borehole ground stress test

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A2

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PH PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A2

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

AK Designated states

Kind code of ref document: A3

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PH PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A3

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2001972284

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2001292062

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 2423232

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 10398262

Country of ref document: US

WWP Wipo information: published in national office

Ref document number: 2001972284

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

NENP Non-entry into the national phase

Ref country code: JP

WWG Wipo information: grant in national office

Ref document number: 2001972284

Country of ref document: EP