WO2007126055A1 - 空気調和装置 - Google Patents

空気調和装置 Download PDF

Info

Publication number
WO2007126055A1
WO2007126055A1 PCT/JP2007/059173 JP2007059173W WO2007126055A1 WO 2007126055 A1 WO2007126055 A1 WO 2007126055A1 JP 2007059173 W JP2007059173 W JP 2007059173W WO 2007126055 A1 WO2007126055 A1 WO 2007126055A1
Authority
WO
WIPO (PCT)
Prior art keywords
refrigerant
target value
indoor
unit
communication pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2007/059173
Other languages
English (en)
French (fr)
Inventor
Manabu Yoshimi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Priority to AU2007244205A priority Critical patent/AU2007244205B2/en
Priority to CN2007800150331A priority patent/CN101432584B/zh
Priority to US12/298,667 priority patent/US7954333B2/en
Priority to EP07742608.8A priority patent/EP2017556A4/en
Publication of WO2007126055A1 publication Critical patent/WO2007126055A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • F24F3/06Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the arrangements for the supply of heat-exchange fluid for the subsequent treatment of primary air in the room units
    • F24F3/065Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the arrangements for the supply of heat-exchange fluid for the subsequent treatment of primary air in the room units with a plurality of evaporators or condensers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/32Responding to malfunctions or emergencies
    • F24F11/36Responding to malfunctions or emergencies to leakage of heat-exchange fluid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/84Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B45/00Arrangements for charging or discharging refrigerant
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/005Outdoor unit expansion valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/007Compression machines, plants or systems with reversible cycle not otherwise provided for three pipes connecting the outdoor side to the indoor side with multiple indoor units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/023Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units
    • F25B2313/0231Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units with simultaneous cooling and heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/023Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units
    • F25B2313/0233Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units in parallel arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/025Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units
    • F25B2313/0252Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units with bypasses
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/02741Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using one four-way valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/029Control issues
    • F25B2313/0291Control issues related to the pressure of the indoor unit
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/029Control issues
    • F25B2313/0294Control issues related to the outdoor fan, e.g. controlling speed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/031Sensor arrangements
    • F25B2313/0314Temperature sensors near the indoor heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/031Sensor arrangements
    • F25B2313/0315Temperature sensors near the outdoor heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00Component parts or details not otherwise provided for in this subclass
    • F25B2400/13Economisers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/19Calculation of parameters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/24Low amount of refrigerant in the system
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/021Inverters therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/17Control issues by controlling the pressure of the condenser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/19Refrigerant outlet condenser temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/21Refrigerant outlet evaporator temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/04Refrigerant level
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • F25B2700/1931Discharge pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • F25B2700/1933Suction pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2104Temperatures of an indoor room or compartment
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2106Temperatures of fresh outdoor air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2116Temperatures of a condenser
    • F25B2700/21163Temperatures of a condenser of the refrigerant at the outlet of the condenser
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Definitions

  • the present invention relates to a function for determining the suitability of the amount of refrigerant in a refrigerant circuit of an air conditioner, in particular, an air conditioner configured by connecting a compressor, a condenser, an expansion mechanism, and an evaporator.
  • an air conditioner configured by connecting a compressor, a condenser, an expansion mechanism, and an evaporator.
  • the present invention relates to an air conditioner having a function of determining whether or not the amount of refrigerant in a refrigerant circuit is appropriate.
  • refrigerant amount determination for determining whether the refrigerant amount in the refrigerant circuit is excessive or insufficient
  • a method has been proposed in which operation is performed to determine whether the amount of refrigerant in the refrigerant circuit is excessive or insufficient (see, for example, Patent Document 1).
  • Patent Document 1 Japanese Patent Laid-Open No. 3-186170
  • An object of the present invention is to suppress an increase in temperature in a machine room due to insufficient capacity of an indoor unit even in a refrigerant amount detection operation, and to suppress a failure in a machine room device.
  • An air conditioner includes a refrigerant circuit and operation control means.
  • the refrigerant circuit is configured by connecting a heat source unit, a plurality of utilization units, and an expansion mechanism.
  • the heat source unit has a compressor and heat source side heat exchange. Usage units are And a use side heat exchanger.
  • the operation control means can perform a refrigerant amount determination operation for controlling the constituent devices such that the first state value becomes the first control target value.
  • the operation control means is
  • the cooling capacity of the first usage unit that air-conditions the predetermined space among the plurality of usage units is maintained.
  • Usage units may be placed in certain spaces (hereinafter referred to as machine rooms) such as machine rooms that require constant cooling operation.
  • machine rooms such as machine rooms that require constant cooling operation.
  • the control target value for detection operation e.g., the low pressure target value, the superheat degree target value, etc.
  • the cooling capacity of the units used in the machine room may be insufficient in some cases, and malfunctions may occur in equipment (servers, etc.) in the machine room.
  • An air conditioner according to a second invention is the air conditioner according to the first invention, wherein the first control target value is a low pressure target value.
  • the operation control means controls the constituent devices such that the refrigerant pressure on the suction side of the compressor or the operation state quantity equivalent to the pressure becomes constant at the low pressure target value.
  • the low pressure target value is set as the first control target value
  • the operation control means has an operation state amount equivalent to the pressure or pressure of the refrigerant on the suction side of the compressor in the refrigerant amount determination operation. Control the components so that the value is constant.
  • the usage unit in the machine room is operated with sufficient capacity for the cooling load of the machine room.
  • the temperature rise in the machine room due to insufficient unit capacity can be suppressed, and the occurrence of failures in machine room equipment can be suppressed.
  • An air conditioner pertaining to a third invention is the air conditioner pertaining to the first invention, wherein the first control target value is a superheat degree target value.
  • the operation control means is useful in the refrigerant quantity determination operation.
  • the equipment side heat exchanger functions as a refrigerant evaporator and the components are controlled so that the superheat degree of the refrigerant sent from the use side heat exchanger to the compressor becomes constant at the superheat degree target value.
  • the superheat degree target value is set as the first control target value
  • the operation control means causes the use side heat exchanger to function as a refrigerant evaporator and the use side heat exchange in the refrigerant quantity determination operation.
  • the components are controlled so that the degree of superheat of the refrigerant sent from the compressor to the compressor becomes constant at the superheat target value.
  • the usage unit in the machine room is operated with sufficient capacity against the cooling load of the machine room, thereby It is possible to suppress the temperature rise in the machine room due to the lack of capacity and to prevent the machine room equipment from being damaged.
  • An air conditioner according to a fourth invention is the air conditioner according to any one of the first to third inventions, further comprising a history recording means.
  • the history recording means can record the history of the second control target value, which is the control target value of the first usage unit.
  • the operation control means derives the second control target value before the refrigerant amount determination operation based on the history during the refrigerant amount determination operation, and controls the first usage unit with the second control target value.
  • the second control target value in the first usage unit before the refrigerant amount determination operation is recorded as a history, and the first usage unit is recorded based on the history during the refrigerant amount determination operation.
  • the use room in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and the temperature in the machine room due to insufficient capacity of the use unit. It is possible to suppress the rise and prevent the machine room equipment from being damaged.
  • An air conditioner according to a fifth invention is the air conditioner according to the fourth invention, wherein the second control target value is a superheat degree target value of the first usage unit.
  • the superheat target value of the first usage unit is recorded as a history, and the control before the refrigerant amount determination operation is performed on the first usage unit based on the history during the refrigerant amount determination operation.
  • the cooling capacity of the first usage unit is maintained at the same level as the cooling capacity before the refrigerant quantity determination operation.
  • the superheat degree target value of the first usage unit is recorded as a history, it is possible to maintain the cooling capacity of the first usage unit equivalent to the capacity before the refrigerant amount determination operation. For this reason, even in refrigerant quantity detection operation, the units used in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and temperature rise in the machine room due to insufficient capacity of the unit used can be suppressed. It is possible to suppress the occurrence of failures in machine room equipment.
  • An air conditioner according to a sixth aspect of the present invention is the air conditioner according to any of the first to third aspects of the present invention, further comprising environmental information acquisition means and target derivation means.
  • the environmental information acquisition means can acquire environmental information outdoors or in a predetermined space.
  • the target value deriving means derives a third control target value that optimally air-conditions the predetermined space based on the environmental information.
  • the operation control means controls the operation of the first usage unit based on the third control target value.
  • the environment information in the predetermined space is monitored, and the inside of the predetermined space is determined based on the environment information.
  • the third control target value for optimal air conditioning is derived.
  • the first usage unit is controlled based on the third control target value, so that the cooling capacity of the first usage unit is equal to the capacity before the refrigerant quantity judgment operation. It is possible to maintain. For this reason, even in the refrigerant quantity judgment operation, the use unit in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and the temperature rise in the machine room due to insufficient capacity of the use unit is suppressed, It is possible to suppress the occurrence of failures in machine room devices.
  • An air conditioner according to a seventh aspect is the air conditioner according to the sixth aspect, wherein the third control target value is a superheat degree target value of the first usage unit.
  • the first usage unit as the third control target value for optimally air-conditioning the predetermined space based on the environmental information by monitoring the environmental information in the predetermined space
  • the target value of superheat degree is derived.
  • the first usage unit is controlled based on the superheat degree target value, so that the cooling capacity of the first usage unit is made equal to the capacity before the refrigerant quantity determination operation. It is possible to maintain. For this reason, even in refrigerant quantity detection operation, the units used in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and the temperature rise in the machine room due to insufficient capacity of the unit used is suppressed, It is possible to suppress the occurrence of failures in machine room devices.
  • An air conditioner according to an eighth aspect of the present invention is the air conditioner according to the sixth aspect of the present invention, wherein the environmental information acquisition means is a temperature sensor provided in the heat source unit, and calculates the outside air temperature as environmental information. get.
  • the outside air temperature is acquired as environmental information by a temperature sensor provided in the heat source unit. Then, during the refrigerant quantity determination operation, a third control target value for optimally air-conditioning the predetermined space is derived based on the outside air temperature.
  • the cooling capacity of the first usage unit is maintained equal to the capacity before the refrigerant quantity determination operation. Is possible. For this reason, even in refrigerant quantity detection operation, the units used in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and temperature rise in the machine room due to insufficient capacity of the unit used can be suppressed. It is possible to suppress the occurrence of trouble in the machine room equipment.
  • An air conditioner according to a ninth aspect of the invention is the air conditioner according to the sixth aspect of the invention, wherein the environmental information acquisition means is a temperature sensor in or provided in a predetermined space, and the predetermined space is provided as environmental information. Get the temperature inside.
  • a temperature in a predetermined space is acquired as environmental information by a temperature sensor provided in the predetermined space. Then, during the refrigerant quantity determination operation, a third control target value for optimally air-conditioning the predetermined space is derived based on the temperature in the predetermined space.
  • the cooling capacity of the first usage unit is maintained equal to the capacity before the refrigerant quantity determination operation. Is possible. For this reason, even in the refrigerant quantity detection operation, Can be operated with sufficient capacity against the cooling load of the machine room, suppressing the temperature rise in the machine room due to insufficient capacity of the used unit and suppressing the occurrence of trouble in the machine room equipment can do.
  • An air conditioner according to a tenth aspect of the present invention is the air conditioner according to the sixth aspect of the present invention, wherein the environmental information acquisition means can provide meteorological information as environmental information via a network. Get weather information from the server.
  • This air conditioner is connected to a network and acquires weather information as environmental information via the network. Then, during the refrigerant quantity determination operation, a third control target value for optimally air-conditioning the predetermined space is derived based on this weather information.
  • the cooling capacity of the first usage unit is maintained equal to the capacity before the refrigerant quantity determination operation. Is possible. For this reason, even in refrigerant quantity detection operation, the units used in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and temperature rise in the machine room due to insufficient capacity of the unit used can be suppressed. It is possible to suppress the occurrence of trouble in the machine room equipment.
  • the use unit in the machine room is operated with sufficient capacity with respect to the cooling load of the machine room.
  • the rise in temperature in the machine room due to the shortage can be suppressed, and the occurrence of failures in the machine room equipment can be suppressed.
  • the unit used in the machine room is controlled against the cooling load of the machine room during the refrigerant amount determination operation for controlling the constituent devices so as to be constant at the low pressure target value.
  • the unit used in the machine room is controlled against the cooling load of the machine room during the refrigerant amount determination operation for controlling the constituent devices so as to be constant at the superheat target value. Insufficient capacity of the units used by operating with sufficient capacity It is possible to suppress the temperature rise in the machine room due to, and to prevent the machine room equipment from being damaged.
  • the second control target value in the first usage unit before the refrigerant amount determination operation is recorded as a history, and the history is determined during the refrigerant amount determination operation. Therefore, by controlling the first usage unit before the refrigerant amount determination operation, the cooling capacity of the first usage unit is maintained equal to the cooling capability before the refrigerant amount determination operation.
  • the air conditioner according to the fifth aspect of the invention since the superheat degree target value of the first usage unit is recorded as a history, it is possible to maintain the cooling capacity of the first usage unit equal to the capacity before the refrigerant amount determination operation. Is possible. For this reason, even in refrigerant quantity detection operation, the units used in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and the temperature rise in the machine room due to insufficient capacity of the unit used is suppressed, It is possible to suppress the occurrence of failures in machine room devices.
  • the first usage unit is controlled based on the third control target value during the refrigerant amount determination operation, so that the cooling capacity of the first usage unit is determined. It is possible to maintain the same capacity as before operation. For this reason, even in the refrigerant quantity judgment operation, the units used in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and the temperature rise in the machine room due to insufficient capacity of the unit used is suppressed. It is possible to suppress the occurrence of a failure in the machine room device.
  • the first usage unit is controlled based on this superheat degree target value during the refrigerant amount determination operation, so the cooling capacity of the first usage unit is determined before the refrigerant amount determination operation. It is possible to maintain the same capacity. For this reason, even in refrigerant quantity detection operation, the units used in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and the temperature rise in the machine room due to insufficient capacity of the unit used. It is possible to suppress the occurrence of a failure in the machine room device.
  • the first usage unit is controlled based on the third control target value, so the cooling capacity of the first usage unit is determined based on the refrigerant quantity judgment operation. It is possible to maintain the same capacity as before the transfer. For this reason, even in the refrigerant quantity detection operation, the units used in the machine room have sufficient capacity for the cooling load of the machine room. It is possible to operate the machine in the machine room, suppress the temperature rise in the machine room due to insufficient capacity of the unit used, and suppress the occurrence of failures in the machine room equipment.
  • the first usage unit is controlled based on the third control target value. Therefore, the cooling capacity of the first usage unit is determined before the refrigerant quantity judgment operation. It is possible to maintain the same capacity. For this reason, even in refrigerant quantity detection operation, the units used in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and the temperature rise in the machine room due to insufficient capacity of the unit used is suppressed. It is possible to suppress the occurrence of a failure in the machine room device.
  • the first usage unit is controlled based on the third control target value, so the cooling capacity of the first usage unit is determined before the refrigerant amount determination operation. It is possible to maintain the same capacity as For this reason, even in refrigerant quantity detection operation, the units used in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and the temperature in the machine room due to insufficient capacity of the unit used. It is possible to suppress the ascent and to prevent the machine room device from being damaged.
  • FIG. 1 is a schematic configuration diagram of an air conditioner according to an embodiment of the present invention.
  • FIG. 2 is a control block diagram of the air conditioner.
  • FIG. 3 Flow chart of test operation mode.
  • FIG. 4 Flow chart of refrigerant automatic charging operation.
  • FIG. 5 is a schematic diagram showing the state of refrigerant flowing in the refrigerant circuit in the refrigerant quantity determination operation (illustration of a four-way switching valve and the like is omitted).
  • FIG. 6 Flow chart of pipe volume judgment operation.
  • FIG. 7 is a Mollier diagram showing the refrigeration cycle of the air conditioner in the pipe volume judgment operation for the liquid refrigerant communication pipe.
  • FIG. 8 is a Mollier diagram showing the refrigeration cycle of the air conditioner in the pipe volume judgment operation for the gas refrigerant communication pipe.
  • FIG. 9 is a flowchart of initial refrigerant quantity detection operation.
  • FIG. 10 is a flowchart of a refrigerant leak detection operation mode.
  • ⁇ 11 Relationship diagram between control unit and environmental information acquisition means according to other embodiment (A).
  • FIG. 12 is a schematic diagram of a weather information acquisition network according to another embodiment (A).
  • T6 outdoor temperature sensor (environmental information acquisition means)
  • Tl lc Indoor temperature sensor (environmental information acquisition means)
  • FIG. 1 is a schematic configuration diagram of an air-conditioning apparatus 1 according to one embodiment of the present invention.
  • the air conditioner 1 is an apparatus used for air conditioning in a room such as a building by performing a vapor compression refrigeration cycle operation.
  • a room such as a building by performing a vapor compression refrigeration cycle operation.
  • the air conditioner 1 mainly includes an outdoor unit 2 as one heat source unit, and indoor units 3a to 3c as a plurality of units (in this embodiment, three units) connected in parallel to the outdoor unit 2
  • a connection unit 4a, 4b provided corresponding to each of the indoor units 3a, 3b
  • a first refrigerant communication pipe group 5 that connects the outdoor unit 2, the connection units 4a, 4b, and the indoor unit 3c
  • a second refrigerant communication pipe group 7 for connecting the connection units 4a, 4b and the indoor units 3a, 3b is provided.
  • the indoor unit 3c is provided in a machine room having a constant cooling load, and is a dedicated indoor unit for cooling.
  • the first refrigerant communication pipe group 5 is composed of a first liquid refrigerant communication pipe 51, a high pressure gas refrigerant communication pipe 52, and a low pressure gas refrigerant communication pipe 53
  • the second refrigerant communication pipe group 7 is a second liquid refrigerant communication pipe.
  • Pipes 71a and 71b and second gas refrigerant communication pipes 72a and 72b are included. That is, the vapor compression refrigerant circuit 10 of the air conditioner 1 of the present embodiment includes the outdoor unit 2, the indoor units 3a to 3c, the connection units 4a and 4b, the first refrigerant communication pipe group 5, and the second The refrigerant communication pipe group 7 is connected.
  • This air conditioner 1 is an indoor air-conditioned space in which the indoor units 3a and 3b are installed, for example, such that a cooling operation is performed for one air-conditioned space and a heating operation is performed for another air-conditioned space.
  • the system is configured to enable simultaneous cooling and heating according to the demand of the vehicle.
  • the indoor unit 3c in the machine room is configured to be always capable of cooling operation according to the cooling load in the machine room.
  • the indoor units 3a to 3c are installed in a ceiling of a room such as a building or suspended, or installed on a wall surface of the room.
  • the indoor units 3a and 3b are connected to the connection units 4a and 4b via the second refrigerant communication pipe group 7, and constitute a part of the refrigerant circuit 10.
  • the indoor unit 3c is connected to the outdoor unit 2 via the first refrigerant communication pipe group 5, and constitutes a part of the refrigerant circuit 10 in the same manner as the indoor units 3a and 3b.
  • the configuration of the indoor units 3a to 3c will be described. Since the indoor unit 3a and the indoor units 3b and 3c have the same configuration, only the configuration of the indoor unit 3a will be described here, and the configuration of the indoor units 3b and 3c will be described in each part of the indoor unit 3a. Xb and Xc are attached instead of Xa, and the description of each part is omitted.
  • a room The force S corresponds to the indoor fan 32a of the inner unit 3a and the indoor fans 32b and 32c of the indoor units 3b and 3c.
  • the indoor unit 3a mainly has an indoor refrigerant circuit 30a that constitutes a part of the refrigerant circuit 10.
  • This indoor refrigerant circuit 30a mainly has an indoor expansion valve V9a as an expansion mechanism and an indoor heat exchanger 3la as a use side heat exchanger.
  • the indoor expansion valve V9a is an electric expansion valve connected to the liquid side of the indoor heat exchanger 31a in order to adjust the flow rate of the refrigerant flowing through the indoor refrigerant circuit 30a.
  • the indoor heat exchanger ⁇ 31a is a cross-fin type 'and' tube heat exchanger composed of heat transfer tubes and a large number of fins, and functions as a refrigerant evaporator during cooling operation to transfer indoor air. It is a heat exchanger that cools and heats indoor air by functioning as a refrigerant condenser during heating operation.
  • the indoor unit 3a has an indoor fan 32a as a blower fan that sucks indoor air into the unit and exchanges heat with the refrigerant in the indoor heat exchanger 31a, and then supplies the air as indoor air to the room. ing.
  • the indoor fan 32a is a fan that can vary the air volume Wr of air supplied to the indoor heat exchanger 31a.
  • the indoor fan 32a is a centrifugal fan or multiblade driven by a motor 33a that also serves as a DC fan motor. Fan etc.
  • the indoor unit 3a is provided with various sensors. On the liquid side of the indoor heat exchanger 31a, there is provided a liquid side temperature sensor T9a that detects the temperature of the refrigerant (that is, the refrigerant temperature corresponding to the condensation temperature Tc during heating operation or the evaporation temperature Te during cooling operation). ing. A gas side temperature sensor TlOa for detecting the refrigerant temperature Teo is provided on the gas side of the indoor heat exchanger 31a. On the indoor air inlet side of the indoor unit 3a, an indoor temperature sensor Tl la is provided for detecting the temperature of the indoor air flowing into the unit (that is, the indoor temperature Tr).
  • the indoor unit 3a includes an indoor side control unit 34a that controls the operation of each unit constituting the indoor unit 3a.
  • the indoor side control unit 34a includes a microcomputer, a memory, and the like provided for controlling the indoor unit 3a, and a remote controller (not shown) for individually operating the indoor unit 3a. Exchange of control signals, etc. between the outdoor unit 2 and In addition, control signals can be exchanged between the connection units 4a and 4b via the transmission line 81.
  • the indoor control unit 34a can regularly record the control target value of the indoor unit 3a in the built-in memory 35a.
  • the outdoor unit 2 is installed outside a building or the like, and is connected to the connection units 4a and 4b and the indoor unit 3c via the first refrigerant communication pipe group 5, and constitutes the refrigerant circuit 10.
  • the outdoor unit 2 mainly has an outdoor refrigerant circuit 20 that constitutes a part of the refrigerant circuit 10.
  • This outdoor refrigerant circuit 20 mainly includes a compressor 21, a four-way switching valve VI, an outdoor heat exchanger 22 as a heat source side heat exchanger, an outdoor expansion valve V2 as an expansion mechanism, an accumulator 23, and a temperature control.
  • the compressor 21 is a compressor capable of changing the operating capacity, and in this embodiment, is a positive displacement compressor driven by a motor 21a whose rotational speed Rm is controlled by an inverter. .
  • a compressor 21 is provided, but the present invention is not limited to this, and two or more compressors may be connected in parallel according to the number of indoor units connected.
  • the four-way switching valve VI is a valve provided to allow the outdoor heat exchange 22 to function as an evaporator and a condenser.
  • the four-way selector valve VI is connected to the refrigerant gas side of the outdoor heat exchanger 22, the suction side accumulator 23 of the compressor 21, the discharge side of the compressor 21, and the decompression circuit 28.
  • the outdoor heat exchange functions as a condenser, the discharge side of the compressor 21 and the refrigerant gas side of the outdoor heat exchange are connected, and the accumulator 23 and the decompression circuit 28 on the suction side of the compressor 21 are connected. Connecting.
  • the outdoor heat exchanger 22 functions as an evaporator
  • the refrigerant heat side of the outdoor heat exchanger and the accumulator 23 on the suction side of the compressor 21 are connected and the discharge side of the compressor 21 is connected.
  • the decompression circuit 28 are connected.
  • Outdoor heat exchange can function as a refrigerant evaporator and a refrigerant condenser.
  • the heat exchanger is a cross fin type “and” tube type heat exchanger that exchanges heat with a refrigerant using air as a heat source.
  • the outdoor heat exchanger 22 has its gas side connected to the four-way selector valve VI and its liquid side connected to the first liquid refrigerant communication pipe 51.
  • the outdoor expansion valve V2 is an electric expansion valve connected to the liquid side of the outdoor heat exchange 22 in order to adjust the pressure and flow rate of the refrigerant flowing in the outdoor refrigerant circuit 20.
  • the outdoor unit 2 has an outdoor fan 25 as a blower fan for sucking outdoor air into the unit, exchanging heat with the refrigerant in the outdoor heat exchanger 22, and then discharging the air outside.
  • This outdoor fan 25 is a fan that can vary the air volume Wo supplied to the outdoor heat exchanger ⁇ 22.
  • the outdoor fan 25 is a propeller fan or the like driven by a motor 25a that also has a DC fan motor power. is there.
  • the accumulator 23 is connected between the four-way selector valve VI and the compressor 21, and removes the excess refrigerant generated in the refrigerant circuit 10 in accordance with fluctuations in the operating load of the indoor units 3a to 3c. It is a container that can be stored.
  • the accumulator 23 is connected to the connection units 4a and 4b via the low pressure gas side closing valve V6 and the low pressure gas refrigerant communication pipe 53.
  • the supercooler 24 is a double-pipe heat exchanger, and is provided to cool the refrigerant that is condensed in the outdoor heat exchanger 22 and then sent to the indoor expansion valves V9a to V9c. It has been.
  • the supercooler 24 is connected between the outdoor expansion valve V2 and the liquid side closing valve V4.
  • a second bypass refrigerant circuit 6 is provided as a cooling source for the subcooler 24.
  • the part of the refrigerant circuit 10 excluding the second bypass refrigerant circuit 6 will be referred to as the main refrigerant circuit for convenience.
  • the second bypass refrigerant circuit 6 is configured so that a part of the refrigerant sent from the outdoor heat exchanger 22 to the indoor expansion valves V9a to V9c via the connection units 4a and 4b is branched into the main refrigerant circuit force.
  • the main refrigerant circuit is connected to return to the suction side.
  • the second bypass refrigerant circuit 6 uses a part of the refrigerant sent from the outdoor expansion valve V2 to the indoor expansion valves V9a to V9c via the connection units 4a and 4b, between the outdoor heat exchanger and the subcooler 24.
  • the branch circuit 61 is provided with a bypass expansion valve V7 for adjusting the flow rate of the refrigerant flowing through the second bypass refrigerant circuit 6.
  • the bypass expansion valve V7 also has an electric expansion valve force.
  • the first bypass refrigerant circuit 27 bypasses the piping between the high-pressure gas side closing valve V5 and the discharge side of the compressor 21 and the piping between the low-pressure gas side closing valve V6 and the accumulator 23. There is a circuit. On the first bypass refrigerant circuit 27, a first bypass on-off valve V3 is provided.
  • the first bypass on-off valve V3 is composed of an electromagnetic valve capable of circulating and blocking the refrigerant.
  • the decompression circuit 28 has a capillary tube C 1 and is connected to the four-way selector valve VI and the accumulator 23.
  • Liquid side shutoff valve V4, high pressure gas side shutoff valve V5, and low pressure gas side shutoff valve V6 are external devices and pipes (specifically, first liquid refrigerant communication pipe 51, high pressure gas refrigerant communication pipe 52, and low pressure gas It is a valve provided at the connection port with the gas refrigerant communication pipe 53).
  • the liquid side closing valve V4 is connected to the outdoor heat exchange via the supercooler 24 and the outdoor expansion valve V2.
  • the high-pressure gas side shut-off valve V5 is connected to the discharge side of the compressor 21.
  • the low-pressure gas side closing valve V6 is connected to the suction side of the compressor 21 via the accumulator 23.
  • the first high-pressure gas on-off valve V8 is provided on a high-pressure gas side pipe to which the discharge side force of the compressor 21 is also branched, and is capable of flowing and blocking the high-pressure gas refrigerant to the high-pressure gas refrigerant communication pipe 52. Valve force.
  • the outdoor unit 2 is provided with various sensors. Specifically, the outdoor unit 2 includes a suction pressure sensor P1 that detects the suction pressure Ps of the compressor 21, a discharge pressure sensor P2 that detects the discharge pressure Pd of the compressor 21, and the compressor 21.
  • the suction temperature sensor T1 that detects the suction temperature Ts and the discharge temperature sensor T2 that detects the discharge temperature Td of the compressor 21 Is provided.
  • the suction temperature sensor T1 is provided at a position between the accumulator 23 and the compressor 21.
  • the outdoor heat exchanger 22 has a heat exchange temperature for detecting the temperature of the refrigerant flowing in the outdoor heat exchanger 22 (that is, the refrigerant temperature corresponding to the condensation temperature Tc during cooling operation or the evaporation temperature Te during heating operation).
  • a liquid side temperature sensor T4 for detecting the refrigerant temperature Tco is provided on the liquid side of the outdoor heat exchanger 22.
  • a liquid pipe temperature sensor T5 for detecting the temperature of the refrigerant (that is, the liquid pipe temperature Tip) is provided at the outlet of the subcooler 24 on the main refrigerant circuit side.
  • An outdoor temperature sensor T6 for detecting the temperature of the outdoor air flowing into the unit (that is, the outdoor temperature Ta) is provided on the outdoor air inlet side of the outdoor unit 2.
  • the junction circuit 62 of the second bypass refrigerant circuit 6 is provided with a binos temperature sensor T7 for detecting the temperature of the refrigerant flowing through the outlet of the subcooler 24 on the second bypass refrigerant circuit 6 side.
  • the high-pressure gas pipe between the high-pressure gas side closing valve V5 and the first high-pressure gas on / off valve V8 has a first high-pressure gas pipe temperature sensor T8 that detects the refrigerant temperature (that is, the first high-pressure gas pipe temperature Thl).
  • suction temperature sensor Tl, discharge temperature sensor ⁇ 2, heat exchange temperature sensor ⁇ 3, liquid side temperature sensor ⁇ 4, liquid pipe temperature sensor ⁇ 5, outdoor temperature sensor ⁇ 6, bypass temperature sensor ⁇ 7, and first high pressure gas piping temperature Sensor 8 is also a thermistor.
  • the outdoor unit 2 also has an outdoor control unit 26 that controls the operation of each part constituting the outdoor unit 2.
  • the outdoor side control unit 26 includes a microcomputer provided to control the outdoor unit 2, a memory, an inverter circuit that controls the motor 21a, and the like, and the indoor side control units of the indoor units 3a to 3c. Control signals and the like can be exchanged via the transmission line 81 between 34a to 34c and connection side control units 44a and 44b of connection units 4a and 4b described later. That is, the overall operation of the air conditioner 1 is controlled by the indoor side control units 34a to 34c, the connection side control units 44a and 44b, the outdoor side control unit 26, and the transmission line 81 connecting the control units.
  • the control unit 8 is configured.
  • the control unit 8 can receive detection signals of various sensors PI, P2, T1 to T8, T9a to T9c, Tl 0a to T10c, Tl la to Tl lc, T12a, T12b. And various devices and valves 21, 25, 32a to 32c, V1 to V3, V7, V8, V9a to V9c, VlOa, VlOb, Vila, Vl lb, V12a , V12 It is connected so that b, VI 3a and VI 3b can be controlled. Further, the control unit 8 is connected with a warning display unit 9 that also has an LED or the like for notifying that a refrigerant leak has been detected in the refrigerant leak detection operation described later.
  • FIG. 2 is a control block diagram of the air conditioner 1.
  • connection units 4a and 4b are installed together with the indoor units 3a and 3b in a room such as a building.
  • the connection units 4a and 4b, together with the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7, are interposed between the indoor units 3a and 3b and the outdoor unit 2, and a part of the refrigerant circuit 10 is provided. It is configured.
  • connection unit 4a and 4b have the same configuration, only the configuration of the connection unit 4a will be described here, and the configuration of the connection unit 4b is indicated by a Ya indicating each part of the connection unit 4a. Symbols Yb and Yc are attached instead of symbols, and explanation of each part is omitted.
  • the supercooler 41a of the connection unit 4a corresponds to the supercooler 41b of the connection unit 4b.
  • connection unit 4a constitutes a part of the refrigerant circuit 10 and includes a connection-side refrigerant circuit 40a.
  • the connection-side refrigerant circuit 40a mainly includes a supercooler 41a, a decompression circuit 42a, a third no-pass refrigerant circuit 43a, a low pressure gas on / off valve V10a, and a second high pressure gas on / off valve VI la.
  • the subcooler 41a sends a part of the liquid refrigerant returned to the first liquid refrigerant communication pipe 51 to the supercooler 41a through the decompression circuit 42a described later when the indoor units 3a and 3b perform the cooling and heating simultaneous operation.
  • This is a device for supercooling the liquid refrigerant returned to the first liquid refrigerant communication pipe 51.
  • a part of the liquid refrigerant introduced into the supercooler 41a evaporates by heat exchange and returns to the outdoor refrigerant circuit 20 through the low-pressure gas refrigerant communication pipe 53.
  • a pressure reducing circuit opening / closing valve VI 2a and a capillary tube C2a are connected in series.
  • the third bypass refrigerant circuit 43a is a circuit that bypasses the high-pressure gas refrigerant communication pipe 52 and the low-pressure gas refrigerant communication pipe 53.
  • a second bypass on-off valve VI 3a is provided on the third binos refrigerant circuit 43a.
  • the second bypass on-off valve VI 3a is an electromagnetic valve capable of circulating and blocking the refrigerant.
  • the low-pressure gas on-off valve VlOa is connected to the low-pressure gas refrigerant communication pipe 53, and is an electromagnetic valve capable of flowing and blocking refrigerant.
  • the second high-pressure gas on-off valve VI la is an electromagnetic valve that is connected to the high-pressure gas refrigerant communication pipe 52 and can flow and shut off the refrigerant.
  • connection unit 4a opens the low-pressure gas on-off valve V10a and closes the second high-pressure gas on-off valve VIla.
  • the connection unit 4a sends the liquid refrigerant flowing in from the first liquid refrigerant communication pipe 51 to the indoor expansion valve V9a of the indoor refrigerant circuit 30a, and is depressurized by the indoor expansion valve V9a, in the indoor heat exchanger 31a. It can function to return the evaporated gas refrigerant to the low-pressure gas refrigerant communication pipe 53.
  • connection unit 4a closes the low pressure gas on / off valve VlOa and opens the second high pressure gas on / off valve VIla.
  • the connection unit 4a sends the high-pressure gas refrigerant flowing in from the high-pressure gas refrigerant communication pipe 52 to the gas side of the indoor heat exchanger 31a in the indoor refrigerant circuit 30a, and V is supplied to the indoor heat exchanger 31a.
  • the condensed liquid refrigerant can function to return to the first liquid refrigerant communication pipe 51.
  • connection unit 4a is provided with a second high-pressure gas pipe temperature sensor T12a for detecting the temperature of the refrigerant (that is, the second high-pressure gas pipe temperature Th2) on the high-pressure gas refrigerant flow path.
  • the second high-pressure gas pipe temperature sensor Tl 2a is also a thermistor.
  • the connection unit 4a includes a connection-side control unit 44a that controls the operation of each unit constituting the connection unit 4a.
  • the connection-side control unit 44a includes a microcomputer and a memory provided to control the connection unit 4a, and exchanges control signals and the like with the indoor-side control unit 34a of the indoor unit 3a. It is getting ready to be done.
  • the outdoor refrigerant circuit 20 is connected to the indoor refrigerant circuits 30a and 30b via the connection refrigerant circuits 40a and 40b, and is connected to the indoor refrigerant circuit 30c and air.
  • the refrigerant circuit 10 of the harmony device 1 is configured.
  • the air conditioner 1 of the present embodiment for example, it is possible to perform a so-called simultaneous cooling and heating operation such that the indoor units 3a and 3b perform a heating operation while the indoor unit 3c performs a cooling operation. Yes.
  • the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7 connect the air conditioner 1 to a building, etc.
  • Refrigerant piping installed on site when installing at the installation site, and has various lengths and pipe diameters depending on the installation conditions such as the installation location and the combination of the outdoor unit, indoor unit and connection unit. Things are used. For this reason, for example, when a new air conditioner 1 is installed, the length of the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7 may be used to calculate the refrigerant charge amount.
  • the information management is complicated. When the existing unit is used to update an indoor unit, an outdoor unit or a connection unit, the length of the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7 can be Information may be lost.
  • the indoor refrigerant circuits 30a to 30c, the outdoor refrigerant circuit 20, the connection refrigerant circuits 40a and 40b, the first refrigerant communication pipe group 5, and the second refrigerant communication pipe group 7 are provided.
  • the refrigerant circuit 10 of the air conditioner 1 is configured by being connected.
  • the refrigerant circuit 10 is composed of the second binos refrigerant circuit 6 and the main refrigerant circuit excluding the second bypass refrigerant circuit 6.
  • the air conditioner 1 according to the present embodiment includes the control unit 8 including the indoor side control units 34a to 34c, the connection side control units 44a and 44b, and the outdoor side control unit 26.
  • Operation is switched between cooling operation and simultaneous heating / cooling operation by the path switching valve VI and the first high pressure gas on / off valve V8 and the low pressure gas on / off valve VlOa and the second high pressure gas on / off valve Vila in the connection units 4a and 4b.
  • the devices of the outdoor unit 2, the indoor units 3a to 3c, and the connection units 4a and 4b are controlled! /.
  • the components of the outdoor unit 2, the indoor units 3a to 3c, and the connection units 4a and 4b are controlled according to the operation load of the indoor units 3a to 3c.
  • Normal operation mode and after installation of components of the air conditioner 1 Specifically, not limited to after installation of the first device, for example after modification or addition of components such as indoor units (Including after repairing the malfunction of the test) and the test run mode for performing the test operation, and after the test run is finished and the normal operation is started, whether or not the refrigerant leaks from the refrigerant circuit 10 is determined.
  • refrigerant leak detection operation mode In the normal operation mode, mainly, the cooling operation for cooling all the indoor units 3a to 3c according to the cooling / heating load of the indoor units 3a to 3c and the cooling operation for some of the indoor units 3a to 3c are performed. And simultaneous cooling and heating operation in which other indoor units perform heating operation.
  • the outdoor unit 2 When the outdoor unit 2 functions as an evaporator due to the air conditioning load of the entire indoor units 3a to 3c (evaporation operation state), the outdoor unit 2 It can be divided into the case where the outdoor heat exchanger 22 is operated as a condenser (condensation operation state).
  • the cooling and heating simultaneous operation referred to here is, for example, an operation in which the indoor unit 3a performs the heating operation and the remaining indoor units 3b and 3c perform the cooling operation.
  • the automatic refrigerant charging operation for charging the refrigerant into the refrigerant circuit 10
  • the piping for detecting the volumes of the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7 are performed.
  • the volume determination operation and the initial refrigerant amount detection operation for detecting the initial refrigerant amount after the constituent devices are installed or after the refrigerant circuit 10 is filled with the refrigerant are included.
  • the four-way switching valve VI is switched to the state shown by the solid line in FIG. 1 so that the outdoor heat exchange functions as a condenser. .
  • the outdoor expansion valve V2 is fully opened.
  • the liquid side closing valve V4, the high pressure gas side closing valve V5, and the low pressure gas side closing valve V6 are opened, and the first high pressure gas on / off valve V8 is closed.
  • each of the indoor expansion valves V9a to V9c has a refrigerant superheat degree SHr at the outlet of the indoor heat exchangers 31a to 31c (that is, the gas side of the indoor heat exchangers 31a to 31c).
  • the opening degree is adjusted to be constant at the superheat target value SHrs!
  • the degree of superheat S of the refrigerant at the outlet of each indoor heat exchanger 31a to 31c Hr is detected by subtracting the refrigerant temperature value detected by the gas side temperature sensors T10a to T10c from the refrigerant temperature value (corresponding to the evaporation temperature Te) detected by the liquid side temperature sensors T9a to T9c, or
  • the suction pressure pressure Ps of the compressor 21 detected by the suction pressure sensor P1 is converted into a saturation temperature value corresponding to the evaporation temperature Te, and the refrigerant temperature value force detected by the gas side temperature sensors T10a to Tl Oc It is detected by subtracting the saturation temperature value.
  • a temperature sensor that detects the temperature of the refrigerant flowing in each of the indoor heat exchangers 31 a to 31 C is provided, and the refrigerant corresponding to the evaporation temperature Te detected by this temperature sensor a temperature value, by subtracting the refrigerant temperature value force is detected by the gas side temperature sensor T10a ⁇ T10c, Yo is also possible to detect the degree of superheat SHr of the refrigerant definitive the outlet of the indoor heat exchange 31 a to 31 C ⁇ .
  • the opening degree of the bypass expansion valve V7 is adjusted so that the superheat degree SHb of the refrigerant at the outlet of the second bypass refrigerant circuit 6 side of the supercooler 24 becomes the superheat degree target value SHbs. It has been.
  • the superheat degree SHb of the refrigerant at the outlet of the second bypass refrigerant circuit 6 side of the supercooler 24 is obtained by changing the suction pressure Ps of the compressor 21 detected by the suction pressure sensor P1 to the evaporation temperature Te. It is detected by converting to a corresponding saturation temperature value and subtracting the saturation temperature value of the refrigerant from the refrigerant temperature value detected by the bypass temperature sensor T7.
  • a temperature sensor is provided at the inlet of the second bypass refrigerant circuit 6 side of the subcooler 24, and the refrigerant temperature value detected by this temperature sensor is measured by the bypass temperature sensor T7. By subtracting the detected refrigerant temperature value force, the superheat degree SHb of the refrigerant at the outlet of the subcooler 24 on the second bypass refrigerant circuit 6 side may be detected.
  • connection units 4a and 4b the second high pressure gas on / off valves VIla and Vl lb are closed and the low pressure gas on / off valves VlOa and VlOb are opened.
  • the indoor heat exchange 31 a to 31 C of the indoor unit 3a ⁇ 3c functions as an evaporator, the indoor heat exchange of the indoor unit 3a ⁇ 3c
  • the compressor 21, the outdoor fan 25, and the indoor fans 32a to 32 When c is started, the low-pressure gas refrigerant is sucked into the compressor 21 and compressed to become a high-pressure gas refrigerant. Thereafter, the high-pressure gas refrigerant is sent to the outdoor heat exchanger 22 via the four-way switching valve VI, and is condensed by exchanging heat with the outdoor air supplied by the outdoor fan 25. It becomes. Then, this high-pressure liquid refrigerant passes through the outdoor expansion valve V2, flows into the supercooler 24, is further cooled by exchanging heat with the refrigerant flowing through the second bypass refrigerant circuit 6, and enters a supercooled state. Become.
  • a part of the high-pressure liquid refrigerant condensed in the outdoor heat exchange 22 is branched to the second bypass refrigerant circuit 6 and is decompressed by the bypass expansion valve V7, and then returned to the suction side of the compressor 21.
  • a part of the refrigerant passing through the bypass expansion valve V7 is evaporated by being depressurized to near the suction pressure Ps of the compressor 21.
  • the refrigerant whose outlet force of the bypass expansion valve V7 of the second bypass refrigerant circuit 6 also flows toward the suction side of the compressor 21 passes through the subcooler 24 and passes through the outdoor heat exchanger 22 on the main refrigerant circuit side to the indoor side. Heat exchange is performed with the high-pressure liquid refrigerant sent to the units 3a to 3c.
  • the high-pressure liquid refrigerant in a supercooled state is sent to the indoor units 3a to 3c via the liquid side closing valve V4 and the first liquid refrigerant communication pipe 51.
  • the high-pressure liquid refrigerant sent to the indoor units 3a to 3c is decompressed by the indoor expansion valves V9a to V9c to near the suction pressure Ps of the compressor 21, and becomes a low-pressure gas-liquid two-phase refrigerant. It is sent to the AC 31 a to 31 C, and in the indoor heat exchanger 31 a to 31 C , it exchanges heat with the indoor air and evaporates to become a low-pressure gas refrigerant.
  • the low-pressure gas refrigerant evaporated in the indoor heat exchange 31a, 3 lb is sent to the low-pressure gas refrigerant communication pipe 53 through the low-pressure gas on / off valves VlOa, VlOb of the connection units 4a, 4b, and the indoor heat exchanger
  • the low-pressure gas refrigerant evaporated in 31c is sent to the low-pressure gas refrigerant communication pipe 53 as it is.
  • This low-pressure gas refrigerant is sent to the outdoor unit 2 via the low-pressure gas refrigerant communication pipe 53 and flows into the accumulator 23 through the low-pressure gas side closing valve V6.
  • the low-pressure gas refrigerant that has flowed into the accumulator 23 is again sucked into the compressor 21.
  • the indoor unit 3c always performs the cooling operation according to the cooling load of the machine room.
  • the indoor side control unit 34c The superheat target value SHrcs of the mouth coolant is periodically recorded in the built-in memory 35c.
  • the indoor units 3a to 3c are operated for heating and the indoor unit 3c is operated for cooling and heating simultaneously, depending on the air conditioning load of the entire indoor units 3a to 3c.
  • the operation (evaporation operation) that causes the outdoor heat exchange of unit 2 to function as an evaporator will be described.
  • the four-way switching valve VI is switched to the state shown by the broken line in FIG. 1 so that the outdoor heat exchanger 22 functions as an evaporator, and the two indoor units are operated for heating through the high-pressure gas refrigerant communication pipe 52.
  • the high-pressure gas refrigerant compressed and discharged by the compressor 21 is supplied to 3a and 3b.
  • the binary expansion valve V7 is closed, and the first high-pressure gas on-off valve V8 is opened.
  • the indoor expansion valves V9a and V9b are subcooling refrigerant at the outlets of the indoor heat exchangers 3la and 31b (that is, the liquid side of the indoor heat exchangers 31a and 31b).
  • the degree of opening is adjusted so that the degree SCr becomes constant at the supercooling degree target value SCrs!
  • the connection units 4a and 4b the low pressure gas on / off valves VlOa and VlOb are closed and the second high pressure Gas on / off valves VI la, Vl lb open.
  • the indoor heat exchanges 31 & , 31b of the indoor units 3a, 3b enter a state of functioning as a condenser.
  • the pressure reducing circuit on / off valves V12a and V12b are in an open state.
  • the indoor expansion valve V9c is, for example, the degree of superheat of the indoor heat exchanger 31c (specifically, the refrigerant temperature detected by the liquid side temperature sensor T9c and the refrigerant detected by the gas side temperature sensor TlOc).
  • the degree of opening is adjusted according to the cooling load of the indoor unit 3c, for example, the degree of opening is adjusted based on the temperature difference from the temperature.
  • the high-pressure gas refrigerant compressed and discharged by the compressor 21 in the state of the refrigerant circuit 10 is sent to the high-pressure gas refrigerant communication pipe 52 through the high-pressure gas side closing valve V5.
  • the high-pressure gas refrigerant sent to the high-pressure gas refrigerant communication pipe 52 is sent to the indoor units 3a and 3b through the connection units 4a and 4b and the second high-pressure gas on / off valves VI la and Vl lb.
  • the high-pressure gas refrigerant sent to the indoor units 3a and 3b is condensed in the indoor heat exchangers 31a and 31b by exchanging heat with the indoor air to become high-pressure liquid refrigerant, and then the indoor expansion valve.
  • the pressure is reduced according to the valve opening of the indoor expansion valves V9a and V9b.
  • room air is heated and supplied indoors.
  • the refrigerant that has passed through the indoor expansion valves V9a and V9b is sent to the subcoolers 41a and 4 lb of the connection units 4a and 4b to be supercooled.
  • This supercooled refrigerant liquid is sent to the first liquid refrigerant communication pipe 51, and a part of the liquid refrigerant sent to the first liquid refrigerant communication pipe 51 is sent to the indoor expansion valve V9c of the indoor unit 3c. .
  • the refrigerant sent to the indoor expansion valve V9c is depressurized by the indoor expansion valve V9c, and then is evaporated by exchanging heat with indoor air in the indoor heat exchanger 31c to become a low-pressure gas refrigerant.
  • room air is cooled and supplied indoors.
  • the low-pressure gas refrigerant is sent to the outdoor unit 2 through the low-pressure gas refrigerant communication pipe 53 and flows into the accumulator 23 via the low-pressure gas side closing valve V6. Then, the low-pressure gas refrigerant that has flowed into the accumulator 23 is again sucked into the compressor 21.
  • the remaining refrigerant excluding the refrigerant sent from the first liquid refrigerant communication pipe 51 to the indoor unit 3c is sent to the outdoor heat exchanger 22 through the liquid side shut-off valve V4 of the outdoor unit 2, and the outdoor heat exchanger 22 Is evaporated into a low-pressure gas refrigerant.
  • This gas refrigerant is sucked into the compressor 21 via the four-way selector valve VI and the accumulator 23.
  • the indoor unit 3c even in the case of simultaneous cooling and heating operation (evaporation load), the indoor unit 3c always performs the cooling operation according to the cooling load of the machine room.
  • the indoor side control unit 34 c periodically records the superheat degree target value S Hrcs of the refrigerant at the outlet of the indoor heat exchanger 31 c in the built-in memory 35 c.
  • the indoor units 3a to 3c for example, in the heating / cooling simultaneous operation mode in which the indoor unit 3a is heated and the indoor units 3b and 3c are cooled, the air conditioning load of the entire indoor units 3a to 3c is reduced. Accordingly, an operation (condensation operation) in which the outdoor heat exchange of the outdoor unit 2 functions as a condenser will be described.
  • the four-way selector valve VI is switched to the state shown by the solid line in FIG. 1 so that the outdoor heat exchange functions as a condenser and the compressor 21 is connected to the indoor unit 3a through the high-pressure gas refrigerant communication pipe 52.
  • the high-pressure gas refrigerant compressed and discharged in is supplied.
  • the indoor expansion valve V9a is, for example, the degree of supercooling of the indoor heat exchanger 31a (specifically, the refrigerant temperature detected by the liquid side temperature sensor T9a and the gas side temperature sensor TlOa The opening degree is adjusted according to the heating load of the indoor unit 3a.
  • connection unit 4a the low pressure gas on / off valve VlOa is closed and the second high pressure gas on / off valve Vila is opened.
  • the indoor heat exchanger 31a of the indoor unit 3a functions as a condenser.
  • the pressure reducing circuit on-off valve V12a is in an open state.
  • the indoor expansion valves V9b and V9c are, for example, the degree of superheat of the indoor heat exchangers 31b and 31c (specifically, the refrigerant temperature and gas detected by the liquid side temperature sensors T9b and T9c).
  • the opening degree is adjusted in accordance with the cooling load of each indoor unit 3b, 3c, for example, the opening degree is adjusted based on the temperature difference from the refrigerant temperature detected by the side temperature sensors TlOb, TlOc).
  • connection unit 4b the second high-pressure gas on-off valve Vl lb is closed and the low-pressure gas is closed.
  • the suction side of 21 is connected via a low-pressure gas refrigerant communication pipe 53. Further, the pressure reducing circuit on-off valve V12b is in a closed state.
  • the high-pressure gas refrigerant compressed and discharged by the compressor 21 is sent to the outdoor heat exchange through the four-way switching valve VI and communicated with the high-pressure gas refrigerant through the high-pressure gas side closing valve V5. Also sent to pipe 52.
  • the high-pressure gas refrigerant sent to the outdoor heat exchanger 22 is condensed in the outdoor heat exchanger 22 and becomes liquid refrigerant. Then, the liquid refrigerant is sent to the first liquid refrigerant communication pipe 51 through the liquid side closing valve V4.
  • the high-pressure gas refrigerant sent to the high-pressure gas refrigerant communication pipe 52 is sent over the connection unit 4a.
  • the high-pressure gas refrigerant sent to the connection unit 4a is sent to the indoor heat exchanger 31a of the indoor unit 3a through the second high-pressure gas on-off valve VI la.
  • the high-pressure gas refrigerant sent to the indoor heat exchanger 31a is condensed by exchanging heat with indoor air in the indoor heat exchanger 31a of the indoor unit 3a. On the other hand, room air is heated and supplied indoors.
  • the refrigerant condensed in the indoor heat exchanger 31a After passing through the expansion valve V9a, it is sent to the connection unit 4a.
  • the refrigerant sent to the connection unit 4a is sent to the first liquid refrigerant communication pipe 51 and merged with the refrigerant sent to the first liquid refrigerant communication pipe 51 through the liquid side shut-off valve V4.
  • the refrigerant flowing through the first liquid refrigerant communication pipe 51 is sent to the indoor expansion valves V9b and V9c of the indoor units 3b and 3c.
  • the indoor expansion valve V9b passes through the connection unit 4b.
  • the refrigerant sent to the indoor expansion valves V9b and V9c is depressurized by the indoor expansion valves V9b and V9c, and then evaporated by exchanging heat with the indoor air in the indoor heat exchangers 31b and 31c. It becomes a low-pressure gas refrigerant.
  • room air is cooled and supplied indoors.
  • the low-pressure gas refrigerant that has exchanged heat with the indoor heat exchanger 31b is sent to the connection unit 4b. Further, the low-pressure gas refrigerant that has exchanged heat in the indoor heat exchanger 31c is sent to the low-pressure gas refrigerant communication pipe 53.
  • the low-pressure gas refrigerant sent to the connection unit 4b is sent to the low-pressure gas refrigerant communication pipe 53 through the low-pressure gas on-off valve VlOb, and merges with the low-pressure gas refrigerant that has exchanged heat with the indoor heat exchanger 31c.
  • the combined low-pressure gas refrigerant is sucked into the compressor 21 via the low-pressure gas side closing valve V6 and the accumulator 23.
  • control unit 8 More specifically, the indoor side control units 34a to 34a functioning as normal operation control means for performing normal operation including cooling operation and heating operation.
  • the indoor unit 3c always performs the cooling operation according to the cooling load of the machine room even in the simultaneous cooling and heating operation (condensation load).
  • the indoor side control unit 34 c similarly to the case of the cooling operation and the simultaneous cooling / heating operation (evaporation load), the indoor side control unit 34 c periodically stores the superheat target value SHrcs of the refrigerant at the outlet of the indoor heat exchanger 31 c in the built-in memory 35c. Record and record.
  • Fig. 3 is a flowchart of the test operation mode.
  • the test operation mode first, the automatic refrigerant charging operation in step S1 is performed, then the pipe volume determination operation in step S2 is performed, and further, the initial refrigerant amount detection operation in step S3 is performed. .
  • the outdoor unit 2 pre-filled with the refrigerant, the indoor units 3a to 3c, and the connection units 4a and 4b are installed at an installation location such as a building, and the first refrigerant communication pipe group 5 After connecting through the second refrigerant communication pipe group 7 and configuring the refrigerant circuit 10, the refrigerant circuit runs out of the refrigerant that is insufficient depending on the volume of the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7.
  • additional filling in 10 will be described as an example.
  • Step S1 Automatic refrigerant charging operation
  • liquid side shut-off valve V4, the high-pressure gas side shut-off valve V5, and the low-pressure gas side shut-off valve V6 of the outdoor unit 2 are opened, and the refrigerant previously filled in the outdoor unit 2 is filled in the refrigerant circuit 10.
  • FIG. 4 is a flowchart of the automatic refrigerant charging operation.
  • Step S11 Refrigerant amount judgment operation
  • the refrigerant circuit 10 When an instruction to start the automatic refrigerant charging operation is issued, the refrigerant circuit 10 is in a state where the four-way switching valve VI of the outdoor unit 2 is shown by the solid line in FIG. 1 and the indoor expansion valves V9a to 3a to 3c of the indoor units 3a to 3c.
  • the valves VI la and VI lb are closed, and the compressor 21, outdoor fan 25, and indoor fans 32a to 32c are activated, and all the indoor units 3a to 3c are forcibly cooled. Driving).
  • the refrigerant pressure in the high-pressure gas refrigerant communication pipe 52 and the low-pressure gas refrigerant communication pipe 53 is equalized.
  • the flow path from the compressor 21 to the outdoor heat exchange functioning as a condenser is compressed and discharged by the compressor 21.
  • the high-pressure gas refrigerant flows (see the hatched area in Fig. 5 from the compressor 21 to the outdoor heat exchanger 22), and the outdoor heat exchanger 22 that functions as a condenser is connected to the outdoor air.
  • High-pressure refrigerant that changes phase from gas state to liquid state due to heat exchange flows (see the hatched and black hatched parts in Fig.
  • the connecting unit 4a, 4b high-pressure gas side and low-pressure gas side flow paths (including third bypass refrigerant circuits 43a and 43b), high-pressure gas refrigerant communication pipe 52, low-pressure gas refrigerant communication pipe 53, first bypass refrigerant circuit 27, and accumulator 23
  • the partial force on the second bypass refrigerant circuit 6 side of the subcooler 24 also flows into the flow path up to the compressor 21 (see the hatched portion in FIG. 5).
  • FIG. 5 is a schematic diagram showing the state of the refrigerant flowing in the refrigerant circuit 10 in the refrigerant quantity determination operation (illustration of the four-way switching valve VI and the like is omitted).
  • the following device control is performed to shift to an operation for stabilizing the state of the refrigerant circulating in the refrigerant circuit 10.
  • the stable control of the refrigerant state includes superheat degree control for controlling each indoor expansion valve V9a to V9c so that the superheat degree SHr of the whole indoor heat exchanger functioning as an evaporator becomes constant, and evaporation pressure Pe Evaporative pressure control that controls the operating capacity of the compressor 21 so that the pressure is constant, and the outdoor fan 25 so that the condensation pressure Pc of the refrigerant in the outdoor heat exchanger ⁇ 22 is constant.
  • Condensation pressure control for controlling the air volume Wo of the outdoor air supplied to the outdoor heat exchanger 22 and the temperature of the refrigerant sent from the supercooler 24 to the indoor expansion valves V9a to V9c to be constant.
  • the evaporation pressure control is performed in the indoor heat exchangers 31a to 31c functioning as an evaporator in a low-pressure refrigerant while changing phase to a gas-liquid two-phase force gas state by heat exchange with indoor air.
  • the indoor heat exchangers 31a to 31c through which the air flows (refer to the part corresponding to the indoor heat exchangers 31a to 31c in the grid-shaped hatched and hatched portions in FIG. 5 and hereinafter referred to as the evaporator part C)
  • the amount of refrigerant in the engine is a force that greatly affects the evaporation pressure Pe of the refrigerant.
  • the evaporating pressure Pe of the refrigerant in the indoor heat exchangers 31a to 31c is made constant, The state of the refrigerant flowing in the evaporator section C is stabilized. That is, a state in which the amount of refrigerant in the evaporator C changes mainly by the evaporation pressure Pe is created.
  • the refrigerant temperature values (corresponding to the evaporation temperature Te) detected by the liquid side temperature sensors T9a to T9c of the indoor heat exchangers 31a to 31c are saturated.
  • the operating capacity of the compressor 21 is controlled so that this pressure value becomes constant at the low pressure target value Pes (that is, control for changing the rotational speed Rm of the motor 2 la is performed). This is realized by increasing or decreasing the refrigerant circulation amount Wc flowing in the refrigerant circuit 10.
  • the compressor detected by the suction pressure sensor P1 which is an operation state amount equivalent to the refrigerant pressure at the refrigerant evaporation pressure Pe in the indoor heat exchangers 31a to 31c. 21 so that the suction pressure Ps is constant at the low pressure target value Pes, or the saturation temperature value corresponding to the suction pressure Ps (corresponding to the evaporation temperature Te) is constant at the low pressure target value Pes.
  • the operating capacity of the compressor 21 may be controlled, and the refrigerant temperature value (corresponding to the evaporation temperature Te) detected by the liquid side temperature sensors T9a to T9c of the indoor heat exchangers 31a to 31c is the low pressure target value Pes.
  • the operating capacity of the compressor 21 may be controlled so as to be constant at.
  • the refrigerant pipe including the low-pressure gas refrigerant communication pipe 53 and the accumulator 23 from the indoor heat exchangers 31a to 31c to the compressor 21 (in the hatched portion in FIG. 5).
  • indoor heat exchangers 31a to 31c to compressor 21 The state of the refrigerant flowing through the gas refrigerant circulation section D is also stable, and the evaporation pressure Pe (which is an operation state quantity equivalent to the refrigerant pressure in the gas refrigerant circulation section D) That is, a state is created in which the amount of refrigerant in the gas refrigerant circulation portion D is changed by the suction pressure Ps).
  • Condensation pressure control is also performed in the outdoor heat exchanger ⁇ 22 in which high-pressure refrigerant flows while the gas state force changes to a liquid state due to heat exchange with the outdoor air (hatched hatched and blackened in Fig. 5).
  • the condenser part A see the part corresponding to the outdoor heat exchanger 22 (hereinafter referred to as the condenser part A), and this is the force that greatly affects the refrigerant condensing pressure Pc.
  • the refrigerant condensing pressure Pc in the condenser section A changes more greatly than the influence of the outdoor temperature Ta, by controlling the air volume Wo of the outdoor air supplied from the outdoor fan 25 to the outdoor heat exchange by the motor 25a, The refrigerant condensing pressure Pc in the outdoor heat exchanger 22 is kept constant, and the state of the refrigerant flowing in the condenser section A is stabilized.
  • the refrigerant in the condenser A is mainly controlled by the degree of supercooling SCo on the liquid side of the outdoor heat exchanger 22 (hereinafter referred to as the outlet of the outdoor heat exchanger 22 in the description of the refrigerant amount determination operation). It creates a state where the amount changes.
  • the compressor 21 detected by the discharge pressure sensor P2 which is an operation state quantity equivalent to the refrigerant condensation pressure Pc in the outdoor heat exchanger 22, is used.
  • the temperature of the refrigerant flowing through the outdoor heat exchanger 22 that is, the condensation temperature Tc detected by the heat exchange temperature sensor T3.
  • the flow path from the outdoor heat exchange to the indoor expansion valves V9a to V9c (the outdoor expansion valve V2 and the part on the main refrigerant circuit side of the subcooler 24 and the first liquid refrigerant).
  • High-pressure liquid refrigerant flows through the flow path from the outdoor heat exchanger 22 to the bypass expansion valve V7 of the second bypass refrigerant circuit 6 and the indoor expansion from the outdoor heat exchanger 22
  • the pressure of the refrigerant in the parts up to the valves V9a to V9c and the bypass expansion valve V7 (refer to the black hatched part in FIG. 5, hereinafter referred to as the liquid refrigerant circulation part B) is also stable, and the liquid refrigerant circulation part B becomes liquid. It is sealed with the refrigerant and becomes stable.
  • the liquid pipe temperature control is performed in the refrigerant pipe including the first liquid refrigerant communication pipe 51 extending from the supercooler 24 to the indoor expansion valves V9a to V9c (in the liquid refrigerant circulation section B shown in FIG. cold This is so that the density of the refrigerant in the internal expansion valve V9a to V9c does not change! Then, the capacity control of the subcooler 24 controls the refrigerant temperature Tip detected by the liquid pipe temperature sensor T5 provided at the outlet of the main refrigerant circuit of the subcooler 24 to be constant at the liquid pipe temperature target value Tips.
  • the amount of refrigerant flowing through the second bypass refrigerant circuit 6 is increased or decreased to adjust the amount of exchange heat between the refrigerant flowing through the main refrigerant circuit side of the subcooler 24 and the refrigerant flowing through the second bypass refrigerant circuit 6 side. It is realized by doing.
  • the flow rate of the refrigerant flowing through the second bypass refrigerant circuit 6 is increased or decreased by adjusting the opening of the bypass expansion valve V7.
  • liquid pipe temperature control is realized in which the refrigerant temperature in the refrigerant pipe including the first liquid refrigerant communication pipe 51 extending from the supercooler 24 to the indoor expansion valves V9a to V9c is constant.
  • the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 22 due to the increase in the amount of refrigerant due to the refrigerant being charged into the refrigerant circuit 10 that is, excess refrigerant at the outlet of the outdoor heat exchanger 22.
  • SCo degree of cooling
  • the change in the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 22 is caused by the refrigerant pipes from the subcooler 24 to the indoor expansion valves V9a to V9c including the first liquid refrigerant communication pipe 51 in the liquid refrigerant circulation part B. It will be in a state that does not affect.
  • the superheat control is performed because the amount of refrigerant in the evaporator section C greatly affects the dryness of the refrigerant at the outlets of the indoor heat exchangers 31a to 31c.
  • the refrigerant superheat degree SHr at the outlets of the indoor heat exchangers 31a to 31c is controlled by controlling the opening degree of the indoor expansion valves V9a to V9c, so that the gas side of the indoor heat exchangers 31a to 31c (hereinafter referred to as refrigerant amount determination operation).
  • control unit 8 (more specifically, the indoor side control units 34a to 34c, the connection side control units 44a and 44b, the outdoor side, which functions as the refrigerant amount determination operation control means for performing the refrigerant amount determination operation. This is performed as the process of step S11 by the control unit 26 and the transmission line 81) connecting the control units 34a to 34c, 44a, 44b, 26.
  • the constituent devices are abnormally stopped when performing the refrigerant amount determination operation described above prior to the processing of step S11. It is necessary to fill the refrigerant until the amount of refrigerant does not fall.
  • step S12 additional refrigerant charging is performed in the refrigerant circuit 10 while performing the above-described refrigerant amount determination operation.
  • the additional charging of the refrigerant in step S12 is performed by the control unit 8 functioning as the refrigerant amount calculating means.
  • the refrigerant amount in the refrigerant circuit 10 is calculated from the refrigerant flowing through the refrigerant circuit 10 at the time or the operation state quantity of the component equipment.
  • the refrigerant quantity calculating means calculates the refrigerant quantity in the refrigerant circuit 10 by dividing the refrigerant circuit 10 into a plurality of parts and calculating the refrigerant quantity for each of the divided parts. More specifically, for each of the divided parts, a relational expression between the refrigerant amount of each part and the operating state quantity of the refrigerant flowing through the refrigerant circuit 10 or the component device is set, and these relational expressions are used. Thus, the refrigerant amount of each part can be calculated.
  • the refrigerant circuit 10 has a state in which the four-way switching valve VI is shown by the solid line in FIG.
  • the high pressure gas pipe section E up to the outdoor heat exchanger 22 (hereinafter referred to as the high pressure gas pipe section E), the outdoor heat exchanger 22 section (that is, the condenser section A), and the liquid In the refrigerant circulation section B, the part from the outdoor heat exchanger 22 to the supercooler 24 and the half on the inlet side of the part on the main refrigerant circuit side of the supercooler 24 (hereinafter referred to as the high temperature side liquid pipe section B1), the liquid Outlet half of the refrigerant refrigerant section B on the main refrigerant circuit side of the subcooler 24 and the part from the supercooler 24 to the liquid side shut-off valve V 4 (not shown in FIG.
  • liquid refrigerant circulation part B (hereinafter, low temperature side) Liquid pipe part B2), and part of liquid refrigerant circulation part B that combines first liquid refrigerant communication pipe 51, liquid side refrigerant flow path of connection units 4a and 4b, and second liquid refrigerant communication pipes 71a and 71b (Hereinafter referred to as the liquid refrigerant communication pipe section B3) and the liquid refrigerant circulation section B from the first liquid refrigerant communication pipe 51 to the indoor expansion valves V9a to V9c and the indoor heat exchangers 31a to 31c That is, the gas refrigerant circulation part D including the evaporator part C) to the second gas refrigerant communication pipes 72a and 72b (hereinafter referred to as the indoor unit part F) and the gas refrigerant circulation part D of the high-pressure gas Combined with refrigerant communication pipe 52 and high-pressure gas side refrigerant flow path in connection units 4a and 4b (including second bypass on-off valves VI 3
  • the low pressure gas side closing valve V6 (not shown in FIG. 5) to the first bypass refrigerant circuit 27, the first bypass refrigerant circuit 27 and the first A part that combines the bypass refrigerant circuit 27 to the four-way selector valve VI and the first bypass refrigerant circuit 27 to the compressor 21 including the accumulator 23 (hereinafter referred to as second low-pressure gas pipe part I), and liquid refrigerant Portion of the second low-pressure gas pipe section including the part of the second bypass refrigerant circuit 6 side of the bypass expansion valve V7 and the subcooler 24 from the high temperature side liquid pipe section B1 in the circulation section B (hereinafter referred to as the second bypass) Circuit part J) and relational expressions are set for each part.
  • the combined portion of the high-pressure gas refrigerant communication pipe part G1 and the low-pressure gas refrigerant communication pipe part G2 is referred to as the gas refrigerant communication pipe part G.
  • the relational expressions set for each part will be described. [0064]
  • the relational expression between the refrigerant amount Mogl in the high-pressure gas pipe E and the operating state quantity of the refrigerant or the component device flowing through the refrigerant circuit 10 is, for example,
  • the volume Vogl of the high-pressure gas pipe E is a known value of the front force at which the outdoor unit 2 is installed at the installation location, and is stored in the memory of the control unit 8 in advance.
  • the density of the refrigerant in the high-pressure gas pipe E can be obtained by converting the discharge temperature Td and the discharge pressure Pd.
  • the relational expression between the refrigerant amount Mc in the condenser part A and the operation state quantity of the refrigerant flowing through the refrigerant circuit 10 or the component device is, for example,
  • Mc kcl XTa + kc2 XTc + kc3 X SHm + kc4 XWc
  • the outdoor temperature Ta, the condensation temperature Tc, the compressor discharge superheat degree SHm, the refrigerant circulation rate Wc, the saturated liquid density pc of the refrigerant in the outdoor heat exchanger 22, and the refrigerant density p at the outlet of the outdoor heat exchanger 22 It is expressed as a function expression of co. Note that the parameters kcl to kc7 in the above relational expression are obtained by regression analysis of the results of tests and detailed simulations, and are stored in the memory of the control unit 8 in advance.
  • the compressor discharge superheat degree SHm is the refrigerant superheat degree on the discharge side of the compressor.
  • the discharge pressure Pd is converted into the refrigerant saturation temperature value, and the discharge temperature Td force is subtracted from the refrigerant saturation temperature value. can get.
  • the saturated liquid density pc of the refrigerant can be obtained by converting the condensation temperature Tc.
  • the refrigerant density p co at the outlet of the outdoor heat exchanger is obtained by converting the condensation pressure Pc obtained by converting the condensation temperature Tc and the refrigerant temperature Tco.
  • the volume Voll of the high temperature side liquid pipe part B1 of the outdoor unit 2 in the high temperature side liquid pipe part B1 It is expressed as a function equation obtained by multiplying the refrigerant density p co (that is, the refrigerant density at the outlet of the outdoor heat exchanger 22 described above). Note that the volume Voll of the high temperature side liquid pipe part B1 is also a known value of the front force at which the outdoor unit 2 is installed at the installation location, and is stored in the memory of the control unit 8 in advance.
  • the relational expression between the refrigerant amount Mol2 in the low temperature side liquid pipe part B2 and the operation state quantity of the refrigerant flowing through the refrigerant circuit 10 or the component device is, for example,
  • t is expressed as a functional expression obtained by multiplying the volume Vol2 of the low temperature side liquid pipe portion B2 of the outdoor unit 2 by the refrigerant density p lp in the low temperature side liquid pipe portion B2.
  • the volume Vol 2 of the low temperature side liquid pipe section B2 is also a known value of the front force at which the outdoor unit 2 is installed at the installation location, and is stored in the memory of the control section 8 in advance.
  • the refrigerant density p lp in the low temperature side liquid pipe section B2 is the refrigerant density at the outlet of the subcooler 24, and is converted by converting the condensation pressure Pc and the refrigerant temperature Tip at the outlet of the subcooler 24. can get.
  • the relational expression between the refrigerant amount Mlp in the liquid refrigerant communication pipe section B3 and the operating state quantity of the refrigerant or the component device flowing through the refrigerant circuit 10 is, for example,
  • the volume Vlp of the portion where the first liquid refrigerant communication pipe 51 and the liquid side refrigerant flow path of the connection units 4a and 4b and the second liquid refrigerant communication pipes 71a and 71b are combined is added to the volume Vlp of the refrigerant in the liquid refrigerant communication pipe section B3. It is expressed as a function equation multiplied by the density p lp (that is, the density of the refrigerant at the outlet of the supercooler 24).
  • Vlp is divided into the volume Vlpl of the combined portion of the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipe 71a, 71b, and the volume Vlp 2 of the liquid side refrigerant flow path of the connection units 4a, 4b. Divided.
  • the volume Vlpl of the combined portion of the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipes 71a, 71b is the air conditioner 1 between the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipes 71a, 71b.
  • the information power such as the pipe diameter is input, and the value calculated in the field or the information such as the length and pipe diameter is entered.
  • Information is input at the site and calculated by the information power control unit 8 between the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipes 71a and 71b, or the pipe volume judgment operation is performed as described later. It is calculated using the operation result of.
  • Connection unit 4 The volume Vlp2 of the liquid refrigerant passages a and 4b is a known value before the connection units 4a and 4b are installed at the installation location, and is stored in the memory of the control unit 8 in advance.
  • Mr krl XTlp + kr2 X AT + kr3 X SHr + kr4 XWr + kr5
  • the refrigerant temperature Tlp at the outlet of the supercooler 24, the temperature difference ⁇ obtained by subtracting the evaporation temperature Te from the room temperature Tr, the superheat degree SHr of the refrigerant at the outlet of the indoor heat exchangers 31a to 31c, and the indoor fans 32a to 32a It is expressed as a function expression of the air volume Wr of 32c.
  • the parameters krl to kr5 in the above relational expression are obtained by regression analysis of the results of tests and detailed simulations, and are stored in the memory of the control unit 8 in advance.
  • the relational expression of the refrigerant amount Mr is set corresponding to each of the three indoor units 3a to 3c, and the refrigerant amount Mr of the indoor unit 3a, the refrigerant amount Mr of the indoor unit 3b, and the indoor unit are set. By adding the refrigerant amount Mr of 3c, the total refrigerant amount of the indoor unit F is calculated.
  • relational expressions having different values of the parameters krl to kr5 are used.
  • the gas refrigerant communication pipe part G is divided into a high pressure gas refrigerant communication pipe part G1 and a low pressure gas refrigerant communication pipe part G2, and the refrigerant amount Mgp in the gas refrigerant communication pipe part G is a high pressure gas refrigerant communication pipe part. This is the sum of the refrigerant amount Mgph of G1 and the refrigerant amount Mgpl of the low-pressure gas refrigerant communication pipe G2.
  • the volume Vgp of the gas refrigerant communication pipe G is a value obtained by adding the volume Vgph of the high pressure gas refrigerant communication pipe G1 and the volume Vgpl of the low pressure gas refrigerant communication pipe G2.
  • Vgp Vgph + Vgpl
  • the relational expression between the refrigerant amount Mgph in the high-pressure gas refrigerant communication pipe section Gl and the operating state quantity of the refrigerant flowing through the refrigerant circuit 10 or the component equipment is, for example,
  • Mgph Vgph X p gph
  • the high-pressure gas refrigerant communication pipe 52 and the high-pressure gas-side refrigerant flow path in the connection units 4a and 4b (The volume Vgph of the part that includes the second bypass on-off valves VI 3a and VI 3b on the high-pressure gas side of the third bypass refrigerant circuit 43a, 43b) and the density of the refrigerant in the high-pressure gas refrigerant communication pipe part G1 It is expressed as a function expression multiplied by gph.
  • Vgph is the volume Vgphl of the high-pressure gas refrigerant communication pipe 52 and the high-pressure gas side refrigerant flow path in the connection units 4a and 4b (the second bypass on-off valve on the high-pressure gas side of the third bypass refrigerant circuits 43a and 43b). (Including VI 3a and VI 3b) and volume Vgph2.
  • the volume Vgpl of the high-pressure gas refrigerant communication pipe 52 is the same as that of the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipes 71a and 71b.
  • the refrigerant density p gph in the high-pressure gas refrigerant communication pipe section G1 is equal to the refrigerant density ps on the suction side of the compressor 21, the high-pressure gas side shut-off valve V5 and the first high-pressure gas on-off valve V8 in the outdoor unit 2.
  • the refrigerant density p oh in the high-pressure gas side pipe between, the refrigerant density p bsh in the high-pressure gas side refrigerant flow path in the connection units 4a and 4b, and the outlets of the indoor heat exchangers 31a to 31c (that is, This is the average value of the refrigerant density p eo in the second gas refrigerant communication pipes 72a and 72b.
  • the density ps of the refrigerant can be obtained by converting the suction pressure Ps and the suction temperature Ts.
  • the density p oh of the refrigerant can be obtained by converting the first high pressure gas pipe temperature Thl.
  • the density p bsh of the refrigerant can be obtained by converting the second high-pressure gas pipe temperature Th2.
  • the density p eo of the refrigerant is obtained by converting the evaporation pressure Pe, which is a conversion value of the evaporation temperature Te, and the outlet temperature Teo of the indoor heat exchangers 31a to 31c.
  • the volume Vgp2 of the high pressure gas side refrigerant flow path (including the second bypass open / close valves V13a and VI 3b on the high pressure gas side of the third bypass refrigerant circuits 43a and 43b) in the connection units 4a and 4b , 4b is a known value of the front force to be installed at the installation location, and is stored in the memory of the control unit 8 in advance.
  • the relational expression between the refrigerant quantity Mgpl in the low-pressure gas refrigerant communication pipe section G2 and the operating state quantity of the refrigerant flowing through the refrigerant circuit 10 or the component equipment is, for example,
  • Mgpl Vgpl X gpl
  • the low-pressure gas refrigerant communication pipe 53, the second gas refrigerant communication pipe 72a, 72b, and the low-pressure gas side refrigerant flow path in the connection units 4a, 4b (the second bypass on the low-pressure gas side of the third bypass refrigerant circuits 43a, 43b) It is expressed as a function equation by multiplying the volume Vgpl of the part combined with the on-off valves VI 3a and VI 3b) by the refrigerant density p gpl in the low-pressure gas refrigerant communication pipe section G2.
  • Vgpl is the volume Vgpll of the portion of the low-pressure gas refrigerant communication pipe 53 and the second gas refrigerant communication pipes 72a and 72b, and the low-pressure gas side refrigerant flow path (third bypass refrigerant in the connection units 4a and 4b). Divided into the volume Vgpl2 of the second bypass on-off valves VI 3a and V13b on the low-pressure gas side of the circuits 43a and 43b.
  • the volume of the part that combines the low-pressure gas refrigerant communication pipe 53 and the second gas refrigerant communication pipes 72a and 72b Vgpll is the part that combines the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipes 71a and 71b and Like the high-pressure gas refrigerant communication pipe 52, the low-pressure gas refrigerant communication pipe 53 and the second gas refrigerant communication pipe 72a, 72b are installed on site when the air conditioner 1 is installed at the installation location of a building or the like. Since the length of the pipe is the information capacity of the pipe diameter, etc., input the value calculated locally, or the length of the pipe diameter etc. is input locally.
  • the information power of the pipe 53 and the second gas refrigerant communication pipes 72a and 72b is also calculated by the control unit 8, or using the operation result of the pipe volume determination operation as described later.
  • the refrigerant density p gpl in the low-pressure gas refrigerant communication pipe section G2 is equal to the refrigerant density ps on the suction side of the compressor 21 and the outlets of the indoor heat exchangers 31a to 31c (that is, the second gas refrigerant communication pipe 72a, This is the average value of the density p eo of the refrigerant at the inlet 72b).
  • the refrigerant density ps is obtained by converting the suction pressure Ps and the suction temperature T s
  • the refrigerant density p eo is a conversion value of the evaporation temperature Te, the evaporation pressure Pe, and the outlets of the indoor heat exchangers 31a to 31c. It is obtained by converting the temperature Teo.
  • connection units 4a and 4b including the second bypass on-off valves VI 3a and VI 3b on the low-pressure gas side of the third bypass refrigerant circuits 43a and 43b
  • V g P 12 The pre-force at which the connection units 4a and 4b are installed at the installation location is also a known value and is stored in advance in the memory of the control unit 8.
  • the relational expression between the refrigerant amount Mog2 in the first low-pressure gas pipe section H and the operating state quantity of the refrigerant flowing through the refrigerant circuit 10 or the component device is, for example,
  • Mog2 Vog2 X oh This is expressed as a functional expression obtained by multiplying the volume Vog2 of the first low-pressure gas pipe H in the outdoor unit 2 by the refrigerant density poh in the first low-pressure gas pipe H. Note that the volume Vog2 of the first low-pressure gas pipe section H is also a known value of the pre-force that is shipped to the installation location, and is stored in advance in the memory of the control section 8.
  • the relational expression between the amount of refrigerant Mog3 in the second low-pressure gas pipe part I and the operating state quantity of the refrigerant or the component device flowing through the refrigerant circuit 10 is, for example,
  • volume Vog3 of the second low-pressure gas pipe section I in the outdoor unit 2 is expressed as a functional expression obtained by multiplying the volume Vog3 of the second low-pressure gas pipe section I in the outdoor unit 2 by the refrigerant density p s in the second low-pressure gas pipe section I.
  • the volume Vog3 of the second low-pressure gas pipe section I has a known value for the pre-force shipped to the installation location, and is stored in the memory of the control section 8 in advance.
  • the relational expression between the refrigerant amount Mob in the second bypass circuit part J and the refrigerant flowing through the refrigerant circuit 10 or the operation state quantity of the component device is, for example,
  • Mob kobl X co + kob2 X ps + kob3 X Pe + kob4
  • This is expressed as a functional expression obtained by multiplying the volume Vob of the second bypass circuit portion J by the saturated liquid density pe and the correction coefficient kob in the second bypass circuit side portion of the subcooler 24.
  • the volume Vob of the second bypass circuit portion J is a known value before the outdoor unit 2 is installed at the installation location, and is stored in the memory of the control unit 8 in advance.
  • the saturated liquid density pe in the second bypass circuit side portion of the subcooler 24 can be obtained by converting the suction pressure Ps or the evaporation temperature Te.
  • the amount of refrigerant related to the outdoor units Mogl, Mc, Moll, Mol2, Mog2, Mog3, and Mob has a relational expression of the amount of refrigerant in each part corresponding to each of the plurality of outdoor units, and the total amount of refrigerant in the outdoor unit is obtained by adding the amount of refrigerant in each part of the plurality of outdoor units. It is calculated.
  • the relational expression for the amount of refrigerant in each part with different meter values is used.
  • the refrigerant flowing through the refrigerant circuit 10 in the refrigerant quantity judgment operation or the operating state quantity of the component device is calculated.
  • the refrigerant amount of the refrigerant circuit 10 can be calculated.
  • step S12 Since this step S12 is repeated until the condition for determining whether the refrigerant amount is appropriate in step S13, which will be described later, is satisfied, the refrigerant is charged until the additional charging of the refrigerant is started and the force is completed. Using the relational expression for each part of circuit 10, the amount of refrigerant in each part is calculated.
  • the refrigerant amount Mo in the outdoor unit 2 is calculated by calculating the refrigerant amounts Mogl, Mc, Moll, Mol 2, Mog2, Mog3, and Mob of each part in the outdoor unit 2 described above. .
  • control unit that functions as a refrigerant amount calculating means for calculating the refrigerant amount in each part of the refrigerant circuit 10 from the refrigerant flowing in the refrigerant circuit 10 in the automatic refrigerant charging operation or the operating state quantity of the constituent devices.
  • step 8 the process of step S12 is performed.
  • the refrigerant amount in the refrigerant circuit 10 gradually increases.
  • the refrigerant amount to be filled in the refrigerant circuit 10 after additional charging of the refrigerant is determined as the refrigerant circuit 10 It cannot be defined as the total amount of refrigerant.
  • the indoor units 3a to 3c, and the connection units 4a and 4b that is, the refrigerant circuit 10 excluding the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7
  • this amount of refrigerant is stored in advance in the memory of the control unit 8 as the charging target value Ms, and the above relational expression is obtained.
  • the refrigerant amount in the outdoor unit 2 in which the refrigerant flowing in the refrigerant circuit 10 in the automatic refrigerant charging operation or the operating state quantity force of the component device is also calculated Mo, the refrigerant amount Mr in the indoor units 3a to 3c, and the connection units 4a and 4b Refrigerant amount value obtained by adding the refrigerant amount Mbs Additional refrigerant charging may be performed until the charging target value Ms is reached.
  • step S13 the refrigerant amount value obtained by adding the refrigerant amount Mo of the outdoor unit 2, the refrigerant amount Mr of the indoor units 3a to 3c, and the refrigerant amount Mbs of the connection units 4a and 4b in the automatic refrigerant charging operation is determined.
  • This is a process for determining whether or not the amount of refrigerant charged in the refrigerant circuit 10 by additional charging of the refrigerant is appropriate by determining whether or not the value Ms has been reached.
  • step S13 the refrigerant amount value obtained by adding the refrigerant amount Mo of the outdoor unit 2, the refrigerant amount Mr of the indoor units 3a to 3c, and the refrigerant amount Mbs of the connection units 4a and 4b is smaller than the filling target value Ms.
  • the process of step S13 is repeated until the charging target value Ms is reached.
  • the refrigerant amount value obtained by adding the refrigerant amount Mo of the outdoor unit 2 the refrigerant amount Mr of the indoor units 3a to 3c, and the refrigerant amount Mbs of the connection units 4a and 4b reaches the charging target value Ms, the refrigerant Is completed, and step S1 as the automatic refrigerant charging operation processing is completed.
  • the degree of supercooling SCo at the outlet of the outdoor heat exchanger 22 tends to increase mainly, and outdoor heat exchange occurs.
  • the refrigerant amount Mc in the vessel 22 increases, and the refrigerant amount in other parts tends to be kept almost constant.
  • the charging target value Ms is set as a value corresponding only to the refrigerant amount Mo of the outdoor unit 2, which is not the outdoor unit 2, the indoor units 3a to 3c, and the connection units 4a and 4b, or the outdoor unit 2 It may be set as a value corresponding to the refrigerant amount Mc of the heat exchanger ⁇ 22 and additional charging of the refrigerant may be performed until the charging target value Ms is reached. [0076] In this manner, it functions as a refrigerant amount determination means for determining the suitability of the refrigerant amount in the refrigerant circuit 10 in the refrigerant amount determination operation of the automatic refrigerant charging operation (that is, whether or not the charging target value Ms has been reached).
  • the control unit 8 performs the process of step S13.
  • Step S2 Pipe volume judgment operation
  • step S1 When the above-described automatic refrigerant charging operation in step S1 is completed, the process proceeds to the pipe volume determination operation in step S2.
  • the control unit 8 performs the processing from step S21 to step S25 shown in FIG.
  • FIG. 6 is a flow chart of the pipe volume judgment operation.
  • Step S21 Pipe volume determination operation and volume calculation for liquid refrigerant communication pipe
  • step S21 the indoor unit 100% operation and condensation are performed in the same manner as the refrigerant amount determination operation in step S11 in the above-described automatic refrigerant charging operation.
  • the refrigerant temperature at the outlet of the main refrigerant circuit side of the subcooler 24 in the liquid pipe temperature control is set as the first target value Tlpsl, which is the liquid pipe temperature target value Tips for the T1 P.
  • the steady state is the first state (see the refrigeration cycle indicated by the line including the broken line in Fig. 7).
  • FIG. 7 is a Mollier diagram showing the refrigeration cycle of the air conditioner 1 in the pipe volume determination operation for the liquid refrigerant communication pipe.
  • the density of the refrigerant in the liquid refrigerant communication pipe section B3 decreases, so the refrigerant in the liquid refrigerant communication pipe section B3 in the second state
  • the amount Mlp will be reduced compared to the amount of refrigerant in the first state.
  • the refrigerant decreased from the liquid refrigerant communication pipe section B3 is transferred to the other part of the refrigerant circuit 10. Will move.
  • the equipment control conditions other than the liquid pipe temperature control are not changed, so that the refrigerant amount Mogl in the high pressure gas pipe E, the first low pressure gas pipe H Refrigerant amount Mog2, refrigerant amount Mog3 in the second low pressure gas pipe part I, refrigerant amount Mgph in the high pressure gas refrigerant communication pipe part G1, and refrigerant quantity Mgpl in the low pressure gas refrigerant communication pipe part G2 are kept substantially constant,
  • the refrigerant decreased from the liquid refrigerant communication pipe section B3 moves to the condenser section A, the high temperature side liquid pipe section Bl, the low temperature side liquid pipe section B2, the indoor unit section F, and the second bypass circuit section J.
  • the refrigerant amount Mc in the condenser part A the refrigerant amount Moll in the high temperature side liquid pipe part B1
  • the refrigerant quantity Mol2 in the low temperature side liquid pipe part B2 and the indoor unit part by the amount of refrigerant reduced from the liquid refrigerant communication pipe part B3
  • the refrigerant quantity Mr in F and the refrigerant quantity Mob in the second bypass circuit section J will increase.
  • control unit 8 (more specifically, the indoor side control) that functions as a pipe volume determination operation control means for performing a pipe volume determination operation for calculating the volume Mlp of the liquid refrigerant communication pipe unit B3.
  • control unit 8 (more specifically, the indoor side control) that functions as a pipe volume determination operation control means for performing a pipe volume determination operation for calculating the volume Mlp of the liquid refrigerant communication pipe unit B3.
  • step S22 the liquid cooling medium is utilized by utilizing the phenomenon that the refrigerant is decreased from the liquid refrigerant communication pipe section B3 and moves to the other part of the refrigerant circuit 10 due to the change from the first state to the second state. Calculate the volume Vlp of the connecting piping section B3.
  • the amount of refrigerant that has decreased from the liquid refrigerant communication piping section B3 and moved to the other part of the refrigerant circuit 10 by the pipe volume determination operation described above is defined as the refrigerant increase / decrease amount ⁇ Mlp, and each amount between the first and second states.
  • refrigerant amount Mogl refrigerant amount Mog2, refrigerant amount Mog3, refrigerant amount Mgp h, and refrigerant amount Mgpl are almost constant
  • the refrigerant increase / decrease amount ⁇ Mlp is, for example,
  • ⁇ Mlp — ( ⁇ Mc + ⁇ Moll + ⁇ ⁇ 12 + ⁇ Mr + ⁇ Mob)
  • ⁇ Mlp is then used as the liquid refrigerant communication pipe.
  • the volume Vlp of the liquid refrigerant communication pipe part B3 can be calculated. It should be noted that the calculation result of the refrigerant increase / decrease amount ⁇ Mlp has little influence, but the refrigerant amount Mogl and the refrigerant amount Mog2 may be included in the above-described function formula.
  • Vlp ⁇ Mlp / ⁇ lp
  • the volume Vlp2 of the liquid side refrigerant flow path of the connection units 4a and 4b is a known value before the connection units 4a and 4b are installed at the installation location.
  • a Mc, ⁇ ⁇ 11, ⁇ ⁇ 12, A Mr, and A Mob represent the refrigerant amount in the first state and the refrigerant amount in the second state by using the relational expressions for the respective parts of the refrigerant circuit 10 described above. Is obtained by subtracting the amount of refrigerant in the second state.
  • the density change amount ⁇ p ip calculates the refrigerant density at the outlet of the subcooler 24 in the first state and the refrigerant density at the outlet of the subcooler 24 in the second state, and further calculates the refrigerant density in the second state. Density force of the pressure is obtained by subtracting the refrigerant density in the first state.
  • the volume Vlp of the liquid refrigerant communication pipe section B3 can be calculated from the operating state quantity of the refrigerant flowing through the refrigerant circuit 10 in the first and second states or the component devices. I'll do it.
  • the state is changed so that the second target value Tlps2 in the second state is higher than the first target value Tlpsl in the first state, and the refrigerant in the low temperature side liquid pipe section B2 is changed.
  • the amount of refrigerant in the other part is increased by moving to this part, and the volume Vlp of the increased force liquid refrigerant communication pipe part B3 is calculated, but the second target value Tlps2 in the second state is the first Change the state so that the temperature is lower than the first target value Tlpsl in the state, and move the refrigerant from the other part to the liquid refrigerant communication pipe part B3 to reduce the amount of refrigerant in the other part.
  • step S22 is performed by the control unit 8 that functions as a pipe volume calculation means for pipes.
  • Steps S23 and S24 Pipe volume judgment operation for gas refrigerant communication pipe and calculation of volume
  • step S23 the piping for the gas refrigerant communication pipe G including the indoor unit 100% operation, condensing pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control. Perform volume judgment operation.
  • the low pressure target value Pes of the suction pressure Ps of the compressor 21 in the evaporation pressure control is set to the first target value Pesl
  • the state in which the refrigerant amount determination operation is stabilized at the first target value Pesl is set to the first state (Refer to the refrigeration cycle indicated by the line including the dashed line in Figure 8).
  • FIG. 8 is a Mollier diagram showing the refrigeration cycle of the air-conditioning apparatus 1 in the pipe volume determination operation for the gas refrigerant communication pipe.
  • the low pressure target value Pes of the suction pressure Ps of the compressor 21 in the evaporation pressure control is stable at the first target value Pesl
  • other device control that is, liquid pipe temperature control, condensation
  • the pressure control and superheat degree control conditions are not changed (that is, the liquid pipe temperature target value Tips and the superheat degree target value SHrs are not changed)
  • the low pressure target value Pes is changed to the first target value Pesl.
  • Change to a different second target value Pes2 to obtain a stable second state see the refrigeration cycle shown only by the solid line in Fig. 8).
  • the second target value Pes2 is a pressure lower than the first target value Pesl.
  • the refrigerant in the gas refrigerant communication pipe section G since the density of the refrigerant in the gas refrigerant communication pipe section G is reduced by changing from the stable state in the first state to the second state, the refrigerant in the gas refrigerant communication pipe section G in the second state The amount Mgp will decrease compared to the amount of refrigerant in the first state. Then, the refrigerant decreased from the gas refrigerant communication pipe part G moves to the other part of the refrigerant circuit 10.
  • the refrigerant amount Mo gl in the high-pressure gas pipe E and the refrigerant in the high-temperature side liquid pipe Bl Amount Moll, amount of refrigerant in low temperature side liquid pipe section B2 Mol 2 and the refrigerant quantity Mlp in the liquid refrigerant communication pipe section B3 is kept substantially constant, and the refrigerant decreased from the gas refrigerant communication pipe section G is the first low pressure gas pipe section H, the second low pressure gas pipe section I, It moves to the condenser part A, the indoor unit part F, and the second bypass circuit part J.
  • the refrigerant amount Mog2 in the first low-pressure gas pipe part H, the refrigerant quantity Mog3 in the second low-pressure gas pipe part I, and the condenser part A by the amount of the refrigerant reduced from the gas refrigerant communication pipe part G
  • the refrigerant quantity Mc, the refrigerant quantity Mr in the indoor unit part F, and the refrigerant quantity Mob in the second bypass circuit part J will increase.
  • control unit 8 (more specifically, the indoor side control) that functions as a pipe volume determination operation control unit that performs a pipe volume determination operation for calculating the volume Vgp of the gas refrigerant communication pipe unit G.
  • control unit 8 (more specifically, the indoor side control) that functions as a pipe volume determination operation control unit that performs a pipe volume determination operation for calculating the volume Vgp of the gas refrigerant communication pipe unit G.
  • step S24 by changing from the first state to the second state, the gas refrigerant communication piping part G force also uses the phenomenon that the refrigerant decreases and moves to the other part of the refrigerant circuit 10 to connect the gas refrigerant.
  • Pipe volume G volume Vgp is calculated.
  • the amount of refrigerant that has decreased from the gas refrigerant communication pipe G and moved to the other part of the refrigerant circuit 10 by the pipe volume determination operation described above is defined as refrigerant increase / decrease amount ⁇ Mgp, and each part between the first and second states.
  • a Mc, A Mog2, A Mog3, ⁇ ⁇ , and ⁇ Mob (Here, the refrigerant amount Mogl, the refrigerant amount Moll, the refrigerant amount Mol2, and the refrigerant amount Mlp are kept almost constant. Therefore, the refrigerant increase / decrease amount ⁇ Mgp is, for example,
  • a Mgp -(A Mc + A Mog2 + A Mog3 + A Mr + A Mob)
  • the functional force It is possible to calculate the functional force. Then, by dividing the value of ⁇ Mgp by the refrigerant density change ⁇ pgp between the first and second states in the gas refrigerant communication piping section G, the volume Vgp of the gas refrigerant communication piping section G is calculated. can do. Note that, although the calculation result of the refrigerant increase / decrease amount ⁇ Mgp is hardly affected, the refrigerant quantity Mogl, the refrigerant quantity Moll, and the refrigerant quantity Mol2 may be included in the above-described functional expression.
  • a Mc, A Mog2, A Mog3, A Mr, and ⁇ Mob represent the refrigerant amount in the first state and the refrigerant amount in the second state by using the relational expressions for each part of the refrigerant circuit 10 described above. Is calculated by subtracting the amount of refrigerant in the second state, and the density change ⁇ p gp is the refrigerant density on the suction side of the compressor 21 in the first state.
  • the volume Vgp of the gas refrigerant communication pipe section G can be calculated from the operating state quantities of the refrigerant flowing through the refrigerant circuit 10 in the first and second states or the component devices. .
  • the volume Vgp2 of the high pressure gas side refrigerant flow path and low pressure gas side refrigerant flow path (including the third bypass refrigerant circuit 43a, 43b part) in the connection unit 4a, 4b is set at the installation location of the connection unit 4a, 4b. Since the pre-force is a known value, it is subtracted from the volume Vgp of the gas refrigerant communication pipe G obtained by calculation, so that the air conditioner 1 is installed on site when it is installed at the installation location such as a building.
  • the volume V gpl of the combined portion of the high-pressure gas refrigerant communication pipe 52, the low-pressure gas refrigerant communication pipe 53, and the second gas refrigerant communication pipes 72a and 72b, which are the refrigerant pipes to be generated, can be obtained.
  • the state change is performed so that the second target value Pes2 in the second state is lower than the first target value Pesl in the first state and becomes a pressure, and the gas refrigerant communication pipe section G
  • the amount of refrigerant in the other part is increased by moving the refrigerant to the other part, and this increasing force is calculated as the volume Vlp of the gas refrigerant communication pipe G.
  • the second target value in the second state Change the state so that Pes2 is at a pressure higher than the first target value Pesl in the first state!
  • step S24 Refrigerant amount in the other part by moving the refrigerant from the other part to the gas refrigerant communication pipe part G Calculate the volume Vlp of the gas refrigerant communication pipe G from this decrease.
  • the control unit 8 functioning as a pipe volume calculating means.
  • step S25 whether or not the result of the pipe volume determination operation is valid, that is, the liquid refrigerant communication pipe section B3 calculated by the pipe volume calculation means. It is determined whether or not the volume Vlp of the gas and the volume Vg p of the gas refrigerant communication pipe G are appropriate.
  • ⁇ 1 and ⁇ 2 are values that can be varied based on the minimum value and the maximum value of the pipe volume ratio in a feasible combination of the heat source unit and the utilization unit.
  • step S2 when the volume ratio VlpZVgp satisfies the above numerical range, the processing of step S2 that is applied to the pipe volume determination operation is completed, and when the volume ratio VlpZVgp does not satisfy the above numerical range, The pipe volume determination operation and the volume calculation process in steps S21 to S24 are performed again.
  • step S25 is performed by the control unit 8 functioning as a validity determination means for determining whether or not the volume Vgp is appropriate.
  • the pipe volume determination operation for the liquid refrigerant communication pipe section B3 (steps S21 and S22) is performed first, and then the pipe volume determination operation for the gas refrigerant communication pipe section G (step S23 and S24) are performed, but the pipe volume determination operation for the gas refrigerant communication pipe section G may be performed first.
  • step S25 the pipe volume determination operation in steps S21 to S24 is performed.
  • the result is judged to be invalid multiple times, or when the volume Vlp of the liquid refrigerant communication piping part B3 and the volume Vgp of the gas refrigerant communication piping part G are more simply determined, although not shown in FIG.
  • step S25 after it is determined in step S25 that the result of the pipe volume determination operation in steps S21 to S24 is not valid, the liquid refrigerant communication pipe part B3 and the gas refrigerant communication pipe part G
  • the pressure loss force in the combined part (hereinafter referred to as refrigerant communication pipe section K) Estimated the pipe length of refrigerant communication pipe section K, and the volume of liquid refrigerant communication pipe section B3 from this estimated pipe length and average volume ratio It is possible to obtain the volume Vlp of the liquid refrigerant communication pipe B3 and the volume Vgp of the gas refrigerant communication pipe G by shifting to the process of calculating Vlp and the volume Vgp of the gas refrigerant communication pipe G.
  • the length of the refrigerant communication pipe section K does not include information such as the pipe diameter.
  • the volume Vlp of the liquid refrigerant communication pipe section B3 and the volume Vgp of the gas refrigerant communication pipe section G are unknown.
  • the pipe volume determination operation is performed to calculate the volume Vlp of the liquid refrigerant communication pipe section B3 and the volume Vgp of the gas refrigerant communication pipe section G.
  • it has a function to calculate the volume Vlp of the liquid refrigerant communication pipe B3 and the volume Vgp of the gas refrigerant communication pipe G by inputting information such as the length of the refrigerant communication pipe K and the pipe diameter. This function may be used in combination.
  • the function of calculating the volume Vlp of the liquid refrigerant communication pipe section B3 and the volume Vgp of the gas refrigerant communication pipe section G using the above-described pipe volume judgment operation and the operation result is not used, and the refrigerant communication pipe section K If only the function to calculate the volume Vlp of the liquid refrigerant communication piping part B3 and the volume Vgp of the gas refrigerant communication piping part G is used by inputting information such as the tube diameter, the above-mentioned validity judgment The means (step S25) may be used to determine whether or not the input information such as the length of the refrigerant communication pipe section K is appropriate.
  • Step S3 Initial refrigerant quantity detection operation
  • FIG. 9 is a flowchart of the initial refrigerant quantity detection operation. (Step S31: Refrigerant amount judgment operation)
  • step S31 similar to the refrigerant quantity determination operation in step S11 of the refrigerant automatic charging operation described above, the refrigerant quantity including the indoor unit 100% operation, the condensation pressure control, the liquid pipe temperature control, the superheat degree control, and the evaporation pressure control. Judgment operation is performed.
  • the liquid pipe temperature target value Tlps in the liquid pipe temperature control, the superheat degree target value SHrs in the superheat degree control, and the low pressure target value Pes in the evaporation pressure control are, in principle, the step S 11 of the automatic refrigerant charging operation.
  • the same value as the target value in the refrigerant quantity determination operation is used.
  • the superheat degree target value SHrc for indoor heat exchange 31 C is the same value as the target value in the refrigerant quantity determination operation in step SI 1 of the automatic refrigerant charging operation.
  • control unit 8 functioning as the refrigerant quantity determination operation control means for performing the refrigerant quantity determination operation including the indoor unit total number operation, the condensation pressure control, the liquid pipe temperature control, the superheat degree control, and the evaporation pressure control, performs step S 31 processes are performed.
  • the refrigerant amount determination operation is performed while the control unit 8 functioning as the refrigerant amount calculation means while flowing through the refrigerant circuit 10 in the initial refrigerant amount detection operation in step S32.
  • the amount of refrigerant in 10 is calculated.
  • the amount of refrigerant in the refrigerant circuit 10 is calculated using a relational expression between the amount of refrigerant in each part of the refrigerant circuit 10 and the operating state amount of the refrigerant flowing through the refrigerant circuit 10 or the constituent devices.
  • the volume Vlp of the liquid refrigerant communication pipe section B3 and the volume Vgp of the gas refrigerant communication pipe section G which were unknown after the installation of the components of the air conditioner 1, are calculated by the pipe volume determination operation described above. Therefore, by multiplying the volume Vgp of the liquid refrigerant communication pipe B3 and the volume Vgp of the gas refrigerant communication pipe G by the refrigerant density, the amount of refrigerant in the liquid refrigerant communication pipe B3 Mlp And the refrigerant amount Mgp of the gas refrigerant communication pipe part G, and by adding the refrigerant amounts of the other parts, the initial refrigerant amount of the refrigerant circuit 10 as a whole can be detected.
  • This initial refrigerant amount is used as the reference refrigerant amount Mi of the refrigerant circuit 10 as a reference for determining the presence or absence of leakage from the refrigerant circuit 10 in the refrigerant leakage detection operation described later. Then, it is stored in the memory of the control unit 8 as state quantity storage means. In this way, the control unit 8 functions as a refrigerant amount calculating means for calculating the refrigerant amount of each part of the refrigerant circuit 10 from the refrigerant flowing in the refrigerant circuit 10 or the operation state quantity of the constituent device in the initial refrigerant amount detection operation. Thus, the process of step S32 is performed.
  • FIG. 10 is a flowchart of the refrigerant leak detection operation mode.
  • Step S41 Refrigerant amount judgment operation
  • the refrigerant leakage detection is automatically or manually performed from the normal operation mode.
  • the refrigerant quantity judgment operation including all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control To do.
  • the liquid pipe temperature target value Tlps in the liquid pipe temperature control, the superheat degree target value SHrs in the superheat degree control, and the low pressure target value Pes in the evaporation pressure control are, in principle, the refrigerant quantity judgment operation in the initial refrigerant quantity detection operation. The same value as the target value in step S31 is used.
  • the indoor unit 3c is operated so as to maintain the cooling capacity of the indoor unit 3c. Control independent of the other indoor units 3a and 3b is performed.
  • the superheat degree SHrc of the indoor heat exchanger 31c is the superheat degree target value SHr cs recorded in the built-in memory 35c of the indoor control unit 34c in the normal operation mode.
  • the indoor expansion valve V9c is controlled so that In the indoor units 3a and 3b, the indoor expansion valves V9a and V9b are controlled so that the superheat degree SHr of the indoor heat exchangers 31a to 31c as a whole is constant at the superheat degree target value SHrs.
  • the indoor fans 32a to 32c have constant air volume Wra to Wrc supplied to the indoor heat exchangers 31a to 31c so that the evaporation pressure Pe of the refrigerant is stably controlled by the evaporation pressure control. Controlled to be It is.
  • the refrigerant amount determination operation is performed for each refrigerant leakage detection operation. For example, when the condensation pressure Pc is different, the refrigerant amount determination operation is caused by a difference in operating conditions such as when refrigerant leakage occurs. Even when the temperature Tco of the refrigerant at the outlet of the outdoor heat exchanger 22 fluctuates, the temperature of the refrigerant in the liquid refrigerant communication pipe section B3 is kept constant at the same liquid pipe temperature target value Tips by liquid pipe temperature control. Will be.
  • control unit 8 functioning as the refrigerant quantity determination operation control means for performing the refrigerant quantity determination operation including the indoor unit total number operation, the condensation pressure control, the liquid pipe temperature control, the superheat degree control, and the evaporation pressure control, performs step S41. Is performed.
  • control unit 8 that performs the refrigerant amount determination operation and functions as the refrigerant amount calculation means while the refrigerant flowing in the refrigerant circuit 10 in the refrigerant leakage detection operation in step S42 or the operation state quantity power of the component device is performed.
  • the amount of refrigerant in 10 is calculated.
  • the refrigerant amount in the refrigerant circuit 10 is calculated using a relational expression between the refrigerant amount of each part of the refrigerant circuit 10 and the operating state quantity of the refrigerant flowing through the refrigerant circuit 10 or the component device.
  • the volume Vlp of the liquid refrigerant communication pipe B3 and the gas refrigerant communication pipe section that were unknown after the installation of the components of the air conditioner 1 were performed by the pipe volume determination operation described above. Since the volume Vgp of G is calculated and becomes known, the volume Vlp of the liquid cooling medium communication piping part B3 and the volume Vgp of the gas refrigerant communication piping part G are multiplied by the refrigerant density.
  • the refrigerant quantity M of the entire refrigerant circuit 10 is obtained. It can be calculated.
  • the liquid refrigerant communication pipe section B3 since the temperature Tip of the refrigerant in the liquid refrigerant communication pipe section B3 is kept constant at the same liquid pipe temperature target value Tips by the liquid pipe temperature control, the liquid refrigerant communication pipe The refrigerant amount Mlp in the part B3 is kept constant even when the refrigerant temperature Tco fluctuates at the outlet of the outdoor heat exchanger 22 regardless of the operating condition of the refrigerant leak detection operation.
  • step S42 is performed by the control unit 8 functioning as a refrigerant amount calculating means for calculating the refrigerant amount of each part of the refrigerant circuit 10 from the operating state quantity of the cooler.
  • Steps S43, S44 Judgment of appropriateness of refrigerant amount, warning display
  • the refrigerant amount M of the entire refrigerant circuit 10 calculated in step S42 described above is the reference refrigerant amount MU detected in the initial refrigerant amount detection operation when refrigerant leakage from the refrigerant circuit 10 occurs. If the refrigerant leaks from the refrigerant circuit 10 and becomes V, in this case, it becomes almost the same value as the reference refrigerant amount Mi.
  • step S43 it is determined whether or not refrigerant has leaked. If it is determined in step S43 that no refrigerant leaks from the refrigerant circuit 10, the refrigerant leak detection operation mode is terminated.
  • step S43 if it is determined in step S43 that refrigerant has leaked from the refrigerant circuit 10, the process proceeds to step S44, and a warning is sent to the warning display unit 9 informing that the refrigerant has been detected. After the display, the refrigerant leak detection operation mode is terminated.
  • the refrigerant amount determination means for detecting the presence or absence of refrigerant leakage by determining whether or not the refrigerant amount in the refrigerant circuit 10 is appropriate while performing the refrigerant amount determination operation in the refrigerant leakage detection operation mode.
  • the processing of steps S42 to S44 is performed by the control unit 8 that functions as one refrigerant leakage detection means.
  • the control unit 8 includes the refrigerant amount determination operation means, the refrigerant amount calculation means, the refrigerant amount determination means, the pipe volume determination operation means, the pipe volume calculation means, By functioning as validity determination means and state quantity accumulation means, a refrigerant amount determination system for determining the suitability of the refrigerant amount charged in the refrigerant circuit 10 is configured.
  • the low pressure target value Pes is set as the first control target value
  • the control unit 8 has an operation state amount equivalent to the refrigerant pressure or pressure on the suction side of the compressor 21 in the refrigerant amount determination operation.
  • the component devices are controlled so as to be constant at the low pressure target value Pes.
  • the target degree of superheat SHrs is the first target control value
  • the control unit 8 have contact with the refrigerant quantity judging operation, the indoor heat exchange 31 a to 31 C with to function as an evaporator of refrigerant, the indoor heat exchange
  • the components are controlled so that the superheat degree SHr of the refrigerant sent from the converters 31a to 31c to the compressor 21 becomes constant at the superheat degree target value SHrs.
  • the indoor unit 3c in the machine room has sufficient capacity for the cooling load of the machine room.
  • the temperature rise in the machine room due to insufficient capacity of the indoor unit can be suppressed, and failure in the machine room equipment can be suppressed.
  • the superheat degree target value SHrcs which is the second control target value in the indoor unit 3c before the refrigerant amount determination operation, is recorded as a history, and the indoor temperature is determined based on the history during the refrigerant amount determination operation.
  • the cooling capacity of the indoor unit 3c is maintained equal to the cooling capacity before the refrigerant amount determination operation. Therefore, it is possible to maintain the cooling capacity of the indoor unit 3c at the capacity before the refrigerant amount determination operation.
  • the indoor unit 3c can be operated with sufficient capacity against the cooling load of the machine room, and temperature rise in the machine room due to insufficient capacity of the indoor unit 3c is suppressed, and the machine It is possible to suppress the occurrence of trouble in the room equipment.
  • the control unit 8 records the superheat degree target value SHrsc, which is the second control target value in the indoor unit 3c, as a history, and the indoor unit based on the history during the refrigerant amount determination operation.
  • the cooling capacity of the indoor unit 3c is maintained equal to the cooling capacity before the refrigerant amount determination operation.
  • the present invention is not limited to this, and environmental information acquisition means T6, Tlc, 90 and target value derivation means 82 are further provided to acquire environmental information in the machine room, and within a predetermined space based on the acquired environmental information.
  • the indoor unit 3c is controlled to the third control target value, so that the cooling capacity of the indoor unit 3c is changed to the capacity before the refrigerant amount judgment operation. Control to maintain may be performed.
  • the “environmental information acquisition means” mentioned here is, for example, an outdoor temperature sensor T6 provided in the outdoor unit 2 or an indoor temperature sensor Tlc provided in a predetermined space or in the indoor unit 3c. Yes (see Figure 1, Figure 2, and Figure 11). Further, it may be a weather information acquisition network 90 connected to the weather information providing external server 92 via the network 91 (see FIG. 12).
  • the “environment information” mentioned here is, for example, the outside air temperature, the temperature in the predetermined space, weather information, and the like.
  • the “third control target value” mentioned here is, for example, a superheat degree target value of the indoor unit 3c.
  • the indoor unit 3c is controlled based on the third control target value, so that the cooling capacity of the indoor unit 3c can be maintained equal to the capacity before the refrigerant quantity determination operation. Is possible. For this reason, even in the refrigerant amount determination operation, the indoor unit 3c in the machine room can be operated with sufficient capacity against the cooling load of the machine room, and the temperature increase in the machine room due to insufficient capacity of the indoor unit 3c. It is possible to suppress the occurrence of failures in the machine room equipment.
  • a force that uses an air-cooled outdoor unit that uses outside air as a heat source as the outdoor unit 2 of the air conditioner 1 uses a water-cooled or ice heat storage outdoor unit. Also good.
  • the present invention is not limited thereto, and may be configured as a multi-air conditioner dedicated to cooling operation.
  • the outdoor condition control unit 26, the indoor side control units 34a to 34c, and the connection side control units 44a and 44b exchange control signals via the transmission line 81 as the entire air conditioner 1.
  • the control unit that controls the entire air conditioner 1 may be provided in the outdoor unit 2 or in the indoor units 3a to 3c. Alternatively, they may be provided in the connection units 4a and 4b, or a single unit may be provided as a control unit.
  • the air conditioner according to the present invention suppresses an increase in temperature in the predetermined space due to insufficient capacity of the utilization unit even in the refrigerant amount determination operation, and suppresses a failure in the devices in the predetermined space.
  • Function for determining the suitability of the amount of refrigerant in the refrigerant circuit of the air conditioner, and in particular, the refrigerant circuit of the air conditioner configured by connecting the compressor, the condenser, the expansion mechanism, and the evaporator It is useful as an air conditioner having a function of determining the suitability of the amount of refrigerant in the inside.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

本発明の課題は、冷媒量検知運転においても、室内ユニットの能力不足によるマシンルーム内の温度上昇を抑え、マシンルームの機器に障害を発生させることを抑制することにある。 冷媒回路(10)と、運転制御手段(8,8a)とを備える。冷媒回路は、熱源ユニット(2)と、複数の利用ユニット(3a~3c)と、膨張機構(V2,V9a~V9c)とが接続されることによって構成されている。熱源ユニットは、圧縮機(21)と、熱源側熱交換器(22)とを有する。利用ユニットは、利用側熱交換器(31a~31c)を有する。運転制御手段は、第1状態値が第1制御目標値になるように構成機器の制御を行う冷媒量判定運転が可能である。また、運転制御手段は、冷媒量判定運転の際に、複数の利用ユニットの内、所定空間を空調する第1利用ユニット(3c)の冷房能力を維持する。

Description

明 細 書
空気調和装置
技術分野
[0001] 本発明は、空気調和装置の冷媒回路内の冷媒量の適否を判定する機能、特に、 圧縮機と凝縮器と膨張機構と蒸発器とが接続されることによって構成される空気調和 装置の冷媒回路内の冷媒量の適否を判定する機能を有する空気調和装置に関する
背景技術
[0002] 従来、圧縮機、凝縮器、膨張弁、および蒸発器を接続して構成される冷媒回路を 備えた冷凍装置において、冷媒回路内の冷媒量の過不足を判定するための冷媒量 判定運転を行い、冷媒回路内の冷媒量の過不足を判定する手法が提案されている( 例えば、特許文献 1参照)。
特許文献 1:特開平 3— 186170号公報
発明の開示
発明が解決しょうとする課題
[0003] しかし、常時冷房運転が必要なマシンルームなどの部屋 (以下マシンルームとする) に室内ユニットが置かれている場合があり、この場合、上述のような冷媒量判定運転 の際に、マシンルーム内の冷房負荷を考慮せずに制御目標値を与えると、場合によ つてはマシンルーム内の室内ユニットの冷房能力が不足し、マシンルームの機器(サ ーバなど)に不具合が起こる可能性がある。
本発明の課題は、冷媒量検知運転においても、室内ユニットの能力不足によるマシ ンルーム内の温度上昇を抑え、マシンルームの機器に障害を発生させることを抑制 することにある。
課題を解決するための手段
[0004] 第 1発明に係る空気調和装置は、冷媒回路と、運転制御手段とを備える。冷媒回路 は、熱源ユニットと、複数の利用ユニットと、膨張機構とが接続されることによって構成 されている。熱源ユニットは、圧縮機と、熱源側熱交翻とを有する。利用ユニットは 、利用側熱交換器を有する。運転制御手段は、第 1状態値が第 1制御目標値になる ように構成機器の制御を行う冷媒量判定運転が可能である。また、運転制御手段は
、冷媒量判定運転の際に、複数の利用ユニットの内、所定空間を空調する第 1利用 ユニットの冷房能力を維持する。
常時冷房運転が必要なマシンルームなどの所定空間(以下マシンルームとする)に 利用ユニットが置かれている場合がある。この場合、冷媒量検知運転の際に、マシン ルーム内の冷房負荷を考慮せずに熱源ユニットから利用ユニットの蒸発器に検知運 転用の制御目標値 (例えば、低圧目標値、過熱度目標値など)を与えると、場合によ つてはマシンルーム内の利用ユニットの冷房能力が不足し、マシンルーム内の機器( サーバなど)に不具合が起こる可能性がある。
この空気調和装置では、このような冷媒量検知運転においても、マシンルーム内の 利用ユニットをマシンルームの冷房負荷に対して十分な能力で運転させることにより
、利用ユニットの能力不足によるマシンルーム内の温度上昇を抑え、マシンルームの 機器に障害を発生させることを抑制することができる。
[0005] 第 2発明に係る空気調和装置は、第 1発明に係る空気調和装置であって、第 1制御 目標値は、低圧目標値である。運転制御手段は、冷媒量判定運転において、圧縮 機の吸入側の冷媒の圧力または圧力に等価な運転状態量が、低圧目標値で一定に なるように構成機器の制御を行う。
この空気調和装置では、低圧目標値を第 1制御目標値としており、運転制御手段 は、冷媒量判定運転において、圧縮機の吸入側の冷媒の圧力または圧力に等価な 運転状態量が、低圧目標値で一定になるように構成機器の制御を行う。
したがって、低圧目標値で一定になるように構成機器の制御を行う冷媒量判定運 転において、マシンルーム内の利用ユニットをマシンルームの冷房負荷に対して十 分な能力で運転させることにより、利用ユニットの能力不足によるマシンルーム内の 温度上昇を抑え、マシンルームの機器に障害を発生させることを抑制することができ る。
[0006] 第 3発明に係る空気調和装置は、第 1発明に係る空気調和装置であって、第 1制御 目標値は、過熱度目標値である。運転制御手段は、冷媒量判定運転において、利 用側熱交換器を冷媒の蒸発器として機能させるとともに、利用側熱交換器から圧縮 機に送られる冷媒の過熱度が、過熱度目標値で一定になるように構成機器の制御を 行う。
この空気調和装置では、過熱度目標値を第 1制御目標値としており、運転制御手 段は、冷媒量判定運転において、利用側熱交換器を冷媒の蒸発器として機能させる とともに、利用側熱交換器から圧縮機に送られる冷媒の過熱度が、過熱度目標値で 一定になるように構成機器の制御を行う。
したがって、過熱度目標値で一定になるように構成機器の制御を行う冷媒量判定 運転において、マシンルーム内の利用ユニットをマシンルームの冷房負荷に対して 十分な能力で運転させることにより、利用ユニットの能力不足によるマシンルーム内 の温度上昇を抑え、マシンルームの機器に障害を発生させることを抑制することがで きる。
[0007] 第 4発明に係る空気調和装置は、第 1発明から第 3発明のいずれかに係る空気調 和装置であって、履歴記録手段をさらに備える。履歴記録手段は、第 1利用ユニット の制御目標値である第 2制御目標値の履歴を記録可能である。運転制御手段は、冷 媒量判定運転の際に、履歴に基づいて冷媒量判定運転前の第 2制御目標値を導出 し、第 1利用ユニットを第 2制御目標値で制御する。
この空気調和装置では、冷媒量判定運転前の第 1利用ユニットにおける第 2制御目 標値を履歴として記録しておき、冷媒量判定運転の際に、履歴に基づいて第 1利用 ユニットに対して冷媒量判定運転前の制御を行うことで、第 1利用ユニットの冷房能 力を冷媒量判定運転前の冷房能力と同等に維持して 、る。
したがって、第 1利用ユニットの冷房能力を冷媒量判定運転前の能力に維持するこ とが可能である。このため、冷媒量検知運転においても、マシンルーム内の利用ュ- ットをマシンルームの冷房負荷に対して十分な能力で運転させることができ、利用ュ ニットの能力不足によるマシンルーム内の温度上昇を抑え、マシンルームの機器に 障害を発生させることを抑制することができる。
[0008] 第 5発明に係る空気調和装置は、第 4発明に係る空気調和装置であって、第 2制御 目標値は、第 1利用ユニットの過熱度目標値である。 この空気調和装置では、第 1利用ユニットの過熱度目標値を履歴として記録してお き、冷媒量判定運転の際に、履歴に基づいて第 1利用ユニットに対して冷媒量判定 運転前の制御を行うことで、第 1利用ユニットの冷房能力を冷媒量判定運転前の冷 房能力と同等に維持している。
本発明では、第 1利用ユニットの過熱度目標値を履歴として記録しているため、第 1 利用ユニットの冷房能力を冷媒量判定運転前の能力と同等に維持することが可能で ある。このため、冷媒量検知運転においても、マシンルーム内の利用ユニットをマシ ンルームの冷房負荷に対して十分な能力で運転させることができ、利用ユニットの能 力不足によるマシンルーム内の温度上昇を抑え、マシンルームの機器に障害を発生 させることを抑制することができる。
[0009] 第 6発明に係る空気調和装置は、第 1発明から第 3発明のいずれかに係る空気調 和装置であって、環境情報取得手段と、目標導出手段とをさらに備える。環境情報 取得手段は、屋外または所定空間内の環境情報を取得可能である。目標値導出手 段は、環境情報に基づいて所定空間内を最適に空調する第 3制御目標値を導出す る。運転制御手段は、第 3制御目標値に基づいて第 1利用ユニットの運転制御を行う この空気調和装置では、所定空間内の環境情報を監視することにより、環境情報 に基づいて、所定空間内を最適に空調する第 3制御目標値を導出する。
本発明では、冷媒量判定運転の際に、この第 3制御目標値に基づいて第 1利用ュ ニットを制御するため、第 1利用ユニットの冷房能力を冷媒量判定運転前の能力と同 等に維持することが可能である。このため、冷媒量判定運転においても、マシンルー ム内の利用ユニットをマシンルームの冷房負荷に対して十分な能力で運転させること ができ、利用ユニットの能力不足によるマシンルーム内の温度上昇を抑え、マシンル ームの機器に障害を発生させることを抑制することができる。
[0010] 第 7発明に係る空気調和装置は、第 6発明に係る空気調和装置であって、第 3制御 目標値は、第 1利用ユニットの過熱度目標値である。
この空気調和装置では、所定空間内の環境情報を監視することにより、環境情報 に基づいて、所定空間内を最適に空調する第 3制御目標値としての第 1利用ユニット の過熱度目標値を導出する。
本発明では、冷媒量判定運転の際に、この過熱度目標値に基づいて第 1利用ュ- ットを制御するため、第 1利用ユニットの冷房能力を冷媒量判定運転前の能力と同等 に維持することが可能である。このため、冷媒量検知運転においても、マシンルーム 内の利用ユニットをマシンルームの冷房負荷に対して十分な能力で運転させることが でき、利用ユニットの能力不足によるマシンルーム内の温度上昇を抑え、マシンルー ムの機器に障害を発生させることを抑制することができる。
[0011] 第 8発明に係る空気調和装置は、第 6発明に係る空気調和装置であって、環境情 報取得手段は、熱源ユニットに設けられた温度センサであり、環境情報としての外気 温を取得する。
この空気調和装置では、熱源ユニットに設けられた温度センサにより、環境情報とし ての外気温を取得する。そして、冷媒量判定運転の際に、この外気温に基づいて、 所定空間内を最適に空調する第 3制御目標値を導出する。
本発明では、冷媒量判定運転の際に、第 3制御目標値に基づいて第 1利用ュ-ッ ト制御するため、第 1利用ユニットの冷房能力を冷媒量判定運転前の能力と同等に 維持することが可能である。このため、冷媒量検知運転においても、マシンルーム内 の利用ユニットをマシンルームの冷房負荷に対して十分な能力で運転させることがで き、利用ユニットの能力不足によるマシンルーム内の温度上昇を抑え、マシンルーム の機器に障害を発生させることを抑制することができる。
[0012] 第 9発明に係る空気調和装置は、第 6発明に係る空気調和装置であって、環境情 報取得手段は、所定空間内または設けられた温度センサであり、環境情報として所 定空間内の温度を取得する。
この空気調和装置では、所定空間内に設けられた温度センサにより、環境情報とし ての所定空間内温度を取得する。そして、冷媒量判定運転の際に、この所定空間内 温度に基づいて、所定空間内を最適に空調する第 3制御目標値を導出する。
本発明では、冷媒量判定運転の際に、第 3制御目標値に基づいて第 1利用ュ-ッ ト制御するため、第 1利用ユニットの冷房能力を冷媒量判定運転前の能力と同等に 維持することが可能である。このため、冷媒量検知運転においても、マシンルーム内 の利用ユニットをマシンルームの冷房負荷に対して十分な能力で運転させることがで き、利用ユニットの能力不足によるマシンルーム内の温度上昇を抑え、マシンルーム の機器に障害を発生させることを抑制することができる。
[0013] 第 10発明に係る空気調和装置は、第 6発明に係る空気調和装置であって、環境情 報取得手段は、ネットワークを介して、環境情報としての気象情報を提供可能な気象 情報提供サーバから気象情報を取得する。
この空気調和装置では、ネットワークと接続されており、ネットワークを介して環境情 報としての気象情報を取得する。そして、冷媒量判定運転の際に、この気象情報に 基づ 、て所定空間内を最適に空調する第 3制御目標値を導出する。
本発明では、冷媒量判定運転の際に、第 3制御目標値に基づいて第 1利用ュ-ッ ト制御するため、第 1利用ユニットの冷房能力を冷媒量判定運転前の能力と同等に 維持することが可能である。このため、冷媒量検知運転においても、マシンルーム内 の利用ユニットをマシンルームの冷房負荷に対して十分な能力で運転させることがで き、利用ユニットの能力不足によるマシンルーム内の温度上昇を抑え、マシンルーム の機器に障害を発生させることを抑制することができる。
発明の効果
[0014] 第 1発明に係る空気調和装置では、冷媒量検知運転においても、マシンルーム内 の利用ユニットをマシンルームの冷房負荷に対して十分な能力で運転させることによ り、利用ユニットの能力不足によるマシンルーム内の温度上昇を抑え、マシンルーム の機器に障害を発生させることを抑制することができる。
第 2発明に係る空気調和装置では、低圧目標値で一定になるように構成機器の制 御を行う冷媒量判定運転にぉ 、て、マシンルーム内の利用ユニットをマシンルームの 冷房負荷に対して十分な能力で運転させることにより、利用ユニットの能力不足によ るマシンルーム内の温度上昇を抑え、マシンルームの機器に障害を発生させることを 抑帘 Uすることができる。
第 3発明に係る空気調和装置では、過熱度目標値で一定になるように構成機器の 制御を行う冷媒量判定運転にぉ 、て、マシンルーム内の利用ユニットをマシンルー ムの冷房負荷に対して十分な能力で運転させることにより、利用ユニットの能力不足 によるマシンルーム内の温度上昇を抑え、マシンルームの機器に障害を発生させる ことを抑帘 Uすることができる。
[0015] 第 4発明に係る空気調和装置では、冷媒量判定運転前の第 1利用ユニットにおけ る第 2制御目標値を履歴として記録しておき、冷媒量判定運転の際に、履歴に基づ いて第 1利用ユニットに対して冷媒量判定運転前の制御を行うことで、第 1利用ュ- ットの冷房能力を冷媒量判定運転前の冷房能力と同等に維持している。
第 5発明に係る空気調和装置では、第 1利用ユニットの過熱度目標値を履歴として 記録しているため、第 1利用ユニットの冷房能力を冷媒量判定運転前の能力と同等 に維持することが可能である。このため、冷媒量検知運転においても、マシンルーム 内の利用ユニットをマシンルームの冷房負荷に対して十分な能力で運転させることが でき、利用ユニットの能力不足によるマシンルーム内の温度上昇を抑え、マシンルー ムの機器に障害を発生させることを抑制することができる。
[0016] 第 6発明に係る空気調和装置では、冷媒量判定運転の際に、この第 3制御目標値 に基づいて第 1利用ユニットを制御するため、第 1利用ユニットの冷房能力を冷媒量 判定運転前の能力と同等に維持することが可能である。このため、冷媒量判定運転 においても、マシンルーム内の利用ユニットをマシンルームの冷房負荷に対して十分 な能力で運転させることができ、利用ユニットの能力不足によるマシンルーム内の温 度上昇を抑え、マシンルームの機器に障害を発生させることを抑制することができる。 第 7発明に係る空気調和装置では、冷媒量判定運転の際に、この過熱度目標値に 基づいて第 1利用ユニットを制御するため、第 1利用ユニットの冷房能力を冷媒量判 定運転前の能力と同等に維持することが可能である。このため、冷媒量検知運転に おいても、マシンルーム内の利用ユニットをマシンルームの冷房負荷に対して十分な 能力で運転させることができ、利用ユニットの能力不足によるマシンルーム内の温度 上昇を抑え、マシンルームの機器に障害を発生させることを抑制することができる。
[0017] 第 8発明に係る空気調和装置では、冷媒量判定運転の際に、第 3制御目標値に基 づいて第 1利用ユニット制御するため、第 1利用ユニットの冷房能力を冷媒量判定運 転前の能力と同等に維持することが可能である。このため、冷媒量検知運転におい ても、マシンルーム内の利用ユニットをマシンルームの冷房負荷に対して十分な能力 で運転させることができ、利用ユニットの能力不足によるマシンルーム内の温度上昇 を抑え、マシンルームの機器に障害を発生させることを抑制することができる。
第 9発明に係る空気調和装置では、冷媒量判定運転の際に、第 3制御目標値に基 づいて第 1利用ユニット制御するため、第 1利用ユニットの冷房能力を冷媒量判定運 転前の能力と同等に維持することが可能である。このため、冷媒量検知運転におい ても、マシンルーム内の利用ユニットをマシンルームの冷房負荷に対して十分な能力 で運転させることができ、利用ユニットの能力不足によるマシンルーム内の温度上昇 を抑え、マシンルームの機器に障害を発生させることを抑制することができる。
[0018] 第 10発明に係る空気調和装置では、冷媒量判定運転の際に、第 3制御目標値に 基づいて第 1利用ユニット制御するため、第 1利用ユニットの冷房能力を冷媒量判定 運転前の能力と同等に維持することが可能である。このため、冷媒量検知運転にお いても、マシンルーム内の利用ユニットをマシンルームの冷房負荷に対して十分な能 力で運転させることができ、利用ユニットの能力不足によるマシンルーム内の温度上 昇を抑え、マシンルームの機器に障害を発生させることを抑制することができる。 図面の簡単な説明
[0019] [図 1]本発明の一実施形態に力かる空気調和装置の概略構成図。
[図 2]空気調和装置の制御ブロック図。
[図 3]試運転モードのフローチャート。
[図 4]冷媒自動充填運転のフローチャート。
[図 5]冷媒量判定運転における冷媒回路内を流れる冷媒の状態を示す模式図(四路 切換弁等の図示を省略)。
[図 6]配管容積判定運転のフローチャート。
[図 7]液冷媒連絡配管用の配管容積判定運転における空気調和装置の冷凍サイク ルを示すモリエル線図。
[図 8]ガス冷媒連絡配管用の配管容積判定運転における空気調和装置の冷凍サイク ルを示すモリエル線図。
[図 9]初期冷媒量検知運転のフローチャート。
[図 10]冷媒漏洩検知運転モードのフローチャート。 圆 11]他の実施形態 (A)に係る制御部と環境情報取得手段との関係図。
[図 12]他の実施形態 (A)に係る気象情報取得ネットワークの概略図。
符号の説明
1, la 空気調和装置
2 室外ユニット (熱源ユニット)
21 圧縮機
22 室外熱交換器 (熱源側熱交換器)
m〜3c 室内ユニット (利用ユニット)
3c 室内ユニット (第 1利用ユニット)
dla〜3丄 c 室内熱交翻 (利用側熱交翻)
35c 内蔵メモリ(履歴記録手段)
8, 8a 制御部 (運転制御手段)
10 冷媒回路
82 目標値導出手段
90 気象情報取得ネットワーク (環境情報取得手段)
91 ネットワーク
T6 室外温度センサ (環境情報取得手段)
Tl lc 室内温度センサ (環境情報取得手段)
V2 室外膨張弁 (膨張機構)
V9a〜V9c 室内膨張弁 (膨張機構)
発明を実施するための最良の形態
以下、図面に基づいて、本発明にかかる空気調和装置の実施形態について説明 する。
(1)空気調和装置の構成
図 1は、本発明の一実施形態に力かる空気調和装置 1の概略構成図である。空気 調和装置 1は、蒸気圧縮式の冷凍サイクル運転を行うことによって、ビル等の室内の 冷暖房に使用される装置である。ここでは、ビル内に事務所等の室内と常時冷房負 荷が力かるマシンルームとがあるものとする。 空気調和装置 1は、主として、 1台の熱源ユニットとしての室外ユニット 2と、それに 並列に接続された複数台(本実施形態では、 3台)の利用ユニットとしての室内ュ-ッ ト 3a〜3cと、各室内ユニット 3a、 3bに対応して設けられた接続ユニット 4a, 4bと、室 外ユニット 2と接続ユニット 4a, 4bおよび室内ユニット 3cとを接続する第 1冷媒連絡配 管群 5と、接続ユニット 4a, 4bと室内ユニット 3a, 3bとを接続する第 2冷媒連絡配管 群 7とを備えている。ここで、室内ユニット 3cは、常時冷房負荷があるマシンルーム内 に備えられており、冷房専用の室内ユニットである。第 1冷媒連絡配管群 5は、第 1液 冷媒連絡配管 51と高圧ガス冷媒連絡配管 52と低圧ガス冷媒連絡配管 53とから構 成され、第 2冷媒連絡配管群 7は、第 2液冷媒連絡配管 71a, 71bと第 2ガス冷媒連 絡配管 72a, 72bとから構成される。すなわち、本実施形態の空気調和装置 1の蒸気 圧縮式の冷媒回路 10は、室外ユニット 2と、室内ユニット 3a〜3cと、接続ユニット 4a, 4bと、第 1冷媒連絡配管群 5と、第 2冷媒連絡配管群 7とが接続されることによって構 成されている。
[0022] この空気調和装置 1は、例えば、ある空調空間については冷房運転を行いつつ他 の空調空間については暖房運転を行う等のように、室内ユニット 3a, 3bが設置される 室内の空調空間の要求に応じて冷暖同時運転が可能になるように構成されて 、る。 また、マシンルーム内の室内ユニット 3cは、マシンルーム内の冷房負荷に応じて常に 冷房運転が可能になるように構成されて 、る。
<室内ユニット >
室内ユニット 3a〜3cは、ビル等の室内の天井に埋め込みや吊り下げ等、または、 室内の壁面に壁掛け等により設置されている。室内ユニット 3a、 3bは、第 2冷媒連絡 配管群 7を介して接続ユニット 4a, 4bに接続されており、冷媒回路 10の一部を構成 している。また、室内ユニット 3cは、第 1冷媒連絡配管郡 5を介して室外ユニット 2に接 続されており、室内ユニット 3a, 3bと同様に冷媒回路 10の一部を構成している。
[0023] 次に、室内ユニット 3a〜3cの構成について説明する。なお、室内ユニット 3aと室内 ユニット 3b, 3cとは同様の構成であるため、ここでは、室内ユニット 3aの構成のみ説 明し、室内ユニット 3b, 3cの構成については、それぞれ、室内ユニット 3aの各部を示 す Xaの符号の代わりに Xb, Xcの符号を付して、各部の説明を省略する。例えば、室 内ユニット 3aの室内ファン 32aと、室内ユニット 3b, 3cの室内ファン 32b, 32cと力 S対 応する。
室内ユニット 3aは、主として、冷媒回路 10の一部を構成する室内側冷媒回路 30a を有している。この室内側冷媒回路 30aは、主として、膨張機構としての室内膨張弁 V9aと、利用側熱交^^としての室内熱交 3 laとを有している。
室内膨張弁 V9aは、室内側冷媒回路 30a内を流れる冷媒の流量の調節等を行うた めに、室内熱交換器 31aの液側に接続された電動膨張弁である。
室内熱交^^ 31aは、伝熱管と多数のフィンとにより構成されたクロスフィン式のフ イン 'アンド'チューブ型熱交換器であり、冷房運転時には冷媒の蒸発器として機能し て室内空気を冷却し、暖房運転時には冷媒の凝縮器として機能して室内空気をカロ 熱する熱交^^である。
また、室内ユニット 3aは、室内空気をユニット内に吸入して、室内熱交換器 31aに おいて冷媒と熱交換させた後に、供給空気として室内に供給する送風ファンとしての 室内ファン 32aを有している。室内ファン 32aは、室内熱交換器 31aに供給する空気 の風量 Wrを可変することが可能なファンであり、本実施形態において、 DCファンモ 一タカもなるモータ 33aによって駆動される遠心ファンや多翼ファン等である。
また、室内ユニット 3aには、各種のセンサが設けられている。室内熱交換器 31aの 液側には、冷媒の温度 (すなわち、暖房運転時における凝縮温度 Tcまたは冷房運 転時における蒸発温度 Teに対応する冷媒温度)を検出する液側温度センサ T9aが 設けられている。室内熱交換器 31aのガス側には、冷媒の温度 Teoを検出するガス 側温度センサ TlOaが設けられている。室内ユニット 3aの室内空気の吸入口側には 、ユニット内に流入する室内空気の温度 (すなわち、室内温度 Tr)を検出する室内温 度センサ Tl laが設けられている。本実施形態において、液側温度センサ T9a、ガス 側温度センサ T10a、および室内温度センサ Tl laは、サーミスタカもなる。また、室 内ユニット 3aは、室内ユニット 3aを構成する各部の動作を制御する室内側制御部 34 aを備えている。そして、室内側制御部 34aは、室内ユニット 3aの制御を行うために設 けられたマイクロコンピュータやメモリ等を有しており、室内ユニット 3aを個別に操作 するためのリモコン(図示せず)との間で制御信号等のやりとりや、室外ユニット 2およ び接続ユニット 4a, 4bとの間で伝送線 81を介して制御信号等のやりとり等を行うこと ができるようになつている。また、室内側制御部 34aは、内蔵メモリ 35aに定期的に室 内ユニット 3aの制御目標値を記録できるようになって 、る。
[0025] <室外ユニット >
室外ユニット 2は、ビル等の室外に設置されており、第 1冷媒連絡配管群 5を介して 接続ユニット 4a, 4bおよび室内ユニット 3cに接続されており、冷媒回路 10を構成し ている。
次に、室外ユニット 2の構成について説明する。室外ユニット 2は、主として、冷媒回 路 10の一部を構成する室外側冷媒回路 20を有している。この室外側冷媒回路 20は 、主として、圧縮機 21と、四路切換弁 VIと、熱源側熱交 としての室外熱交 22と、膨張機構としての室外膨張弁 V2と、アキュムレータ 23と、温度調節機構として の過冷却器 24と、第 1バイパス冷媒回路 27と、減圧回路 28と、液側閉鎖弁 V4と、高 圧ガス側閉鎖弁 V5と、低圧ガス側閉鎖弁 V6と、第 1高圧ガス開閉弁 V8とを有してい る。
[0026] 圧縮機 21は、運転容量を可変することが可能な圧縮機であり、本実施形態におい て、インバータにより回転数 Rmが制御されるモータ 21aによって駆動される容積式圧 縮機である。本実施形態において、圧縮機 21は、 1台のみであるが、これに限定され ず、室内ユニットの接続台数等に応じて、 2台以上の圧縮機が並列に接続されてい ても良い。
四路切換弁 VIは、室外熱交 22を蒸発器および凝縮器として機能させるため に設けられた弁である。四路切換弁 VIは、室外熱交換器 22の冷媒ガス側と、圧縮 機 21の吸入側のアキュムレータ 23と、圧縮機 21の吐出側と、減圧回路 28とに接続 されている。そして、室外熱交 を凝縮器として機能させる際には、圧縮機 21 の吐出側と室外熱交 の冷媒ガス側とを接続するとともに、圧縮機 21の吸入側 のアキュムレータ 23と減圧回路 28とを接続する。逆に、室外熱交翻 22を蒸発器と して機能させる際には、室外熱交 の冷媒ガス側と圧縮機 21の吸入側のアキ ュムレータ 23とを接続するとともに、圧縮機 21の吐出側と減圧回路 28とを接続する。
[0027] 室外熱交 は、冷媒の蒸発器および冷媒の凝縮器として機能させることが可 能な熱交換器であり、本実施形態において、空気を熱源として冷媒と熱交換するクロ スフイン式のフィン 'アンド'チューブ型熱交翻である。室外熱交翻 22は、そのガ ス側が四路切換弁 VIに接続され、その液側が第 1液冷媒連絡配管 51に接続されて いる。
室外膨張弁 V2は、室外側冷媒回路 20内を流れる冷媒の圧力や流量等の調節を 行うために、室外熱交翻22の液側に接続された電動膨張弁である。
また、室外ユニット 2は、ユニット内に室外空気を吸入して、室外熱交換器 22におい て冷媒と熱交換させた後に、室外に排出するための送風ファンとしての室外ファン 25 を有している。この室外ファン 25は、室外熱交^^ 22に供給する空気の風量 Woを 可変することが可能なファンであり、本実施形態において、 DCファンモータ力もなる モータ 25aによって駆動されるプロペラファン等である。
[0028] アキュムレータ 23は、四路切換弁 VIと圧縮機 21との間に接続されており、室内ュ ニット 3a〜3cの運転負荷の変動等に応じて冷媒回路 10内に発生する余剰冷媒を溜 めることが可能な容器である。また、アキュムレータ 23は、低圧ガス側閉鎖弁 V6およ び低圧ガス冷媒連絡配管 53を介して接続ユニット 4a, 4bに接続されて 、る。
過冷却器 24は、本実施形態において、 2重管式の熱交換器であり、室外熱交換器 22において凝縮された後に、室内膨張弁 V9a〜V9cに送られる冷媒を冷却するた めに設けられている。過冷却器 24は、室外膨張弁 V2と液側閉鎖弁 V4との間に接続 されている。
また、過冷却器 24の冷却源としての第 2バイパス冷媒回路 6が設けられている。な お、以下の説明では、冷媒回路 10から第 2バイパス冷媒回路 6を除いた部分を、便 宜上、主冷媒回路と呼ぶことにする。
[0029] 第 2バイパス冷媒回路 6は、室外熱交翻22から接続ユニット 4a, 4bを介して室内 膨張弁 V9a〜V9cへ送られる冷媒の一部を主冷媒回路力 分岐させて圧縮機 21の 吸入側に戻すように主冷媒回路に接続されている。具体的には、第 2バイパス冷媒 回路 6は、室外膨張弁 V2から接続ユニット 4a, 4bを介して室内膨張弁 V9a〜V9cに 送られる冷媒の一部を室外熱交 と過冷却器 24との間の位置力も分岐させる ように接続された分岐回路 61と、過冷却器 24の第 2バイパス冷媒回路 6側の出口か ら圧縮機 21の吸入側に戻すように圧縮機 21の吸入側に接続された合流回路 62とを 有している。そして、分岐回路 61には、第 2バイパス冷媒回路 6を流れる冷媒の流量 を調節するためのバイパス膨張弁 V7が設けられている。ここで、バイパス膨張弁 V7 は、電動膨張弁力もなる。これにより、室外熱交翻22から接続ユニット 4a, 4bを介 して室内膨張弁 V9a〜V9cに送られる冷媒は、過冷却器 24において、バイパス膨張 弁 V7によって減圧された後の第 2バイパス冷媒回路 6を流れる冷媒によって冷却さ れる。すなわち、過冷却器 24は、バイパス膨張弁 V7の開度調節によって能力制御 が行われることになる。
[0030] 第 1バイパス冷媒回路 27は、高圧ガス側閉鎖弁 V5と圧縮機 21の吐出側との間の 配管と、低圧ガス側閉鎖弁 V6とアキュムレータ 23との間の配管とをバイパスしている 回路である。この第 1バイパス冷媒回路 27上には、第 1バイパス開閉弁 V3が設けら れている。ここで、第 1バイパス開閉弁 V3は、冷媒の流通および遮断が可能な電磁 弁からなる。
減圧回路 28は、キヤビラリ一チューブ C1を有しており、四路切換弁 VIおよびアキ ュムレータ 23に接続されている。
液側閉鎖弁 V4、高圧ガス側閉鎖弁 V5、および低圧ガス側閉鎖弁 V6は、外部の 機器および配管 (具体的には、第 1液冷媒連絡配管 51、高圧ガス冷媒連絡配管 52 、および低圧ガス冷媒連絡配管 53)との接続口に設けられた弁である。液側閉鎖弁 V4は、過冷却器 24および室外膨張弁 V2を介して室外熱交 に接続されて ヽ る。高圧ガス側閉鎖弁 V5は、圧縮機 21の吐出側に接続されている。低圧ガス側閉 鎖弁 V6は、アキュムレータ 23を介して圧縮機 21の吸入側に接続されている。
[0031] 第 1高圧ガス開閉弁 V8は、圧縮機 21の吐出側力も分岐された高圧ガス側の配管 上に設けられ、高圧ガス冷媒連絡配管 52へ高圧ガス冷媒の流通および遮断が可能 な電磁弁力 なる。
また、室外ユニット 2には、各種のセンサが設けられている。具体的には、室外ュ- ット 2には、圧縮機 21の吸入圧力 Psを検出する吸入圧力センサ P1と、圧縮機 21の 吐出圧力 Pdを検出する吐出圧力センサ P2と、圧縮機 21の吸入温度 Tsを検出する 吸入温度センサ T1と、圧縮機 21の吐出温度 Tdを検出する吐出温度センサ T2とが 設けられている。吸入温度センサ T1は、アキュムレータ 23と圧縮機 21との間の位置 に設けられている。室外熱交換器 22には、室外熱交換器 22内を流れる冷媒の温度 (すなわち、冷房運転時における凝縮温度 Tcまたは暖房運転時における蒸発温度 T eに対応する冷媒温度)を検出する熱交温度センサ T3が設けられている。室外熱交 22の液側には、冷媒の温度 Tcoを検出する液側温度センサ T4が設けられて ヽ る。過冷却器 24の主冷媒回路側の出口には、冷媒の温度 (すなわち、液管温度 Tip )を検出する液管温度センサ T5が設けられている。室外ユニット 2の室外空気の吸入 口側には、ユニット内に流入する室外空気の温度 (すなわち、室外温度 Ta)を検出 する室外温度センサ T6が設けられている。第 2バイパス冷媒回路 6の合流回路 62に は、過冷却器 24の第 2バイパス冷媒回路 6側の出口を流れる冷媒の温度を検出する ためのバイノス温度センサ T7が設けられている。高圧ガス側閉鎖弁 V5から第 1高圧 ガス開閉弁 V8までの間の高圧ガス配管には、冷媒の温度 (すなわち、第 1高圧ガス 管温度 Thl)を検出する第 1高圧ガス配管温度センサ T8が設けられている。本実施 形態において、吸入温度センサ Tl、吐出温度センサ Τ2、熱交温度センサ Τ3、液側 温度センサ Τ4、液管温度センサ Τ5、室外温度センサ Τ6、バイパス温度センサ Τ7、 および第 1高圧ガス配管温度センサ Τ8は、サーミスタカもなる。
また、室外ユニット 2は、室外ユニット 2を構成する各部の動作を制御する室外側制 御部 26を有している。そして、室外側制御部 26は、室外ユニット 2の制御を行うため に設けられたマイクロコンピュータ、メモリやモータ 21aを制御するインバータ回路等 を有しており、室内ユニット 3a〜3cの室内側制御部 34a〜34cおよび後述する接続 ユニット 4a, 4bの接続側制御部 44a, 44bとの間で伝送線 81を介して制御信号等の やりとりを行うことができるようになつている。すなわち、室内側制御部 34a〜34cと接 続側制御部 44a, 44bと室外側制御部 26と各制御部間を接続する伝送線 81とによ つて、空気調和装置 1全体の運転制御を行う制御部 8が構成されて 、る。
制御部 8は、図 2に示されるように、各種センサ PI, P2, T1〜T8, T9a〜T9c, Tl 0a〜T10c, Tl la〜Tl lc, T12a, T12bの検出信号を受けることができるように接 続されるとともに、これらの検出信号等に基づいて各種機器および弁 21, 25, 32a〜 32c, V1〜V3, V7, V8, V9a〜V9c, VlOa, VlOb, Vi la, Vl lb, V12a, V12 b, VI 3a, VI 3bを制御することができるように接続されている。また、制御部 8には、 後述の冷媒漏洩検知運転において、冷媒漏洩を検知したことを知らせるための LED 等力もなる警告表示部 9が接続されている。ここで、図 2は、空気調和装置 1の制御ブ ロック図である。
[0033] <接続ユニット >
接続ユニット 4a, 4bは、ビル等の室内に室内ユニット 3a, 3bとともに設置されている 。接続ユニット 4a, 4bは、第 1冷媒連絡配管群 5と第 2冷媒連絡配管群 7とともに、室 内ユニット 3a, 3bと室外ユニット 2との間に介在しており、冷媒回路 10の一部を構成 している。
次に、接続ユニット 4a, 4bの構成について説明する。なお、接続ユニット 4aと接続 ユニット 4bとは同様の構成であるため、ここでは、接続ユニット 4aの構成のみ説明し、 接続ユニット 4bの構成については、それぞれ、接続ユニット 4aの各部を示す Yaの符 号代わりに Yb, Ycの符号を付して、各部の説明を省略する。例えば、接続ユニット 4 aの過冷却器 41aと、接続ユニット 4bの過冷却器 41bとが対応する。
[0034] 接続ユニット 4aは、冷媒回路 10の一部を構成しており、接続側冷媒回路 40aを備 えている。この接続側冷媒回路 40aは、主として、過冷却器 41a、減圧回路 42a、第 3 ノ ィパス冷媒回路 43a、低圧ガス開閉弁 V10a、および第 2高圧ガス開閉弁 VI laを 備えている。
過冷却器 41aは、室内ユニット 3a, 3bが冷暖同時運転をする際に、第 1液冷媒連 絡配管 51に戻す液冷媒の一部を、後述する減圧回路 42aを通じて過冷却器 41aに 送り、第 1液冷媒連絡配管 51に戻す液冷媒を過冷却するための機器である。この過 冷却器 41aに導入された液冷媒の一部は、熱交換により蒸発し、低圧ガス冷媒連絡 配管 53を通じて室外側冷媒回路 20に戻されるようになつている。減圧回路 42aは、 減圧回路開閉弁 VI 2aとキヤビラリ一チューブ C2aとが直列に接続されている。
[0035] 第 3バイパス冷媒回路 43aは、高圧ガス冷媒連絡配管 52と低圧ガス冷媒連絡配管 53とをバイパスする回路である。この第 3バイノス冷媒回路 43a上には、第 2バイパス 開閉弁 VI 3aが設けられている。ここで、第 2バイパス開閉弁 VI 3aは、冷媒の流通お よび遮断が可能な電磁弁である。 低圧ガス開閉弁 VlOaは、低圧ガス冷媒連絡配管 53に接続されており、冷媒の流 通および遮断が可能な電磁弁である。
第 2高圧ガス開閉弁 VI laは、高圧ガス冷媒連絡配管 52に接続されており、冷媒 の流通および遮断が可能な電磁弁である。
接続ユニット 4aは、室内ユニット 3aが冷房運転を行う際には、低圧ガス開閉弁 V10 aを開けた状態にし、かつ、第 2高圧ガス開閉弁 VI laを閉止する。これにより、接続 ユニット 4aは、第 1液冷媒連絡配管 51から流入してくる液冷媒を室内側冷媒回路 30 aの室内膨張弁 V9aに送り、室内膨張弁 V9aで減圧され室内熱交換器 31aにおいて 蒸発したガス冷媒を低圧ガス冷媒連絡配管 53に戻すように機能することができる。
[0036] また、接続ユニット 4aは、室内ユニット 3aが暖房運転する際には、低圧ガス開閉弁 VlOaを閉止し、かつ、第 2高圧ガス開閉弁 VI laを開けた状態にする。これにより、 接続ユニット 4aは、高圧ガス冷媒連絡配管 52から流入してくる高圧のガス冷媒を室 内側冷媒回路 30a内の室内熱交換器 31aのガス側に送り、室内熱交換器 31aにお V、て凝縮された液冷媒を第 1液冷媒連絡配管 51に戻すように機能することができる。 また、接続ユニット 4aには、高圧ガス冷媒流路上に冷媒の温度 (すなわち、第 2高 圧ガス管温度 Th2)を検出する第 2高圧ガス配管温度センサ T12aが設けられている 。本実施形態において、第 2高圧ガス配管温度センサ Tl 2aは、サーミスタカもなる。 さらに、接続ユニット 4aは、接続ユニット 4aを構成する各部の動作を制御する接続 側制御部 44aを備えている。そして、接続側制御部 44aは、接続ユニット 4aの制御を 行うために設けられたマイクロコンピュータやメモリを有しており、室内ユニット 3aの室 内側制御部 34aとの間で制御信号等のやりとりを行うことができるようになつている。
[0037] 以上のように、室外側冷媒回路 20は、室内側冷媒回路 30a, 30bと接続側冷媒回 路 40a, 40bを介して接続され、また、室内側冷媒回路 30cと接続されて、空気調和 装置 1の冷媒回路 10が構成されている。そして、本実施形態の空気調和装置 1では 、例えば、室内ユニット 3a, 3bが暖房運転を行いつつ、室内ユニット 3cが冷房運転 を行う等の、いわゆる、冷暖同時運転を行うことが可能になっている。
<第 1冷媒連絡配管群、第 2冷媒連絡配管群 >
第 1冷媒連絡配管群 5および第 2冷媒連絡配管群 7は、空気調和装置 1をビル等の 設置場所に設置する際に、現地にて施工される冷媒配管であり、設置場所や室外ュ ニットと室内ユニットと接続ユニットとの組み合わせ等の設置条件に応じて種々の長さ や管径を有するものが使用される。このため、例えば、新規に空気調和装置 1を設置 する場合には、冷媒充填量を計算するために、第 1冷媒連絡配管群 5および第 2冷 媒連絡配管群 7の長さゃ管径等の情報を正確に把握する必要があるが、その情報 管理ゃ冷媒量の計算自体が煩雑である。また、既設配管を利用して室内ユニットま たは室外ユニットまたは接続ユニットを更新するような場合には、第 1冷媒連絡配管 群 5および第 2冷媒連絡配管群 7の長さゃ管径等の情報が失われていることがある。
[0038] 以上のように、室内側冷媒回路 30a〜30cと、室外側冷媒回路 20と、接続側冷媒 回路 40a, 40bと、第 1冷媒連絡配管群 5と、第 2冷媒連絡配管群 7が接続されて、空 気調和装置 1の冷媒回路 10が構成されている。また、この冷媒回路 10は、第 2バイ ノス冷媒回路 6と、第 2バイパス冷媒回路 6を除く主冷媒回路とから構成されていると 言い換えることもできる。そして、本実施形態の空気調和装置 1は、室内側制御部 34 a〜34cと接続側制御部 44a, 44bと室外側制御部 26とから構成される制御部 8が、 室外ユニット 2内の四路切換弁 VIおよび第 1高圧ガス開閉弁 V8と接続ユニット 4a, 4b内の低圧ガス開閉弁 VlOaおよび第 2高圧ガス開閉弁 Vi laとにより、冷房運転お よび冷暖同時運転を切り換えて運転を行うとともに、各室内ユニット 3a〜3cの運転負 荷に応じて、室外ユニット 2、室内ユニット 3a〜3c、および接続ユニット 4a, 4bの各機 器の制御を行うようになって!/、る。
[0039] (2)空気調和装置の動作
次に、本実施形態の空気調和装置 1の動作について説明する。
本実施形態の空気調和装置 1の運転モードとしては、各室内ユニット 3a〜3cの運 転負荷に応じて室外ユニット 2、室内ユニット 3a〜3c、および接続ユニット 4a, 4bの 構成機器の制御を行う通常運転モードと、空気調和装置 1の構成機器の設置後 (具 体的には、最初の機器設置後に限られず、例えば、室内ユニット等の構成機器を追 加や撤去する等の改造後や機器の故障を修理した後等も含まれる)に行われる試運 転を行うための試運転モードと、試運転を終了して通常運転を開始した後において、 冷媒回路 10からの冷媒の漏洩の有無を判定する冷媒漏洩検知運転モードとがある そして、通常運転モードには、主として、室内ユニット 3a〜3cの冷暖房の負荷に応 じて、全ての室内ユニット 3a〜3cの冷房を行う冷房運転と、室内ユニット 3a〜3cの一 部が冷房運転を行いつつ他の室内ユニットが暖房運転を行う冷暖同時運転とが含ま れている。また、冷暖同時運転については、室内ユニット 3a〜3c全体の空調負荷に より、室外ユニット 2の室外熱交 22を蒸発器として機能させて運転している場合 ( 蒸発運転状態)と、室外ユニット 2の室外熱交 22を凝縮器として機能させて運転 している場合 (凝縮運転状態)とに分けることができる。なお、ここに言う、冷暖同時運 転とは、具体的には、例えば、室内ユニット 3aが暖房運転を行い、残りの室内ュ-ッ ト 3b, 3cが冷房運転を行うような運転である。
[0040] また、試運転モードには、主として、冷媒回路 10内に冷媒を充填する冷媒自動充 填運転と、第 1冷媒連絡配管群 5および第 2冷媒連絡配管群 7の容積を検知する配 管容積判定運転と、構成機器を設置した後または冷媒回路 10内に冷媒を充填した 後の初期冷媒量を検知する初期冷媒量検知運転とが含まれている。
以下、空気調和装置 1の各運転モードにおける動作について説明する。
<通常運転モード >
(冷房運転)
まず、通常運転モードにおける冷房運転について、図 1および図 2を用いて説明す る。
冷房運転時は、室外ユニット 2の室外側冷媒回路 20において、四路切換弁 VIが 図 1の実線で示される状態に切り換えられることによって、室外熱交 が凝縮器 として機能するようになっている。室外膨張弁 V2は、全開状態にされている。液側閉 鎖弁 V4、高圧ガス側閉鎖弁 V5、および低圧ガス側閉鎖弁 V6は、開状態にされ、第 1高圧ガス開閉弁 V8は、閉状態にされる。
[0041] 室内ユニット 3a〜3cにおいては、各室内膨張弁 V9a〜V9cは、室内熱交換器 31a 〜31cの出口(すなわち、室内熱交換器 31a〜31cのガス側)における冷媒の過熱 度 SHrが過熱度目標値 SHrsで一定になるように開度調節されるようになって!/、る。 本実施形態において、各室内熱交換器 31a〜31cの出口における冷媒の過熱度 S Hrは、ガス側温度センサ T10a〜T10cにより検出される冷媒温度値力も液側温度セ ンサ T9a〜T9cにより検出される冷媒温度値 (蒸発温度 Teに対応)を差し引くことに よって検出される、または、吸入圧力センサ P1により検出される圧縮機 21の吸入圧 力 Psを蒸発温度 Teに対応する飽和温度値に換算し、ガス側温度センサ T10a〜Tl Ocにより検出される冷媒温度値力 この冷媒の飽和温度値を差し引くことによって検 出される。なお、本実施形態では採用していないが、各室内熱交 31a〜31C内 を流れる冷媒の温度を検出する温度センサを設けて、この温度センサにより検出され る蒸発温度 Teに対応する冷媒温度値を、ガス側温度センサ T10a〜T10cにより検 出される冷媒温度値力 差し引くことによって、各室内熱交 31a〜31Cの出口に おける冷媒の過熱度 SHrを検出するようにしてもょ ヽ。
[0042] また、バイパス膨張弁 V7は、過冷却器 24の第 2バイパス冷媒回路 6側の出口にお ける冷媒の過熱度 SHbが過熱度目標値 SHbsになるように開度調節されるようになつ ている。本実施形態において、過冷却器 24の第 2バイパス冷媒回路 6側の出口にお ける冷媒の過熱度 SHbは、吸入圧力センサ P1により検出される圧縮機 21の吸入圧 力 Psを蒸発温度 Teに対応する飽和温度値に換算し、バイパス温度センサ T7により 検出される冷媒温度値からこの冷媒の飽和温度値を差し引くことによって検出される 。なお、本実施形態では採用していないが、過冷却器 24の第 2バイパス冷媒回路 6 側の入口に温度センサを設けて、この温度センサにより検出される冷媒温度値をバイ パス温度センサ T7により検出される冷媒温度値力 差し引くことによって、過冷却器 24の第 2バイパス冷媒回路 6側の出口における冷媒の過熱度 SHbを検出するように してちよい。
[0043] 接続ユニット 4a, 4bにおいては、第 2高圧ガス開閉弁 VI la, Vl lbが閉止するとと もに低圧ガス開閉弁 VlOa, VlObが開く。これにより、室内ユニット 3a〜3cの室内熱 交 31a〜31Cが蒸発器として機能するとともに、室内ユニット 3a〜3cの室内熱交
Figure imgf000022_0001
を介して接続された状態になっている。また、減圧回路開閉弁 V12a, V12bは、閉 状態になっている。
この冷媒回路 10の状態で、圧縮機 21、室外ファン 25、および室内ファン 32a〜32 cを起動すると、低圧のガス冷媒は、圧縮機 21に吸入されて圧縮されて高圧のガス 冷媒となる。その後、高圧のガス冷媒は、四路切換弁 VIを経由して室外熱交換器 2 2に送られて、室外ファン 25によって供給される室外空気と熱交換を行って凝縮し、 高圧の液冷媒となる。そして、この高圧の液冷媒は、室外膨張弁 V2を通過して、過 冷却器 24に流入し、第 2バイパス冷媒回路 6を流れる冷媒と熱交換を行ってさらに冷 却され、過冷却状態になる。このとき、室外熱交翻22において凝縮された高圧の 液冷媒の一部は、第 2バイパス冷媒回路 6に分岐され、バイパス膨張弁 V7によって 減圧された後に、圧縮機 21の吸入側に戻される。ここで、バイパス膨張弁 V7を通過 する冷媒は、圧縮機 21の吸入圧力 Ps近くまで減圧されることで、その一部が蒸発す る。そして、第 2バイパス冷媒回路 6のバイパス膨張弁 V7の出口力も圧縮機 21の吸 入側に向かって流れる冷媒は、過冷却器 24を通過して、主冷媒回路側の室外熱交 22から室内ユニット 3a〜3cへ送られる高圧の液冷媒と熱交換を行う。
[0044] そして、過冷却状態になった高圧の液冷媒は、液側閉鎖弁 V4および第 1液冷媒連 絡配管 51を経由して室内ユニット 3a〜3cに送られる。この室内ユニット 3a〜3cに送 られた高圧の液冷媒は、室内膨張弁 V9a〜V9cによって圧縮機 21の吸入圧力 Ps近 くまで減圧されて低圧の気液二相状態の冷媒となって室内熱交 31a〜31Cに送 られ、室内熱交 31a〜31Cにおいて室内空気と熱交換を行って蒸発して低圧の ガス冷媒となる。
そして、室内熱交翻 31a, 3 lbで蒸発した低圧のガス冷媒は、接続ユニット 4a, 4 bの低圧ガス開閉弁 VlOa, VlObを通じて、低圧ガス冷媒連絡配管 53に送られ、室 内熱交換器 31cで蒸発した低圧のガス冷媒は、そのまま低圧ガス冷媒連絡配管 53 に送られる。この低圧のガス冷媒は、低圧ガス冷媒連絡配管 53を経由して室外ュ- ット 2に送られ、低圧ガス側閉鎖弁 V6を通じてアキュムレータ 23に流入する。アキュ ムレータ 23に流入した低圧のガス冷媒は、再び、圧縮機 21に吸入される。
[0045] 本実施例において、室内ユニット 3cは、マシンルームの冷房負荷に応じて常に冷 房運転を行っている。ここで、室内側制御部 34cは、
Figure imgf000023_0001
口の冷 媒の過熱度目標値 SHrcsを、内蔵メモリ 35cに定期的に記録している。
(冷暖同時運転 Z蒸発負荷) 室内ユニット 3a〜3cのうち、例えば、室内ユニット 3a, 3bを暖房運転し、かつ、室内 ユニット 3cを冷房運転する冷暖同時運転であって、室内ユニット 3a〜3c全体の空調 負荷に応じて、室外ユニット 2の室外熱交 を蒸発器として機能させる運転 (蒸 発運転)について説明する。この際、四路切換弁 VIが図 1の破線で示される状態に 切り換えられることによって、室外熱交 22が蒸発器として機能するとともに、高圧 ガス冷媒連絡配管 52を通じて暖房運転する 2台の室内ユニット 3a, 3bに圧縮機 21 において圧縮され吐出された高圧のガス冷媒が供給されるようになる。このとき、バイ ノ ス膨張弁 V7は、閉止されており、第 1高圧ガス開閉弁 V8は、開状態にされている
[0046] また、室内ユニット 3a, 3bにおいては、室内膨張弁 V9a, V9bは、室内熱交換器 3 la, 31bの出口(すなわち、室内熱交換器 31a, 31bの液側)における冷媒の過冷却 度 SCrが過冷却度目標値 SCrsで一定になるように開度調節されるようになって!/、る 接続ユニット 4a, 4bにおいては、低圧ガス開閉弁 VlOa, VlObが閉止するとともに 第 2高圧ガス開閉弁 VI la, Vl lbが開く。これにより、室内ユニット 3a, 3bの室内熱 交翻31&, 31bが凝縮器として機能する状態になる。また、減圧回路開閉弁 V12a , V12bは、開状態になっている。
室内ユニット 3cにおいては、室内膨張弁 V9cは、例えば、室内熱交換器 31cの過 熱度 (具体的には、液側温度センサ T9cで検出される冷媒温度とガス側温度センサ TlOcで検出される冷媒温度との温度差)に基づいて開度調節する等、室内ユニット 3cの冷房負荷に応じて開度調節されて 、る。
[0047] この冷媒回路 10の状態で、圧縮機 21で圧縮され吐出された高圧のガス冷媒は、 高圧ガス側閉鎖弁 V5を通じて、高圧ガス冷媒連絡配管 52に送られる。
そして、高圧ガス冷媒連絡配管 52に送られた高圧のガス冷媒は、各接続ユニット 4 a, 4bおよび第 2高圧ガス開閉弁 VI la, Vl lbを通じて、室内ユニット 3a, 3bに送ら れる。室内ユニット 3a, 3bに送られた高圧のガス冷媒は、室内熱交^^ 31a, 31bに おいて、室内空気と熱交換を行って凝縮されて高圧の液冷媒となった後、室内膨張 弁 V9a, V9bを通過する際に、室内膨張弁 V9a, V9bの弁開度に応じて減圧される 。一方、室内空気は、加熱されて室内に供給される。
室内膨張弁 V9a, V9bを通過した冷媒は、接続ユニット 4a, 4bの過冷却器 41a, 4 lbに送られ過冷却される。この過冷却された冷媒液は、第 1液冷媒連絡配管 51に送 られ、第 1液冷媒連絡配管 51に送られた液冷媒の一部は、室内ユニット 3cの室内膨 張弁 V9cに送られる。
[0048] 室内膨張弁 V9cに送られた冷媒は、室内膨張弁 V9cによって減圧された後、室内 熱交換器 31cにおいて、室内空気と熱交換を行うことによって蒸発されて低圧のガス 冷媒となる。一方、室内空気は冷却されて室内に供給される。そして、低圧のガス冷 媒は、低圧ガス冷媒連絡配管 53を通じて室外ユニット 2に送られ、低圧ガス側閉鎖 弁 V6を経由して、アキュムレータ 23に流入する。そして、アキュムレータ 23に流入し た低圧のガス冷媒は、再び、圧縮機 21に吸入される。
一方、第 1液冷媒連絡配管 51から室内ユニット 3cに送られた冷媒を除いた残りの 冷媒は、室外ユニット 2の液側閉鎖弁 V4を通じて室外熱交換器 22に送られ、室外熱 交換器 22において蒸発されて低圧のガス冷媒になる。このガス冷媒は、四路切換弁 VIおよびアキュムレータ 23を経由して、圧縮機 21に吸入される。
[0049] 本実施例において、冷暖同時運転 (蒸発負荷)の場合も、室内ユニット 3cは、マシ ンルームの冷房負荷に応じて常に冷房運転を行っている。ここで、室内側制御部 34 cは、冷房運転の場合と同様に、室内熱交換器 31cの出口の冷媒の過熱度目標値 S Hrcsを、内蔵メモリ 35cに定期的に記録している。
(冷暖同時運転 Z凝縮負荷)
室内ユニット 3a〜3cのうち、例えば、室内ユニット 3aを暖房運転し、かつ、室内ュ- ット 3b, 3cを冷房運転する冷暖同時運転モードであって、室内ユニット 3a〜3c全体 の空調負荷に応じて、室外ユニット 2の室外熱交 を凝縮器として機能させる 運転 (凝縮運転)について説明する。この際、四路切換弁 VIが図 1の実線で示され る状態に切り換えられることによって、室外熱交 が凝縮器として機能するととも に、高圧ガス冷媒連絡配管 52を通じて室内ユニット 3aに圧縮機 21において圧縮さ れ吐出された高圧のガス冷媒が供給されるようになる。このとき、第 1高圧ガス開閉弁 V8は、開状態にされている。 [0050] 室内ユニット 3aにおいては、室内膨張弁 V9aは、例えば、室内熱交換器 31aの過 冷却度 (具体的には、液側温度センサ T9aで検出される冷媒温度とガス側温度セン サ TlOaで検出される冷媒温度との温度差)に基づいて開度調節する等、室内ュニッ ト 3aの暖房負荷に応じて開度調節されて 、る。
接続ユニット 4aにおいては、低圧ガス開閉弁 VlOaが閉止するとともに第 2高圧ガス 開閉弁 Vi laが開く。これにより、室内ユニット 3aの室内熱交 31aが凝縮器として 機能する状態になる。また、減圧回路開閉弁 V12aは、開状態になっている。
室内ユニット 3b, 3cにおいては、室内膨張弁 V9b, V9cは、例えば、室内熱交換 器 31b, 31cの過熱度 (具体的には、液側温度センサ T9b, T9cで検出される冷媒温 度とガス側温度センサ TlOb, TlOcで検出される冷媒温度との温度差)に基づいて 開度調節する等、各室内ユニット 3b, 3cの冷房負荷に応じて開度調節されている。
[0051] 接続ユニット 4bにおいては、第 2高圧ガス開閉弁 Vl lbが閉止するとともに低圧ガ
Figure imgf000026_0001
21の吸入側とが低圧ガス冷媒連絡配管 53を介して接続された状態になっている。ま た、減圧回路開閉弁 V12bは、閉状態になっている。
このような冷媒回路 10の状態で、圧縮機 21で圧縮され吐出された高圧のガス冷媒 は、四路切換弁 VIを通じて室外熱交 に送られるとともに、高圧ガス側閉鎖弁 V5を通じて高圧ガス冷媒連絡配管 52にも送られる。
室外熱交換器 22に送られた高圧のガス冷媒は、室外熱交換器 22において凝縮さ れ、液冷媒となる。そして、その液冷媒は、液側閉鎖弁 V4を通じて、第 1液冷媒連絡 配管 51に送られる。
[0052] また、高圧ガス冷媒連絡配管 52に送られた高圧のガス冷媒は、接続ユニット 4a〖こ 送られる。接続ユニット 4aに送られた高圧のガス冷媒は、第 2高圧ガス開閉弁 VI la を通じて室内ユニット 3aの室内熱交換器 31aに送られる。
室内熱交換器 31aに送られた高圧のガス冷媒は、室内ユニット 3aの室内熱交換器 31aにおいて、室内空気と熱交換を行うことによって凝縮される。一方、室内空気は 加熱されて室内に供給される。室内熱交換器 31aにおいて凝縮された冷媒は、室内 膨張弁 V9aを通過した後、接続ユニット 4aに送られる。
接続ユニット 4aに送られた冷媒は、第 1液冷媒連絡配管 51に送られて、液側閉鎖 弁 V4を通じて第 1液冷媒連絡配管 51に送られた冷媒に合流される。この第 1液冷媒 連絡配管 51を流れる冷媒は、室内ユニット 3b, 3cの室内膨張弁 V9b, V9cに送られ る。ここで、室内膨張弁 V9bへは、接続ユニット 4bを経由する。
[0053] 室内膨張弁 V9b, V9cに送られた冷媒は、室内膨張弁 V9b, V9cによって減圧さ れた後、室内熱交 31b, 31cにおいて、室内空気と熱交換を行うことによって蒸 発されて低圧のガス冷媒となる。一方、室内空気は冷却されて室内に供給される。そ して、室内熱交換器 31bで熱交換を行った低圧のガス冷媒は、接続ユニット 4bに送 られる。また、室内熱交翻 31cで熱交換を行った低圧のガス冷媒は、低圧ガス冷 媒連絡配管 53に送られる。
接続ユニット 4bに送られた低圧のガス冷媒は、低圧ガス開閉弁 VlObを通じて、低 圧ガス冷媒連絡配管 53に送られ、室内熱交換器 31cで熱交換を行った低圧のガス 冷媒と合流する。合流した低圧のガス冷媒は、低圧ガス側閉鎖弁 V6およびアキュム レータ 23を経由して、圧縮機 21に吸入される。
[0054] 以上のような通常運転モードにおける運転制御は、冷房運転および暖房運転を含 む通常運転を行う通常運転制御手段として機能する制御部 8 (より具体的には、室内 側制御部 34a〜34c、接続側制御部 44a, 44b、室外側制御部 26、および各制御部 34a〜34c, 44a, 44b, 26間を接続する伝送線 81)によって行われる。
本実施例において、冷暖同時運転 (凝縮負荷)の場合も、室内ユニット 3cは、マシ ンルームの冷房負荷に応じて常に冷房運転を行っている。ここで、室内側制御部 34 cは、冷房運転および冷暖同時運転 (蒸発負荷)の場合と同様に、室内熱交換器 31 cの出口の冷媒の過熱度目標値 SHrcsを、内蔵メモリ 35cに定期的に記録して 、る。
<試運転モード >
次に、試運転モードについて、図 1〜図 3を用いて説明する。ここで、図 3は、試運 転モードのフローチャートである。本実施形態において、試運転モードでは、まず、ス テツプ S1の冷媒自動充填運転が行われ、続いて、ステップ S2の配管容積判定運転 が行われ、さらに、ステップ S3の初期冷媒量検知運転が行われる。 [0055] 本実施形態では、冷媒が予め充填された室外ユニット 2と、室内ユニット 3a〜3cと、 接続ユニット 4a, 4bとをビル等の設置場所に設置し、第 1冷媒連絡配管群 5と第 2冷 媒連絡配管群 7とを介して接続し、冷媒回路 10を構成した後に、第 1冷媒連絡配管 群 5と第 2冷媒連絡配管群 7との容積に応じて不足する冷媒を冷媒回路 10内に追加 充填する場合を例にして説明する。
(ステップ S 1:冷媒自動充填運転)
まず、室外ユニット 2の液側閉鎖弁 V4、高圧ガス側閉鎖弁 V5、および低圧ガス側 閉鎖弁 V6を開けて、室外ユニット 2に予め充填されている冷媒を冷媒回路 10内に充 満させる。
次に、試運転を行う作業者が、追加充填用の冷媒ボンべを冷媒回路 10のサービス ポート(図示せず)に接続し、制御部 8に対して直接にまたはリモコン(図示せず)等を 通じて遠隔から試運転を開始する指令を出すと、制御部 8によって、図 4に示されるス テツプ S11〜ステップ S13の処理が行われる。ここで、図 4は、冷媒自動充填運転の フローチャートである。
[0056] (ステップ S 11:冷媒量判定運転)
冷媒自動充填運転の開始指令がなされると、冷媒回路 10が、室外ユニット 2の四路 切換弁 VIが図 1の実線で示される状態で、かつ、室内ユニット 3a〜3cの室内膨張 弁 V9a〜V9c、接続ユニット 4a, 4bの低圧ガス開閉弁 VlOa, V10b、および室外膨 張弁 V2が開状態となり、室外ユニット 2の第 1高圧ガス開閉弁 V8および接続ユニット 4a, 4bの第 2高圧ガス開閉弁 VI la, VI lbが閉状態となり、圧縮機 21、室外ファン 2 5、および室内ファン 32a〜32cが起動されて、室内ユニット 3a〜3cの全てについて 強制的に冷房運転 (以下、室内ユニット全数運転とする)が行われる。このとき、室外 ユニット 2内の第 1バイパス冷媒回路 27上の第 1バイパス開閉弁 V3と、接続ユニット 4 a, 4b内の第 3バイパス冷媒回路 43a, 43b上の第 2バイパス開閉弁 V13a, V13bと が開状態となり、高圧ガス冷媒連絡配管 52内と低圧ガス冷媒連絡配管 53内との冷 媒圧力が均圧化される。
[0057] すると、図 5に示されるように、冷媒回路 10において、圧縮機 21から凝縮器として 機能する室外熱交 までの流路には圧縮機 21において圧縮されて吐出され た高圧のガス冷媒が流れ(図 5の斜線のハッチング部分のうち圧縮機 21から室外熱 交換器 22までの部分を参照)、凝縮器として機能する室外熱交換器 22には室外空 気との熱交換によってガス状態から液状態に相変化する高圧の冷媒が流れ (図 5の 斜線のハッチングおよび黒塗りのハッチングの部分のうち室外熱交換器 22に対応す る部分を参照)、室外熱交換器 22から室内膨張弁 V9a〜V9cまでの流路 (室外膨張 弁 V2、過冷却器 24の主冷媒回路側の部分および第 1液冷媒連絡配管 51を含む)と 室外熱交翻 22からバイパス膨張弁 V7までの流路とには高圧の液冷媒が流れ (図 5の黒塗りのハッチング部分のうち室外熱交換器 22から室内膨張弁 V9a〜V9cおよ びバイパス膨張弁 V7までの部分を参照)、蒸発器として機能する室内熱交翻 31a 〜31cの部分と過冷却器 24の第 2バイパス冷媒回路 6側の部分とには室内空気など との熱交換によって気液二相状態からガス状態に相変化する低圧の冷媒が流れ (図 5の格子状のハッチングおよび斜線のハッチングの部分のうち室内熱交換器 31a〜3 lcの部分と過冷却器 24の部分を参照)、室内熱交換器 31a〜31cから圧縮機 21ま での流路の内で、接続ユニット 4a, 4bの高圧ガス側および低圧ガス側の流路 (第 3バ ィパス冷媒回路 43a, 43bを含む)、高圧ガス冷媒連絡配管 52、低圧ガス冷媒連絡 配管 53、第 1バイパス冷媒回路 27、およびアキュムレータ 23を含む流路と過冷却器 24の第 2バイパス冷媒回路 6側の部分力も圧縮機 21までの流路とには低圧のガス冷 媒が流れるようになる(図 5の斜線のハッチングの部分のうち室内熱交換器 31a〜31 cから圧縮機 21までの部分 (接続ユニット 4a, 4bと高圧ガス冷媒連絡配管 52と低圧 ガス冷媒連絡配管 53とを含む)と過冷却器 24の第 2バイパス冷媒回路 6側の部分か ら圧縮機 21までの部分とを参照)。図 5は、冷媒量判定運転における冷媒回路 10内 を流れる冷媒の状態を示す模式図(四路切換弁 VI等の図示を省略)である。
次に、以下のような機器制御を行って、冷媒回路 10内を循環する冷媒の状態を安 定させる運転に移行する。
冷媒の状態の安定制御は、具体的に、蒸発器として機能する室内熱交換器全体の 過熱度 SHrが一定になるように各室内膨張弁 V9a〜V9cを制御する過熱度制御と、 蒸発圧力 Peが一定になるように圧縮機 21の運転容量を制御する蒸発圧力制御と、 室外熱交^^ 22における冷媒の凝縮圧力 Pcが一定になるように室外ファン 25によ つて室外熱交 22に供給される室外空気の風量 Woを制御する凝縮圧力制御と 、過冷却器 24から室内膨張弁 V9a〜V9cに送られる冷媒の温度が一定になるように 過冷却器 24の能力を制御する液管温度制御とがある。
ここで、蒸発圧力制御を行うのは、蒸発器として機能する室内熱交換器 31a〜31c 内において、室内空気との熱交換によって気液二相状態力 ガス状態に相変化しな がら低圧の冷媒が流れる室内熱交換器 31a〜31c内(図 5の格子状のハッチングぉ よび斜線のハッチングの部分のうち室内熱交換器 31a〜31cに対応する部分を参照 、以下、蒸発器部 Cとする)における冷媒量が、冷媒の蒸発圧力 Peに大きく影響する 力 である。そして、ここでは、インバータにより回転数 Rmが制御されるモータ 21aに よって圧縮機 21の運転容量を制御することによって、室内熱交換器 31a〜31cにお ける冷媒の蒸発圧力 Peを一定にして、蒸発器部 C内を流れる冷媒の状態を安定さ せている。すなわち、主として、蒸発圧力 Peによって蒸発器 C内における冷媒量が変 化する状態を作り出している。なお、本実施形態の圧縮機 21による蒸発圧力 Peの制 御においては、室内熱交換器 31a〜31cの液側温度センサ T9a〜T9cにより検出さ れる冷媒温度値 (蒸発温度 Teに対応)を飽和圧力値に換算して、この圧力値が低圧 目標値 Pesで一定になるように、圧縮機 21の運転容量を制御して (すなわち、モータ 2 laの回転数 Rmを変化させる制御を行って)、冷媒回路 10内を流れる冷媒循環量 Wcを増減することによって実現されている。なお、本実施形態では採用していない が、室内熱交換器 31a〜31cにおける冷媒の蒸発圧力 Peにおける冷媒の圧力に等 価な運転状態量である、吸入圧力センサ P 1によって検出される圧縮機 21の吸入圧 力 Psが、低圧目標値 Pesで一定になるように、または、吸入圧力 Psに対応する飽和 温度値 (蒸発温度 Teに対応)が、低圧目標値 Pesで一定になるように、圧縮機 21の 運転容量を制御してもよいし、室内熱交換器 31a〜31cの液側温度センサ T9a〜T9 cにより検出される冷媒温度値 (蒸発温度 Teに対応)が、低圧目標値 Pesで一定にな るように、圧縮機 21の運転容量を制御してもよい。
そして、このような蒸発圧力制御を行うことによって、室内熱交換器 31a〜31cから 圧縮機 21までの低圧ガス冷媒連絡配管 53およびアキュムレータ 23を含む冷媒配管 内(図 5の斜線のハッチングの部分のうち室内熱交換器 31a〜31cから圧縮機 21ま での部分を参照、以下、ガス冷媒流通部 Dとする)を流れる冷媒の状態も安定して、 主として、ガス冷媒流通部 Dにおける冷媒の圧力に等価な運転状態量である、蒸発 圧力 Pe (すなわち、吸入圧力 Ps)によってガス冷媒流通部 D内における冷媒量が変 化する状態を作り出して 、る。
また、凝縮圧力制御を行うのは、室外空気との熱交換によってガス状態力も液状態 に相変化しながら高圧の冷媒が流れる室外熱交^^ 22内(図 5の斜線のハッチング および黒塗りのハッチングの部分のうち室外熱交換器 22に対応する部分を参照、以 下、凝縮器部 Aとする)における冷媒量が、冷媒の凝縮圧力 Pcに大きく影響する力も である。そして、この凝縮器部 Aにおける冷媒の凝縮圧力 Pcは、室外温度 Taの影響 より大きく変化するため、モータ 25aにより室外ファン 25から室外熱交 に供給 する室外空気の風量 Woを制御することによって、室外熱交換器 22における冷媒の 凝縮圧力 Pcを一定にして、凝縮器部 A内を流れる冷媒の状態を安定させている。す なわち、主として、室外熱交換器 22の液側(以下、冷媒量判定運転に関する説明で は、室外熱交換器 22の出口とする)における過冷却度 SCoによって凝縮器 A内にお ける冷媒量が変化する状態を作り出している。なお、本実施形態の室外ファン 25に よる凝縮圧力 Pcの制御においては、室外熱交換器 22における冷媒の凝縮圧力 Pc に等価な運転状態量である、吐出圧力センサ P2によって検出される圧縮機 21の吐 出圧力 Pd、または、熱交温度センサ T3によって検出される室外熱交換器 22内を流 れる冷媒の温度 (すなわち、凝縮温度 Tc)が用いられる。
そして、このような凝縮圧力制御を行うことによって、室外熱交 から室内膨 張弁 V9a〜V9cまでの流路 (室外膨張弁 V2と過冷却器 24の主冷媒回路側の部分 と第 1液冷媒連絡配管 51とを含む)と、室外熱交換器 22から第 2バイパス冷媒回路 6 のバイパス膨張弁 V7までの流路とには高圧の液冷媒が流れて、室外熱交換器 22か ら室内膨張弁 V9a〜V9cおよびバイパス膨張弁 V7までの部分(図 5の黒塗りのハツ チング部分を参照、以下、液冷媒流通部 Bとする)における冷媒の圧力も安定し、液 冷媒流通部 Bが液冷媒でシールされて安定した状態となる。
また、液管温度制御を行うのは、過冷却器 24から室内膨張弁 V9a〜V9cに至る第 1液冷媒連絡配管 51を含む冷媒配管内(図 5に示される液冷媒流通部 Bのうち過冷 却器 24力も室内膨張弁 V9a〜V9cまでの部分を参照)の冷媒の密度が変化しな!、 ようにするためである。そして、過冷却器 24の能力制御は、過冷却器 24の主冷媒回 路側の出口に設けられた液管温度センサ T5によって検出される冷媒の温度 Tipが 液管温度目標値 Tipsで一定になるように第 2バイパス冷媒回路 6を流れる冷媒の流 量を増減して、過冷却器 24の主冷媒回路側を流れる冷媒と第 2バイパス冷媒回路 6 側を流れる冷媒との間の交換熱量を調節することによって実現されている。なお、こ の第 2バイパス冷媒回路 6を流れる冷媒の流量の増減は、バイパス膨張弁 V7の開度 調節によって行われる。このようにして、過冷却器 24から室内膨張弁 V9a〜V9cに 至る第 1液冷媒連絡配管 51を含む冷媒配管内における冷媒の温度が一定となる液 管温度制御が実現されて!ヽる。
[0061] そして、冷媒回路 10内に冷媒を充填することによる冷媒量の増加が及ぼす室外熱 交換器 22の出口における冷媒の温度 Tco (すなわち、室外熱交換器 22の出口にお ける冷媒の過冷却度 SCo)の変化がある場合であっても、このような液管温度一定制 御を行うことによって、室外熱交換器 22の出口における冷媒の温度 Tcoの変化の影 響力 室外熱交^^ 22の出口力も過冷却器 24に至る冷媒配管のみに収まる。この ため、室外熱交換器 22の出口における冷媒の温度 Tcoの変化は、液冷媒流通部 B のうち過冷却器 24から第 1液冷媒連絡配管 51を含む室内膨張弁 V9a〜 V9cまでの 冷媒配管には影響しない状態となる。
さらに、過熱度制御を行うのは、蒸発器部 Cにおける冷媒量が、室内熱交換器 31a 〜31cの出口における冷媒の乾き度に大きく影響するからである。この室内熱交換 器 31a〜31cの出口における冷媒の過熱度 SHrは、室内膨張弁 V9a〜V9cの開度 を制御することによって、室内熱交換器 31a〜31cのガス側(以下、冷媒量判定運転
Figure imgf000032_0001
SHrが過熱度目標値 SHrsで一定になるように(すなわち、室内熱交換器 31a〜31c の出口のガス冷媒を過熱状態に)して、蒸発器部 C内を流れる冷媒の状態を安定さ せている。
[0062] そして、このような過熱度制御を行うことによって、ガス冷媒流通部 Dにガス冷媒が 確実に流れる状態を作り出して ヽる。 上述の各種制御によって、冷媒回路 10内を循環する冷媒の状態が安定して、冷媒 回路 10内における冷媒量の分布が一定となるため、続いて行われる冷媒の追加充 填によって冷媒回路 10内に冷媒が充填され始めた際に、冷媒回路 10内の冷媒量 の変化が、主として、室外熱交換器 22内の冷媒量の変化となって現れる状態を作り 出すことができる(以下、この運転を冷媒量判定運転とする)。
以上のような制御は、冷媒量判定運転を行う冷媒量判定運転制御手段として機能 する制御部 8 (より具体的には、室内側制御部 34a〜34c、接続側制御部 44a, 44b 、室外側制御部 26、および各制御部 34a〜34c, 44a, 44b, 26間を接続する伝送 線 81)により、ステップ S 11の処理として行われる。
なお、本実施形態と異なり、室外ユニット 2に予め冷媒が充填されていない場合に は、このステップ S 11の処理に先だって、上述の冷媒量判定運転を行う際に、構成 機器が異常停止してしまうことがない程度の冷媒量になるまで冷媒充填を行う必要が ある。
(ステップ S 12:冷媒量の演算)
次に、上記の冷媒量判定運転を行いつつ、冷媒回路 10内に冷媒の追加充填を実 施するが、この際、冷媒量演算手段として機能する制御部 8によって、ステップ S12 における冷媒の追加充填時における冷媒回路 10を流れる冷媒または構成機器の運 転状態量から冷媒回路 10内の冷媒量を演算する。
まず、本実施形態における冷媒量演算手段について説明する。冷媒量演算手段 は、冷媒回路 10を複数の部分に分割して、分割された各部分ごとに冷媒量を演算 することで、冷媒回路 10内の冷媒量を演算するものである。より具体的には、分割さ れた各部分ごとに、各部分の冷媒量と冷媒回路 10を流れる冷媒または構成機器の 運転状態量との関係式が設定されており、これらの関係式を用いて、各部分の冷媒 量を演算することができるようになつている。そして、本実施形態においては、冷媒回 路 10は、四路切換弁 VIが図 1の実線で示される状態、すなわち、圧縮機 21の吐出 側が室外熱交換器 22のガス側に接続され、かつ、圧縮機 21の吸入側が低圧ガス側 閉鎖弁 V6および低圧ガス冷媒連絡配管 53を介して室内熱交換器 31a〜31cの出 口に接続された状態において、圧縮機 21の部分および圧縮機 21から四路切換弁 V 1 (図 5では図示せず)を含む室外熱交換器 22までの部分 (以下、高圧ガス管部 Eと する)と、室外熱交換器 22の部分 (すなわち、凝縮器部 A)と、液冷媒流通部 Bのうち 室外熱交換器 22から過冷却器 24までの部分および過冷却器 24の主冷媒回路側の 部分の入口側半分 (以下、高温側液管部 B1とする)と、液冷媒流通部 Bのうち過冷 却器 24の主冷媒回路側の部分の出口側半分および過冷却器 24から液側閉鎖弁 V 4 (図 5では図示せず)までの部分 (以下、低温側液管部 B2とする)と、液冷媒流通部 Bのうち第 1液冷媒連絡配管 51と接続ユニット 4a, 4bの液側冷媒流路と第 2液冷媒 連絡配管 71a, 71bとを併せた部分 (以下、液冷媒連絡配管部 B3とする)と、液冷媒 流通部 Bのうち第 1液冷媒連絡配管 51から室内膨張弁 V9a〜V9cおよび室内熱交 換器 31a〜31cの部分 (すなわち、蒸発器部 C)を含むガス冷媒流通部 Dのうち第 2 ガス冷媒連絡配管 72a, 72bまでの部分 (以下、室内ユニット部 Fとする)と、ガス冷媒 流通部 Dのうち高圧ガス冷媒連絡配管 52と接続ユニット 4a, 4b内の高圧ガス側冷媒 流路 (第 3バイパス冷媒回路 43a, 43bの高圧ガス側の第 2バイパス開閉弁 VI 3a, V 13bまでを含む)とを併せた部分 (以下、高圧ガス冷媒連絡配管部 G1とする)と、ガス 冷媒流通部 Dのうち低圧ガス冷媒連絡配管 53と第 2ガス冷媒連絡配管 72a, 72bと 接続ユニット 4a, 4b内の低圧ガス側冷媒流路 (第 3バイパス冷媒回路 43a, 43bの低 圧ガス側の第 2バイパス開閉弁 VI 3a, VI 3bまでを含む)とを併せた部分 (以下、低 圧ガス冷媒連絡配管部 G2とする)と、ガス冷媒流通部 Dのうち高圧ガス側閉鎖弁 V5 (図 5では図示せず)から第 1高圧ガス開閉弁 V8までの部分 (以下、第 1低圧ガス管 部 Hとする)と、低圧ガス側閉鎖弁 V6 (図 5では図示せず)から第 1バイパス冷媒回路 27までと第 1バイパス冷媒回路 27と第 1バイパス冷媒回路 27から四路切換弁 VIま でと第 1バイパス冷媒回路 27からアキュムレータ 23を含む圧縮機 21までとを併せた 部分 (以下、第 2低圧ガス管部 Iとする)と、液冷媒流通部 Bのうち高温側液管部 B1か らバイパス膨張弁 V7および過冷却器 24の第 2バイパス冷媒回路 6側の部分を含む 第 2低圧ガス管部ほでの部分 (以下、第 2バイパス回路部 Jとする)とに分割されて、 各部分ごとに関係式が設定されている。なお、高圧ガス冷媒連絡配管部 G1と低圧ガ ス冷媒連絡配管部 G2を併せた部分をガス冷媒連絡配管部 Gとする。次に、上述の 各部分ごとに設定された関係式について、説明する。 [0064] 本実施形態において、高圧ガス管部 Eにおける冷媒量 Moglと冷媒回路 10を流れ る冷媒または構成機器の運転状態量との関係式は、例えば、
Mogl =Vogl X p d
という、室外ユニット 2の高圧ガス管部 Eの容積 Voglに高圧ガス管部 Eにおける冷媒 の密度 p dを乗じた関数式として表される。なお、高圧ガス管部 Eの容積 Voglは、室 外ユニット 2が設置場所に設置される前力 既知の値であり、予め制御部 8のメモリに 記憶されている。また、高圧ガス管部 Eにおける冷媒の密度 は、吐出温度 Tdおよ び吐出圧力 Pdを換算することによって得られる。
凝縮器部 Aにおける冷媒量 Mcと冷媒回路 10を流れる冷媒または構成機器の運転 状態量との関係式は、例えば、
Mc=kcl XTa+kc2 XTc+kc3 X SHm+kc4 XWc
Figure imgf000035_0001
という、室外温度 Ta、凝縮温度 Tc、圧縮機吐出過熱度 SHm、冷媒循環量 Wc、室 外熱交換器 22における冷媒の飽和液密度 p c、および室外熱交換器 22の出口に おける冷媒の密度 p coの関数式として表される。なお、上述の関係式におけるパラメ ータ kcl〜kc7は、試験や詳細なシミュレーションの結果を回帰分析することによって 求められたものであり、予め制御部 8のメモリに記憶されている。また、圧縮機吐出過 熱度 SHmは、圧縮機の吐出側における冷媒の過熱度であり、吐出圧力 Pdを冷媒の 飽和温度値に換算し、吐出温度 Td力 この冷媒の飽和温度値を差し引くことにより 得られる。冷媒循環量 Wcは、蒸発温度 Teと凝縮温度 Tcとの関数 (すなわち、 Wc = f (Te、 Tc) )として表される。冷媒の飽和液密度 p cは、凝縮温度 Tcを換算すること によって得られる。室外熱交 の出口における冷媒の密度 p coは、凝縮温度 T cを換算することによって得られる凝縮圧力 Pcおよび冷媒の温度 Tcoを換算すること によって得られる。
[0065] 高温側液管部 B1における冷媒量 Mollと冷媒回路 10を流れる冷媒または構成機 器の運転状態量との関係式は、例えば、
Moll =Voll X p co
t 、う、室外ユニット 2の高温側液管部 B1の容積 Vollに高温側液管部 B1における 冷媒の密度 p co (すなわち、上述の室外熱交換器 22の出口における冷媒の密度) を乗じた関数式として表される。なお、高温側液管部 B1の容積 Vollは、室外ュ-ッ ト 2が設置場所に設置される前力も既知の値であり、予め制御部 8のメモリに記憶され ている。
低温側液管部 B2における冷媒量 Mol2と冷媒回路 10を流れる冷媒または構成機 器の運転状態量との関係式は、例えば、
Mol2=Vol2 X ip
t 、う、室外ユニット 2の低温側液管部 B2の容積 Vol2に低温側液管部 B2における 冷媒の密度 p lpを乗じた関数式として表される。なお、低温側液管部 B2の容積 Vol 2は、室外ユニット 2が設置場所に設置される前力も既知の値であり、予め制御部 8の メモリに記憶されている。また、低温側液管部 B2における冷媒の密度 p lpは、過冷 却器 24の出口における冷媒の密度であり、凝縮圧力 Pcおよび過冷却器 24の出口 における冷媒の温度 Tipを換算することによって得られる。
液冷媒連絡配管部 B3における冷媒量 Mlpと冷媒回路 10を流れる冷媒または構成 機器の運転状態量との関係式は、例えば、
Mlp=Vlp X ip
という、第 1液冷媒連絡配管 51と接続ユニット 4a, 4bの液側冷媒流路と第 2液冷媒 連絡配管 71a, 71bとを併せた部分の容積 Vlpに液冷媒連絡配管部 B3における冷 媒の密度 p lp (すなわち、過冷却器 24の出口における冷媒の密度)を乗じた関数式 として表される。ここで、 Vlpは、第 1液冷媒連絡配管 51と第 2液冷媒連絡配管 71a, 71bとを併せた部分の容積 Vlplと、接続ユニット 4a, 4bの液側冷媒流路の容積 Vlp 2とに分割される。第 1液冷媒連絡配管 51と第 2液冷媒連絡配管 71a, 71bとを併せ た部分の容積 Vlplは、第 1液冷媒連絡配管 51と第 2液冷媒連絡配管 71a, 71bとが 空気調和装置 1をビル等の設置場所に設置する際に現地にて施工される冷媒配管 であるため、長さゃ管径等の情報力 現地において演算した値を入力したり、長さや 管径等の情報を現地において入力し、これらの入力された第 1液冷媒連絡配管 51と 第 2液冷媒連絡配管 71a, 71bとの情報力 制御部 8で演算したり、または、後述のよ うに、配管容積判定運転の運転結果を用いたりして演算される。また、接続ユニット 4 a, 4bの液側冷媒流路の容積 Vlp2は、接続ユニット 4a, 4bが設置場所に設置される 前から既知の値であり、予め制御部 8のメモリに記憶されている。
[0067] 室内ュニット部 Fにおける冷媒量 Mrと冷媒回路 10を流れる冷媒または構成機器の 運転状態量との関係式は、例えば、
Mr=krl XTlp+kr2 X AT+kr3 X SHr+kr4 XWr+kr5
という、過冷却器 24の出口における冷媒の温度 Tlp、室内温度 Trから蒸発温度 Teを 差し引いた温度差 ΔΤ、室内熱交換器 31a〜31cの出口における冷媒の過熱度 SH r、および室内ファン 32a〜32cの風量 Wrの関数式として表される。なお、上述の関 係式におけるパラメータ krl〜kr5は、試験や詳細なシミュレーションの結果を回帰分 析することによって求められたものであり、予め制御部 8のメモリに記憶されている。な お、ここでは、 3台の室内ユニット 3a〜3cのそれぞれに対応して冷媒量 Mrの関係式 が設定されており、室内ユニット 3aの冷媒量 Mrと室内ユニット 3bの冷媒量 Mrと室内 ユニット 3cの冷媒量 Mrとを加算することにより、室内ユニット部 Fの全冷媒量が演算 されるようになつている。なお、室内ユニット 3a、室内ユニット 3b、および室内ユニット 3cとの機種や容量が異なる場合には、パラメータ krl〜kr5の値が異なる関係式が 使用されること〖こなる。
[0068] ガス冷媒連絡配管部 Gは、高圧ガス冷媒連絡配管部 G1と低圧ガス冷媒連絡配管 部 G2とに分割され、ガス冷媒連絡配管部 Gの冷媒量 Mgpは、高圧ガス冷媒連絡配 管部 G1の冷媒量 Mgphと低圧ガス冷媒連絡配管部 G2の冷媒量 Mgplとを加算した 値となる。また、ガス冷媒連絡配管部 Gの容積 Vgpは、高圧ガス冷媒連絡配管部 G1 の容積 Vgphと低圧ガス冷媒連絡配管部 G2の容積 Vgplとを加算した値となる。すな わち、これらの関係式は、次のようになる。
Mgp = Mgph + Mgpl
Vgp = Vgph + Vgpl
高圧ガス冷媒連絡配管部 Glにおける冷媒量 Mgphと冷媒回路 10を流れる冷媒ま たは構成機器の運転状態量との関係式は、例えば、
Mgph = Vgph X p gph
という、高圧ガス冷媒連絡配管 52と接続ユニット 4a, 4b内の高圧ガス側冷媒流路( 第 3バイパス冷媒回路 43a, 43bの高圧ガス側の第 2バイパス開閉弁 VI 3a, VI 3bま でを含む)とを併せた部分の容積 Vgphに高圧ガス冷媒連絡配管部 G1における冷 媒の密度 p gphを乗じた関数式として表される。ここで、 Vgphは、高圧ガス冷媒連絡 配管 52の容積 Vgphlと、接続ユニット 4a, 4b内の高圧ガス側冷媒流路 (第 3バイパ ス冷媒回路 43a, 43bの高圧ガス側の第 2バイパス開閉弁 VI 3a, VI 3bまでを含む) の容積 Vgph2とに分割される。高圧ガス冷媒連絡配管 52の容積 Vgplは、第 1液冷 媒連絡配管 51と第 2液冷媒連絡配管 71a, 71bとを併せた部分と同様に、高圧ガス 冷媒連絡配管 52が空気調和装置 1をビル等の設置場所に設置する際に現地にて 施工される冷媒配管であるため、長さゃ管径等の情報力も現地において演算した値 を入力したり、長さゃ管径等の情報を現地において入力し、これらの入力された高圧 ガス冷媒連絡配管 52の情報力も制御部 8で演算したり、または、後述のように、配管 容積判定運転の運転結果を用いたりして演算される。また、高圧ガス冷媒連絡配管 部 G1における冷媒の密度 p gphは、圧縮機 21の吸入側における冷媒の密度 p sと 、室外ユニット 2内の高圧ガス側閉鎖弁 V5と第 1高圧ガス開閉弁 V8との間の高圧ガ ス側の配管における冷媒の密度 p ohと、接続ユニット 4a, 4b内の高圧ガス側冷媒流 路における冷媒の密度 p bshと、室内熱交換器 31a〜31cの出口(すなわち、第 2ガ ス冷媒連絡配管 72a, 72bの入口)における冷媒の密度 p eoとの平均値である。冷 媒の密度 p sは、吸入圧力 Psおよび吸入温度 Tsを換算することによって得られる。 冷媒の密度 p ohは、第 1高圧ガス管温度 Thlを換算することによって得られる。冷媒 の密度 p bshは、第 2高圧ガス管温度 Th2を換算することによって得られる。冷媒の 密度 p eoは、蒸発温度 Teの換算値である蒸発圧力 Peおよび室内熱交換器 31a〜 31cの出口温度 Teoを換算することによって得られる。また、接続ユニット 4a, 4b内の 高圧ガス側冷媒流路 (第 3バイパス冷媒回路 43a, 43bの高圧ガス側の第 2バイパス 開閉弁 V13a, VI 3bまでを含む)の容積 Vgp2は、接続ユニット 4a, 4bが設置場所 に設置される前力 既知の値であり、予め制御部 8のメモリに記憶されている。
低圧ガス冷媒連絡配管部 G2における冷媒量 Mgplと冷媒回路 10を流れる冷媒ま たは構成機器の運転状態量との関係式は、例えば、
Mgpl = Vgpl X gpl という、低圧ガス冷媒連絡配管 53と第 2ガス冷媒連絡配管 72a, 72bと接続ユニット 4 a, 4b内の低圧ガス側冷媒流路 (第 3バイパス冷媒回路 43a, 43bの低圧ガス側の第 2バイパス開閉弁 VI 3a, VI 3bまでを含む)とを併せた部分の容積 Vgplに低圧ガス 冷媒連絡配管部 G2における冷媒の密度 p gplを乗じた関数式として表される。ここ で、 Vgplは、低圧ガス冷媒連絡配管 53と第 2ガス冷媒連絡配管 72a, 72bとを併せ た部分の容積 Vgpllと、接続ユニット 4a, 4b内の低圧ガス側冷媒流路 (第 3バイパス 冷媒回路 43a, 43bの低圧ガス側の第 2バイパス開閉弁 VI 3a, V13bまでを含む)の 容積 Vgpl2とに分割される。低圧ガス冷媒連絡配管 53と第 2ガス冷媒連絡配管 72a , 72bとを併せた部分の容積 Vgpllは、第 1液冷媒連絡配管 51と第 2液冷媒連絡配 管 71a, 71bとを併せた部分および高圧ガス冷媒連絡配管 52と同様に、低圧ガス冷 媒連絡配管 53と第 2ガス冷媒連絡配管 72a, 72bとが空気調和装置 1をビル等の設 置場所に設置する際に現地にて施工される冷媒配管であるため、長さゃ管径等の情 報力 現地において演算した値を入力したり、長さゃ管径等の情報を現地において 入力し、これらの入力された低圧ガス冷媒連絡配管 53と第 2ガス冷媒連絡配管 72a , 72bとの情報力も制御部 8で演算したり、または、後述のように、配管容積判定運転 の運転結果を用いたりして演算される。また、低圧ガス冷媒連絡配管部 G2における 冷媒の密度 p gplは、圧縮機 21の吸入側における冷媒の密度 p sと、室内熱交換器 31a〜31cの出口(すなわち、第 2ガス冷媒連絡配管 72a, 72bの入口)における冷 媒の密度 p eoとの平均値である。冷媒の密度 p sは、吸入圧力 Psおよび吸入温度 T sを換算することによって得られ、冷媒の密度 p eoは、蒸発温度 Teの換算値である 蒸発圧力 Peおよび室内熱交換器 31a〜31cの出口温度 Teoを換算することによって 得られる。また、接続ユニット 4a, 4b内の低圧ガス側冷媒流路 (第 3バイパス冷媒回 路 43a, 43bの低圧ガス側の第 2バイパス開閉弁 VI 3a, VI 3bまでを含む)の容積 V gP12は、接続ユニット 4a, 4bが設置場所に設置される前力も既知の値であり、予め 制御部 8のメモリに記憶されて 、る。
第 1低圧ガス管部 Hにおける冷媒量 Mog2と冷媒回路 10を流れる冷媒または構成 機器の運転状態量との関係式は、例えば、
Mog2=Vog2 X oh という、室外ユニット 2内の第 1低圧ガス管部 Hの容積 Vog2に第 1低圧ガス管部 Hに おける冷媒の密度 p ohを乗じた関数式として表される。なお、第 1低圧ガス管部 Hの 容積 Vog2は、設置場所に出荷される前力も既知の値であり、予め制御部 8のメモリ に記憶されている。
第 2低圧ガス管部 Iにおける冷媒量 Mog3と冷媒回路 10を流れる冷媒または構成 機器の運転状態量との関係式は、例えば、
Mog 5 = Vog3 X p s
という、室外ユニット 2内の第 2低圧ガス管部 Iの容積 Vog3に第 2低圧ガス管部 Iにお ける冷媒の密度 p sを乗じた関数式として表される。なお、第 2低圧ガス管部 Iの容積 Vog3は、設置場所に出荷される前力も既知の値であり、予め制御部 8のメモリに記 憶されている。
第 2バイパス回路部 Jにおける冷媒量 Mobと冷媒回路 10を流れる冷媒または構成 機器の運転状態量との関係式は、例えば、
Mob = kobl X co + kob2 X p s + kob3 X Pe + kob4
という、室外熱交換器 22の出口における冷媒の密度 p co、過冷却器 24のバイパス 回路側の出口における冷媒の密度 p s、および蒸発圧力 Peの関数式として表される 。なお、上述の関係式におけるパラメータ kobl〜kob3は、試験や詳細なシミュレ一 シヨンの結果を回帰分析することによって求められたものであり、予め制御部 8のメモ リに記憶されている。また、第 2バイパス回路部 Jの容積 Mobは、他の部分に比べて 冷媒量が少ないこともあり、さらに簡易的な関係式によって演算されてもよい。例えば
Mob=Vob X e X kob5
という、第 2バイパス回路部 Jの容積 Vobに過冷却器 24の第 2バイパス回路側の部分 における飽和液密度 p eおよび補正係数 kobを乗じた関数式として表される。なお、 第 2バイパス回路部 Jの容積 Vobは、室外ユニット 2が設置場所に設置される前から既 知の値であり、予め制御部 8のメモリに記憶されている。また、過冷却器 24の第 2バイ パス回路側の部分における飽和液密度 p eは、吸入圧力 Psまたは蒸発温度 Teを換 算すること〖こよって得られる。 [0072] なお、本実施形態において、室外ユニット 2は 1台である力 室外ユニットが複数台 接続される場合には、室外ユニットに関する冷媒量 Mogl、 Mc、 Moll, Mol2、 Mo g2、 Mog3、および Mobは、複数の室外ユニットのそれぞれに対応して各部分の冷 媒量の関係式が設定され、複数の室外ユニットの各部分の冷媒量を加算することに より、室外ユニットの全冷媒量が演算されるようになっている。なお、機種や容量が異 なる複数の室外ユニットが接続される場合には、ノ メータの値が異なる各部分の冷 媒量の関係式が使用されることになる。
以上のように、本実施形態では、冷媒回路 10の各部分についての関係式を用いて 、冷媒量判定運転における冷媒回路 10を流れる冷媒または構成機器の運転状態量 力 各部分の冷媒量を演算することで、冷媒回路 10の冷媒量を演算することができ るようになっている。
[0073] そして、このステップ S 12は、後述のステップ S 13における冷媒量の適否の判定の 条件が満たされるまで繰り返されるため、冷媒の追加充填が開始して力 完了するま での間、冷媒回路 10の各部分についての関係式を用いて、冷媒充填時における運 転状態量力 各部分の冷媒量が演算される。より具体的には、後述のステップ S 13 における冷媒量の適否の判定に必要な室外ユニット 2内の冷媒量 Mo、各室内ュニ ット 3a〜3c内の冷媒量 Mr、および各接続ユニット 4a, 4b内の冷媒量 Mbs (=Vlp2 X lp+Vgp2 X gp) (すなわち、第 1冷媒連絡配管群 5および第 2冷媒連絡配管 群 7を除く冷媒回路 10の各部分の冷媒量)が演算される。ここで、室外ユニット 2内の 冷媒量 Moは、上述の室外ユニット 2内の各部分の冷媒量 Mogl、 Mc、 Moll, Mol 2、 Mog2、 Mog3、および Mobをカ卩算することによって演算される。
[0074] このように、冷媒自動充填運転における冷媒回路 10内を流れる冷媒または構成機 器の運転状態量から冷媒回路 10の各部分の冷媒量を演算する冷媒量演算手段とし て機能する制御部 8により、ステップ S 12の処理が行われる。
(ステップ S 13:冷媒量の適否の判定)
上述のように、冷媒回路 10内に冷媒の追加充填を開始すると、冷媒回路 10内の 冷媒量が徐々に増加する。ここで、第 1冷媒連絡配管群 5の容積が未知である場合 には、冷媒の追加充填後に冷媒回路 10内に充填されるべき冷媒量を、冷媒回路 10 全体の冷媒量として規定することができない。しかし、室外ユニット 2、室内ユニット 3a 〜3c、および接続ユニット 4a, 4bだけに着目すれば (すなわち、第 1冷媒連絡配管 群 5および第 2冷媒連絡配管群 7を除く冷媒回路 10)、試験や詳細なシミュレーション により通常運転モードにおける最適な室外ユニット 2の冷媒量を予め知ることができる ため、この冷媒量を充填目標値 Msとして予め制御部 8のメモリに記憶しておき、上述 の関係式を用いて冷媒自動充填運転における冷媒回路 10内を流れる冷媒または構 成機器の運転状態量力も演算される室外ユニット 2の冷媒量 Moと室内ユニット 3a〜 3cの冷媒量 Mrと接続ユニット 4a, 4bの冷媒量 Mbsとを加算した冷媒量の値力 この 充填目標値 Msに到達するまで、冷媒の追加充填を行えばよいことになる。すなわち 、ステップ S13は、冷媒自動充填運転における室外ユニット 2の冷媒量 Moと室内ュ ニット 3a〜3cの冷媒量 Mrと接続ユニット 4a, 4bの冷媒量 Mbsとを加算した冷媒量 の値が充填目標値 Msに到達したかどうかを判定することで、冷媒の追加充填により 冷媒回路 10内に充填された冷媒量の適否を判定する処理である。
そして、ステップ S13において、室外ユニット 2の冷媒量 Moと室内ユニット 3a〜3c の冷媒量 Mrと接続ユニット 4a, 4bの冷媒量 Mbsとを加算した冷媒量の値が充填目 標値 Msよりも小さぐ冷媒の追加充填が完了していない場合には、充填目標値 Ms に到達するまで、ステップ S 13の処理が繰り返される。また、室外ユニット 2の冷媒量 Moと室内ユニット 3a〜3cの冷媒量 Mrと接続ユニット 4a, 4bの冷媒量 Mbsとを加算 した冷媒量の値が充填目標値 Msに到達した場合には、冷媒の追加充填が完了し、 冷媒自動充填運転処理としてのステップ S 1が完了する。
なお、上述の冷媒量判定運転においては、冷媒回路 10内への冷媒の追加充填が 進むにつれて、主として、室外熱交換器 22の出口における過冷却度 SCoが大きくな る傾向が現れて室外熱交換器 22における冷媒量 Mcが増加し、他の部分における 冷媒量がほぼ一定に保たれる傾向になる。このため、充填目標値 Msを、室外ュ-ッ ト 2、室内ユニット 3a〜3c、および接続ユニット 4a, 4bではなぐ室外ユニット 2の冷媒 量 Moのみに対応する値として設定したり、または、室外熱交^^ 22の冷媒量 Mcに 対応する値として設定して、充填目標値 Msに到達するまで冷媒の追加充填を行うよ うにしてもよい。 [0076] このように、冷媒自動充填運転の冷媒量判定運転における冷媒回路 10内の冷媒 量の適否 (すなわち、充填目標値 Msに到達したかどうか)を判定する冷媒量判定手 段として機能する制御部 8により、ステップ S 13の処理が行われる。
(ステップ S2:配管容積判定運転)
上述のステップ S1の冷媒自動充填運転が完了したら、ステップ S 2の配管容積判 定運転に移行する。配管容積判定運転では、制御部 8によって、図 6に示されるステ ップ S21〜ステップ S25の処理が行われる。ここで、図 6は、配管容積判定運転のフ ローチャートである。
(ステップ S21、S22 :液冷媒連絡配管用の配管容積判定運転および容積の演算) ステップ S21では、上述の冷媒自動充填運転におけるステップ S 11の冷媒量判定 運転と同様に、室内ユニット全数運転、凝縮圧力制御、液管温度制御、過熱度制御 、および蒸発圧力制御を含む液冷媒連絡配管部 B3用の配管容積判定運転を行う。 ここで、液管温度制御における過冷却器 24の主冷媒回路側の出口の冷媒の温度 T1 Pの液管温度目標値 Tipsを第 1目標値 Tlpslとし、この第 1目標値 Tlpslで冷媒量判 定運転が安定した状態を第 1状態とする(図 7の破線を含む線で示された冷凍サイク ルを参照)。なお、図 7は、液冷媒連絡配管用の配管容積判定運転における空気調 和装置 1の冷凍サイクルを示すモリエル線図である。
[0077] 次に、液管温度制御における過冷却器 24の主冷媒回路側の出口の冷媒の温度 T lpが第 1目標値 Tlpslで安定した第 1状態から、他の機器制御、すなわち、凝縮圧力 制御、過熱度制御、および蒸発圧力制御の条件については変更することなく(すな わち、過熱度目標値 SHrsや低圧目標値 Pesを変更することなく)、液管温度目標値 Tipsを第 1目標値 Tlpslと異なる第 2目標値 Tlps2に変更して安定させた第 2状態と する(図 7の実線で示された冷凍サイクルを参照)。本実施形態において、第 2目標 値 Tlps2は、第 1目標値 Tlpslよりも高い温度である。
このように、第 1状態で安定した状態から第 2状態に変更することによって、液冷媒 連絡配管部 B3内の冷媒の密度が小さくなるため、第 2状態における液冷媒連絡配 管部 B3の冷媒量 Mlpは、第 1状態における冷媒量に比べて減少することになる。そ して、この液冷媒連絡配管部 B3から減少した冷媒は、冷媒回路 10の他の部分に移 動することになる。より具体的には、上述のように、液管温度制御以外の他の機器制 御の条件については変更していないことから、高圧ガス管部 Eにおける冷媒量 Mogl 、第 1低圧ガス管部 Hにおける冷媒量 Mog2、第 2低圧ガス管部 Iにおける冷媒量 Mo g3、高圧ガス冷媒連絡配管部 G1における冷媒量 Mgph、および低圧ガス冷媒連絡 配管部 G2における冷媒量 Mgplがほぼ一定に保たれて、液冷媒連絡配管部 B3から 減少した冷媒は、凝縮器部 A、高温側液管部 Bl、低温側液管部 B2、室内ユニット部 F、および第 2バイパス回路部 Jに移動することになる。すなわち、液冷媒連絡配管部 B3から冷媒が減少した分だけ、凝縮器部 Aにおける冷媒量 Mc、高温側液管部 B1 における冷媒量 Moll、低温側液管部 B2における冷媒量 Mol2、室内ユニット部 Fに おける冷媒量 Mr、および第 2バイパス回路部 Jにおける冷媒量 Mobが増加すること になる。
以上のような制御は、液冷媒連絡配管部 B3の容積 Mlpを演算するための配管容 積判定運転を行う配管容積判定運転制御手段として機能する制御部 8 (より具体的 には、室内側制御部 34a〜34c、接続側制御部 44a, 44b、室外側制御部 26、およ び各制御部 34a〜34c, 44a, 44b, 26間を接続する伝送線 81)により、ステップ S2 1の処理として行われる。
次に、ステップ S22では、第 1状態から第 2状態への変更により、液冷媒連絡配管 部 B3から冷媒が減少して冷媒回路 10の他の部分に移動する現象を利用して、液冷 媒連絡配管部 B3の容積 Vlpを演算する。
まず、液冷媒連絡配管部 B3の容積 Vlpを演算するために使用される演算式につい て、説明する。上述の配管容積判定運転によって、この液冷媒連絡配管部 B3から減 少して冷媒回路 10の他の部分に移動した冷媒量を冷媒増減量 Δ Mlpとし、第 1およ び第 2状態間における各部分の冷媒の増減量を A Mc、 Δ Μο11、 Δ Μο12、 A Mr、 および Δ Mob (ここでは、冷媒量 Mogl、冷媒量 Mog2、冷媒量 Mog3、冷媒量 Mgp h、および冷媒量 Mgplがほぼ一定に保たれるため省略する)とすると、冷媒増減量 Δ Mlpは、例えば、
Δ Mlp=— ( Δ Mc+ Δ Moll + Δ Μο12+ Δ Mr+ Δ Mob)
という関数式力 演算することができる。そして、この Δ Mlpの値を液冷媒連絡配管 部 B3内における第 1および第 2状態間の冷媒の密度変化量 Δ lpで除算することに より、液冷媒連絡配管部 B3の容積 Vlpを演算することができる。なお、冷媒増減量 Δ Mlpの演算結果にはほとんど影響しないが、上述の関数式において、冷媒量 Mogl および冷媒量 Mog2が含まれて 、てもよ 、。
[0079] Vlp = Δ Mlp/ Δ lp
また、接続ユニット 4a, 4bの液側冷媒流路の容積 Vlp2は、接続ユニット 4a, 4bが 設置場所に設置される前力 既知の値であるため、演算により求められた液冷媒連 絡配管部 B3の容積 Vlpから減算することで、空気調和装置 1をビル等の設置場所に 設置する際に現地にて施工される冷媒配管である第 1液冷媒連絡配管 51と第 2液冷 媒連絡配管 71a, 71bとを併せた部分の容積 Vlplを求めることができる。
なお、 A Mc、 Δ Μο11、 Δ Μο12、 A Mr、および A Mobは、上述の冷媒回路 10の 各部分についての関係式を用いて、第 1状態における冷媒量と第 2状態における冷 媒量とを演算し、さらに第 2状態における冷媒量力 第 1状態の冷媒量を減算するこ とによって得られる。また、密度変化量 Δ p ipは、第 1状態における過冷却器 24の出 口における冷媒の密度と第 2状態における過冷却器 24の出口における冷媒の密度 を演算し、さらに第 2状態における冷媒の密度力 第 1状態における冷媒の密度を減 算すること〖こよって得られる。
[0080] 以上のような演算式を用いて、第 1および第 2状態における冷媒回路 10を流れる冷 媒または構成機器の運転状態量から液冷媒連絡配管部 B3の容積 Vlpを演算するこ とがでさる。
なお、本実施形態では、第 2状態における第 2目標値 Tlps2が第 1状態における第 1目標値 Tlpslよりも高い温度になるように状態変更を行い、低温側液管部 B2の冷 媒を他の部分に移動させることで他の部分における冷媒量を増加させて、この増加 量力 液冷媒連絡配管部 B3の容積 Vlpを演算しているが、第 2状態における第 2目 標値 Tlps2が第 1状態における第 1目標値 Tlpslよりも低い温度になるように状態変 更を行い、液冷媒連絡配管部 B3に他の部分から冷媒を移動させることで他の部分 における冷媒量を減少させて、この減少量から液冷媒連絡配管部 B3の容積 Vlpを 演算してちょい。 [0081] このように、液冷媒連絡配管部 B3用の配管容積判定運転における冷媒回路 10内 を流れる冷媒または構成機器の運転状態量から液冷媒連絡配管部 B3の容積 Vlpを 演算する液冷媒連絡配管用の配管容積演算手段として機能する制御部 8により、ス テツプ S22の処理が行われる。
(ステップ S23、S24 :ガス冷媒連絡配管用の配管容積判定運転および容積の演 算)
上述のステップ S21およびステップ S22が完了した後、ステップ S23において、室 内ユニット全数運転、凝縮圧力制御、液管温度制御、過熱度制御、および蒸発圧力 制御を含むガス冷媒連絡配管部 G用の配管容積判定運転を行う。ここで、蒸発圧力 制御における圧縮機 21の吸入圧力 Psの低圧目標値 Pesを第 1目標値 Peslとし、こ の第 1目標値 Peslで冷媒量判定運転が安定した状態を第 1状態とする(図 8の破線 を含む線で示された冷凍サイクルを参照)。なお、図 8は、ガス冷媒連絡配管用の配 管容積判定運転における空気調和装置 1の冷凍サイクルを示すモリエル線図である
[0082] 次に、蒸発圧力制御における圧縮機 21の吸入圧力 Psの低圧目標値 Pesが第 1目 標値 Peslで安定した第 1状態から、他の機器制御、すなわち、液管温度制御、凝縮 圧力制御、および過熱度制御の条件については変更することなく(すなわち、液管温 度目標値 Tipsや過熱度目標値 SHrsを変更することなく)、低圧目標値 Pesを第 1目 標値 Peslと異なる第 2目標値 Pes2に変更して安定させた第 2状態とする(図 8の実 線のみで示された冷凍サイクルを参照)。本実施形態において、第 2目標値 Pes2は 、第 1目標値 Peslよりも低い圧力である。
このように、第 1状態で安定した状態から第 2状態に変更することによって、ガス冷 媒連絡配管部 G内の冷媒の密度が小さくなるため、第 2状態におけるガス冷媒連絡 配管部 Gの冷媒量 Mgpは、第 1状態における冷媒量に比べて減少することになる。 そして、このガス冷媒連絡配管部 Gから減少した冷媒は、冷媒回路 10の他の部分に 移動することになる。より具体的には、上述のように、蒸発圧力制御以外の他の機器 制御の条件については変更していないことから、高圧ガス管部 Eにおける冷媒量 Mo gl、高温側液管部 Blにおける冷媒量 Moll、低温側液管部 B2における冷媒量 Mol 2、および液冷媒連絡配管部 B3における冷媒量 Mlpがほぼ一定に保たれて、ガス冷 媒連絡配管部 Gから減少した冷媒は、第 1低圧ガス管部 H、第 2低圧ガス管部 I、凝 縮器部 A、室内ユニット部 F、および第 2バイパス回路部 Jに移動することになる。すな わち、ガス冷媒連絡配管部 Gから冷媒が減少した分だけ、第 1低圧ガス管部 Hにお ける冷媒量 Mog2、第 2低圧ガス管部 Iにおける冷媒量 Mog3、凝縮器部 Aにおける 冷媒量 Mc、室内ユニット部 Fにおける冷媒量 Mr、および第 2バイパス回路部 Jにお ける冷媒量 Mobが増加することになる。
以上のような制御は、ガス冷媒連絡配管部 Gの容積 Vgpを演算するための配管容 積判定運転を行う配管容積判定運転制御手段として機能する制御部 8 (より具体的 には、室内側制御部 34a〜34c、接続側制御部 44a, 44b、室外側制御部 26、およ び各制御部 34a〜34c, 44a, 44b, 26間を接続する伝送線 81)により、ステップ S2 3の処理として行われる。
次に、ステップ S24では、第 1状態から第 2状態への変更により、ガス冷媒連絡配管 部 G力も冷媒が減少して冷媒回路 10の他の部分に移動する現象を利用して、ガス 冷媒連絡配管部 Gの容積 Vgpを演算する。
まず、ガス冷媒連絡配管部 Gの容積 Vgpを演算するために使用される演算式につ いて、説明する。上述の配管容積判定運転によって、このガス冷媒連絡配管部 Gか ら減少して冷媒回路 10の他の部分に移動した冷媒量を冷媒増減量 Δ Mgpとし、第 1および第 2状態間における各部分の冷媒の増減量を A Mc、 A Mog2、 A Mog3、 Δ ΜΓ,および Δ Mob (ここでは、冷媒量 Mogl、冷媒量 Moll、冷媒量 Mol2、およ び冷媒量 Mlpがほぼ一定に保たれるため省略する)とすると、冷媒増減量 Δ Mgpは 、例えば、
A Mgp= - ( A Mc+ A Mog2+ A Mog3+ A Mr+ A Mob)
という関数式力 演算することができる。そして、この Δ Mgpの値をガス冷媒連絡配 管部 G内における第 1および第 2状態間の冷媒の密度変化量 Δ p gpで除算すること により、ガス冷媒連絡配管部 Gの容積 Vgpを演算することができる。なお、冷媒増減 量 Δ Mgpの演算結果にはほとんど影響しないが、上述の関数式において、冷媒量 Mogl、冷媒量 Moll、および冷媒量 Mol2が含まれていてもよい。
Figure imgf000048_0001
なお、 A Mc、 A Mog2、 A Mog3、 A Mr、および Δ Mobは、上述の冷媒回路 10の 各部分についての関係式を用いて、第 1状態における冷媒量と第 2状態における冷 媒量とを演算し、さらに第 2状態における冷媒量力 第 1状態の冷媒量を減算するこ とによって得られ、また、密度変化量 Δ p gpは、第 1状態における圧縮機 21の吸入 側における冷媒の密度 p sと、室外ユニット 2内の高圧ガス側閉鎖弁 V5と第 1高圧ガ ス開閉弁 V8との間の高圧ガス側の配管における冷媒の密度 p ohと、接続ユニット 4 a, 4b内の高圧ガス側冷媒流路における冷媒の密度 p bshと、室内熱交換器 31a〜 31cの出口における冷媒の密度 p eoとの平均密度を演算し、第 2状態における平均 密度力 第 1状態における平均密度を減算することによって得られる。
[0085] 以上のような演算式を用いて、第 1および第 2状態における冷媒回路 10を流れる冷 媒または構成機器の運転状態量からガス冷媒連絡配管部 Gの容積 Vgpを演算する ことができる。
また、接続ユニット 4a, 4b内の高圧ガス側冷媒流路および低圧ガス側冷媒流路( 第 3バイパス冷媒回路 43a, 43b部分を含む)の容積 Vgp2は、接続ユニット 4a, 4b が設置場所に設置される前力 既知の値であるため、演算により求められたガス冷媒 連絡配管部 Gの容積 Vgpから減算することで、空気調和装置 1をビル等の設置場所 に設置する際に現地にて施工される冷媒配管である高圧ガス冷媒連絡配管 52と低 圧ガス冷媒連絡配管 53と第 2ガス冷媒連絡配管 72a, 72bとを併せた部分の容積 V gplを求めることができる。
[0086] なお、本実施形態では、第 2状態における第 2目標値 Pes2が第 1状態における第 1 目標値 Peslよりも低 、圧力になるように状態変更を行 、、ガス冷媒連絡配管部 Gの 冷媒を他の部分に移動させることで他の部分における冷媒量を増加させて、この増 加量力 ガス冷媒連絡配管部 Gの容積 Vlpを演算しているが、第 2状態における第 2 目標値 Pes2が第 1状態における第 1目標値 Peslよりも高い圧力になるように状態変 更を行!ヽ、ガス冷媒連絡配管部 Gに他の部分から冷媒を移動させることで他の部分 における冷媒量を減少させて、この減少量からガス冷媒連絡配管部 Gの容積 Vlpを 演算してちょい。 このように、ガス冷媒連絡配管部 G用の配管容積判定運転における冷媒回路 10内 を流れる冷媒または構成機器の運転状態量からガス冷媒連絡配管部 Gの容積 Vgp を演算するガス冷媒連絡配管用の配管容積演算手段として機能する制御部 8により 、ステップ S24の処理が行われる。
[0087] (ステップ S25:配管容積判定運転の結果の妥当性の判定)
上述のステップ S21〜ステップ S24が完了した後、ステップ S25において、配管容 積判定運転の結果が妥当なものであるかどうか、すなわち、配管容積演算手段によ つて演算された液冷媒連絡配管部 B3の容積 Vlpとガス冷媒連絡配管部 Gの容積 Vg pとが妥当なものであるかどうかを判定する。
具体的には、以下の不等式のように、演算により得られたガス冷媒連絡配管部 Gの 容積 Vgpに対する液冷媒連絡配管部 B3の容積 Vlpの比が所定の数値範囲内にあ るかどうかにより判定する。
ε 1 く Vlp/Vgp く ε 2
ここで、 ε 1および ε 2は、熱源ユニットと利用ユニットとの実現可能な組み合わせに おける配管容積比の最小値および最大値に基づいて可変される値である。
[0088] そして、容積比 VlpZVgpが上述の数値範囲を満たす場合には、配管容積判定運 転に力かるステップ S2の処理が完了となり、容積比 VlpZVgpが上述の数値範囲を 満たさない場合には、再度、ステップ S21〜ステップ S 24の配管容積判定運転およ び容積の演算の処理が行われる。
このように、上述の配管容積判定運転の結果が妥当なものであるかどうか、すなわ ち、配管容積演算手段によって演算された液冷媒連絡配管部 B3の容積 Vlpとガス 冷媒連絡配管部 Gの容積 Vgpとが妥当なものであるかどうかを判定する妥当性判定 手段として機能する制御部 8により、ステップ S 25の処理が行われる。
なお、本実施形態においては、液冷媒連絡配管部 B3用の配管容積判定運転 (ス テツプ S21、 S22)を先に行い、その後に、ガス冷媒連絡配管部 G用の配管容積判 定運転 (ステップ S23、 S24)を行っているが、ガス冷媒連絡配管部 G用の配管容積 判定運転を先に行ってもよい。
[0089] また、上述のステップ S25において、ステップ S21〜S24の配管容積判定運転の 結果が妥当でないものと複数回判定されるような場合や、より簡易的に液冷媒連絡 配管部 B3の容積 Vlpとガス冷媒連絡配管部 Gの容積 Vgpとの判定を行 、た 、場合 には、図 6には図示しないが、例えば、ステップ S25において、ステップ S21〜S24の 配管容積判定運転の結果が妥当でないものと判定された後に、液冷媒連絡配管部 B3とガス冷媒連絡配管部 Gとを併せた部分 (以下、冷媒連絡配管部 K)における圧 力損失力 冷媒連絡配管部 Kの配管長さを推定し、この推定された配管長さと平均 容積比から液冷媒連絡配管部 B3の容積 Vlpとガス冷媒連絡配管部 Gの容積 Vgpと を演算する処理に移行して、液冷媒連絡配管部 B3の容積 Vlpとガス冷媒連絡配管 部 Gの容積 Vgpとを得るようにしてもょ 、。
[0090] また、本実施形態においては、冷媒連絡配管部 Kの長さゃ管径等の情報がなぐ 液冷媒連絡配管部 B3の容積 Vlpとガス冷媒連絡配管部 Gの容積 Vgpとが未知であ ることを前提として、配管容積判定運転を行って液冷媒連絡配管部 B3の容積 Vlpと ガス冷媒連絡配管部 Gの容積 Vgpとを演算する場合につ 、て説明したが、配管容積 演算手段が、冷媒連絡配管部 Kの長さゃ管径等の情報を入力することで液冷媒連 絡配管部 B3の容積 Vlpとガス冷媒連絡配管部 Gの容積 Vgpとを演算する機能を有 している場合には、この機能を併用してもよい。
さらに、上述の配管容積判定運転およびその運転結果を用いて液冷媒連絡配管 部 B3の容積 Vlpとガス冷媒連絡配管部 Gの容積 Vgpとを演算する機能を使用せず、 冷媒連絡配管部 Kの長さゃ管径等の情報を入力することで液冷媒連絡配管部 B3の 容積 Vlpとガス冷媒連絡配管部 Gの容積 Vgpとを演算する機能のみを使用する場合 には、上述の妥当性判定手段 (ステップ S25)を用いて、入力された冷媒連絡配管部 Kの長さゃ管径等の情報が妥当であるかどうかについての判定を行うようにしてもよ い。
[0091] (ステップ S3:初期冷媒量検知運転)
上述のステップ S 2の配管容積判定運転が完了したら、ステップ S3の初期冷媒量 検知運転に移行する。初期冷媒量検知運転では、制御部 8によって、図 9に示される ステップ S31およびステップ S32の処理が行われる。ここで、図 9は、初期冷媒量検 知運転のフローチャートである。 (ステップ S31:冷媒量判定運転)
ステップ S31では、上述の冷媒自動充填運転のステップ S11の冷媒量判定運転と 同様に、室内ユニット全数運転、凝縮圧力制御、液管温度制御、過熱度制御、およ び蒸発圧力制御を含む冷媒量判定運転が行われる。ここで、液管温度制御におけ る液管温度目標値 Tlps、過熱度制御における過熱度目標値 SHrs、および蒸発圧 力制御における低圧目標値 Pesは、原則として、冷媒自動充填運転のステップ S 11 の冷媒量判定運転における目標値と同じ値が使用される。なお、室内熱交 31C の過熱度目標値 SHrcも、原則として、冷媒自動充填運転のステップ SI 1の冷媒量 判定運転における目標値と同じ値が使用される。
このように、室内ユニット全数運転、凝縮圧力制御、液管温度制御、過熱度制御、 および蒸発圧力制御を含む冷媒量判定運転を行う冷媒量判定運転制御手段として 機能する制御部 8により、ステップ S 31の処理が行われる。
(ステップ S32:冷媒量の演算)
次に、上述の冷媒量判定運転を行!、つつ冷媒量演算手段として機能する制御部 8 によって、ステップ S32における初期冷媒量検知運転における冷媒回路 10を流れる 冷媒または構成機器の運転状態量力 冷媒回路 10内の冷媒量を演算する。冷媒回 路 10内の冷媒量の演算は、上述の冷媒回路 10の各部分の冷媒量と冷媒回路 10を 流れる冷媒または構成機器の運転状態量との関係式を用いて演算されるが、この際 、上述の配管容積判定運転によって、空気調和装置 1の構成機器の設置後におい て未知であった液冷媒連絡配管部 B3の容積 Vlpとガス冷媒連絡配管部 Gの容積 Vg pとが演算されて既知となっているため、これらの液冷媒連絡配管部 B3の容積 Vlpと ガス冷媒連絡配管部 Gの容積 Vgpとに冷媒の密度を乗算することによって、液冷媒 連絡配管部 B3の冷媒量 Mlpとガス冷媒連絡配管部 Gの冷媒量 Mgpとを演算し、さ らに他の各部分の冷媒量を加算することにより、冷媒回路 10全体の初期冷媒量を検 知することができる。この初期冷媒量は、後述の冷媒漏洩検知運転において、冷媒 回路 10からの漏洩の有無を判定する基準となる冷媒回路 10全体の基準冷媒量 Mi として使用されるため、運転状態量の 1つとして、状態量蓄積手段としての制御部 8の メモリに記憶される。 [0093] このように、初期冷媒量検知運転における冷媒回路 10内を流れる冷媒または構成 機器の運転状態量から冷媒回路 10の各部分の冷媒量を演算する冷媒量演算手段 として機能する制御部 8により、ステップ S32の処理が行われる。
<冷媒漏洩検知運転モード >
次に、冷媒漏洩検知運転モードについて、図 1、図 2、図 5、および図 10を用いて 説明する。ここで、図 10は、冷媒漏洩検知運転モードのフローチャートである。
本実施形態において、定期的 (例えば、休日や深夜等で空調を行う必要がない時 間帯等)に、不測の原因により冷媒回路 10から冷媒が外部に漏洩していないかどう かを検知する場合を例にして説明する。
(ステップ S41:冷媒量判定運転)
まず、上記の冷房運転ゃ冷暖同時運転のような通常運転モードにおける運転が一 定時間 (例えば、半年〜 1年ごと等)経過した場合に、自動または手動で通常運転モ ードから冷媒漏洩検知運転モードに切り換えて、初期冷媒量検知運転の冷媒量判 定運転と同様に、室内ユニット全数運転、凝縮圧力制御、液管温度制御、過熱度制 御、および蒸発圧力制御を含む冷媒量判定運転を行なう。ここで、液管温度制御に おける液管温度目標値 Tlps、過熱度制御における過熱度目標値 SHrs、および蒸発 圧力制御における低圧目標値 Pesは、原則として、初期冷媒量検知運転の冷媒量 判定運転のステップ S31における目標値と同じ値が使用される。
[0094] 本実施例では、通常運転モードから冷媒漏洩検知運転モードに移行した場合にお いても、室内ユニット 3cの冷房能力を維持するように運転を行っているため、室内ュ ニット 3cは、他の室内ユニット 3a, 3bとは独立した制御が行われる。ここで、上述の過 熱度制御において、室内ユニット 3cでは、室内熱交換器 31cの過熱度 SHrcは、通 常運転モードで室内側制御部 34cの内蔵メモリ 35cに記録された過熱度目標値 SHr csになるように室内膨張弁 V9cが制御される。また、室内ユニット 3a, 3bでは、室内 熱交換器 31a〜31c全体としての過熱度 SHrは、過熱度目標値 SHrsで一定になる ように室内膨張弁 V9a, V9bが制御される。また、蒸発圧力制御によって冷媒の蒸発 圧力 Peが安定的に制御されるように、室内ファン 32a〜32cは、室内熱交換器 31a 〜31cに供給される室内空気の風量 Wra〜Wrcがそれぞれ一定になるように制御さ れている。
[0095] なお、この冷媒量判定運転は、冷媒漏洩検知運転ごとに行われることになるが、例 えば、凝縮圧力 Pcが異なる場合ゃ冷媒漏洩が生じている場合のような運転条件の 違いによって室外熱交換器 22出口における冷媒の温度 Tcoが変動する場合におい ても、液管温度制御によって、液冷媒連絡配管部 B3内の冷媒の温度 Tipが同じ液 管温度目標値 Tipsで一定に保たれることになる。
このように、室内ユニット全数運転、凝縮圧力制御、液管温度制御、過熱度制御、 および蒸発圧力制御を含む冷媒量判定運転を行う冷媒量判定運転制御手段として 機能する制御部 8により、ステップ S41の処理が行われる。
(ステップ S42:冷媒量の演算)
次に、上述の冷媒量判定運転を行!、つつ冷媒量演算手段として機能する制御部 8 によって、ステップ S42における冷媒漏洩検知運転における冷媒回路 10を流れる冷 媒または構成機器の運転状態量力 冷媒回路 10内の冷媒量を演算する。冷媒回路 10内の冷媒量の演算は、上述の冷媒回路 10の各部分の冷媒量と冷媒回路 10を流 れる冷媒または構成機器の運転状態量との関係式を用いて演算されるが、この際、 初期冷媒量検知運転と同様に、上述の配管容積判定運転によって、空気調和装置 1の構成機器の設置後において未知であった液冷媒連絡配管部 B3の容積 Vlpとガ ス冷媒連絡配管部 Gの容積 Vgpとが演算されて既知となって 、るため、これらの液冷 媒連絡配管部 B3の容積 Vlpとガス冷媒連絡配管部 Gの容積 Vgpとに冷媒の密度を 乗算することによって、液冷媒連絡配管部 B3の冷媒量 Mlpとガス冷媒連絡配管部 G の冷媒量 Mgpとを演算し、さらに他の各部分の冷媒量を加算することにより、冷媒回 路 10全体の冷媒量 Mを演算することができる。
[0096] ここで、上述のように、液管温度制御によって液冷媒連絡配管部 B3内の冷媒の温 度 Tipが同じ液管温度目標値 Tipsで一定に保たれているため、液冷媒連絡配管部 B3における冷媒量 Mlpは、冷媒漏洩検知運転の運転条件の違いによらず、室外熱 交換器 22出口における冷媒の温度 Tcoが変動する場合においても、一定に保たれ ることになる。
このように、冷媒漏洩検知運転における冷媒回路 10内を流れる冷媒または構成機 器の運転状態量から冷媒回路 10の各部分の冷媒量を演算する冷媒量演算手段とし て機能する制御部 8により、ステップ S42の処理が行われる。
(ステップ S43、 S44 :冷媒量の適否の判定、警告表示)
冷媒回路 10から冷媒が外部に漏洩すると、冷媒回路 10内の冷媒量が減少する。 そして、冷媒回路 10内の冷媒量が減少すると、主として、室外熱交換器 22の出口に おける過冷却度 SCoが小さくなる傾向が現れ、これに伴い、室外熱交^^ 22におけ る冷媒量 Mcが減少し、他の部分における冷媒量がほぼ一定に保たれる傾向になる 。このため、上述のステップ S42において演算された冷媒回路 10全体の冷媒量 Mは 、冷媒回路 10からの冷媒漏洩が生じている場合には、初期冷媒量検知運転におい て検知された基準冷媒量 MUりも小さくなり、冷媒回路 10からの冷媒漏洩が生じて V、な 、場合には、基準冷媒量 Miとほぼ同じ値になる。
[0097] このことを利用して、ステップ S43では、冷媒の漏洩の有無を判定している。そして 、ステップ S43において、冷媒回路 10からの冷媒の漏洩が生じていないと判定され る場合には、冷媒漏洩検知運転モードを終了する。
一方、ステップ S43において、冷媒回路 10からの冷媒の漏洩が生じていると判定さ れる場合には、ステップ S44の処理に移行して、冷媒漏洩を検知したことを知らせる 警告を警告表示部 9に表示した後、冷媒漏洩検知運転モードを終了する。
このように、冷媒漏洩検知運転モードにお!ヽて冷媒量判定運転を行!ヽつつ冷媒回 路 10内の冷媒量の適否を判定して冷媒漏洩の有無を検知する、冷媒量判定手段の 一つである冷媒漏洩検知手段として機能する制御部 8により、ステップ S42〜S44の 処理が行われる。
[0098] 以上のように、本実施形態の空気調和装置 1では、制御部 8が、冷媒量判定運転 手段、冷媒量演算手段、冷媒量判定手段、配管容積判定運転手段、配管容積演算 手段、妥当性判定手段、および状態量蓄積手段として機能することにより、冷媒回路 10内に充填された冷媒量の適否を判定するための冷媒量判定システムを構成して いる。
(3)空気調和装置の特徴
(A) この空気調和装置 1では、冷媒量判定運転においても、マシンルーム内の室内ュ ニットをマシンルームの冷房負荷に対して十分な能力で運転させることにより、室内 ユニットの能力不足によるマシンルーム内の温度上昇を抑え、マシンルームの機器 に障害を発生させることを抑制することができる。
[0099] (B)
この空気調和装置 1では、低圧目標値 Pesを第 1制御目標値としており、制御部 8 は、冷媒量判定運転において、圧縮機 21の吸入側の冷媒の圧力または圧力に等価 な運転状態量が、低圧目標値 Pesで一定になるように構成機器の制御を行う。また、 過熱度目標値 SHrsを第 1制御目標値としており、制御部 8は、冷媒量判定運転にお いて、室内熱交 31a〜31Cを冷媒の蒸発器として機能させるとともに、室内熱交 換器 31a〜31cから圧縮機 21に送られる冷媒の過熱度 SHrが、過熱度目標値 SHrs で一定になるように構成機器の制御を行う。
したがって、低圧目標値 Pesおよび過熱度目標値 SHrsで一定になるように構成機 器の制御を行う冷媒量判定運転において、マシンルーム内の室内ユニット 3cをマシ ンルームの冷房負荷に対して十分な能力で運転させることにより、室内ユニットの能 力不足によるマシンルーム内の温度上昇を抑え、マシンルームの機器に障害を発生 させることを抑制することができる。
[0100] (C)
この空気調和装置 1では、冷媒量判定運転前の室内ユニット 3cにおける第 2制御 目標値である過熱度目標値 SHrcsを履歴として記録しておき、冷媒量判定運転の際 に、履歴に基づいて室内ユニット 3cに対して冷媒量判定運転前の制御を行うことで、 室内ユニット 3cの冷房能力を冷媒量判定運転前の冷房能力と同等に維持している。 したがって、室内ユニット 3cの冷房能力を冷媒量判定運転前の能力に維持するこ とが可能である。このため、冷媒量判定運転においても、室内ユニット 3cをマシンル ームの冷房負荷に対して十分な能力で運転させることができ、室内ユニット 3cの能力 不足によるマシンルーム内の温度上昇を抑え、マシンルームの機器に障害を発生さ せることを抑帘 Uすることができる。
[0101] (4)他の実施形態 以上、本発明の実施形態について図面に基づいて説明したが、具体的な構成は、 これらの実施形態に限られるものではなぐ発明の要旨を逸脱しない範囲で変更可 能である。
(A)
上述の実施例では、制御部 8は、室内ユニット 3cにおける第 2制御目標値である過 熱度目標値 SHrscを履歴として記録しておき、冷媒量判定運転の際に、履歴に基づ いて室内ユニット 3cに対して冷媒量判定運転前の制御を行うことで、室内ユニット 3c の冷房能力を冷媒量判定運転前の冷房能力と同等に維持している。しかし、これに 限らず、環境情報取得手段 T6, Tl lc, 90と目標値導出手段 82とをさらに備え、マ シンルーム内の環境情報を取得し、取得した環境情報に基づ 、て所定空間内を最 適に空調する第 3制御目標値を導出することにより、第 3制御目標値になるように室 内ユニット 3cを制御することにより室内ユニット 3cの冷房能力を冷媒量判定運転前の 能力に維持する制御を行っても良い。なお、ここに言う「環境情報取得手段」とは、例 えば、室外ユニット 2に設けられた室外温度センサ T6、所定空間内または室内ュ-ッ ト 3cに設けられた室内温度センサ Tl lcなどである(図 1、図 2、および図 11参照)。ま た、ネットワーク 91を介して気象情報提供外部サーバ 92と接続された気象情報取得 ネットワーク 90であっても良い(図 12参照)。なお、ここに言う「環境情報」とは、例え ば、外気温、所定空間内温度、気象情報などである。また、ここに言う「第 3制御目標 値」とは、例えば、室内ユニット 3cの過熱度目標値などである。
これにより、冷媒量判定運転の際に、この第 3制御目標値に基づいて室内ユニット 3 cを制御するため、室内ユニット 3cの冷房能力を冷媒量判定運転前の能力と同等に 維持することが可能である。このため、冷媒量判定運転においても、マシンルーム内 の室内ユニット 3cをマシンルームの冷房負荷に対して十分な能力で運転させること ができ、室内ユニット 3cの能力不足によるマシンルーム内の温度上昇を抑え、マシン ルームの機器に障害を発生させることを抑制することができる。
(B)
上述の実施形態では、空気調和装置 1の室外ユニット 2として外気を熱源とした空 冷式の室外ユニットを使用している力 水冷式や氷蓄熱式の室外ユニットを使用して も良い。また、冷暖同時運転が可能なマルチ空気調和装置として構成されているが、 これに限らず、冷房運転専用のマルチ空気調和装置として構成されているものであ つても良い。
[0103] (C)
上述の実施形態では、室外側制御部 26と、室内側制御部 34a〜34cと、接続側制 御部 44a, 44bとを伝送線 81を介して制御信号をやりとりし空気調和装置 1全体とし て制御部 8を構成していた力 これに限定されず、空気調和装置 1全体の制御を行う 制御部を、室外ユニット 2内に設けても良いし、室内ユニット 3a〜3c内に設けても良 いし、接続ユニット 4a, 4b内に設けても良いし、制御ユニットとして単独のユニットを 設けても良い。
産業上の利用可能性
[0104] 本発明に係る空気調和装置は、冷媒量判定運転においても、利用ユニットの能力 不足による所定空間内の温度上昇を抑え、所定空間内の機器に障害を発生させるこ とを抑制することができ、空気調和装置の冷媒回路内の冷媒量の適否を判定する機 能、特に、圧縮機と凝縮器と膨張機構と蒸発器とが接続されることによって構成され る空気調和装置の冷媒回路内の冷媒量の適否を判定する機能を有する空気調和装 置として有用である。

Claims

請求の範囲
[1] 圧縮機 (21)と熱源側熱交 (22)とを有する熱源ユニット (2)と、利用側熱交換 器(31a〜31c)を有する複数の利用ユニット(3a〜3c)と、膨張機構 (V2, V9a〜V9 c)とが接続されることによって構成される冷媒回路(10)と、
第 1状態値が第 1制御目標値になるように構成機器の制御を行う冷媒量判定運転 が可能な運転制御手段 (8)と、
を備え、
前記運転制御手段は、前記冷媒量判定運転の際に、前記複数の利用ユニットの内 、所定空間を空調する第 1利用ユニット (3c)の冷房能力を維持する、
空気調和装置(1, la)。
[2] 前記第 1制御目標値は、低圧目標値であり、
前記運転制御手段は、前記冷媒量判定運転において、前記圧縮機の吸入側の冷 媒の圧力または前記圧力に等価な運転状態量が、前記低圧目標値で一定になるよ うに構成機器の制御を行う、
請求項 1に記載の空気調和装置(1, la)。
[3] 前記第 1制御目標値は、過熱度目標値であり、
前記運転制御手段は、前記冷媒量判定運転において、前記利用側熱交換器を冷 媒の蒸発器として機能させるとともに、前記利用側熱交^^から前記圧縮機に送ら れる冷媒の過熱度が、前記過熱度目標値で一定になるように構成機器の制御を行う 請求項 1に記載の空気調和装置(1, la)。
[4] 前記第 1利用ユニット (3c)の制御目標値である第 2制御目標値の履歴を記録可能 な履歴記録手段(35c)をさらに備え、
前記運転制御手段は、前記冷媒量判定運転の際に、前記履歴に基づいて前記冷 媒量判定運転前の前記第 2制御目標値を導出し、前記第 1利用ユニットを前記第 2 制御目標値で制御する、
請求項 1から 3の 、ずれかに記載の空気調和装置(1)。
[5] 前記第 2制御目標値は、前記第 1利用ユニットの過熱度目標値である、 請求項 4に記載の空気調和装置(1)。
[6] 屋外または前記所定空間内の環境情報を取得可能な環境情報取得手段 (T6, T1 lc, 90)と、
前記環境情報に基づいて前記所定空間内を最適に空調する第 3制御目標値を導 出する目標値導出手段 (82)と、
をさらに備え、
前記運転制御手段は、前記冷媒量判定運転の際に、前記第 3制御目標値に基づ いて前記第 1利用ユニットの運転制御を行う、
請求項 1から 3の 、ずれかに記載の空気調和装置(la)。
[7] 前記第 3制御目標値は、前記第 1利用ユニットの過熱度目標値である、
請求項 6に記載の空気調和装置( 1 a)。
[8] 前記環境情報取得手段 (T6)は、前記熱源ユニットに設けられた温度センサであり
、前記環境情報としての外気温を取得する、
請求項 6に記載の空気調和装置( 1 a)。
[9] 前記環境情報取得手段 (Tl lc)は、前記所定空間内に設けられた温度センサであ り、前記環境情報として前記所定空間内の温度を取得する、
請求項 6に記載の空気調和装置( 1 a)。
[10] 前記環境情報取得手段(90)は、ネットワーク(91)を介して、前記環境情報として の気象情報を提供可能な気象情報提供サーバ (92)から前記気象情報を取得する、 請求項 6の 、ずれかに記載の空気調和装置(la)。
PCT/JP2007/059173 2006-04-28 2007-04-27 空気調和装置 Ceased WO2007126055A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
AU2007244205A AU2007244205B2 (en) 2006-04-28 2007-04-27 Air conditioner
CN2007800150331A CN101432584B (zh) 2006-04-28 2007-04-27 空调装置
US12/298,667 US7954333B2 (en) 2006-04-28 2007-04-27 Air conditioner
EP07742608.8A EP2017556A4 (en) 2006-04-28 2007-04-27 AIR CONDITIONING

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2006125737A JP4904908B2 (ja) 2006-04-28 2006-04-28 空気調和装置
JP2006-125737 2006-04-28

Publications (1)

Publication Number Publication Date
WO2007126055A1 true WO2007126055A1 (ja) 2007-11-08

Family

ID=38655576

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2007/059173 Ceased WO2007126055A1 (ja) 2006-04-28 2007-04-27 空気調和装置

Country Status (7)

Country Link
US (1) US7954333B2 (ja)
EP (1) EP2017556A4 (ja)
JP (1) JP4904908B2 (ja)
KR (1) KR20090033830A (ja)
CN (1) CN101432584B (ja)
AU (1) AU2007244205B2 (ja)
WO (1) WO2007126055A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100146998A1 (en) * 2008-12-11 2010-06-17 Fujitsu General Limited Refrigeration apparatus
US8220280B2 (en) * 2008-02-05 2012-07-17 Lg Electronics Inc. Air conditioning apparatus and method for determining the amount of refrigerant of air-conditioning apparatus
CN105423484A (zh) * 2015-11-05 2016-03-23 广东爱晟电子科技有限公司 一种空调制冷剂不足的检测方法及检测电路
JP2016166703A (ja) * 2015-03-10 2016-09-15 パナソニックIpマネジメント株式会社 空気調和装置

Families Citing this family (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4715561B2 (ja) * 2006-03-06 2011-07-06 ダイキン工業株式会社 冷凍装置
KR101581466B1 (ko) * 2008-08-27 2015-12-31 엘지전자 주식회사 공기조화시스템
KR101583344B1 (ko) * 2009-01-06 2016-01-19 엘지전자 주식회사 공기조화기 및 공기조화기의 냉매 충전 방법
EP2476965B1 (en) * 2009-09-10 2018-10-24 Mitsubishi Electric Corporation Air conditioning device
KR101727034B1 (ko) * 2010-03-11 2017-04-14 엘지전자 주식회사 공기조화장치
JP5352512B2 (ja) * 2010-03-31 2013-11-27 日立アプライアンス株式会社 空気調和機
WO2012172605A1 (ja) * 2011-06-16 2012-12-20 三菱電機株式会社 空気調和装置
ES2730118T3 (es) * 2011-11-30 2019-11-08 Mitsubishi Electric Corp Método para seleccionar un medio térmico en el intercambiador de calor del lado de utilización en la instalación de un sistema de aire acondicionado
EP2924368B1 (en) * 2012-11-22 2019-02-06 Mitsubishi Electric Corporation Air conditioner and operation control method therefor
JP6264633B2 (ja) * 2013-07-08 2018-01-24 パナソニックIpマネジメント株式会社 空気調和装置
AT515455B1 (de) * 2014-01-31 2016-05-15 Vaillant Group Austria Gmbh Automatische Erkennung von Kältemittelfüllmengen in Kältekreisläufen
EP3150935B1 (en) * 2014-05-30 2019-03-06 Mitsubishi Electric Corporation Air conditioner
US10119738B2 (en) 2014-09-26 2018-11-06 Waterfurnace International Inc. Air conditioning system with vapor injection compressor
CN106796071B (zh) * 2014-10-01 2020-02-11 丹佛斯有限公司 用于估算rvcs系统中的制冷剂充注损耗的方法和系统
WO2016135956A1 (ja) * 2015-02-27 2016-09-01 三菱電機株式会社 冷凍装置
JP6657613B2 (ja) * 2015-06-18 2020-03-04 ダイキン工業株式会社 空気調和装置
KR101726073B1 (ko) * 2015-10-01 2017-04-11 엘지전자 주식회사 공기조화 시스템
US10871314B2 (en) 2016-07-08 2020-12-22 Climate Master, Inc. Heat pump and water heater
CN106545958B (zh) * 2016-10-11 2019-07-26 广东美的暖通设备有限公司 多联机系统及其室内机制冷能力不足的判定方法
US10866002B2 (en) 2016-11-09 2020-12-15 Climate Master, Inc. Hybrid heat pump with improved dehumidification
US10794621B2 (en) * 2016-11-18 2020-10-06 Lg Electronics Inc. Air conditoner and method for controlling an air conditioner
CN106979599B (zh) * 2017-05-12 2019-11-26 广东美的制冷设备有限公司 家用电器控制方法和装置、服务器
JP6935720B2 (ja) * 2017-10-12 2021-09-15 ダイキン工業株式会社 冷凍装置
EP3578904B1 (en) * 2018-04-26 2022-02-16 Hitachi-Johnson Controls Air Conditioning, Inc. Air conditioner
US11592215B2 (en) 2018-08-29 2023-02-28 Waterfurnace International, Inc. Integrated demand water heating using a capacity modulated heat pump with desuperheater
CN112840164B (zh) * 2018-09-27 2023-01-17 大金工业株式会社 空调装置和管理装置
EP3936789A4 (en) * 2019-03-04 2022-11-16 Daikin Industries, Ltd. ASSISTANCE SYSTEM
JP6911883B2 (ja) * 2019-03-29 2021-07-28 ダイキン工業株式会社 冷凍サイクル装置の性能劣化診断システム
CA3081986A1 (en) 2019-07-15 2021-01-15 Climate Master, Inc. Air conditioning system with capacity control and controlled hot water generation
JP7406165B2 (ja) * 2020-05-08 2023-12-27 ダイキン工業株式会社 冷凍サイクルシステム、熱源ユニット、および冷凍サイクル装置
JP7492154B2 (ja) 2020-05-08 2024-05-29 ダイキン工業株式会社 冷凍サイクル装置
JP7380663B2 (ja) * 2021-09-29 2023-11-15 株式会社富士通ゼネラル 空気調和機及び空気調和システム
US12181189B2 (en) 2021-11-10 2024-12-31 Climate Master, Inc. Ceiling-mountable heat pump system
KR102765014B1 (ko) * 2022-08-29 2025-02-12 엘지전자 주식회사 공기조화기
KR102891771B1 (ko) * 2022-10-25 2025-11-27 엘지전자 주식회사 공기조화기

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03186170A (ja) * 1989-12-13 1991-08-14 Hitachi Ltd 冷凍装置及び冷凍装置における冷媒量表示方法
JPH0674621A (ja) * 1992-08-31 1994-03-18 Toshiba Ave Corp 空気調和機
JP2002089929A (ja) * 2000-09-18 2002-03-27 Hitachi Ltd 空調制御システム
JP2006058007A (ja) * 2004-06-11 2006-03-02 Daikin Ind Ltd 空気調和装置

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0735447A (ja) * 1993-07-19 1995-02-07 Mitsubishi Heavy Ind Ltd 冷媒封入量の判定方法
KR950029693A (ko) 1994-04-20 1995-11-24 이헌조 공기 조화기의 기상정보 입력방법
JP3852472B2 (ja) 2004-06-11 2006-11-29 ダイキン工業株式会社 空気調和装置
KR20070032683A (ko) 2004-06-11 2007-03-22 다이킨 고교 가부시키가이샤 공기 조화 장치

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03186170A (ja) * 1989-12-13 1991-08-14 Hitachi Ltd 冷凍装置及び冷凍装置における冷媒量表示方法
JPH0674621A (ja) * 1992-08-31 1994-03-18 Toshiba Ave Corp 空気調和機
JP2002089929A (ja) * 2000-09-18 2002-03-27 Hitachi Ltd 空調制御システム
JP2006058007A (ja) * 2004-06-11 2006-03-02 Daikin Ind Ltd 空気調和装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2017556A4 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8220280B2 (en) * 2008-02-05 2012-07-17 Lg Electronics Inc. Air conditioning apparatus and method for determining the amount of refrigerant of air-conditioning apparatus
US20100146998A1 (en) * 2008-12-11 2010-06-17 Fujitsu General Limited Refrigeration apparatus
US8413456B2 (en) * 2008-12-11 2013-04-09 Fujitsu General Limited Refrigeration apparatus
AU2009248466B2 (en) * 2008-12-11 2016-03-17 Fujitsu General Limited Refrigeration Apparatus
JP2016166703A (ja) * 2015-03-10 2016-09-15 パナソニックIpマネジメント株式会社 空気調和装置
CN105423484A (zh) * 2015-11-05 2016-03-23 广东爱晟电子科技有限公司 一种空调制冷剂不足的检测方法及检测电路

Also Published As

Publication number Publication date
KR20090033830A (ko) 2009-04-06
JP4904908B2 (ja) 2012-03-28
US20090255284A1 (en) 2009-10-15
AU2007244205A1 (en) 2007-11-08
JP2007298221A (ja) 2007-11-15
EP2017556A4 (en) 2014-03-26
AU2007244205B2 (en) 2010-05-27
CN101432584B (zh) 2012-07-25
EP2017556A1 (en) 2009-01-21
CN101432584A (zh) 2009-05-13
US7954333B2 (en) 2011-06-07

Similar Documents

Publication Publication Date Title
WO2007126055A1 (ja) 空気調和装置
JP4114691B2 (ja) 空気調和装置
JP4120676B2 (ja) 空気調和装置
JP4124228B2 (ja) 空気調和装置
JP4705878B2 (ja) 空気調和装置
JP4155313B2 (ja) 空気調和装置
WO2007086445A1 (ja) 空気調和装置
WO2007086506A1 (ja) 空気調和装置
WO2007105604A1 (ja) 空気調和装置
WO2007108433A1 (ja) 空気調和装置
JP2007212134A (ja) 空気調和装置
JP2008064456A (ja) 空気調和装置
JP3933179B1 (ja) 空気調和装置
JP5104225B2 (ja) 空気調和装置
WO2007125959A1 (ja) 空気調和装置
JP4665748B2 (ja) 空気調和装置
JP4311470B2 (ja) 空気調和装置
JP2007255738A (ja) 空気調和装置
JP2008025935A (ja) 空気調和装置
JP2007198680A (ja) 空気調和装置
JP4892954B2 (ja) 空気調和装置
JP4826247B2 (ja) 空気調和装置
JP2008025936A (ja) 空気調和装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07742608

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 200780015033.1

Country of ref document: CN

Ref document number: 12298667

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 1020087027198

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 2007244205

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 2007742608

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2007244205

Country of ref document: AU

Date of ref document: 20070427

Kind code of ref document: A