WO2011043848A1 - Integration of external data in electronic construction data management - Google Patents

Integration of external data in electronic construction data management Download PDF

Info

Publication number
WO2011043848A1
WO2011043848A1 PCT/US2010/035624 US2010035624W WO2011043848A1 WO 2011043848 A1 WO2011043848 A1 WO 2011043848A1 US 2010035624 W US2010035624 W US 2010035624W WO 2011043848 A1 WO2011043848 A1 WO 2011043848A1
Authority
WO
WIPO (PCT)
Prior art keywords
construction
records
information
component
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2010/035624
Other languages
French (fr)
Inventor
Nikhil Chaubey
Austin Higgs
Mark Albertin
Chaumathi Vasudevan
Kevin W. Clark
Richard Jerry Saine
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fluor Technologies Corp
Original Assignee
Fluor Technologies Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from PCT/US2009/059705 external-priority patent/WO2010042524A1/en
Application filed by Fluor Technologies Corp filed Critical Fluor Technologies Corp
Priority to JP2012533146A priority Critical patent/JP2013506933A/en
Priority to IN3010DEN2012 priority patent/IN2012DN03010A/en
Priority to CA2777168A priority patent/CA2777168A1/en
Priority to AU2010303893A priority patent/AU2010303893A1/en
Priority to EP10822373.6A priority patent/EP2486484A4/en
Priority to CN201080055281.0A priority patent/CN102763084A/en
Publication of WO2011043848A1 publication Critical patent/WO2011043848A1/en
Anticipated expiration legal-status Critical
Priority to ZA2012/02897A priority patent/ZA201202897B/en
Ceased legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • the field of the invention is automated integration of external data into construction data management for tracking, validation, and/or archiving of various parameters in highly complex construction environments.
  • the present inventive subject matter is drawn to systems, configurations, and methods of automated recording and/or associating external activities and/or information with one or more construction records to so allow coordinated and rapid retrieval of multiple construction records that are associated with the information and to allow rapid updating of construction work packages that include activities or items that are associated with the information.
  • a method of facilitating information retrieval from a plurality of construction records in which in one step a plurality of construction records is maintained in a construction database on a construction database server.
  • information external to the plurality of construction records is automatically acquired, wherein each of the construction records is associated with a plant component, a plant sub-component, and/or a work package.
  • the information is associated one or more construction records such as to allow automatic retrieval of multiple construction records using the information.
  • a user interface is configured to allow retrieval of the plurality of construction records based on the information.
  • the construction database includes one or more (logical or physical) sub-databases, including an engineering database, a component database, a work package database, an archive database, a project document and data management database, and a material manager database.
  • the step of automatically comprises a step of receiving a vendor record, receiving a quality control record, receiving a field report record, receiving data from an environmental sensor, receiving an RFID signal, and/or receiving a signal from a bar code reader.
  • the information external to the plurality of construction records includes at least one of construction material-associated data, vendor information, tool calibration data, quality control data, weather data, and personnel-associated data.
  • each of the construction records is associated with at least two of the plant component, the plant sub-component, and the work package, and/or that one of the multiple construction records belong to one of the plant component, the plant subcomponent, and the work package, that another of the multiple construction records belong to another of the plant component, the plant sub-component, and the work package, and that the one and the another are not the same.
  • the step of associating the information with the construction record comprises an automated import in response to an import request and/or an import from a mobile device.
  • a method of automatically modifying a work package, a plant component, or a plant sub-component in a construction project is contemplated.
  • Preferred methods will include a step of maintaining a plurality of construction records in a construction database on a construction database server, wherein each of the construction records is associated with at least one of a plant component, a plant sub-component, and a work package.
  • information external to the plurality of construction records is automatically acquired, and the information is then associated with at least one construction record of the plurality of construction records.
  • a work package is modified based on the information, and in a further step, a user interface is provided that is configured to allow retrieval of the modified work package.
  • the construction database comprises one or more databases, including an engineering database, a component database, a work package database, an archive database, a project document and data management database, and a material manager database.
  • the step of automatically acquiring is selected from the group consisting of receiving a vendor record, receiving a quality control record, receiving a field report record, receiving data from an environmental sensor, receiving an RFID signal, and receiving a signal from a bar code reader, and that the information external to the plurality of construction records is selected from the group consisting of construction material-associated data, vendor information, tool calibration data, quality control data, weather data, and personnel-associated data.
  • the step of associating the information with the construction record comprises an automated import in response to an import request, and/or an import from a mobile device.
  • Figure 1 is a schematic of an exemplary construction database with integration of external data according to the inventive subject matter.
  • Figure 2 is a schematic of an exemplary work package system with integration of external data according to the inventive subject matter.
  • Figure 3 is a schematic exemplary illustration of interrelations among various aspects in contemplated construction database and work package systems.
  • the present inventive subject matter is drawn to systems, configurations, and methods of automated acquisition and/or integration of external data into a construction database and/or work package system to so allow for rapid (typically post hoc) analysis of construction data and/or rapid modification of work packages based on the acquired external information.
  • the information is associated with at least one construction record in real-time or near real-time. Consequently, it should be appreciated that elements and/or status of various plant components and plant sub-components can be readily retrieved and analyzed on the basis of information that may be critical to assembly or operation of the plant but that is ordinarily not associated with a construction database. Similarly, work packages can be readily identified and modified on the basis of information that may be critical to assembly or operation of the plant but that is yet again ordinarily not associated with a construction database.
  • computing devices comprise a processor configured to execute software instructions stored on a computer readable storage medium (e.g., hard drive, RAM, flash, ROM, etc.).
  • the software instructions preferably configure the computing device to provide the roles, responsibilities, or other functionality as discussed below with respect to the specific apparatus.
  • the various servers, systems, databases, or interfaces exchange data using standardized protocols or algorithms, possibly based on HTTP, HTTPS, AES, public -private key exchanges, web service APIs, known financial transaction protocols, or other electronic information exchanging methods.
  • Data exchanges preferably are conducted over a packet-switched network, the Internet, LAN, WAN, VPN, or other type of packet switched network.
  • contemplated systems and methods are particularly advantageous for relatively complex engineering contracts, and especially for engineering in nuclear facilities where traceability for most of the work performed is required. As such requirements demand a significant amount of time to manage and track such work, heretofore known systems often failed to accurately and cost effectively plan, distribute, and manage construction work. Moreover, prior systems also often produced errors, which are especially undesirable where validation and tracking records are critical to safety. [0021] Among other desirable characteristics, contemplated systems and methods will allow automated acquisition of data external to construction records and further allow (preferably automated) association of the external data with at least some of the construction records. Thus, significant time savings in the review and/or analysis of construction projects as well as modification of work packages are possible at minimal operator input.
  • contemplated systems and methods even where the data or records belong to entirely different components or sub-components in a plant.
  • the external information is information on a batch number of faulty material
  • contemplated systems and methods will readily allow identification of all plant components, sub-components, and work packages that included the material, and will also allow modification of existing work packages to avoid or replace the faulty material.
  • exemplary external data or information includes material-associated data, vendor information, tool calibration data, quality control data, weather data, and/or personnel-associated data (infra).
  • a method of facilitating information retrieval from a plurality of construction records is contemplated in which construction records are maintained in a construction database on a construction database server.
  • information is automatically acquired that is external to the construction records, wherein in further preferred aspects each of the construction records is associated with at least one of a plant component, a plant sub-component, and a work package.
  • the external information is then associated with one or more construction records such as to allow automatic retrieval of multiple construction records using the same external information.
  • a user interface is provided that is configured to allow retrieval of the plurality of construction records based on the external information.
  • association of external information with various construction records in the construction database will also advantageously allow methods of automatically modifying a work package for a plant component or a plant sub-component in a construction project.
  • various construction records are maintained in a construction database on a construction database server, wherein each of the construction records is associated with a plant component, a plant sub-component, and/or a work package.
  • a work package is then generated using at least some of the construction records, and it is particularly preferred that information external to the plurality of construction records is automatically acquired. Once acquired, the information is then (preferably automatically) associated with at least one construction record of the plurality of construction records, and the work package is modified based on the information.
  • a user interface is configured and provided to allow retrieval of the modified work package.
  • a construction database 100 for a large scale construction project comprises an engineering database 110 (most typically comprising engineering software and associated functional modules) that is logically coupled to a component database 120 (typically comprising a project document and data management database, a materials manager database, a component database, a database in which tool and craft certification and calibration information is stored, a rules database, a quality control database, and an archive database).
  • component database 120 is logically coupled to a work package database 130 (typically comprising a work package system that functionally cooperates with various modules such as quality control modules, weld modules, certification modules, etc).
  • External data 140 are automatically acquired (e.g., via sensors, push notification, network data transfer, etc.) and relayed to at least one component of at least one of the engineering database 110, the component database 120, and the work package database 130.
  • Figure 2 exemplarily depicts a detail aspect of the system of Figure 1 where the work package system 210 comprises a work package query/planning section, a work package generator, a work package component statusing section, and a work package record section, each of which is logically coupled to various databases (e.g., object attribute database, component status database, archive database, and other functional modules [live tracking modules]).
  • external data 240 are preferably automatically acquired and also preferably automatically associated with one or more components of the work package system and/or associated databases.
  • construction databases may be physically single units having several logical sub-units.
  • the sub-units may be physically separate, but logically connected using communication protocols well known in the art. Further details and aspects of preferred construction databases and work package systems are provided in our co-pending International application with the serial number PCT/US09/59705, which is incorporated by reference herein.
  • the construction database comprises a plurality of records, and all known types of construction records are deemed suitable for use herein.
  • suitable records include engineering records (e.g., location description, functional information, interrelation of multiple parts within a structure or substructure, etc.), various component records (e.g., material type, weld type, etc.), numerous work package records (e.g., anticipated work to be completed, completed work, etc.), archive records, project document and data records, and procurement records.
  • engineering records e.g., location description, functional information, interrelation of multiple parts within a structure or substructure, etc.
  • various component records e.g., material type, weld type, etc.
  • numerous work package records e.g., anticipated work to be completed, completed work, etc.
  • archive records e.g., project document and data records
  • procurement records e.g., procurement records.
  • External information is then preferably (but not necessarily) automatically acquired via numerous routes. The specific route will at least in part depend on the type of external information and the origin of the external information.
  • the external information is a vendor record
  • the information may be provided in an electronic format using data structures well known in the art (e.g., XML, HTML, etc.) and may be imported into the construction database via direct vendor access, via request from the database, or via manual entry.
  • the external information is a quality control record (e.g., weld record, X-ray image, etc.)
  • the record may be produced from a dedicated field input device that is logically connected to the construction database.
  • portable devices e.g., smart phones, laptops, etc.
  • external information may also be provided from one or more environmental sensors that may be at the construction site or in a remote location (e.g., weather-related data at the site or provided by weather service).
  • RFID readers or transponders may be provide by one or more RFID readers or transponders, video capture devices, and/or bar code readers
  • the external information may be provided to the construction database in form of a single set of data, multiple sets of data, or as a continuous stream of data.
  • the data transfer may be performed using a wireless connection (e.g., cellular network, WiFi network, Bluetooth, etc.), via upload or other transfer using a local or wide area network (preferably with restricted access), via standard interface connections (e.g., USB2, RS323, etc.). Consequently, it is generally preferred that the external data are automatically (i.e., without manual user intervention) acquired, and also automatically transferred to the construction database.
  • a wireless connection e.g., cellular network, WiFi network, Bluetooth, etc.
  • standard interface connections e.g., USB2, RS323, etc.
  • the external information may also be manually acquired and/or manually entered into the construction database.
  • the external information is construction material-associated data (e.g., lot numbers, heat numbers, delivery date, delivery location, storage location, etc.), vendor information (e.g., vendor identification, vendor location, etc.), tool calibration data (e.g., pass/fail record, expiration date of calibration, calibration personnel), quality control data (e.g., weld inspection record, ultrasound records, X-ray records, etc.), weather data (e.g., temperature, precipitation, wind, humidity, etc.), and personnel-associated data (e.g., identity of worker, qualification record of worker, work packages assigned to specific worker, etc.).
  • use of such external data is particularly advantageous where one, more than one, or all of the each of the construction records are associated with at least two of the plant component, the plant sub-component, and the work package.
  • the external information may be acquired and/or associated with one or more construction records in an automated fashion and/or in response to a user and/or operator request.
  • the request may be provided from a user, a networked computer, and/or a mobile device.
  • the association of the external information is performed via logical association of the information with one or more fields in the construction database, and more preferably with one or more fields of at least one construction record.
  • external information may also be stored in a physically and/or logically separate database and then be logically connected to one or more
  • Figure 3 exemplarily depicts multiple associations in contemplated systems and methods.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

Systems and methods of construction management and quality control are presented in which activities and/or information external to construction data are automatically captured and associated in a hierarchical manner to allow coordinated retrieval of the activities and/or information across multiple components, sub-components, and/or work packages within a construction project. Among other advantages, contemplated systems and methods allow fast and coordinated retrieval of construction records as well as dynamic modification of work packages as a function of associated external information.

Description

INTEGRATION OF EXTERNAL DATA IN ELECTRONIC CONSTRUCTION DATA
MANAGEMENT
[0001] This application claims priority to International application with the serial number PCT/US09/59705, which is incorporated by reference herein. Field of The Invention
[0002] The field of the invention is automated integration of external data into construction data management for tracking, validation, and/or archiving of various parameters in highly complex construction environments.
Background of The Invention
[0003] As complexity and size of engineering projects increase, construction management has become increasingly important to control cost and man-hours. Moreover, where quality control records and certifications are required, or where traceability of work steps or workers are needed, demands on management are often substantial, particularly in the construction of nuclear facilities. [0004] To assist in scheduling, material flow, and work progress monitoring, numerous methods and systems are known in the art. For example, U.S. Pat. App. No. 2005/0171790 describes a construction simulator in which work and material flow is simulated prior to implementation. Similarly, U.S. Pat. App. No. 2003/0033187 describes a construction management system in which the construction and its progress is graphically represented in a three-dimensional model to so help optimize work flow. In yet another known method, as taught in U.S. Pat. App. No. 2005/0065826, a work flow optimizer is presented in which bottlenecks are identified and recommendations for rectification are provided. Still further, RFID tagging of construction components to improve and track construction progress is described in WO 2004/008306. [0005] While most of such known systems and methods provide at least some advantage in one or more areas of concern, various difficulties nevertheless remain. For example, certain parameters associated with activities and/or information that is external to construction data are often maintained separately and can not be easily retrieved in conjunction with selected construction data. Moreover, in all or almost all known cases, most external activities and/or information are manually recorded and will therefore be subject to significant time delays and human error. Such disadvantage is particularly undesirable where quality control and/or quality assurance activities uncover one or more areas or items of concern, and where the areas or items are distributed throughout a large construction project.
[0006] Consequently, there is still a considerable need for improved systems and methods for recording, maintaining, and associating external activities and/or information, especially as it relates to construction management and quality control.
Summary of the Invention
[0007] The present inventive subject matter is drawn to systems, configurations, and methods of automated recording and/or associating external activities and/or information with one or more construction records to so allow coordinated and rapid retrieval of multiple construction records that are associated with the information and to allow rapid updating of construction work packages that include activities or items that are associated with the information.
[0008] In one aspect of the inventive subject matter, a method of facilitating information retrieval from a plurality of construction records is contemplated in which in one step a plurality of construction records is maintained in a construction database on a construction database server. In another step, information external to the plurality of construction records is automatically acquired, wherein each of the construction records is associated with a plant component, a plant sub-component, and/or a work package. In yet another step, the information is associated one or more construction records such as to allow automatic retrieval of multiple construction records using the information. A user interface is configured to allow retrieval of the plurality of construction records based on the information.
[0009] While not limiting to the inventive subject matter, it is typically preferred that the construction database includes one or more (logical or physical) sub-databases, including an engineering database, a component database, a work package database, an archive database, a project document and data management database, and a material manager database. It is further generally preferred that the step of automatically comprises a step of receiving a vendor record, receiving a quality control record, receiving a field report record, receiving data from an environmental sensor, receiving an RFID signal, and/or receiving a signal from a bar code reader. In most embodiments, the information external to the plurality of construction records includes at least one of construction material-associated data, vendor information, tool calibration data, quality control data, weather data, and personnel-associated data. [0010] It is further contemplated that each of the construction records is associated with at least two of the plant component, the plant sub-component, and the work package, and/or that one of the multiple construction records belong to one of the plant component, the plant subcomponent, and the work package, that another of the multiple construction records belong to another of the plant component, the plant sub-component, and the work package, and that the one and the another are not the same. Additionally, it is preferred that the step of associating the information with the construction record comprises an automated import in response to an import request and/or an import from a mobile device.
[0011] In another aspect of the inventive subject matter, a method of automatically modifying a work package, a plant component, or a plant sub-component in a construction project is contemplated. Preferred methods will include a step of maintaining a plurality of construction records in a construction database on a construction database server, wherein each of the construction records is associated with at least one of a plant component, a plant sub-component, and a work package. In another step, information external to the plurality of construction records is automatically acquired, and the information is then associated with at least one construction record of the plurality of construction records. In yet another step, a work package is modified based on the information, and in a further step, a user interface is provided that is configured to allow retrieval of the modified work package.
[0012] As before, it is generally preferred that the construction database comprises one or more databases, including an engineering database, a component database, a work package database, an archive database, a project document and data management database, and a material manager database. Most typically, it is preferred that the step of automatically acquiring is selected from the group consisting of receiving a vendor record, receiving a quality control record, receiving a field report record, receiving data from an environmental sensor, receiving an RFID signal, and receiving a signal from a bar code reader, and that the information external to the plurality of construction records is selected from the group consisting of construction material-associated data, vendor information, tool calibration data, quality control data, weather data, and personnel-associated data.
[0013] It is further preferred that the step of associating the information with the construction record comprises an automated import in response to an import request, and/or an import from a mobile device. [0014] Various objects, features, aspects and advantages of the present invention will become more apparent from the following detailed description of preferred embodiments of the invention.
Brief Description of the Drawing
[0015] Figure 1 is a schematic of an exemplary construction database with integration of external data according to the inventive subject matter.
[0016] Figure 2 is a schematic of an exemplary work package system with integration of external data according to the inventive subject matter.
[0017] Figure 3 is a schematic exemplary illustration of interrelations among various aspects in contemplated construction database and work package systems.
Detailed Description
[0018] The present inventive subject matter is drawn to systems, configurations, and methods of automated acquisition and/or integration of external data into a construction database and/or work package system to so allow for rapid (typically post hoc) analysis of construction data and/or rapid modification of work packages based on the acquired external information. In particularly preferred aspects, the information is associated with at least one construction record in real-time or near real-time. Consequently, it should be appreciated that elements and/or status of various plant components and plant sub-components can be readily retrieved and analyzed on the basis of information that may be critical to assembly or operation of the plant but that is ordinarily not associated with a construction database. Similarly, work packages can be readily identified and modified on the basis of information that may be critical to assembly or operation of the plant but that is yet again ordinarily not associated with a construction database.
[0019] It should be noted that while the following description is drawn to a computer/server based construction data processing system, various alternative configurations are also deemed suitable and may employs various computing devices including servers, interfaces, systems, databases, or other types of computing devices operating individually or collectively. One should appreciate the computing devices comprise a processor configured to execute software instructions stored on a computer readable storage medium (e.g., hard drive, RAM, flash, ROM, etc.). The software instructions preferably configure the computing device to provide the roles, responsibilities, or other functionality as discussed below with respect to the specific apparatus. In especially preferred embodiments, the various servers, systems, databases, or interfaces exchange data using standardized protocols or algorithms, possibly based on HTTP, HTTPS, AES, public -private key exchanges, web service APIs, known financial transaction protocols, or other electronic information exchanging methods. Data exchanges preferably are conducted over a packet-switched network, the Internet, LAN, WAN, VPN, or other type of packet switched network.
[0020] It should be appreciated that contemplated systems and methods are particularly advantageous for relatively complex engineering contracts, and especially for engineering in nuclear facilities where traceability for most of the work performed is required. As such requirements demand a significant amount of time to manage and track such work, heretofore known systems often failed to accurately and cost effectively plan, distribute, and manage construction work. Moreover, prior systems also often produced errors, which are especially undesirable where validation and tracking records are critical to safety. [0021] Among other desirable characteristics, contemplated systems and methods will allow automated acquisition of data external to construction records and further allow (preferably automated) association of the external data with at least some of the construction records. Thus, significant time savings in the review and/or analysis of construction projects as well as modification of work packages are possible at minimal operator input. Moreover, analysis and information retrieval is possible with contemplated systems and methods, even where the data or records belong to entirely different components or sub-components in a plant. For example, where the external information is information on a batch number of faulty material, contemplated systems and methods will readily allow identification of all plant components, sub-components, and work packages that included the material, and will also allow modification of existing work packages to avoid or replace the faulty material.
[0022] As used herein, the term "external" in conjunction with the term "information" or "data" refers to information or data that are not parameters that are essential to describe the structure or function of a plant component or plant sub-component, and/or contents of a work package. For example, exemplary external data or information includes material-associated data, vendor information, tool calibration data, quality control data, weather data, and/or personnel-associated data (infra). [0023] In one aspect of the inventive subject matter, a method of facilitating information retrieval from a plurality of construction records is contemplated in which construction records are maintained in a construction database on a construction database server. Most preferably, information is automatically acquired that is external to the construction records, wherein in further preferred aspects each of the construction records is associated with at least one of a plant component, a plant sub-component, and a work package. The external information is then associated with one or more construction records such as to allow automatic retrieval of multiple construction records using the same external information. Preferably, a user interface is provided that is configured to allow retrieval of the plurality of construction records based on the external information.
[0024] It should be noted that association of external information with various construction records in the construction database will also advantageously allow methods of automatically modifying a work package for a plant component or a plant sub-component in a construction project. In especially preferred methods, various construction records are maintained in a construction database on a construction database server, wherein each of the construction records is associated with a plant component, a plant sub-component, and/or a work package. A work package is then generated using at least some of the construction records, and it is particularly preferred that information external to the plurality of construction records is automatically acquired. Once acquired, the information is then (preferably automatically) associated with at least one construction record of the plurality of construction records, and the work package is modified based on the information. As before, it is generally preferred that a user interface is configured and provided to allow retrieval of the modified work package.
[0025] For example, as exemplarily depicted in Figure 1, a construction database 100 for a large scale construction project (e.g., nuclear power plant) comprises an engineering database 110 (most typically comprising engineering software and associated functional modules) that is logically coupled to a component database 120 (typically comprising a project document and data management database, a materials manager database, a component database, a database in which tool and craft certification and calibration information is stored, a rules database, a quality control database, and an archive database). Component database 120 is logically coupled to a work package database 130 (typically comprising a work package system that functionally cooperates with various modules such as quality control modules, weld modules, certification modules, etc). External data 140 are automatically acquired (e.g., via sensors, push notification, network data transfer, etc.) and relayed to at least one component of at least one of the engineering database 110, the component database 120, and the work package database 130. [0026] Figure 2 exemplarily depicts a detail aspect of the system of Figure 1 where the work package system 210 comprises a work package query/planning section, a work package generator, a work package component statusing section, and a work package record section, each of which is logically coupled to various databases (e.g., object attribute database, component status database, archive database, and other functional modules [live tracking modules]). Once more, external data 240 are preferably automatically acquired and also preferably automatically associated with one or more components of the work package system and/or associated databases. Of course, it should be recognized that various permutations and arrangements other than those depicted in Figure 1 are deemed suitable for use herein. For example, construction databases may be physically single units having several logical sub-units. Likewise, the sub-units may be physically separate, but logically connected using communication protocols well known in the art. Further details and aspects of preferred construction databases and work package systems are provided in our co-pending International application with the serial number PCT/US09/59705, which is incorporated by reference herein. [0027] In especially preferred aspects, the construction database comprises a plurality of records, and all known types of construction records are deemed suitable for use herein. For example, suitable records include engineering records (e.g., location description, functional information, interrelation of multiple parts within a structure or substructure, etc.), various component records (e.g., material type, weld type, etc.), numerous work package records (e.g., anticipated work to be completed, completed work, etc.), archive records, project document and data records, and procurement records. Of course, it should be appreciated that the construction records contemplated herein may be stored in a single database on a single server, or in multiple independent or logically connected databases on physically distinct servers. [0028] External information is then preferably (but not necessarily) automatically acquired via numerous routes. The specific route will at least in part depend on the type of external information and the origin of the external information. For example, where the external information is a vendor record, the information may be provided in an electronic format using data structures well known in the art (e.g., XML, HTML, etc.) and may be imported into the construction database via direct vendor access, via request from the database, or via manual entry. On the other hand, where the external information is a quality control record (e.g., weld record, X-ray image, etc.), the record may be produced from a dedicated field input device that is logically connected to the construction database. Alternatively, portable devices (e.g., smart phones, laptops, etc.) may be configured with software to provide external information (e.g., incident pictures, security reports, etc.) via a wireless network to so provide a field report record. In still further contemplated aspects, external information may also be provided from one or more environmental sensors that may be at the construction site or in a remote location (e.g., weather-related data at the site or provided by weather service).
Additionally contemplated external information may be provide by one or more RFID readers or transponders, video capture devices, and/or bar code readers
[0029] Thus, it should be appreciated that the external information may be provided to the construction database in form of a single set of data, multiple sets of data, or as a continuous stream of data. Moreover, and depending on the type of data source, it should be appreciated that the data transfer may be performed using a wireless connection (e.g., cellular network, WiFi network, Bluetooth, etc.), via upload or other transfer using a local or wide area network (preferably with restricted access), via standard interface connections (e.g., USB2, RS323, etc.). Consequently, it is generally preferred that the external data are automatically (i.e., without manual user intervention) acquired, and also automatically transferred to the construction database. However, it should be noted that in at least some instances, the external information may also be manually acquired and/or manually entered into the construction database. [0030] Among other suitable external information, it is especially preferred that the external information is construction material-associated data (e.g., lot numbers, heat numbers, delivery date, delivery location, storage location, etc.), vendor information (e.g., vendor identification, vendor location, etc.), tool calibration data (e.g., pass/fail record, expiration date of calibration, calibration personnel), quality control data (e.g., weld inspection record, ultrasound records, X-ray records, etc.), weather data (e.g., temperature, precipitation, wind, humidity, etc.), and personnel-associated data (e.g., identity of worker, qualification record of worker, work packages assigned to specific worker, etc.). use of such external data is particularly advantageous where one, more than one, or all of the each of the construction records are associated with at least two of the plant component, the plant sub-component, and the work package.
[0031] Viewed from a different perspective, the external information may be acquired and/or associated with one or more construction records in an automated fashion and/or in response to a user and/or operator request. The request may be provided from a user, a networked computer, and/or a mobile device. Most typically, the association of the external information is performed via logical association of the information with one or more fields in the construction database, and more preferably with one or more fields of at least one construction record. Alternatively, external information may also be stored in a physically and/or logically separate database and then be logically connected to one or more
construction records in the construction database. Figure 3 exemplarily depicts multiple associations in contemplated systems and methods.
[0032] In the association contemplated herein, using specific external information as a query will readily identify one or more plant components/sub-components, and/or work package that is associated or affected by the external information. Similarly, it is generally preferred that one of the multiple construction records belong to one of the plant component, the plant sub-component, and the work package, and that another of the multiple construction records belongs to another of the plant component, the plant sub-component, and the work package, and wherein the one and the another are not the same. Thus, disparate records are easily retrievable using external data where the data are associated with different components, subcomponents, and/or work packages.
[0033] Thus, specific compositions and methods of integration of external data in electronic construction data management have been disclosed. It should be apparent, however, to those skilled in the art that many more modifications besides those already described are possible without departing from the inventive concepts herein. The inventive subject matter, therefore, is not to be restricted except in the spirit of the appended claims. Moreover, in interpreting both the specification and the claims, all terms should be interpreted in the broadest possible manner consistent with the context. In particular, the terms "comprises" and "comprising" should be interpreted as referring to elements, components, or steps in a non-exclusive manner, indicating that the referenced elements, components, or steps may be present, or utilized, or combined with other elements, components, or steps that are not expressly referenced. Furthermore, where a definition or use of a term in a reference, which is incorporated by reference herein is inconsistent or contrary to the definition of that term provided herein, the definition of that term provided herein applies and the definition of that term in the reference does not apply.

Claims

CLAIMS What is claimed is:
1. A method of facilitating information retrieval from a plurality of construction records, comprising:
maintaining a plurality of construction records in a construction database on a
construction database server;
automatically acquiring information external to the plurality of construction records, wherein each of the construction records is associated with at least one of a plant component, a plant sub-component, and a work package; associating the information with at least one construction record of the plurality of construction records in a manner to allow automatic retrieval of multiple construction records using the information; and
providing a user interface that is configured to allow retrieval of the plurality of
construction records based on the information.
2. The method of claim 1 wherein the construction database comprises a plurality of records selected from the group consisting of engineering records, component records, work package records, archive records, project document and data records, and procurement records.
3. The method of claim 1 wherein the step of automatically acquiring is selected from the group consisting of receiving a vendor record, receiving a quality control record, receiving a field report record, receiving data from an environmental sensor, receiving an RFID signal, and receiving a signal from a bar code reader.
4. The method of claim 1 wherein the information external to the plurality of
construction records is selected form the group consisting of construction material- associated data, vendor information, tool calibration data, quality control data, weather data, and personnel-associated data.
5. The method of claim 1 wherein each of the construction records is associated with at least two of the plant component, the plant sub-component, and the work package.
6. The method of claim 5 wherein one of the multiple construction records belong to one of the plant component, the plant sub-component, and the work package, and wherein another of the multiple construction records belong to another of the plant component, the plant sub-component, and the work package, and wherein the one and the another are not the same.
7. The method of claim 1 wherein one of the multiple construction records belong to one of the plant component, the plant sub-component, and the work package, and wherein another of the multiple construction records belong to another of the plant component, the plant sub-component, and the work package, and wherein the one and the another are not the same.
8. The method of claim 1 wherein the step of associating the information with the at least one construction record comprises an automated import in response to an import request.
9. The method of claim 1 wherein the step of associating the information with the at least one construction record comprises an import from a mobile device.
10. A method of automatically modifying a work package a plant component or a plant sub-component in a construction project, comprising:
maintaining a plurality of construction records in a construction database on a
construction database server, wherein each of the construction records is associated with at least one of a plant component, a plant sub-component, and a work package;
automatically acquiring information external to the plurality of construction records; associating the information with at least one construction record of the plurality of construction records;
modifying a work package based on the information; and
providing a user interface that is configured to allow retrieval of the modified work package.
11. The method of claim 10 wherein the construction database comprises a plurality of records selected from the group consisting of engineering records, component records, work package records, archive records, project document and data records, and procurement records.
12. The method of claim 10 wherein the step of automatically acquiring is selected from the group consisting of receiving a vendor record, receiving a quality control record, receiving a field report record, receiving data from an environmental sensor, receiving an RFID signal, and receiving a signal from a bar code reader.
13. The method of claim 10 wherein the information external to the plurality of
construction records is selected form the group consisting of construction material- associated data, vendor information, tool calibration data, quality control data, weather data, and personnel-associated data
14. The method of claim 10 wherein the step of associating the information with the at least one construction record comprises an automated import in response to an import request.
15. The method of claim 10 wherein the step of associating the information with the at least one construction record comprises an import from a mobile device.
PCT/US2010/035624 2009-10-06 2010-05-20 Integration of external data in electronic construction data management Ceased WO2011043848A1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
JP2012533146A JP2013506933A (en) 2009-10-06 2010-05-20 Integration of external data in electronic construction data management
IN3010DEN2012 IN2012DN03010A (en) 2009-10-06 2010-05-20
CA2777168A CA2777168A1 (en) 2009-10-06 2010-05-20 Integration of external data in electronic construction data management
AU2010303893A AU2010303893A1 (en) 2009-10-06 2010-05-20 Integration of external data in electronic construction data management
EP10822373.6A EP2486484A4 (en) 2009-10-06 2010-05-20 Integration of external data in electronic construction data management
CN201080055281.0A CN102763084A (en) 2009-10-06 2010-05-20 Integration of External Data in Electronic Structure Data Management
ZA2012/02897A ZA201202897B (en) 2009-10-06 2012-04-19 Integration of external data in electronic construction data management

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
USPCT/US2009/059705 2009-10-06
PCT/US2009/059705 WO2010042524A1 (en) 2008-10-06 2009-10-06 Systems and methods of integrated and automated generation of work packages

Publications (1)

Publication Number Publication Date
WO2011043848A1 true WO2011043848A1 (en) 2011-04-14

Family

ID=43857798

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2010/035624 Ceased WO2011043848A1 (en) 2009-10-06 2010-05-20 Integration of external data in electronic construction data management

Country Status (8)

Country Link
EP (1) EP2486484A4 (en)
JP (1) JP2013506933A (en)
CN (1) CN102763084A (en)
AU (1) AU2010303893A1 (en)
CA (1) CA2777168A1 (en)
IN (1) IN2012DN03010A (en)
WO (1) WO2011043848A1 (en)
ZA (1) ZA201202897B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117875790A (en) * 2024-02-03 2024-04-12 浙江方大通信有限公司 A construction engineering construction quality supervision early warning system and method
CN118052521A (en) * 2024-02-29 2024-05-17 江苏丰阳建设工程有限公司 Building construction management method and system based on artificial intelligence

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160314439A1 (en) * 2015-04-22 2016-10-27 Aktiebolaget Skf Work package management

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030033179A1 (en) * 2001-08-09 2003-02-13 Katz Steven Bruce Method for generating customized alerts related to the procurement, sourcing, strategic sourcing and/or sale of one or more items by an enterprise
US20050027386A1 (en) * 2003-07-30 2005-02-03 Michele Weigand Decentralized project management system
US6885903B2 (en) * 2001-07-10 2005-04-26 General Electric Company Method and system for tracking repair of components
US20050131947A1 (en) * 2003-12-12 2005-06-16 Udo Laub Data processing system and method
US7518511B1 (en) * 2005-03-01 2009-04-14 Ravi Panja Dynamic product tracking system using RFID
US20090150197A1 (en) * 2007-12-11 2009-06-11 Strauss David V System and method for managing the surety status reporting process
US20090292580A1 (en) * 2008-05-23 2009-11-26 International Business Machines Corporation Ambient project management

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0117784D0 (en) * 2001-07-20 2001-09-12 Start Global Ltd Improvements relating to process control
EP1464005A4 (en) * 2002-01-11 2005-04-13 Sap Ag CONTEXTIC AND REAL-TIME ARTICLE TRACKING SYSTEM ARCHITECTURE AND SCENARIOS
JP2004030372A (en) * 2002-06-27 2004-01-29 Komatsu Ltd Data reference system, data reference method, and program for causing computer to execute this method
JP2006164112A (en) * 2004-12-10 2006-06-22 Ohbayashi Corp Project management system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6885903B2 (en) * 2001-07-10 2005-04-26 General Electric Company Method and system for tracking repair of components
US20030033179A1 (en) * 2001-08-09 2003-02-13 Katz Steven Bruce Method for generating customized alerts related to the procurement, sourcing, strategic sourcing and/or sale of one or more items by an enterprise
US20050027386A1 (en) * 2003-07-30 2005-02-03 Michele Weigand Decentralized project management system
US20050131947A1 (en) * 2003-12-12 2005-06-16 Udo Laub Data processing system and method
US7518511B1 (en) * 2005-03-01 2009-04-14 Ravi Panja Dynamic product tracking system using RFID
US20090150197A1 (en) * 2007-12-11 2009-06-11 Strauss David V System and method for managing the surety status reporting process
US20090292580A1 (en) * 2008-05-23 2009-11-26 International Business Machines Corporation Ambient project management

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2486484A4 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117875790A (en) * 2024-02-03 2024-04-12 浙江方大通信有限公司 A construction engineering construction quality supervision early warning system and method
CN118052521A (en) * 2024-02-29 2024-05-17 江苏丰阳建设工程有限公司 Building construction management method and system based on artificial intelligence

Also Published As

Publication number Publication date
CN102763084A (en) 2012-10-31
JP2013506933A (en) 2013-02-28
CA2777168A1 (en) 2011-04-14
EP2486484A1 (en) 2012-08-15
EP2486484A4 (en) 2014-10-29
ZA201202897B (en) 2014-10-29
IN2012DN03010A (en) 2015-07-31
AU2010303893A1 (en) 2012-05-03

Similar Documents

Publication Publication Date Title
US12066979B2 (en) Intelligent and automated review of industrial asset integrity data
US11392110B2 (en) Information management system
JP6205757B2 (en) Control system, control apparatus, image processing apparatus, and control method
CN106249707B (en) Information collection system and information collection method
CA2910715C (en) Method and system for systematization of production-process video data
US20130253968A1 (en) Facility control system (fcs, c1) to manage assets planning, design, construction, fabrication, operating, maintence and products
Back et al. A study for production simulation model generation system based on data model at a shipyard
CN112016870A (en) Intelligent warehousing system
CN103870921A (en) Operation maintenance management system
US20110178935A1 (en) Systems And Methods Of Integrated And Automated Generation Of Work Packages
EP2486484A1 (en) Integration of external data in electronic construction data management
CN118348920A (en) Production data inspection method, inspection system and storage medium
CN106469074B (en) Update system and application method thereof
Asare et al. Building information modelling for airport facility management: The case of a US airport
JP4347685B2 (en) Building management system
RU2672307C2 (en) Method (options) for systematization of video data production process and system (options)
CN107708070A (en) GIS coordinate systems collection positioning method for uploading and system based on NFC label
CN113450016A (en) Fixed asset management system based on BIM technology
RU2615247C1 (en) Integrated system of security and control of operations for complex technical systems
CN121215212B (en) Medical equipment maintenance system, method, terminal and medium based on augmented reality
RU56684U1 (en) AUTOMATED DATA PROCESSING SYSTEM RELATING TO PROPERTY OBJECTS
Azra et al. The maintenance process improvement of radiological health equipment, by utilizing internet of things (IoT)
CHANG et al. Development of mobile BIM-assisted defect management system for quality inspection of building projects
CN121525653A (en) A method and system for generating automated operation compliance reports
Kor et al. A Literature Study on Digital Technology Applications in China Construction Industry

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080055281.0

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10822373

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2010303893

Country of ref document: AU

Ref document number: 2012533146

Country of ref document: JP

Ref document number: 2010822373

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 3010/DELNP/2012

Country of ref document: IN

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2777168

Country of ref document: CA

ENP Entry into the national phase

Ref document number: 2010303893

Country of ref document: AU

Date of ref document: 20100520

Kind code of ref document: A