WO2011059535A1 - Method and apparatus for reservoir modeling and simulation - Google Patents
Method and apparatus for reservoir modeling and simulation Download PDFInfo
- Publication number
- WO2011059535A1 WO2011059535A1 PCT/US2010/043462 US2010043462W WO2011059535A1 WO 2011059535 A1 WO2011059535 A1 WO 2011059535A1 US 2010043462 W US2010043462 W US 2010043462W WO 2011059535 A1 WO2011059535 A1 WO 2011059535A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- grid
- dimensional
- constraints
- image
- cells
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V99/00—Subject matter not provided for in other groups of this subclass
Definitions
- aspects disclosed herein relate to a method and apparatus for reservoir modeling and/or reservoir simulation, particularly but not exclusively to a method and apparatus for generating a grid for a reservoir model.
- FIG. 1 illustrates a complex reservoir geometry which contains multiple fault surfaces which deviate from the vertical direction.
- a structural framework outlines the major components of the reservoir and it is often used to model the fluid volumes located in the reservoir and the fluid movement during production. It is therefore helpful for the structural framework to be modeled accurately.
- Voronoi grids constructed by the projection or extrusion of a 2D Voronoi grid in a vertical or near vertical direction, are widely accepted for reservoir simulations (see, for example, WO 2008/150325).
- the prismatic grid cells can be easily constrained to resolve horizons or stratigraphic layer boundaries.
- Voronoi grids are much more flexible and adaptive than structured corner point grids which are commonly used in reservoir simulators.
- Voronoi grids generally require fewer grid cells to represent and simulate the geometry in comparison to conventional corner point grids. This reduces computing power requirements whilst the accuracy of the models is not compromised.
- generating an accurate constrained grid still poses problems and as a result, the accuracy of reservoir models for complex reservoir geometries is still compromised.
- U.S. Patent No. 6,106,561 discloses a simulation gridding method and apparatus including a structured area gridder adapted for use by a reservoir simulator. This disclosure is concerned with generating a 2.5D structured grid based on segmented coordinate lines. Coordinate lines are vertical or near vertical lines which approximate the fault surface geometry. An areal 2D grid is projected along the coordinate lines to form a 2.5D prismatic grid. This gridding method cannot cope with complex system of faults or highly-deviated (from vertical) faults, as this results in unacceptable grids with inside-out cells and vertices outside of the model domain.
- a method of generating a three-dimensional simulation grid for a reservoir model comprising: providing a geological model comprising horizons, constraints and multiple geological grid cells; constructing a pre-image corresponding to the geological grid cells, said pre-image comprising a surface, said modeling constraints being mapped onto said surface; generating a constrained two- dimensional grid on the pre-image, the two-dimensional grid comprising multiple grid cells; selecting simulation layer boundaries from said geological model and projecting the constrained two-dimensional grid onto said simulation layer boundaries; generating prismatic cells to form the three-dimensional simulation grid; and outputting the three-dimensional simulation grid.
- the grid is thus effectively constructed from a pre-image containing the constraints from the geological model. This enables faults to be accurately represented by the grid.
- the pre-image may be constructed by selecting a parametric space corresponding to a base horizon.
- the parametric space may comprise multiple vertices.
- the vertices may be moved to correspond with the location of the constraints in the geological model.
- the constraints may be approximated in the three- dimensional space of a geological model and the constraints may be mapped onto the pre- image.
- the pre-image may be adjusted to match the constraints. Edges of the pre-image grid are matched to the corresponding constraints on the pre-image.
- the pre-image may be constructed by defining a continuous base horizon surface across one or more faults, smoothing the continuous base horizon, and projecting the continuous base horizon onto a plane to form the pre-image, the pre-image including multiple vertices.
- Fault vertices of the base horizon may be merged to locate the fault vertices on the continuous base horizon.
- the fault vertices on the continuous base horizon surface may be located equidistant from the fault intersections of the base horizon on either side of the fault.
- the continuous base horizon may be smoothed by moving one or more vertices in a k-direction of the geological model.
- the base horizon may be projected vertically onto the plane to form the pre-image.
- the constrained two-dimensional grid may be generated on the pre-image.
- the two-dimensional grid cells may include identifiers corresponding to the grid cells of the geological model.
- the grid cells may be projected along k direction lines of the geological grid cells.
- the constraints may include internal constraints and/or external constraints, the constraints including modeling constraints for simulation grid generation representing subsurface reservoir elements.
- the internal constraints may be included in the geological model.
- the external constraints may include modeling constraints ancillary to the geological model. Hydrocarbons in a hydrocarbon reservoir may be managed using the three-dimensional simulation grid.
- a simulation gridding apparatus for generating a grid for a reservoir model comprising the following features, which may be computer-based: a geological model comprising horizons, constraints and multiple geological grid cells; a pre-image corresponding to the geological grid cells, said pre-image comprising a surface, the modeling constraints being mapped onto the surface; a generator for generating a constrained two-dimensional grid on the pre-image, the two-dimensional grid comprising multiple grid cells; a selector for selecting simulation layer boundaries from the geological model and a projector for projecting the constrained two-dimensional grid onto the simulation layer boundaries; a generator for generating prismatic cells to form the three-dimensional simulation grid; a transferor for transferring reservoir properties to the three-dimensional simulation grid; a definer for defining state variables and/or state parameters for each grid cell in the three-dimensional simulation grid; and a solver for simulating physical and chemical processes related to hydrocarbon production on the three-dimensional simulation grid.
- the two-dimensional grid cells may include identifiers corresponding to the grid cells of the geological model.
- the constraints may include at least one of internal constraints and external constraints.
- the internal constraints may include modeling constraints for simulation grid generation representing subsurface reservoir elements.
- the external constraints may include modeling constraints ancillary to the reservoir.
- the reservoir simulator includes a gridding apparatus having: a geological model comprising horizons, constraints and multiple geological grid cells; a pre-image corresponding to the geological grid cells, the pre-image comprising a surface, the modeling constraints being mapped onto the surface; a generator for generating a constrained two-dimensional grid on the pre-image, the two-dimensional grid comprising multiple grid cells; simulation layer boundaries selected from the geological model and a projector for projecting the constrained two-dimensional grid onto said simulation layer boundaries; and a generator for generating prismatic cells from the two- dimensional grid to form the three-dimensional simulation grid.
- the reservoir simulator also includes computer based transfer means for transferring reservoir properties to the three- dimensional simulation grid, and a solver for simulating physical and chemical processes related to hydrocarbon production on the three-dimensional simulation grid based on state variables and/or state parameters for each grid cell in the three-dimensional simulation grid.
- a program storage device is provided.
- the program storage device is readable by a machine and tangibly embodying a program of instructions executable by the machine.
- the instructions include: code for providing a geological model comprising horizons, constraints and multiple geological grid cells; code for constructing a pre-image corresponding to the geological grid cells, said pre-image comprising a surface, said modeling constraints being mapped onto said surface; code for generating a constrained two-dimensional grid on the pre- image, the two-dimensional grid comprising multiple grid cells; code for selecting simulation layer boundaries from said geological model and projecting the constrained two-dimensional grid onto said simulation layer boundaries; and code for generating prismatic cells from the two-dimensional grid to form the three-dimensional simulation grid.
- Figure 1 shows a diagrammatic view of a complex structural framework of a reservoir
- Figure 2 shows a diagrammatic flow chart of the method steps according to disclosed aspects
- Figures 3A-3C show a diagrammatic view of a base horizon, its corresponding parametric space, and its final pre-image;
- Figures 4A and 4B show a pre-image modification;
- Figures 5A and 5B show the simplification of original constraints into simplified constraints
- Figures 6A and 6B show the modification of an original pre-image by coinciding constraint edges of the parametric space with the simplified constraints of the pre-image
- Figures 7A and 7B show a base horizon and its vertical projection or pre-image
- Figures 8A and 8B show a smoothed pre-image surface and its vertical projection or pre-image
- Figures 9A-9E show the projection of a two-dimensional grid onto a simulation layer boundary
- Figure 10 is a block diagram illustrating a computer environment
- Figure 11 is a block diagram of machine-readable code
- Figure 12 is a side elevational view of a hydrocarbon management activity
- Figure 13 is a flowchart of a method of extracting hydrocarbons from a subsurface region.
- Embodiments disclosed herein also relate to an apparatus for performing the operations herein.
- This apparatus may be specially constructed for the required purposes, or it may comprise a general-purpose computer selectively activated or reconfigured by a computer program or code stored in the computer.
- Such a computer program or code may be stored or encoded in a computer readable medium or implemented over some type of transmission medium.
- a computer-readable medium includes any medium or mechanism for storing or transmitting information in a form readable by a machine, such as a computer ('machine' and 'computer' are used synonymously herein).
- a computer-readable medium may include a computer-readable storage medium (e.g., read only memory (“ROM”), random access memory (“RAM”), magnetic disk storage media, optical storage media, flash memory devices, etc.).
- a transmission medium may be twisted wire pairs, coaxial cable, optical fiber, or some other suitable transmission medium, for transmitting signals such as electrical, optical, acoustical or other form of propagated signals (e.g., carrier waves, infrared signals, digital signals, etc.).
- modules, features, attributes, methodologies, and other aspects can be implemented as software, hardware, firmware or any combination thereof.
- a component of the invention is implemented as software, the component can be implemented as a standalone program, as part of a larger program, as a plurality of separate programs, as a statically or dynamically linked library, as a kernel loadable module, as a device driver, and/or in every and any other way known now or in the future to those of skill in the art of computer programming.
- the invention is not limited to implementation in any specific operating system or environment.
- displaying includes a direct act that causes displaying, as well as any indirect act that facilitates displaying.
- Indirect acts include providing software to an end user, maintaining a website through which a user is enabled to affect a display, hyperlinking to such a website, or cooperating or partnering with an entity who performs such direct or indirect acts.
- a first party may operate alone or in cooperation with a third party vendor to enable the reference signal to be generated on a display device.
- the display device may include any device suitable for displaying the reference image, such as without limitation a CRT monitor, a LCD monitor, a plasma device, a flat panel device, or printer.
- the display device may include a device which has been calibrated through the use of any conventional software intended to be used in evaluating, correcting, and/or improving display results (e.g., a color monitor that has been adjusted using monitor calibration software).
- a method may include providing a reference image to a subject. "Providing a reference image” may include creating or distributing the reference image to the subject by physical, telephonic, or electronic delivery, providing access over a network to the reference, or creating or distributing software to the subject configured to run on the subject's workstation or computer including the reference image.
- the providing of the reference image could involve enabling the subject to obtain the reference image in hard copy form via a printer.
- information, software, and/or instructions could be transmitted (e.g., electronically or physically via a data storage device or hard copy) and/or otherwise made available (e.g., via a network) in order to facilitate the subject using a printer to print a hard copy form of reference image.
- the printer may be a printer which has been calibrated through the use of any conventional software intended to be used in evaluating, correcting, and/or improving printing results (e.g., a color printer that has been adjusted using color correction software).
- "exemplary" is used exclusively herein to mean “serving as an example, instance, or illustration.” Any aspect described herein as "exemplary” is not necessarily to be construed as preferred or advantageous over other aspects.
- hydrocarbon reservoirs include reservoirs containing any hydrocarbon substance, including for example one or more than one of any of the following: oil (often referred to as petroleum), natural gas, gas condensate, tar and bitumen.
- hydrocarbon management or “managing hydrocarbons” includes hydrocarbon extraction, hydrocarbon production, hydrocarbon exploration, identifying potential hydrocarbon resources, identifying well locations, determining well injection and/or extraction rates, identifying reservoir connectivity, acquiring, disposing of and/or abandoning hydrocarbon resources, reviewing prior hydrocarbon management decisions, and any other hydrocarbon-related acts or activities.
- machine-readable medium refers to a medium that participates in directly or indirectly providing signals, instructions and/or data.
- a machine-readable medium may take forms, including, but not limited to, non-volatile media (e.g. ROM, disk) and volatile media (RAM).
- Machine-readable medium include, but are not limited to, a floppy disk, a flexible disk, a hard disk, a magnetic tape, other magnetic medium, a CD-ROM, other optical medium, punch cards, paper tape, other physical medium with patterns of holes, a RAM, a ROM, an EPROM, a FLASH-EPROM, or other memory chip or card, a memory stick, and other media from which a computer, a processor or other electronic device can read.
- geological model is a representation of the subsurface earth volume in three dimensions.
- the geological model is preferably represented by a structured three-dimensional grid.
- the geological model may be computer-based.
- pre-image is a surface representative of the areal geometry of a geological model.
- grid cell or "3D grid cell” is a unital block that defines a portion of a three-dimensional reservoir model.
- a three-dimensional reservoir model may include a number of grid cells, ranging from tens and hundreds to thousands and millions of grid cells.
- Each grid cell may represent a specifically allocated portion of the three- dimensional reservoir model.
- An entire set of grid cells may constitute a grid which forms a geologic model that represents a sub-surface earth volume of interest.
- Each grid cell preferably corresponds to a portion of the sub-surface.
- a "grid” is a set of grid cells.
- constraints are conditions for choosing the data elements in which designated areas of interest can be identified.
- the constraints comprise modeling constraints for simulation grid generation which represent features of the subsurface reservoir that are important for flow simulation and, consequently, should be incorporated into the simulation model.
- the constraints consist of internal constraints and external constraints.
- Internal constraints comprise faults, model boundaries, and horizons.
- External constraints comprise modeling constraints for simulation grid generation which are ancillary to the geological model.
- External constraints comprise wells and areal polylines.
- a "constrained grid” is a grid which complies with the modeling constraints. For example, a grid constrained to a fault should accurately represent a fault surface with grid cell faces, i.e. some of the grid cell faces are constrained to lie on a fault surface.
- the most commonly used structured grids are Cartesian or radial grids in which each cell has four edges in two dimensions or six faces in three dimensions.
- an "unstructured grid” is a grid which does not have a regular (indexing) structure, so its topological relationships (boundary, adjacency, etc.) have to be stored, e.g. connectivity matrices provide for each cell lists of its faces, edges, and vertices. Unstructured grid cells may or may not be of similar geometric shape.
- a "horizon” is a horizontal section or time slice of the 3D volume of geological data.
- a "zone” is a volume between two horizons and some lateral boundaries which may or may not coincide with the model boundaries.
- a "prismatic cell” is a three-dimensional cell which is constructed by projection or extrusion of a two-dimensional cell, i.e., n-sided polygon in the third dimension to form a polyhedron. The resulting polyhedron has two n-sided polygonal faces connected by n parallelogram faces.
- a "parametric space” is the indexing space of a structured grid.
- a "node” is a point in a grid where continuity of mass and momentum is conserved.
- a "fault” is a break in the earth layer and the horizons surfaces, across which there is observable displacement.
- smoothing refers to modifying the placement of one or more vertices to improve a grid without modifying the grid connectivity.
- This disclosure solves the problem of generating a three-dimensional unstructured grid in the three-dimensional domain with internal features to enable more accurate modeling of faults, boundaries and other constraints of the structured framework.
- the improved accuracy of the grid with respect to these elements in turn enhances the resolution of faults, boundaries and their intersections in conventional reservoir models.
- geological models have consisted of maps, and, given a geological model, a simulation model was constructed from the geological model.
- reservoir engineers would directly modify the simulation model rather than update the underlying geological model.
- Many different algorithms have been proposed to perform the gridding task automatically.
- none of the conventional gridding models are adapted to provide adequate resolution to allow simulation of faults in sub surface reservoirs adequately.
- a grid for a reservoir model is generated in a number of steps as illustrated in Figure 2.
- a geological model is provided (10) which comprises horizons, constraints and multiple geological grid cells.
- a pre-image is constructed which corresponds to the geological grid cells (12).
- the pre-image comprises a two-dimensional surface, and the modeling constraints from the geological model are mapped onto the two-dimensional surface.
- a constrained two-dimensional grid is generated on the pre-image (14), the two-dimensional grid comprising multiple constrained grid cells.
- Simulation layer boundaries are selected based on the geological grid cells and/or horizons in the geological model to define partitioning of the space between the horizons (16).
- the constrained two-dimensional grid is projected onto the simulation layer boundaries (18); and prismatic cells are generated to form the grid (20).
- the disclosed methodologies and techniques may be computer based in the form of a program or software.
- the improved gridding methods as disclosed support the iterative process of modifying the underlying geological model and of accommodating modifications to the simulation model more quickly than is currently possible.
- Disclosed aspects provide a method of generating a grid for the reservoir model which comprises multiple geological grid cells and multiple horizons and constraints.
- the first step is to construct a pre-image which comprises a two-dimensional surface in a three- dimensional space having all modeling constraints mapped onto the pre-image.
- a constrained two-dimensional grid is generated on the pre-image to form a two-dimensional grid comprising multiple grid cells.
- Different two-dimensional grids can be generated on the same pre-image for different zones of the model based on each zone's rock properties and constraints.
- Each constrained two-dimensional grid is then mapped or projected onto a simulation layer boundary or horizon within the zone to which it is assigned and prismatic cells are generated for each zone.
- the prismatic cells which are below the pinch-out threshold based on thickness or volume may be merged geometrically to neighboring prismatic cells during prismatic cell generation.
- Split prismatic cell faces are computed along fault surfaces and on the zone bounding horizons between two mapped two-dimensional grids from corresponding zones, which finalizes generation of a three-dimensional grid for the entire model. Having different areal grids in different zones of the model allows a more accurate accounting for vertical variation in areal trends of rock and fluid properties, as well as for incorporating engineering features such as wells and other constraints locally within one zone.
- a feature of the disclosed methodologies and techniques is the construction of a pre-image which comprises all the modeling constraints including faults and reservoir boundaries and which are all mapped onto it. Since the pre-image is used as an input for two- dimensional area gridding, the pre-image must accurately represent the real three- dimensional geometry of the horizons, faults and other constraints.
- a method of constructing a pre-image by selecting a parametric space corresponding to a base horizon, the parametric space comprising a two-dimensional indexing grid.
- the base horizon is selected on the basis of the complexity of the horizons and may cover the entire areal extent of the reservoir model.
- the parametric space grid reflects the topology of the grid representing the base horizon.
- the vertices of the parametric space grid are moved to correspond to the location of the constraints in the geological model.
- this ensures accurate modeling of the faults as the grid is positioned such that faults are adequately covered by the grid structure. This results in improved resolution of the model with respect to the faults.
- a base horizon 30 is shown.
- Figure 3B depicts the corresponding parametric space 32
- Figure 3C shows the final pre- image 34 which is constructed by moving the vertices or nodes to correspond with the location of the constraints in the base horizon of the geological model.
- the pre-image is constructed by modifying the parametric space grid by vertex movement to achieve consistency with the original geometry of the constraints on the three- dimensional horizon surface of the geological model.
- Figure 4A presents a pre-image comprising a constraint corresponding to a fault.
- Figure 4B is a modified pre-image comprising a modified constraint by vertex movement.
- the vertices 42 representing constraints in the pre-image are moved to eliminate a stair-stepping effect of the parametric space grid.
- the vertex movement is localized within a patch of adjacent cells, and causes local distortion of the pre-image cells. The vertex movement is performed automatically.
- the constraints are represented on a fine scale in the geological model.
- the grid corresponding to the constraints is preferably simplified and approximated on the coarse scale of the simulation grid cells. This simplification reduces the number of grid points. In one aspect, the number of grid points may be reduced selectively to ensure adequate model resolution in fault areas and/or other areas of interest.
- the constraints may be simplified or approximated in a three-dimensional space on the surface of the base horizon. Following simplification or approximation, the constraints are mapped onto the pre-image. The effect of the approximation is illustrated in Figure 5A, which shows the constraints in the pre-image before simplification.
- Figure 5B shows the constraints after simplification.
- the coarsely approximated constraints may not be fully consistent with the fine-scale representation of the constraints by the edges of the pre-image grid. Therefore, adjustment of the pre-image may be done to improve the accuracy of the grid and the subsequent simulation results.
- constraint edges of the parametric grid are forced to coincide with the coarse constraint geometry of the pre-image.
- Figures 6A and 6B presents the parametric grid and Figure 6B presents the modified parametric grid in which the constraint edges are forced to coincide with a new coarse constraint geometry on the pre-image.
- the modified parametric grid may be further smoothed to minimize cell distortion.
- a base horizon from the geological model provides the basis for a pre-image through its parametric space.
- the pre-image is modified to represent the constraints which correspond to the three-dimensional geometry.
- the parametric space of the pre-image is modified by vertex movement to achieve consistency with the original geometry of the constraints in the horizon.
- the constraints are represented on a fine scale. To simplify and approximate this scale on the coarser scale of the simulation grid cells, the constraints are simplified in the three- dimensional space of the base horizon and they are subsequently mapped onto the pre-image.
- the pre-image is adjusted to ensure consistency with the approximated constraints, by forcing constrained edges of the space to coincide with the modified coarse constraints geometry on the pre-image.
- the pre-image may be constructed by defining a continuous base horizon surface across a fault and forming a pre-image surface based thereon.
- the continuous base horizon may be smoothed and then projected onto a plane to form the pre-image.
- the base horizon is considered to be a continuous surface across the fault as illustrated in Figure 7A to form a pre-image surface.
- the corresponding fault vertices of the base horizon grid on the two sides of the fault are merged and located on the pre-image to place these on the middle trace of the fault which is at an equidistant location from the unmodified grid on either side of the fault.
- the base horizon is considered to be a continuous surface across the fault, the fault vertices join up the surface.
- Vertical projection of the continuous base horizon is shown in Figure 7B.
- the projection may not be useful as a pre-image since it is a highly non uniform grid as evidenced by the elongated cells near the fault.
- the two- dimensional grid of the pre-image surface is smoothed and unfolded.
- the grid vertices are allowed to move in three-dimensional directions but only along the k directions of the geological model grid (along the pillars). This can be achieved by using a global smoothing technique such as the technique which is described in "A variational grid optimization method based on local cell quality metric", Branets LV, PhD thesis, University of Texas, 2005.
- the resulting smooth pre-image is shown in Figure 8A, which presents the smooth pre-image surface.
- Figure 8B shows the vertical projection of the smooth pre-image surface which forms the pre-image.
- a constrained two-dimensional grid is constructed on it.
- the grid may be constructed by approximating the boundaries and internal features of the pre-image with polylines, constructing an unconstrained grid by Delaunay triangulation for the image, modifying the Delaunay triangulation to conform triangle sides to the polylines, and correcting the modified constrained triangulation to bring it in line with the constraints.
- WO2008/150325 discloses further details on the generation of a constrained two- dimensional grid. To further improve consistency between the two-dimensional grid and the actual three-dimensional horizon geometry, it may be preferable to use curvature information of a base horizon for two-dimensional grid generation on the pre-image.
- the constrained two- dimensional grid is then projected on the simulation layer boundaries or horizons. Simulation layer boundaries are chosen based on the horizons and/or grid cells of the geological model to subdivide the volume between the horizons into the layers of the simulation grid.
- simulation layer boundaries can be defined by specifying top-conforming, bottom-conforming, or proportional layering style where the simulation layer boundaries will correspondingly repeat the shape of the top horizon, bottom horizon, or divide the volume proportionally.
- simulation layer boundaries can be defined in terms of layers of geological grid cells by specifying the geological grid layers which are to be combined into one simulation layer. The layers are preferably stacked in the k-direction.
- Figures 9A-9E illustrate the projection of a cell of the constrained two- dimensional grid onto a simulation layer boundary.
- Figure 9A shows a grid cell which includes a cell centre.
- the constrained two-dimensional grid is constructed on the pre-image, and, therefore, for each vertex and cell centre of the constrained two-dimensional grid there can be determined a cell of the pre-image containing this vertex ( Figure 9B) and local coordinates ⁇ , ⁇ of this vertex within the pre-image cell ( Figure 9C). Since the pre-image is formed from the parametric space of the base horizon, the cells of the pre-image can be uniquely identified with the k-columns of cells in the structured grid of the geological model. Within each of these k-columns the simulation layer boundaries have been identified (Figure 9D).
- each vertex or cell centre of each constrained grid cell (Figure 9A) can be projected to all simulation layer boundaries within the corresponding k-column of the geological model grid cells ( Figure 9E).
- the prismatic grid cells may be constructed by using conventional techniques. For example, the prismatic cells may be generated column by column by connecting faces of cells which have corresponding column numbers. Prismatic cells which are below the pinch-out threshold based on thickness or volume may be merged geometrically to neighboring prismatic cells during prismatic cell generation. Split prismatic cell faces are computed along fault surfaces and on the zone bounding horizons if the grid is generated by zones using a separate constrained two-dimensional grid for each zone.
- Projection of areal simulation grid along the k-columns of the geological model grid ensures improved consistency between the resulting simulation grid and underlying geological model. For example, it facilitates transfer of the rock and fluid properties from the geological model onto the simulation grid by providing a more accurate and efficient way for evaluating geometrical containment relationships between simulation grid cells and geological model cells.
- a pre-image is constructed to accurately approximate the three-dimensional geometry of the base horizon and model constraints, and coordinate lines from the geological model are used as projection directions. This ensures consistency between the simulation and geological models, in contrast to conventional methods, where the pre-image is derived as a horizontal plane onto which constraints from the horizon or base model are projected vertically. Conventional methods can therefore not handle complex deviated faults or reverse faults.
- FIG. 10 illustrates a computer system 90 on which software for performing processing operations relating to aspects of the disclosed methodologies and techniques may be implemented.
- a central processing unit (CPU) 91 is coupled to the system.
- CPU 91 may be any general purpose CPU or application-specific CPU. The disclosed aspects are not restricted by the architecture of CPU 91 or other components of computer system 90.
- the CPU may execute the various logical instructions for performing processing according to the exemplary operational flow described in conjunction with methods disclosed herein.
- CPU 91 may execute machine-level instructions, or machine-readable code, for performing operational blocks or steps of Figure 2 herein.
- Computer system 90 may include one or more machine-readable media such as random access memory (RAM) 92.
- RAM 92 may hold user and system data and programs, such as a computer program product containing code effectuating methods of the aspects, methodologies and techniques disclosed herein.
- the computer system also includes an input- output (I/O) adapter 93, a network adapter 94, and an image processing adapter/card 95.
- Computer system 90 may also include an output device, such as a printer or display 97, to display or otherwise visually provide results of one or more portions of the disclosed methods.
- Figure 11 depicts a representation of a tangible machine-readable medium 1 10 incorporating machine-readable code that may be used with a computing system such as computing system 90.
- code is provided for providing a geological model comprising horizons, constraints and multiple geological grid cells.
- code is provided for constructing a pre-image corresponding to the geological grid cells, the pre- image comprising a surface, and the modeling constraints being mapped onto the surface.
- code is provided for generating a constrained two-dimensional grid on the pre- image, the two-dimensional grid comprising multiple grid cells.
- code is provided for selecting simulation layer boundaries from the geological model and projecting the constrained two-dimensional grid onto the simulation layer boundaries.
- code is provided for generating prismatic cells from the two-dimensional grid to form the three-dimensional simulation grid.
- code may be provided for outputting the three-dimensional simulation grid.
- Code effectuating or executing other features of the disclosed aspects and methodologies may be provided as well.
- This additional code is represented in Figure 1 1 as block 117, and may be placed at any location within the machine- readable code according to computer code programming techniques.
- aspects disclosed herein may be used to perform hydrocarbon management activities.
- the method of generating a grid as herein described may be incorporated in existing reservoir simulators to improve the accuracy of existing reservoir models.
- mathematical equations describing the physical flow of fluids in the reservoir are numerically solved using a computer.
- the equations may generally be ordinary differential equations and/or partial differential equations.
- finite element methods there are known finite element methods, finite difference methods, finite volume methods and the like.
- a grid is generated as herein before described based on the physical system or geological model, and the state variables that vary in space throughout the model are represented by sets of values for each cell.
- a reservoir model and a reservoir simulator thereby may be derived from a geological model by generating a grid as hereinbefore described, up-scaling or transferring the properties of the geological model to the generated grid, defining state variables and/or state parameters for each grid cell in the grid, and solving the grid using an appropriate solver to simulate the flow of hydrocarbons in the grid over time in accordance with the boundary conditions to the reservoir.
- aspects disclosed herein may be used to assist in extracting hydrocarbons from a subsurface region or reservoir, which is indicated by reference number 120 in Figure 12.
- a method 130 of extracting hydrocarbons from subsurface reservoir 120 is presented in Figure 13.
- inputs are received from a numerical model, geological model, or flow simulation of the subsurface region, where the model or simulation has been constructed or improved using the methods and aspects disclosed herein.
- the presence and/or location of hydrocarbons in the subsurface region is predicted, or alternatively an extraction location may be predicted or estimated.
- hydrocarbon extraction is conducted to remove hydrocarbons from the subsurface region, which may be accomplished by drilling a well 122 using oil drilling equipment 124 ( Figure 12).
- Other hydrocarbon management activities may be performed according to known principles.
Landscapes
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Processing Or Creating Images (AREA)
- Image Processing (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Description
Claims
Priority Applications (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/498,256 US10061060B2 (en) | 2009-11-12 | 2010-07-28 | Method and apparatus for generating a three-dimensional simulation grid for a reservoir model |
| CA2776487A CA2776487C (en) | 2009-11-12 | 2010-07-28 | Method and apparatus for generating a three-dimentional simulation grid for a reservoir model |
| BR112012009045-3A BR112012009045B1 (en) | 2009-11-12 | 2010-07-28 | methods to generate a three-dimensional simulation grid for a reservoir model, simulation railing apparatus and reservoir simulator |
| CN201080051131.2A CN102612682B (en) | 2009-11-12 | 2010-07-28 | For the method and apparatus of reservoir modeling and simulation |
| EP10830349.6A EP2499567A4 (en) | 2009-11-12 | 2010-07-28 | Method and apparatus for reservoir modeling and simulation |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US26058909P | 2009-11-12 | 2009-11-12 | |
| US61/260,589 | 2009-11-12 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2011059535A1 true WO2011059535A1 (en) | 2011-05-19 |
Family
ID=43991920
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2010/043462 Ceased WO2011059535A1 (en) | 2009-11-12 | 2010-07-28 | Method and apparatus for reservoir modeling and simulation |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US10061060B2 (en) |
| EP (1) | EP2499567A4 (en) |
| CN (1) | CN102612682B (en) |
| BR (1) | BR112012009045B1 (en) |
| CA (1) | CA2776487C (en) |
| WO (1) | WO2011059535A1 (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2542874C1 (en) * | 2013-10-15 | 2015-02-27 | Антон Александрович Колесниченко | Method for adaptive breakdown of three-dimensional grid into layers when creating three-dimensional digital geologic models of formations |
| EP2899571A1 (en) * | 2014-01-28 | 2015-07-29 | IFP Energies nouvelles | Method for constructing a volumetric mesh for modelling geological structures |
| WO2016018723A1 (en) * | 2014-07-30 | 2016-02-04 | Exxonmobil Upstream Research Company | Method for volumetric grid generation in a domain with heterogeneous material properties |
| AU2014306489B2 (en) * | 2013-08-16 | 2016-05-19 | Landmark Graphics Corporation | Dynamically updating compartments representing one or more geological structures |
| GB2532590A (en) * | 2014-10-09 | 2016-05-25 | Logined Bv | Fault representation |
| US9354338B1 (en) | 2012-02-22 | 2016-05-31 | Westerngeco L.L.C. | Generating synthetic seismic traces |
| WO2020178609A1 (en) * | 2019-03-05 | 2020-09-10 | Total Sa | Hydrocarbon flow simulation |
| US11300706B2 (en) | 2017-01-19 | 2022-04-12 | Total Se | Designing a geological simulation grid |
| CN120495444A (en) * | 2025-04-29 | 2025-08-15 | 中国矿业大学(北京) | Geological modeling method and related device based on self-adaptive geometric multiple grids |
Families Citing this family (49)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2948215B1 (en) * | 2009-07-16 | 2011-06-24 | Inst Francais Du Petrole | METHOD FOR GENERATING A HEXA-DOMINANT MESHING OF A FAILLED UNDERGROUND MEDIUM |
| US9134454B2 (en) | 2010-04-30 | 2015-09-15 | Exxonmobil Upstream Research Company | Method and system for finite volume simulation of flow |
| US20120022837A1 (en) * | 2010-05-18 | 2012-01-26 | Schlumberger Technology Corporation | Smoothing Of Stair-Stepped Geometry In Grids |
| GB2498255B (en) | 2010-06-15 | 2018-11-14 | Exxonmobil Upstream Res Co | Method and system for stabilizing formulation methods |
| US8463586B2 (en) * | 2010-06-22 | 2013-06-11 | Saudi Arabian Oil Company | Machine, program product, and computer-implemented method to simulate reservoirs as 2.5D unstructured grids |
| FR2962835B1 (en) * | 2010-07-16 | 2013-07-12 | IFP Energies Nouvelles | METHOD FOR GENERATING A HEXA-DOMINANT MESH OF A GEOMETRICALLY COMPLEX BASIN |
| US10087721B2 (en) | 2010-07-29 | 2018-10-02 | Exxonmobil Upstream Research Company | Methods and systems for machine—learning based simulation of flow |
| CA2805446C (en) | 2010-07-29 | 2016-08-16 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
| AU2011283196B2 (en) | 2010-07-29 | 2014-07-31 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
| EP2599031A4 (en) | 2010-07-29 | 2014-01-08 | Exxonmobil Upstream Res Co | Methods and systems for machine-learning based simulation of flow |
| BR112013002114A2 (en) | 2010-09-20 | 2016-05-17 | Exxonmobil Upstream Res Co | flexible and adaptable formulations for complex reservoir simulations |
| WO2012071090A1 (en) | 2010-11-23 | 2012-05-31 | Exxonmobil Upstream Research Company | Variable discretization method for flow simulation on complex geological models |
| US9229129B2 (en) * | 2010-12-10 | 2016-01-05 | Conocophillips Company | Reservoir geobody calculation |
| US20140236558A1 (en) * | 2011-05-17 | 2014-08-21 | Serguei Maliassov | Method For Partitioning Parallel Reservoir Simulations In the Presence of Wells |
| BR112014005794A2 (en) | 2011-09-15 | 2017-03-28 | Exxonmobil Upstream Res Co | optimized matrix and vector operations in limited instruction algorithms that perform equation of state calculations |
| EP2901363A4 (en) | 2012-09-28 | 2016-06-01 | Exxonmobil Upstream Res Co | Fault removal in geological models |
| GB2512372B (en) * | 2013-03-28 | 2020-07-29 | Total Sa | Method of modelling a subsurface volume |
| CA2913898C (en) * | 2013-07-02 | 2017-03-28 | Landmark Graphics Corporation | 3d stadia algorithm for discrete network meshing |
| DE112013007359T5 (en) * | 2013-08-23 | 2016-05-25 | Landmark Graphics Corporation | Local update of a geocellular 3D model |
| US9790770B2 (en) | 2013-10-30 | 2017-10-17 | The Texas A&M University System | Determining performance data for hydrocarbon reservoirs using diffusive time of flight as the spatial coordinate |
| DE112013007652T5 (en) * | 2013-11-26 | 2016-08-11 | Landmark Graphics Corporation | Sequence for resolving faults in building a global raster for complex fault network topologies |
| US10417354B2 (en) * | 2013-12-17 | 2019-09-17 | Schlumberger Technology Corporation | Model order reduction technique for discrete fractured network simulation |
| WO2015138807A1 (en) * | 2014-03-12 | 2015-09-17 | Landmark Graphics Corporation | Efficient and robust compositional reservoir simulation using a fast phase envelope |
| CN105184862B (en) * | 2014-06-18 | 2018-06-29 | 星际空间(天津)科技发展有限公司 | A kind of three dimension strata model dynamic fixing method |
| CA2963092C (en) | 2014-10-31 | 2021-07-06 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
| US10803534B2 (en) | 2014-10-31 | 2020-10-13 | Exxonmobil Upstream Research Company | Handling domain discontinuity with the help of grid optimization techniques |
| US20160131800A1 (en) * | 2014-11-07 | 2016-05-12 | Schlumberger Technology Corporation | Modeling fluid-conducting fractures in reservoir simulation grids |
| CA2963928C (en) * | 2014-11-12 | 2019-06-25 | Halliburton Energy Services, Inc. | Reservoir mesh creation using extended anisotropic, geometry-adaptive refinement of polyhedra |
| CA2972149A1 (en) * | 2015-02-25 | 2016-09-01 | Exxonmobil Upstream Research Company | Method for parameterizing a 3d domain with discontinuities |
| CN105184867B (en) * | 2015-09-29 | 2017-11-10 | 中国矿业大学 | The three dimensional contour line method of rule-based grid and Corner-point Grids technology |
| US10947820B2 (en) | 2015-11-12 | 2021-03-16 | Halliburton Energy Services, Inc. | Simulating hydraulic fracture propagation using dynamic mesh deformation |
| CN105488349B (en) * | 2015-12-01 | 2018-06-08 | 中国石油大学(北京) | The microcosmic geological feature of shale oil and gas reservoir determines method and apparatus |
| CN107240152A (en) * | 2016-03-28 | 2017-10-10 | 中国石油化工股份有限公司 | The modeling method and system of three-dimensional geological model |
| WO2017192423A1 (en) * | 2016-05-04 | 2017-11-09 | Saudi Arabian Oil Company | Two dimensional reservoir pressure estimation with integrated static bottom–hole pressure survey data and simulation modeling |
| WO2018118374A1 (en) | 2016-12-23 | 2018-06-28 | Exxonmobil Upstream Research Company | Method and system for stable and efficient reservoir simulation using stability proxies |
| CN106875487B (en) * | 2017-03-01 | 2020-03-31 | 中国石油大学(华东) | Geological hexahedral mesh smoothing method based on neighborhood acting force |
| US10325039B2 (en) * | 2017-03-28 | 2019-06-18 | Hexagon Technology Center Gmbh | Method for virtually inspecting an actual produced part |
| US11215732B2 (en) | 2017-09-25 | 2022-01-04 | Baker Hughes Holdings Llc | Geological constraint using probability functions in stochastic mineralogy modeling |
| CN108763695A (en) * | 2018-05-18 | 2018-11-06 | 中国石油天然气股份有限公司 | Geological structure simulation method, device, electronic equipment and storage medium |
| CN108898670B (en) * | 2018-07-26 | 2022-04-01 | 广州图石科技有限公司 | Three-dimensional geological modeling method based on entity and profile |
| WO2020112974A1 (en) * | 2018-11-28 | 2020-06-04 | Schlumberger Technology Corporation | Implicit property modeling |
| CN109712238B (en) * | 2018-12-25 | 2023-06-06 | 长江大学 | Method and equipment for smoothing geologic model |
| US11401786B2 (en) | 2019-03-06 | 2022-08-02 | Saudi Arabian Oil Company | Systems and methods for hydrocarbon reservoir well connectivity graph optimization, simulation and development |
| US12117582B2 (en) | 2019-10-01 | 2024-10-15 | ExxonMobil Technology and Engineering Company | Model for coupled porous flow and geomechanics for subsurface simulation |
| CN110968904B (en) * | 2019-11-12 | 2023-02-24 | 广州市第一市政工程有限公司 | BIM technology-based method for calculating shape and earth volume of earth excavation side slope |
| US12596203B2 (en) | 2020-01-22 | 2026-04-07 | Totalenergies Onetech | Layering for geomodeling |
| US11282269B2 (en) * | 2020-05-13 | 2022-03-22 | Chevron U.S.A. Inc. | Image-comparison based analysis of subsurface representations |
| CN119150383B (en) * | 2024-07-18 | 2025-09-23 | 长江大学 | Geological modeling method and system for simulating the center bank based on river channel distribution characteristics |
| CN121543305A (en) * | 2026-01-15 | 2026-02-17 | 中国地质大学(武汉) | A simulation method for tunnel collapse |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20060058965A1 (en) * | 2004-09-16 | 2006-03-16 | Ludovic Ricard | Method for generating a reservoir model on flexible grid |
| US20070150244A1 (en) * | 2005-12-28 | 2007-06-28 | Caterpillar Inc. | Method and apparatus for automated grid formation in multi-cell system dynamics models |
| WO2009079088A1 (en) | 2007-12-14 | 2009-06-25 | Exxonmobil Upstream Research Company | Modeling subsurface processes on unstructured grid |
| US20090265152A1 (en) * | 2008-04-17 | 2009-10-22 | Marie-Christine Cacas | Method of seeking hydrocarbons in a geologically complex basin, by means of basin modeling |
Family Cites Families (45)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6128577A (en) | 1996-12-19 | 2000-10-03 | Schlumberger Technology Corporation | Modeling geological structures and properties |
| US6018497A (en) * | 1997-02-27 | 2000-01-25 | Geoquest | Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore |
| US6106561A (en) * | 1997-06-23 | 2000-08-22 | Schlumberger Technology Corporation | Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator |
| GB2352036B (en) * | 1998-05-04 | 2002-11-27 | Schlumberger Evaluation & Prod | Near wellbore modelling method and apparatus |
| US6826520B1 (en) * | 1999-06-24 | 2004-11-30 | Exxonmobil Upstream Research Company | Method of upscaling permeability for unstructured grids |
| FR2801710B1 (en) | 1999-11-29 | 2002-05-03 | Inst Francais Du Petrole | METHOD FOR GENERATING A HYBRID MESH FOR MODELING A HETEROGENEOUS FORMATION CROSSED BY ONE OR MORE WELLS |
| FR2802324B1 (en) | 1999-12-10 | 2004-07-23 | Inst Francais Du Petrole | METHOD FOR GENERATING A MESH ON A HETEROGENEOUS FORMATION CROSSED BY ONE OR MORE GEOMETRIC DISCONTINUITIES FOR THE PURPOSE OF MAKING SIMULATIONS |
| US6980940B1 (en) | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
| CN1386200A (en) | 2000-06-29 | 2002-12-18 | 目标储油层公司 | Feature modeling method in a finite element model |
| US7369973B2 (en) | 2000-06-29 | 2008-05-06 | Object Reservoir, Inc. | Method and system for representing reservoir systems |
| FR2823877B1 (en) | 2001-04-19 | 2004-12-24 | Inst Francais Du Petrole | METHOD FOR CONSTRAINING BY DYNAMIC PRODUCTION DATA A FINE MODEL REPRESENTATIVE OF THE DISTRIBUTION IN THE DEPOSIT OF A CHARACTERISTIC PHYSICAL SIZE OF THE BASEMENT STRUCTURE |
| GB2387000B (en) * | 2002-03-20 | 2005-06-01 | Inst Francais Du Petrole | Method for modelling fluid flows in a multilayer porous medium crossed by an unevenly distributed fracture network |
| FR2846767B1 (en) | 2002-10-30 | 2004-12-24 | Inst Francais Du Petrole | METHOD FOR FASTER FORMATION OF A STOCHASTIC MODEL REPRESENTATIVE OF AN UNDERGROUND HETEROGENEOUS TANK, CONSTRAINED BY DYNAMIC DATA |
| FR2850187B1 (en) | 2003-01-16 | 2005-03-11 | Inst Francais Du Petrole | METHOD FOR DETERMINING ZONES IN A LAMINATED MEDIUM OR THE INTERFACE BETWEEN A FLUID IN PLACE IN THE MEDIUM AND A SCANNING FLUID, IS STATIONALLY MOVED |
| US7200540B2 (en) | 2003-01-31 | 2007-04-03 | Landmark Graphics Corporation | System and method for automated platform generation |
| US7096172B2 (en) | 2003-01-31 | 2006-08-22 | Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. | System and method for automated reservoir targeting |
| AU2004211184A1 (en) | 2003-02-05 | 2004-08-26 | Moldflow Ireland Ltd. | Apparatus and methods for performing process simulation using a hybrid model |
| FR2851670B1 (en) | 2003-02-21 | 2005-07-01 | Inst Francais Du Petrole | METHOD FOR RAPIDLY DEVELOPING A STOCHASTIC MODEL REPRESENTATIVE OF A UNDERGROUND HETEROGENEOUS RESERVOIR CONSTRAINTED BY UNCERTAIN STATIC AND DYNAMIC DATA |
| US6823297B2 (en) | 2003-03-06 | 2004-11-23 | Chevron U.S.A. Inc. | Multi-scale finite-volume method for use in subsurface flow simulation |
| US7496488B2 (en) | 2003-03-06 | 2009-02-24 | Schlumberger Technology Company | Multi-scale finite-volume method for use in subsurface flow simulation |
| FR2852710B1 (en) | 2003-03-18 | 2005-04-29 | Inst Francais Du Petrole | METHOD FOR RAPIDLY FORMING A STOCHASTIC MODEL REPRESENTATIVE OF THE DISTRIBUTION OF A PHYSICAL SIZE IN A HETEROGENEOUS MEDIUM BY AN APPROPRIATE SELECTION OF GEOSTATISTICAL ACHIEVEMENTS |
| US7096122B2 (en) | 2003-07-22 | 2006-08-22 | Dianli Han | Method for producing full field radial grid for hydrocarbon reservoir simulation |
| NL1024444C2 (en) * | 2003-10-03 | 2005-04-08 | J O A Beheer B V | Method, device, computer program and data carrier for modeling a multi-dimensional heterogeneous structure with a digital processing unit. |
| US20050120195A1 (en) | 2003-11-13 | 2005-06-02 | Alok Kumar | Allocating memory |
| WO2005120195A2 (en) | 2004-06-07 | 2005-12-22 | Brigham Young University | Reservoir simulation |
| EP1766439A2 (en) * | 2004-07-01 | 2007-03-28 | ExxonMobil Upstream Research Company | Hydrodynamics-based gridding geologic modeling (hydro-gridding) |
| WO2006034256A2 (en) | 2004-09-17 | 2006-03-30 | Cyberextruder.Com, Inc. | System, method, and apparatus for generating a three-dimensional representation from one or more two-dimensional images |
| US7640149B2 (en) * | 2004-12-15 | 2009-12-29 | Schlumberger Technology Corporation | Method system and program storage device for optimization of valve settings in instrumented wells using adjoint gradient technology and reservoir simulation |
| US7596480B2 (en) | 2005-04-14 | 2009-09-29 | Saudi Arabian Oil Company | Solution method and apparatus for large-scale simulation of layered formations |
| FR2891383B1 (en) | 2005-09-26 | 2008-07-11 | Inst Francais Du Petrole | METHOD FOR SIMULATING FLUID FLOWS WITHIN A DISCRETE MEDIA BY A HYBRID MESH |
| US7584081B2 (en) | 2005-11-21 | 2009-09-01 | Chevron U.S.A. Inc. | Method, system and apparatus for real-time reservoir model updating using ensemble kalman filter |
| US7716029B2 (en) | 2006-05-15 | 2010-05-11 | Schlumberger Technology Corporation | Method for optimal gridding in reservoir simulation |
| EP1865340B1 (en) | 2006-06-06 | 2010-09-29 | Total S.A. | A process and program for characterising evolution of an oil reservoir over time |
| US7574339B2 (en) | 2006-09-19 | 2009-08-11 | The Protomold Company | Automated generation of lean models for injection molding simulation |
| US7440853B2 (en) | 2006-10-16 | 2008-10-21 | Bbn Technologies Corp. | Systems and methods for detecting shallow buried objects |
| US8150663B2 (en) * | 2007-03-30 | 2012-04-03 | Paradigm Geophysical (Luxembourg) S.A.R.L. | Partitioning algorithm for building a stratigraphic grid |
| EP2153413A4 (en) | 2007-06-01 | 2014-05-21 | Exxonmobil Upstream Res Co | Generation of constrained voronoi grid in a plane |
| US7720659B2 (en) | 2007-06-30 | 2010-05-18 | Schlumberger Technology Corporation | Simulating fluid flow in reservoir with modified grid |
| US8738341B2 (en) | 2007-12-21 | 2014-05-27 | Schlumberger Technology Corporation | Method for reservoir characterization and monitoring including deep reading quad combo measurements |
| US8744817B2 (en) | 2007-12-21 | 2014-06-03 | Schlumberger Technology Corporation | Method for upscaling a reservoir model using deep reading measurements |
| US8285532B2 (en) | 2008-03-14 | 2012-10-09 | Schlumberger Technology Corporation | Providing a simplified subterranean model |
| US7933750B2 (en) * | 2008-04-02 | 2011-04-26 | Schlumberger Technology Corp | Method for defining regions in reservoir simulation |
| US9594186B2 (en) | 2010-02-12 | 2017-03-14 | Exxonmobil Upstream Research Company | Method and system for partitioning parallel simulation models |
| US9134454B2 (en) | 2010-04-30 | 2015-09-15 | Exxonmobil Upstream Research Company | Method and system for finite volume simulation of flow |
| EP2588952A4 (en) | 2010-06-29 | 2017-10-04 | Exxonmobil Upstream Research Company | Method and system for parallel simulation models |
-
2010
- 2010-07-28 EP EP10830349.6A patent/EP2499567A4/en not_active Withdrawn
- 2010-07-28 BR BR112012009045-3A patent/BR112012009045B1/en not_active IP Right Cessation
- 2010-07-28 US US13/498,256 patent/US10061060B2/en active Active
- 2010-07-28 WO PCT/US2010/043462 patent/WO2011059535A1/en not_active Ceased
- 2010-07-28 CN CN201080051131.2A patent/CN102612682B/en not_active Expired - Fee Related
- 2010-07-28 CA CA2776487A patent/CA2776487C/en not_active Expired - Fee Related
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20060058965A1 (en) * | 2004-09-16 | 2006-03-16 | Ludovic Ricard | Method for generating a reservoir model on flexible grid |
| US20070150244A1 (en) * | 2005-12-28 | 2007-06-28 | Caterpillar Inc. | Method and apparatus for automated grid formation in multi-cell system dynamics models |
| WO2009079088A1 (en) | 2007-12-14 | 2009-06-25 | Exxonmobil Upstream Research Company | Modeling subsurface processes on unstructured grid |
| US20090265152A1 (en) * | 2008-04-17 | 2009-10-22 | Marie-Christine Cacas | Method of seeking hydrocarbons in a geologically complex basin, by means of basin modeling |
Non-Patent Citations (2)
| Title |
|---|
| BRANETS ET AL.: "Challenges and technologies in reservoir modeling", COMMUNICATIONS IN COMPUTATIONAL PHYSICS, vol. 6, no. 1, pages 1 - 23, XP002655348 |
| See also references of EP2499567A4 |
Cited By (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9354338B1 (en) | 2012-02-22 | 2016-05-31 | Westerngeco L.L.C. | Generating synthetic seismic traces |
| AU2014306489B2 (en) * | 2013-08-16 | 2016-05-19 | Landmark Graphics Corporation | Dynamically updating compartments representing one or more geological structures |
| US9489769B2 (en) | 2013-08-16 | 2016-11-08 | Landmark Graphics Corporation | Dynamically updating compartments representing one or more geological structures |
| RU2542874C1 (en) * | 2013-10-15 | 2015-02-27 | Антон Александрович Колесниченко | Method for adaptive breakdown of three-dimensional grid into layers when creating three-dimensional digital geologic models of formations |
| EP2899571A1 (en) * | 2014-01-28 | 2015-07-29 | IFP Energies nouvelles | Method for constructing a volumetric mesh for modelling geological structures |
| FR3016983A1 (en) * | 2014-01-28 | 2015-07-31 | IFP Energies Nouvelles | METHOD FOR CONSTRUCTING A VOLUME MESH FOR MODELING GEOLOGICAL STRUCTURES |
| AU2015298233B2 (en) * | 2014-07-30 | 2018-02-22 | Exxonmobil Upstream Research Company | Method for volumetric grid generation in a domain with heterogeneous material properties |
| WO2016018723A1 (en) * | 2014-07-30 | 2016-02-04 | Exxonmobil Upstream Research Company | Method for volumetric grid generation in a domain with heterogeneous material properties |
| US10319143B2 (en) | 2014-07-30 | 2019-06-11 | Exxonmobil Upstream Research Company | Volumetric grid generation in a domain with heterogeneous material properties |
| GB2532590A (en) * | 2014-10-09 | 2016-05-25 | Logined Bv | Fault representation |
| GB2532590B (en) * | 2014-10-09 | 2019-07-10 | Logined Bv | Simulating fluid flow using a stairstepped grid to represent a geological fault |
| US10571601B2 (en) | 2014-10-09 | 2020-02-25 | Schlumberger Technology Corporation | Geologic fault representation for flow simulation |
| US11300706B2 (en) | 2017-01-19 | 2022-04-12 | Total Se | Designing a geological simulation grid |
| WO2020178609A1 (en) * | 2019-03-05 | 2020-09-10 | Total Sa | Hydrocarbon flow simulation |
| US12405399B2 (en) | 2019-03-05 | 2025-09-02 | Totalenergies Onetech | Hydrocarbon flow simulation |
| CN120495444A (en) * | 2025-04-29 | 2025-08-15 | 中国矿业大学(北京) | Geological modeling method and related device based on self-adaptive geometric multiple grids |
Also Published As
| Publication number | Publication date |
|---|---|
| EP2499567A4 (en) | 2017-09-06 |
| CA2776487C (en) | 2017-02-14 |
| CN102612682A (en) | 2012-07-25 |
| CA2776487A1 (en) | 2011-05-19 |
| CN102612682B (en) | 2016-04-27 |
| US10061060B2 (en) | 2018-08-28 |
| US20120215513A1 (en) | 2012-08-23 |
| BR112012009045B1 (en) | 2020-12-08 |
| EP2499567A1 (en) | 2012-09-19 |
| BR112012009045A2 (en) | 2016-04-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2776487C (en) | Method and apparatus for generating a three-dimentional simulation grid for a reservoir model | |
| US9600608B2 (en) | Method of constructing a geological model comprising setting a depositional position of stratigraphic units | |
| US8818780B2 (en) | Forming a model of a subsurface region | |
| CN102239507B (en) | For the mess generation system and method for discrete fracture modeling | |
| US20120010865A1 (en) | Reservoir Quality Characterization Using Heterogeneity Equations With Spatially-Varying Parameters | |
| US20140136171A1 (en) | Unstructured Grids For Modeling Reservoirs | |
| US20180031721A1 (en) | Method and System for Generating a Subsurface Model | |
| EP3293552B1 (en) | System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles | |
| EP3018502A2 (en) | Modeling fluid-conducting fractures in reservoir simulation grids | |
| US10564317B2 (en) | Reservoir mesh creation using extended anisotropic, geometry-adaptive refinement of polyhedra | |
| AU2011339017A1 (en) | Constructing geologic models from geologic concepts | |
| CA2908934C (en) | Gridless simulation of a fluvio-deltaic environment | |
| EP2631685A2 (en) | Building faulted grids for a sedimentary basin including structural and stratigraphic interfaces | |
| US20180031720A1 (en) | Method and System for Generating a Subsurface Model | |
| EP3571533B1 (en) | Designing a geological simulation grid | |
| US12105241B2 (en) | Conditioning method and system for channel lobe deposition environment | |
| CN112292714B (en) | Grid partitioning based on fault radiation | |
| Lopez et al. | 2.5 D Hexahedral Meshing for Reservoir Simulations | |
| Suter et al. | A novel method for locally updating an earth model while geosteering | |
| Manchuk | Geostatistical modeling of unstructured grids for flow simulation | |
| Suter et al. | A novel method for multi-resolution earth model gridding | |
| Poudret et al. | New flattening-based methodology for more accurate geostatistical reservoir populating | |
| US20250284862A1 (en) | Enabling unstructured grids from depositional space for finite element simulations | |
| CN119206105A (en) | VTK-based 3D visualization and interpretation method and system for railway engineering survey | |
| Suter | Novel Principles for Effective Earth Model Grid Management while Geosteering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WWE | Wipo information: entry into national phase |
Ref document number: 201080051131.2 Country of ref document: CN |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10830349 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13498256 Country of ref document: US |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2821/CHENP/2012 Country of ref document: IN |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2776487 Country of ref document: CA |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2010830349 Country of ref document: EP |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112012009045 Country of ref document: BR |
|
| ENP | Entry into the national phase |
Ref document number: 112012009045 Country of ref document: BR Kind code of ref document: A2 Effective date: 20120417 |