WO2011063983A1 - Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers - Google Patents

Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers Download PDF

Info

Publication number
WO2011063983A1
WO2011063983A1 PCT/EP2010/007225 EP2010007225W WO2011063983A1 WO 2011063983 A1 WO2011063983 A1 WO 2011063983A1 EP 2010007225 W EP2010007225 W EP 2010007225W WO 2011063983 A1 WO2011063983 A1 WO 2011063983A1
Authority
WO
WIPO (PCT)
Prior art keywords
factory
station
voussoirs
concreting
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/EP2010/007225
Other languages
French (fr)
Inventor
Miguel Ángel FERNÁNDEZ GÓMEZ
José Emilio JIMENO CHUECA
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inneo Torres SL
Original Assignee
Inneo Torres SL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=43587548&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=WO2011063983(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Priority to CN2010800541197A priority Critical patent/CN102695590A/en
Priority to EP10795926A priority patent/EP2507021A1/en
Priority to NZ600538A priority patent/NZ600538A/en
Priority to MX2012006151A priority patent/MX2012006151A/en
Priority to JP2012541341A priority patent/JP2013512132A/en
Application filed by Inneo Torres SL filed Critical Inneo Torres SL
Priority to UAA201207913A priority patent/UA106401C2/en
Priority to CA2781979A priority patent/CA2781979A1/en
Priority to KR1020127016338A priority patent/KR20140015636A/en
Publication of WO2011063983A1 publication Critical patent/WO2011063983A1/en
Anticipated expiration legal-status Critical
Priority to ZA2012/03981A priority patent/ZA201203981B/en
Priority to MA34975A priority patent/MA33831B1/en
Ceased legal-status Critical Current

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00—General arrangement or layout of plant ; Industrial outlines or plant installations
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00—General arrangement or layout of plant ; Industrial outlines or plant installations
    • B28B15/002—Mobile plants, e.g. on vehicles or on boats
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/34—Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability
    • E04B1/3404—Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability supported by masts or tower-like structures
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14—Conveying or assembling building elements
    • E04G21/16—Tools or apparatus
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14—Conveying or assembling building elements
    • E04G21/16—Tools or apparatus
    • E04G21/18—Adjusting tools; Templates
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/242—Safety or protective measures preventing damage to building parts or finishing work during construction for temporarily covering the whole worksite, e.g. building, trench
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/28—Safety or protective measures preventing damage to building parts or finishing work during construction against unfavourable weather influence
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03D—WIND MOTORS
    • F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2230/00—Manufacture
    • F05B2230/20—Manufacture essentially without removing material
    • F05B2230/21—Manufacture essentially without removing material by casting
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00—Integration of renewable energy sources in buildings
    • Y02B10/30—Wind power
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/70—Wind energy
    • Y02E10/72—Wind turbines with rotation axis in wind direction
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/70—Wind energy
    • Y02E10/728—Onshore wind turbines
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50—Manufacturing or production processes characterised by the final manufactured product
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00—Climate change mitigation technologies for sector-wide applications
    • Y02P80/20—Climate change mitigation technologies for sector-wide applications using renewable energy

Definitions

  • the present invention relates to a factory for the molding manufacture of precast concrete voussoirs (wedge-shaped panels) for the construction of wind generator support towers, to the concrete voussoirs manufactured by molding in said factory, and to a wind generator support tower at least partially constructed by concrete voussoirs manufactured by molding in said factory, as well as to the operating method of said factory.
  • the state of the art in the field of the invention generally presents large and expensive facilities which are essentially immobile in the sense that they are built with a view to a permanent site, so in addition to the fact that building and dismantling them can be equally expensive and tedious, building them causes structural changes in the location terrain that are extremely difficult if not impossible to reverse, even after being dismantled, i.e., they have a substantial environmental impact.
  • the road transport of large voussoirs from the facility to the point of erection of the pertinent towers is an always complicated task with certain risks, entailing a problem especially in territories with very strict regulations concerning the road transport of large-sized parts.
  • transporting voussoirs of more than 20 meters in length involves a number of additional legal requirements so in practice, manufacturers normally limit the longitudinal dimension of the voussoirs they produce precisely to said length of 20 meters.
  • the object of the present invention is, therefore, a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers enabling the reduction of the drawbacks derived from handling the manufactured voussoirs even in the event that they are large and heavy, without precisely limiting neither the size nor the weight of the voussoirs to be manufactured and limiting the environmental impacts.
  • a first aspect of the present invention is a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, using passive steel or rebar-like elements, as well as active pre-stressing steel, with or without sheath, concrete and finishing accessories, the factory including hoisting means and concreting means, the factory also including:
  • At least one reinforcing station with at least one frame, for preparing cores of rebar-like elements called cages,
  • At least one concreting station with at least one mold including a main mold body, a counter mold and a protective canvas for the steam setting, for the application of one of said cages in said mold, the concreting of said mold, the setting of said concrete in said mold and the extraction of the set part (semi-finished voussoir) from said mold,
  • the base of said reinforcing station, said concreting station and said conditioning station comprises a concrete slab formed directly on compacted terrain, i.e., without foundations, anchors or the like to the compacted terrain
  • said hoisting means are hoisting means without foundations
  • said mold body is divided into at least two portions attached to one another by fixing means
  • said counter mold is divided into at least two portions attached to one another by fixing means.
  • a factory is thus provided for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, having structural features which allow placing the factory in a place of origin in a disassembled state in initial units that are smaller than the voussoirs to be manufactured, taking said initial units to a building site close to the point of delivery or assembly of the voussoirs to be manufactured, assembling the factory at said building site starting from said initial units, manufacturing the pertinent voussoirs by means of the factory in the assembled state, disassembling the factory at said building site until the factory is in a disassembled state in final units that are smaller than the manufactured voussoirs, and taking said final units to a place of destination, leaving said building site in basically the same conditions as before the assembly of the factory at said building site, i.e., with an essentially nil environmental impact.
  • Said place of destination can logically be said place of origin from the start, or it can be a different building site.
  • the manufacture can thus take place at a building site that is so close to the point of delivery or assembly of the voussoirs that the drawbacks derived from handling said voussoirs even in the case of them being large and heavy are considerably reduced.
  • the manufacture can take place at a building site that is so close to the point of delivery or assembly of the voussoirs that road transport is avoided, as are the aforementioned drawbacks, the dimensions of the voussoirs to be manufactured then being limited by the load capacity of the hoisting means, which is usually greater than the road transport means which are typically used in the state of the art .
  • the factory can include (pre-tensioned reinforcement and/or post-tensioned reinforcement) pre- stressing performance means, which will preferably be arranged in said concreting station or in said conditioning station.
  • hoisting means without foundations and/or the concreting means can be mobile.
  • the hoisting means can comprise one or more boom crane trucks or one or more gantries on wheels (optionally self- propelled) and/or the concreting means can comprise one or more concrete mixer trucks or one or more pieces of concrete distribution equipment , including pumping equipment .
  • said concrete slab is formed on site in a single part.
  • the concrete slab will preferably have a thickness of 15 cm at the least and preferably of 25 cm at the most .
  • a second aspect of the present invention is a concrete voussoir intended for the construction of wind generator support towers, manufactured in said factory.
  • a third aspect of the present invention is a wind generator support tower at least partially constructed by concrete voussoirs manufactured in said factory.
  • Figure 1 schematically shows the layout of a first embodiment of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers according to the present invention.
  • Figure 2 schematically shows a front view of Figure 1.
  • Figure 3 schematically shows the layout of a second embodiment of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers according to the present invention.
  • Figure 4 schematically shows a front view of Figure 3.
  • FIGS 1 and 2 show a first embodiment of a factory 10 for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, according to the present invention, at a building site .
  • the factory 10 comprises at one end an entrance 12 for rebar-like elements, followed in an essentially linear manner in series by an reinforcing station 14, a concreting station
  • each frame 22 is arranged longitudinally in the direction of the production line, in two lines of two frames 22 and one line of one frame 22 parallel to one another. Said frames 22 receive rebar-like elements from said entrance 12. Said rebar-like elements are then attached to make cages. Said reinforcing station 14 can optionally comprise welding means for attaching the rebar-like elements to one another, although said cages will preferably be made by tying the rebar-like elements to one another in a manner that is known in the state of the art.
  • said concreting station 16 six steam setting molds 24 are arranged longitudinally in the direction of the production line, in two lines of three molds 24 each. Said molds 24 are divided into four portions attached to one another by fixing means (not shown) .
  • Said molds 24 receive the cages made in said reinforcing station 14, and concrete is subsequently poured into the molds 24, the poured concrete is left to set and the set parts 38 (in this case, semi-finished voussoirs intended for the construction of wind generator support towers) are finally extracted from said molds 24.
  • corrugated sheaths intended to be embedded in a predetermined manner in the concrete once it is poured into said mold 24 will also be arranged in said reinforcing stations
  • said concreting station 16 can comprise pre-tensioned reinforcement pre- stressing means, including pre-stressing tendons, which are arranged in the mold and are tensioned before the pouring and setting of the concrete, and pre-stressing performance means, which will tension said pre-stressing tendons.
  • each of said molds 24 includes a main mold body, a counter mold and a steam setting canvas (neither shown nor described in detail as it is part of the state of the art) .
  • the concreting means comprise a concrete mixer 26 which, once assembled, is arranged in a stationary manner, laterally with respect to said concreting station 16 (said concrete mixer
  • each mold 24 from said concrete mixer 26 could also be arranged in and be part of the actual concreting station 16) .
  • the concrete will therefore be poured into each mold 24 from said concrete mixer 26, in this embodiment by means of preferably self-propelled dispensing carriages 40 which are also part of said concreting means.
  • tubular or semi-tubular conduits can be used (not shown in the figures) .
  • Said conditioning station 18 is shown with four semi- finished voussoirs 38 which were brought from the concreting station 16, once extracted from said molds 24.
  • the semi-finished voussoirs 38 can receive a finishing (polishing and/or painting and/or lacquering, etc.) . Furthermore, in said conditioning station 18, the semi-finished voussoirs 38 can be provided with the appropriate finishing accessories, for example with eye bolts or any other means of attachment to other voussoirs . The material necessary for the finishing enters said conditioning station 18 laterally with respect to said factory 10.
  • Said reinforcing station 14, said concreting station 16 and said conditioning station 18 make up the operational section of said factory 10.
  • Said operational section 14, 16, 18 is established on a concrete slab 28 that is 20 cm thick.
  • said stocking station 20 has a plurality of finished voussoirs 32 stored in an orderly fashion, prepared for delivery.
  • the factory 10 includes hoisting means made up of two gantries 30 the rails 42 of which are fixed directly to said concrete slab 28 and of five self-propelled gantries 30' on wheels.
  • an asphalted area 34 is arranged laterally and contiguous to said operational section 14, 16, 18.
  • the factory 10 further comprises a folding or modular canopy or stationary roof 36 extending above the entire operational section 14, 16, 18 and a portion of the asphalted area 34 to simply improve working conditions for the operators .
  • FIGS 3 and 4 show a second embodiment of a factory 100 for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, according to the present invention, at a building site.
  • the factory 100 comprises two reinforcing stations 114 and a concreting station 116, both elongated in the direction of the production line, parallel to one another, followed in an essentially linear manner in series by a conditioning station 118 and a stocking station 120.
  • each of said reinforcing stations 114 three frames 122 are arranged longitudinally in the direction of the production line. Said frames 122 receive rebar-like elements laterally with respect to said factory 100. Said rebar-like elements are then attached to make cages.
  • said reinforcing stations 114 can comprise welding means for attaching the rebar-like elements to one another, although said cages will preferably be made by tying the rebar-like elements to one another in a manner that is known in the state of the art .
  • said concreting station 116 six steam setting molds 124 are arranged longitudinally in the direction of the production line, in two lines of three molds 124 each. Said molds 124 are divided into four portions attached to one another by fixing means (not shown) .
  • Said molds 124 receive the cages made in said reinforcing station 114, and concrete is subsequently poured into the molds 124, the poured concrete is left to set and the set parts 138
  • each of said molds 124 includes a main mold body, a counter mold and a steam setting canvas (neither shown nor described in detail as it is part of the state of the art) .
  • said reinforcing stations 114 are parallel with said concreting station 116 such that said concreting station 116 is located between said reinforcing stations 114.
  • This factory 100 comprises completely moveable concreting means specifically consisting of two concrete mixer trucks 126 moving laterally with respect to said reinforcing stations 114. The concrete will then be poured directly from said concrete mixer trucks 126 into each mold 124.
  • corrugated sheaths intended for being embedded in a predetermined manner in the concrete once it is poured into said mold 124 will also be arranged in said reinforcing stations 114 or in said concreting station 116, such sheaths being suitable for a subsequent assembly of the voussoirs.
  • said reinforcing stations 114 or said concreting station 116 can comprise pre- tensioned reinforcement pre-stressing means, including sheathed pre-stressing tendons, which are arranged in the mold before the pouring and setting of the concrete and will be tensioned after the pouring and setting of the concrete, and pre- stressing performance means, which will tension said pre- stressing tendons .
  • Said conditioning station 118 is shown with two semifinished voussoirs 138 which were brought from the concreting station 116 once extracted from said molds 124.
  • the semi-finished voussoirs 138 can receive a finishing (polishing and/or painting and/or lacquering, etc.). Furthermore, in said conditioning station 118, the semi- finished voussoirs 138 can be provided with the appropriate finishing accessories, for example with eye bolts or any other means of attachment to other voussoirs. The material necessary for the finishing enters said conditioning station 118 laterally with respect to said factory 100.
  • said pre-stressing performance means will preferably be arranged in said conditioning station 118.
  • Said reinforcing station 114, said concreting station 116 and said conditioning station 118 make up the operational section of said factory 100.
  • Said operational section 114, 116, 118 is established on a concrete slab 128 that is 20 cm thick.
  • said stocking station 120 has a plurality of finished voussoirs 132 stored in an orderly fashion, prepared for delivery and subsequent assembly.
  • the factory 100 includes hoisting means made up of two boom crane trucks 130 moving laterally with respect to said operational section 114, 116, 118.
  • the factory 100 comprises two moveable roofs 136 to simply improve the working conditions for the operators.
  • Said moveable roofs 136 slide in the direction of the production line in respective straight contiguous parallel paths of said operational section 114, 116, 10 118, on rails 134 formed directly in said concrete slab 128.
  • each moveable roof 136 has an extension in the direction of said rails 134 essentially equal to the length of a mold 124.
  • the conditioning station(s) and the stocking station (s) will be arranged in any direction and relative position, preferably such that the contour of the factory adapts to the available surface at the building site.
  • the semi-finished voussoirs in the conditioning station (s) and the finished voussoirs in the stocking station (s) will be arranged in any number, direction and position, preferably such that the contour of the factory- adapts to the available surface at the building site.
  • the frames in the reinforcing station (s) and the molds in the concreting station (s) will have the dimensions (width, length, curve, etc.) suited to the manufacture to be obtained. All this is obviously done such that the predetermined yield requirements are met.
  • the factory comprises one or more roofs, whether they are stationary or moveable, they can be sized and arranged in any manner suited to the configuration of the factory.
  • the supplies such as the rebar-like elements and the conditioning material can enter the factory in the manner that is likewise most suited to the configuration of the factory.
  • the supplies such as the rebar-like elements and the conditioning material can enter through entrances located at the beginning and at the end of the production lines if the factories are basically elongated in the direction of the production lines.
  • rebar-like element is intended to mean any solid reinforcing steel-type body, reinforcement, reinforcing steel, smooth bar, corrugated bar, steel cord, strand, etc. used in the art such that it is embedded in the concrete part to give improved properties to the part against tensile stresses.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Sustainable Development (AREA)
  • General Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Sustainable Energy (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Wind Motors (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The present invention relates to a factory (10, 100) for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers, to the concrete voussoirs manufactured by molding in said factory (10, 100), and to a wind generator support tower at least partially constructed by concrete voussoirs manufactured by molding in said factory (10, 100), as well as to the operating method of said factory (10, 100).

Description

FACTORY FOR THE MOLDING MANUFACTURE OF PRECAST CONCRETE
VOUSSOIRS FOR THE CONSTRUCTION OF WIND GENERATOR SUPPORT TOWERS
DESCRIPTION
Field of the Invention
The present invention relates to a factory for the molding manufacture of precast concrete voussoirs (wedge-shaped panels) for the construction of wind generator support towers, to the concrete voussoirs manufactured by molding in said factory, and to a wind generator support tower at least partially constructed by concrete voussoirs manufactured by molding in said factory, as well as to the operating method of said factory.
Background of the Invention
Making at least one portion of wind generator towers using precast concrete voussoirs instead of metal parts has been known for a relatively short time.
This practice enables obtaining wind generator support towers with better mechanical strength properties. However, for practical design reasons, at least some of the precast concrete voussoirs intended for the construction of wind generator support towers must be extraordinarily large and heavy.
Due to the relative newness of the practice of using precast concrete voussoirs instead of metal parts for making at least one portion of wind generator towers as was previously mentioned, there are virtually no factories dedicated to the manufacture of parts of this type. In the state of the art there are, however, large precast facilities which do not manufacture parts of this type but rather others with their own characteristics but they are potentially capable of manufacturing parts of this type with the pertinent adjustments. These large facilities include large load capacity gantry cranes or bridge cranes extending substantially along the entire production line, first handling raw material and then precast parts to a stocking area in which are stored said parts. Said gantry cranes or bridge cranes are supported, as a last resort, on foundations of either the support columns of the roof of the facility in the case of bridge cranes or on their own support columns in the case of gantry cranes.
Therefore, the state of the art in the field of the invention generally presents large and expensive facilities which are essentially immobile in the sense that they are built with a view to a permanent site, so in addition to the fact that building and dismantling them can be equally expensive and tedious, building them causes structural changes in the location terrain that are extremely difficult if not impossible to reverse, even after being dismantled, i.e., they have a substantial environmental impact.
Furthermore, if the parts were precast concrete voussoirs for making at least some of the wind generator towers, once the voussoirs are precast in the facility, clear drawbacks would arise in terms of handling large and heavy voussoirs.
For example, the road transport of large voussoirs from the facility to the point of erection of the pertinent towers, in addition to involving an elevated cost, is an always complicated task with certain risks, entailing a problem especially in territories with very strict regulations concerning the road transport of large-sized parts. By way of example, in Spain, in particular, transporting voussoirs of more than 20 meters in length involves a number of additional legal requirements so in practice, manufacturers normally limit the longitudinal dimension of the voussoirs they produce precisely to said length of 20 meters. Likewise, in practice manufacturers usually limit the transverse dimension of the voussoirs they manufacture to a width of 5 meters for similar reasons. Additionally, those complications are accentuated because they are heavy items .
In other countries, the regulation can be even more restrictive and limit the dimensions of the voussoirs to smaller sizes or require more permits and authorizations. Obviously, in addition to regulatory and permit issues, in less developed countries with less advanced road systems practical transport problems can arise which could even be insurmountable .
Therefore, there is a need to improve the system of molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers such that the drawbacks derived from handling the manufactured voussoirs even in the event that they are large, precisely without limiting the size or the weight of the voussoirs to be manufactured and limiting the environmental impacts, are reduced.
Summary of the Invention
The object of the present invention is, therefore, a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers enabling the reduction of the drawbacks derived from handling the manufactured voussoirs even in the event that they are large and heavy, without precisely limiting neither the size nor the weight of the voussoirs to be manufactured and limiting the environmental impacts.
More specifically, a first aspect of the present invention is a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, using passive steel or rebar-like elements, as well as active pre-stressing steel, with or without sheath, concrete and finishing accessories, the factory including hoisting means and concreting means, the factory also including:
- at least one reinforcing station, with at least one frame, for preparing cores of rebar-like elements called cages,
- at least one concreting station, with at least one mold including a main mold body, a counter mold and a protective canvas for the steam setting, for the application of one of said cages in said mold, the concreting of said mold, the setting of said concrete in said mold and the extraction of the set part (semi-finished voussoir) from said mold,
- at least one conditioning station for the finishing of said semi-finished voussoir and/or the application of finishing accessories to said semi-finished voussoir, and
- at least one stocking area for the storage of finished voussoirs;
wherein the base of said reinforcing station, said concreting station and said conditioning station comprises a concrete slab formed directly on compacted terrain, i.e., without foundations, anchors or the like to the compacted terrain, said hoisting means are hoisting means without foundations, said mold body is divided into at least two portions attached to one another by fixing means, and said counter mold is divided into at least two portions attached to one another by fixing means.
A factory is thus provided for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, having structural features which allow placing the factory in a place of origin in a disassembled state in initial units that are smaller than the voussoirs to be manufactured, taking said initial units to a building site close to the point of delivery or assembly of the voussoirs to be manufactured, assembling the factory at said building site starting from said initial units, manufacturing the pertinent voussoirs by means of the factory in the assembled state, disassembling the factory at said building site until the factory is in a disassembled state in final units that are smaller than the manufactured voussoirs, and taking said final units to a place of destination, leaving said building site in basically the same conditions as before the assembly of the factory at said building site, i.e., with an essentially nil environmental impact.
Said place of destination can logically be said place of origin from the start, or it can be a different building site. The manufacture can thus take place at a building site that is so close to the point of delivery or assembly of the voussoirs that the drawbacks derived from handling said voussoirs even in the case of them being large and heavy are considerably reduced.
In fact, the manufacture can take place at a building site that is so close to the point of delivery or assembly of the voussoirs that road transport is avoided, as are the aforementioned drawbacks, the dimensions of the voussoirs to be manufactured then being limited by the load capacity of the hoisting means, which is usually greater than the road transport means which are typically used in the state of the art .
Additionally, the factory can include (pre-tensioned reinforcement and/or post-tensioned reinforcement) pre- stressing performance means, which will preferably be arranged in said concreting station or in said conditioning station.
Optionally, all or part of the hoisting means without foundations and/or the concreting means can be mobile. For example, the hoisting means can comprise one or more boom crane trucks or one or more gantries on wheels (optionally self- propelled) and/or the concreting means can comprise one or more concrete mixer trucks or one or more pieces of concrete distribution equipment , including pumping equipment .
Preferably, said concrete slab is formed on site in a single part.
In any case, the concrete slab will preferably have a thickness of 15 cm at the least and preferably of 25 cm at the most .
A second aspect of the present invention is a concrete voussoir intended for the construction of wind generator support towers, manufactured in said factory.
Finally, a third aspect of the present invention is a wind generator support tower at least partially constructed by concrete voussoirs manufactured in said factory. Brief Description of the Drawings
Figure 1 schematically shows the layout of a first embodiment of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers according to the present invention.
Figure 2 schematically shows a front view of Figure 1.
Figure 3 schematically shows the layout of a second embodiment of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers according to the present invention.
Figure 4 schematically shows a front view of Figure 3. Particular Embodiments of the Invention
Referring to Figures 1 and 2, they show a first embodiment of a factory 10 for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, according to the present invention, at a building site .
The factory 10 comprises at one end an entrance 12 for rebar-like elements, followed in an essentially linear manner in series by an reinforcing station 14, a concreting station
16, a conditioning station 18 and a stocking station 20.
In said reinforcing station 14, five frames 22 are arranged longitudinally in the direction of the production line, in two lines of two frames 22 and one line of one frame 22 parallel to one another. Said frames 22 receive rebar-like elements from said entrance 12. Said rebar-like elements are then attached to make cages. Said reinforcing station 14 can optionally comprise welding means for attaching the rebar-like elements to one another, although said cages will preferably be made by tying the rebar-like elements to one another in a manner that is known in the state of the art.
In said concreting station 16 six steam setting molds 24 are arranged longitudinally in the direction of the production line, in two lines of three molds 24 each. Said molds 24 are divided into four portions attached to one another by fixing means (not shown) .
Said molds 24 receive the cages made in said reinforcing station 14, and concrete is subsequently poured into the molds 24, the poured concrete is left to set and the set parts 38 (in this case, semi-finished voussoirs intended for the construction of wind generator support towers) are finally extracted from said molds 24.
Optionally, corrugated sheaths intended to be embedded in a predetermined manner in the concrete once it is poured into said mold 24 will also be arranged in said reinforcing stations
14 or in said concreting station 16, such sheaths being suitable for a subsequent assembly of the voussoirs.
Optionally, in a manner known in the art said concreting station 16 can comprise pre-tensioned reinforcement pre- stressing means, including pre-stressing tendons, which are arranged in the mold and are tensioned before the pouring and setting of the concrete, and pre-stressing performance means, which will tension said pre-stressing tendons.
For the molding, each of said molds 24 includes a main mold body, a counter mold and a steam setting canvas (neither shown nor described in detail as it is part of the state of the art) .
The concreting means comprise a concrete mixer 26 which, once assembled, is arranged in a stationary manner, laterally with respect to said concreting station 16 (said concrete mixer
26 could also be arranged in and be part of the actual concreting station 16) . The concrete will therefore be poured into each mold 24 from said concrete mixer 26, in this embodiment by means of preferably self-propelled dispensing carriages 40 which are also part of said concreting means. As an alternative or as a complement to said dispensing carriages 40, tubular or semi-tubular conduits can be used (not shown in the figures) .
Said conditioning station 18 is shown with four semi- finished voussoirs 38 which were brought from the concreting station 16, once extracted from said molds 24.
In said conditioning station 18, the semi-finished voussoirs 38 can receive a finishing (polishing and/or painting and/or lacquering, etc.) . Furthermore, in said conditioning station 18, the semi-finished voussoirs 38 can be provided with the appropriate finishing accessories, for example with eye bolts or any other means of attachment to other voussoirs . The material necessary for the finishing enters said conditioning station 18 laterally with respect to said factory 10.
Said reinforcing station 14, said concreting station 16 and said conditioning station 18 make up the operational section of said factory 10. Said operational section 14, 16, 18 is established on a concrete slab 28 that is 20 cm thick.
Finally, said stocking station 20 has a plurality of finished voussoirs 32 stored in an orderly fashion, prepared for delivery.
The factory 10 includes hoisting means made up of two gantries 30 the rails 42 of which are fixed directly to said concrete slab 28 and of five self-propelled gantries 30' on wheels.
Additionally, in the present embodiment, an asphalted area 34 is arranged laterally and contiguous to said operational section 14, 16, 18. The factory 10 further comprises a folding or modular canopy or stationary roof 36 extending above the entire operational section 14, 16, 18 and a portion of the asphalted area 34 to simply improve working conditions for the operators .
Now referring to Figures 3 and 4, they show a second embodiment of a factory 100 for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, according to the present invention, at a building site.
The factory 100 comprises two reinforcing stations 114 and a concreting station 116, both elongated in the direction of the production line, parallel to one another, followed in an essentially linear manner in series by a conditioning station 118 and a stocking station 120.
In each of said reinforcing stations 114 three frames 122 are arranged longitudinally in the direction of the production line. Said frames 122 receive rebar-like elements laterally with respect to said factory 100. Said rebar-like elements are then attached to make cages. Optionally, as in the first embodiment discussed above, said reinforcing stations 114 can comprise welding means for attaching the rebar-like elements to one another, although said cages will preferably be made by tying the rebar-like elements to one another in a manner that is known in the state of the art .
In said concreting station 116 six steam setting molds 124 are arranged longitudinally in the direction of the production line, in two lines of three molds 124 each. Said molds 124 are divided into four portions attached to one another by fixing means (not shown) .
Said molds 124 receive the cages made in said reinforcing station 114, and concrete is subsequently poured into the molds 124, the poured concrete is left to set and the set parts 138
(in this case, semi- finished voussoirs intended for the construction of wind generator support towers) are finally extracted from said molds 124.
For the molding, each of said molds 124 includes a main mold body, a counter mold and a steam setting canvas (neither shown nor described in detail as it is part of the state of the art) .
As can be seen in Figures 3 and 4 , in this embodiment said reinforcing stations 114 are parallel with said concreting station 116 such that said concreting station 116 is located between said reinforcing stations 114.
This factory 100 comprises completely moveable concreting means specifically consisting of two concrete mixer trucks 126 moving laterally with respect to said reinforcing stations 114. The concrete will then be poured directly from said concrete mixer trucks 126 into each mold 124.
Optionally, corrugated sheaths intended for being embedded in a predetermined manner in the concrete once it is poured into said mold 124 will also be arranged in said reinforcing stations 114 or in said concreting station 116, such sheaths being suitable for a subsequent assembly of the voussoirs.
Optionally, in a manner known in the art said reinforcing stations 114 or said concreting station 116 can comprise pre- tensioned reinforcement pre-stressing means, including sheathed pre-stressing tendons, which are arranged in the mold before the pouring and setting of the concrete and will be tensioned after the pouring and setting of the concrete, and pre- stressing performance means, which will tension said pre- stressing tendons .
Said conditioning station 118 is shown with two semifinished voussoirs 138 which were brought from the concreting station 116 once extracted from said molds 124.
In said conditioning station 118, the semi-finished voussoirs 138 can receive a finishing (polishing and/or painting and/or lacquering, etc.). Furthermore, in said conditioning station 118, the semi- finished voussoirs 138 can be provided with the appropriate finishing accessories, for example with eye bolts or any other means of attachment to other voussoirs. The material necessary for the finishing enters said conditioning station 118 laterally with respect to said factory 100.
As an alternative to what has been described above, said pre-stressing performance means will preferably be arranged in said conditioning station 118.
Said reinforcing station 114, said concreting station 116 and said conditioning station 118 make up the operational section of said factory 100. Said operational section 114, 116, 118 is established on a concrete slab 128 that is 20 cm thick.
Finally, said stocking station 120 has a plurality of finished voussoirs 132 stored in an orderly fashion, prepared for delivery and subsequent assembly.
The factory 100 includes hoisting means made up of two boom crane trucks 130 moving laterally with respect to said operational section 114, 116, 118.
5 Additionally, in the present embodiment, the factory 100 comprises two moveable roofs 136 to simply improve the working conditions for the operators. Said moveable roofs 136 slide in the direction of the production line in respective straight contiguous parallel paths of said operational section 114, 116, 10 118, on rails 134 formed directly in said concrete slab 128. In the present embodiment, each moveable roof 136 has an extension in the direction of said rails 134 essentially equal to the length of a mold 124.
Naturally, the principle of the invention remaining the 15 same, the embodiment details can be greatly varied with respect to those described and illustrated herein simply by way of non- limiting example, without thereby departing from the scope of protection defined by the attached claims .
Basically, the reinforcing station (s), the concreting
;20 station (s) , the conditioning station(s) and the stocking station (s) will be arranged in any direction and relative position, preferably such that the contour of the factory adapts to the available surface at the building site. Likewise, the frames in the reinforcing station (s), the molds in the
;25 concreting station(s), the semi-finished voussoirs in the conditioning station (s) and the finished voussoirs in the stocking station (s) will be arranged in any number, direction and position, preferably such that the contour of the factory- adapts to the available surface at the building site. 30 Furthermore, the frames in the reinforcing station (s) and the molds in the concreting station (s) will have the dimensions (width, length, curve, etc.) suited to the manufacture to be obtained. All this is obviously done such that the predetermined yield requirements are met.
;35 Likewise, if the factory comprises one or more roofs, whether they are stationary or moveable, they can be sized and arranged in any manner suited to the configuration of the factory.
Of course two or more factories according to the present invention can be paired or matched up to form a single manufacturing unit without thereby departing from the scope of the invention.
Furthermore, the supplies such as the rebar-like elements and the conditioning material can enter the factory in the manner that is likewise most suited to the configuration of the factory. For example, in the case mentioned above of a manufacturing unit formed by several factories according to the invention matched up to one another, it may be appropriate for most of the supplies to enter through entrances located at the beginning and at the end of the production lines if the factories are basically elongated in the direction of the production lines.
Finally, it must be understood that as it is used herein the term "rebar-like element" is intended to mean any solid reinforcing steel-type body, reinforcement, reinforcing steel, smooth bar, corrugated bar, steel cord, strand, etc. used in the art such that it is embedded in the concrete part to give improved properties to the part against tensile stresses.

Claims

1.- A factory (10; 100) for the molding manufacture of precast concrete voussoirs for the construction of wind 5 generator support towers, using passive steel or rebar-like element(s), as well as active pre-stressing steel, with or without sheath, concrete and finishing accessories, the factory including (10; 100) hoisting means (30, 30'; 130) and concreting means (26; 126) , the factory also including (10; ;10 100):
- at least one reinforcing station (14; 114), with at least one frame (22; 122), for preparing cages,
- at least one concreting station (16; 116) , with at least one steam setting mold (24; 124) including a main mold body, a
15 counter mold and a steam setting canvas, for the application of one of said cages in said mold (24; 124), the concreting of said mold (24; 124), the setting of said concrete in said mold (24; 124) and the extraction of the set part (semi-finished voussoir) (38; 138) from said mold,
;20 - at least one conditioning station (18; 118) for the finishing of said semi-finished voussoir (38; 138) and/or the application of finishing accessories to said semi- finished voussoir (38; 138), and
- at least one stocking area for the storage of finished ;25 voussoirs (32; 132);
characterized in that the base of said reinforcing station (14; 114), said concreting station (16; 116) and said conditioning station (18; 118) comprises a concrete slab (28; 128) formed directly on compacted terrain, i.e., without
30 foundations, anchors or the like to the compacted terrain, in that said hoisting means (30, 30'; 130) are hoisting means without foundations, in that said mold body is divided into at least two portions attached to one another by fixing means, and in that said counter mold is divided into at least two portions
35 attached to one another by fixing means.
2. - The factory according to claim 1, additionally including pre-stressing means, including pre-stressing performance means and pre-stressing tendons.
3. - The factory according to claim 2, wherein said pre- stressing performance means are arranged in said concreting station (16; 116) in the case of pre-tensioned reinforcement or in said conditioning station (18; 118) in the case of post- tensioned reinforcement.
4. - The factory according to any one of the previous claims, wherein all or a portion of said hoisting means (30,
30' ; 130) without foundations are moveable and/or all or a portion of said concreting means (26; 126) are moveable.
5. - The factory according to claim 4 , wherein said hoisting means comprise one or more boom crane trucks (130) and/or one or more gantries (30) on rails (42) and/or one or more gantries (30') on wheels.
6. - The factory according to claim 5 , wherein at least one of said gantries (30) on rails (42) and/or at least one of said gantries on wheels (30') are self-propelled.
7.- The factory according to claim 4, wherein said concreting means comprise one or more concrete mixer trucks (126) or pieces of concrete distributing equipment, including pumping equipment .
8. - The factory according to any one of the previous claims, wherein said concrete slab (28; 128) is formed on site in a single part.
9. - The factory according to any one of the previous claims, wherein said concrete slab (28; 128) preferably has a thickness of 15 cm at the least and preferably 25 cm at the most.
10. - The factory according to any one of the previous claims, additionally comprising at least one folding or modular canopy or stationary roof (36) at least partially covering said reinforcing station (14; 114) and/or said concreting station (16; 116) and/or said conditioning station (18; 118) .
11. - The factory according to any one of the previous claims, additionally comprising at least one moveable roof (136) at least partially covering said reinforcing station (14; 114) , said concreting station (16; 116) and said conditioning station (18; 118) .
12. - The factory according to claim 11, wherein said moveable roof (136) slides in the direction of the production line on rails (134) formed directly in said concrete slab (128) and has an extension in the direction of said rails (134) essentially equal to the length of a mold (124) .
13. - An operating method of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers according to any one of the previous claims, characterized in that it includes the following steps:
placing the factory in a place of origin in a disassembled state in initial units that are smaller than the voussoirs to be manufactured,
- taking said initial units to a building site close to the point of delivery of the voussoirs to be manufactured,
- assembling the factory at said building site starting from said initial units,
- manufacturing the pertinent voussoirs by means of the factory in the assembled state,
- disassembling the factory at said building site until the factory is in a disassembled state in final units that are smaller than the manufactured voussoirs, and
taking said final units to a place of destination leaving said building site in basically the same conditions as before assembling the factory at said building site.
14. - The method according to claim 13 , wherein said place of destination is said place of origin.
15. - The method according to claim 13 , wherein said place of destination is another building site.
PCT/EP2010/007225 2009-11-30 2010-11-29 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers Ceased WO2011063983A1 (en)

Priority Applications (10)

Application Number Priority Date Filing Date Title
KR1020127016338A KR20140015636A (en) 2009-11-30 2010-11-29 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers
CA2781979A CA2781979A1 (en) 2009-11-30 2010-11-29 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers
NZ600538A NZ600538A (en) 2009-11-30 2010-11-29 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers
MX2012006151A MX2012006151A (en) 2009-11-30 2010-11-29 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers.
JP2012541341A JP2013512132A (en) 2009-11-30 2010-11-29 Factory for forming precast concrete panels for construction of wind generator support towers
CN2010800541197A CN102695590A (en) 2009-11-30 2010-11-29 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers
UAA201207913A UA106401C2 (en) 2009-11-30 2010-11-29 Factory for molding manufacture of precast concrete voussoirs for construction of wind generator support towers
EP10795926A EP2507021A1 (en) 2009-11-30 2010-11-29 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers
ZA2012/03981A ZA201203981B (en) 2009-11-30 2012-05-31 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers
MA34975A MA33831B1 (en) 2009-11-30 2012-06-15 MANUFACTURING PLANT FOR MOLDING PRECAST CONCRETE BUMPERS FOR THE CONSTRUCTION OF AEROGENERATOR MOUNTS

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ES200902259A ES2371960B1 (en) 2009-11-30 2009-11-30 FACTORY FOR THE PRODUCTION BY MOLDING OF PREFABRICATED CONCRETE DOVELAS FOR THE CONSTRUCTION OF AIRLINER SUPPORT TOWERS.
ESP200902259 2009-11-30

Publications (1)

Publication Number Publication Date
WO2011063983A1 true WO2011063983A1 (en) 2011-06-03

Family

ID=43587548

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2010/007225 Ceased WO2011063983A1 (en) 2009-11-30 2010-11-29 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers

Country Status (20)

Country Link
US (2) US20110127691A1 (en)
EP (1) EP2507021A1 (en)
JP (1) JP2013512132A (en)
KR (1) KR20140015636A (en)
CN (1) CN102695590A (en)
AR (1) AR081705A1 (en)
AU (1) AU2010246534B2 (en)
BR (1) BRPI1004888B1 (en)
CA (1) CA2781979A1 (en)
CL (1) CL2012001390A1 (en)
CO (1) CO6541619A2 (en)
DE (1) DE202010018643U1 (en)
ES (1) ES2371960B1 (en)
MA (1) MA33831B1 (en)
MX (1) MX2012006151A (en)
NZ (1) NZ600538A (en)
UA (1) UA106401C2 (en)
UY (1) UY33067A (en)
WO (1) WO2011063983A1 (en)
ZA (1) ZA201203981B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2749386A3 (en) * 2012-12-27 2015-12-09 Acciona Windpower S.a. Mould and manufacturing process for precast concrete element production
EP3845354A2 (en) 2019-12-10 2021-07-07 Wobben Properties GmbH Method of manufacturing segments for a tower, prestressed segment, tower ring, tower, wind turbine and prestressing device

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2460392B1 (en) * 2012-02-07 2015-07-21 Inneo Torres, S.L. STORAGE STRUCTURE OF CONSTRUCTION MODULES OF AIRPORT SUPPLIER TOWERS, PROCEDURE USING STRUCTURE AND INSTALLATION RESULTING FROM SUCH PROCEDURE
ES1109530Y (en) 2014-04-30 2014-08-06 Acciona Windpower Sa PORTABLE PLANT FOR THE MANUFACTURE OF PREFABRICATED CONCRETE ELEMENTS FOR CONCRETE TOWER
ES2565518B1 (en) * 2014-09-17 2016-12-27 Pacadar S.A. Method for the manufacture of tubular concrete segments and for the erection of towers by means of said tubular segments
CN104723449B (en) * 2015-02-12 2017-08-18 沈阳卫德住宅工业化科技有限公司 A kind of automatic assembly line of building industrialization concrete prefabricated element
CN106223708A (en) * 2016-08-31 2016-12-14 山东电力建设第工程公司 Scheme had bad luck by a kind of inner steel cylinder of chimney barrel sheet material
ES2688842A1 (en) * 2017-05-03 2018-11-07 Universidad De Valladolid DOVELAS SUPPORT AND TRANSPORTATION SUPPORT
CN111761706B (en) * 2020-08-05 2025-09-12 远大住宅工业(天津)有限公司 Pre-curing device for reinforced concrete prefabricated components, production line and processing method thereof
CN112140324A (en) * 2020-10-23 2020-12-29 上海电气研砼(木垒)建筑科技有限公司 A detachable mobile assembly line factory
CN113306002A (en) * 2021-05-28 2021-08-27 中铁四局集团第三建设有限公司 Layout construction method and application of prefabricated bridge prefabricated part production base
ES2942547B2 (en) 2021-12-01 2026-04-06 Esteyco S A PROCEDURE FOR MANUFACTURING AND ASSEMBLING A PLURALITY OF TOWERS IN A WIND FARM
CN117817828B (en) * 2023-12-29 2025-04-15 明阳智慧能源集团股份公司 Prefabrication production method of long and short line combination of floating UHPC buoy segments

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3659979A (en) * 1968-07-13 1972-05-02 Wolfgang Schneider Plant for manufacturing small structural elements
NL7803925A (en) * 1977-07-19 1979-01-23 Mitsubishi Heavy Ind Ltd FACTORY BOAT FOR MANUFACTURE OF REINFORCED CONCRETE PRODUCTS.
DE2939472A1 (en) * 1979-09-28 1981-04-09 G.A. Pfleiderer GmbH & Co KG, 8430 Neumarkt Concrete column with prestressed rods - also has after stressing rods wedged in anchor plate with screw holes
FR2872843A1 (en) * 2004-07-12 2006-01-13 Electricite De France Longitudinal mast for wind turbine in marine site, involves decomposing mast into lower and upper sections, and assembling sections between them, and with base and nacelle of wind turbine in rigid manner
DE102006051045A1 (en) * 2006-10-30 2008-05-08 Erich Kastner Device for manufacturing elements from hardenable casting mass, preferably at building site places, has transportable container that is designed inside for regulation and withdrawal of movable equipment relevant for manufacturing of element
WO2009099360A1 (en) * 2008-02-05 2009-08-13 Telefonaktiebolaget L M Ericsson (Publ) Method of making hollow concrete elements

Family Cites Families (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3014598A (en) * 1958-05-20 1961-12-26 Concrete Conduit Corp Mold positioner for concrete-molding plant
US3254914A (en) * 1965-05-26 1966-06-07 Vindale Corp Mobile home underframe construction
US3552072A (en) * 1968-10-11 1971-01-05 James P O Connell Method and apparatus for housing an enclosed area with aero-trussed structures
US3534512A (en) * 1969-03-13 1970-10-20 William Ballas Collapsible shelter
US3659986A (en) * 1970-03-16 1972-05-02 Nathan L Gelbman Apparatus for making concrete products
US3994060A (en) * 1971-10-01 1976-11-30 Lely Cornelis V D Methods and production lines for the manufacture of prefabricated buildings
JPS4965981A (en) * 1972-10-30 1974-06-26
GB1446853A (en) * 1972-12-08 1976-08-18 Dobie C H Gantry cranes
US3925679A (en) * 1973-09-21 1975-12-09 Westinghouse Electric Corp Modular operating centers and methods of building same for use in electric power generating plants and other industrial and commercial plants, processes and systems
US3963395A (en) * 1974-02-25 1976-06-15 Automated Construction Industries, Inc. Mass production line for fabricating structural building members
US4005972A (en) * 1975-04-04 1977-02-01 Bearingwall Systems Inc. Invertible apparatus for molding a concrete panel
US4175361A (en) * 1977-10-13 1979-11-27 Kiyomitsu Tanaka Openable canopy housing
JPS5527231A (en) * 1978-08-18 1980-02-27 Nikken Kogaku Kk Preparation of concrete block
ES278419Y (en) 1984-03-26 1985-05-16 Tecmacon, S.A. METALLIC STRUCTURE FOR THE ATTACHMENT OF PANELS, IN THE CONSTRUCTION OF PREFABRICATED UNITS.
JPH027854Y2 (en) * 1985-02-13 1990-02-26
FR2589500B1 (en) * 1985-11-06 1988-01-08 Leurent Ghislain COVERABLE STRUCTURE OF ANY PLACE, IN PARTICULAR OF A POOL
FR2669259A1 (en) * 1990-11-21 1992-05-22 Tuyaux Bonna Process for the manufacture of prefabricated arch units
US5398472A (en) * 1993-02-19 1995-03-21 The Shandel Group Fiber-bale composite structural system and method
ES1043906Y (en) 1998-07-28 2000-07-16 Blanco Baeza Fernando MODULAR Kiosk PERFECTED FOR URBAN SERVICE.
JP3120980B2 (en) * 1999-10-29 2000-12-25 普 山田 Concrete unit manufacturing equipment
JP2001322115A (en) * 2000-05-17 2001-11-20 Shimizu Corp Site factory equipment
JP3603957B2 (en) * 2001-09-06 2004-12-22 株式会社沖創建設 On-site manufacturing method for PC members
EP1629160A1 (en) * 2003-05-02 2006-03-01 David W. Powell A structure and method for prefabricated construction
EP1669503A1 (en) 2003-08-20 2006-06-14 Incoribe, S.L. Building construction method and modular shuttering method
US20050252123A1 (en) * 2004-05-14 2005-11-17 Karen Colonias Construction connector anchor cage system
US20070079565A1 (en) * 2005-07-25 2007-04-12 Bahram Bahramian Light weight sandwich panels
JP4746959B2 (en) * 2005-10-26 2011-08-10 株式会社竹中工務店 Tower structure
CN101316972B (en) * 2006-03-06 2012-03-07 积水化学工业株式会社 Building structures, structural units and construction methods
US20080022609A1 (en) * 2006-07-28 2008-01-31 Bit Technologies Limited Mobile manufacturing plants for producing prefab elements
CN200952187Y (en) * 2006-09-07 2007-09-26 张兴汉 Assembling building structural components
US7832087B2 (en) * 2006-10-11 2010-11-16 The Mattamy Corporation Housing manufacturing system
JP2008101363A (en) * 2006-10-18 2008-05-01 Oriental Shiraishi Corp Columnar structure, its construction method, and concrete panel
SE531076C2 (en) * 2007-04-12 2008-12-09 Ingenjoers Hebe Ab Fa Plant for the production of concrete
WO2009056898A1 (en) * 2007-11-02 2009-05-07 Alejandro Cortina-Cordero Post-tensioned concrete tower for wind turbines
DE102008016828A1 (en) * 2008-04-01 2009-10-15 Wobben, Aloys Process for producing precast concrete parts

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3659979A (en) * 1968-07-13 1972-05-02 Wolfgang Schneider Plant for manufacturing small structural elements
NL7803925A (en) * 1977-07-19 1979-01-23 Mitsubishi Heavy Ind Ltd FACTORY BOAT FOR MANUFACTURE OF REINFORCED CONCRETE PRODUCTS.
DE2939472A1 (en) * 1979-09-28 1981-04-09 G.A. Pfleiderer GmbH & Co KG, 8430 Neumarkt Concrete column with prestressed rods - also has after stressing rods wedged in anchor plate with screw holes
FR2872843A1 (en) * 2004-07-12 2006-01-13 Electricite De France Longitudinal mast for wind turbine in marine site, involves decomposing mast into lower and upper sections, and assembling sections between them, and with base and nacelle of wind turbine in rigid manner
DE102006051045A1 (en) * 2006-10-30 2008-05-08 Erich Kastner Device for manufacturing elements from hardenable casting mass, preferably at building site places, has transportable container that is designed inside for regulation and withdrawal of movable equipment relevant for manufacturing of element
WO2009099360A1 (en) * 2008-02-05 2009-08-13 Telefonaktiebolaget L M Ericsson (Publ) Method of making hollow concrete elements

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2749386A3 (en) * 2012-12-27 2015-12-09 Acciona Windpower S.a. Mould and manufacturing process for precast concrete element production
EP3845354A2 (en) 2019-12-10 2021-07-07 Wobben Properties GmbH Method of manufacturing segments for a tower, prestressed segment, tower ring, tower, wind turbine and prestressing device
US11566605B2 (en) 2019-12-10 2023-01-31 Wobben Properties Gmbh Method for manufacturing segments for a tower, prestressed segment, tower ring, tower, wind turbine, and prestressing device

Also Published As

Publication number Publication date
ES2371960A1 (en) 2012-01-12
ZA201203981B (en) 2013-08-28
CO6541619A2 (en) 2012-10-16
AU2010246534A1 (en) 2011-06-16
KR20140015636A (en) 2014-02-06
CL2012001390A1 (en) 2013-07-12
UA106401C2 (en) 2014-08-26
UY33067A (en) 2011-06-30
BRPI1004888A2 (en) 2013-03-19
CA2781979A1 (en) 2011-06-03
US20110127691A1 (en) 2011-06-02
AR081705A1 (en) 2012-10-17
CN102695590A (en) 2012-09-26
MX2012006151A (en) 2012-08-23
AU2010246534B2 (en) 2014-01-09
EP2507021A1 (en) 2012-10-10
ES2371960B1 (en) 2012-11-19
JP2013512132A (en) 2013-04-11
MA33831B1 (en) 2012-12-03
NZ600538A (en) 2014-06-27
BRPI1004888B1 (en) 2017-02-14
US20120324823A1 (en) 2012-12-27
DE202010018643U1 (en) 2020-10-30

Similar Documents

Publication Publication Date Title
AU2010246534B2 (en) Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers
US10513858B2 (en) Construction process of structures with empty segments and construction system of structures with empty segments
EP2479430B1 (en) Method for assembling shell segments for forming tower sections of a hybrid wind turbine tower
EP3212863B1 (en) Method for installing a hollow concrete tower made from more than one segment
KR101230049B1 (en) Incremental launching apparatus for launching concrete slab for bridge using form and rail, and constructing method for the same
KR101223753B1 (en) Incremental launching apparatus for launching concrete slab of tunnel type for composite bridge, and constructing method for the same
KR101195442B1 (en) Apparatus for making box girder for bridge and a method for manufacturing box girder for bridge using this apparatus
JP6871728B2 (en) Prefabricated structure
EP3535460B1 (en) Reinforcing framework and slab design
EP3403798B1 (en) Mobile structure and procedure for the prefabrication of desirably prestressed concrete bars
EP2939809B1 (en) Portable facility for the manufacture of prefabricated concrete elements for concrete towers
KR20180054526A (en) Round lamp structure for vehicle entry and exit with stress distribution type precast frame
JP2009281141A (en) Hollow floor slab unit for prefabricated bridge, hollow floor slab for prefabricated bridge, and construction method of hollow floor slab bridge
US20250162023A1 (en) Arrangement and process for the construction of a steel plant and related steel plant
CN120556505B (en) General reusable caisson reinforcement rapid deployment construction method
JP2018184724A (en) Culvert construction method
KR101940040B1 (en) Incremental launching apparatus having spreader beam assembly for controlling bearing stress of hydraulic jack, and method for the same
CN113863151A (en) Steel box tied arch bridge construction method
UA142069U (en) DEVICE FOR MANUFACTURE OF FRAMES OF DRILLED PILLS
JPH03107037A (en) Constructing method for structure

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10795926

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2781979

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: MX/A/2012/006151

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: DZP2012000356

Country of ref document: DZ

Ref document number: 2012001390

Country of ref document: CL

Ref document number: 2012541341

Country of ref document: JP

Ref document number: 12090295

Country of ref document: CO

WWE Wipo information: entry into national phase

Ref document number: 2010795926

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 1540/MUMNP/2012

Country of ref document: IN

ENP Entry into the national phase

Ref document number: 20127016338

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: A201207913

Country of ref document: UA