WO2011077085A2 - A crane on a vessel - Google Patents
A crane on a vessel Download PDFInfo
- Publication number
- WO2011077085A2 WO2011077085A2 PCT/GB2010/002309 GB2010002309W WO2011077085A2 WO 2011077085 A2 WO2011077085 A2 WO 2011077085A2 GB 2010002309 W GB2010002309 W GB 2010002309W WO 2011077085 A2 WO2011077085 A2 WO 2011077085A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- crane
- deck
- lifting
- arm
- arrangement according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/10—Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
- B63B27/12—Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes of gantry type
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/04—Fastening or guiding equipment for chains, ropes, hawsers, or the like
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
Definitions
- the present invention relates generally to crane systems and arrangements for marine vessel applications. More particularly, the invention relates to a travelling crane arrangement for a floating vessel. Aspects of the invention provide a crane on a vessel where the crane includes a transverse beam that extends between uprights and where the crane is movable on tracks along the vessel.
- Lifting and handling operations onboard a vessel are illustrated under reference to anchor handling work as such operations well illustrate the tasks involved. This is in no way intended to limit the scope of the invention to such applications.
- Anchor Handling Tug Vessels utilized for anchor handling, such as so-called Anchor Handling Tug Vessels (AHTVs) are often equipped with a stern roller and a relatively heavy winch.
- an anchor rope that may include a chain, a wire or a rope, is connected to the anchor, and the anchor is lowered into the sea over the stern roller by letting out rope from the winch.
- Retrieving an anchor is undertaken by performing the operations in reversed order. Large forces are encountered during such operations and sometimes assistance is needed from another vessel in order to ensure safe working conditions.
- the '367 publication proposes a roller that is parallel to the stern of the vessel and connected to two arms.
- the arms which are hinged close to the stern of the vessel, are moving the roller between an idle position below the deck and an active position above the stern.
- the anchor When an anchor is to be deployed, the anchor is placed on the deck behind the roller.
- the roller is moved towards its active position, thus lifting the anchor at least partly off the deck.
- the anchor may be lowered clear of the stern as the rope is let out over the roller.
- a disadvantage of the equipment is that the roller is moving along a fixed path and does not offer the flexibility of a crane.
- N0325335 shows a transverse crane that spans across a vessel.
- the crane includes a remotely operated arm for handling anchor equipment.
- a travelling crane arrangement for a floating vessel having a pair of substantially parallel tracks
- the crane arrangement comprising: a pair of uprights for movement on respective said tracks, a transverse beam extending between said uprights so as to extend across a deck of the vessel in spaced relation thereto, the beam having a trolley arranged for movement along the beam, the trolley carrying at least part of a lifting mechanism operable to lift a load above the deck, wherein the crane arrangement is characterised by the provision of a support selectively positionable in an brace position in which it extends between the deck and the trolley to at least partially support the beam in compression during use of the crane to lift or otherwise support the weight of a load.
- tracks is used herein to refer to any convenient elongate member along which other components of the arrangement may run and thus includes, for example, rails, channels or the like.
- the tracks are arranged to extend in a substantially stem-stern direction of the vessel and may either me mounted directly on or in the cargo deck or other deck of the vessel, or be raised above the deck, for example in the region of the vessel's gunwales.
- said support comprises an arm slideably mounted to said trolley for sliding movement between a retracted position in which the arm is substantially clear of the deck and a brace position in which a lower end of the arm engages the deck to support the beam.
- said arm forms part of said lifting mechanism and is configured for use in lifting a load when not engaged with the deck to support the beam, the lifting mechanism being operable to lift said load by slideably raising the arm relative to the trolley.
- said lifting mechanism comprises a lifting member arranged for sliding movement along said support, the lifting mechanism being operable to lift a load via upwards movement of the lifting member along the support.
- said lifting mechanism is operable for independent movement of i) said arm relative to said trolley, and ii) said lifting member relative to said arm.
- said lifting mechanism is operable to move said lifting member relative to said arm whilst the lower end of said arm is engaged with the deck to support the beam.
- said lifting member comprises a rotatably mounted sheave, the lifting member being operable via movement of a wire or rope passing around the sheave.
- the crane arrangement is provided in combination with a tool releasably connectable to said lifting member.
- the crane arrangement may be provided in combination with a tool releasably connectable to the lower end of said arm.
- the or at least one said tool is a gripping tool.
- the or at least one said tool is remotely controlled.
- the tool comprises a robotic arm.
- the crane arrangement comprises two said trolleys, each trolley being arranged for independent movement along said beam and having a respective said support.
- each said support has a respective said lifting member, the lifting mechanism being operable to raise and lower said lifting members either independently of one another or in synchronism.
- said lifting members are arranged in facing relation to one another, thereby permitting each to be connected to a respective part of a load extending between said supports.
- the arrangement further comprises a pair of carriages configured for sliding movement along respective said tracks, wherein each said upright is pivotally connected to a respective said carriage and is thus arranged for tilting movement about a substantially horizontal axis.
- said beam is pivotally connected to each said upright about a substantially horizontal axis and is arranged for tilting movement relative to said uprights.
- the arrangement is provided on a vessel and the lower end of the or each said arm is releasably connectable to a respective fitting mounted in or on the deck of the vessel when the arm is in its operative position.
- the vessel is provided with a roller hook comprising a roller mounted for rotation about an axis between a pair of spaced apart side members, the roller hook having a stowed position beneath the deck of the vessel.
- said side members are each configured for connection to a respective said lifting member, the roller hook thus being arranged to be lifted clear of the deck by said lifting members.
- said roller hook is received within a cradle when in said stowed position, the cradle being mounted for transverse sliding movement in or below said deck, and wherein said fittings for connection to the lower ends of said arms are provided on the cradle in spaced relation to one another on respective sides of the roller hook.
- Figure 1 is a perspective view of vessel for anchor handling operations that includes a crane and a roller hook;
- Figure 2 shows to a larger scale an end view of the crane where the upper part of the crane is in its lower position
- Figure 3 shows an end view of the crane where the upper part of the crane is in its upper position
- Figure 4 shows an end view of the crane where the crane is tilted and a manipulator arm is extending from the crane;
- Figure 5 shows to a larger scale a perspective view of a the interface between an upright of the crane and the vessel
- Figure 6 shows in a perspective view a section of the deck of the vessel including a roller hook in its lower position and a lifter of the crane;
- Figure 7 shows in a perspective view the roller hook fixed to the crane
- Figure 8 shows a side view of the roller hook fixed to the crane
- Figure 9 shows a side view of the roller hook used as a pulley
- Figure 10 shows a principal sketch of a vessel where an item is retrieved from the sea and where the rope is passing over the stern roller and to a winch
- Figure 11 is a view corresponding generally to that of figure 10, but illustrates the rope passing over the roller hook when the roller hook is in its active position on the crane;
- Figure 12 is a view corresponding generally to that of figure 11 , but illustrates the item entering the deck of the vessel;
- Figure 13 is a view corresponding generally to that of figure 12, but which shows the arrangement after the item has been retrieved onto the deck and the roller hook has been lowered to its stowage position;
- Figure 14 is a perspective view of vessel for anchor handling operations having a crane arrangement in accordance with another embodiment
- Figure 15 is a perspective view of the crane arrangement shown separate from the vessel;
- Figure 16 is an elevational view of the crane arrangement of figures 14 and 15, showing the crane in the position of figure 15;
- Figure 17 is a generally similar view to figure 15, but shows the crane in an alternate position/configuration
- Figure 18 is a generally similar view to figure 16, but which shows the crane in the position/configuration of figure 17;
- Figure 19 is perspective view showing the crane in another alternate position/configuration
- Figure 20 is an elevational view showing the crane in the position/configuration of figure 19;
- Figure 21 is a perspective view showing the crane of figures 13 to 20 in a position immediately prior to connection to tools stowed below the deck of the vessel;
- Figure 22 shows the crane equipped with tools for use in handling an anchor chain
- Figure 23 shows the crane equipped with tools in an alternative manner
- Figure 24 shows the crane supporting an anchor via a lifting yoke
- Figure 25 shows the crane setting the anchor down at the aft end of the vessel's deck
- Figure 26 shows the crane in an alternate position ready for connection to a roller hook, and also shows the roller hook in the deck;
- Figure 27 shows the crane in an initial stage during connection to the roller hook, with support arms extending downwardly to the deck;
- Figure 28 is a perspective view, from the opposite side, of the lower ends of the support arms, with lifting members associated therewith connected to the roller hook;
- Figure 29 shows the crane in use to lift the roller hook above the deck
- Figure 30 shows the crane in use in an alternative mode of operation in which it is tilted over the aft end of the vessel;
- Figure 31 shows the crane supporting the roller hook over the aft end of the vessel;
- Figure 32 shows the crane in a parked position and the roller hook in use for spooling a wire between two winches
- Figure 33 shows the crane supporting a wire-coiling tool
- Figure 34 is an enlarged view showing the wire-coiling tool of figure 33 fixed to the lower end of one of the crane's support arms.
- FIG 1 there is illustrated a marine vessel 1 of a so-called Anchor Handling Tug Vessel (AHTV) type.
- the vessel has a deck 2 including retractable towing pins 4 and stern rollers 6 as is conventional for such vessels.
- the vessel 1 is also equipped with a heavy winch 8 at deck level and a pair of lighter winches 10 position raised above the deck 2, on the vessel's superstructure.
- tracks 12 for a crane 14 of a gantry type.
- the tracks 12 are parallel, extend in the stem-to-stern direction of the vessel and are shown mounted to the gunwales of the vessel, at positions raised above the deck 2.
- the tracks could alternatively be mounted in or on the deck 2.
- the crane 4 includes a transverse beam 6 that extends between two uprights 18.
- the uprights are movable on wheels 20 along the tracks 12, as shown most clearly in figure 5.
- a lifter 22 for lifting of heavy loads is connected to a trolley 24.
- the trolley 24 is movable along the transversal beam 16.
- a knuckle boom 26 is also connected to the trolley 24.
- a hydraulic aggregate 28 and winch 30 for operating the lifter 22 via and arrangement of wires and pulleys are fixed to the crane 14.
- a roller hook 32 is positioned in an aperture 34 in the deck 2 at a position in front of the towing pins 4.
- a first hydraulic ram 36 is connected between a lower telescopic part 38 and an upper telescopic part 40 of each upright as shown most clearly in figure 2.
- the transverse beam 16 is shown in its lower position with the first ram 36 fully retracted.
- Figure 3 shows the upper telescopic part 40 having been driven upwardly with respect to the lower telescopic part 38 via extension of the first hydraulic ram 36, the resultant effect being to raise the transverse beam 16 to the upper position illustrated.
- the first ram 36 is not shown in figure 3.
- the lower telescopic part 38 of the upright is pivotally mounted about an axis 42 to a carriage 44.
- the carriage 44 holds the wheels 20.
- a second hydraulic ram 46 which is connected between the carriage 44 and the lower telescopic part 38 of the upright, is designed to tilt the transverse beam 16 and the uprights 18 about the axis 42 upon extension, as illustrated in figure 4.
- the knuckle boom 26 is shown in an extended position suitable for forerunner work.
- each carriage 44 is moved along its respective track 12 via operation of a hydraulic motor 48 which is mounted to the carriage and which engages with a toothed, rack 50 extending parallel to the track 12 in close spaced relation thereto. This is illustrated most clearly in figure 5.
- the lifter 22 is equipped with a telescopic lifting arm 52 that is extendable in the vertical direction as illustrated most clearly in figures 6 and 7.
- a wire 54 which is connected to the winch 30, is shown running in a well known manner over pulleys 56 on the trolley 24 and on the arm 52.
- the knuckled boom 26 is not shown in figures 6 and 7.
- the telescopic arm 52 is equipped with a cross-beam 58 that includes two actuator-operated hooks 60 which are spaced apart from one another at opposite ends of the cross-beam 58.
- a cradle 62 is positioned in the aperture 34 in the deck 2, as shown in figure 6.
- the cradle 62 is movable in the aperture 34 on transversely oriented tracks 64 via a first actuator 66 in the starboard-portside direction of the vessel 1.
- the cradle 62 includes an elevating module 68.
- the elevating module 68 is moveable in the vertical direction relative to the cradle 62 by a second actuator 70.
- the roller hook 32 includes a roller 72 which is mounted for rotation about an axis between a pair of spaced apart side members 74.
- the roller 72 is thus free to rotate relative to the side members 74.
- Each side member carries a fitting in the form of a catch 76 along its upper edge, each catch being configured for engagement with the hooks 60 of the cross-beam 58.
- each side member 74 is also provided with a pair of extendable locks 78 arranged at respective upper corners of the side members.
- the roller hook 32 is pivotally connected to the elevating module 68 via respective releasabie pivotal connections 80 at the lower regions of the two side members 74.
- the roller hook 32 rests on the elevating module 68 in the cradle 62 below the deck 2.
- a rope (or a wire or a chain) 84 will normally be located between the towing pins 4 as shown in figure 6.
- the cradle 62 with the roller hook 32 is moved in the starboard-portside direction so as to position the roller 72 beneath the rope 84.
- the elevating module 68 is then elevated to lift the roller hook 32, preferably until the roller abuts the rope 84, and the connections 80 are released leaving the roller hook resting on the elevating module but not pinned thereto.
- the crane 14 is then moved along the tracks 12 and the trolley is moved along the transverse beam 16 as necessary to position the lifter 22 over the roller hook 32.
- the telescopic arm 52 is then extended so as to lower the cross-beam 58 towards the roller hook. As illustrated in figure 6, the cross-beam spans the gap between the side members 74 of the roller hook and the hooks 60 at each end of the cross-beam engage respective catches 76.
- the lifter 22 then moves the roller hook 32 upwardly towards the traverse beam 16 where the side members 74 engage within complementary receptacles 86 as shown in figures 7 and 8.
- the locks 78 are then operated to engage with the receptacles 86, whereupon the lifter 22 may be disconnected from the roller hook 32, leaving the roller hook 32 secured to the transverse beam 16 in the raised position above the deck 2.
- Figure 9 shows the roller hook 32 in use in another type of operation in which it remains pinned to the elevator module 68 but is lifted above the level of the deck 2 via the elevator module for use as a pulley for spooling purposes.
- FIG. 10 also shows the crane 14 is in its retracted parked position immediately aft of the vessel's superstructure, while the roller hook 32 is in its idle stowed position below the deck 2.
- the roller hook 32 is then engaged with the rope 84 and connected to the crane 14 as described above.
- the crane 14 may then be moved to the stern of the vessel 1 and tilted out over the stern via extension of the second hydraulic rams 46 to move the uprights pivotally about their pivot axes 42, as shown in figure 11.
- the object 88 may then be lifted at least partly out of the sea without being bent over the stern roller 6.
- the object 88 is shown entering the deck 2 over the stern roller 6 at an angle that that creates significantly less tension in the rope 84 than would be the case if the object were pulled onto the deck with the rope 84 passing directly over the stern roller 6 as in the prior art.
- Figure 13 shows the object 88 retrieved and located on the deck 2, with the roller hook 32 having been lowered back down to the deck 2 to a position favourable for disconnecting the rope from the object.
- FIG 14 shows a marine vessel 1 of the same general configuration to that described above and illustrated in figure 1 ; namely an AHTV.
- the vessel 1 again has a deck 2 including retractable towing pins 4 (not shown in figure 1) and stern rollers 6 in a generally conventional configuration.
- the vessel is also equipped with a heavy winch 8 at deck level and a pair of lighter winches 10 at a position raised above the deck 2, on the vessel's superstructure.
- tracks 12 for the crane 1 which is again of a travelling gantry type.
- the tracks 12 are parallel, extend in the stem-to-stern direction of the vessel and are shown mounted to the gunwales of the vessel, at positions raised above the deck 2.
- the tracks could alternatively be mounted in or on the deck 2.
- the crane 14 again includes a transverse beam 16 extending between a pair of uprights 18, the uprights being movable on wheels 20 along the tracks 12 in a generally similar manner to that described above with reference to the arrangement of figures 1 to 12.
- Two trolleys 24, 25 are mounted to the transverse beam 16 for independent movement along the beam. In the parked position illustrated in figures 14 to 16 it will be noted that one trolley 24 is located at the port end of the beam 16, generally adjacent the upper end of the port upright 18, whilst the other trolley 25 is located at the starboard end of the beam 16, generally adjacent the upper end of the starboard upright 18.
- the transverse beam 16 comprises a pair of spaced apart parallel members 90, each of which has a track or rail 91 mounted on its upper surface along which the trolleys 24, 25 are mounted for movement along the beam 16.
- Each trolley 24, 25 carries a respective lifting arm 92, 93 which forms part of a lifting mechanism operable to lift a load above the deck 2.
- the lifting arms 92, 93 are each slideably mounted to a respective trolley 24, 25 for sliding movement in a direction substantially parallel to the uprights 18, and the lifting mechanism is operable to move the lifting arms 92, 93 relative to their respective trolleys independently of one another.
- the lower end region of each arm 92, 93 carries a rotatably mounted pulley wheel 56.
- Control wires extend down the length of each arm in a loop around the pulley wheels 56 and then return upwardly to the trolleys.
- the control wires and are used to control the vertical position of the lifting arms 92, 93 in a manner known per se and similar to that in which the length of the lifting arm 22 of the previously described embodiment is controlled.
- the two lifting arms 92, 93 pass between the two beam members 90 and so any load supported or lifted by the lifting arms will be spread substantially equally between the two beam members 90.
- Figures 1 to 16 show the two lifting arms 92, 93 in parked positions in which they extend downwardly from their respective trolleys with their lower ends 94, 95 spaced above the deck 2.
- the lifting arms are each shown with a lifting hook 96, 97 fitted to their lower ends.
- Figures 17 and 18 show the crane arrangement in a position in which the two trolleys 24, 25 have been moved towards one another so as to sit generally adjacent in a central region of the beam 16. As will be noted, with the trolleys 24, 25 positioned adjacent one another in this manner, the two lifting arms are spaced from one another. Figures 17 and 18 also show the two lifting arms 92, 93 in their fully lowered positions relative to the trolleys 24, 25.
- each lifting arm 92, 93 is provided with a respective lifting member 98, 99, the lifting members being mounted to the arms for sliding movement along the length of the arms.
- the lifting members 98, 99 are each arranged so as to extend in an inboard direction from the arm on which they are mounted towards the other arm, and so in this manner the lifting members 98, 99 are arranged in facing relation to one another, with each occupying a space between the two lifting arms 92, 93.
- Each lifting member 98, 99 has a rotatably mounted sheave 100, 101 around which a control wire (not shown) is passed, looping down from the trolley above in a manner known per se.
- the two lifting members 98, 99 are moved along their respective arms 92, 93 under the control of the wires.
- the lifting mechanism can be controlled either to move the two lifting members 98, 99 independently of one another or in synchronism.
- the lifting arms 92, 93 and the lifting members 98, 99 all form part of the overall lifting mechanism of the crane arrangement.
- the lifting mechanism is operable to move the two arms 92, 93 relative to their respective trolleys 24, 25 entirely independently of any movement between the lifting members 98, 99 and the arms.
- the lifting members 98, 99 can both be moved with or without simultaneous movement of their respective lifting arms 92, 93. This functionality of the lifting mechanism provides for considerable flexibility in lifting operations.
- each upright 18 is again pivotally mounted about a substantially horizontal pivot axis 42 to a respective carriage 44, the carriages holding the wheels 20 for movement along the tracks 12.
- a first actuator 102 in the form of a hydraulic ram is connected between each carriage 44 and an upper end of each upright 18.
- Figure 20 illustrates in solid lines the position of the crane arrangement when the two actuators 102 are each in their fully retracted positions, and it will be seen that in this condition the two uprights 44 both extend substantially vertically upwards from the carriages 44.
- extension of the two actuators 102 is effective to tilt the uprights 18 in an aft direction about the axes 42.
- a pair of second actuators 103 are also provided, each of which also takes the form of a hydraulic ram.
- the second actuators 103 are each connected between a respective carriage and a corresponding end part of the transverse beam 16.
- the transverse beam 16 is pivotally connected at each end to a respective upright 18 for rotation about an axis 104 running parallel to the length of the beam 6 and transversely relative to the vessel 1.
- the beam 16 is mounted for rotational movement relative to the uprights 18, this movement being controlled via the second actuators 103, independently of the tilting movement of the uprights 18.
- Figure 19 shows the uprights 18 tilted rearwardly relative to their supporting carriages 44, and also shows the transverse beam 16 having been simultaneously rotated relative to the uprights, under the control of the second actuators 103, such that the lifting arms 92, 93 remain substantially vertical.
- figure 20 shows, in phantom, the uprights 18 tilted rearwardly and the beam 16 also having been rotated relative to the uprights so that the lifting arms 92, 93 adopt a non-vertical position.
- the crane arrangement 14 is shown installed on an AHTV having a tool store 104 located below the level of the deck 2, on the starboard side of the vessel 1.
- the tool store 104 takes the form of a cavity formed below the deck, and is provided with slideably retractable doors 105.
- the doors 105 are shown in figure 14 in their retracted positions which are effective to open the tool store 104 for access.
- the crane 14 is shown positioned so that the two trolleys 24, 25 are generally adjacent one another at the starboard end of the transverse beam 16.
- the port trolley 24 is shown positioned immediately above the open tool store 104, and its lifting arm 92 is shown extending down towards the tool store.
- the port lifting arm is thus positioned ready to receive a handling tool from within the tool store, for connection to the lower end of the arm, for example in place of the lifting hook 96 previously illustrated.
- the tool store 104 may contain one or more tools for releasable connection to the lower end of each lifting arm 92, 93.
- Connection of a suitable tool to the arm can either be done manually, involving deck personnel manually lifting the tool from within the store and connecting it to the lower end of the arm located above, or possibly automatically by lowering the arm 92 down into the store 104 and into automatic engagement with the tool.
- Figure 21 shows the lifting arm 93 of the starboard trolley 25 with a first tool 106 already connected to its lower end, the tool 106 having been retrieved from the tool store 104 as described above.
- Figure 22 shows the crane arrangement with a second tool 107 having been retrieved from the tool store 104 and connected to the lower end of the port lifting arm, both lifting arms thus each having a respective tool connected thereto.
- the doors 105 of the tool store 104 are closed after selection of appropriate tools.
- the crane 14 is shown in use handling a heavy chain 108 which runs from the heavy winch 8, through a raised gripping jaw 109, between the raised towing pins 4 and which terminates with a connection to an anchor 110 shown hanging over the rollers 6 at the stern of the vessel.
- the second tool 107 connected to the starboard lifting arm is provided in the form of an articulated robotic arm having a gripping jaw 111 at its free end.
- the robotic arm is configured for remote control, for example by an operative sitting in a control room, remote from the operations on deck.
- Figure 23 illustrates the crane 14 performing a similar chain handling operation, but in this arrangement the robotic arm tool 107 is connected to the lifting member 98 of the starboard lifting arm 92 instead of the lower end of the arm itself.
- Figure 24 shows the crane 14 in use lifting and transporting a deep sea anchor 110 above the deck 2 in an aftwards direction towards the stern rollers 6 in readiness for launching.
- the anchor 110 is connected to and suspended from a lifting yoke 112.
- the lifting yoke 112 is shown connected at opposite ends to respective lifting members 98, 99 and is thus supported between the two lifting arms 92, 93, both of which are in a raised position to lift the anchor 110 clear of the deck 2.
- Figure 25 shows the crane 4, supporting the yoke 112 and the anchor 110, in its aftmost position in which the carriages 44 are located at the aft ends of their respective tracks 12. In this position, the transverse beam 16 and the lifting arms 92, 93 are located above the aft end of the deck, immediately forward of the stern rollers 6.
- Figure 26 shows the crane 14 in a subsequent position in preparation for launch of the anchor 10.
- the anchor 110 has been lowered and set down on the deck adjacent the stern rollers 6.
- the lifting yoke 112 is not shown in figure 26 as it has been moved forwardly by the crane 14 and positioned in a safe stowage position, clear of the launching area.
- the heavy anchor chain 108 is shown in figure 26 connected to the anchor so as to extend forwardly from the anchor, over the roller hook 32 and along the deck 2 to the heavy winch 8.
- the roller hook 32 has a generally similar configuration to that previously described and as shown in figures 1 to 13. As will be appreciated, when not in use the roller hook 32 is stowed below the level of the deck behind a pair of sliding doors 113.
- the doors 113 are shown in figure 26 in an open position to provide access to the roller hook 32.
- the crane 14 is shown in a longitudinal position along the deck 2 which is effective to locate the transverse beam 16 above the roller hook 32.
- the roller hook 32 is positioned below the anchor chain 108, whereupon the trolleys 24, 25 of the crane are moved together so as to be positioned adjacent one another and above the roller hook 32 as shown in figure 27.
- Figure 27 also shows the two lifting arms 92, 93 in a fully lowered position in which they extend from the level of the deck 2 all the way up to their respective trolleys 24, 25. More particularly, the lower end of each lifting arm 92, 93 is shown engaged in a respective fitting in the form of a socket 114 formed in the cradle 62 on opposite sides of the roller hook 32, as illustrated most clearly in figure 28.
- the lower ends of the lifting arms 92, 93 are releasably locked in position in the sockets 14, for example by suitable catches or the like.
- FIG 27 also shows the roller hook 32 having been raised above the level of the deck 2 by the underlying elevating module 68, the catches 76 on the two side members 74 thus being presented in a position above the level of the deck and adjacent respective arms 92, 93.
- the two lifting members 98, 99 can then be moved downwardly along their respective arms 92, 93 and into engagement with the two catches 76 for releasable connection thereto. This is illustrated in figure 28, and in this configuration the roller hook 32 is connected to the two lifting members 98, 99.
- the crane 14 can then be operated to lift the roller hook 32 upwardly, out of the cradle 62 and towards the transverse beam 16 by moving the two lifting members 98, 99 upwardly along their respective arms as illustrated in figure 29.
- the crane thus serves a similar function to that described above in connection with the arrangement of figures 1 to 13.
- the two lifting arms 92, 93 are locked relative to their respective trolleys 24, 25 at their upper ends, and are received in and connected to the sockets 114 at deck level at their lower ends, they effectively adopt a brace position in which they function as supports to at least partially support the transverse beam 16 (the arms acting in compression) as the crane lifts the roller hook 32 and the associated weight of the chain and anchor.
- the arms 92, 93 thus relieve the bending stresses which would otherwise be applied to the transverse beam under the weight of the roller hook 32 and associated load of the chain and the anchor.
- the lifting arms 92, 93 of the above-described arrangement thus have a dual function.
- each arm 92, 93 could be used in their bracing function for various other lifting operations apart from the roller hook lifting operation described above.
- the lower end of each arm 92, 93 with a pad or other such fitting in order to permit the arms to be lowered into brace positions at any of a number of different positions on the deck 2, the pad simply sitting on the upper surface of the deck.
- the only requirement for a suitable bracing position for the arms would be that the deck beneath is sufficiently well supported to withstand the loads likely to be applied by the arms 92, 93 as the crane is used to lift or support a load.
- the deck 2 may be provided with fittings for connection to the lower ends of the arms at discrete positions around the deck.
- the crane arrangement 14 is shown in use to operate a tool in the form of a boathook 1 15 which is pivotally connected to the lower end of the one of the lifting arms 92.
- the crane is positioned as far aft as possible, with its two carriages 44 thus located at the aft ends of the tracks 12.
- the uprights 18 have been tilted rearwardly about their pivot axes 42 in the manner described above in connection with figures 19 and 20.
- the position of the boathook 115 can also be controlled via pivotal movement of the transverse beam 16 relative to the uprights 18.
- Figure 31 shows the crane 14 in a similar position in which the uprights 18 are tilted rearwardly so as to support the transverse beam 6 over the sea.
- the lifting members 98, 99 are connected to the roller hook 32 and the lifting arms 92, 93 are fully raised so that the roller hook 32 is suspended from the trolleys 24, 25 and is clear from obstruction by the lifting arms.
- the crane 14 and the roller hook 32 can be used for operations involving the lowering of load to the seabed; for example installation of a Christmas tree on a subsea oil-well.
- FIG. 33 illustrates the crane 14 being used for wire-winding operations, in which only one trolley 25 and its associated lifting arm 93 are used, the other trolley 24 being left in its parked position.
- the lower end of the operative arm 93 is shown connected to a cross-beam 58 of generally identical configuration to that described above in connection with figure 6.
- FIG. 32 illustrates the crane 14 in an inoperative parked position, and shows the roller hook 32 raised above the level of deck 2 in a similar manner to that illustrated in figure 9 discussed above. In this position, the roller hook 32 can be used for spooling operations, for example to spool a wire or a rope 1 16 between the heavy winch 8 and one of the light winches 10 as shown.
- orientation used herein such as “horizontal”, “vertical” and derivatives thereof, are intended to refer to the normal orientation of certain components relative to the normal position of the vessel 1 when floating in normal trim in substantially flat water.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Jib Cranes (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP10801216.2A EP2516250B1 (en) | 2009-12-21 | 2010-12-21 | A crane on a vessel |
| BR112012015448-6A BR112012015448B1 (en) | 2009-12-21 | 2010-12-21 | floating vessel comprising an overhead crane |
| DK10801216.2T DK2516250T3 (en) | 2009-12-21 | 2010-12-21 | Crane on a ship |
| US13/517,262 US9061738B2 (en) | 2009-12-21 | 2010-12-21 | Crane on a vessel |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US28836409P | 2009-12-21 | 2009-12-21 | |
| US61/288,364 | 2009-12-21 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2011077085A2 true WO2011077085A2 (en) | 2011-06-30 |
| WO2011077085A3 WO2011077085A3 (en) | 2011-12-01 |
Family
ID=43719499
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/GB2010/002309 Ceased WO2011077085A2 (en) | 2009-12-21 | 2010-12-21 | A crane on a vessel |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US9061738B2 (en) |
| EP (1) | EP2516250B1 (en) |
| BR (1) | BR112012015448B1 (en) |
| DK (1) | DK2516250T3 (en) |
| WO (1) | WO2011077085A2 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130220204A1 (en) * | 2009-12-21 | 2013-08-29 | National Oilwell Varco, L.P. | Crane on a Vessel |
| WO2015122777A1 (en) * | 2014-02-11 | 2015-08-20 | Macgregor Norway As | A device for handling and storage of a traveling unit of an offshore crane |
| EP3421409A1 (en) * | 2017-06-30 | 2019-01-02 | Lohr Industrie | Handling gantry and handling system comprising such a gantry |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NL2014296B1 (en) * | 2015-02-13 | 2016-10-13 | Hendricus Liet Cornelis | Device for loosening feed. |
| NO20180894A1 (en) * | 2018-06-25 | 2019-12-26 | Rolls Royce Marine As | Rope sheave arrangement and a vessel comprising a rope sheave arrangement |
| US20220154695A1 (en) | 2020-11-18 | 2022-05-19 | Friede & Goldman, Llc D/B/A Friede & Goldman, Ltd. | Systems and methods for assembling and installing offshore wind turbines |
| WO2022235508A2 (en) | 2021-05-06 | 2022-11-10 | Friede & Goldman, Llc D/B/A Friede & Goldman Ltd. | Systems and methods for a rack structure for a transport vessel adapted for use with an offshore self-elevating vessel |
| CN114735599B (en) * | 2022-03-29 | 2023-03-10 | 武汉理工大学 | A gantry crane ship capable of intelligent cooperative operation |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2009005367A2 (en) | 2007-07-05 | 2009-01-08 | Odim Asa | Anchor handling device |
Family Cites Families (78)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1428809A (en) | 1922-09-12 | Boat crane | ||
| GB596544A (en) | 1945-07-30 | 1948-01-06 | Harnischfeger Corp | Improvements in bridge cranes |
| US2343014A (en) | 1943-05-08 | 1944-02-29 | Langan Thomas | Hoisting frame |
| US2490609A (en) * | 1945-05-07 | 1949-12-06 | Harnischfeger Corp | Cargo handling apparatus |
| US2984367A (en) | 1958-01-24 | 1961-05-16 | Humboldt Company | Cable hauling system with fixed machinery for use on container ships |
| US3042227A (en) | 1958-09-26 | 1962-07-03 | Sea Land Service | Shipboard freight container transferring apparatus |
| FR1239793A (en) | 1959-07-31 | 1960-08-26 | Nat Malleable & Steel Castings | Improvements to a lifting system for freight containers |
| US3061112A (en) | 1960-12-08 | 1962-10-30 | Lake Shore Inc | Material handling apparatus |
| US3074563A (en) | 1961-12-13 | 1963-01-22 | Pacific Coast Eng Co | Fold-in boom |
| FR92601E (en) * | 1962-12-29 | 1968-12-06 | Mac Gregor Comarain Sa | Device for loading and unloading on ships or the like, and ships fitted with such devices |
| DE1215019B (en) | 1962-09-12 | 1966-04-21 | Sverre Munck | Support of pivotable booms of the portal of a ship crane |
| GB1027343A (en) * | 1963-05-08 | 1966-04-27 | John Vernon Buckland | Improvements in or relating to cargo, or like handling apparatus for ships |
| US3248487A (en) | 1963-07-11 | 1966-04-26 | Harnischfeger Corp | Shipboard cargo transferring apparatus having an electrical cable supporting means |
| GB1025017A (en) | 1963-11-12 | 1966-04-06 | Pacific Coast Eng Co | High speed cargo container handling equipment |
| US3244297A (en) | 1963-12-18 | 1966-04-05 | Alliance Machine Co | Container ship cranes |
| GB1125281A (en) | 1964-09-09 | 1968-08-28 | Vickers Ltd | Improvements in or relating to container handling apparatus |
| US3390657A (en) | 1966-08-12 | 1968-07-02 | Morgan Engineering Co | Gantry crane for loading barges on ships |
| GB1170847A (en) | 1967-09-14 | 1969-11-19 | Warnowwerft Warnemuende Veb | Improvements in or relating to Cranes |
| DK141778B (en) | 1967-10-19 | 1980-06-16 | Mitsui Shipbuilding Eng | Unloader for unloading bulk cargo, in particular chips, from ships. |
| US3550788A (en) | 1967-12-07 | 1970-12-29 | United Ind Syndicate | Overhead traveling crane and hoist mechanism therefor |
| BE708038A (en) | 1967-12-15 | 1968-04-16 | ||
| GB1232873A (en) | 1968-07-02 | 1971-05-19 | ||
| GB1193605A (en) | 1968-08-21 | 1970-06-03 | Catharius Marie Ponsen | Cargo Handling Apparatus for Ships. |
| US3486641A (en) | 1969-01-27 | 1969-12-30 | Fruehauf Corp | Bulk loader,unloader,and cargo container handling crane and method |
| US3598256A (en) | 1969-07-17 | 1971-08-10 | Alliance Machine Co | Container ship cranes |
| NL6917389A (en) | 1969-11-19 | 1971-05-24 | ||
| DE2052319A1 (en) | 1970-01-16 | 1971-07-22 | Direktion Der Binnenschiffahrt | Method and device for loading and unloading heavy goods, in particular on inland vessels |
| US3645405A (en) | 1970-04-20 | 1972-02-29 | Eness Research & Dev Corp | Cargo-handling vessel |
| US3696947A (en) * | 1970-07-15 | 1972-10-10 | Catharinus M Ponsen | Dock side cargo handling apparatus |
| DE2312991A1 (en) | 1973-03-15 | 1974-10-03 | Liebherr Hans Dr Ing E H | LOADING BRIDGE |
| JPS5523196B2 (en) | 1973-10-19 | 1980-06-21 | ||
| DE2406730A1 (en) | 1974-02-13 | 1975-08-21 | Neuenfelder Maschf Gmbh | Gantry crane for ship - having transverse beams on gantry to extend range of crane |
| FR2313256A1 (en) | 1975-06-04 | 1976-12-31 | Havre Chantiers | Transverse beam for transferring material between ships at sea - has ball and socket joint at one end to accommodate relative motion |
| JPS527555U (en) | 1975-07-03 | 1977-01-19 | ||
| DE2543156C3 (en) | 1975-09-27 | 1978-11-30 | Thomas Dipl.-Ing. Dipl.- Kfm. Dr. 4600 Dortmund Hinckeldey | Method and device for loading and unloading heavy piece goods, in particular containers, by means of a ship's own gantry crane |
| US4027800A (en) | 1975-12-03 | 1977-06-07 | The Alliance Machine Company | Gantry crane with plural hoist means |
| US4106641A (en) | 1976-03-17 | 1978-08-15 | Algoship International Limited | Universal gantry crane |
| FR2363510A1 (en) * | 1976-09-01 | 1978-03-31 | Ferodo Sa | Collapsible portal crane for ship - has pulleys and anchor points on folding columns accommodating hoist ropes for erection |
| FR2385636A1 (en) * | 1977-03-28 | 1978-10-27 | Mecatel | Structure for installing bridge girders - has secondary supports slidable on guides to allow attachment to piers which follow curve |
| DE2744334A1 (en) | 1977-10-01 | 1979-04-12 | Orenstein & Koppel Ag | LOADING BRIDGE |
| JPS5818275B2 (en) | 1977-11-04 | 1983-04-12 | 日立造船株式会社 | Ship with lifting crane track |
| FI56343C (en) | 1977-11-22 | 1980-01-10 | Kone Oy | FARTYGSLYFTKRAN |
| JPS5621749Y2 (en) | 1978-03-28 | 1981-05-22 | ||
| JPS54144592U (en) | 1978-03-30 | 1979-10-06 | ||
| JPS5943355Y2 (en) | 1978-04-05 | 1984-12-21 | 三菱重工業株式会社 | Retractable marine gantry crane |
| US4227846A (en) * | 1978-06-07 | 1980-10-14 | Valmet Oy | Method and apparatus for loading or unloading water vessels |
| FR2428565A1 (en) | 1978-06-14 | 1980-01-11 | Brissonneau & Lotz | Ship's cargo unloading crane - has guides allowing stowage of gantry in hold after removal of tower legs at sides of hold |
| JPS5828155B2 (en) | 1978-12-26 | 1983-06-14 | 日本鋼管株式会社 | Onboard crane for chemical tanker |
| JPS5943389B2 (en) | 1979-02-26 | 1984-10-22 | 三井造船株式会社 | Marine gantry crane |
| JPS57105893U (en) | 1980-12-23 | 1982-06-30 | ||
| JPS59108784U (en) | 1983-01-10 | 1984-07-21 | 石川島播磨重工業株式会社 | Onboard gantry crane |
| JPS59108780U (en) | 1983-01-11 | 1984-07-21 | 石川島播磨重工業株式会社 | Onboard crane |
| JPS60133888U (en) | 1984-02-14 | 1985-09-06 | 石川島播磨重工業株式会社 | Onboard gantry crane |
| JPS60159789U (en) | 1984-04-03 | 1985-10-24 | 曽 俊雄 | Double-headed traveling gantry crane |
| JPS6138297U (en) | 1984-08-11 | 1986-03-10 | 日立造船株式会社 | ship crane |
| JPH01118982U (en) | 1988-02-03 | 1989-08-11 | ||
| JPH0724316Y2 (en) | 1990-02-28 | 1995-06-05 | 石川島播磨重工業株式会社 | Gantry crane for ships |
| JPH0741672Y2 (en) | 1990-02-28 | 1995-09-27 | 石川島播磨重工業株式会社 | Gantry crane for ships |
| DE9108874U1 (en) | 1991-07-19 | 1992-11-19 | O & K Orenstein & Koppel Ag, 1000 Berlin | Onboard crane in gantry design |
| DE4123931A1 (en) * | 1991-07-19 | 1993-01-21 | Orenstein & Koppel Ag | PORTAL DESIGN ON-BOARD CRANE |
| JPH07137981A (en) | 1993-11-12 | 1995-05-30 | Sekigahara Seisakusho:Kk | Crane equipment for container ships |
| US5511268A (en) * | 1994-08-08 | 1996-04-30 | The United States Of America As Represented By The Secretary Of Commerce | Construction of large structures by robotic crane placement of modular bridge sections |
| NL1002362C2 (en) | 1996-02-15 | 1997-08-18 | Johannes Hubertus Kieboom | Substructure construction with heel minimizing supporting construction for jib crane on inland vessel. |
| JPH1036076A (en) | 1996-07-18 | 1998-02-10 | Mitsubishi Heavy Ind Ltd | Gantry crane carrying vessel and its loading method |
| JP2000318976A (en) | 1999-05-06 | 2000-11-21 | Nippon Steel Logistics Co Ltd | On-board gate crane |
| FR2808252B1 (en) * | 2000-04-26 | 2004-05-28 | France Etat | AUTONOMOUS CONTAINER SHIP |
| JP2002087758A (en) | 2000-09-12 | 2002-03-27 | Komatsu Ltd | Anti-swing device for unloading buckets in ship tanks |
| US20020129755A1 (en) * | 2001-01-12 | 2002-09-19 | Dagfinn Hagen | Apparatus for and method of installing subsea components |
| NO325335B1 (en) | 2001-12-03 | 2008-03-31 | Lars Magnus Solstad | Device and method of a traverse crane on a floating vessel |
| NO330543B1 (en) | 2005-12-23 | 2011-05-09 | Munck Cranes As | Lifting in process racks |
| US7845296B1 (en) * | 2006-12-13 | 2010-12-07 | Jon Khachaturian | Marine lifting apparatus |
| US20100263581A1 (en) * | 2007-12-17 | 2010-10-21 | Jon Khachaturian | Marine Lifting Apparatus |
| CN103847932B (en) * | 2008-02-15 | 2016-11-23 | 伊特雷科公司 | offshore drilling vessel |
| DE202008006569U1 (en) * | 2008-05-15 | 2008-07-24 | Rosenblum, Gabriel | Container crane with variable supports |
| EP2322001B1 (en) * | 2008-09-03 | 2018-04-25 | Thomson Licensing | Method and apparatus for transmit power control in wireless networks |
| KR20100031833A (en) * | 2008-09-16 | 2010-03-25 | 한국과학기술원 | Mobile harbor |
| US9061738B2 (en) * | 2009-12-21 | 2015-06-23 | National Oilwell Varco, L.P. | Crane on a vessel |
| EP2551231B1 (en) * | 2011-07-26 | 2014-06-25 | Spielthoff's Bevrachtingskantoor B.V. | Hold crane as well as pipefeeder vessel with such hold crane |
-
2010
- 2010-12-21 US US13/517,262 patent/US9061738B2/en active Active
- 2010-12-21 BR BR112012015448-6A patent/BR112012015448B1/en active IP Right Grant
- 2010-12-21 WO PCT/GB2010/002309 patent/WO2011077085A2/en not_active Ceased
- 2010-12-21 DK DK10801216.2T patent/DK2516250T3/en active
- 2010-12-21 EP EP10801216.2A patent/EP2516250B1/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2009005367A2 (en) | 2007-07-05 | 2009-01-08 | Odim Asa | Anchor handling device |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130220204A1 (en) * | 2009-12-21 | 2013-08-29 | National Oilwell Varco, L.P. | Crane on a Vessel |
| US9061738B2 (en) * | 2009-12-21 | 2015-06-23 | National Oilwell Varco, L.P. | Crane on a vessel |
| WO2015122777A1 (en) * | 2014-02-11 | 2015-08-20 | Macgregor Norway As | A device for handling and storage of a traveling unit of an offshore crane |
| NO339774B1 (en) * | 2014-02-11 | 2017-01-30 | Macgregor Norway As | Device for handling and storage of an offshore wreath unit |
| EP3421409A1 (en) * | 2017-06-30 | 2019-01-02 | Lohr Industrie | Handling gantry and handling system comprising such a gantry |
| FR3068343A1 (en) * | 2017-06-30 | 2019-01-04 | Lohr Industrie | PORTEUR HANDLING AND HANDLING SYSTEM COMPRISING SUCH A PORTIC |
Also Published As
| Publication number | Publication date |
|---|---|
| EP2516250A2 (en) | 2012-10-31 |
| BR112012015448B1 (en) | 2020-11-10 |
| BR112012015448A2 (en) | 2016-03-15 |
| EP2516250B1 (en) | 2016-07-20 |
| DK2516250T3 (en) | 2016-10-10 |
| US20130220204A1 (en) | 2013-08-29 |
| WO2011077085A3 (en) | 2011-12-01 |
| US9061738B2 (en) | 2015-06-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2516250B1 (en) | A crane on a vessel | |
| US3846860A (en) | Movable access ramp for vehicles | |
| KR100643808B1 (en) | Debit Device | |
| AU2008288209B2 (en) | Pipe laying apparatus and method | |
| US6591770B1 (en) | Boating lift | |
| KR20140123543A (en) | Traction system for operating lines of a vessel | |
| US4632622A (en) | Marine cargo transfer device | |
| JPH0686236B2 (en) | Offshore cargo handling equipment | |
| WO2018065748A1 (en) | Reel drive apparatus | |
| CN101389562A (en) | Tie-back systems for cranes, especially heavy-duty offshore cranes | |
| CN101337575B (en) | anchor handling device | |
| GB2316545A (en) | Seismic cable retrieval systems | |
| CN110382345B (en) | boat transfer system | |
| NL2015891B1 (en) | System and method for transfer of cargo and/or personnel. | |
| WO1996037403A1 (en) | Improvements relating to tender supports | |
| JP4568632B2 (en) | Lifting device | |
| JP3850434B1 (en) | Vehicle with lifting device and lifting device | |
| CA2308839A1 (en) | Marine carrier | |
| AU2025203530A1 (en) | Davit system | |
| CN220298698U (en) | Ship rescue boat retraction system | |
| RU2216462C2 (en) | Loader | |
| CN111377351A (en) | Crane for directly hoisting object into house | |
| JP2698736B2 (en) | Port ladder equipment | |
| CN214828505U (en) | A combined crane ship | |
| NO20240482A1 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10801216 Country of ref document: EP Kind code of ref document: A1 |
|
| DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| REEP | Request for entry into the european phase |
Ref document number: 2010801216 Country of ref document: EP |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2010801216 Country of ref document: EP |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112012015448 Country of ref document: BR |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13517262 Country of ref document: US |
|
| ENP | Entry into the national phase |
Ref document number: 112012015448 Country of ref document: BR Kind code of ref document: A2 Effective date: 20120625 |