WO2011104446A1 - Installation de production d'energie a partir d'un reacteur nucleaire rapide a gaz - Google Patents
Installation de production d'energie a partir d'un reacteur nucleaire rapide a gaz Download PDFInfo
- Publication number
- WO2011104446A1 WO2011104446A1 PCT/FR2011/000108 FR2011000108W WO2011104446A1 WO 2011104446 A1 WO2011104446 A1 WO 2011104446A1 FR 2011000108 W FR2011000108 W FR 2011000108W WO 2011104446 A1 WO2011104446 A1 WO 2011104446A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- circuit
- reactor
- primary
- pressure
- gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D3/00—Control of nuclear power plant
- G21D3/04—Safety arrangements
- G21D3/06—Safety arrangements responsive to faults within the plant
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
- F02C1/00—Gas-turbine plants characterised by the use of hot gases or unheated pressurised gases, as the working fluid
- F02C1/04—Gas-turbine plants characterised by the use of hot gases or unheated pressurised gases, as the working fluid the working fluid being heated indirectly
- F02C1/05—Gas-turbine plants characterised by the use of hot gases or unheated pressurised gases, as the working fluid the working fluid being heated indirectly characterised by the type or source of heat, e.g. using nuclear or solar energy
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C1/00—Reactor types
- G21C1/02—Fast fission reactors, i.e. reactors not using a moderator ; Metal cooled reactors; Fast breeders
- G21C1/028—Fast fission reactors, i.e. reactors not using a moderator ; Metal cooled reactors; Fast breeders cooled by a pressurised coolant
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C15/00—Cooling arrangements within the pressure vessel containing the core; Selection of specific coolants
- G21C15/18—Emergency cooling arrangements; Removing shut-down heat
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C15/00—Cooling arrangements within the pressure vessel containing the core; Selection of specific coolants
- G21C15/28—Selection of specific coolants ; Additions to the reactor coolants, e.g. against moderator corrosion
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Definitions
- the invention relates to fourth generation nuclear reactors, in particular those referred to as GFR (gas-cooled Fast Reactor).
- GFR gas-cooled Fast Reactor
- the invention relates more particularly to the cooling of such a reactor in an accident situation.
- fast reactor is meant a reactor using a coolant that does not slow down the neutrons emitted by the nuclear reaction and having no moderator.
- Figure 1 shows a power generation facility from a combined indirect cycle GFR reactor, of the type discussed in the conference paper Proceedings of ICAPP '09, Tokyo, Japan, May 10-14, 2009, P 9378, "CATHARE SIMULATION OF TRANSIENTS FOR THE 2400 MW GAS FAST REACTOR CONCEPT".
- a primary circuit 10 having pure helium as heat transfer fluid, passes through the core of a nuclear reactor 12 and by a heat exchanger 14.
- the helium is circulated by a fan 16 electrically powered and placed in the circuit between the outlet of the exchanger 14 and the inlet of the reactor 12.
- the helium is at a pressure of the order of 70 bar.
- This type of reactor, indirect cycle, differs from a direct cycle reactor in that the primary circuit does not include a turbine.
- the primary circuit simply serves to transfer the heat from the core of the reactor 12 to the exchanger 14, which facilitates the confinement of the reactor and the elements of the primary circuit, thus limiting the risks of activation, of missiles resulting from blade losses. the turbine and water inlet.
- the turbine 18 and the compressor 22 are mounted on the same shaft 24 which also drives an alternator 26.
- the mixture of helium and nitrogen comprises 50 to 70% volume fraction of helium, and the balance in nitrogen.
- the pressure of the mixture is of the order of 65 bar at the inlet of the turbine 18 and of the order of 40 bar at the outlet of the turbine 18.
- the steam turbine drives an alternator 36 thus completing the production of alternator electricity 26.
- This dual source of electricity production justifies the designation of combined indirect cycle.
- the distribution of the powers generated at the alternators 26 and 36 is of the order of 1/3 and 2/3, respectively.
- a helium-based primary backup circuit 40 passes through the reactor 12, a heat exchanger 42, and a fan 44. In normal operation, this circuit primary relief is cut by a valve 46, and the blower 44 is stopped.
- a backup secondary circuit 48 based on water, passes through the exchanger 42 and into a tank filled with water 50. In general, there are several redundant backup circuits.
- the reactor 12 and the primary circuits 10 and 40 are placed in a close enclosure 52 itself placed in a confinement enclosure not shown here.
- the close chamber is intended to ensure a sufficient reactor withdrawal pressure after a breach, of the order of 5 to 10 bars, and the containment chamber is intended to contain any leakage to the outside of elements that may be activated by the reactor.
- the pressures of the close chamber and the primary circuit equalize. The pressure rise in the close chamber is detected and causes the reactor to stop by introducing control rods into its core.
- This type of installation thus requires a number of operations to be implemented in the event of an accident. These operations can of course be automated, but they present a risk of default all the more high as the number of operations and intervening elements is high.
- a power generation installation comprising a primary gas circuit passing through a nuclear reactor, a first heat exchanger, and a fan.
- a non-condensable gas secondary circuit passes through the first exchanger, and a turbine and a compressor mounted on the same shaft. The blower is driven by the shaft.
- the gases in the primary and secondary circuits are of the same kind, and the pressure in the secondary circuit is slaved to the pressure in the primary circuit.
- FIG. 1 previously described, represents a conventional GFR nuclear reactor with combined indirect cycle
- FIG. 2 schematically represents a GFR reactor installation having an autonomous backup cooling capacity
- FIGS. 3A to 3D show various parameters evolution curves in the event of an accident affecting the installation of FIG. 2.
- the gas in the secondary circuit is the same (pure helium) as in the primary circuit, and it is at the same pressure (for example 70 bar).
- the seal tightness constraints are relaxed, and its design can be simpler.
- the pressure of the secondary circuit is slaved to the pressure of the primary circuit.
- This control is achieved, for example, by a simple valve connecting the primary and secondary circuits. In nominal conditions, the valve is closed. In an accidental depressurization type condition of the primary circuit 52, the pressure difference on either side of this valve is greater than the mechanical calibration pressure of the valve, causing the latter to open.
- a more complex valve set would enslave the pressure of the circuit 17 'to that of the circuit 10 by discharging the excess volume from the pipe 17' of the secondary circuit into the enclosure 52.
- the backup cooling circuit be redundant.
- a plurality of circuit pairs is preferably provided around the same reactor 12.
- primary and secondary for example three.
- Two redundant primary circuit outputs 10b and 10c have been symbolized.
- the primary circuits 10, 10b and 10c communicate with each other in the reactor.
- these three primary circuits are not isolated from each other in the reactor, from which it follows that a breach in one of the circuits necessarily affects the other two circuits.
- Each redundant secondary circuit is provided with its own turbine 18, compressor 22 and alternator 26, coupled to a shaft 24 'driving the fan 16' of the associated redundant primary circuit.
- FIGS. 3A to 3D show changes in the time t of several parameters following an accident of the aforementioned type in an example installation comprising three pairs of redundant primary and secondary circuits.
- FIG. 3A shows the evolution of the pressure p10 of the primary circuits and of the pressure p52 in the close chamber following the opening of the gap in one of the primary circuits.
- Figure 3B shows the evolution of reactor power.
- Figure 3C shows the evolution of the speed of rotation of the shafts 24 '.
- FIG. 3D shows the evolution of the maximum temperature of the Th fuel sheath at the reactor core, the temperature of the helium at the outlet of the To reactor, and the temperature of the helium at the inlet of the Ti reactor.
- the leak in the primary circuit 10 causes a rapid drop in the pressure p10.
- the leak is confined in the chamber 52, whose pressure p52 starts to increase to equalize with the pressure p10 after 80 s.
- the pressure of the secondary circuits being slaved to the pressure of the primary circuits, the pressure of the secondary circuits follows the evolution of the pressure p10.
- This pressure drop is immediately detected by an automaton which stops the reactor by introducing control rods into the reactor core.
- the power of the reactor drops in a few seconds to a residual power of a few percent of the nominal power, as shown in Figure 3B. This residual power must, however, be evacuated.
- the mass flow rate of the primary gas drops in proportion to the pressure drop.
- the calorific value of the gas falls correspondingly. This combined with the power drop of the reactor causes a drop in power transmitted to the secondary circuit, tending to decrease the rotational speed of the turbine 18, as shown in Figure 3C.
- this type of installation has no autonomous capacity for emergency cooling. Indeed, during a reduction in power of the reactor following an accident, the heat transmitted to the secondary circuit becomes insufficient to maintain the carbon dioxide in the vapor phase. The turbines drown, in particular that dedicated to the blower, and the blower stops, so that the primary circuit can no longer evacuate the residual heat of the reactor.
- the gas used in the secondary circuit of the plant of Figure 2 is preferably an incondensable gas, helium being an example.
- the shaft 24 ' goes from the secondary circuit 17' to the primary circuit 10 to drive the fan 16 '.
- This shaft should normally have a rotating joint that isolates the primary and secondary circuits from each other.
- Blower 16 ' in the context of the aforementioned example, consumes a power of the order of 17 MW.
- the shaft 24 ' has a large diameter, it rotates relatively fast (around 6000 rev / min), and it must withstand a high temperature (400 °).
- the seal should also withstand a pressure difference of 5 bar. The design of such a joint is difficult.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- High Energy & Nuclear Physics (AREA)
- Plasma & Fusion (AREA)
- Sustainable Development (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Sustainable Energy (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structure Of Emergency Protection For Nuclear Reactors (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
- Separation By Low-Temperature Treatments (AREA)
Abstract
Description
Claims
Priority Applications (9)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201180020644.1A CN102870165B (zh) | 2010-02-24 | 2011-02-23 | 用于从气冷快堆产生能量的设施 |
| US13/581,162 US20120314830A1 (en) | 2010-02-24 | 2011-02-23 | Installation for producing power from a gas-cooled fast nuclear reactor |
| RU2012140437/07A RU2550504C2 (ru) | 2010-02-24 | 2011-02-23 | Установка для производства энергии на основе газоохлаждаемого реактора на быстрых нейтронах |
| EP11711954.5A EP2539901B1 (fr) | 2010-02-24 | 2011-02-23 | Installation de production d'energie a partir d'un reacteur nucleaire rapide a gaz |
| PL11711954T PL2539901T3 (pl) | 2010-02-24 | 2011-02-23 | Instalacja do wytwarzania energii przy wykorzystaniu reaktora jądrowego prędkiego chłodzonego gazem |
| CA2789172A CA2789172A1 (fr) | 2010-02-24 | 2011-02-23 | Installation de production d'energie a partir d'un reacteur nucleaire rapide a gaz |
| JP2012554387A JP5833033B2 (ja) | 2010-02-24 | 2011-02-23 | ガス冷却高速炉からエネルギーを生産する施設 |
| KR1020127024708A KR20130004305A (ko) | 2010-02-24 | 2011-02-23 | 가스 냉각 고속로를 사용하여 에너지를 생산하기 위한 설비 |
| ZA2012/06013A ZA201206013B (en) | 2010-02-24 | 2012-08-10 | Facility for rpoducing energy using a gas-cooled fast reactor |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR1000749A FR2956773B1 (fr) | 2010-02-24 | 2010-02-24 | Installation de production d'energie a partir d'un reacteur nucleaire rapide a gaz |
| FR1000749 | 2010-02-24 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2011104446A1 true WO2011104446A1 (fr) | 2011-09-01 |
Family
ID=42735462
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/FR2011/000108 Ceased WO2011104446A1 (fr) | 2010-02-24 | 2011-02-23 | Installation de production d'energie a partir d'un reacteur nucleaire rapide a gaz |
Country Status (11)
| Country | Link |
|---|---|
| US (1) | US20120314830A1 (fr) |
| EP (1) | EP2539901B1 (fr) |
| JP (1) | JP5833033B2 (fr) |
| KR (1) | KR20130004305A (fr) |
| CN (1) | CN102870165B (fr) |
| CA (1) | CA2789172A1 (fr) |
| FR (1) | FR2956773B1 (fr) |
| PL (1) | PL2539901T3 (fr) |
| RU (1) | RU2550504C2 (fr) |
| WO (1) | WO2011104446A1 (fr) |
| ZA (1) | ZA201206013B (fr) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101988265B1 (ko) * | 2017-05-24 | 2019-06-12 | 한국원자력연구원 | 원자로용기 내 냉각 및 발전 시스템 |
| CN109630212A (zh) * | 2018-12-19 | 2019-04-16 | 中国船舶重工集团公司第七0三研究所 | 高温气冷堆氦气透平发电系统 |
| CN112392597A (zh) * | 2020-11-17 | 2021-02-23 | 哈尔滨工程大学 | 一种核动力发动机装置 |
| FR3146368B1 (fr) | 2023-03-01 | 2025-02-21 | Commissariat Energie Atomique | Réacteur nucléaire à caloporteur liquide et assemblages combustibles solides, intégrant un système d’évacuation de la puissance nominale à bain de métal liquide et à matériau(x) (MCP) pour l’évacuation de la puissance résiduelle en cas accidentel. |
| FR3146369B1 (fr) | 2023-03-01 | 2025-02-21 | Commissariat Energie Atomique | Réacteur nucléaire à caloporteur liquide en convection forcée et assemblages combustibles solides, intégrant un système d’évacuation de la puissance nominale à bain de métal liquide et à matériau(x) (MCP) pour l’évacuation de la puissance résiduelle en cas accidentel. |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4466249A (en) * | 1980-11-25 | 1984-08-21 | Bbc Brown, Boveri & Company, Limited | Gas turbine system for generating high-temperature process heat |
| US4576783A (en) * | 1981-01-12 | 1986-03-18 | Ga Technologies Inc. | Heat pump augmentation of nuclear process heat |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3920513A (en) * | 1973-04-18 | 1975-11-18 | Westinghouse Electric Corp | Protection system for a nuclear reactor |
| CH682357A5 (fr) * | 1991-09-05 | 1993-08-31 | Asea Brown Boveri | |
| JPH05164888A (ja) * | 1991-12-13 | 1993-06-29 | Mitsubishi Heavy Ind Ltd | ガスタービン発電装置 |
| JPH08338892A (ja) * | 1995-06-14 | 1996-12-24 | Japan Atom Energy Res Inst | ヘリウム冷却高温ガス炉 |
| CN1076140C (zh) * | 1996-12-03 | 2001-12-12 | 艾略特能源系统股份有限公司 | 用于涡轮/交流发电机的共轴电气系统 |
| RU2160839C1 (ru) * | 1999-09-30 | 2000-12-20 | Военный инженерно-космический университет им. А.Ф. Можайского | Энергетическая установка с газоохлаждаемым реактором |
| CN1123893C (zh) * | 2000-04-24 | 2003-10-08 | 清华大学 | 高温气冷堆换热装置 |
| FR2838555B1 (fr) * | 2002-04-12 | 2006-01-06 | Framatome Anp | Procede et dispositif de production d'electricite a partir de la chaleur produite dans le coeur d'au moins un reacteur nucleaire a haute temperature |
| JP2004044533A (ja) * | 2002-07-15 | 2004-02-12 | Mitsubishi Heavy Ind Ltd | タービン設備 |
| CN101331555B (zh) * | 2006-02-09 | 2012-04-18 | 卵石床模块反应器控股有限公司 | 卵石床核反应堆核电站 |
| JP4774028B2 (ja) * | 2007-10-12 | 2011-09-14 | 三菱重工業株式会社 | クローズドサイクルプラント |
-
2010
- 2010-02-24 FR FR1000749A patent/FR2956773B1/fr not_active Expired - Fee Related
-
2011
- 2011-02-23 RU RU2012140437/07A patent/RU2550504C2/ru not_active IP Right Cessation
- 2011-02-23 US US13/581,162 patent/US20120314830A1/en not_active Abandoned
- 2011-02-23 KR KR1020127024708A patent/KR20130004305A/ko not_active Abandoned
- 2011-02-23 CA CA2789172A patent/CA2789172A1/fr active Pending
- 2011-02-23 PL PL11711954T patent/PL2539901T3/pl unknown
- 2011-02-23 JP JP2012554387A patent/JP5833033B2/ja not_active Expired - Fee Related
- 2011-02-23 WO PCT/FR2011/000108 patent/WO2011104446A1/fr not_active Ceased
- 2011-02-23 CN CN201180020644.1A patent/CN102870165B/zh not_active Expired - Fee Related
- 2011-02-23 EP EP11711954.5A patent/EP2539901B1/fr active Active
-
2012
- 2012-08-10 ZA ZA2012/06013A patent/ZA201206013B/en unknown
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4466249A (en) * | 1980-11-25 | 1984-08-21 | Bbc Brown, Boveri & Company, Limited | Gas turbine system for generating high-temperature process heat |
| US4576783A (en) * | 1981-01-12 | 1986-03-18 | Ga Technologies Inc. | Heat pump augmentation of nuclear process heat |
Non-Patent Citations (6)
| Title |
|---|
| "Proceedings of Gas-Cooled Reactor Information Meeting", 27 April 1970, OAK RIDGE NATIONAL LABORATORY, article "GAS TURBINE POWER CONVERSION SYSTEMS FOR HELIUM COOLED BREEDER REACTORS" |
| BENTIVOGLIO F ET AL: "Cathare simulation of transients for the 2400 mw gas fast reactor concept", PROCEEDINGS OF THE ICAPP'09. INTERNATIONAL CONGRESS ON ADVANCES IN NUCLEAR POWER PLANTS. TOKYO, JAPAN, MAY 10-14, 2009,, 10 May 2009 (2009-05-10), pages 1672 - 1681, XP009139064 * |
| LIN-GEN C. ET AL: "Power, power density and efficiancy optimization for a closed cycle helium turbine nuclear power plant", ENERGY CONVERSION AND MANAGEMENT, vol. 44, 2003, pages 2393 - 2401, XP002602395, DOI: 10.1016/S0196-8904(03)00008-6 * |
| LYS L A ET AL: "Gas turbine power conversion systems for helium cooled breeder reactors", PROCEEDINGS OF GAS-COOLED REACTOR INFORMATION MEETING, OAK RIDGE NATIONAL LABORATORY,, 1 January 1970 (1970-01-01), pages 812 - 832, XP009139080 * |
| MALO J Y ET AL: "GAS COOLED FAST REACTOR 2400 MWTH, END OF THE PRELIMINARY VIABILITY PHASE", PROCEEDINGS OF THE 2008 INTERNATIONAL CONGRESS ON ADVANCES IN NUCLEAR POWER PLANTS, ICAPP 2008: EMBEDDED TOPICAL MEETING; JUNE 8 - 12, 2008, ANAHEIM, CALIFORNIA,, 8 June 2008 (2008-06-08), pages 208 - 218, XP009139136, ISBN: 978-0-89448-061-4 * |
| MCDONALD C F: "A nuclear gas turbine perspective...the indirect cycle (IDC) offers a practical solution", ENERGY CONVERSION ENGINEERING CONFERENCE, 1996. IECEC 96., PROCEEDINGS OF THE 31ST INTERSOCIETY WASHINGTON, DC, USA 11-16 AUG. 1996, NEW YORK, NY, USA,IEEE, US LNKD- DOI:10.1109/IECEC.1996.553840, vol. 2, 11 August 1996 (1996-08-11), pages 1029 - 1035, XP010197871, ISBN: 978-0-7803-3547-9 * |
Also Published As
| Publication number | Publication date |
|---|---|
| PL2539901T3 (pl) | 2015-05-29 |
| CN102870165A (zh) | 2013-01-09 |
| CA2789172A1 (fr) | 2011-09-01 |
| RU2012140437A (ru) | 2014-03-27 |
| RU2550504C2 (ru) | 2015-05-10 |
| CN102870165B (zh) | 2015-08-26 |
| EP2539901B1 (fr) | 2014-11-26 |
| ZA201206013B (en) | 2013-05-29 |
| KR20130004305A (ko) | 2013-01-09 |
| JP2013520671A (ja) | 2013-06-06 |
| US20120314830A1 (en) | 2012-12-13 |
| EP2539901A1 (fr) | 2013-01-02 |
| FR2956773B1 (fr) | 2012-03-23 |
| FR2956773A1 (fr) | 2011-08-26 |
| JP5833033B2 (ja) | 2015-12-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP1495473B1 (fr) | Procede et dispositif de production d'electricite a partir de la chaleur produite dans le coeur d'au moins un reacteur nucleaire a haute temperature | |
| EP2539901B1 (fr) | Installation de production d'energie a partir d'un reacteur nucleaire rapide a gaz | |
| FR3002073A1 (fr) | Dispositif d'injection de securite a multiples niveaux et systeme d'injection de securite passif comportant ce dispositif | |
| FR2985841A1 (fr) | Systeme d'evacuation de la puissance residuelle d'un reacteur nucleaire a eau sous pression | |
| FR2985842A1 (fr) | Systeme pour evacuer la puissance residuelle d'un reacteur nucleaire a eau sous pression | |
| FR2985847A1 (fr) | Module sous-marin de production d'energie electrique | |
| FR2911216A1 (fr) | Systeme et procede de generation d'electricite d'origine nucleaire | |
| FR3012183A1 (fr) | Motopompe centrifuge pour circuit primaire de petits ou moyens reacteurs modulaires nucleaires. | |
| EP4216235A2 (fr) | Réacteur nucléaire à eau légère, notamment à eau pressurisée ou à eau bouillante, intégrant un système passif et autonome d' évacuation de la puissance résiduelle | |
| WO2013107863A1 (fr) | Module immergé de production d'énergie | |
| EP0306725B1 (fr) | Procédé de protection d'un réacteur nucléaire à eau préssurisée contre les défaillances de son dispositif d'arrêt d'urgence | |
| WO2013107874A1 (fr) | Module immergé de production d'énergie électrique | |
| WO2013107878A1 (fr) | Module de production d'énergie électrique | |
| WO2013107873A1 (fr) | Module immergé de génération d'énergie électrique | |
| EP3835555B1 (fr) | Dispositif de production d'énergie électrique comportant un accumulateur d'énergie thermique | |
| FR3060190A1 (fr) | Convertisseur, centrale nucleaire et procede associes | |
| EP4216233A2 (fr) | Réacteur nucléaire à eau légère, notamment à eau pressurisée ou à eau bouillante, à source froide au sol et intégrant un système autonome d'évacuation de la puissance résiduelle | |
| WO2013107879A1 (fr) | Module immergé ou sous-marin de production d'énergie électrique | |
| EP4427245A1 (fr) | Installation de cogénération électronucléaire à réacteur avec cycle thermodynamique indirect sans prélèvement ou rejet d'eau liquide dans l'environnement | |
| EP1898056A1 (fr) | Dispositif d'extraction de chaleur du condensat préchauffé du cycle à vapeur d'un cycle combiné | |
| FR3016725A1 (fr) | Installation d'extraction de chaleur pour un reacteur nucleaire a neutrons rapides | |
| WO2024133455A1 (fr) | Réacteur nucléaire à eau pressurisée (rep) de type modulaire (smr) à pressuriseur sans aspersion d'eau |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WWE | Wipo information: entry into national phase |
Ref document number: 201180020644.1 Country of ref document: CN |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11711954 Country of ref document: EP Kind code of ref document: A1 |
|
| DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
| ENP | Entry into the national phase |
Ref document number: 2789172 Country of ref document: CA |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2012554387 Country of ref document: JP |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13581162 Country of ref document: US |
|
| ENP | Entry into the national phase |
Ref document number: 20127024708 Country of ref document: KR Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2012140437 Country of ref document: RU Ref document number: 2011711954 Country of ref document: EP |