WO2011155252A1 - 電力需要計画調整装置、電力需要計画調整方法、及びプログラム - Google Patents
電力需要計画調整装置、電力需要計画調整方法、及びプログラム Download PDFInfo
- Publication number
- WO2011155252A1 WO2011155252A1 PCT/JP2011/058172 JP2011058172W WO2011155252A1 WO 2011155252 A1 WO2011155252 A1 WO 2011155252A1 JP 2011058172 W JP2011058172 W JP 2011058172W WO 2011155252 A1 WO2011155252 A1 WO 2011155252A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- demand
- power
- plan
- amount
- price
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Definitions
- the present invention relates to a power demand plan adjusting device, a power demand plan adjusting method, and a program.
- Non-Patent Document 1 discloses a technique for planning power supply and supply so that the power generation cost for 24 hours is minimized, and Patent Document 1 discloses that the price of generated power is maximized. Techniques for planning reservoir water levels are disclosed. In addition, the next day's power price is provided to the customer, and the customer determines the amount of power demand to be used by looking at the price.
- Patent Document 2 discloses a technique for controlling the hot water temperature of a hot water storage water heater so that the electricity charge for heating is minimized. In recent years, an experiment called smart grid, which attempts to control demand with real-time electricity prices, is also underway.
- various optimal plans such as a power generation plan for thermal power generation, a power generation plan for hydroelectric power generation, and a hot water temperature plan in a water heater are independently performed. It can happen that it is not an optimal plan.
- the present invention has been made in view of such a background, and provides a power demand plan adjustment device, a power demand plan adjustment method, and a program capable of adjusting a plurality of separately calculated plans. With the goal.
- the main invention of the present invention for solving the above-mentioned problems is a demand-and-supply planning apparatus for calculating an optimum value of power demand per unit time by an electric device and calculating an optimum value of power price per unit time
- a demand planning device that plans a power demand amount by the electric device according to a power price, and is a device that adjusts the demand plan, and is connected to be communicable with each other, and the demand amount per unit time
- An optimal supply and demand plan acquisition unit that acquires the optimal value of the power price and the optimal value of the power price from the supply and demand planning device, and controls the demand planning device to plan the demand amount according to the acquired optimal value of the power price
- an optimal demand amount acquisition unit that acquires the planned value of the demand amount from the demand planning device, and the power value for the unit time when the planned value of the demand amount exceeds the optimal value of the demand amount.
- Increasing the, and be provided with a price adjustment unit to control the demand planning system to plan the demand in accordance with the power price the increased
- the demand plan apparatus can recalculate the demand quantity after increasing the power price in the unit period in which the planned demand quantity exceeds the optimum demand quantity. It is preferable for electrical equipment to reduce power demand during times when electricity prices are high and shift power demand to times when electricity prices are lower, so recalculation can be done to reduce demand during times when electricity prices are raised. Expected to be done. Thereby, a plan demand amount can be made to approach an optimal demand amount.
- the price adjusting unit sets a predetermined maximum value for the power price for the unit time in which the planned value of the demand amount exceeds the optimum value of the demand amount. You may do it.
- a method for adjusting a plan of power demand by an electric device wherein an optimum value of the power demand amount per unit time by the electric device is calculated and the power per unit time is calculated.
- a computer that is communicably connected to each of the supply and demand planning device that calculates the optimum value of the price and the demand planning device that plans the amount of power demand by the electrical device according to the power price, Obtaining the optimum value of the demand amount and the optimum value of the power price from the supply and demand planning device, controlling the demand planning device to plan the demand amount according to the obtained optimum value of the power price, The plan value of the demand amount is acquired from a demand planning device, the power price is increased for the unit time when the plan value of the demand amount exceeds the optimum value of the demand amount, and the increase is performed. And controlling the demand planning system to plan the demand in accordance with the power prices.
- the computer sets a predetermined maximum value to the power price for the unit time that can be said that the planned value of the demand amount exceeds the optimum value of the demand amount. May be.
- Another aspect of the present invention is a program for adjusting a plan of power demand by an electrical device, and calculates an optimum value of the power demand amount per unit time by the electrical device and for each unit time.
- the unit time is connected to a computer that is communicably connected to each of a supply and demand planning device that calculates an optimum value of the power price of the power supply, and a demand planning device that plans a power demand amount by the electrical equipment according to the power price. Acquiring the optimum value of the demand amount and the optimum value of the power price from the supply and demand planning device, and the demand planning device to plan the demand amount according to the obtained optimum value of the power price.
- Controlling obtaining the demand value plan value from the demand planning device, and the unit time when the demand value plan value exceeds the optimum value of the demand amount Serial to increase the electricity price, and possible to execute the steps of: controlling the demand planning system to plan the demand in accordance with the power price the increased.
- the power price has a predetermined maximum value for the unit time that can be said that the planned value of the demand amount exceeds the optimum value of the demand amount.
- a value may be set.
- a plurality of separately calculated plans can be adjusted.
- FIG. 2 is a diagram illustrating a hardware configuration of an economic load distribution adjusting device 10.
- FIG. 2 is a diagram showing a software configuration of an economic load distribution adjusting device 10.
- FIG. It is a figure explaining the outline
- FIG. 6 is a diagram illustrating an example of a constraint condition table 63.
- the posted load distribution system of this embodiment includes an economic load distribution adjustment device 10, a plurality of water level planning devices 21, a plurality of hot water storage temperature control devices 22, and a supply and demand planning device 23. .
- the economic load distribution adjusting device 10 is connected to a water level planning device 21, a hot water storage temperature control device 22, and a supply and demand planning device 23 via a communication network 24.
- the communication network 24 is, for example, the Internet or a LAN (Local Area Network), and is constructed by a public telephone line network, Ethernet (registered trademark), a wireless communication network, or the like.
- the supply and demand planning device 23 plans the power generation amount and the power demand amount so as to minimize the cost for power generation in a predetermined period (24 hours in the present embodiment) (hereinafter referred to as “optimal supply and demand plan”). ).
- the supply and demand planning device 23 includes a power generation amount by hydroelectric power generation (hereinafter referred to as “hydroelectric power generation amount”), a power generation amount by thermal power generation (hereinafter referred to as “thermal power generation amount”), and a power consumption amount (hereinafter referred to as “thermal power generation amount”). , "Hot water supply demand”), and a simulation of the power consumption used for loads other than the water heater so that the power generation cost for 24 hours is minimized.
- the supply and demand planning device 23 is based on a method described in, for example, “Electric market simulation—Development of basic model considering power supply start / stop plan” (March 2004, Central Research Institute of Electric Power Corporation). An optimal supply and demand plan can be calculated. In this document, the optimal supply and demand plan is calculated assuming that the amount of hydroelectric power generation and power demand is given. For example, the power supply and demand plan in the present embodiment can be changed by changing the amount of hydroelectric power generation and power demand. It is assumed that the apparatus 23 can calculate optimum values for hydroelectric power generation and power demand in addition to thermal power generation.
- the supply and demand planning device 23 is, for example, an electricity price per unit power amount per hour at a wholesale power exchange, a cost required to start a thermal power generator (startup cost), restrictions on water heaters, water heaters Depending on various factors such as restrictions on loads other than those on power generation and restrictions on power generation other than thermal power generation, hourly power demand, hydroelectric power generation, Unit price ”), and calculate the power generation cost by multiplying the total power generation amount by the unit price of power generation and calculate the power generation cost by minimizing the power generation cost (hereinafter referred to as“ optimum power generation amount ”). ), Thermal power generation, non-hydrothermal power generation, hot water demand (hereinafter referred to as “optimum demand”), power consumption due to other loads, and the like.
- startup cost a cost required to start a thermal power generator
- restrictions on water heaters water heaters
- water heaters Depending on various factors such as restrictions on loads other than those on power generation and restrictions on power generation other than thermal power generation, hourly power demand, hydroelectric power generation,
- the unit price of power generation is assumed to be the power price.
- the power price may be obtained by adding profit to the unit price of power generation.
- the supply and demand planning device 23 is, for example, a personal computer, a workstation, a mobile phone terminal, or a PDA. In addition, you may make it implement
- the water level planning device 21 (corresponding to the “hydropower planning device” of the present invention) sets the water level of the reservoir so that the selling price of the power generated by the hydropower generation is maximized while satisfying various constraints.
- Plan hereinafter referred to as “optimum water level plan”.
- optimum water level plan For the water level planning by the water level planning device 21, for example, the technique disclosed in Japanese Patent Application Laid-Open No. 2009-223692 can be used.
- As a constraint condition regarding hydroelectric power generation for example, the minimum value (hereinafter referred to as “minimum water intake”) of the amount of water given to the generator (hereinafter referred to as “minimum water intake”) and the maximum value of water intake (hereinafter referred to as “maximum water intake”). )and so on.
- the water level planning device 21 also calculates hourly hydroelectric power generation (hereinafter referred to as “planned power generation”) in the optimal water level planning.
- the water level planning device 21 is given an hourly power price, and an optimum water level plan is calculated according to the given power price. In addition, it is good also as electric power price by adding profit to the said power generation unit price.
- the water level planning device 21 is a computer provided for each hydroelectric power plant, such as a personal computer, a workstation, a mobile phone terminal, a PDA (Personal Digital Assistant) or the like.
- the hot water storage temperature control device 22 plans the heating of the hot water storage in the hot water storage water heater so as to minimize the power charge for heating while satisfying various constraints. (Hereafter referred to as “optimum heating plan”).
- optimum heating plan For the heating plan by the hot water storage temperature control device 22, for example, the technique disclosed in JP 2009-257703 A can be used.
- As a restriction condition related to heating in the hot water storage water heater for example, a minimum value of electric energy (energization amount) that can be energized in the hot water heater (hereinafter referred to as “minimum energization amount”) and a maximum value of energization amount (hereinafter referred to as “minimum energization amount”).
- the hot water storage temperature control device 22 is also given an hourly power price, and an optimum heating plan is calculated according to the given power price.
- the hot water storage temperature control device 22 also calculates the hourly hot water supply demand (hereinafter referred to as “planned demand amount”) in the optimum heating plan.
- the hot water storage temperature control device 22 is a computer provided for each water heater of an electric power consumer.
- the hot water storage temperature control device 22 may be, for example, a control panel built in the water heater, or a personal computer or PDA connected to the water heater.
- the economic load distribution adjusting device 10 performs adjustment so that the water level plan of the reservoir and the heating plan of the water heater are performed so as to follow the optimum supply and demand plan calculated by the supply and demand planning device 23 as much as possible. If there is a time zone in which the total amount of planned power generation planned by the water level planning device 21 is larger than the optimal power generation amount in the optimal supply and demand plan, the economic load distribution adjusting device 10 lowers the power price in that time zone, Let the device 21 recalculate the water level plan. Since the water level planning device 21 plans the water level so as to maximize the sales price of electric power, it is expected that the plan will be modified to reduce the amount of power generation in the time zone when the electric power price is lowered.
- the power generation amount can be brought close to the optimum supply and demand plan.
- the power price in that time zone is raised and a heating plan is set in the hot water temperature control device 22. Recalculate.
- the heating plan is calculated so as to minimize the power consumption fee, it is expected that the heating plan is corrected so as to reduce the power consumption in the time zone when the power price is raised. . Thereby, electric power demand can be brought close to an optimal supply-and-demand plan. Details will be described below.
- FIG. 2 is a diagram illustrating a hardware configuration of the economic load distribution adjusting device 10.
- the economic load distribution adjusting device 10 includes a CPU 101, a memory 102, a storage device 103, a communication interface 104, an input device 105, and an output device 106.
- the storage device 103 stores various data and programs, for example, a hard disk drive or a flash memory.
- the CPU 101 implements various functions by reading a program stored in the storage device 103 into the memory 102 and executing it.
- the communication interface 104 is an interface for connecting to the communication network 24. For example, an adapter for connecting to Ethernet (registered trademark), a modem for connecting to a telephone line network, and a wireless communication network are used. Such as a wireless communication device.
- the input device 105 is a keyboard, mouse, microphone, or the like that accepts data input from the user.
- the output device 106 is, for example, a display, a printer, or a speaker that outputs data.
- FIG. 3 is a diagram illustrating a software configuration of the economic load distribution adjusting device 10.
- the economic load distribution adjusting device 10 includes functional units such as an optimal supply and demand plan acquisition unit 111, an optimal power generation amount acquisition unit 112, an optimal demand amount acquisition unit 113, and a power price adjustment unit 114.
- Each functional unit is realized by the CPU 101 included in the economic load distribution adjusting device 10 reading out a program stored in the storage device 103 to the memory 102 and executing the program.
- the optimum supply and demand plan acquisition unit 111 acquires the optimum supply and demand plan calculated by the supply and demand planning device 23.
- the optimum supply and demand plan acquisition unit 111 transmits a command (hereinafter referred to as “optimum plan request”) instructing to perform optimization calculation to the demand planning device 23, and the supply and demand planning device 23 performs the optimum plan.
- the optimum supply and demand plan is calculated according to the request, and the optimum power price, the optimum demand amount, and the optimum power generation amount are responded to the economic load distribution adjusting device 10, and the optimum supply and demand plan acquisition unit 111 receives them.
- the optimum power generation amount obtaining unit 112 obtains the hourly planned power generation amount in the optimum water level plan calculated by each water level planning device 21.
- the optimum power generation amount acquisition unit 112 transmits to the water level planning device 21 an optimum plan request including the hourly optimum power price acquired from the supply and demand planning device 23.
- the water level planning device 21 calculates an optimal water level plan according to the optimal plan request, responds to the economic load distribution adjusting device 10 with the hourly planned power generation amount in the optimal water level plan, and the optimal power generation amount acquisition unit 112 receives this. .
- the optimal demand amount acquisition unit 113 acquires hourly planned demand amounts in the optimal heating plan calculated by each hot water storage temperature control device 22.
- the optimum demand amount acquisition unit 113 transmits to the hot water storage temperature control device 22 an optimum plan request including the hourly optimum power price acquired from the supply and demand planning device 23.
- the hot water storage temperature control device 22 calculates an optimum heating plan in response to the optimum plan request, responds to the economic load distribution adjustment device 10 with the hourly planned demand in the optimum heating plan, and the optimum demand amount acquisition unit 113 receives this. To do.
- the power price adjusting unit 114 causes the water level planning device 21 to recalculate so that the hydroelectric power generation amount acquired from each water level planning device 21 is in line with the optimum supply and demand plan. Moreover, the electric power price adjustment part 114 makes the hot water storage temperature control apparatus 22 recalculate so that the hot water supply demand acquired from each hot water storage temperature control apparatus 22 may follow an optimal demand-and-supply plan. In the present embodiment, the power price adjustment unit 114 uses the power of the time period for a time zone in which the total value of the planned power generation amount acquired from the water level planning device 21 exceeds the optimal power generation amount included in the optimal supply and demand plan.
- the price is adjusted so as to be lower than the current value, and an optimal plan request including the adjusted power price is transmitted to the water level planning device 21, thereby causing the water level planning device 21 to recalculate.
- the power price adjustment unit 114 has the current power price in the current time zone for the time zone in which the total planned demand amount acquired from the hot water storage temperature control device 22 exceeds the optimum demand amount included in the optimum demand plan. It adjusts so that it may become higher than a value, and transmits the optimal plan request
- FIG. 4 is a diagram for explaining the outline of processing in the economic load distribution system.
- the supply and demand planning device 23 calculates the optimum supply and demand plan (S301), the water level planning device 21 calculates the hourly planned power generation amount by the optimum water level plan (S302), and the hot water storage temperature control device 22 changes the hourly by the optimum heating plan.
- the planned demand is calculated (S303).
- the economic load distribution adjusting device 10 determines the order of the water level planning device 21 (power plant) and the hot water storage temperature control device 22 (water heater) that are to be adjusted (S304). Details of the order determination method will be described later.
- the economic load distribution adjusting device 10 reduces the power price at that time (S306), and the water level planning device 21 recalculates the planned power generation amount by the optimum water level plan (S307). If the planned power generation amount does not exceed the optimal power generation amount at all times (S305: YES), the process proceeds to step S308.
- the economic load distribution adjustment device 10 increases the power price at that time (S309), and stores the water. The temperature control device 22 recalculates the planned demand amount based on the optimum heating plan (S310).
- FIG. 5 is a diagram for explaining how data is transmitted and received in the process of FIG. Steps S401 to S403 correspond to step S301 in FIG.
- the economic load distribution adjusting device 10 transmits an optimum plan request to the demand planning device 23 (S401).
- the supply and demand planning device 23 performs a simulation according to the optimum plan request, calculates the optimum supply and demand plan (S402), and sets the optimum power price, the optimum demand amount, and the optimum power generation amount for each hour in the optimum supply and demand plan. (S403).
- Steps S404 to S406 correspond to step S302 in FIG.
- the economic load distribution adjusting device 10 includes the optimum power price received from the supply and demand planning device 23 in the optimum plan request and transmits it to each water level planning device 21 (S404).
- Each water level planning device 21 uses the power price included in the optimum plan request to create an optimum water level plan so that the sales price of power generated by hydropower generation is maximized (S405), and the planned power generation amount related to the optimum water level plan.
- S406 To the economic load distribution adjusting device 10 (S406).
- Steps S407-S409 correspond to step S303 in FIG.
- the economic load distribution adjusting device 10 includes the optimum power price received from the supply and demand planning device 23 in the optimum plan request and transmits it to each hot water storage temperature control device 22 (S407). Note that the economic load distribution adjusting device 10 may transmit the optimal plan request to the hot water storage temperature control device 22 before step S404 for transmitting the optimal plan request to the water level planning device 21.
- the hot water storage temperature control device 22 creates an optimum heating plan using the optimum power price included in the optimum plan request so that the power charge for heating is minimized (S408), and the planned demand according to time in the optimum heating plan. The amount is transmitted to the economic load distribution adjusting device 10 (S409).
- Step S410 corresponds to steps S306 and S309 in FIG.
- the economic load distribution adjusting device 10 determines that the planned power generation amount exceeds the optimum power generation amount at a time after time t (k) corresponding to the number of repetitions k of the process shown in steps S305 to S307 or steps S308 to S310 in FIG.
- the power price is lowered during a certain time, and the power price is raised for the time when the planned demand exceeds the optimum demand (S410).
- the economic load distribution adjusting device 10 sets a predetermined minimum value for the power price for the time when the planned power generation amount exceeds the optimum power generation amount, and the power price for the time when the planned demand amount exceeds the optimal demand amount.
- a predetermined maximum value can be set for.
- Steps S411-S413 correspond to steps S305 and S307 in FIG.
- the economic load distribution adjusting device 10 sets a constraint condition (hereinafter referred to as “power generation adjustment constraint condition”) that prevents the amount of generated power from changing in the adjusted time zone.
- the economic load distribution adjusting device 10 converts the amount of generated power at the time when the price has been adjusted into a water intake amount, sets the water intake amount for both the minimum water intake amount and the maximum water intake amount, and serves as a power generation adjustment constraint condition.
- the economic load distribution adjusting device 10 transmits an optimal plan request including the power price and the power generation adjustment constraint condition with the price reduced to the water level planning device 21 (S411).
- the water level planning device 21 uses the power price and the power generation adjustment constraint conditions included in the optimum plan request so that the sales price of the power by hydropower generation is maximized while satisfying the power generation adjustment constraint conditions in addition to the normal constraint conditions.
- the optimum water level plan is recreated (S412).
- the water level planning device 21 transmits the hourly planned power generation amount in the optimal water level plan to the economic load distribution adjusting device 10 (S413).
- Steps S414 to S416 correspond to steps S308 and S310 in FIG.
- the economic load distribution adjusting device 10 sets a constraint condition (hereinafter referred to as “demand adjustment constraint condition”) that prevents the demand amount from changing in the adjusted time zone.
- the economic load distribution adjusting device 10 converts the demand amount in the time when the price has been adjusted into the energization amount, and sets the energization amount for both the minimum energization amount and the maximum energization amount as the demand adjustment constraint condition.
- the economic load distribution adjusting device 10 transmits an optimum plan request including the increased power price and the demand adjustment constraint condition to the hot water storage temperature control device 22 (S414).
- the hot water storage temperature control device 22 uses the power price and the demand adjustment restriction condition included in the optimum plan request so that the power charge for heating is minimized while satisfying the demand adjustment restriction condition in addition to the normal restriction condition.
- An optimal heating plan is created (S415).
- the energization amount does not change, that is, the demand amount does not change, and other times Can be directed so that the demand is expected to be adjusted to reduce the demand during the time the price is raised.
- the hot water storage temperature control device 22 transmits the hourly planned demand in the optimum heating plan to the economic load distribution adjusting device 10 (S416).
- the economic load distribution adjusting device 10 is configured such that the planned power generation amount is less than or equal to the optimal power generation amount and the planned demand amount is less than or equal to the optimal demand amount at all times, or all the water level planning devices 21 and all the hot water storage temperature control devices. 22, the process from step S410 to step S416 is repeated until the optimum water level plan and the optimum heating plan are recreated.
- the optimum water level plan and the optimum heating plan are adjusted in each water level planning device 21 and each hot water storage temperature control device 22 so as to approximate the optimum power generation amount and optimum demand amount in the optimum supply and demand plan as much as possible.
- FIG. 6 is a diagram for explaining the flow of the adjustment process of the power price for transmission to the water level planning device 21 in step S306 in FIG. 4 and step S410 in FIG.
- the economic load distribution adjusting device 10 creates a price table 61 that stores the optimum power price received from the supply and demand planning device 23 in association with the hydroelectric power plant (S500).
- FIG. 7 is a diagram showing an example of the price list 61. In the present embodiment, the price list 61 stores prices with the hydroelectric power plant in the column direction and time in the row direction.
- the economic load distribution adjusting device 10 creates a power generation amount table 62 for storing the hourly planned power generation amount received from the water level planning device 21 for each hydropower station (S501).
- FIG. 8 is a diagram illustrating an example of the power generation amount table 62.
- the power generation table 62 also stores the amount of hydroelectric power generation with the hydroelectric power plant in the column direction and the time in the row direction. Further, the economic load distribution adjusting device 10 totals the planned power generation amounts corresponding to the respective hydroelectric power stations for each time, and sets the total power generation amount 62 in the hourly total column 621.
- the economic load distribution adjusting device 10 creates a constraint condition table 63 for storing the constraint conditions for each time for each power plant, and sets the constraint conditions to initial values (S502).
- FIG. 9 is a diagram illustrating an example of the constraint condition table 63.
- the constraint conditions are only the minimum water intake (Qmin) and the maximum water intake (Qmax).
- the initial value of the constraint condition for all hydroelectric power plants is assumed to be the same value.
- the economic load distribution adjusting device 10 identifies the first time point at which the hourly total becomes the maximum, and rearranges the columns of the price list 61 and the power generation amount table 62 in the order of the hydroelectric power plants having the largest power generation amount at that time (S503). . 10 and 11, the hourly total at 3:00 is the maximum 750, and according to the power generation amount at 13:00, the columns of the price list 61 and the power generation amount table 62 are the power plant 5, power plant 4 in order from the left.
- An example of rearranging power plant 3, power plant 2, and power plant 1 is shown. In this embodiment, the data is rearranged in order from the left, but of course, the data may be rearranged in order from the right.
- the economic load distribution adjusting apparatus 10 records the time t (k) in association with the order k in the order of the hourly sum in the power generation amount table 62 in the power generation amount time table 64 shown in FIG. 12 (S504).
- the economic load distribution adjusting apparatus 10 sets 1 to the variable k (S505), reads t (k) corresponding to k from the power generation sequence timetable 64, and sets it to t (S506). In the example of FIG. 12, for example, if k is 1, t (k) is “13”.
- the time set to t is selected by a predetermined determination method, for example, an earlier time is selected.
- the economic load distribution adjusting apparatus 10 sets PMAX as the optimum power generation amount at time t (S507), sets 0 (zero) to the variable P0 (S508), and sets 1 to the variable n (S509).
- the economic load distribution adjusting apparatus 10 sets Pn as the hydroelectric power generation amount at time t in the nth power plant, that is, the value corresponding to time t in the nth column from the left of the power generation amount table 62 (S510). Addition is performed (S511). If P0 is less than PMAX (S512: NO), the economic load distribution adjusting device 10 increments n (S513) and repeats the processing from step S510.
- the economic load distribution adjusting device 10 determines the power price after the nth, that is, the value corresponding to the time t after the nth from the left of the price list 61, for a predetermined value.
- the minimum value is set (S514). In the example of FIG. 13, it is assumed that the minimum value is “0.01”. For example, if n is 5 and t is 13, the power price 611 at 13:00 is 0.01 only for the power plant 1.
- the economic load distribution adjusting device 10 performs the following processing for the variable i from 1 to k.
- the economic load distribution adjusting device 10 reads t (i) from the power generation sequence time table 64 for each power station before the nth, and acquires the power amount in the power generation amount table 62 corresponding to the time t (i).
- the amount of electric power thus obtained is converted into a water amount Q (S515).
- Q water amount
- the generated power amount is Pn
- the water intake amount is Q
- the effective head is hn
- the coefficient relating to the conversion efficiency is c
- the gravitational acceleration is g
- the effective head hn and the coefficient c relating to the conversion efficiency are assumed to be the same value in all the hydroelectric power stations, and therefore, the water intake amount Q can be calculated from the electric energy by the above formula.
- the economic load distribution adjusting device 10 sets the calculated water intake Q for both the minimum water intake and the maximum water intake in the constraint condition table 63 corresponding to time t (i) for each power plant before the nth ( S516).
- the water intake amount Q at t (i) cannot be changed for the 1st to n-th power plants. Therefore, even when the water level planning device 21 recalculates the optimum water level plan, t (i ) The amount of power generated at the time can be prevented from changing.
- the minimum and maximum water intakes corresponding to t (i) are set to the converted water intakes.
- the minimum water intake amount and the maximum water intake amount at 13:00 are the same for each of the power plants 2 to 5.
- the economic load distribution adjusting device 10 reads out the hourly power price from the price list 61 and reads out the hourly constraints (minimum water intake and maximum water intake) from the constraint table 63 for each hydroelectric power station.
- the optimum plan request including the power price and the constraint conditions is transmitted to the water level planning device 21 (S517), and the water level planning device 21 is recalculated.
- the economic load distribution adjusting device 10 increments k (S518).
- the economic load distribution adjusting device 10 repeats the processing from step 506 if the processing is not performed for all times, that is, if k is 24 or less (S519: NO), and if k exceeds 24 (S519: YES), the process ends.
- FIG. 15 is a diagram for explaining the power price adjustment process shown in FIG. 6 described above.
- (A1) is a graph showing the optimal power price calculated by the supply and demand planning device 23, and (a2) is calculated by each water level planning device 21 according to the line graph of the optimal power generation amount and the optimal power price. It is a stacked graph of planned power generation.
- the total planned power generation amount exceeds the optimum power generation amount from 13:00 to 16:00.
- the water level planning device 21 of the power plant 1 increases the power generation amount at other times in order to maximize the selling price of the power. It is expected.
- the power generation planned at 13:00 is moving at 11:00.
- the power price for power plants 1 and 2 is lowered (c1), and in order to maximize the selling price of power, the water level planning device 21 of the power plant 1 moves at 17:00 the power generation planned at 14:00
- the water level planning device 21 of the power plant 2 moves the power generation planned at 14:00 to 11:00 (c2).
- the power price for the power plant 1 is lowered at 15:00 (d1), and the power generation at the power plant 1 is moved to 10:00 (d2).
- the power price for the power plant 1-3 was lowered (e1).
- a power generation plan is formulated by each water level planning device 21 in a state substantially in line with the optimal power generation amount.
- the economic load distribution adjustment device 10 sets the power price in that time zone to the lowest value.
- the water level planning device 21 can recalculate the water level plan. Since the water level planning device 21 plans the water level so as to maximize the sales price of electric power, it is expected that the plan will be modified to reduce the amount of power generation in the time zone when the electric power price is lowered. As a result, the power generation amount can be brought close to the optimum supply and demand plan.
- FIG. 16 is a diagram for explaining the flow of power price adjustment processing for transmission to hot water storage temperature control device 22 in step S309 in FIG. 4 and step S410 in FIG.
- the economic load distribution adjusting device 10 creates a price list 71 that stores the optimum power price received from the supply and demand planning device 23 in association with the water heater (S520).
- the price list 71 stores prices with the water heater as the column direction and the time as the row direction.
- the economic load distribution adjusting device 10 creates a demand table 72 for storing the planned demand received from the hot water storage temperature control device 22 for each water heater (S521).
- the demand amount table 72 also stores the demand amount with the water heater as the column direction and the time as the row direction. Further, the economic load distribution adjusting device 10 totals the planned demand amounts corresponding to the respective water heaters for each time, and sets the sum in the hourly total column 651 of the demand amount table 72. Furthermore, the economic load distribution adjusting device 10 creates a constraint condition table 73 that stores the constraint condition of each time sense for each water heater, and sets the constraint condition to an initial value (S522).
- FIG. 17 is a diagram illustrating an example of the constraint condition table 73. In the present embodiment, it is assumed that the constraint conditions are only the minimum energization amount and the maximum energization amount. Moreover, the initial value of the constraint condition about all the water heaters shall be the same value.
- the economic load distribution adjusting device 10 identifies the first time point at which the hourly total becomes the maximum, and rearranges the columns of the price list 71 and the demand amount table 72 in order of the water heater with the largest demand amount at that time (S523).
- 19 and 20 are diagrams illustrating examples of the price table 71 and the demand amount table 72 after rearrangement, respectively.
- the columns of the price list 71 and the demand amount table 72 are rearranged in the order of the water heater 3, the water heater 1, and the water heater 2 from the left.
- the economic load distribution adjusting apparatus 10 records the time t (k) in association with the order k in the order of the hourly total in the demand quantity table 62 in the demand quantity order time table 74 shown in FIG. 18 (S524).
- the economic load distribution adjusting apparatus 10 sets 1 to the variable k (S525), reads t (k) corresponding to k from the demand amount order timetable 74, and sets it to t (S526).
- t is “5”.
- the time set to t is selected by a predetermined determination method, for example, an earlier time is selected.
- the economic load distribution adjusting device 10 sets the optimum demand amount at time t to LMAX (S527), sets 0 (zero) to the variable L0 (S528), and sets 1 to the variable n (S529).
- the economic load distribution adjusting device 10 sets Ln as the planned demand at time t in the n-th water heater, that is, the value corresponding to time t at the n-th column from the left in the demand table 72 (S530), and sets Ln to L0. Addition is performed (S531). If L0 is less than LMAX (S532: NO), the economic load distribution adjusting device 10 increments n (S533) and repeats the processing from step S530.
- the economic load distribution adjusting device 10 determines the power price after the nth, that is, the value corresponding to the time t after the nth from the left in the price list 71. Is set to the highest value (S534). In the example of FIG. 21, it is assumed that the maximum value is “99”. For example, if n is 1 and t is 5, the power price 711 at 5 o'clock is 99 for other than the water heater 3.
- the economic load distribution adjusting device 10 performs the following processing for the variable i from 1 to k.
- the economic load distribution adjusting device 10 reads t (i) from the demand amount order timetable 74 for each nth or earlier water heater, and acquires the demand amount in the demand amount table 72 corresponding to t (i) (S535). ).
- the economic load distribution adjusting device 10 has acquired both the minimum energization amount and the maximum energization amount of the constraint condition table 73 corresponding to the time t (i) for each water heater before the nth economic load distribution adjustment device 10.
- a demand amount is set (S536).
- the energization amount at t (i) cannot be changed for the 1st to n-th water heaters. Therefore, even when the hot water storage temperature control device 22 recalculates the optimum heating plan, t (i ) The amount of demand at the time can be kept unchanged.
- the above process is repeated for i from 1 to k, and the acquired demand is set for both the minimum energization amount and the maximum energization amount corresponding to t (i) for the water heater that does not adjust the power price.
- the economic load distribution adjusting device 10 For each water heater, the economic load distribution adjusting device 10 reads the power price for each hour from the price list 71, reads the constraint conditions (minimum energization amount and maximum energization amount) for each hour from the constraint condition table 73, and reads the read power
- the optimal plan request including the price and the constraint condition is transmitted to the hot water storage temperature control device 22 (S537), and the hot water storage temperature control device 22 is recalculated.
- the economic load distribution adjusting device 10 increments k (S538).
- the economic load distribution adjusting device 10 repeats the processing from step 526 if the processing is not performed for all the times, that is, if k is 24 or less (S539: NO), and if k exceeds 24 (S539: YES), the process ends.
- FIG. 22 is a diagram illustrating the power price adjustment process shown in FIG. 16 described above.
- (A1) is a graph showing the optimal power price calculated by the supply and demand planning device 23, and (a2) is calculated by each hot water storage temperature control device 22 according to the line graph of the optimal demand and the optimal power price. It is the accumulation graph of the planned demand. In the example of FIG. 22, the total planned demand amount exceeds the optimum demand amount from 5:00 to 8:00.
- the hot water storage temperature control device 22 that controls the water heaters 4 and 5 should minimize the electricity charge related to power consumption. It is expected to reduce the demand for the time when the electricity price is raised and increase the demand for the other time.
- the heating by the water heater 5 planned at 7 o'clock is moving at 4 o'clock.
- the electricity prices for the water heaters 4 and 5 are raised (c1), so that the hot water storage temperature control device 22 of the water heaters 4 and 5 is designed for heating at 8 o'clock. Is moving at 3 o'clock.
- the power price for the water heaters 4 and 5 is increased (d1), the heating is moved at 2 o'clock (d2), and at 6 o'clock the power price is increased for the water heaters 4 and 5 (e1 ), The heating is moving at 1 o'clock (e2).
- a heating plan is formulated by each hot water storage temperature control device 22 in a state substantially in line with the optimum power generation amount.
- the hot water storage temperature control device 22 can recalculate the heating plan after setting the power price in that time zone to the maximum value. it can.
- the heating plan is recalculated so as to minimize the electricity charge for heating, and therefore the heating plan may be modified so as to reduce the power consumption in the time zone when the power price is raised. Be expected. Thereby, electric power demand can be brought close to an optimal supply-and-demand plan.
- a plurality of water level planning devices 21 are arranged in the economic load distribution system, but only one water level planning device 21 may be installed. Similarly, only one hot water storage temperature control device 22 may be installed. Further, the water level planning device 21 may not be provided, and only one or more hot water storage temperature control devices 22 may be installed. Conversely, the hot water storage temperature control device 22 is not provided, and only one or more water level planning devices 21 may be provided. You may make it install.
- the economic load distribution adjusting device 10 causes the water level planning device 21 and the hot water storage temperature control device 22 to recalculate the optimum plans, but the water level planning device 21 and the hot water storage temperature control device 22. Only one of them may be recalculated.
- the demand amount is planned by the hot water storage temperature control device 22 connected to the water heater, but the hot water storage temperature control device 22 is not limited to the water heater, and includes a refrigerator, a freezer, an air conditioner, It is also possible to adjust the power consumption for various electrical devices such as power storage devices.
- constraint condition regarding hydropower generation is only the minimum water intake amount and the maximum water intake amount, but if the constraint condition does not change from the previous power generation amount even if the optimum water level plan is recalculated, Other constraint conditions may be set.
- the initial value of the constraint condition for all the hydroelectric power stations is the same value, but the economic load distribution adjusting device 10 acquires the constraint condition from the water level planning device 21. Also good.
- the economic load distribution adjustment apparatus 10 memorize
- the price list 71 and the demand amount table 72 for each water heater are prepared.
- the hot water storage temperature control device 22 transmits area information indicating the area where the water heater is installed to the economic load distribution adjusting device 10 together with the hourly hot water supply demand.
- the economic load distribution adjusting device 10 sums up the hourly hot water supply demands transmitted from the hot water storage temperature control device 22 in the same area, and stores the hourly hot water demands in the demand amount table 72 in association with the area information. To do. Further, the economic load distribution adjusting device 10 stores the power price in the price list 71 for each area information. Thereby, when a large amount of water heaters are set, the calculation load concerning the adjustment process of the power price can be reduced.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
【課題】別個に算出された複数の計画を調整することができるようにする。 【解決手段】経済負荷配分調整装置10は、需給計画装置23から最適水力発電量、最適需要量、及び最適電力価格を取得し、水位計画装置21が計画した計画水力発電量を取得し、貯湯温度制御装置22が計画した計画需要量を取得する。経済負荷配分調整装置10は、計画水力発電量が最適発電量を超えている時間の電力価格を下げて水位計画装置21に水力発電量を再計画させ、計画需要量が最適需要量を超えている時間の電力価格を上げて貯水温度制御装置22に需要量を再計画させる。
Description
本発明は、電力需要計画調整装置、電力需要計画調整方法、及びプログラムに関する。
様々な数理計画法を用いて、電力需要を満たしつつ、燃料費や起動費などを含む総発電コストを最小とし、あるいは発電した電力の販売価格を最大にするような経済的な負荷配分を計画することが行われている。例えば、非特許文献1には、24時間の発電費用が最小となるように電力需要と供給を計画する技術が開示されており、特許文献1には、発電した電力価格が最大となるように貯水池の水位を計画する技術が開示されている。また、翌日の電力価格を顧客に提供し、その価格を見て顧客が電力需要の使用量を決定するということも行われている。例えば、特許文献2には、加熱にかかる電力料金が最小となるように貯湯温水器の湯温を制御する技術が開示されている。近年では、スマートグリッドとよばれる、リアルタイムの電力価格で需要をコントロールしようとする実験も進められている。
渡邉ほか、"電力市場のシミュレーション -電源の起動停止計画を考慮した基本モデルの開発-"、[online]、平成16年3月、財団法人電力中央研究所、[平成22年4月23日検索]、インターネット<http://criepi.denken.or.jp/jp/kenkikaku/report/detail/R03016.html>
しかしながら、従来の技術では、例えば、火力発電についての発電計画や、水力発電についての発電計画、温水器における湯温計画など、各種の最適計画は独立して行われていたため、全体としてみると必ずしも最適な計画ではないことが起こり得る。
本発明は、このような背景を鑑みてなされたものであり、別個に算出された複数の計画を調整することのできる、電力需要計画調整装置、電力需要計画調整方法、及びプログラムを提供することを目的とする。
本発明は、このような背景を鑑みてなされたものであり、別個に算出された複数の計画を調整することのできる、電力需要計画調整装置、電力需要計画調整方法、及びプログラムを提供することを目的とする。
上記課題を解決するための本発明の主たる発明は、電気機器による単位時間ごとの電力需要量の最適値を算出するとともに前記単位時間ごとの電力価格の最適値を算出する需給計画装置と、前記電力価格に応じて前記電気機器による電力需要量を計画する需要計画装置と、のそれぞれと通信可能に接続される、前記需要の計画を調整する装置であって、前記単位時間ごとの前記需要量の最適値及び前記電力価格の最適値を前記需給計画装置から取得する最適需給計画取得部と、前記取得した電力価格の最適値に応じて前記需要量を計画するように前記需要計画装置を制御し、前記需要計画装置から前記需要量の計画値を取得する最適需要量取得部と、前記需要量の計画値が前記需要量の最適値を超えている前記単位時間について前記電力価格を増加させて、前記増加させた電力価格に応じて前記需要量を計画するように前記需要計画装置を制御する価格調整部と、を備えることとする。
本発明の需要計画調整装置によれば、計画需要量が最適需要量を超えた単位期間における電力価格を増加させた上で、需要計画装置に需要量を再計算させることができる。電気機器は電力価格の高い時間での電力需要を抑え、より電力価格の低い時間に電力需要をシフトすることが好ましいので、電力価格が上げられた時間における需要量は減少するように再計算が行われることが期待される。これにより、計画需要量が最適需要量に近づくようにすることができる。
また、本発明の電力需要計画調整装置では、前記価格調整部は、前記需要量の計画値が前記需要量の最適値を超えていえる前記単位時間について前記電力価格に所定の最高値を設定するようにしてもよい。
また、本発明の他の態様は、電気機器による電力需要の計画を調整する方法であって、前記電気機器による単位時間ごとの前記電力需要量の最適値を算出するとともに前記単位時間ごとの電力価格の最適値を算出する需給計画装置と、前記電力価格に応じて前記電気機器による電力需要量を計画する需要計画装置と、のそれぞれと通信可能に接続されるコンピュータが、前記単位時間ごとの前記需要量の最適値及び前記電力価格の最適値を前記需給計画装置から取得し、前記取得した電力価格の最適値に応じて前記需要量を計画するように前記需要計画装置を制御し、前記需要計画装置から前記需要量の計画値を取得し、前記需要量の計画値が前記需要量の最適値を超えている前記単位時間について前記電力価格を増加させて、前記増加させた電力価格に応じて前記需要量を計画するように前記需要計画装置を制御することとする。
また、本発明の電力需要計画調整方法では、前記コンピュータは、前記需要量の計画値が前記需要量の最適値を超えていえる前記単位時間について前記電力価格に所定の最高値を設定するようにしてもよい。
また、本発明の他の態様は、電気機器による電力需要の計画を調整するためのプログラムであって、前記電気機器による単位時間ごとの前記電力需要量の最適値を算出するとともに前記単位時間ごとの電力価格の最適値を算出する需給計画装置と、前記電力価格に応じて前記電気機器による電力需要量を計画する需要計画装置と、のそれぞれと通信可能に接続されるコンピュータに、前記単位時間ごとの前記需要量の最適値及び前記電力価格の最適値を前記需給計画装置から取得するステップと、前記取得した電力価格の最適値に応じて前記需要量を計画するように前記需要計画装置を制御し、前記需要計画装置から前記需要量の計画値を取得するステップと、前記需要量の計画値が前記需要量の最適値を超えている前記単位時間について前記電力価格を増加させて、前記増加させた電力価格に応じて前記需要量を計画するように前記需要計画装置を制御するステップと、を実行させることとする。
また、本発明のプログラムでは、前記需要計画装置を制御するステップにおいて、前記コンピュータに、前記需要量の計画値が前記需要量の最適値を超えていえる前記単位時間について前記電力価格に所定の最高値を設定させるようにしてもよい。
その他本願が開示する課題やその解決方法については、発明の実施形態の欄及び図面により明らかにされる。
本発明によれば、別個に算出された複数の計画を調整することができる。
==概要==
以下、本発明の一実施形態に係る経済負荷配分調整装置10を含む経済負荷配分システムについて説明する。図1に示すように、本実施形態の掲載負荷配分システムは、経済負荷配分調整装置10、複数の水位計画装置21、複数の貯湯温度制御装置22及び需給計画装置23を含んで構成されている。経済負荷配分調整装置10は、通信ネットワーク24を介して水位計画装置21、貯湯温度制御装置22及び需給計画装置23に接続されている。通信ネットワーク24は、例えばインターネットやLAN(Local Area Network)などであり、公衆電話回線網やイーサネット(登録商標)、無線通信網などにより構築される。
以下、本発明の一実施形態に係る経済負荷配分調整装置10を含む経済負荷配分システムについて説明する。図1に示すように、本実施形態の掲載負荷配分システムは、経済負荷配分調整装置10、複数の水位計画装置21、複数の貯湯温度制御装置22及び需給計画装置23を含んで構成されている。経済負荷配分調整装置10は、通信ネットワーク24を介して水位計画装置21、貯湯温度制御装置22及び需給計画装置23に接続されている。通信ネットワーク24は、例えばインターネットやLAN(Local Area Network)などであり、公衆電話回線網やイーサネット(登録商標)、無線通信網などにより構築される。
需給計画装置23は、所定期間(本実施形態では24時間とする。)の発電にかかる費用が最小となるように発電量および電力の需要量を計画する(以下、「最適需給計画」という。)。需給計画装置23は、水力発電による発電量(以下、「水力発電量」という。)、火力発電による発電量(以下、「火力発電量」という。)、温水器に用いられる消費電力量(以下、「給湯需要量」という。)、及び温水器以外の負荷に用いられる消費電力量についてのシミュレーションを行い、24時間の発電費用が最小となるようにする。需給計画装置23は、例えば「電力市場のシミュレーション -電源の起動停止計画を考慮した基本モデルの開発-」(平成16年3月、財団法人電力中央研究所)に記載された方法に基づいて、最適需給計画を算出することができる。なお、当該文献では、水力発電量や電力需要は所与のものとして最適需給計画を算出しているが、例えば、水力発電量や電力需要を変動させることなどにより、本実施形態での需給計画装置23では火力発電量に加え、水力発電量や電力需要についても、最適値を算出することができるものとする。需給計画装置23は、例えば、卸電力取引所における、時別の単位電力量あたりの電力価格や火力発電の発電機を起動するためにかかる費用(起動費)、温水器に係る制約、温水器以外の負荷に係る制約、火力発電以外による発電に係る制約などの諸元に応じて、時別の電力需要量、水力発電量、火力発電量を増減し、発電にかかる単価(以下、「発電単価」という。)を算出し、全発電量に発電単価を乗じて24時間分を集計して発電費用を算出していき、発電費用が最小となる、水力発電量(以下、「最適発電量」という。)、火力発電量、水力火力以外による発電量、給湯需要量(以下、「最適需要量」という。)、その他の負荷による消費電力量などを算出する。なお、本実施形態では、発電単価が電力価格であるものとするが、発電単価に利潤を加算して電力価格としてもよい。需給計画装置23は、例えばパーソナルコンピュータやワークステーション、携帯電話端末、PDAなどである。なお、需給計画装置23と、後述する経済負荷配分調整装置10とを1台のコンピュータにより実現するようにしてもよい。
水位計画装置21(本発明の「水力発電計画装置」に対応する。)は、各種の制約条件を満たしつつ、水力発電により発電された電力の販売価格が最大となるように、貯水池の水位を計画する(以下、「最適水位計画」という。)。水位計画装置21による水位計画には、例えば、特開2009-223692号公報に開示されている手法を用いることができる。水力発電に関する制約条件としては、例えば発電機に与える水の量(取水量)の最小値(以下、「最小取水量」という。)や取水量の最大値(以下、「最大取水量」という。)などがある。水位計画装置21は、最適水位計画における時別の水力発電量(以下、「計画発電量」という。)も算出する。本実施形態では水位計画装置21には時別の電力価格が与えられ、与えられた電力価格に応じて最適水位計画を算出することとする。なお、上記発電単価に利潤を加算して電力価格としてもよい。水位計画装置21は水力発電所ごとに設けられるコンピュータであり、例えばパーソナルコンピュータやワークステーション、携帯電話端末、PDA(Personal Digital Assistant)などである。
貯湯温度制御装置22(本発明の「需要計画装置」に対応する。)は、各種の制約条件を満たしつつ、加熱にかかる電力料金が最小となるように貯湯温水器における貯湯の加熱を計画する(以下、「最適加熱計画」という。)。貯湯温度制御装置22による加熱計画には、例えば、特開2009-257703号公報に開示されている手法を用いることができる。貯湯温水器における加熱に係る制約条件としては、例えば貯湯温水器に通電することができる電力量(通電量)の最小値(以下、「最小通電量」という。)や通電量の最大値(以下、「最大通電量」という。)などがある。貯湯温度制御装置22にも時別の電力価格が与えられて、与えられた電力価格に応じて最適加熱計画を算出することとする。また、貯湯温度制御装置22は、最適加熱計画における時別の給湯需要量(以下、「計画需要量」という。)も算出する。貯湯温度制御装置22は電力需要者の温水器ごとに設けられるコンピュータである。貯湯温度制御装置22は、例えば、温水器に内蔵される制御盤であってもよいし、温水器に接続するパーソナルコンピュータやPDAなどであってもよい。
経済負荷配分調整装置10は、需給計画装置23により算出された最適需給計画に、なるべく沿うように貯水池の水位計画や温水器の加熱計画が行われるように調整を行う。経済負荷配分調整装置10は、最適需給計画における最適発電量よりも、水位計画装置21が計画した計画発電量の合計が多い時間帯があれば、その時間帯の電力価格を下げて、水位計画装置21に水位計画を再計算させる。水位計画装置21では電力の販売価格を最大化するように水位が計画されるため、電力価格が下げられた時間帯における発電量を下げるように計画が修正されることが期待される。これにより、発電量を最適需給計画に近づけることができる。また、最適需給計画における最適需要量よりも、貯湯温度制御装置22が計画した計画需要量が多い時間帯があれば、その時間帯の電力価格を上げて、貯湯温度制御装置22に加熱計画を再計算させる。貯湯温度制御装置22では、消費電力料金を最小化するように加熱計画が算出されるため、電力価格が上げられた時間帯における消費電力を下げるように加熱計画が修正されることが期待される。これにより、電力需要量を最適需給計画に近づけることができる。
以下、詳細に付いて説明する。
以下、詳細に付いて説明する。
==ハードウェア==
図2は、経済負荷配分調整装置10のハードウェア構成を示す図である。経済負荷配分調整装置10はCPU101、メモリ102、記憶装置103、通信インタフェース104、入力装置105、出力装置106を備えている。記憶装置103は、各種のデータやプログラムを記憶する、例えば、ハードディスクドライブやフラッシュメモリなどである。CPU101は、記憶装置103に記憶されているプログラムをメモリ102に読み出して実行することにより各種の機能を実現する。通信インタフェース104は、通信ネットワーク24に接続するためのインタフェースであり、例えば、イーサネット(登録商標)に接続するためのアダプタや、電話回線網に接続するためのモデム、無線通信網に接続するための無線通信器などである。入力装置105は、ユーザからデータの入力を受け付ける、例えば、キーボードやマウス、マイクロフォンなどである。出力装置106は、データを出力する、例えば、ディスプレイやプリンタ、スピーカなどである。
図2は、経済負荷配分調整装置10のハードウェア構成を示す図である。経済負荷配分調整装置10はCPU101、メモリ102、記憶装置103、通信インタフェース104、入力装置105、出力装置106を備えている。記憶装置103は、各種のデータやプログラムを記憶する、例えば、ハードディスクドライブやフラッシュメモリなどである。CPU101は、記憶装置103に記憶されているプログラムをメモリ102に読み出して実行することにより各種の機能を実現する。通信インタフェース104は、通信ネットワーク24に接続するためのインタフェースであり、例えば、イーサネット(登録商標)に接続するためのアダプタや、電話回線網に接続するためのモデム、無線通信網に接続するための無線通信器などである。入力装置105は、ユーザからデータの入力を受け付ける、例えば、キーボードやマウス、マイクロフォンなどである。出力装置106は、データを出力する、例えば、ディスプレイやプリンタ、スピーカなどである。
==ソフトウェア==
図3は、経済負荷配分調整装置10のソフトウェア構成を示す図である。経済負荷配分調整装置10は、最適需給計画取得部111、最適発電量取得部112、最適需要量取得部113、電力価格調整部114の各機能部を備えている。なお、上記各機能部は、経済負荷配分調整装置10が備えるCPU101が記憶装置103に記憶されているプログラムをメモリ102に読み出して実行することにより実現される。
図3は、経済負荷配分調整装置10のソフトウェア構成を示す図である。経済負荷配分調整装置10は、最適需給計画取得部111、最適発電量取得部112、最適需要量取得部113、電力価格調整部114の各機能部を備えている。なお、上記各機能部は、経済負荷配分調整装置10が備えるCPU101が記憶装置103に記憶されているプログラムをメモリ102に読み出して実行することにより実現される。
最適需給計画取得部111は、需給計画装置23により算出される最適需給計画を取得する。本実施形態では、最適需給計画取得部111は、最適化計算を行うように指示するコマンド(以下、「最適計画要求」という。)を需要計画装置23に送信し、需給計画装置23が最適計画要求に応じて最適需給計画を算出し、最適電力価格、最適需要量及び最適発電量を経済負荷配分調整装置10に応答し、最適需給計画取得部111はこれらを受信する。
最適発電量取得部112は、各水位計画装置21により算出される最適水位計画における時別の計画発電量を取得する。本実施形態では、最適発電量取得部112は、需給計画装置23から取得した時別の最適電力価格を含む最適計画要求を水位計画装置21に送信する。水位計画装置21が最適計画要求に応じて最適水位計画を算出し、最適水位計画における時別の計画発電量を経済負荷配分調整装置10に応答し、最適発電量取得部112はこれを受信する。
最適需要量取得部113は、各貯湯温度制御装置22により算出される最適加熱計画における時別の計画需要量を取得する。本実施形態では、最適需要量取得部113は、需給計画装置23から取得した時別の最適電力価格を含む最適計画要求を貯湯温度制御装置22に送信する。貯湯温度制御装置22が最適計画要求に応じて最適加熱計画を算出し、最適加熱計画における時別の計画需要量を経済負荷配分調整装置10に応答し、最適需要量取得部113はこれを受信する。
電力価格調整部114は、各水位計画装置21から取得した水力発電量が最適需給計画になるべく沿うように、水位計画装置21に再計算をさせる。また、電力価格調整部114は、各貯湯温度制御装置22から取得した給湯需要量が最適需給計画になるべく沿うように、貯湯温度制御装置22に再計算をさせる。本実施形態では、電力価格調整部114は、水位計画装置21から取得した計画発電量の合計値が最適需給計画に含まれている最適発電量を超えている時間帯について、当該時間帯の電力価格が現在値よりも低くなるように調整し、調整後の電力価格を含む最適計画要求を水位計画装置21に送信することにより、水位計画装置21に再計算をさせる。また、電力価格調整部114は、貯湯温度制御装置22から取得した計画需要量の合計が最適需要計画に含まれている最適需要量を超えている時間帯について、当該時間帯の電力価格が現在値よりも高くなるように調整し、調整後の電力価格を含む最適計画要求を貯湯温度制御装置22に送信することにより、貯湯温度制御装置22に再計算をさせる。
==処理概要==
図4は、経済負荷配分システムにおける処理の概要を説明する図である。
需給計画装置23が最適需給計画を算出し(S301)、水位計画装置21が最適水位計画により時別の計画発電量を算出し(S302)、貯湯温度制御装置22が最適加熱計画により時別の計画需要量を算出する(S303)。経済負荷配分調整装置10は、調整を行う対象となる水位計画装置21(発電所)及び貯湯温度制御装置22(温水器)の順番を決定する(S304)。なお、順番の決定方法の詳細については後述する。
水位計画装置21から受信した計画発電量が最適発電量を超えている時間がある場合(S305:NO)、経済負荷配分調整装置10は、その時間の電力価格を下げ(S306)、水位計画装置21は、最適水位計画により計画発電量を再計算する(S307)。
全ての時間において、計画発電量が最適発電量を超えていなければ(S305:YES)、ステップS308に進む。貯湯温度制御装置22から受信した計画需要量が最適需要量を超えている時間がある場合(S308:NO)、経済負荷配分調整装置10は、その時間の電力価格を上げて(S309)、貯水温度制御装置22は、最適加熱計画により計画需要量を再計算する(S310)。
図4は、経済負荷配分システムにおける処理の概要を説明する図である。
需給計画装置23が最適需給計画を算出し(S301)、水位計画装置21が最適水位計画により時別の計画発電量を算出し(S302)、貯湯温度制御装置22が最適加熱計画により時別の計画需要量を算出する(S303)。経済負荷配分調整装置10は、調整を行う対象となる水位計画装置21(発電所)及び貯湯温度制御装置22(温水器)の順番を決定する(S304)。なお、順番の決定方法の詳細については後述する。
水位計画装置21から受信した計画発電量が最適発電量を超えている時間がある場合(S305:NO)、経済負荷配分調整装置10は、その時間の電力価格を下げ(S306)、水位計画装置21は、最適水位計画により計画発電量を再計算する(S307)。
全ての時間において、計画発電量が最適発電量を超えていなければ(S305:YES)、ステップS308に進む。貯湯温度制御装置22から受信した計画需要量が最適需要量を超えている時間がある場合(S308:NO)、経済負荷配分調整装置10は、その時間の電力価格を上げて(S309)、貯水温度制御装置22は、最適加熱計画により計画需要量を再計算する(S310)。
図5は、図4の処理におけるデータの送受信の様子を説明するための図である。
ステップS401-S403が図4のステップS301に対応する。経済負荷配分調整装置10は、最適計画要求を需要計画装置23に送信する(S401)。需給計画装置23は最適計画要求に応じてシミュレーションを行い、最適需給計画を算出し(S402)、最適需給計画における時別の最適電力価格、最適需要量及び最適発電量を経済負荷配分調整装置10に送信する(S403)。
ステップS401-S403が図4のステップS301に対応する。経済負荷配分調整装置10は、最適計画要求を需要計画装置23に送信する(S401)。需給計画装置23は最適計画要求に応じてシミュレーションを行い、最適需給計画を算出し(S402)、最適需給計画における時別の最適電力価格、最適需要量及び最適発電量を経済負荷配分調整装置10に送信する(S403)。
ステップS404-S406が図4のステップS302に対応する。経済負荷配分調整装置10は、最適計画要求に需給計画装置23から受信した最適電力価格を含めて各水位計画装置21に送信する(S404)。各水位計画装置21は、最適計画要求に含まれる電力価格を用いて、水力発電による電力の販売価格が最大となるように最適水位計画を作成し(S405)、最適水位計画に係る計画発電量を経済負荷配分調整装置10に応答する(S406)。
ステップS407-S409が図4のステップS303に対応する。経済負荷配分調整装置10は、最適計画要求に需給計画装置23から受信した最適電力価格を含めて、各貯湯温度制御装置22に送信する(S407)。なお、経済負荷配分調整装置10は、水位計画装置21に対して最適計画要求を送信するステップS404以前に貯湯温度制御装置22に最適計画要求を送信するようにしてもよい。貯湯温度制御装置22は、最適計画要求に含まれる最適電力価格を用いて、加熱にかかる電力料金が最小となるように最適加熱計画を作成し(S408)、最適加熱計画における時別の計画需要量を経済負荷配分調整装置10に送信する(S409)。
ステップS410は図4のステップS306、S309に対応する。経済負荷配分調整装置10は、図4のステップS305-S307あるいはステップS308-S310に示す処理の繰り返し回数kに応じた時間t(k)以後の時間において、計画発電量が最適発電量を超えている時間の電力価格を下げ、計画需要量が最適需要量を超えている時間については電力価格を上げる(S410)。経済負荷配分調整装置10は、例えば、計画発電量が最適発電量を超えている時間について電力価格に所定の最低値を設定し、計画需要量が最適需要量を超えている時間については電力価格に所定の最高値を設定することができる。
ステップS411-S413が図4のステップS305及びS307に対応する。経済負荷配分調整装置10は、調整済みの時間帯については、発電電力量が変化しないようにする制約条件(以下、「発電調整制約条件」という。)を設定する。例えば、経済負荷配分調整装置10は、価格の調整済みの時間における発電電力量を取水量に変換し、最小取水量及び最大取水量の両方にその取水量を設定して発電調整制約条件とする。経済負荷配分調整装置10は、価格を下げた電力価格と発電調整制約条件とを含む最適計画要求を水位計画装置21に送信する(S411)。水位計画装置21は、最適計画要求に含まれる電力価格と発電調整制約条件とを用いて、通常の制約条件に加えて発電調整制約条件も満たしつつ水力発電による電力の販売価格が最大となるように最適水位計画を再作成する(S412)。これにより、価格調整した時間については、最小取水量及び最大取水量が一致することから取水量が変化せず、すなわち、発電電力量が変化しないようにすることを可能にするとともに、その他の時間については、価格が下げられた時間の発電量を下げるように発電電力量が調整されることが期待されるように仕向けることができる。水位計画装置21は、最適水位計画における時別の計画発電量を経済負荷配分調整装置10に送信する(S413)。
ステップS414-S416は図4のステップS308、S310に対応する。経済負荷配分調整装置10は、調整済みの時間帯については、需要量が変化しないようにする制約条件(以下、「需要調整制約条件」という。)を設定する。例えば、経済負荷配分調整装置10は、価格の調整済みの時間における需要量を通電量に変換し、最小通電量及び最大通電量の両方にその通電量を設定して需要調整制約条件とする。経済負荷配分調整装置10は、価格を上げた電力価格と需要調整制約条件とを含む最適計画要求を貯湯温度制御装置22に送信する(S414)。貯湯温度制御装置22は、最適計画要求に含まれる電力価格と需要調整制約条件とを用いて、通常の制約条件に加えて需要調整制約条件も満たしつつ加熱にかかる電力料金が最小となるように最適加熱計画を作成する(S415)。これにより、価格調整した時間については、最小通電量及び最大通電量が一致することから通電量が変化せず、すなわち、需要量が変化しないようにすることを可能にするとともに、その他の時間については、価格が上げられた時間の需要量を下げるように需要量が調整されることが期待されるように仕向けることができる。貯湯温度制御装置22は、最適加熱計画における時別の計画需要量を経済負荷配分調整装置10に送信する(S416)。
経済負荷配分調整装置10は、全ての時間において、計画発電量が最適発電量以下となり、計画需要量が最適需要量以下となるまで、あるいは、全ての水位計画装置21及び全ての貯湯温度制御装置22に対して、最適水位計画及び最適加熱計画を再作成させるまで、ステップS410からステップS416までの処理を繰り返すことになる。
以上のようにして、なるべく最適需給計画における最適発電量及び最適需要量に近づくように、各水位計画装置21及び各貯湯温度制御装置22において最適水位計画及び最適加熱計画が調整される。
==電力価格の調整(水力発電所)==
図6は、図4のステップS306及び図5のステップS410における、水位計画装置21に送信するための電力価格の調整処理の流れを説明する図である。
経済負荷配分調整装置10は、需給計画装置23から受信した最適電力価格を水力発電所に対応付けて格納する価格表61を作成する(S500)。図7は価格表61の一例を示す図である。本実施形態では、価格表61は、水力発電所を列方向とし、時間を行方向として価格を格納する。経済負荷配分調整装置10は、水位計画装置21から受信した時別の計画発電量を水力発電所ごとに格納する発電量表62を作成する(S501)。図8は、発電量表62の一例を示す図である。本実施形態では、発電力表62も、水力発電所を列方向とし、時間を行方向として水力発電量を格納するものとする。また、経済負荷配分調整装置10は、各時間について、各水力発電所に対応する計画発電量を合計し、電力量表62の時別合計欄621に設定する。さらに、経済負荷配分調整装置10は、発電所ごとに各時間の制約条件を格納する制約条件表63を作成し、制約条件を初期値に設定する(S502)。図9は制約条件表63の一例を示す図である。なお、本実施形態では、制約条件は最小取水量(Qmin)と最大取水量(Qmax)のみであるものとする。また、全ての水力発電所についての制約条件の初期値は同じ値であるものとする。
図6は、図4のステップS306及び図5のステップS410における、水位計画装置21に送信するための電力価格の調整処理の流れを説明する図である。
経済負荷配分調整装置10は、需給計画装置23から受信した最適電力価格を水力発電所に対応付けて格納する価格表61を作成する(S500)。図7は価格表61の一例を示す図である。本実施形態では、価格表61は、水力発電所を列方向とし、時間を行方向として価格を格納する。経済負荷配分調整装置10は、水位計画装置21から受信した時別の計画発電量を水力発電所ごとに格納する発電量表62を作成する(S501)。図8は、発電量表62の一例を示す図である。本実施形態では、発電力表62も、水力発電所を列方向とし、時間を行方向として水力発電量を格納するものとする。また、経済負荷配分調整装置10は、各時間について、各水力発電所に対応する計画発電量を合計し、電力量表62の時別合計欄621に設定する。さらに、経済負荷配分調整装置10は、発電所ごとに各時間の制約条件を格納する制約条件表63を作成し、制約条件を初期値に設定する(S502)。図9は制約条件表63の一例を示す図である。なお、本実施形態では、制約条件は最小取水量(Qmin)と最大取水量(Qmax)のみであるものとする。また、全ての水力発電所についての制約条件の初期値は同じ値であるものとする。
経済負荷配分調整装置10は、時別合計が最大となる最初の時点を特定し、その時点における発電量が大きい水力発電所順に、価格表61及び発電量表62の列を並べ替える(S503)。図10及び図11では、13時において時別合計が最大の750となり、13時における発電量に応じて、価格表61及び発電量表62の列が、左から順に発電所5、発電所4、発電所3、発電所2、発電所1と並べ替えられている例が示されている。本実施形態では左から順に並べ替えるものとするが、もちろん、右から順に並べ替えるようにしてもよい。
経済負荷配分調整装置10は、発電量表62において時別合計の大きい順に、順番kに対応付けて時間t(k)を、図12に示す発電量順時刻表64に記録する(S504)。経済負荷配分調整装置10は、変数kに1を設定し(S505)、発電量順時刻表64からkに対応するt(k)を読み出してtとする(S506)。図12の例では、例えば、kが1であれば、t(k)は「13」となる。なお、時別合計が同じ値の時間が複数ある場合には、例えば、より早い時間を選択するなど、所定の決定方法によりtに設定する時間を選択する。経済負荷配分調整装置10は、t時における最適発電量をPMAXとし(S507)、変数P0に0(ゼロ)を設定し(S508)、変数nに1を設定する(S509)。経済負荷配分調整装置10は、n番目の発電所におけるt時の水力発電量、すなわち発電量表62の左からn番目の列のt時に対応する値をPnとし(S510)、P0にPnを加算する(S511)。
P0がPMAX未満であれば(S512:NO)、経済負荷配分調整装置10は、nをインクリメントして(S513)、ステップS510からの処理を繰り返す。
P0がPMAX未満であれば(S512:NO)、経済負荷配分調整装置10は、nをインクリメントして(S513)、ステップS510からの処理を繰り返す。
P0がPMAX以上になれば(S512:YES)、経済負荷配分調整装置10は、n番目以後の電力価格、すなわち、価格表61の左からn番目より後のt時に対応する値を、所定の最低値に設定する(S514)。図13の例では、最低値が「0.01」であるものとしている。例えば、nが5であり、tが13であれば、13時の電力価格611は、発電所1についてのみ0.01となる。
経済負荷配分調整装置10は、1からkまでの変数iについて以下の処理を行う。経済負荷配分調整装置10は、n番目以前の各発電所について、t(i)を発電量順時刻表64から読み出し、t(i)時に対応する発電量表62の電力量を取得し、取得した電力量を取水量Qに変換する(S515)。例えば特開2009-223692号公報に開示されているように、発電電力量をPn、取水量をQ、有効落差をhn、変換効率に係る係数をc、重力加速度をgとした場合、式Pn=Q×hn×c×gが成立する。本実施形態では、有効落差hn及び変換効率に関する係数cは全ての水力発電所で同じ値であるものとし、したがって上記式により電力量から取水量Qを算出することができるものとする。経済負荷配分調整装置10は、n番目より前の各発電所について、t(i)時に対応する制約条件表63の最小取水量及び最大取水量の両方に、算出した取水量Qを設定する(S516)。これにより、1からn番目の発電所について、t(i)時の取水量Qを変化させることができなくなり、したがって、水位計画装置21が最適水位計画を再計算する場合にも、t(i)時の発電量が変化しないようにすることができる。
以上の処理を1からkまでのiについて繰り返し、電力価格の調整を行わない発電所については、t(i)時に対応する最小取水量と最大取水量が、上記変換した取水量に設定される。図14の例では、発電所2から発電所5のそれぞれについて、13時における最小取水量及び最大取水量が同じ値となっている。
経済負荷配分調整装置10は、各水力発電所について、価格表61から時間毎の電力価格を読み出し、制約条件表63から時間毎の制約条件(最小取水量及び最大取水量)を読み出し、読み出した電力価格及び制約条件を含む最適計画要求を水位計画装置21に送信して(S517)、水位計画装置21に最適水位計画を再計算させる。経済負荷配分調整装置10は、kをインクリメントする(S518)。経済負荷配分調整装置10は、全ての時間について処理を行っていなければ、すなわちkが24以下であれば(S519:NO)、ステップ506からの処理を繰り返し、kが24を超えれば(S519:YES)、処理を終了する。
図15は、上述した図6に示す電力価格の調整処理を説明する図である。(a1)は、需給計画装置23により算出された最適電力価格を示すグラフであり、(a2)は、最適発電量の折れ線グラフと、最適電力価格に応じて各水位計画装置21により算出された計画発電量の積み上げグラフである。図15の例では、13時から16時の間、計画発電量の合計が最適発電量を超えている。13時において最適発電量を超えた発電所1について電力価格が下げられると(b1)、発電所1の水位計画装置21は電力の販売価格を最大化するべく、他の時間の発電量を増やすことが期待される。(b2)の例では、13時に計画されていた発電が11時に移動している。14時には、発電所1及び2について電力価格が下げられ(c1)、これにより電力の販売価格を最大化するべく、発電所1の水位計画装置21は14時に計画していた発電が17時に移動し、発電所2の水位計画装置21は14時に計画していた発電を11時に移動している(c2)。同様に、15時には発電所1についての電力価格が下げられて(d1)、発電所1における発電は10時に移動されている(d2)。16時には発電所1-3についての電力価格が下げられ(e1)、16時に計画されていた、発電所1における発電は18時に、発電所2における発電は10時に、発電所3における発電は11時にそれぞれ移動されている(e2)。このようにして、(e2)では、最適発電量にほぼ沿った状態で、各水位計画装置21によって発電計画が策定される。
以上のように、本実施形態の経済負荷配分システムでは、経済負荷配分調整装置10は、最適発電量よりも計画発電量が多い時間帯があれば、その時間帯の電力価格を最低値に設定した上で、水位計画装置21に水位計画を再計算させることができる。水位計画装置21では電力の販売価格を最大化するように水位が計画されるため、電力価格が下げられた時間帯における発電量を下げるように計画が修正されることが期待される。これにより、発電量を最適需給計画に近づけることができる。
==電力価格の調整(温水器)==
図16は、図4のステップS309及び図5のステップS410における、貯湯温度制御装置22に送信するための電力価格の調整処理の流れを説明する図である。
経済負荷配分調整装置10は、需給計画装置23から受信した最適電力価格を温水器に対応付けて格納する価格表71を作成する(S520)。本実施形態では、価格表71は、温水器を列方向とし、時間を行方向として価格を格納する。経済負荷配分調整装置10は、貯湯温度制御装置22から受信した計画需要量を温水器ごとに格納する需要量表72を作成する(S521)。本実施形態では、需要量表72も、温水器を列方向とし、時間を行方向として需要量を格納するものとする。また、経済負荷配分調整装置10は、各時間について、各温水器に対応する計画需要量を合計し、需要量表72の時別合計欄651に設定する。さらに、経済負荷配分調整装置10は、温水器ごとの各時感の制約条件を格納する制約条件表73を作成し、制約条件を初期値に設定する(S522)。図17は、制約条件表73の一例を示す図である。なお、本実施形態では、制約条件は最小通電量及び最大通電量のみであるものとする。また、全ての温水器についての制約条件の初期値は同じ値であるものとする。
図16は、図4のステップS309及び図5のステップS410における、貯湯温度制御装置22に送信するための電力価格の調整処理の流れを説明する図である。
経済負荷配分調整装置10は、需給計画装置23から受信した最適電力価格を温水器に対応付けて格納する価格表71を作成する(S520)。本実施形態では、価格表71は、温水器を列方向とし、時間を行方向として価格を格納する。経済負荷配分調整装置10は、貯湯温度制御装置22から受信した計画需要量を温水器ごとに格納する需要量表72を作成する(S521)。本実施形態では、需要量表72も、温水器を列方向とし、時間を行方向として需要量を格納するものとする。また、経済負荷配分調整装置10は、各時間について、各温水器に対応する計画需要量を合計し、需要量表72の時別合計欄651に設定する。さらに、経済負荷配分調整装置10は、温水器ごとの各時感の制約条件を格納する制約条件表73を作成し、制約条件を初期値に設定する(S522)。図17は、制約条件表73の一例を示す図である。なお、本実施形態では、制約条件は最小通電量及び最大通電量のみであるものとする。また、全ての温水器についての制約条件の初期値は同じ値であるものとする。
経済負荷配分調整装置10は、時別合計が最大となる最初の時点を特定し、その時点における需要量が大きい温水器順に、価格表71及び需要量表72の列を並べ替える(S523)。図19及び図20はそれぞれ、並べ替えた後の価格表71及び需要量表72の一例を示す図である。図19及び図20の例では、価格表71及び需要量表72の列が左から温水器3、温水器1、温水器2の順に並べ替えられている。
経済負荷配分調整装置10は、需要量表62において時別合計の大きい順に、順番kに対応付けて時間t(k)を、図18に示す需要量順時刻表74に記録する(S524)。経済負荷配分調整装置10は、変数kに1を設定し(S525)、需要量順時刻表74からkに対応するt(k)を読み出してtとする(S526)。図20の例では、例えば、5時における時別合計「150」が最大であれば、tは「5」となる。なお、時別合計が同じ値の時間が複数ある場合には、例えば、より早い時間を選択するなど、所定の決定方法によりtに設定する時間を選択する。経済負荷配分調整装置10は、t時における最適需要量をLMAXとし(S527)、変数L0に0(ゼロ)を設定し(S528)、変数nに1を設定する(S529)。経済負荷配分調整装置10は、n番目の温水器におけるt時の計画需要量、すなわち需要量表72の左からn番目の列のt時に対応する値をLnとし(S530)、L0にLnを加算する(S531)。
L0がLMAX未満であれば(S532:NO)、経済負荷配分調整装置10は、nをインクリメントして(S533)、ステップS530からの処理を繰り返す。
L0がLMAX未満であれば(S532:NO)、経済負荷配分調整装置10は、nをインクリメントして(S533)、ステップS530からの処理を繰り返す。
L0がLMAX以上になれば(S532:YES)、経済負荷配分調整装置10は、n番目より後の電力価格、すなわち、価格表71の左からn番目より後のt時に対応する値を、所定の最高値に設定する(S534)。図21の例では、最高値が「99」であるものとしている。例えば、nが1であり、tが5であれば、5時の電力価格711は、温水器3以外について99となる。
経済負荷配分調整装置10は、1からkまでの変数iについて以下の処理を行う。経済負荷配分調整装置10は、n番目以前の各温水器について、t(i)を需要量順時刻表74から読み出し、t(i)時に対応する需要量表72の需要量を取得する(S535)。経済負荷配分調整装置10は、経済負荷配分調整装置10は、n番目以前の各温水器について、t(i)時に対応する制約条件表73の最小通電量及び最大通電量の両方に、取得した需要量を設定する(S536)。これにより、1からn番目の温水器について、t(i)時の通電量を変化させることができなくなり、したがって、貯湯温度制御装置22が最適加熱計画を再計算する場合にも、t(i)時の需要量が変化しないようにすることができる。
以上の処理を1からkまでのiについて繰り返し、電力価格の調整を行わない温水器については、t(i)時に対応する最小通電量と最大通電量の両方に、取得した需要量が設定される。
経済負荷配分調整装置10は、各温水器について、価格表71から時間毎の電力価格を読み出し、制約条件表73から時間毎の制約条件(最小通電量及び最大通電量)を読み出し、読み出した電力価格及び制約条件を含む最適計画要求を貯湯温度制御装置22に送信して(S537)、貯湯温度制御装置22に最適加熱計画を再計算させる。経済負荷配分調整装置10は、kをインクリメントする(S538)。経済負荷配分調整装置10は、全ての時間について処理を行っていなければ、すなわちkが24以下であれば(S539:NO)、ステップ526からの処理を繰り返し、kが24を超えれば(S539:YES)、処理を終了する。
図22は、上述した図16に示す電力価格の調整処理を説明する図である。(a1)は、需給計画装置23により算出された最適電力価格を示すグラフであり、(a2)は、最適需要量の折れ線グラフと、最適電力価格に応じて各貯湯温度制御装置22により算出された計画需要量の積み上げグラフである。図22の例では、5時から8時の間、計画需要量の合計が最適需要量を超えている。最適需要量を超えた7時において温水器4及び5について電力価格が上げられると(b1)、温水器4及び5を制御する貯湯温度制御装置22は消費電力に係る電気料金を最小化するべく、電力価格が上げられた時間の需要量を減らし、他の時間の需要量を増やすことが期待される。(b2)の例では、7時に計画されていた温水器5による加熱が4時に移動している。8時においても、温水器4及び5について電力価格が上げられ(c1)、これにより電力料金を最小化するべく、温水器4及び5の貯湯温度制御装置22は、8時に計画していた加熱を3時に移動している。5時においても温水器4及び5について電力価格が上げられて(d1)、加熱が2時に移動しており(d2)、6時においても温水器4及び5について電力価格が上げられて(e1)、加熱が1時に移動している(e2)。このようにして、(e2)では、最適発電量にほぼ沿った状態で、各貯湯温度制御装置22により加熱計画が策定される。
以上のように、最適需要量よりも計画需要量が多い時間帯があれば、その時間帯の電力価格を最高値に設定した上で、貯湯温度制御装置22に加熱計画を再計算させることができる。貯湯温度制御装置22では、加熱にかかる電力料金を最小化するように加熱計画が再計算されるため、電力価格が上げられた時間帯における消費電力を下げるように加熱計画が修正されることが期待される。これにより、電力需要量を最適需給計画に近づけることができる。
なお、本実施形態では、経済負荷配分システムには複数の水位計画装置21が配置されるものとしたが、1つの水位計画装置21のみが設置されている場合でもよい。同様に、1つの貯湯温度制御装置22のみが設置されている場合でもよい。また、水位計画装置21を設けず、1つ以上の貯湯温度制御装置22のみを設置するようにしてもよいし、逆に貯湯温度制御装置22を設けず、1つ以上の水位計画装置21のみを設置するようにしてもよい。
また、本実施形態では、経済負荷配分調整装置10は水位計画装置21及び貯湯温度制御装置22のそれぞれに対して最適計画を再計算させるものとしたが、水位計画装置21及び貯湯温度制御装置22のどちらか一方にのみ再計算させるようにしてもよい。
また、本実施形態では、需要量の計画は温水器に接続された貯湯温度制御装置22により行うものとしたが、貯湯温度制御装置22は、温水器に限らず、冷蔵庫や冷凍庫、空調設備、蓄電機器など、各種の電気機器について消費電力量を調整するようにすることもできる。
また、本実施形態では、水力発電に関する制約条件は最小取水量及び最大取水量のみであるものとしたが、最適水位計画を再計算しても前回の発電量から変化ない制約条件であれば、その他の制約条件を設定するようにしてもよい。
また、本実施形態では、全ての水力発電所についての制約条件の初期値は同じ値であるものとしたが、経済負荷配分調整装置10が、水位計画装置21から制約条件を取得するようにしてもよい。
また、本実施形態では、全ての水力発電所の有効落差hnが同じ値であるものとしたが、経済負荷配分調整装置10が水力発電所ごとのhnを記憶しておき、それを読み出すようにすることもできる。
また、本実施形態では、温水器ごとの価格表71や需要量表72を作成するものとしたが、温水器が大量に設置されているような場合には、温水器が設置されているエリアごとに集約するようにしてもよい。この場合、例えば、貯湯温度制御装置22は、時別の給湯需要量とともに、温水器が設置されているエリアを示すエリア情報を経済負荷配分調整装置10に送信するようにする。経済負荷配分調整装置10は、同じエリアの貯湯温度制御装置22から送信された時別の給湯需要量を合計して、エリア情報に対応付けて時別の給湯需要量を需要量表72に格納するようにする。また、経済負荷配分調整装置10は、エリア情報ごとに電力価格を価格表71に格納するようにする。これにより、大量の温水器が設定されている場合に、電力価格の調整処理に係る計算負荷を軽減することができる。
以上、本実施形態について説明したが、上記実施形態は本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得ると共に、本発明にはその等価物も含まれる。
10 経済負荷配分調整装置
21 水位計画装置
22 貯湯温度制御装置
23 需給計画装置
24 通信ネットワーク
101 CPU
102 メモリ
103 記憶装置
104 通信インタフェース
105 入力装置
106 出力装置
111 最適需給計画取得部
112 最適発電量取得部
113 最適需要量取得部
114 電力価格調整部
21 水位計画装置
22 貯湯温度制御装置
23 需給計画装置
24 通信ネットワーク
101 CPU
102 メモリ
103 記憶装置
104 通信インタフェース
105 入力装置
106 出力装置
111 最適需給計画取得部
112 最適発電量取得部
113 最適需要量取得部
114 電力価格調整部
Claims (6)
- 電気機器による単位時間ごとの電力需要量の最適値を算出するとともに前記単位時間ごとの電力価格の最適値を算出する需給計画装置と、前記電力価格に応じて前記電気機器による電力需要量を計画する需要計画装置と、のそれぞれと通信可能に接続される、前記需要の計画を調整する装置であって、
前記単位時間ごとの前記需要量の最適値及び前記電力価格の最適値を前記需給計画装置から取得する最適需給計画取得部と、
前記取得した電力価格の最適値に応じて前記需要量を計画するように前記需要計画装置を制御し、前記需要計画装置から前記需要量の計画値を取得する最適需要量取得部と、
前記需要量の計画値が前記需要量の最適値を超えている前記単位時間について前記電力価格を増加させて、前記増加させた電力価格に応じて前記需要量を計画するように前記需要計画装置を制御する価格調整部と、
を備えることを特徴とする電力需要計画調整装置。 - 請求項1に記載の電力需要計画調整装置であって、
前記価格調整部は、前記需要量の計画値が前記需要量の最適値を超えている前記単位時間について前記電力価格に所定の最高値を設定すること、
を特徴とする電力需要計画調整装置。 - 電気機器による電力需要の計画を調整する方法であって、
前記電気機器による単位時間ごとの前記電力需要量の最適値を算出するとともに前記単位時間ごとの電力価格の最適値を算出する需給計画装置と、前記電力価格に応じて前記電気機器による電力需要量を計画する需要計画装置と、のそれぞれと通信可能に接続されるコンピュータが、
前記単位時間ごとの前記需要量の最適値及び前記電力価格の最適値を前記需給計画装置から取得し、
前記取得した電力価格の最適値に応じて前記需要量を計画するように前記需要計画装置を制御し、前記需要計画装置から前記需要量の計画値を取得し、
前記需要量の計画値が前記需要量の最適値を超えている前記単位時間について前記電力価格を増加させて、前記増加させた電力価格に応じて前記需要量を計画するように前記需要計画装置を制御すること、
を特徴とする電力需要計画調整方法。 - 請求項3に記載の電力需要計画調整方法であって、
前記コンピュータは、前記需要量の計画値が前記需要量の最適値を超えていえる前記単位時間について前記電力価格に所定の最高値を設定すること、
を特徴とする電力需要計画調整方法。 - 電気機器による電力需要の計画を調整するためのプログラムであって、
前記電気機器による単位時間ごとの前記電力需要量の最適値を算出するとともに前記単位時間ごとの電力価格の最適値を算出する需給計画装置と、前記電力価格に応じて前記電気機器による電力需要量を計画する需要計画装置と、のそれぞれと通信可能に接続されるコンピュータに、
前記単位時間ごとの前記需要量の最適値及び前記電力価格の最適値を前記需給計画装置から取得するステップと、
前記取得した電力価格の最適値に応じて前記需要量を計画するように前記需要計画装置を制御し、前記需要計画装置から前記需要量の計画値を取得するステップと、
前記需要量の計画値が前記需要量の最適値を超えている前記単位時間について前記電力価格を増加させて、前記増加させた電力価格に応じて前記需要量を計画するように前記需要計画装置を制御するステップと、
を実行させるためのプログラム。 - 請求項5に記載のプログラムであって、
前記需要計画装置を制御するステップにおいて、前記コンピュータに、前記需要量の計画値が前記需要量の最適値を超えていえる前記単位時間について前記電力価格に所定の最高値を設定させるためのプログラム。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP11792210.4A EP2581872A4 (en) | 2010-06-08 | 2011-03-31 | DEVICE FOR COORDINATING A POWER SUPPLY PLAN, METHOD FOR COORDINATING A POWER SUPPLY PLAN AND A PROGRAM THEREFOR |
| US13/702,481 US20130138468A1 (en) | 2010-06-08 | 2011-03-31 | Power demand plan coordination device, power demand plan coordination method, and program |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2010-131320 | 2010-06-08 | ||
| JP2010131320A JP5042342B2 (ja) | 2010-06-08 | 2010-06-08 | 電力需要計画調整装置、電力需要計画調整方法、及びプログラム |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2011155252A1 true WO2011155252A1 (ja) | 2011-12-15 |
Family
ID=45097867
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2011/058172 Ceased WO2011155252A1 (ja) | 2010-06-08 | 2011-03-31 | 電力需要計画調整装置、電力需要計画調整方法、及びプログラム |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20130138468A1 (ja) |
| EP (1) | EP2581872A4 (ja) |
| JP (1) | JP5042342B2 (ja) |
| WO (1) | WO2011155252A1 (ja) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103714410A (zh) * | 2012-09-28 | 2014-04-09 | 株式会社日立制作所 | 运转计划支援系统 |
| CN107679694A (zh) * | 2017-09-04 | 2018-02-09 | 佛山佳牧乐科技有限公司 | 一种电力调控方法和装置 |
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5106708B1 (ja) * | 2011-12-06 | 2012-12-26 | 中国電力株式会社 | 電力需要計画調整装置、方法及びプログラム |
| EP2790147A4 (en) * | 2011-12-06 | 2015-08-05 | Chugoku Electric Power | DEVICE FOR ADJUSTING A PLAN FOR PRODUCING HYDROELECTRIC POWER, METHOD FOR SETTING A PLAN FOR GENERATING HYDROELECTRIC POWER AND PROGRAM THEREFOR |
| US10121120B2 (en) | 2012-05-10 | 2018-11-06 | Japan Science And Technology Agency | Information processing system and recording device |
| KR20140088829A (ko) * | 2013-01-03 | 2014-07-11 | 한양대학교 에리카산학협력단 | 스마트 그리드 시스템 및 이에 있어서 자원 분배 방법 |
| JP2015076931A (ja) * | 2013-10-07 | 2015-04-20 | 株式会社日立製作所 | 電力需要調整システム、電力需要調整方法および電力管理装置 |
| CN105137756B (zh) * | 2015-08-31 | 2017-10-27 | 南京南瑞继保电气有限公司 | 钢铁企业电网协调控制方法及系统 |
| CA3090944A1 (en) * | 2017-02-08 | 2018-08-16 | Upstream Data Inc. | Blockchain mine at oil or gas facility |
| JP6788555B2 (ja) * | 2017-08-07 | 2020-11-25 | 株式会社東芝 | 情報処理システム、情報処理装置、及び情報処理方法 |
| AU2017444178A1 (en) * | 2017-12-22 | 2019-10-31 | Dalian University Of Technology | Relative objective proximity and marginal analysis principle coupled multi-objective optimization dispatching method for cascade hydropower station |
| AU2020276342A1 (en) | 2019-05-15 | 2021-12-16 | Upstream Data Inc. | Portable blockchain mining system and methods of use |
| CN111062743A (zh) * | 2019-11-28 | 2020-04-24 | 山东理工大学 | 基于奖励公平性的分布式需求响应实时定价方法 |
| CA3076653A1 (en) | 2020-03-21 | 2021-09-21 | Upstream Data Inc. | Portable blockchain mining systems and methods of use |
| JP7083008B2 (ja) * | 2020-08-31 | 2022-06-09 | 三菱重工サーマルシステムズ株式会社 | 計画システム、計画方法及びプログラム |
| US20250035342A1 (en) * | 2022-01-31 | 2025-01-30 | Mitsubishi Electric Corporation | Heat storage system control device, heat storage system, heat storage system control method , control program, and recording medium |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004187405A (ja) * | 2002-12-03 | 2004-07-02 | Osaka Gas Co Ltd | インバランス電力取引支援システム |
| JP2004252967A (ja) * | 2003-01-31 | 2004-09-09 | Toshiba Corp | 電力取引リスク管理システム及び電力取引リスク管理方法 |
| JP2004274956A (ja) * | 2003-03-12 | 2004-09-30 | Hitachi Ltd | 発電計画・電力売買計画作成方法,装置及びプログラム |
| JP2005051866A (ja) * | 2003-07-31 | 2005-02-24 | Hitachi Ltd | 電力売買計画作成方法および装置 |
| JP2005522164A (ja) * | 2002-03-28 | 2005-07-21 | ロバートショー コントロールズ カンパニー | エネルギー管理システム及び方法 |
| JP2005258689A (ja) * | 2004-03-10 | 2005-09-22 | Tokyo Electric Power Co Inc:The | 電力の入札システム |
| JP2007108933A (ja) * | 2005-10-12 | 2007-04-26 | Tokyo Electric Power Co Inc:The | 電力の取引への入札を行う仲介サーバ |
| JP2007159239A (ja) * | 2005-12-02 | 2007-06-21 | Chubu Electric Power Co Inc | 電力取引評価支援システムと方法、およびプログラム |
| JP2009223692A (ja) | 2008-03-17 | 2009-10-01 | Chugoku Electric Power Co Inc:The | 貯水施設の運用支援システム、運用支援方法及びプログラム |
| JP2009257703A (ja) | 2008-04-18 | 2009-11-05 | Chugoku Electric Power Co Inc:The | 貯湯温度制御装置、貯湯温水器、貯湯温度制御方法、及びプログラム |
Family Cites Families (27)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6021402A (en) * | 1997-06-05 | 2000-02-01 | International Business Machines Corporaiton | Risk management system for electric utilities |
| JP2000300000A (ja) * | 1999-04-12 | 2000-10-24 | Hitachi Ltd | 発電機起動停止計画方法 |
| JP2001211548A (ja) * | 2000-01-20 | 2001-08-03 | Hitachi Ltd | 発電計画作成方法および装置 |
| JP2002135976A (ja) * | 2000-10-26 | 2002-05-10 | Mitsubishi Electric Corp | 負荷平準化システム及び負荷平準化方法 |
| JP2002269470A (ja) * | 2001-03-09 | 2002-09-20 | Hitachi Ltd | 分散型電源事業の需要家情報開示・契約方法 |
| JP2002271981A (ja) * | 2001-03-14 | 2002-09-20 | Hitachi Ltd | 電力料金単価設定方法及び電力料金単価提供サービス |
| JP3970536B2 (ja) * | 2001-03-19 | 2007-09-05 | 三菱電機株式会社 | 発電設備の最適運転計画策定方法 |
| JP4023101B2 (ja) * | 2001-04-13 | 2007-12-19 | 株式会社日立製作所 | 電力需給制御方法および装置 |
| JP2003087969A (ja) * | 2001-09-17 | 2003-03-20 | Mitsubishi Electric Corp | 電力需要調整システム |
| JP3787761B2 (ja) * | 2001-09-27 | 2006-06-21 | 株式会社日立製作所 | 発電設備運用計画システム及び売電システム |
| JP2003141216A (ja) * | 2001-10-31 | 2003-05-16 | Toshiba Corp | 運転計画評価システム |
| US20040044613A1 (en) * | 2002-05-15 | 2004-03-04 | Kabushiki Kaisha Toshiba | Price evaluation system and method for derivative security, and risk management system and method for power exchange |
| JP2004173342A (ja) * | 2002-11-18 | 2004-06-17 | Hitachi Ltd | 運転支援システム及び運転支援コンピュータプログラム |
| JP3873152B2 (ja) * | 2003-02-10 | 2007-01-24 | 日本エネルギーネットワーク株式会社 | 電力供給計画方法および電力供給計画システム |
| JP3823105B2 (ja) * | 2003-10-31 | 2006-09-20 | 大阪瓦斯株式会社 | エネルギ供給評価システム |
| JP2005135266A (ja) * | 2003-10-31 | 2005-05-26 | Osaka Gas Co Ltd | 電力取引支援システム |
| JP2005275984A (ja) * | 2004-03-25 | 2005-10-06 | Kansai Electric Power Co Inc:The | 資源利用提案支援システム |
| US7356383B2 (en) * | 2005-02-10 | 2008-04-08 | General Electric Company | Methods and apparatus for optimizing combined cycle/combined process facilities |
| JP2006235888A (ja) * | 2005-02-24 | 2006-09-07 | Tokyo Electric Power Co Inc:The | 電力事業会社における収益予測及び収益計測のためのコンピュータ・システム、収益予測方法及び収益計測方法 |
| JP2006260431A (ja) * | 2005-03-18 | 2006-09-28 | Chugoku Electric Power Co Inc:The | 電力入札価格策定支援システム |
| JP2007219912A (ja) * | 2006-02-17 | 2007-08-30 | Osaka Gas Co Ltd | エネルギ供給評価システム |
| JP2007244160A (ja) * | 2006-03-10 | 2007-09-20 | Tokyo Electric Power Co Inc:The | 取引単価算出装置及び方法並びにプログラム |
| JP4672580B2 (ja) * | 2006-03-20 | 2011-04-20 | 株式会社東芝 | 温暖化ガス排出量取引支援システムと方法、およびプログラム |
| US20080319811A1 (en) * | 2007-06-21 | 2008-12-25 | Audrey Lynn Casey | System and method for modeling an asset-based business |
| JP4672028B2 (ja) * | 2008-01-18 | 2011-04-20 | 日立Geニュークリア・エナジー株式会社 | プラント建設向け作業シミュレーションシステム |
| JP5086968B2 (ja) * | 2008-11-04 | 2012-11-28 | 株式会社東芝 | 定検計画策定装置、方法、及びその制御プログラム |
| US8457821B2 (en) * | 2009-04-07 | 2013-06-04 | Cisco Technology, Inc. | System and method for managing electric vehicle travel |
-
2010
- 2010-06-08 JP JP2010131320A patent/JP5042342B2/ja active Active
-
2011
- 2011-03-31 US US13/702,481 patent/US20130138468A1/en not_active Abandoned
- 2011-03-31 EP EP11792210.4A patent/EP2581872A4/en not_active Ceased
- 2011-03-31 WO PCT/JP2011/058172 patent/WO2011155252A1/ja not_active Ceased
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005522164A (ja) * | 2002-03-28 | 2005-07-21 | ロバートショー コントロールズ カンパニー | エネルギー管理システム及び方法 |
| JP2004187405A (ja) * | 2002-12-03 | 2004-07-02 | Osaka Gas Co Ltd | インバランス電力取引支援システム |
| JP2004252967A (ja) * | 2003-01-31 | 2004-09-09 | Toshiba Corp | 電力取引リスク管理システム及び電力取引リスク管理方法 |
| JP2004274956A (ja) * | 2003-03-12 | 2004-09-30 | Hitachi Ltd | 発電計画・電力売買計画作成方法,装置及びプログラム |
| JP2005051866A (ja) * | 2003-07-31 | 2005-02-24 | Hitachi Ltd | 電力売買計画作成方法および装置 |
| JP2005258689A (ja) * | 2004-03-10 | 2005-09-22 | Tokyo Electric Power Co Inc:The | 電力の入札システム |
| JP2007108933A (ja) * | 2005-10-12 | 2007-04-26 | Tokyo Electric Power Co Inc:The | 電力の取引への入札を行う仲介サーバ |
| JP2007159239A (ja) * | 2005-12-02 | 2007-06-21 | Chubu Electric Power Co Inc | 電力取引評価支援システムと方法、およびプログラム |
| JP2009223692A (ja) | 2008-03-17 | 2009-10-01 | Chugoku Electric Power Co Inc:The | 貯水施設の運用支援システム、運用支援方法及びプログラム |
| JP2009257703A (ja) | 2008-04-18 | 2009-11-05 | Chugoku Electric Power Co Inc:The | 貯湯温度制御装置、貯湯温水器、貯湯温度制御方法、及びプログラム |
Non-Patent Citations (3)
| Title |
|---|
| CENTRAL RESEARCH INSTITUTE OF ELECTRIC POWER INDUSTRY, 23 April 2010 (2010-04-23), Retrieved from the Internet <URL:http://criepi.denken.or.jp/jp/kenkikaku/report/detail/R03016 .html> |
| See also references of EP2581872A4 * |
| WATANABE: "Simulation of Electricity Market -Development of Basic Market Model with Unit Commitment", March 2004 |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103714410A (zh) * | 2012-09-28 | 2014-04-09 | 株式会社日立制作所 | 运转计划支援系统 |
| CN107679694A (zh) * | 2017-09-04 | 2018-02-09 | 佛山佳牧乐科技有限公司 | 一种电力调控方法和装置 |
| CN107679694B (zh) * | 2017-09-04 | 2021-06-04 | 佛山佳牧乐科技有限公司 | 一种电力调控方法和装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP5042342B2 (ja) | 2012-10-03 |
| JP2011257949A (ja) | 2011-12-22 |
| EP2581872A1 (en) | 2013-04-17 |
| US20130138468A1 (en) | 2013-05-30 |
| EP2581872A4 (en) | 2014-02-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5042342B2 (ja) | 電力需要計画調整装置、電力需要計画調整方法、及びプログラム | |
| JP4920123B1 (ja) | 電力需要計画調整装置、電力需要計画調整方法、及びプログラム | |
| JP5106708B1 (ja) | 電力需要計画調整装置、方法及びプログラム | |
| JP5095036B1 (ja) | 水力発電計画調整装置、水力発電計画調整方法及びプログラム | |
| Wille-Haussmann et al. | Decentralised optimisation of cogeneration in virtual power plants | |
| JP5042341B2 (ja) | 水力発電計画調整装置、水力発電計画調整方法、及びプログラム | |
| CN108875992B (zh) | 一种考虑需求响应的虚拟电厂日前优化调度方法 | |
| JP7181350B2 (ja) | マイクログリッドの運転計画装置および方法、並びにマイクログリッドの運転計画装置で使用される地域エネルギー管理装置およびエネルギー管理装置 | |
| Dorahaki et al. | A stackelberg game theory model for integrated community energy storage systems | |
| CN115001037A (zh) | 一种多目标多时间尺度协同的储能系统调度运行方法 | |
| JP5980857B2 (ja) | 電力需要量抑制支援装置、電力需要量抑制支援方法およびプログラム | |
| JP6725086B1 (ja) | 制御計画補正装置及び制御計画補正方法 | |
| CN109066769A (zh) | 风电全消纳下虚拟电厂内部资源调度控制方法 | |
| JPWO2014076785A1 (ja) | ダイナミックプライシング支援装置、ダイナミックプライシング支援方法およびプログラム | |
| CN105096010A (zh) | 一种考虑需求侧管理的电网规划方法 | |
| He et al. | Microgrid operator's capacity and storage investment strategies under environmental regulations | |
| KR102852539B1 (ko) | 에너지 저장시스템의 충방전 에너지 효율의 선형화 방법 및 이를 이용한 에너지 저장시스템의 스케줄링 방법 | |
| Shen et al. | Demand-side management under real-time greenhouse gas emission factor for electricity | |
| Khodabakhsh | Energy Management in Grid-connected Microgrids with On-site Storage Devices | |
| CN114336772A (zh) | 基于可再生能源微电网的不确定条件下需求侧管理的方法 | |
| CN118643973A (zh) | 一种考虑低碳效益的综合能源系统运行优化方法 | |
| Carter et al. | Using a unit commitment program to coordinate power transactions with internal system generation | |
| CN109063888A (zh) | 一种用于并网式热电联供系统的多类型能源调控方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11792210 Country of ref document: EP Kind code of ref document: A1 |
|
| REEP | Request for entry into the european phase |
Ref document number: 2011792210 Country of ref document: EP |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2011792210 Country of ref document: EP |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13702481 Country of ref document: US |