WO2013175612A1 - 電力供給システム - Google Patents

電力供給システム Download PDF

Info

Publication number
WO2013175612A1
WO2013175612A1 PCT/JP2012/063339 JP2012063339W WO2013175612A1 WO 2013175612 A1 WO2013175612 A1 WO 2013175612A1 JP 2012063339 W JP2012063339 W JP 2012063339W WO 2013175612 A1 WO2013175612 A1 WO 2013175612A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
self
line
power storage
storage device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2012/063339
Other languages
English (en)
French (fr)
Inventor
仲尾国広
八切好司
平井友之
永田敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
VPEC Inc
Original Assignee
Osaka Gas Co Ltd
VPEC Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd, VPEC Inc filed Critical Osaka Gas Co Ltd
Priority to CN201280073400.4A priority Critical patent/CN104662764A/zh
Priority to JP2014516590A priority patent/JP5945594B2/ja
Priority to EP12877259.7A priority patent/EP2858200B1/en
Priority to US14/402,255 priority patent/US9866022B2/en
Priority to PCT/JP2012/063339 priority patent/WO2013175612A1/ja
Priority to AU2012380449A priority patent/AU2012380449B2/en
Publication of WO2013175612A1 publication Critical patent/WO2013175612A1/ja
Priority to PH12014502631A priority patent/PH12014502631A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in networks by storage of energy
    • H02J3/32Arrangements for balancing of the load in networks by storage of energy using batteries or super capacitors with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/007Arrangements for selectively connecting one or more loads to one or more power sources or power lines
    • H02J3/0073Arrangements for selectively connecting one or more loads to one or more power sources or power lines by providing alternative feeding paths when the main path fails
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
    • H02J3/46Controlling the sharing of generated power between the generators, sources or networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
    • H02J7/50Circuit arrangements for charging or discharging batteries or for supplying loads from batteries acting upon multiple batteries simultaneously or sequentially
    • H02J7/52Circuit arrangements for charging or discharging batteries or for supplying loads from batteries acting upon multiple batteries simultaneously or sequentially for charge balancing, e.g. equalisation of charge between batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M5/00Conversion of AC power input into AC power output, e.g. for change of voltage, for change of frequency, for change of number of phases
    • H02M5/40Conversion of AC power input into AC power output, e.g. for change of voltage, for change of frequency, for change of number of phases with intermediate conversion into DC
    • H02M5/42Conversion of AC power input into AC power output, e.g. for change of voltage, for change of frequency, for change of number of phases with intermediate conversion into DC by static converters

Definitions

  • the present invention includes a plurality of self-systems including a plurality of self-systems including an AC line to which a plurality of power consumers are connected, a power storage device, and a self-inverter device that connects the power storage device and the AC line.
  • the present invention relates to a power supply system including a connected inverter device that connects a power storage device included in one self-system and an AC line included in the other self-system between the self-systems so that they are electrically connected in series.
  • a power supply system has been proposed that includes a plurality of self-systems having an AC line to which a plurality of power consumers are connected, a power storage device, and a self-inverter device that connects the power storage device and the AC line.
  • a power supply system described in Patent Document 1 International Publication No. 2010/103650
  • Patent Document 1 includes a power storage device included in one self-system and another one so that a plurality of self-systems are electrically connected in series.
  • the inverter system which connects the alternating current line which one self system has is provided between self systems.
  • the self-inverter device of each of the plurality of self-systems has a target frequency at which the voltage of the power on the AC line becomes the target voltage and the frequency of the power on the AC line is determined according to the amount of power stored in the power storage device.
  • the self-inverter device For two self-systems that are electrically connected via a single inverter device, power is transferred from the self-system with the higher target frequency to the self-system with the lower target frequency.
  • the operation of the connected inverter device is controlled so as to be supplied. That is, since the frequency of the power on the AC line of each self system is a value reflecting the amount of power stored in the power storage device, the connected inverter device is connected to each AC line with respect to the two electrically connected self systems.
  • each self system includes a power generation device, and therefore, the electric power generated by the power generation device can be stored in the power storage device of the self system.
  • the amount of electricity stored in the power storage device provided in the self-system is regarded as the power supply capacity for the power consumer connected to the AC line of the self-system, It can be said that the power supply capacity for power consumers is small.
  • the present invention has been made in view of the above problems, and an object of the present invention is to provide a power supply system capable of maintaining a large power supply capacity for a power consumer in a power supply system including a plurality of self systems. There is in point to do.
  • the characteristic configuration of the power supply system according to the present invention for achieving the above object includes an AC line to which a plurality of power consumers are connected, a power storage device, and a self inverter that connects the power storage device and the AC line.
  • a power supply system provided between systems, A shut-off device capable of switching the AC line of one of the plurality of self-systems and an external power system to either one of a connected state and a disconnected state;
  • a control device capable of controlling the operation of the self-inverter device, the linked inverter device and the shut-off device;
  • the control device includes: When the AC line of the self system and the power system that can be linked to the power system via the shut-off device are in the disconnected state, the self inverter device of each of the plurality of self systems, Disconnection operation mode for controlling the voltage of power on the AC line to be a target voltage and controlling the frequency of power on the AC line to be a target frequency determined according to the amount of power stored in the power storage device To work with When it is determined that the condition for switching to the interconnection state is satisfied, the operation of the self-inverter device in the disconnection operation mode is stopped for the self-system that can be linked to the power system via the disconnection device. In addition, the self-inverter device is operated
  • the necessary amount is obtained by linking the AC line of the own system and the power system at the timing when the switching condition to the interconnection state is satisfied, and operating the own inverter device in the charge operation mode.
  • the replenishment power can be received from the power system and the power storage device can be charged.
  • each self-system is electrically connected by a connected inverter device provided between the self-systems, so that the replenishment power can be accommodated from the self-system receiving the supplementary power from the power system to another self-system. Is possible.
  • a self-system that has received supplementary power from another self-system it is possible to store power in the power storage device using the power that has received the accommodation. Therefore, in a power supply system including a plurality of self-systems, it is possible to increase the power supply capacity for power consumers.
  • Another characteristic configuration of the power supply system according to the present invention is that the control device determines that the condition for switching to the connected state is satisfied when the set time is reached.
  • the above characteristic configuration it is possible to periodically determine that the condition for switching to the connected state is satisfied at the set time, and charge the power storage device with the supplementary power received from the power system. For example, if the set time is set before the time when power demand increases during the day, it is determined that the condition for switching to the connected state is satisfied prior to the time when power demand increases. Thus, power storage to the power storage device with the supplementary power is performed. As a result, it is possible to increase the power supply capacity for the power consumer prior to the time period when the power demand increases.
  • control device is configured such that a power storage amount of the power storage device of the self system that can be linked to the power system via the cutoff device is less than a lower limit power storage amount. In other words, it is determined that the condition for switching to the connected state is satisfied.
  • the condition for switching to the connected state is satisfied at the timing when the amount of power stored in the power storage device becomes less than the lower limit power storage amount, that is, when the power supply capacity from the power storage device to the power consumer decreases. Therefore, the power storage device can be charged from the power system. In addition, charging of the power storage device with supplementary power from the power system is performed only when the power storage amount of the power storage device becomes less than the lower limit power storage amount, that is, when charging of the power storage device is required. You can build a system.
  • Still another characteristic configuration of the power supply system according to the present invention is that the control device is connected to the power system via the cutoff device when it is determined that the condition for switching to the connected state is satisfied.
  • the amount of the supplementary power received by the self inverter device from the power system in the charging operation mode is changed according to the amount of electricity stored in the power storage device of the self system to be obtained.
  • the control device when the control device increases the supplementary power received from the power system by the self inverter device in the charge operation mode, the time required for the power storage amount of the power storage device to reach the full charge level is relatively short. Become. That is, the control device changes the amount of supplementary power received from the power system by the self-inverter device in the charge operation mode in accordance with the amount of power stored in the power storage device of the self-system. The time required to reach the fully charged level can be changed.
  • Still another characteristic configuration of the power supply system according to the present invention is that, when the control device operates the self-inverter device in the charging operation mode, the linked inverter device between two adjacent self-systems. Is to increase the power that can be accommodated as the supplementary power increases.
  • a self-system that can be linked to the power system via the shut-off device receives supplementary power from the power system, as the supplementary power increases, another self-system passes through the linked inverter device.
  • the power that can be accommodated increases.
  • by receiving the supplementary power from the power system it is possible to increase the amount of power stored in the power storage device of the own system that can be linked to the power system via the cutoff device, and to store the power stored in the power storage device of another self system. The amount can also be increased.
  • Still another characteristic configuration of the power supply system according to the present invention includes an AC line to which a plurality of power consumers are connected, a power storage device, and a self-inverter device that connects the power storage device and the AC line.
  • a self-contained inverter device that connects the power storage device of one self-system and the AC line of the other self-system so that a plurality of the self-systems are electrically connected in series.
  • a power supply system provided between systems, Charging that connects between the power storage device of one of the plurality of self-systems and an external power system, and can use the supplementary power received from the power system for charging the power storage device
  • the control device includes: The self-inverter device of each of the plurality of self-systems is determined so that the voltage of power on the AC line becomes a target voltage, and the frequency of power on the AC line is determined according to the amount of power stored in the power storage device To achieve the target frequency
  • the charging inverter device is operated in a charging operation mode in which the supplementary power is received from the power system and used for charging the power storage device.
  • the charging inverter device is operated in the charging operation mode at the timing when the charging start condition is satisfied, so that the required amount of supplementary power can be received from the power system and the power storage device can be charged. it can.
  • each self-system is electrically connected by a connected inverter device provided between the self-systems, so that the replenishment power can be accommodated from the self-system receiving the supplementary power from the power system to another self-system. Is possible. As a result, even in a self-system that has received supplementary power from another self-system, it is possible to store power in the power storage device using the power that has received the accommodation. Therefore, in a power supply system including a plurality of self-systems, it is possible to increase the power supply capacity for power consumers.
  • Still another characteristic configuration of the power supply system according to the present invention is that the control device determines that the charging start condition is satisfied when a set time is reached.
  • the charging start condition is periodically satisfied at the set time, and to charge the power storage device with the supplementary power received from the power system. For example, if the set time is set before the time period during which power demand increases during the day, it is determined that the charging start condition is satisfied prior to the time period during which power demand increases, and the replenishment is performed. Power storage to the power storage device is performed. As a result, it is possible to increase the power supply capacity for the power consumer prior to the time period when the power demand increases.
  • Still another characteristic configuration of the power supply system according to the present invention is that the control device is configured such that a power storage amount of the power storage device of the self system connected to the power system via the charging inverter device is less than a lower limit power storage amount. Then, it is determined that the charging start condition is satisfied.
  • the charging start condition is satisfied at a timing when the amount of power stored in the power storage device becomes less than the lower limit power storage amount, that is, at a timing when the power supply capacity from the power storage device to the power consumer decreases.
  • the power storage device can be charged from the power system.
  • charging of the power storage device with supplementary power from the power system is performed only when the power storage amount of the power storage device becomes less than the lower limit power storage amount, that is, when charging of the power storage device is required. You can build a system.
  • Yet another characteristic configuration of the power supply system according to the present invention is that the control device is connected to the power system via the charging inverter device when the control device determines that the charging start condition is satisfied.
  • the charging inverter device changes the magnitude of the supplementary power received from the power system in accordance with the magnitude of the power storage amount of the power storage device of the system.
  • the control device when the control device increases the supplementary power received from the power system by the charging inverter device in the charging operation mode, the time required for the power storage amount of the power storage device to reach the full charge level is relatively Shorter.
  • the control device changes the amount of supplementary power received from the power system by the charging inverter device in the charging operation mode in accordance with the amount of power stored in the power storage device of the self system. The time required to reach the full charge level can be changed.
  • Still another characteristic configuration of the power supply system according to the present invention is that, when the control device is operating the charging inverter device in the charging operation mode, the linked inverter between the two adjacent self-systems.
  • the power to be accommodated by the apparatus is to increase as the supplementary power increases.
  • the other self-system when a self-system that can be linked to the power system via the charging inverter device receives supplementary power from the power system, the other self-system is linked to the inverter device as the supplementary power increases.
  • the power that can be accommodated by is increased.
  • the amount of power stored in the power storage device of the self system that can be linked to the power system via the charging inverter device can be increased, and the power storage device of another self system The amount of electricity stored can be increased.
  • Still another characteristic configuration of the power supply system according to the present invention includes an AC line to which a plurality of power consumers are connected, a power storage device, and a self-inverter device that connects the power storage device and the AC line.
  • a self-contained inverter device that connects the power storage device of one self-system and the AC line of the other self-system so that a plurality of the self-systems are electrically connected in series.
  • a power supply system provided between systems, A power converter that connects the AC line of one of the plurality of self-systems and an external power system;
  • a control device capable of controlling operations of the self-inverter device, the linked inverter device, and the power conversion device;
  • the control device includes: The self-inverter device of each of the plurality of self-systems is determined so that the voltage of power on the AC line becomes a target voltage, and the frequency of power on the AC line is determined according to the amount of power stored in the power storage device To achieve the target frequency
  • the replenishment start condition for starting the supply of supplementary power received from the power system to the AC line of the one self-system is satisfied, the supplementary power is received from the power system and the frequency of the supplemental power is set to the target
  • the power converter is operated in a replenishment operation mode in which the frequency is adjusted and supplied to the AC line.
  • a necessary amount of replenishment is obtained by operating the power conversion device in the replenishment operation mode at a timing when the replenishment start condition for starting the supply of replenishment power to the AC line of one self-system is satisfied.
  • the power storage device can be charged by receiving power from the power system.
  • each self-system is electrically connected by a connected inverter device provided between the self-systems, so that the replenishment power can be accommodated from the self-system receiving the supplementary power from the power system to another self-system. Is possible. As a result, even in the self-system that has received the supplementary power from other self-systems, it is possible to carry out power transfer to the power storage device using the interchanged power.
  • the power conversion device receives the supplementary power from the power system, adjusts the frequency of the supplementary power to the target frequency and supplies it to the AC line, so that the self-inverter device controls according to the amount of power stored in the power storage device.
  • the target frequency is not changed.
  • Still another characteristic configuration of the power supply system according to the present invention is that the control device determines that the replenishment start condition is satisfied when a set time is reached.
  • the replenishment start condition is periodically satisfied at the set time, and to charge the power storage device with the replenishment power received from the power system. For example, if the set time is set before a time period in which power demand increases during the day, it is determined that the replenishment start condition is satisfied prior to the time period in which power demand increases, and the replenishment is performed. Power storage to the power storage device is performed. As a result, it is possible to increase the power supply capacity for the power consumer prior to the time period when the power demand increases.
  • Still another characteristic configuration of the power supply system according to the present invention is that the control device is configured such that a power storage amount of the power storage device of the self system connected to the power system via the power conversion device is less than a lower limit power storage amount. In other words, it is determined that the replenishment start condition is satisfied.
  • the replenishment start condition is satisfied at a timing when the amount of power stored in the power storage device becomes less than the lower limit power storage amount, i.e., when the power supply capacity from the power storage device to the power consumer decreases.
  • the power storage device can be charged from the power system.
  • charging of the power storage device with supplementary power from the power system is performed only when the power storage amount of the power storage device becomes less than the lower limit power storage amount, that is, when charging of the power storage device is required. You can build a system.
  • Still another characteristic configuration of the power supply system according to the present invention is that the power converter converts the supplementary power supplied from the power system into desired DC power, and the AC / DC converter.
  • a DC / AC converter that converts the DC power generated by the converter into desired AC power and supplies the AC power to the AC line, and a DC that connects between the AC / DC converter and the DC / AC converter And a connecting portion.
  • the AC / DC converter converts the replenishment power supplied from the power system into desired DC power, and the DC / AC converter converts the DC power into AC power of the target frequency. Can be supplied to the AC line.
  • Still another characteristic configuration of the power supply system according to the present invention is that the control device is connected to the power system via the power conversion device when the control device determines that the replenishment start condition is satisfied.
  • the power conversion device changes the magnitude of the supplementary power received from the power system in the supplementary operation mode in accordance with the amount of electricity stored in the power storage device.
  • the control device when the control device increases the supplementary power received by the power conversion device from the power system in the supplementary operation mode, the time required to reach the full charge level of the power storage amount of the power storage device is relatively short. Become. In other words, the control device changes the amount of supplementary power received from the power system by the power conversion device in the supplementary operation mode in accordance with the amount of electricity stored in the power storage device of the self system. The time required to reach the fully charged level can be changed.
  • Still another characteristic configuration of the power supply system according to the present invention is that, when the control device operates the power conversion device in the replenishment operation mode, the linked inverter device between two adjacent self systems. Is to increase the power that can be accommodated as the supplementary power increases.
  • the other self-system when a self-system that can be linked to the power system via the power conversion device receives supplementary power from the power system, the other self-system is The power that can be accommodated increases.
  • the amount of power stored in the power storage device of the own system that can be linked to the power system via the power conversion device it is possible to increase the amount of power stored in the power storage device of the own system that can be linked to the power system via the power conversion device, and The amount of power storage can also be increased.
  • Still another characteristic configuration of the power supply system according to the present invention is that a natural energy power generation device whose generated power changes according to the weather is connected to the AC line of at least one of the plurality of self systems. And The said control apparatus exists in the point which changes the magnitude
  • the power generated by the natural energy power generation device when the natural energy power generation device is connected to the AC line, the power generated by the natural energy power generation device can be used for power storage in the power storage device. That is, since the power storage device can be charged with the generated power of the natural energy power generation device, the supplementary power received from the power system can be reduced. In addition, when the generated power of the natural energy power generation device predicted in the future is large, the generated power of the natural energy power generation device that can be stored in the power storage device in the future can be expected to be large.
  • the amount of power stored in the power storage device can be recovered to a high level. Can do.
  • the power generated by the natural energy power generation apparatus predicted in the future is small, it is not possible to expect a large amount of power generated by the natural energy power generation apparatus that can be stored in the power storage apparatus in the future. Therefore, if the amount of power stored in the power storage device is low, the amount of power stored in the power storage device cannot be recovered to a high level only with the power generated by the natural energy power generation device.
  • the control device changes the size of the lower limit storage amount according to the predicted weather in the future, that is, according to the amount of power generated by the natural energy power generation device that can be used for power storage in the power storage device.
  • the amount of power stored in the power storage device can be recovered to a high level while effectively using the power generated by the natural energy power generation device for power storage in the power storage device.
  • Still another characteristic configuration of the power supply system according to the present invention is that the control device is electrically connected to each other through the one linked inverter device and is adjacent to each other. Based on the target frequency determined according to the amount of power stored in the power storage device, power is transferred from the self-system having a relatively large power storage amount to the self-system having a relatively small power storage amount. The point is to control the operation of the linked inverter device so that
  • the power supply systems S1 to S4 (S) of the first to fourth embodiments described below all have an AC line 11, a power storage device 12, and a power storage device to which a plurality of power consumers D are connected.
  • a plurality of self-systems 10 each having a self-inverter device 13 for connecting the device 12 and the AC line 11, and the power storage of one self-system 10 so that the plurality of self-systems 10 are electrically connected in series.
  • This is common in that the connected inverter device 20 that connects the device 12 and the AC line 11 of the other one self-system 10 is provided between the self-systems 10.
  • the power supply systems S1 and S2 (S) of the first and second embodiments connect the AC line 11 via the interruption device 2.
  • the power storage device 12 is connected to the electric power system 1 and can be supplied with electric power from the electric power system 1.
  • the power supply system S3 (S) of the third embodiment connects the power storage device 12 to the power system 1 via the charging inverter device 3, and as a result, the power storage device 12 receives supply of power from the power system 1. It has a configuration that can.
  • the power supply system S4 (S) of the fourth embodiment connects the AC line 11 to the power system 1 through the power conversion device 4 capable of performing AC / AC conversion, and as a result, the power storage device 12 is powered. The power supply from the system 1 can be received.
  • FIG. 1 is a diagram illustrating a configuration of a power supply system S1 according to the first embodiment.
  • the power supply system S ⁇ b> 1 includes a plurality of self systems 10, a connected inverter device 20 provided between the self systems 10, a shut-off device 2, and a control device C.
  • FIG. 1 shows an example in which the power supply system S1 includes the own systems 10A and 10B and the inverter devices 20A and 20B linked to each other.
  • a system including a larger number of the self systems 10 and the linked inverter devices 20 is constructed. You can also.
  • the shut-off device 2 is a device that can switch the AC line 11 of one self-system 10A of the plurality of self-systems 10 and the external power system 1 to either the interconnected state or the disconnected state.
  • blocking apparatus 2 can switch the alternating current line 11 of self-system 10A, and the external electric power grid
  • the control device C is a device capable of controlling the operations of the self-inverter device 13, the linked inverter device 20, and the shut-off device 2.
  • the control device C is a device having an information input / output function, a storage function, an arithmetic processing function, and the like.
  • the function of the control device C is that any one of the control units (not shown) included in each of the self-inverter device 13, the linked inverter device 20 and the shut-off device 2 functions as a master control unit. This can be realized by functioning as a slave control unit while performing information communication with the master control unit.
  • control apparatus C is provided separately from the control part (not shown) which each of the self inverter apparatus 13, the linked inverter apparatus 20, and the interruption
  • the self system 10 includes an AC line 11 to which a plurality of power consumers D are connected, a power storage device 12, and a self inverter device 13 that connects the power storage device 12 and the AC line 11.
  • the power consumer D has a power consuming device 14 that consumes power supplied from the AC line 11.
  • the power consumer D may have the power generation device 15 in addition to the power consumption device 14.
  • various devices such as a solar power generation device and a wind power generation device that generate power using natural energy such as sunlight and wind power, and a fuel cell that generates power using fuel can be used.
  • the power consumer D does not include the power generation device 15, but the power generation device 15 may be connected to the AC line 11 alone.
  • the power storage device 12 can use various devices such as a storage battery (for example, a chemical battery) and an electric double layer capacitor.
  • the self-inverter device 13 includes a circuit unit (not shown) having a semiconductor switch and the like, and a control unit (not shown) that controls the switching operation of the semiconductor switch.
  • the operation of the self-inverter device 13 is different between a connected state in which the AC line 11 is connected to the power system 1 and a disconnected state in which the AC line 11 is disconnected from the power system 1.
  • the control device C is configured to A target in which the voltage of power on the AC line 11 becomes the target voltage for each of the self-inverter devices 13 and the frequency of power on the AC line 11 is determined according to the amount of power stored in the power storage device 12.
  • the control device C has a target frequency that is determined with respect to each of the self-inverter devices 13 such that the frequency of power on the AC line 11 increases as the amount of power stored in the power storage device 12 increases. It is instructed to operate in the operation mode at the time of disconnection that is controlled as follows. On the other hand, the control device C stores the supplementary power received from the power system 1 when the AC line 11 and the power system 1 are in an interconnected state (that is, when the interruption device 2 is operated in an interconnected state). The self-inverter device 13 is commanded to operate in the charging operation mode used for charging the device 12. Then, in the self-inverter device 13 that has received a command from the control device C, the control unit controls the operation of the circuit unit to perform the operation in the charging operation mode. Details of the disconnection operation mode and the charging operation mode will be described later.
  • the control unit of the self-inverter device 13 stores in the internal memory or the like a relational expression that the target frequency of the AC line 11 increases in advance as the amount of power stored in the power storage device 12 increases, and operates in the disconnection operation mode. Sometimes control is performed according to the relational expression.
  • the actual frequency of the AC line 11 (that is, the target frequency) reflects the amount of power stored in the power storage device 12 connected to the AC line 11 via the self inverter device 13.
  • the power supply system S1 includes a connected inverter device 20 between the self systems 10.
  • the connected inverter device 20 includes an ac power line 12 included in one self system 10A and an AC line included in the other self system 10B so that a plurality of self systems 10 are electrically connected in series. 11 is connected.
  • the operation of the linked inverter device 20 is controlled by the control device C.
  • the control device C has a target frequency that is determined according to the amount of power stored in each power storage device 12 with respect to two self systems 10 that are electrically connected via one linked inverter device 20.
  • the operation of the connected inverter device 20 is controlled so that power can be accommodated from the self system 10 in which the power storage amount of the power storage device 12 is relatively large to the self system 10 in which the power storage amount of the power storage device 12 is relatively small.
  • Power interchange control is performed. For example, in the present embodiment, control is performed so that the frequency of the power on the AC line 11 becomes a target frequency that is determined so as to increase as the amount of power stored in the power storage device 12 increases. Therefore, power is transferred from the self-system 10 having a higher target frequency (that is, the one having a relatively large amount of storage) to the self-system 10 having a lower target frequency (the one having a relatively small amount of storage).
  • the connected inverter device 20 operates so as to be supplied.
  • FIG. 2 is a flowchart illustrating an example of control of the power supply system S1 by the control device C.
  • the control device C operates the self inverter device 13 by switching between the disconnection operation mode and the charging operation mode.
  • the control device C operates the self-inverter device 13 in the disconnection operation mode before proceeding to step # 10. That is, the self-inverter device 13 increases so that the voltage of power on the AC line 11 of the self-system 10 becomes the target voltage, and the frequency of power on the AC line 11 increases as the amount of power stored in the power storage device 12 increases.
  • Control is performed so that the target frequency is determined by the following relational expression.
  • a frequency variation determined by a function of the amount of power stored in the power storage device 12 (for example, a relationship in which the frequency variation increases as the amount of stored power increases) is used as the reference frequency (for example, 60 Hz) of the AC line 11.
  • the target frequency is a value obtained by addition.
  • the connected inverter device 20 includes, for example, the frequency of power on the AC line 11 of the own system 10A (denoted as “fA1” in FIG. 1) and the frequency of power on the AC line 11 of the own system 10B (in FIG. 1). And the power is supplied from the self-system 10 having a higher frequency to the self-system 10 having a lower frequency.
  • the actual frequencies fA1 and fB of the power on the AC lines 11 of the respective self systems 10A and 10B are the same as the target frequencies determined by the respective self systems 10A and 10B. Therefore, the linked inverter device 20 may actually detect the frequency of the power on the AC line 11 of each of the self systems 10A and 10B, or the target frequency from the self inverter device 13 of each of the self systems 10A and 10B. May be obtained.
  • the voltage and frequency of the power on the AC line 11 of each self system 10A, 10B are from each power storage device 12. Maintained by supplied power.
  • the connected inverter device 20A detects the decrease in the power storage amount due to the power frequency decrease on the AC line 11, and the other By carrying out power interchange control for accommodating power from the own system 10, it is possible to equalize the amount of electricity stored in the power storage device 12 among the respective own systems 10.
  • step # 10 the control device C determines whether or not the condition for switching to the connected state is satisfied.
  • the switching condition to the connected state whether or not the amount of power stored in the power storage device 12 of the own system 10A that can be connected to the power system 1 via the cutoff device 2 is less than a predetermined lower limit power storage amount. is there. That is, the control device C detects the amount of power stored in the power storage device 12 of the own system 10A, and if the amount of power storage is less than the lower limit power storage amount, the control device C determines that the condition for switching to the connected state is satisfied. To do.
  • the power storage device is connected to the power system 1 and the self system 10A as described later at the timing when the amount of power stored in the power storage device 12 of the self system 10A decreases. 12 can be reliably charged. In other words, the power storage capacity of the power storage device 12 can be recovered to a high level at an appropriate timing, and the power supply capacity for the power consumer D can be increased.
  • Step # 10 If it is determined at Step # 10 that the condition for switching to the connected state is satisfied, the control device C proceeds to Step # 12, and if it is determined that the condition for switching to the connected state is not satisfied, Step ## 11 and the self-inverter device 13 of each self-system 10 is continuously operated in the disconnection operation mode.
  • step # 12 the control device C is in the disconnection operation mode with respect to the self inverter device 13 of the self system 10A. Stop the operation. That is, power is not output from the self inverter device 13 to the AC line 11 in the self system 10A. At this time, the control device C may temporarily stop the power accommodation control by the linked inverter device 20, or may not stop the power accommodation control by the linked inverter device 20.
  • step # 13 the control device C operates the shut-off device 2 to link the power system 1 and the AC line 11 of the own system 10A.
  • the voltage and frequency of power on the AC line 11 of the own system 10 ⁇ / b> A are the same as the voltage and frequency of the power system 1.
  • the control device C causes the self inverter device 13 of the self system 10A to operate in a charging operation mode in which the supplementary power received from the power system 1 is used to charge the power storage device 12.
  • the supplementary power: P1 received by the self inverter device 13 from the power system 1 may be within the range of the rated capacity of the self inverter device 13.
  • the power supply system 1 uses the replenishment power P1 stored in advance as 50% of its own rated capacity. Is supplied from the AC line 11 connected to the power storage device 12.
  • the numerical value of 50% is a numerical value given for illustrative purposes only, and the present invention is not limited to this numerical value.
  • the self-inverter device 13 sets the power of 30% of its own rated capacity as the supplementary power: P1 received from the power system 1.
  • control device C causes the linked inverter device 20 to perform the power interchange control in parallel with operating the self inverter device 13 in the charging operation mode. That is, the electric power taken from the electric power system 1 by the self inverter device 13 of the self system 10A can be further transferred to the self system 10B.
  • the AC line 11 of the own system 10A is connected to the power system 1
  • the frequency of power on the AC line 11 is the frequency of power in the power system 1
  • the power storage device 12 It does not reflect the amount of electricity stored.
  • the self-inverter device 13 of the self-system 10A detects the amount of power stored in the power storage device 12 while operating in the charge operation mode, and derives the target frequency according to the amount of power stored.
  • the linked inverter device 20A receives the transmission of the target frequency (denoted as “fA2” in FIG. 1) from the self-inverter device 13 of the self-system 10A, so that the power on the AC line 11 of the self-system 10A is transmitted. It is possible to detect and compare the target frequency (fA2) and the target frequency (fB) of the power on the AC line 11 of the own system 10B. Then, the linked inverter device 20 performs power interchange control for supplying electric power from the own system 10 having a higher frequency to the own system 10 having a lower frequency.
  • the target frequency denoted as “fA2” in FIG. 1
  • the control device C determines whether or not the charging end condition is satisfied in step # 15 while operating the self inverter device 13 in the charge operation mode in step # 14 and causing the connected inverter device 20 to perform power interchange control.
  • the charge termination condition includes whether or not the amount of power stored in the power storage device 12 of the own system 10A has reached the full charge level. If the charging end condition is satisfied, the process proceeds to step # 16. If the charging end condition is not satisfied, the process returns to step # 14.
  • step # 15 when the control device C determines that the charge termination condition is satisfied (for example, when it is determined that the amount of power stored in the power storage device 12 of the own system 10A has reached the full charge level), In step # 16, the charging operation mode by the self inverter device 13 is stopped. Further, the control device C stops the power interchange control by the linked inverter device 20.
  • the control device C While the control device C is operating the self-inverter device 13 of the self-system 10A in the process # 14 in the charge operation mode in which the replenishment power P1 received from the power system 1 is used for charging the power storage device 12, it is in parallel with the control device C.
  • the connected inverter device 20 performs power interchange control
  • the supplementary power supplied from the power system 1 is not only charged in the power storage device 12 of the own system 10A but also accommodated in the own system 10B (that is, Is also supplied to the power storage device 12 of the own system 10B). That is, since the power storage control is performed by the connected inverter device 20, the power storage amount of the power storage device 12 of each self system 10 is equalized.
  • the power storage amount of the power storage device 12 of the self system 10A is equal to the full charge level. It may be considered that the amount of power stored in the power storage devices 12 of all the self systems 10 has reached the full charge level. Therefore, by setting the charge end condition that the power storage amount of the power storage device 12 of the self system 10A has reached the full charge level, the control device C can fully charge the power storage devices 12 of all the self systems 10. It can be confirmed that the charging level has been reached, that is, it is no longer necessary to receive supplementary power from the power system 1.
  • step # 17 the control device C operates the shut-off device 2 to disconnect the AC line 11 of the own system 10A from the power system 1. Thereafter, in step # 18, the control device C causes the linked inverter device 20 to perform the power interchange control in parallel with operating the self inverter device 13 of the self system 10A in the disconnection operation mode.
  • each self system 10 is electrically connected by a connected inverter device 20 provided between the self systems 10, and therefore, from the self system 10 that has received supplementary power from the power system 1 to another self system 10. And its supplementary power can be accommodated. Therefore, in the power supply system S1 including the plurality of self systems 10, the power supply capacity for the power consumer D can be increased.
  • the power supply system S2 (S) of the second embodiment is different from the power supply system S1 of the first embodiment in the form of connection with the power system 1.
  • the power supply system S2 of the second embodiment will be described below, but the description of the same configuration as that of the first embodiment will be omitted.
  • FIG. 3 is a diagram illustrating the configuration of the power supply system S2 of the second embodiment.
  • the AC line 11 of the own system 10 ⁇ / b> B is configured to be connected to the power system 1 via the cutoff device 2. That is, since the power system 1 is connected to the AC line 11 connected to both the connected inverter device 20A and the self-inverter device 13 of the self-system 10B via the shut-off device 2, the inverter for system connection is used. The function required to protect the power system 1 needs to be mounted on both the linked inverter device 20A and the self inverter device 13 of the self system 10B.
  • the control device C disconnects the AC line 11 of the own system 10B from the power system 1 (that is, the interruption device 2 is switched off).
  • the shut-off operation is performed
  • the self-inverter device 13 of each self-system 10 is operated in the disconnection operation mode, and each linked inverter device 20 is operated so as to perform power interchange control.
  • the self-inverter device 13 of each self-system 10 has a power storage amount of the power storage device 12 such that the voltage of power on the AC line 11 of the self-system 10 becomes the target voltage and the frequency of power on the AC line 11 is It is instructed to operate in the operation mode at the time of disconnection which is controlled so as to become the target frequency determined according to.
  • the control device C controls each of the self-inverter devices 13 so that the frequency of the power on the AC line 11 becomes a target frequency that is determined so as to increase as the amount of power stored in the power storage device 12 increases. Command to operate in the disconnection mode.
  • the frequency of power on the AC line 11 reflects the amount of power stored in the power storage device 12 connected to the AC line 11 via the self inverter device 13.
  • Each connected inverter device 20 performs power interchange control for supplying power from the own system 10 having the higher target frequency to the own system 10 having the lower target frequency. At this time, if the AC line 11 of the self system 10B is disconnected from the power system 1, the frequency of the power in the AC line 11 of each self system 10 is the same as the target frequency in each self system 10, Each linked inverter device 20 may detect and compare the frequency of power on the AC line 11 of each system 10.
  • the control device C when the control device C is connected to the power system 1 with the AC line 11 of the own system 10B (that is, when the shut-off device 2 is connected to the power system 1), the control device C and the first embodiment described above.
  • the self-inverter device 13 of the self-system 10B is operated in the charging operation mode, and each linked inverter device 20 is operated so as to perform power interchange control.
  • the replenishment power P1 stored in advance as the power of 50% of the rated capacity of the self-system 10B is stored. Then, the power is supplied from the AC line 11 connected to the power system 1 to the power storage device 12.
  • Each connected inverter device 20 performs power interchange control for supplying power from the own system 10 having the higher target frequency to the own system 10 having the lower target frequency.
  • the linked inverter device 20A receives the target frequency (fA) from the self inverter device 13 of the self system 10A and receives the target frequency (denoted as “fB2” in FIG. 1) from the self inverter device 13 of the self system 10B.
  • the connected inverter device 20A performs power interchange control for supplying power from the self system 10 having a higher frequency to the self system 10 having a lower frequency.
  • FIG. 4 is a diagram illustrating the configuration of the power supply system S3 of the third embodiment.
  • the power supply system S ⁇ b> 3 includes a plurality of self systems 10, a linked inverter device 20 provided between the self systems 10, a charging inverter device 3, and a control device C.
  • FIG. 4 shows an example in which the power supply system S3 includes the own systems 10A and 10B and the inverter devices 20A and 20B linked to each other. You can also.
  • the charging inverter device 3 connects between the power storage device 12 of one self system 10 of the plurality of self systems 10 and the external power system 1, and supplies supplementary power received from the power system 1 to the power storage device 12. It is a device that can be used for charging.
  • the charging inverter device 3 is provided so as to connect between the AC line 11 of the own system 10A and the external power system 1, and converts AC power received from the power system 1 into desired DC power. Thus, it can be supplied to the power storage device 12 side.
  • the charging inverter device 3 is a device for linking the power system 1 and the own system 10, the function required for protecting the power system 1 as an inverter for grid connection is provided. It must be installed.
  • the control device C is a device capable of controlling the operations of the self-inverter device 13, the linked inverter device 20, and the charging inverter device 3.
  • the control device C is a device having an information input / output function, a storage function, an arithmetic processing function, and the like.
  • the function of the control device C is that any one of the control units (not shown) included in each of the self inverter device 13, the linked inverter device 20, and the charging inverter device 3 functions as a master control unit. This can be realized by the unit functioning as a slave control unit while performing information communication with the master control unit.
  • control device C is provided separately from the control unit (not shown) included in each of the self inverter device 13, the linked inverter device 20, and the charging inverter device 3, and can communicate information with these control units. It can be realized by a configured master control unit.
  • the self system 10 includes an AC line 11 to which a plurality of power consumers D are connected, a power storage device 12, and a self inverter device 13 that connects the power storage device 12 and the AC line 11.
  • the power consumer D has a power consuming device 14 that consumes power supplied from the AC line 11.
  • the power consumer D may have the power generation device 15 in addition to the power consumption device 14.
  • various devices such as a solar power generation device and a wind power generation device that generate power using natural energy such as sunlight and wind power, and a fuel cell that generates power using fuel can be used.
  • the power consumer D does not include the power generation device 15, but the power generation device 15 may be connected to the AC line 11 alone.
  • the power storage device 12 can use various devices such as a storage battery (for example, a chemical battery) and an electric double layer capacitor.
  • the self-inverter device 13 includes a circuit unit (not shown) having a semiconductor switch and the like, and a control unit (not shown) for controlling the switching operation of the semiconductor switch.
  • the control device C controls the frequency of the power on the AC line 11 so that the power voltage on the AC line 11 becomes the target voltage for each of the self-inverter devices 13 of the plurality of self-systems 10. Is controlled to become a target frequency determined according to the amount of power stored in the power storage device 12.
  • the control device C has a target frequency that is determined by a relational expression in which the frequency of power on the AC line 11 increases as the amount of power stored in the power storage device 12 increases with respect to each of the self inverter devices 13.
  • a frequency fluctuation determined by a function of the power storage amount of the power storage device 12 (for example, a relationship in which the frequency fluctuation increases as the power storage amount increases) is used as the reference frequency (for example, 60 Hz) of the AC line 11.
  • the reference frequency for example, 60 Hz
  • the target frequency is a value obtained by addition.
  • the control unit of the self-inverter device 13 stores in advance a relational expression in which the target frequency of the AC line 11 increases as the amount of power stored in the power storage apparatus 12 increases, and the AC line 11 is stored in accordance with the relational expression. Voltage control and frequency control are performed. Thus, the actual frequency of the AC line 11 (that is, the target frequency) reflects the amount of power stored in the power storage device 12 connected to the AC line 11 via the self inverter device 13.
  • the power supply system S3 includes a connected inverter device 20 between the self systems 10.
  • the connected inverter device 20 includes an ac power line 12 included in one self system 10A and an AC line included in the other self system 10B so that a plurality of self systems 10 are electrically connected in series. 11 is connected.
  • the operation of the linked inverter device 20 is controlled by the control device C.
  • the control device C has a target frequency that is determined according to the amount of power stored in each power storage device 12 with respect to two self systems 10 that are electrically connected via one linked inverter device 20.
  • the operation of the connected inverter device 20 is controlled so that power can be accommodated from the self system 10 in which the power storage amount of the power storage device 12 is relatively large to the self system 10 in which the power storage amount of the power storage device 12 is relatively small.
  • Power interchange control is performed. For example, in the present embodiment, control is performed so that the frequency of the power on the AC line 11 becomes a target frequency that is determined so as to increase as the amount of power stored in the power storage device 12 increases. Therefore, power is transferred from the self-system 10 having a higher target frequency (that is, the one having a relatively large amount of storage) to the self-system 10 having a lower target frequency (the one having a relatively small amount of storage).
  • the connected inverter device 20 operates so as to be supplied.
  • FIG. 5 is a flowchart illustrating an example of control of the power supply system S3 by the control device C. As shown in FIG. 5, the control device C switches the charging inverter device 3 between execution and stop of the operation in the charging operation mode.
  • the control device C does not cause the charging inverter device 3 to perform the charging operation mode before proceeding to the step # 20. That is, charging using the charging inverter device 3 is not performed on the power storage device 12 of the own system 10A.
  • the self-inverter device 13 causes the power voltage on the AC line 11 of the self-system 10 to be the target voltage, and the power frequency on the AC line 11 increases as the amount of power stored in the power storage device 12 increases. Control is performed so that the target frequency is determined by the relationship of increasing.
  • the connected inverter device 20 includes, for example, the frequency of power on the AC line 11 of the own system 10A (denoted as “fA” in FIG.
  • the linked inverter device 20 may actually detect the frequency of the power on the AC line 11 of each of the self systems 10A and 10B, or the target frequency from the self inverter device 13 of each of the self systems 10A and 10B. May be obtained.
  • the voltage and frequency of power on the AC line 11 of each of the self systems 10A and 10B are maintained by the power supplied from each power storage device 12.
  • the connected inverter device 20A detects the decrease in the power storage amount due to the power frequency decrease on the AC line 11, and the other
  • step # 20 the control device C determines whether or not the charging start condition is satisfied.
  • An example of the charging start condition is whether or not the amount of power stored in the power storage device 12 of the own system 10 connected to the power system 1 via the charging inverter device 3 is less than a predetermined lower limit power storage amount. That is, the control device C detects the amount of power stored in the power storage device 12 of the own system 10A. If the amount of power storage is less than the lower limit power storage amount, the control device C determines that the charging start condition is satisfied. If such a charge start condition is set, at the timing when the amount of power stored in the power storage device 12 of the own system 10A decreases, the power is stored with the supplementary power received from the power system 1 via the charging inverter device 3 as described later. The device 12 can be reliably charged. In other words, the power storage capacity of the power storage device 12 can be recovered to a high level at an appropriate timing, and the power supply capacity for the power consumer D can be increased.
  • step # 20 When it is determined in step # 20 that the charging start condition is satisfied, the control device C proceeds to step # 22, and when it is determined that the charging start condition is not satisfied, the control device C proceeds to step # 21 and proceeds to step # 21.
  • the apparatus 3 is not allowed to operate in the charging operation mode.
  • control device C determines that the charging start condition is satisfied in step # 20
  • the control device C instructs the charging inverter device 3 to operate in the charging operation mode in step # 22.
  • the control device C supplies the power on the AC line 11 as described above to the self inverter device 13 even while the charging inverter device 3 is operating in the charging operation mode.
  • the voltage control and the frequency control are performed, and the power interchange control as described above is performed on the linked inverter device 20.
  • the replenishment power P1 received from the power system 1 by the charging inverter device 3 by the execution of the charging operation mode by the charging inverter device 3 may be within the range of the rated capacity of the charging inverter device 3.
  • the replenishment power P1 stored in advance as power of 50% of its own rated capacity is stored in the power system. 1 is supplied to the power storage device 12.
  • the numerical value of 50% is a numerical value given for illustrative purposes only, and the present invention is not limited to this numerical value.
  • the charging inverter device 3 can be changed so that 30% of its rated capacity is set as supplementary power P1 received from the power system 1.
  • the control device C operates on the AC line 11 as described above for the self inverter device 13 in parallel with the operation of the charging inverter device 3 in the charging operation mode. Voltage control and frequency control are performed. As a result, the frequency of power in the AC line 11 of the own system 10 ⁇ / b> A also increases as the amount of power stored in the power storage device 12 increases due to charging using the supplementary power received from the power system 1. Further, the control device C causes the linked inverter device 20 to perform the power interchange control.
  • the linked inverter device 20A Power interchange is performed from the self system 10A to the self system 10B.
  • step # 23 the control device C determines whether or not the charging end condition is satisfied.
  • the charge termination condition includes whether or not the amount of power stored in the power storage device 12 of the own system 10A has reached the full charge level. If the charging end condition is satisfied, the process proceeds to step # 24. If the charging end condition is not satisfied, the process returns to step # 22.
  • step # 23 determines in step # 23 that the charging end condition is satisfied (for example, when it is determined that the amount of power stored in the power storage device 12 of the own system 10A has reached the full charge level).
  • the operation proceeds to # 24 and the operation of the charging operation mode by the charging inverter device 3 is stopped.
  • the own system 10A is disconnected from the power system 1.
  • the control device C operates the charging inverter device 3 in the charge operation mode in the process ## 22, the AC line as described above with respect to the self-inverter device 13 is performed in parallel therewith.
  • the power supply voltage supplied by the power system 1 is charged to the power storage device 12 of the own system 10A by performing the voltage control and the frequency control of the power at 11 and causing the connected inverter device 20 to perform the power interchange control.
  • the system 10B can be accommodated (that is, supplied to the power storage device 12 of the system 10B).
  • the power storage control is performed by the connected inverter device 20, the power storage amount of the power storage device 12 of each self system 10 is equalized, so that the power storage amount of the power storage device 12 of the self system 10A reaches the full charge level. That is, it may be considered that the amount of power stored in the power storage devices 12 of all the self-systems 10 reaches the full charge level evenly. Therefore, by setting the charge end condition that the power storage amount of the power storage device 12 of the self system 10A has reached the full charge level, the control device C can fully charge the power storage devices 12 of all the self systems 10. It can be confirmed that the charging level has been reached, that is, it is no longer necessary to receive supplementary power from the power system 1.
  • each self system 10 is electrically connected by a connected inverter device 20 provided between the self systems 10, and therefore, from the self system 10 that has received supplementary power from the power system 1 to another self system 10. And its supplementary power can be accommodated. Therefore, in the power supply system S3 including the plurality of self systems 10, the power supply capacity for the power consumer D can be increased.
  • FIG. 6 is a diagram illustrating the configuration of the power supply system S4 of the fourth embodiment.
  • the power supply system S ⁇ b> 4 includes a plurality of self systems 10, a connected inverter device 20 provided between the self systems 10, the power conversion device 4, and a control device C.
  • FIG. 6 shows an example in which the power supply system S4 includes the own systems 10A and 10B and the inverter devices 20A and 20B linked to each other, a system including a larger number of the own system 10 and the linked inverter devices 20 is constructed. You can also.
  • the power conversion device 4 is a device that connects the AC line 11 of one self-system 10 ⁇ / b> A of the plurality of self-systems 10 and the external power system 1.
  • an AC / DC conversion unit 4a that converts AC power supplied from the power system 1 into desired DC power, and DC power generated by the AC / DC conversion unit 4a are used. It has a DC / AC converter 4b that converts it into desired AC power and supplies it to the AC line 11, and a DC connection 4c that connects the AC / DC converter 4a and the DC / AC converter 4b.
  • the power converter device 4 is a device for linking the power system 1 and the AC line 11, a function required to protect the power system 1 as an inverter for grid connection is installed. Need to be.
  • the control device C is a device capable of controlling the operations of the self-inverter device 13, the linked inverter device 20, and the power conversion device 4.
  • the control device C is a device having an information input / output function, a storage function, an arithmetic processing function, and the like.
  • the function of the control device C is that any one of the control units (not shown) included in each of the self inverter device 13, the connected inverter device 20, and the power conversion device 4 functions as a master control unit. Can be realized by functioning as a slave control unit while performing information communication with the master control unit.
  • control device C is provided separately from the control unit (not shown) included in each of the self inverter device 13, the connected inverter device 20, and the power conversion device 4, and is configured to be able to communicate information with those control units. Can be realized by a master controller.
  • the self system 10 includes an AC line 11 to which a plurality of power consumers D are connected, a power storage device 12, and a self inverter device 13 that connects the power storage device 12 and the AC line 11.
  • the power consumer D has a power consuming device 14 that consumes power supplied from the AC line 11.
  • the power consumer D may have the power generation device 15 in addition to the power consumption device 14.
  • various devices such as a solar power generation device and a wind power generation device that generate power using natural energy such as sunlight and wind power, and a fuel cell that generates power using fuel can be used.
  • the electric power consumer D may not be provided with the electric power generating apparatus 15, but you may connect the electric power generating apparatus 15 to the alternating current line 11 alone.
  • the power storage device 12 can use various devices such as a storage battery (for example, a chemical battery) and an electric double layer capacitor.
  • the self-inverter device 13 includes a circuit unit (not shown) having a semiconductor switch and the like, and a control unit (not shown) for controlling the switching operation of the semiconductor switch.
  • the control device C controls the frequency of the power on the AC line 11 so that the power voltage on the AC line 11 becomes the target voltage for each of the self-inverter devices 13 of the plurality of self-systems 10. Is controlled to become a target frequency determined according to the amount of power stored in the power storage device 12.
  • the control device C has a target frequency that is determined by a relational expression in which the frequency of power on the AC line 11 increases as the amount of power stored in the power storage device 12 increases with respect to each of the self inverter devices 13.
  • a frequency fluctuation determined by a function of the power storage amount of the power storage device 12 (for example, a relationship in which the frequency fluctuation increases as the power storage amount increases) is used as the reference frequency (for example, 60 Hz) of the AC line 11.
  • the reference frequency for example, 60 Hz
  • the target frequency is a value obtained by addition.
  • the control unit of the self-inverter device 13 stores in the internal memory or the like a relational expression that the target frequency of the AC line 11 increases in advance as the amount of power stored in the power storage device 12 increases, and operates in the disconnection operation mode. Sometimes control is performed according to the relational expression.
  • the actual frequency of the AC line 11 (that is, the target frequency) reflects the amount of power stored in the power storage device 12 connected to the AC line 11 via the self inverter device 13.
  • the power supply system S4 includes a connected inverter device 20 between the self systems 10.
  • the connected inverter device 20 includes an ac power line 12 included in one self system 10A and an AC line included in the other self system 10B so that a plurality of self systems 10 are electrically connected in series. 11 is connected.
  • the operation of the linked inverter device 20 is controlled by the control device C.
  • the control device C has a target frequency that is determined according to the amount of power stored in each power storage device 12 with respect to two self systems 10 that are electrically connected via one linked inverter device 20.
  • the operation of the connected inverter device 20 is controlled so that power can be accommodated from the self system 10 in which the power storage amount of the power storage device 12 is relatively large to the self system 10 in which the power storage amount of the power storage device 12 is relatively small.
  • Power interchange control is performed. For example, in the present embodiment, control is performed so that the frequency of the power on the AC line 11 becomes a target frequency that is determined so as to increase as the amount of power stored in the power storage device 12 increases. Therefore, power is transferred from the self-system 10 having a higher target frequency (that is, the one having a relatively large amount of storage) to the self-system 10 having a lower target frequency (the one having a relatively small amount of storage).
  • the connected inverter device 20 operates so as to be supplied.
  • the power conversion device 4 detects the frequency (referred to as “fA” in FIG. 6) of the AC line 11 controlled to the target frequency by the self inverter device 13, receives supply power from the power system 1, and supplies the supply power. Power conversion for adjusting the frequency of power to the target frequency and supplying the AC line 11 is performed.
  • the power conversion device 4 of the present embodiment includes the AC / DC conversion unit 4a, the DC / AC conversion unit 4b, and the DC connection unit 4c as described above. Therefore, the power converter 4 converts the supplementary power supplied from the power system 1 into desired DC power by the AC / DC converter 4a, and converts the DC power to the target frequency by the DC / AC converter 4b. It can be supplied to the AC line 11 after being converted to AC power.
  • the self-inverter device 13 is controlled according to the amount of power stored in the power storage device 12.
  • the target frequency is not changed.
  • the frequency of the power on the AC line 11 is a value reflecting the amount of power stored in the power storage device 12 even while the supplementary power is supplied from the power system 1.
  • FIG. 7 is a flowchart illustrating an example of control of the power supply system S4 by the control device C.
  • the control device C receives supply power from the power system 1 to the power conversion device 4, adjusts the frequency of the supply power to the target frequency, and supplies it to the AC line 11. Switch between running and stopping mode operation.
  • the control device C does not cause the power conversion device 4 to operate in the replenishment operation mode before proceeding to step # 30. That is, power is not supplied from the power system 1 to the AC line 11 of the own system 10 ⁇ / b> A via the power conversion device 4.
  • the self-inverter device 13 causes the power voltage on the AC line 11 of the self-system 10 to be the target voltage, and the power frequency on the AC line 11 increases as the amount of power stored in the power storage device 12 increases. Control is performed so that the target frequency is determined by the relationship of increasing.
  • the connected inverter device 20 includes, for example, the frequency of power on the AC line 11 of the own system 10A (denoted as “fA” in FIG.
  • the linked inverter device 20 may actually detect the frequency of the power on the AC line 11 of each of the self systems 10A and 10B, or the target frequency from the self inverter device 13 of each of the self systems 10A and 10B. May be obtained.
  • the voltage and frequency of power on the AC line 11 of each of the self systems 10A and 10B are maintained by the power supplied from each power storage device 12.
  • the connected inverter device 20A detects the decrease in the power storage amount due to the power frequency decrease on the AC line 11, and the other
  • step # 30 the control device C determines whether or not a replenishment start condition for starting the supply of replenishment power received from the power system 1 to the AC line 11 of the own system 10 is satisfied.
  • An example of the replenishment start condition is whether or not the amount of power stored in the power storage device 12 of the own system 10 linked to the power system 1 via the power conversion device 4 is less than a predetermined lower limit power storage amount. That is, the control device C detects the amount of power stored in the power storage device 12 of its own system 10A, and if the amount of power storage is less than the lower limit power storage amount, the control device C determines that the replenishment start condition is satisfied.
  • the power storage device is supplied with replenishment power received from the power system 1 via the power conversion device 4 at a timing when the amount of power stored in the power storage device 12 of the own system 10A decreases. 12 can be reliably charged. In other words, the power storage capacity of the power storage device 12 can be recovered to a high level at an appropriate timing, and the power supply capacity for the power consumer D can be increased.
  • step # 30 When it is determined that the replenishment start condition is satisfied in step # 30, the control device C proceeds to step # 32, and when it is determined that the replenishment start condition is not satisfied, the control device C proceeds to step # 31. 4 is not operated in the replenishment operation mode.
  • the control device C determines that the replenishment start condition is satisfied in step # 30, the control device C instructs the power conversion device 4 to operate in the replenishment operation mode in step # 32.
  • the power converter 4 detects the frequency of the AC line 11 (denoted as “fA” in FIG. 6), receives supplementary power from the power system 1, and sets the frequency of the supplementary power to the frequency of the AC line 11. Power conversion is performed such that the power is adjusted to be supplied to the AC line 11.
  • the control device C supplies power to the self-inverter device 13 on the AC line 11 as described above, even while the power conversion device 4 is operating in the supply operation mode. Voltage control and frequency control are performed, and the power interchange control as described above is performed on the linked inverter device 20.
  • the replenishment power P1 received from the power system 1 by the power conversion device 4 by the execution of the replenishment operation mode by the power conversion device 4 may be within the range of the rated capacity of the power conversion device 4.
  • the power conversion device 4 stores the replenishment power P1 stored in advance as power of 50% of its rated capacity. Is supplied to the AC line 11.
  • the numerical value of 50% is a numerical value given for illustrative purposes only, and the present invention is not limited to this numerical value.
  • the control device C generates power on the AC line 11 as described above with respect to the self inverter device 13 in parallel with operating the power conversion device 4 in the replenishment operation mode. Voltage control and frequency control are performed. As a result, the voltage of the AC line 11 rises to a voltage higher than the target voltage by the supplementary power supplied from the power system 1 to the AC line 11 via the power converter 4. As a result, the self-inverter device 13 supplies power from the AC line 11 to the power storage device 12 in order to reduce the voltage of power on the AC line 11 to the target voltage, and the power storage amount of the power storage device 12 increases.
  • the frequency of the power in the AC line 11 of the self system 10 ⁇ / b> A is increased by the operation of the self inverter device 13. Accordingly, the frequency of power on the AC line 11 detected by the power converter 4 also increases. Further, the control device C causes the linked inverter device 20 to perform the power interchange control. That is, when the frequency of power in the AC line 11 of the own system 10A increases as the amount of power stored in the power storage device 12 increases due to charging using the supplementary power received from the power system 1, the linked inverter device 20A Power interchange is performed from the self system 10A to the self system 10B.
  • step # 33 the control device C determines whether or not the replenishment end condition is satisfied.
  • the supply end condition includes whether or not the amount of power stored in the power storage device 12 of the own system 10A has reached the full charge level. If the replenishment end condition is satisfied, the process proceeds to step # 34. If the replenishment end condition is not satisfied, the process returns to step # 32.
  • step # 33 when the control device C determines that the replenishment end condition is satisfied (for example, when it is determined that the amount of power stored in the power storage device 12 of the own system 10A has reached the full charge level), The process proceeds to # 34 and the operation of the replenishment operation mode by the power conversion device 4 is stopped. As a result, the supply of power from the power system 1 to the own system 10A is stopped.
  • the control device C operates the power conversion device 4 in the replenishment operation mode in the step # 32, in parallel with the AC line 11 as described above with respect to the self-inverter device 13.
  • the supplementary power supplied from the power system 1 is merely charged to the power storage device 12 of the own system 10A. Instead, it is also accommodated in the own system 10B (that is, supplied to the power storage device 12 of the own system 10B).
  • the control device C sets the power storage amount of all the power storage devices 12 of the self system 10 to be full by setting the replenishment end condition that the power storage amount of the power storage device 12 of the self system 10A has reached the full charge level. It can be confirmed that the charging level has been reached, that is, it is no longer necessary to receive supplementary power from the power system 1.
  • each self system 10 is electrically connected by a connected inverter device 20 provided between the self systems 10, and therefore, from the self system 10 that has received supplementary power from the power system 1 to another self system 10. And its supplementary power can be accommodated.
  • the power conversion device 4 receives the supplementary power from the power system 1, adjusts the frequency of the supplementary power to the target frequency and supplies it to the AC line 11, so that the self-inverter device 13 stores the amount of power stored in the power storage device 12. It is possible to prevent the target frequency being controlled from fluctuating according to the above. As a result, it is possible to ensure that the frequency of the power on the AC line 11 is a value reflecting the amount of power stored in the power storage device 12 even while the supplementary power is supplied from the power system 1.
  • blocking apparatus 2 is less than a minimum electrical storage amount as the switching conditions to a connection state.
  • the content of the switching conditions can be changed suitably. For example, whether or not the set time has been reached may be used as a condition for switching to the connected state. That is, the control device C may determine that the condition for switching to the connected state is satisfied at the set time, and cause the power system 1 and the own system 10A to be connected.
  • the power storage device 12 can be charged with the supplementary power periodically received from the power system 1 at the set time. . For example, if the set time is set before the time period in which the power demand increases during the day, the power supply capacity for the power consumer D is increased prior to the time period in which the power demand increases. I can leave.
  • the magnitude of supplementary power: P1 received from the power system 1 by the self-inverter device 13 of the self-system 10A that can be linked to the power system 1 via the cutoff device 2 is also different from that of the first and second embodiments.
  • the setting method may be adopted. For example, when it is determined that the switching condition to the interconnected state is satisfied when the set time is reached as in this embodiment, the power storage of the own system 10A at the time when the switching condition is satisfied Since the power storage amount of the device 12 varies, the self-inverter device 13 of the self-system 10A may change the supplementary power P1 that is supplied from the power system 1 according to the power storage amount.
  • the amount of power stored in the power storage device 12 of the own system 10A that can be connected to the power system 1 via the cutoff device 2 when the control device C determines that the condition for switching to the connected state is satisfied is satisfied.
  • the magnitude of supplementary power: P1 received by the self inverter device 13 from the power system 1 in the charging operation mode may be changed.
  • the control device C determines that the condition for switching to the connected state is satisfied, the control device C detects the amount of power stored in the power storage device 12 of the own system 10A that can be connected to the power system 1 via the cutoff device 2. Then, the control device C operates the self-inverter device 13 such that the smaller the amount of power stored in the power storage device 12, the larger the replenishment power P1 received from the power system 1. For example, the control device C sets the replenishment power: P1 received from the power system 1 as 30% of the rated capacity of the self-inverter device 13 when the power storage amount of the power storage device 12 is at a level of 50% or more of full charge.
  • Replenishment power received from the power system 1 if the amount of power stored in the power storage device 12 is less than 50% of the full charge when the power supply is received from the power system 1, and P1 is set to 50% of the rated capacity of the self inverter device 13 and the power system
  • the self-inverter device 13 can also be operated in a charging operation mode in which power is supplied from 1.
  • the control device C determines whether it is predicted in the future (for example, the next day)
  • the condition for switching to the connected state may be changed.
  • the example in which it is determined that the condition for switching to the connected state is satisfied when the storage amount of the power storage device 12 is less than the lower limit storage amount is shown.
  • a natural energy power generation device include a solar power generation device whose generated power changes according to the weather such as “sunny”, “cloudy”, and “rain”, and the wind speed and the period during which the wind is blowing.
  • wind power generators that change the generated power according to the weather.
  • the control device C when the photovoltaic power generation device is connected as the power generation device 15 to the AC line 11 of at least one of the plurality of self systems 10, the control device C is connected to a communication network (not shown).
  • the weather condition predicted in the future is acquired via the control information, etc., and the condition for switching to the connected state is changed by changing the magnitude of the lower limit storage amount according to the weather information.
  • the control device C sets the lower limit power storage amount to 50 of the full charge of the power storage device 12.
  • the control device C sets the lower limit power storage amount to 60% of the full charge of the power storage device 12. It is determined that the condition for switching to the connected state is satisfied when the amount of power stored in power storage device 12 of self system 10 is less than 60% of full charge.
  • the control device C sets the lower limit power storage amount to 80 of the full charge of the power storage device 12. It is also possible to change the power storage device 12 of the self system 10 so as to determine that the condition for switching to the connected state is satisfied when the amount of power stored in the power storage device 12 of the self system 10 is less than 80% of full charge.
  • control device C is configured such that the total amount of power stored in the power storage devices 12 in the plurality of self systems 10 constituting the power supply system S is the total amount of power stored when all the power storage devices 12 are fully charged. It can also be modified so as to determine that the condition for switching to the connected state is satisfied when it becomes less than a predetermined ratio (for example, less than 50%).
  • control device C determines that the condition for switching to the connected state is satisfied when the power unit price for power purchase when the power supply from the power system 1 is less than the set unit price. It can also be modified.
  • control device C may adopt a combination of a plurality of the switching conditions described above. For example, any of the cases where the storage amount of the power storage device 12 of the own system 10 that can be linked to the power system 1 via the shut-off device 2 is less than the lower limit storage amount and that the control device C has reached the set time Satisfying either one of them may be a condition for switching to the connected state. In that case, the control device C determines that the condition for switching to the connected state is satisfied at the set time even if the power storage amount of the power storage device 12 is not less than the lower limit power storage amount. Even before, if the amount of power stored in the power storage device 12 is less than the lower limit power storage amount, it is determined that the condition for switching to the connected state is satisfied.
  • the control device C is connected to the AC line 11 of one self-system 10 constituting the power supply system S, and the power system 1 Are connected to each other (that is, both when the self-inverter device 13 is operated in the disconnection operation mode and when it is operated in the charge operation mode).
  • the example which performs the said electric power interchange control with respect to was demonstrated, you may change the content of the control performed to the connection inverter apparatus 20.
  • FIG. For example, when the power supply system 1 is connected to the AC line 11 of one self-system 10A that constitutes the power supply system S, that is, the control device C is connected to the self-system 10A in the above-described charging operation mode.
  • control may be performed such that the power that the inverter device 20 connected between two adjacent self-systems becomes larger as the supplementary power increases. That is, the control device C may perform control such that the linked inverter device 20 performs power accommodation determined by the function of the supplementary power P1.
  • FIG. 4 shows an example in which the charging inverter device 3 is connected to the own system 10A, the charging inverter device 3 may be connected to the own system 10B. Alternatively, a configuration in which the charging inverter device 3 is individually connected to the plurality of self systems 10 is also possible.
  • the charging start condition is that the amount of power stored in the power storage device 12 of the own system 10 linked to the power system 1 via the charging inverter device 3 is less than the lower limit power storage amount.
  • the contents of the charging start condition can be changed as appropriate. For example, whether or not the set time has been reached may be used as the charge start condition. That is, the control device C may determine that the charging start condition is satisfied at the set time, and cause the charging inverter device 3 to operate in the charging operation mode.
  • the power storage device 12 can be charged with the supplementary power periodically received from the power system 1 at the set time. For example, if the set time is set before the time period in which the power demand increases during the day, the power supply capacity for the power consumer D is increased prior to the time period in which the power demand increases. I can leave.
  • the magnitude of the supplementary power: P1 received by the charging inverter device 3 from the power system 1 a setting method different from the third embodiment may be adopted. For example, when it is determined that the charge start condition is satisfied when the set time is reached as in this embodiment, the power storage device 12 of the self system 10A at the time when the charge start condition is satisfied. Since the storage amount varies, the replenishment power P1 that the charging inverter device 3 receives from the power system 1 may be changed according to the storage amount. Specifically, when the control device C determines that the charging start condition is satisfied, the amount of power stored in the power storage device 12 of the own system 10A connected to the power system 1 via the charging inverter device 3 is determined. Accordingly, the magnitude of the supplementary power: P1 that the charging inverter device 3 receives from the power system 1 in the charging operation mode may be changed.
  • the control device C determines that the charging start condition is satisfied, the control device C detects the amount of power stored in the power storage device 12 of the own system 10A linked to the power system 1 via the charging inverter device 3. Then, the control device C operates the charging inverter device 3 such that the smaller the amount of power stored in the power storage device 12, the larger the replenishment power P1 received from the power system 1. For example, the control device C sets the replenishment power: P1 received from the power system 1 as 30% of the rated capacity of the charging inverter device 3 if the amount of power stored in the power storage device 12 is at a level of 50% or more of full charge.
  • the charging inverter device 3 can also be operated in a charging operation mode in which power is supplied from the power system 1.
  • the control device C determines whether it is predicted in the future (for example, the next day) You may change charge start conditions.
  • the example in which it is determined that the charging start condition is satisfied when the storage amount of the power storage device 12 is less than the lower limit storage amount has been described.
  • the starting conditions can be substantially changed.
  • Examples of such a natural energy power generation device include a solar power generation device whose generated power changes according to the weather such as “sunny”, “cloudy”, and “rain”, and the wind speed and the period during which the wind is blowing. There are wind power generators that change the generated power according to the weather.
  • the control device C when the photovoltaic power generation device is connected as the power generation device 15 to the AC line 11 of at least one of the plurality of self systems 10, the control device C is connected to a communication network (not shown).
  • the weather condition predicted in the future is acquired via the control information, etc., and the condition for switching to the connected state is changed by changing the magnitude of the lower limit storage amount according to the weather information.
  • the control device C sets the lower limit power storage amount to 50 of the full charge of the power storage device 12.
  • the control device C sets the lower limit power storage amount to 60% of the full charge of the power storage device 12. It is determined that the charge start condition is satisfied when the amount of power stored in the power storage device 12 of the own system 10 is less than 60% of full charge.
  • the control device C sets the lower limit power storage amount to 80 of the full charge of the power storage device 12. It is possible to modify the charging start condition so that it is determined that the charging start condition is satisfied when the amount of power stored in the power storage device 12 of the self system 10 is less than 80% of the full charge.
  • the total amount of power stored in the power storage device 12 in the plurality of self systems 10 constituting the power supply system S3 is the total amount of power stored when all the power storage devices 12 are fully charged. It can also be modified so as to determine that the charging start condition is satisfied when the ratio becomes less than a predetermined ratio (for example, less than 50%).
  • control device C may be modified so as to determine that the charging start condition is satisfied when the power unit price of power purchase when receiving power supply from the power system 1 is less than the set unit price. it can.
  • control device C may adopt a combination of a plurality of the switching conditions described above. For example, any of the cases where the storage amount of the power storage device 12 of the own system 10 that can be connected to the power system 1 via the shut-off device 2 is less than the lower limit storage amount and the set time has been reached. Satisfying either one of them may be a condition for switching to the connected state. In that case, the control device C determines that the condition for switching to the connected state is satisfied at the set time even if the power storage amount of the power storage device 12 is not less than the lower limit power storage amount. Even before, if the amount of power stored in the power storage device 12 is less than the lower limit power storage amount, it is determined that the condition for switching to the connected state is satisfied.
  • the control device C is connected to the connected inverter device 20 both when the charging inverter device 3 is operated in the charging operation mode and when it is not operated in the charging operation mode.
  • the example which performs the said electric power interchange control was demonstrated with respect to it, you may change the content of the control performed to the connection inverter apparatus 20.
  • the control device C operates the charging inverter device 3 in the charging operation mode, that is, when the own system 10 is supplied with the supplementary power: P1 from the power system 1
  • the adjacent two Control may be performed such that the electric power accommodated by the inverter device 20 connected between the two self-systems is increased as the supplementary electric power increases. That is, the control device C may perform control such that the linked inverter device 20 performs power accommodation determined by the function of the supplementary power P1.
  • FIG. 6 shows an example in which the power conversion device 4 is connected to the AC line 11 of the own system 10A, but the power conversion device 4 may be connected to the AC line 11 of the own system 10B. Or the structure that the power converter device 4 is separately connected with respect to the several self-system 10 is also possible.
  • the replenishment start condition is that the power storage amount of the power storage device 12 of the own system 10 linked to the power system 1 via the power conversion device 4 is less than the lower limit power storage amount.
  • the contents of the replenishment start condition can be changed as appropriate.
  • the replenishment start condition may be whether or not the set time has been reached. That is, the control device C may determine that the replenishment start condition is satisfied at the set time, and cause the power conversion device 4 to perform the operation in the replenishment operation mode.
  • the power storage device 12 can be charged with the replenishment power periodically received from the power system 1 at the set time. For example, if the set time is set before the time period in which the power demand increases during the day, the power supply capacity for the power consumer D is increased prior to the time period in which the power demand increases. I can leave.
  • the magnitude of the supplementary power: P1 received by the power conversion device 4 from the power system 1 a setting method different from the fourth embodiment may be adopted. For example, when it is determined that the replenishment start condition is satisfied when the set time is reached as in this embodiment, the power storage device 12 of the own system 10A at the time when the replenishment start condition is satisfied. Since the amount of stored electricity varies, the supplementary power P1 that the power conversion device 4 receives from the power system 1 may be changed according to the amount of stored electricity. Specifically, the control device C determines the amount of power stored in the power storage device 12 of the own system 10A connected to the power system 1 via the power conversion device 4 when it is determined that the replenishment start condition is satisfied. Accordingly, the magnitude of supplementary power: P1 received by the power conversion device 4 from the power system 1 in the supplementary operation mode may be changed.
  • the control device C determines that the replenishment start condition is satisfied, the control device C detects the amount of power stored in the power storage device 12 of the own system 10A linked to the power system 1 via the power conversion device 4. And the control apparatus C operates the power converter device 4 so that the supplementary electric power: P1 received from the electric power grid
  • the control device C determines whether it is predicted in the future (for example, the next day)
  • the replenishment start condition may be changed.
  • the example in which it is determined that the replenishment start condition is satisfied when the power storage amount of the power storage device 12 is less than the lower limit power storage amount has been described.
  • the starting conditions can be substantially changed.
  • Examples of such a natural energy power generation device include a solar power generation device whose generated power changes according to the weather such as “sunny”, “cloudy”, and “rain”, and the wind speed and the period during which the wind is blowing. There are wind power generators that change the generated power according to the weather.
  • the control device C when the photovoltaic power generation device is connected as the power generation device 15 to the AC line 11 of at least one of the plurality of self systems 10, the control device C is connected to a communication network (not shown).
  • the weather condition predicted in the future is acquired via the control information, etc., and the condition for switching to the connected state is changed by changing the magnitude of the lower limit storage amount according to the weather information.
  • the control device C sets the lower limit power storage amount to 50 of the full charge of the power storage device 12.
  • the replenishment start condition is satisfied when the amount of power stored in the power storage device 12 of the own system 10 is less than 50% of the full charge. Furthermore, if the weather predicted for the next day is cloudy (that is, if a slight increase in the amount of power stored in the power storage device 12 can be expected), the control device C sets the lower limit power storage amount to 60% of the full charge of the power storage device 12. It is determined that the replenishment start condition is satisfied when the amount of power stored in the power storage device 12 of the own system 10 is less than 60% of full charge.
  • the control device C sets the lower limit power storage amount to 80 of the full charge of the power storage device 12. It is also possible to modify the power supply device 12 so as to determine that the replenishment start condition is satisfied when the amount of power stored in the power storage device 12 of the self system 10 is less than 80% of full charge.
  • the total amount of power stored in the power storage devices 12 in the plurality of self systems 10 constituting the power supply system S4 is the sum of the power storage amounts when all the power storage devices 12 are fully charged. It can be modified so that it is determined that the replenishment start condition is satisfied when the ratio is less than a predetermined ratio (for example, less than 50%).
  • control device C may be modified to determine that the replenishment start condition is satisfied when the power unit price for power purchase when receiving power supply from the power system 1 is less than the set unit price. it can.
  • control device C may adopt a combination of a plurality of the switching conditions described above. For example, any of the cases where the storage amount of the power storage device 12 of the own system 10 that can be connected to the power system 1 via the shut-off device 2 is less than the lower limit storage amount and the set time has been reached. Satisfying either one of them may be a condition for switching to the connected state. In that case, the control device C determines that the condition for switching to the connected state is satisfied at the set time even if the power storage amount of the power storage device 12 is not less than the lower limit power storage amount. Even before, if the amount of power stored in the power storage device 12 is less than the lower limit power storage amount, it is determined that the condition for switching to the connected state is satisfied.
  • the control device C is connected to the connected inverter device 20 both when the power conversion device 4 is operated in the supply operation mode and when it is not operated in the supply operation mode.
  • FIG. For example, when the control device C is operating the power conversion device 4 in the replenishment operation mode, that is, when the own system 10 is supplied with the replenishment power: P1 from the power system 1, the two adjacent Control may be performed such that the electric power accommodated by the inverter device 20 linked between the own systems is increased as the supplementary electric power increases. That is, the control device C may perform control such that the linked inverter device 20 performs power accommodation determined by the function of the supplementary power P1.
  • the power conversion device 4 is configured to include an AC / DC conversion unit 4a, a DC / AC conversion unit 4b, and a DC connection unit 4c that connects them.
  • power converters 4 having other configurations can also be used.
  • the power conversion device 4 may be configured using a direct AC / AC conversion circuit such as a matrix converter that directly converts AC power into AC power having a desired voltage and frequency without passing through a DC section.
  • the present invention can be used for a power supply system that can increase the power supply surplus for power consumers.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

 電力供給システムSが備える制御装置Cが、自己システム10Aの交流線11と電力系統1とが解列状態にあるとき、複数個の自己システム10のそれぞれの自己インバータ装置13を、交流線11での電力の電圧が目標電圧となるように及び交流線11での電力の周波数が蓄電装置12の蓄電量に応じて決定される目標周波数となるように制御する解列時運転モードで動作させ、連系状態への切換条件が満たされたと判定すると、解列時運転モードでの自己インバータ装置13の動作を停止させると共に遮断装置2を動作させて連系状態に切り換えた後、電力系統1から受け取る補給電力を蓄電装置12への充電に用いる充電運転モードで自己インバータ装置13を動作させる。

Description

電力供給システム
 本発明は、複数の電力需要者が接続されている交流線と、蓄電装置と、その蓄電装置と交流線とを接続する自己インバータ装置とを有する自己システムを複数個備え、複数個の自己システムが電気的に直列接続されるように、一つの自己システムが有する蓄電装置と他の一つの自己システムが有する交流線とを接続する連繋インバータ装置を自己システム同士の間に備える電力供給システムに関する。
 従来から、複数の電力需要者が接続されている交流線と、蓄電装置と、その蓄電装置と交流線とを接続する自己インバータ装置とを有する自己システムを複数個備えるような電力供給システムが提案されている。例えば、特許文献1(国際公開第2010/103650号)に記載の電力供給システムは、複数個の自己システムが電気的に直列接続されるように、一つの自己システムが有する蓄電装置と他の一つの自己システムが有する交流線とを接続する連繋インバータ装置を自己システム同士の間に備えている。更に、複数個の自己システムのそれぞれの自己インバータ装置を、交流線での電力の電圧が目標電圧となるように及び交流線での電力の周波数が蓄電装置の蓄電量に応じて決定する目標周波数となるように動作させ、及び、一つの連繋インバータ装置を介して電気的に接続されている二つの自己システムに関して、目標周波数の高い方の自己システムから目標周波数の低い方の自己システムへ電力を供給するように連繋インバータ装置の動作を制御している。つまり、各自己システムの交流線での電力の周波数は蓄電装置の蓄電量を反映した値となっているので、連繋インバータ装置は、電気的に接続されている二つの自己システムに関して、各交流線の周波数を検出するだけで、何れの自己システムの蓄電装置の蓄電量が多いのかを知ることができる。そして、その検出した周波数の値の大小に応じて、各自己システム間で電力の融通を行うことで、各自己システムの蓄電装置の蓄電量の均等化を図ることができる。
国際公開第2010/103650号
 特許文献1に記載の電力システムでは、各自己システムが発電装置を備えているため、その発電装置の発電電力で自己システムの蓄電装置への蓄電を行える構成となっている。しかし、蓄電装置の蓄電量が低下したときに発電装置の発電出力を即座に上昇させることができるとも限らず、発電装置の発電出力を即座に上昇させることができたとしても蓄電装置の蓄電量の低下分を発電装置の発電出力で充分に賄えることができるとも限らない。つまり、各自己システムが発電装置を備えていても、蓄電装置の蓄電量が低下し続ける場合もある。そして、自己システムが備えている蓄電装置の蓄電量を、その自己システムの交流線に接続されている電力需要者に対する電力の供給余力と見た場合、蓄電装置の蓄電量が低下した状態は、電力需要者に対する電力の供給余力が小さい状態であると言える。
 本発明は、上記の課題に鑑みてなされたものであり、その目的は、複数の自己システムを備える電力供給システムにおいて、電力需要者に対する電力の供給余力を大きく保つことができる電力供給システムを提供する点にある。
 上記目的を達成するための本発明に係る電力供給システムの特徴構成は、複数の電力需要者が接続されている交流線と、蓄電装置と、前記蓄電装置と前記交流線とを接続する自己インバータ装置とを有する自己システムを複数個備え、
 複数個の前記自己システムが電気的に直列接続されるように、一つの前記自己システムが有する前記蓄電装置と他の一つの前記自己システムが有する前記交流線とを接続する連繋インバータ装置を前記自己システム同士の間に備える電力供給システムであって、
 複数個の前記自己システムのうちの一つの自己システムの前記交流線と外部の電力系統とを連系状態及び解列状態の何れか一方に切換可能な遮断装置と、
 前記自己インバータ装置及び前記連繋インバータ装置及び前記遮断装置の動作を制御可能な制御装置とを備え、
 前記制御装置は、
 前記遮断装置を介して前記電力系統に連系され得る前記自己システムの前記交流線と前記電力系統とが前記解列状態にあるとき、複数個の前記自己システムのそれぞれの前記自己インバータ装置を、前記交流線での電力の電圧が目標電圧となるように及び前記交流線での電力の周波数が前記蓄電装置の蓄電量に応じて決定される目標周波数となるように制御する解列時運転モードで動作させ、
 前記連系状態への切換条件が満たされたと判定すると、前記遮断装置を介して前記電力系統に連系され得る前記自己システムについて、前記解列時運転モードでの前記自己インバータ装置の動作を停止させると共に前記遮断装置を動作させて前記連系状態に切り換えた後、前記電力系統から受け取る補給電力を前記蓄電装置への充電に用いる充電運転モードで前記自己インバータ装置を動作させる点にある。
 上記特徴構成によれば、連系状態への切換条件が満たされたタイミングで自己システムの交流線と電力系統とを連系させ、充電運転モードで自己インバータ装置を動作させることで、必要な量の補給電力を電力系統から受け取って蓄電装置の充電を行うことができる。また、各自己システムは、自己システム同士の間に設けられる連繋インバータ装置で電気的に接続されているので、電力系統から補給電力を受け取った自己システムから他の自己システムへとその補給電力を融通可能である。その結果、他の自己システムから補給電力の融通を受けた自己システムにおいても、その融通を受けた電力を用いて蓄電装置への蓄電を行うことができる。
 従って、複数の自己システムを備える電力供給システムにおいて、電力需要者に対する電力の供給余力を大きくしておくことができる。
 本発明に係る電力供給システムの別の特徴構成は、前記制御装置は、設定時刻に到達すると前記連系状態への切換条件が満たされたと判定する点にある。
 上記特徴構成によれば、設定時刻において定期的に連系状態への切換条件が満たされたと判定して、電力系統から受け取る補給電力で蓄電装置の充電を行うことができる。例えば、1日の中で電力需要が増大する時間帯の前に上記設定時刻を設定しておけば、電力需要が増大する時間帯に先立って連系状態への切換条件が満たされたと判定されて、上記補給電力による蓄電装置への蓄電が行われる。その結果、電力需要が増大する時間帯に先立って、電力需要者に対する電力の供給余力を大きくしておくことができる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、前記遮断装置を介して前記電力系統に連系され得る前記自己システムの前記蓄電装置の蓄電量が下限蓄電量未満になると前記連系状態への切換条件が満たされたと判定する点にある。
 上記特徴構成によれば、蓄電装置の蓄電量が下限蓄電量未満になったタイミング、即ち、蓄電装置から電力需要者に対する電力の供給余力が低下したタイミングで連系状態への切換条件が満たされたと判定して、電力系統から蓄電装置への充電を行うことができる。また、蓄電装置の蓄電量が下限蓄電量未満になったタイミングで、即ち、蓄電装置への充電が必要になったタイミングでのみ電力系統からの補給電力による蓄電装置への充電が行われるようなシステムを構築できる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、前記連系状態への切換条件が満たされたと判定したときの、前記遮断装置を介して前記電力系統に連系され得る前記自己システムの前記蓄電装置の蓄電量の大きさに応じて、前記充電運転モードにおいて前記自己インバータ装置が前記電力系統から受け取る前記補給電力の大きさを変更する点にある。
 上記特徴構成によれば、制御装置が、充電運転モードにおいて自己インバータ装置が電力系統から受け取る補給電力を大きくすると、蓄電装置の蓄電量を満充電レベルに到達させるのに要する時間は相対的に短くなる。つまり、制御装置が、上記自己システムの蓄電装置の蓄電量の大きさに応じて、充電運転モードにおいて自己インバータ装置が電力系統から受け取る補給電力の大きさを変更することで、蓄電装置の蓄電量を満充電レベルに到達させるのに要する時間を変更できる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、前記充電運転モードで前記自己インバータ装置を動作させているとき、隣接する二つの前記自己システムの間で前記連繋インバータ装置が融通する電力を前記補給電力が大きくなるにつれて大きくする点にある。
 上記特徴構成によれば、遮断装置を介して電力系統に連系され得る自己システムが電力系統から補給電力を受け取ったとき、その補給電力が大きくなるにつれて、他の自己システムが連繋インバータ装置を介して融通される電力は大きくなる。その結果、電力系統から補給電力を受け取ることで、遮断装置を介して電力系統に連系され得る自己システムの蓄電装置の蓄電量を大きくすることができるとともに、他の自己システムの蓄電装置の蓄電量も大きくすることができる。
 本発明に係る電力供給システムの更に別の特徴構成は、複数の電力需要者が接続されている交流線と、蓄電装置と、前記蓄電装置と前記交流線とを接続する自己インバータ装置とを有する自己システムを複数個備え、
 複数個の前記自己システムが電気的に直列接続されるように、一つの前記自己システムが有する前記蓄電装置と他の一つの前記自己システムが有する前記交流線とを接続する連繋インバータ装置を前記自己システム同士の間に備える電力供給システムであって、
 複数個の前記自己システムのうちの一つの自己システムの前記蓄電装置と外部の電力系統との間を接続し、前記電力系統から受け取る補給電力を前記蓄電装置への充電に利用させることができる充電用インバータ装置と、
 前記自己インバータ装置及び前記連繋インバータ装置及び前記充電用インバータ装置の動作を制御する制御装置とを備え、
 前記制御装置は、
 複数個の前記自己システムのそれぞれの前記自己インバータ装置を、前記交流線での電力の電圧が目標電圧となるように及び前記交流線での電力の周波数が前記蓄電装置の蓄電量に応じて決定される目標周波数となるように制御し、
 充電開始条件が満たされたと判定すると、前記電力系統から前記補給電力を受け取って前記蓄電装置への充電に利用させる充電運転モードで前記充電用インバータ装置を動作させる点にある。
 上記特徴構成によれば、充電開始条件が満たされたタイミングで充電用インバータ装置を充電運転モードで動作させることで、必要な量の補給電力を電力系統から受け取って蓄電装置の充電を行うことができる。また、各自己システムは、自己システム同士の間に設けられる連繋インバータ装置で電気的に接続されているので、電力系統から補給電力を受け取った自己システムから他の自己システムへとその補給電力を融通可能である。その結果、他の自己システムから補給電力の融通を受けた自己システムにおいても、その融通を受けた電力を用いて蓄電装置への蓄電を行うことができる。
 従って、複数の自己システムを備える電力供給システムにおいて、電力需要者に対する電力の供給余力を大きくしておくことができる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、設定時刻に到達すると前記充電開始条件が満たされたと判定する点にある。
 上記特徴構成によれば、設定時刻において定期的に充電開始条件が満たされたと判定して、電力系統から受け取る補給電力で蓄電装置の充電を行うことができる。例えば、1日の中で電力需要が増大する時間帯の前に上記設定時刻を設定しておけば、電力需要が増大する時間帯に先立って充電開始条件が満たされたと判定されて、上記補給電力による蓄電装置への蓄電が行われる。その結果、電力需要が増大する時間帯に先立って、電力需要者に対する電力の供給余力を大きくしておくことができる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、前記充電用インバータ装置を介して前記電力系統に接続される前記自己システムの前記蓄電装置の蓄電量が下限蓄電量未満になると前記充電開始条件が満たされたと判定する点にある。
 上記特徴構成によれば、蓄電装置の蓄電量が下限蓄電量未満になったタイミング、即ち、蓄電装置から電力需要者に対する電力の供給余力が低下したタイミングで充電開始条件が満たされたと判定して、電力系統から蓄電装置への充電を行うことができる。また、蓄電装置の蓄電量が下限蓄電量未満になったタイミングで、即ち、蓄電装置への充電が必要になったタイミングでのみ電力系統からの補給電力による蓄電装置への充電が行われるようなシステムを構築できる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、前記充電開始条件が満たされたと判定したときの、前記充電用インバータ装置を介して前記電力系統に接続される前記自己システムの前記蓄電装置の蓄電量の大きさに応じて、前記充電運転モードにおいて前記充電用インバータ装置が前記電力系統から受け取る前記補給電力の大きさを変更する点にある。
 上記特徴構成によれば、制御装置が、充電運転モードにおいて充電用インバータ装置が電力系統から受け取る補給電力を大きくすると、蓄電装置の蓄電量を満充電レベルに到達させるのに要する時間は相対的に短くなる。つまり、制御装置が、上記自己システムの蓄電装置の蓄電量の大きさに応じて、充電運転モードにおいて充電用インバータ装置が電力系統から受け取る補給電力の大きさを変更することで、蓄電装置の蓄電量を満充電レベルに到達させるのに要する時間を変更できる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、前記充電運転モードで前記充電用インバータ装置を動作させているとき、隣接する二つの前記自己システムの間で前記連繋インバータ装置が融通する電力を前記補給電力が大きくなるにつれて大きくする点にある。
 上記特徴構成によれば、充電用インバータ装置を介して電力系統に連系され得る自己システムが電力系統から補給電力を受け取ったとき、その補給電力が大きくなるにつれて、他の自己システムが連繋インバータ装置によって融通される電力は大きくなる。その結果、電力系統から補給電力を受け取ることで、充電用インバータ装置を介して電力系統に連系され得る自己システムの蓄電装置の蓄電量を大きくすることができるとともに、他の自己システムの蓄電装置の蓄電量も大きくすることができる。
 本発明に係る電力供給システムの更に別の特徴構成は、複数の電力需要者が接続されている交流線と、蓄電装置と、前記蓄電装置と前記交流線とを接続する自己インバータ装置とを有する自己システムを複数個備え、
 複数個の前記自己システムが電気的に直列接続されるように、一つの前記自己システムが有する前記蓄電装置と他の一つの前記自己システムが有する前記交流線とを接続する連繋インバータ装置を前記自己システム同士の間に備える電力供給システムであって、
 複数個の前記自己システムのうちの一つの自己システムの前記交流線と外部の電力系統とを接続する電力変換装置と、
 前記自己インバータ装置及び前記連繋インバータ装置及び前記電力変換装置の動作を制御可能な制御装置とを備え、
 前記制御装置は、
 複数個の前記自己システムのそれぞれの前記自己インバータ装置を、前記交流線での電力の電圧が目標電圧となるように及び前記交流線での電力の周波数が前記蓄電装置の蓄電量に応じて決定される目標周波数となるように制御し、
 前記一つの自己システムの前記交流線への前記電力系統から受け取る補給電力の供給を開始する補給開始条件が満たされたと判定すると、前記電力系統から補給電力を受け取り且つ当該補給電力の周波数を前記目標周波数に調節して前記交流線に供給する補給運転モードで前記電力変換装置を動作させる点にある。
 上記特徴構成によれば、一つの自己システムの交流線への補給電力の供給を開始する補給開始条件が満たされたタイミングで電力変換装置を補給運転モードで動作させることで、必要な量の補給電力を電力系統から受け取って蓄電装置の充電を行うことができる。また、各自己システムは、自己システム同士の間に設けられる連繋インバータ装置で電気的に接続されているので、電力系統から補給電力を受け取った自己システムから他の自己システムへとその補給電力を融通可能である。その結果、他の自己システムから補給電力の融通を受けた自己システムにおいても、その融通を受けた電力を用いて蓄電装置への逐電を行うことができる。
 更に、電力変換装置が、電力系統から補給電力を受け取り且つその補給電力の周波数を上記目標周波数に調節して交流線に供給することで、自己インバータ装置が蓄電装置の蓄電量に応じて制御している目標周波数が変動しないようにできる。その結果、電力系統から補給電力の供給を受けている間においても、交流線での電力の周波数が蓄電装置の蓄電量を反映した値であることを確保できる。
 従って、複数の自己システムを備える電力供給システムにおいて、電力需要者に対する電力の供給余力を大きくしておくことができる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、設定時刻に到達すると前記補給開始条件が満たされたと判定する点にある。
 上記特徴構成によれば、設定時刻において定期的に補給開始条件が満たされたと判定して、電力系統から受け取る補給電力で蓄電装置の充電を行うことができる。例えば、1日の中で電力需要が増大する時間帯の前に上記設定時刻を設定しておけば、電力需要が増大する時間帯に先立って補給開始条件が満たされたと判定されて、上記補給電力による蓄電装置への蓄電が行われる。その結果、電力需要が増大する時間帯に先立って、電力需要者に対する電力の供給余力を大きくしておくことができる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、前記電力変換装置を介して前記電力系統に接続される前記自己システムの前記蓄電装置の蓄電量が下限蓄電量未満になると前記補給開始条件が満たされたと判定する点にある。
 上記特徴構成によれば、蓄電装置の蓄電量が下限蓄電量未満になったタイミング、即ち、蓄電装置から電力需要者に対する電力の供給余力が低下したタイミングで補給開始条件が満たされたと判定して、電力系統から蓄電装置への充電を行うことができる。また、蓄電装置の蓄電量が下限蓄電量未満になったタイミングで、即ち、蓄電装置への充電が必要になったタイミングでのみ電力系統からの補給電力による蓄電装置への充電が行われるようなシステムを構築できる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記電力変換装置が、前記電力系統から供給される前記補給電力を所望の直流電力に変換する交流/直流変換部と、当該交流/直流変換部で生成された直流電力を所望の交流電力に変換して前記交流線に供給する直流/交流変換部と、前記交流/直流変換部と前記直流/交流変換部との間を接続する直流接続部とを有する点にある。
 上記特徴構成によれば、交流/直流変換部で、電力系統から供給される補給電力を所望の直流電力に変換し、直流/交流変換部で、その直流電力を上記目標周波数の交流電力に変換した上で交流線に供給できる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、前記補給開始条件が満たされたと判定したときの、前記電力変換装置を介して前記電力系統に接続される前記自己システムの前記蓄電装置の蓄電量の大きさに応じて、前記補給運転モードにおいて前記電力変換装置が前記電力系統から受け取る前記補給電力の大きさを変更する点にある。
 上記特徴構成によれば、制御装置が、補給運転モードにおいて電力変換装置が電力系統から受け取る補給電力を大きくすると、蓄電装置の蓄電量を満充電レベルに到達させるのに要する時間は相対的に短くなる。つまり、制御装置が、上記自己システムの蓄電装置の蓄電量の大きさに応じて、補給運転モードにおいて電力変換装置が電力系統から受け取る補給電力の大きさを変更することで、蓄電装置の蓄電量を満充電レベルに到達させるのに要する時間を変更できる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、前記補給運転モードで前記電力変換装置を動作させているとき、隣接する二つの前記自己システムの間で前記連繋インバータ装置が融通する電力を前記補給電力が大きくなるにつれて大きくする点にある。
 上記特徴構成によれば、電力変換装置を介して電力系統に連系され得る自己システムが電力系統から補給電力を受け取ったとき、その補給電力が大きくなるにつれて、他の自己システムが連繋インバータ装置によって融通される電力は大きくなる。その結果、電力系統から補給電力を受け取ることで、電力変換装置を介して電力系統に連系され得る自己システムの蓄電装置の蓄電量を大きくすることができるとともに、他の自己システムの蓄電装置の蓄電量も大きくすることができる。
 本発明に係る電力供給システムの更に別の特徴構成は、複数個の前記自己システムのうちの少なくとも一つの自己システムの前記交流線に、発電電力が天候に応じて変化する自然エネルギ発電装置が接続され、
 前記制御装置は、将来に予測される天候に応じて前記下限蓄電量の大きさを変更する点にある。
 上記特徴構成によれば、交流線に自然エネルギ発電装置を接続していると、自然エネルギ発電装置の発電電力を蓄電装置への蓄電のために利用可能である。つまり、自然エネルギ発電装置の発電電力で蓄電装置への充電を行えるので、電力系統から受け取る補給電力を少なくすることができる。
 加えて、将来に予測される自然エネルギ発電装置の発電電力が大きい場合、将来に蓄電装置へ蓄電できる自然エネルギ発電装置の発電電力を大きく見込むことができる。そのため、蓄電装置の蓄電量が低くなったとしても、自然エネルギ発電装置からの大きい発電電力を蓄電装置への蓄電に用いることで、結果として、蓄電装置の蓄電量を高いレベルにまで回復させることができる。これに対して、将来に予測される自然エネルギ発電装置の発電電力が小さい場合、将来に蓄電装置へ蓄電できる自然エネルギ発電装置の発電電力を大きく見込むことができない。そのため、蓄電装置の蓄電量が低くなってしまうと、自然エネルギ発電装置の発電電力だけでは蓄電装置の蓄電量を高いレベルにまで回復させることができない。従って、制御装置が、将来に予測される天候に応じて、即ち、蓄電装置への蓄電に用いることのできる自然エネルギ発電装置の発電電力の大きさに応じて下限蓄電量の大きさを変更することで、自然エネルギ発電装置の発電電力を蓄電装置への蓄電のために有効に活用しつつ、蓄電装置の蓄電量を高いレベルに回復させることができる。
 本発明に係る電力供給システムの更に別の特徴構成は、前記制御装置は、一つの前記連繋インバータ装置を介して電気的に接続されて互いに隣接している二つの前記自己システムに関して、それぞれの前記蓄電装置の蓄電量に応じて決定されている前記目標周波数に基づいて、前記蓄電装置の蓄電量が相対的に大きい自己システムから、前記蓄電装置の蓄電量が相対的に小さい自己システムへと電力を融通するように前記連繋インバータ装置の動作を制御する点にある。
 上記特徴構成によれば、蓄電装置の蓄電量が相対的に大きい自己システムから、蓄電装置の蓄電量が相対的に小さい自己システムへと電力が融通されるので、各自己システム間で蓄電装置の蓄電量の均等化を図ることができる。
は、第1実施形態の電力供給システムの構成を説明する図である。 は、制御装置による電力供給システムの制御例を説明するフローチャートである。 は、第2実施形態の電力供給システムの構成を説明する図である。 は、第3実施形態の電力供給システムの構成を説明する図である。 は、制御装置による電力供給システムの制御例を説明するフローチャートである。 は、第4実施形態の電力供給システムの構成を説明する図である。 は、制御装置による電力供給システムの制御例を説明するフローチャートである。
 以下に説明する第1実施形態~第4実施形態の電力供給システムS1~S4(S)は、何れも、複数の電力需要者Dが接続されている交流線11と、蓄電装置12と、蓄電装置12と交流線11とを接続する自己インバータ装置13とを有する自己システム10を複数個備え、複数個の自己システム10が電気的に直列接続されるように、一つの自己システム10が有する蓄電装置12と他の一つの自己システム10が有する交流線11とを接続する連繋インバータ装置20を自己システム10同士の間に備えている点で共通している。そして、以下に各電力供給システムS1~S4についての特徴は詳細に説明するが、第1及び第2実施形態の電力供給システムS1、S2(S)は、遮断装置2を介して交流線11を電力系統1に接続して、その結果、蓄電装置12が電力系統1から電力の補給を受けることができる構成となっている。第3実施形態の電力供給システムS3(S)は、充電用インバータ装置3を介して蓄電装置12を電力系統1に接続して、その結果、蓄電装置12が電力系統1から電力の供給を受けることができる構成となっている。第4実施形態の電力供給システムS4(S)は、交流/交流変換を行うことができる電力変換装置4を介して交流線11を電力系統1に接続して、その結果、蓄電装置12が電力系統1から電力の補給を受けることができる構成となっている。
<第1実施形態>
 以下に、図面を参照して第1実施形態の電力供給システムS1(S)について説明する。図1は、第1実施形態の電力供給システムS1の構成を説明する図である。
 図1に示すように、電力供給システムS1は、複数個の自己システム10と、それら自己システム10同士の間に設けられる連繋インバータ装置20と、遮断装置2と、制御装置Cとを備える。図1では、電力供給システムS1が、自己システム10A、10Bと連繋インバータ装置20A、20Bとを備える例を示しているが、更に多数の自己システム10及び連繋インバータ装置20を備えるシステムを構築することもできる。遮断装置2は、複数個の自己システム10のうちの一つの自己システム10Aの交流線11と外部の電力系統1とを連系状態及び解列状態の何れか一方に切換可能な装置である。本実施形態では、遮断装置2は、自己システム10Aの交流線11と外部の電力系統1とを連系状態及び解列状態の何れか一方に切換可能である。つまり、図1に例示する電力供給システムS1では、自己システム10Aのみが、遮断装置2を介して電力系統1に連系され得る。従って、系統連系用のインバータとして電力系統1を保護するために要求される機能は、自己システム10Aの自己インバータ装置13のみが搭載していればよい。
 制御装置Cは、上記自己インバータ装置13及び上記連繋インバータ装置20及び上記遮断装置2の動作を制御可能な装置である。例えば、制御装置Cは、情報の入出力機能及び記憶機能及び演算処理機能などを有する装置である。尚、制御装置Cの機能は、自己インバータ装置13及び連繋インバータ装置20及び遮断装置2の夫々が有する制御部(図示せず)の何れか一つがマスター制御部として機能し、他の制御部がマスター制御部と情報通信を行いながらスレーブ制御部として機能することにより実現することができる。或いは、制御装置Cの機能は、自己インバータ装置13及び連繋インバータ装置20及び遮断装置2の夫々が有する制御部(図示せず)とは別に設けられ、それらの制御部と情報通信可能に構成されるマスター制御部によって実現することができる。
 自己システム10は、複数の電力需要者Dが接続されている交流線11と、蓄電装置12と、蓄電装置12と交流線11とを接続する自己インバータ装置13とを有する。
 電力需要者Dは、交流線11から供給される電力を消費する電力消費装置14を有する。或いは、電力需要者Dは、電力消費装置14に加えて、発電装置15を有してもよい。発電装置15としては、太陽光や風力などの自然エネルギを利用して発電する太陽光発電装置や風力発電装置や、燃料を利用して発電する燃料電池などの様々な装置を利用できる。尚、図1に示すように、電力需要者Dが発電装置15を備えるのではなく、発電装置15を単体で交流線11に接続してもよい。また、電力需要者Dが備える電力消費装置14や発電装置15の数や組み合わせは図示した例に限定されない。
 蓄電装置12は、蓄電池(例えば、化学電池)や電気二重層キャパシタなどの様々な装置を利用できる。
 自己インバータ装置13は、半導体スイッチなどを有する回路部(図示せず)、及び、その半導体スイッチのスイッチング動作を制御する制御部(図示せず)などで構成される。自己インバータ装置13の動作は、交流線11が電力系統1に連系されている連系状態と、交流線11が電力系統1から解列されている解列状態とで異なる。具体的には、制御装置Cは、交流線11と電力系統1とが解列状態にあるとき(即ち、遮断装置2を解列作動させているとき)、複数個の自己システム10のそれぞれの自己インバータ装置13の夫々に対して、交流線11での電力の電圧が目標電圧となるように、及び、交流線11での電力の周波数が蓄電装置12の蓄電量に応じて決定される目標周波数となるように制御する解列時運転モードで動作するように指令する。例えば本実施形態では、制御装置Cは、自己インバータ装置13の夫々に対して、交流線11での電力の周波数が蓄電装置12の蓄電量が大きくなるにつれて高くなる関係で決定される目標周波数となるように制御する解列時運転モードで動作するように指令する。
 これに対して、制御装置Cは、交流線11と電力系統1とが連系状態であるとき(即ち、遮断装置2を連系作動させているとき)、電力系統1から受け取る補給電力を蓄電装置12への充電に用いる充電運転モードで自己インバータ装置13を動作させるように指令する。そして、制御装置Cから指令を受けた自己インバータ装置13は、制御部が、回路部の動作を制御して充電運転モードでの動作を行わせる。これら解列時運転モード及び充電運転モードの詳細については後述する。
 自己インバータ装置13の制御部は、蓄電装置12の蓄電量が大きくなるほど交流線11の目標周波数が大きくなるような関係式を予め内部メモリなどに記憶しておき、解列時運転モードで動作するときその関係式に従った制御を行う。このように、交流線11の実際の周波数(即ち、目標周波数)は、その交流線11に自己インバータ装置13を介して接続されている蓄電装置12の蓄電量が反映されていることになる。
 電力供給システムS1は、連繋インバータ装置20を自己システム10同士の間に備える。具体的には、連繋インバータ装置20は、複数個の自己システム10が電気的に直列接続されるように、一つの自己システム10Aが有する蓄電装置12と他の一つの自己システム10Bが有する交流線11とを接続する。連繋インバータ装置20の動作は制御装置Cが制御する。具体的には、制御装置Cは、一つの連繋インバータ装置20を介して電気的に接続されている二つの自己システム10に関して、それぞれの蓄電装置12の蓄電量に応じて決定されている目標周波数に基づいて、蓄電装置12の蓄電量が相対的に大きい自己システム10から、蓄電装置12の蓄電量が相対的に小さい自己システム10へと電力を融通するように連繋インバータ装置20の動作を制御する電力融通制御を行う。例えば本実施形態では、自己インバータ装置13の夫々に対して、交流線11での電力の周波数が蓄電装置12の蓄電量が大きくなるにつれて高くなる関係で決定される目標周波数となるように制御しているため、目標周波数の高い方の(即ち、蓄電量が相対的に大きい方の)自己システム10から目標周波数の低い方の(蓄電量が相対的に小さい方の)自己システム10へ電力を供給するように連繋インバータ装置20は動作する。
 次に、制御装置Cによる電力供給システムS1の動作制御について説明する。図2は、制御装置Cによる電力供給システムS1の制御例を説明するフローチャートである。図2に示すように、制御装置Cは、自己インバータ装置13を解列時運転モードと充電運転モードとの間で切り換えて動作させる。
 先ず、制御装置Cは、工程#10に移行する以前には自己インバータ装置13を解列時運転モードで動作させている。つまり、自己インバータ装置13は、自己システム10の交流線11での電力の電圧が目標電圧となるように、及び、交流線11での電力の周波数が蓄電装置12の蓄電量が大きくなるにつれて高くなる関係式で決定される目標周波数となるように制御している。この関係式の例としては、蓄電装置12の蓄電量の関数で決定する周波数変動分(例えば蓄電量が大きいほど周波数変動分が大きくなる関係など)を交流線11の基準周波数(例えば60Hz)に対して加算して得られる値を目標周波数とするようなものがある。
 また、連繋インバータ装置20は、例えば、自己システム10Aの交流線11での電力の周波数(図1中で「fA1」と記す)と自己システム10Bの交流線11での電力の周波数(図1中で「fB」と記す)とを検出して比較し、周波数の高い方の自己システム10から周波数の低い方の自己システム10へ電力を供給する。このとき、各自己システム10A,10Bの交流線11での電力の実際の周波数fA1,fBは、各自己システム10A,10Bで決定される上記目標周波数と同じである。従って、連繋インバータ装置20は、各自己システム10A,10Bの交流線11での電力の周波数を実際に検出してもよいし、或いは、各自己システム10A,10Bの自己インバータ装置13から目標周波数についての情報を取得してもよい。
 このように、制御装置Cが、自己インバータ装置13を解列時運転モードで動作させている状態では、各自己システム10A,10Bの交流線11での電力の電圧及び周波数は各蓄電装置12から供給される電力によって維持される。加えて、一方の自己システム10の蓄電装置12の蓄電量が低下しても、連繋インバータ装置20Aが、交流線11での電力の周波数の低下によってその蓄電量の低下を検出して、他方の自己システム10から電力の融通を行う電力融通制御を実施することで、各自己システム10の間での蓄電装置12の蓄電量の均等化を図ることができる。
 工程#10において制御装置Cは、連系状態への切換条件が満たされたか否かを判定する。連系状態への切換条件の例としては、遮断装置2を介して電力系統1に連系され得る自己システム10Aの蓄電装置12の蓄電量が所定の下限蓄電量未満であるか否かなどがある。つまり、制御装置Cが、自己システム10Aの蓄電装置12の蓄電量を検出し、その蓄電量が下限蓄電量未満であれば、制御装置Cは、連系状態への切換条件が満たされたと判定する。このような切換条件を設定しておくと、自己システム10Aの蓄電装置12の蓄電量が低下したタイミングで、後述するように電力系統1と自己システム10Aとの連系が行われることで蓄電装置12への充電を確実に行うことができる。つまり、蓄電装置12の蓄電量を適切なタイミングで高いレベルにまで回復させて、電力需要者Dに対する電力の供給余力を大きくしておくことができる。
 制御装置Cは、工程#10において連系状態への切換条件が満たされたと判定した場合は工程#12に移行し、連系状態への切換条件が満たされていないと判定した場合は工程#11に移行して各自己システム10の自己インバータ装置13を解列時運転モードで動作させ続ける。
 制御装置Cが、工程#10において連系状態への切換条件が満たされたと判定した場合、工程#12において制御装置Cは、自己システム10Aの自己インバータ装置13に対して解列時運転モードでの動作を停止させる。つまり、自己システム10Aにおいて、自己インバータ装置13から交流線11へ電力を出力しないようにする。このとき、制御装置Cは、連繋インバータ装置20による電力融通制御を一時的に停止させてもよく、或いは、連繋インバータ装置20による電力融通制御を停止させなくてもよい。
 次に、工程#13において制御装置Cは、遮断装置2を動作させて、電力系統1と自己システム10Aの交流線11とを連系させる。その結果、自己システム10Aの交流線11での電力の電圧及び周波数は電力系統1の電圧及び周波数と同じになる。
 その後、工程#14において制御装置Cは、自己システム10Aの自己インバータ装置13を、電力系統1から受け取る補給電力を蓄電装置12への充電に用いる充電運転モードで動作させる。この充電運転モードにおいて、自己インバータ装置13が電力系統1から受け取る補給電力:P1は、自己インバータ装置13の定格容量の範囲内であればよい。例えば、自己インバータ装置13は、制御装置Cから指令されて充電運転モードでの運転を実行するとき、自己の定格容量の50%の電力として予め記憶している補給電力:P1を、電力系統1に連系されている交流線11から蓄電装置12へと供給する。尚、この50%という数値はあくまでも例示目的で挙げた数値であり、本発明がこの数値に限定される訳ではない。例えば、自己インバータ装置13が、自己の定格容量の30%の電力を、電力系統1から受け取る補給電力:P1と設定するような変更も可能である。
 更に、制御装置Cは、自己インバータ装置13を充電運転モードで動作させるのと並行して、連繋インバータ装置20に上記電力融通制御を行わせる。つまり、自己システム10Aの自己インバータ装置13が電力系統1から取り込んだ電力を、更に自己システム10Bへと移送させることができる。尚、自己システム10Aの交流線11を電力系統1に連系している連系状態では、交流線11での電力の周波数は電力系統1での電力の周波数となっており、蓄電装置12の蓄電量を反映した値とはなっていない。但し、自己システム10Aの自己インバータ装置13は、充電運転モードで動作している間も、蓄電装置12の蓄電量を検出して、その蓄電量に応じて目標周波数を導出している。そのため、例えば、連繋インバータ装置20Aは、自己システム10Aの自己インバータ装置13から目標周波数(図1中で「fA2」と記す)の伝達を受けることで、自己システム10Aの交流線11での電力の目標周波数(fA2)と自己システム10Bの交流線11での電力の目標周波数(fB)とを検出して比較できる。そして、連繋インバータ装置20は、周波数の高い方の自己システム10から周波数の低い方の自己システム10へ電力を供給する電力融通制御を行う。
 制御装置Cは、工程#14において自己インバータ装置13を充電運転モードで動作させ且つ連繋インバータ装置20に電力融通制御を行わせつつ、工程#15において充電終了条件が満たされているか否かを判定する。例えば、充電終了条件として、自己システム10Aの蓄電装置12の蓄電量が満充電レベルに到達しているか否か等がある。そして、充電終了条件が満たされている場合には工程#16に移行し、充電終了条件が満たされていない場合には工程#14にリターンする。
 そして、工程#15において制御装置Cは、充電終了条件が満たされたと判定したとき(例えば、自己システム10Aの蓄電装置12の蓄電量が満充電レベルに到達していると判定したとき)、工程#16に移行して自己インバータ装置13による充電運転モードを停止させる。また、制御装置Cは、連繋インバータ装置20による電力融通制御を停止させる。
 制御装置Cが、工程#14において自己システム10Aの自己インバータ装置13を、電力系統1から受け取る補給電力:P1を蓄電装置12への充電に用いる充電運転モードで動作させている間に、それと並行して連繋インバータ装置20に電力融通制御を行わせると、電力系統1から供給された補給電力が自己システム10Aの蓄電装置12に充電されるだけでなく、自己システム10Bにも融通される(即ち、自己システム10Bの蓄電装置12にも供給される)こととなる。つまり、連繋インバータ装置20で電力融通制御を行わせることで各自己システム10の蓄電装置12の蓄電量が均等化されるため、自己システム10Aの蓄電装置12の蓄電量が満充電レベルにまで均等に到達しているということは、全ての自己システム10の蓄電装置12の蓄電量が満充電レベルに到達していると見なしてもよい。従って、自己システム10Aの蓄電装置12の蓄電量が満充電レベルに到達していることを充電終了条件とすることで、制御装置Cは、全ての自己システム10の蓄電装置12の蓄電量が満充電レベルに到達した状態であること、即ち、電力系統1から補給電力を受け取ることが不要になった状態であることを確認できる。
 次に、工程#17において制御装置Cは、遮断装置2を動作させて自己システム10Aの交流線11を電力系統1から解列させる。その後、工程#18において制御装置Cは、自己システム10Aの自己インバータ装置13を解列時運転モードで動作させるのと並行して、連繋インバータ装置20に上記電力融通制御を行わせる。
 以上のように、連系状態への切換条件が満たされたタイミングで自己システム10の交流線11と電力系統1とを連系させ、充電運転モードで自己インバータ装置13を動作させることで、必要な量の補給電力を電力系統1から受け取って蓄電装置12の充電を行うことができる。また、各自己システム10は、自己システム10同士の間に設けられる連繋インバータ装置20で電気的に接続されているので、電力系統1から補給電力を受け取った自己システム10から他の自己システム10へとその補給電力を融通可能である。従って、複数の自己システム10を備える電力供給システムS1において、電力需要者Dに対する電力の供給余力を大きくしておくことができる。
<第2実施形態>
 第2実施形態の電力供給システムS2(S)は、電力系統1との間の接続形態が第1実施形態の電力供給システムS1と異なっている。以下に第2実施形態の電力供給システムS2について説明するが、第1実施形態と同様の構成については説明を省略する。
 図3は、第2実施形態の電力供給システムS2の構成を説明する図である。第2実施形態では、自己システム10Bの交流線11が、遮断装置2を介して電力系統1に連系され得るように構成されている。つまり、連繋インバータ装置20A及び自己システム10Bの自己インバータ装置13の両方に接続されている交流線11に対して遮断装置2を介して電力系統1が連繋されるので、系統連系用のインバータとして電力系統1を保護するために要求される機能は、連繋インバータ装置20A及び自己システム10Bの自己インバータ装置13の両方に搭載されている必要がある。
 第2実施形態の電力供給システムS2でも、上記第1実施形態と同様に、制御装置Cは、自己システム10Bの交流線11を電力系統1から解列しているとき(即ち、遮断装置2を遮断作動させているとき)、各自己システム10の自己インバータ装置13を解列時動作モードで動作させ、及び、各連繋インバータ装置20が電力融通制御を行うように動作させる。つまり、各自己システム10の自己インバータ装置13は、自己システム10の交流線11での電力の電圧が目標電圧となるように、及び、交流線11での電力の周波数が蓄電装置12の蓄電量に応じて決定される目標周波数となるように制御する解列時運転モードで動作するように指令する。例えば、制御装置Cは、自己インバータ装置13の夫々に対して、交流線11での電力の周波数が蓄電装置12の蓄電量が大きくなるにつれて高くなる関係で決定される目標周波数となるように制御する解列時運転モードで動作するように指令する。その結果、交流線11での電力の周波数は、その交流線11に自己インバータ装置13を介して接続されている蓄電装置12の蓄電量を反映していることになる。
 各連繋インバータ装置20は、目標周波数の高い方の自己システム10から目標周波数の低い方の自己システム10へ電力を供給する電力融通制御を行う。このとき、自己システム10Bの交流線11が電力系統1から解列されていれば、各自己システム10の交流線11での電力の周波数は各自己システム10での目標周波数と同じになるため、各連繋インバータ装置20は、各自己システム10の交流線11での電力の周波数を検出して比較すればよい。
 これに対して、制御装置Cは、自己システム10Bの交流線11を電力系統1に連系しているとき(即ち、遮断装置2を連系作動させているとき)、上記第1実施形態と同様に、自己システム10Bの自己インバータ装置13を充電運転モードで動作させ、及び、各連繋インバータ装置20が電力融通制御を行うように動作させる。例えば、自己システム10Bの自己インバータ装置13は、制御装置Cから指令されて充電運転モードでの運転を実行するとき、自己の定格容量の50%の電力として予め記憶している補給電力:P1を、電力系統1に連系されている交流線11から蓄電装置12へと供給する。
 各連繋インバータ装置20は、目標周波数の高い方の自己システム10から目標周波数の低い方の自己システム10へ電力を供給する電力融通制御を行う。例えば、連繋インバータ装置20Aは、自己システム10Aの自己インバータ装置13から目標周波数(fA)の伝達を受け、自己システム10Bの自己インバータ装置13から目標周波数(図1中で「fB2」と記す)の伝達を受けることで、自己システム10Aの交流線11での電力の目標周波数(fA)と自己システム10Bの交流線11での電力の目標周波数(fB2)とを比較できる。そして、連繋インバータ装置20Aは、周波数の高い方の自己システム10から周波数の低い方の自己システム10へ電力を供給する電力融通制御を行う。
<第3実施形態>
 以下に、図面を参照して第3実施形態の電力供給システムS3(S)について説明する。図4は、第3実施形態の電力供給システムS3の構成を説明する図である。
 図4に示すように、電力供給システムS3は、複数個の自己システム10と、それら自己システム10同士の間に設けられる連繋インバータ装置20と、充電用インバータ装置3と、制御装置Cとを備える。図4では、電力供給システムS3が、自己システム10A、10Bと連繋インバータ装置20A、20Bとを備える例を示しているが、更に多数の自己システム10及び連繋インバータ装置20を備えるシステムを構築することもできる。充電用インバータ装置3は、複数個の自己システム10のうちの一つの自己システム10の蓄電装置12と外部の電力系統1との間を接続し、電力系統1から受け取る補給電力を蓄電装置12への充電に利用可能な装置である。本実施形態では、充電用インバータ装置3は、自己システム10Aの交流線11と外部の電力系統1との間を接続するように設けられ、電力系統1から受け取る交流電力を所望の直流電力に変換して蓄電装置12側へ供給可能である。このように、充電用インバータ装置3は、電力系統1と自己システム10とを連系するための装置であるので、系統連系用のインバータとして電力系統1を保護するために要求される機能が搭載されている必要がある。
 制御装置Cは、上記自己インバータ装置13及び上記連繋インバータ装置20及び上記充電用インバータ装置3の動作を制御可能な装置である。例えば、制御装置Cは、情報の入出力機能及び記憶機能及び演算処理機能などを有する装置である。尚、制御装置Cの機能は、自己インバータ装置13及び連繋インバータ装置20及び充電用インバータ装置3の夫々が有する制御部(図示せず)の何れか一つがマスター制御部として機能し、他の制御部がマスター制御部と情報通信を行いながらスレーブ制御部として機能することにより実現することができる。或いは、制御装置Cの機能は、自己インバータ装置13及び連繋インバータ装置20及び充電用インバータ装置3の夫々が有する制御部(図示せず)とは別に設けられ、それらの制御部と情報通信可能に構成されるマスター制御部によって実現することができる。
 自己システム10は、複数の電力需要者Dが接続されている交流線11と、蓄電装置12と、蓄電装置12と交流線11とを接続する自己インバータ装置13とを有する。
 電力需要者Dは、交流線11から供給される電力を消費する電力消費装置14を有する。或いは、電力需要者Dは、電力消費装置14に加えて、発電装置15を有してもよい。発電装置15としては、太陽光や風力などの自然エネルギを利用して発電する太陽光発電装置や風力発電装置や、燃料を利用して発電する燃料電池などの様々な装置を利用できる。尚、図4に示すように、電力需要者Dが発電装置15を備えるのではなく、発電装置15を単体で交流線11に接続してもよい。また、電力需要者Dが備える電力消費装置14や発電装置15の数や組み合わせは図示した例に限定されない。
 蓄電装置12は、蓄電池(例えば、化学電池)や電気二重層キャパシタなどの様々な装置を利用できる。
 自己インバータ装置13は、半導体スイッチなどを有する回路部(図示せず)、及び、その半導体スイッチのスイッチング動作を制御する制御部(図示せず)などで構成される。制御装置Cは、複数個の自己システム10のそれぞれの自己インバータ装置13の夫々に対して、交流線11での電力の電圧が目標電圧となるように、及び、交流線11での電力の周波数が蓄電装置12の蓄電量に応じて決定される目標周波数となるように制御するように指令する。例えば本実施形態では、制御装置Cは、自己インバータ装置13の夫々に対して、交流線11での電力の周波数が蓄電装置12の蓄電量が大きくなるにつれて高くなる関係式で決定される目標周波数となるように制御するように指令する。この関係式の例としては、蓄電装置12の蓄電量の関数で決定する周波数変動分(例えば蓄電量が大きいほど周波数変動分が大きくなる関係など)を交流線11の基準周波数(例えば60Hz)に対して加算して得られる値を目標周波数とするようなものがある。
 自己インバータ装置13の制御部は、蓄電装置12の蓄電量が大きくなるほど交流線11の目標周波数が大きくなるような関係式を予め内部メモリなどに記憶しておき、その関係式に従って、交流線11の電圧制御及び周波数制御を行う。このように、交流線11の実際の周波数(即ち、目標周波数)は、その交流線11に自己インバータ装置13を介して接続されている蓄電装置12の蓄電量が反映されていることになる。
 電力供給システムS3は、連繋インバータ装置20を自己システム10同士の間に備える。具体的には、連繋インバータ装置20は、複数個の自己システム10が電気的に直列接続されるように、一つの自己システム10Aが有する蓄電装置12と他の一つの自己システム10Bが有する交流線11とを接続する。連繋インバータ装置20の動作は制御装置Cが制御する。具体的には、制御装置Cは、一つの連繋インバータ装置20を介して電気的に接続されている二つの自己システム10に関して、それぞれの蓄電装置12の蓄電量に応じて決定されている目標周波数に基づいて、蓄電装置12の蓄電量が相対的に大きい自己システム10から、蓄電装置12の蓄電量が相対的に小さい自己システム10へと電力を融通するように連繋インバータ装置20の動作を制御する電力融通制御を行う。例えば本実施形態では、自己インバータ装置13の夫々に対して、交流線11での電力の周波数が蓄電装置12の蓄電量が大きくなるにつれて高くなる関係で決定される目標周波数となるように制御しているため、目標周波数の高い方の(即ち、蓄電量が相対的に大きい方の)自己システム10から目標周波数の低い方の(蓄電量が相対的に小さい方の)自己システム10へ電力を供給するように連繋インバータ装置20は動作する。
 次に、制御装置Cによる電力供給システムS3の動作制御について説明する。図5は、制御装置Cによる電力供給システムS3の制御例を説明するフローチャートである。図5に示すように、制御装置Cは、充電用インバータ装置3に対して充電運転モードの動作の実行及び停止を切り換える。
 先ず、制御装置Cは、工程#20に移行する以前には充電用インバータ装置3に対して充電運転モードを行わせない。つまり、自己システム10Aの蓄電装置12に対して充電用インバータ装置3を用いた充電は行われていない。このとき、自己インバータ装置13は、自己システム10の交流線11での電力の電圧が目標電圧となるように、及び、交流線11での電力の周波数が蓄電装置12の蓄電量が大きくなるにつれて高くなる関係で決定される目標周波数となるように制御している。また、連繋インバータ装置20は、例えば、自己システム10Aの交流線11での電力の周波数(図4中で「fA」と記す)と自己システム10Bの交流線11での電力の周波数(図4中で「fB」と記す)とを検出して比較し、周波数の高い方の自己システム10から周波数の低い方の自己システム10へ電力を供給する。このとき、各自己システム10A,10Bの交流線11での電力の実際の周波数fA,fBは、各自己システム10A,10Bで決定される上記目標周波数と同じである。従って、連繋インバータ装置20は、各自己システム10A,10Bの交流線11での電力の周波数を実際に検出してもよいし、或いは、各自己システム10A,10Bの自己インバータ装置13から目標周波数についての情報を取得してもよい。
 このように、各自己システム10A,10Bの交流線11での電力の電圧及び周波数は各蓄電装置12から供給される電力によって維持される。加えて、一方の自己システム10の蓄電装置12の蓄電量が低下しても、連繋インバータ装置20Aが、交流線11での電力の周波数の低下によってその蓄電量の低下を検出して、他方の自己システム10から電力の融通を行う電力融通制御を実施することで、各自己システム10の間での蓄電装置12の蓄電量の均等化を図ることができる。
 工程#20において制御装置Cは、充電開始条件が満たされたか否かを判定する。充電開始条件の例としては、充電用インバータ装置3を介して電力系統1に連系される自己システム10の蓄電装置12の蓄電量が所定の下限蓄電量未満であるか否かなどがある。つまり、制御装置Cが、自己システム10Aの蓄電装置12の蓄電量を検出し、その蓄電量が下限蓄電量未満であれば、制御装置Cは、充電開始条件が満たされたと判定する。このような充電開始条件を設定しておくと、自己システム10Aの蓄電装置12の蓄電量が低下したタイミングで、後述するように電力系統1から充電用インバータ装置3を介して受け取る補給電力で蓄電装置12への充電を確実に行うことができる。つまり、蓄電装置12の蓄電量を適切なタイミングで高いレベルにまで回復させて、電力需要者Dに対する電力の供給余力を大きくしておくことができる。
 制御装置Cは、工程#20において充電開始条件が満たされたと判定した場合は工程#22に移行し、充電開始条件が満たされていないと判定した場合は工程#21に移行して充電用インバータ装置3に対して充電運転モードでの動作を行わせない。
 制御装置Cが、工程#20において充電開始条件が満たされたと判定した場合、工程#22において制御装置Cは、充電用インバータ装置3に対して充電運転モードで動作するように指令する。また、本実施形態において、制御装置Cは、充電用インバータ装置3を充電運転モードで動作させている間であっても、自己インバータ装置13に対して、上述した通りの交流線11での電力の電圧制御及び周波数制御を行わせ、並びに、連繋インバータ装置20に対して、上述した通りの電力融通制御を行わせている。
 この充電用インバータ装置3による充電運転モードの実行によって、充電用インバータ装置3が電力系統1から受け取る補給電力:P1は、充電用インバータ装置3の定格容量の範囲内であればよい。例えば、充電用インバータ装置3は、制御装置Cから指令されて充電運転モードでの運転を実行するとき、自己の定格容量の50%の電力として予め記憶している補給電力:P1を、電力系統1から受け取って蓄電装置12へと供給する。尚、この50%という数値はあくまでも例示目的で挙げた数値であり、本発明がこの数値に限定される訳ではない。例えば、充電用インバータ装置3が、自己の定格容量の30%の電力を、電力系統1から受け取る補給電力:P1と設定するような変更も可能である。
 本実施形態では、上述したように、制御装置Cは、充電用インバータ装置3を充電運転モードで動作させるのと並行して、自己インバータ装置13に対して上述した通りの交流線11での電力の電圧制御及び周波数制御を行わせている。その結果、電力系統1から受け取った補給電力を用いた充電によって蓄電装置12の蓄電量が上昇するのに伴って、自己システム10Aの交流線11における電力の周波数も上昇する。更に、制御装置Cは、連繋インバータ装置20に上記電力融通制御を行わせる。つまり、電力系統1から受け取った補給電力を用いた充電によって蓄電装置12の蓄電量が上昇するのに伴って、自己システム10Aの交流線11における電力の周波数が上昇すると、連繋インバータ装置20Aが、自己システム10Aから自己システム10Bへと電力の融通を行う。
 工程#23において制御装置Cは、充電終了条件が満たされているか否かを判定する。例えば、充電終了条件として、自己システム10Aの蓄電装置12の蓄電量が満充電レベルに到達しているか否か等がある。そして、充電終了条件が満たされている場合には工程#24に移行し、充電終了条件が満たされていない場合には工程#22にリターンする。
 そして、工程#23において制御装置Cは、充電終了条件が満たされたと判定したとき(例えば、自己システム10Aの蓄電装置12の蓄電量が満充電レベルに到達していると判定したとき)、工程#24に移行して充電用インバータ装置3による充電運転モードの動作を停止させる。その結果、自己システム10Aは、電力系統1からは切り離される。
 上述したように、制御装置Cが、工程##22において充電用インバータ装置3を充電運転モードで動作させている間に、それと並行して、自己インバータ装置13に対して上述した通りの交流線11での電力の電圧制御及び周波数制御を行わせ且つ連繋インバータ装置20に上記電力融通制御を行わせることで、電力系統1から供給された補給電力が自己システム10Aの蓄電装置12に充電されるだけでなく、自己システム10Bにも融通される(即ち、自己システム10Bの蓄電装置12にも供給される)こととなる。つまり、連繋インバータ装置20で電力融通制御を行わせることで各自己システム10の蓄電装置12の蓄電量が均等化されるため、自己システム10Aの蓄電装置12の蓄電量が満充電レベルに到達しているということは、全ての自己システム10の蓄電装置12の蓄電量が満充電レベルにまで均等に到達していると見なしてもよい。従って、自己システム10Aの蓄電装置12の蓄電量が満充電レベルに到達していることを充電終了条件とすることで、制御装置Cは、全ての自己システム10の蓄電装置12の蓄電量が満充電レベルに到達した状態であること、即ち、電力系統1から補給電力を受け取ることが不要になった状態であることを確認できる。
 以上のように、充電開始条件が満たされたタイミングで充電用インバータ装置3を充電運転モードで動作させることで、必要な量の補給電力を電力系統1から受け取って蓄電装置12の充電を行うことができる。また、各自己システム10は、自己システム10同士の間に設けられる連繋インバータ装置20で電気的に接続されているので、電力系統1から補給電力を受け取った自己システム10から他の自己システム10へとその補給電力を融通可能である。従って、複数の自己システム10を備える電力供給システムS3において、電力需要者Dに対する電力の供給余力を大きくしておくことができる。
<第4実施形態>
 以下に、図面を参照して第4実施形態の電力供給システムS4(S)について説明する。図6は、第4実施形態の電力供給システムS4の構成を説明する図である。
 図6に示すように、電力供給システムS4は、複数個の自己システム10と、それら自己システム10同士の間に設けられる連繋インバータ装置20と、電力変換装置4と、制御装置Cとを備える。図6では、電力供給システムS4が、自己システム10A、10Bと連繋インバータ装置20A、20Bとを備える例を示しているが、更に多数の自己システム10及び連繋インバータ装置20を備えるシステムを構築することもできる。電力変換装置4は、複数個の自己システム10のうちの一つの自己システム10Aの交流線11と外部の電力系統1とを接続する装置である。本実施形態では、電力変換装置4として、電力系統1から供給される交流電力を所望の直流電力に変換する交流/直流変換部4aと、その交流/直流変換部4aで生成された直流電力を所望の交流電力に変換して交流線11に供給する直流/交流変換部4bと、交流/直流変換部4aと直流/交流変換部4bとの間を接続する直流接続部4cとを有する。このように、図6に例示する電力供給システムS4では、自己システム10Aのみが、電力変換装置4を介して電力系統1に連系され得る。このように、電力変換装置4は、電力系統1と交流線11とを連系するための装置であるので、系統連系用のインバータとして電力系統1を保護するために要求される機能を搭載している必要がある。
 制御装置Cは、上記自己インバータ装置13及び上記連繋インバータ装置20及び上記電力変換装置4の動作を制御可能な装置である。例えば、制御装置Cは、情報の入出力機能及び記憶機能及び演算処理機能などを有する装置である。尚、制御装置Cの機能は、自己インバータ装置13及び連繋インバータ装置20及び電力変換装置4の夫々が有する制御部(図示せず)の何れか一つがマスター制御部として機能し、他の制御部がマスター制御部と情報通信を行いながらスレーブ制御部として機能することにより実現することができる。或いは、制御装置Cの機能は、自己インバータ装置13及び連繋インバータ装置20及び電力変換装置4の夫々が有する制御部(図示せず)とは別に設けられ、それらの制御部と情報通信可能に構成されるマスター制御部によって実現することができる。
 自己システム10は、複数の電力需要者Dが接続されている交流線11と、蓄電装置12と、蓄電装置12と交流線11とを接続する自己インバータ装置13とを有する。
 電力需要者Dは、交流線11から供給される電力を消費する電力消費装置14を有する。或いは、電力需要者Dは、電力消費装置14に加えて、発電装置15を有してもよい。発電装置15としては、太陽光や風力などの自然エネルギを利用して発電する太陽光発電装置や風力発電装置や、燃料を利用して発電する燃料電池などの様々な装置を利用できる。尚、図6に示すように、電力需要者Dが発電装置15を備えるのではなく、発電装置15を単体で交流線11に接続してもよい。また、電力需要者Dが備える電力消費装置14や発電装置15の数や組み合わせは図示した例に限定されない。
 蓄電装置12は、蓄電池(例えば、化学電池)や電気二重層キャパシタなどの様々な装置を利用できる。
 自己インバータ装置13は、半導体スイッチなどを有する回路部(図示せず)、及び、その半導体スイッチのスイッチング動作を制御する制御部(図示せず)などで構成される。制御装置Cは、複数個の自己システム10のそれぞれの自己インバータ装置13の夫々に対して、交流線11での電力の電圧が目標電圧となるように、及び、交流線11での電力の周波数が蓄電装置12の蓄電量に応じて決定される目標周波数となるように制御するように指令する。例えば本実施形態では、制御装置Cは、自己インバータ装置13の夫々に対して、交流線11での電力の周波数が蓄電装置12の蓄電量が大きくなるにつれて高くなる関係式で決定される目標周波数となるように制御するように指令する。この関係式の例としては、蓄電装置12の蓄電量の関数で決定する周波数変動分(例えば蓄電量が大きいほど周波数変動分が大きくなる関係など)を交流線11の基準周波数(例えば60Hz)に対して加算して得られる値を目標周波数とするようなものがある。
 自己インバータ装置13の制御部は、蓄電装置12の蓄電量が大きくなるほど交流線11の目標周波数が大きくなるような関係式を予め内部メモリなどに記憶しておき、解列時運転モードで動作するときその関係式に従った制御を行う。このように、交流線11の実際の周波数(即ち、目標周波数)は、その交流線11に自己インバータ装置13を介して接続されている蓄電装置12の蓄電量が反映されていることになる。
 電力供給システムS4は、連繋インバータ装置20を自己システム10同士の間に備える。具体的には、連繋インバータ装置20は、複数個の自己システム10が電気的に直列接続されるように、一つの自己システム10Aが有する蓄電装置12と他の一つの自己システム10Bが有する交流線11とを接続する。連繋インバータ装置20の動作は制御装置Cが制御する。具体的には、制御装置Cは、一つの連繋インバータ装置20を介して電気的に接続されている二つの自己システム10に関して、それぞれの蓄電装置12の蓄電量に応じて決定されている目標周波数に基づいて、蓄電装置12の蓄電量が相対的に大きい自己システム10から、蓄電装置12の蓄電量が相対的に小さい自己システム10へと電力を融通するように連繋インバータ装置20の動作を制御する電力融通制御を行う。例えば本実施形態では、自己インバータ装置13の夫々に対して、交流線11での電力の周波数が蓄電装置12の蓄電量が大きくなるにつれて高くなる関係で決定される目標周波数となるように制御しているため、目標周波数の高い方の(即ち、蓄電量が相対的に大きい方の)自己システム10から目標周波数の低い方の(蓄電量が相対的に小さい方の)自己システム10へ電力を供給するように連繋インバータ装置20は動作する。
 電力変換装置4では、自己インバータ装置13で目標周波数に制御されている交流線11の周波数(図6中では「fA」と記す)を検出すると共に、電力系統1から補給電力を受け取り且つその補給電力の周波数を上記目標周波数に調節して交流線11に供給する電力変換が行われる。具体的には、本実施形態の電力変換装置4は、上述したように交流/直流変換部4aと直流/交流変換部4bと直流接続部4cとを有する。従って、電力変換装置4は、交流/直流変換部4aで、電力系統1から供給される補給電力を所望の直流電力に変換し、直流/交流変換部4bで、その直流電力を上記目標周波数の交流電力に変換した上で交流線11に供給できる。このように、電力系統1から補給電力を受け取り且つその補給電力の周波数を上記目標周波数に調節して交流線11に供給することで、自己インバータ装置13が蓄電装置12の蓄電量に応じて制御している目標周波数が変動しないようにできる。その結果、電力系統1から補給電力の供給を受けている間においても、交流線11での電力の周波数が蓄電装置12の蓄電量を反映した値であることを確保できる。
 次に、制御装置Cによる電力供給システムS4の動作制御について説明する。図7は、制御装置Cによる電力供給システムS4の制御例を説明するフローチャートである。図7に示すように、制御装置Cは、電力変換装置4に対して、電力系統1から補給電力を受け取り且つその補給電力の周波数を上記目標周波数に調節して交流線11に供給する補給運転モードの動作の実行及び停止を切り換える。
 先ず、制御装置Cは、工程#30に移行する以前には電力変換装置4に対して補給運転モードでの動作を行わせない。つまり、自己システム10Aの交流線11に対して、電力変換装置4を介して電力系統1から電力は供給されていない。このとき、自己インバータ装置13は、自己システム10の交流線11での電力の電圧が目標電圧となるように、及び、交流線11での電力の周波数が蓄電装置12の蓄電量が大きくなるにつれて高くなる関係で決定される目標周波数となるように制御している。また、連繋インバータ装置20は、例えば、自己システム10Aの交流線11での電力の周波数(図6中で「fA」と記す)と自己システム10Bの交流線11での電力の周波数(図6中で「fB」と記す)とを検出して比較し、周波数の高い方の自己システム10から周波数の低い方の自己システム10へ電力を供給する。このとき、各自己システム10A,10Bの交流線11での電力の実際の周波数fA,fBは、各自己システム10A,10Bで決定される上記目標周波数と同じである。従って、連繋インバータ装置20は、各自己システム10A,10Bの交流線11での電力の周波数を実際に検出してもよいし、或いは、各自己システム10A,10Bの自己インバータ装置13から目標周波数についての情報を取得してもよい。
 このように、各自己システム10A,10Bの交流線11での電力の電圧及び周波数は各蓄電装置12から供給される電力によって維持される。加えて、一方の自己システム10の蓄電装置12の蓄電量が低下しても、連繋インバータ装置20Aが、交流線11での電力の周波数の低下によってその蓄電量の低下を検出して、他方の自己システム10から電力の融通を行う電力融通制御を実施することで、各自己システム10の間での蓄電装置12の蓄電量の均等化を図ることができる。
 工程#30において制御装置Cは、自己システム10の交流線11への電力系統1から受け取る補給電力の供給を開始する補給開始条件が満たされたか否かを判定する。補給開始条件の例としては、電力変換装置4を介して電力系統1に連系される自己システム10の蓄電装置12の蓄電量が所定の下限蓄電量未満であるか否かなどがある。つまり、制御装置Cが、自己システム10Aの蓄電装置12の蓄電量を検出し、その蓄電量が下限蓄電量未満であれば、制御装置Cは、補給開始条件が満たされたと判定する。このような補給開始条件を設定しておくと、自己システム10Aの蓄電装置12の蓄電量が低下したタイミングで、後述するように電力系統1から電力変換装置4を介して受け取る補給電力で蓄電装置12への充電を確実に行うことができる。つまり、蓄電装置12の蓄電量を適切なタイミングで高いレベルにまで回復させて、電力需要者Dに対する電力の供給余力を大きくしておくことができる。
 制御装置Cは、工程#30において補給開始条件が満たされたと判定した場合は工程#32に移行し、補給開始条件が満たされていないと判定した場合は工程#31に移行して電力変換装置4に対して補給運転モードでの動作を行わせない。
 制御装置Cが、工程#30において補給開始条件が満たされたと判定した場合、工程#32において制御装置Cは、電力変換装置4に対して補給運転モードで動作するように指令する。その結果、電力変換装置4は、交流線11の周波数(図6中では「fA」と記す)を検出すると共に、電力系統1から補給電力を受け取り且つその補給電力の周波数を交流線11の周波数に調節して交流線11に供給するという電力変換を行う。また、本実施形態において、制御装置Cは、電力変換装置4を補給運転モードで動作させている間であっても、自己インバータ装置13に対して、上述した通りの交流線11での電力の電圧制御及び周波数制御を行わせ、並びに、連繋インバータ装置20に対して、上述した通りの電力融通制御を行わせている。
 この電力変換装置4による補給運転モードの実行によって、電力変換装置4が電力系統1から受け取る補給電力:P1は、電力変換装置4の定格容量の範囲内であればよい。例えば、電力変換装置4は、制御装置Cから指令されて補給運転モードでの運転を実行するとき、自己の定格容量の50%の電力として予め記憶している補給電力:P1を、電力系統1から受け取って交流線11へと供給する。尚、この50%という数値はあくまでも例示目的で挙げた数値であり、本発明がこの数値に限定される訳ではない。例えば、電力変換装置4が、自己の定格容量の30%の電力を、電力系統1から受け取る補給電力:P1と設定するような変更も可能である。
 本実施形態では、上述したように、制御装置Cは、電力変換装置4を補給運転モードで動作させるのと並行して、自己インバータ装置13に対して上述した通りの交流線11での電力の電圧制御及び周波数制御を行わせている。その結果、電力系統1から電力変換装置4を介して交流線11に供給される補給電力によって交流線11の電圧が目標電圧よりも高い電圧に上昇する。その結果、自己インバータ装置13は、交流線11での電力の電圧を目標電圧にまで低下させるべく、交流線11から蓄電装置12へと電力を供給し、蓄電装置12の蓄電量が上昇する。その結果、自己インバータ装置13の動作によって、自己システム10Aの交流線11における電力の周波数が上昇する。従って、電力変換装置4が検出する交流線11での電力の周波数も上昇する。更に、制御装置Cは、連繋インバータ装置20に上記電力融通制御を行わせる。つまり、電力系統1から受け取った補給電力を用いた充電によって蓄電装置12の蓄電量が上昇するのに伴って、自己システム10Aの交流線11における電力の周波数が上昇すると、連繋インバータ装置20Aが、自己システム10Aから自己システム10Bへと電力の融通を行う。
 工程#33において制御装置Cは、補給終了条件が満たされているか否かを判定する。例えば、補給終了条件として、自己システム10Aの蓄電装置12の蓄電量が満充電レベルに到達しているか否か等がある。そして、補給終了条件が満たされている場合には工程#34に移行し、補給終了条件が満たされていない場合には工程#32にリターンする。
 そして、工程#33において制御装置Cは、補給終了条件が満たされたと判定したとき(例えば、自己システム10Aの蓄電装置12の蓄電量が満充電レベルに到達していると判定したとき)、工程#34に移行して電力変換装置4による補給運転モードの動作を停止させる。その結果、電力系統1から自己システム10Aへの電力の補給は停止される。
 上述したように、制御装置Cが、工程#32において電力変換装置4を補給運転モードで動作させている間に、それと並行して、自己インバータ装置13に対して上述した通りの交流線11での電力の電圧制御及び周波数制御を行わせ且つ連繋インバータ装置20に上記電力融通制御を行わせることで、電力系統1から供給された補給電力が自己システム10Aの蓄電装置12に充電されるだけでなく、自己システム10Bにも融通される(即ち、自己システム10Bの蓄電装置12にも供給される)こととなる。つまり、連繋インバータ装置20で電力融通制御を行わせることで各自己システム10の蓄電装置12の蓄電量が均等化されるため、自己システム10Aの蓄電装置12の蓄電量が満充電レベルに到達しているということは、全ての自己システム10の蓄電装置12の蓄電量が満充電レベルにまで均等に到達していると見なしてもよい。従って、自己システム10Aの蓄電装置12の蓄電量が満充電レベルに到達していることを補給終了条件とすることで、制御装置Cは、全ての自己システム10の蓄電装置12の蓄電量が満充電レベルに到達した状態であること、即ち、電力系統1から補給電力を受け取ることが不要になった状態であることを確認できる。
 以上のように、一つの自己システム10の交流線11への補給電力の供給を開始する補給開始条件が満たされたタイミングで電力変換装置4を補給運転モードで動作させることで、必要な量の補給電力を電力系統か1ら受け取って蓄電装置12の充電を行うことができる。また、各自己システム10は、自己システム10同士の間に設けられる連繋インバータ装置20で電気的に接続されているので、電力系統1から補給電力を受け取った自己システム10から他の自己システム10へとその補給電力を融通可能である。更に、電力変換装置4が、電力系統1から補給電力を受け取り且つその補給電力の周波数を上記目標周波数に調節して交流線11に供給することで、自己インバータ装置13が蓄電装置12の蓄電量に応じて制御している目標周波数が変動しないようにできる。その結果、電力系統1から補給電力の供給を受けている間においても、交流線11での電力の周波数が蓄電装置12の蓄電量を反映した値であることを確保できる。
<別実施形態>
<1>
 上記第1及び第2実施形態では、連系状態への切換条件を、遮断装置2を介して電力系統1に連系され得る自己システム10Aの蓄電装置12の蓄電量が下限蓄電量未満であることとした場合の例を説明したが、切換条件の内容は適宜変更可能である。例えば、設定時刻に到達したか否かを、連系状態への切換条件としてもよい。つまり、制御装置Cが、設定時刻になれば連系状態への切換条件が満たされたと判定して、電力系統1と自己システム10Aとの連系を行わせてもよい。このように、設定時刻に到達したときに連系状態への切換条件が満たされたとすることで、設定時刻において定期的に電力系統1から受け取る補給電力で蓄電装置12の充電を行うことができる。例えば、1日の中で電力需要が増大する時間帯の前に上記設定時刻を設定しておけば、電力需要が増大する時間帯に先立って電力需要者Dに対する電力の供給余力を大きくしておくことができる。
 更に、遮断装置2を介して電力系統1に連系され得る自己システム10Aの自己インバータ装置13が電力系統1から受け取る補給電力:P1の大きさに関しても、上記第1及び第2実施形態と別の設定手法を採用してもよい。例えば、本別実施形態のように、設定時刻に到達したときに上記連系状態への切換条件が満たされたと判定するようにした場合、切換条件が満たされた時点での自己システム10Aの蓄電装置12の蓄電量は様々であるため、自己システム10Aの自己インバータ装置13が電力系統1から供給を受ける補給電力:P1をその蓄電量に応じて変化させてもよい。具体的には、制御装置Cは、連系状態への切換条件が満たされたと判定したときの、遮断装置2を介して電力系統1に連系され得る自己システム10Aの蓄電装置12の蓄電量の大きさに応じて、充電運転モードにおいて自己インバータ装置13が電力系統1から受け取る補給電力:P1の大きさを変更してもよい。
 例えば、制御装置Cは、連系状態への切換条件が満たされたと判定すると、遮断装置2を介して電力系統1に連系され得る自己システム10Aの蓄電装置12の蓄電量を検出する。そして、制御装置Cは、その蓄電装置12の蓄電量が少ないほど電力系統1から受け取る補給電力:P1が大きくなるように自己インバータ装置13を動作させる。例えば、制御装置Cは、蓄電装置12の蓄電量が満充電の50%以上のレベルであれば電力系統1から受け取る補給電力:P1を自己インバータ装置13の定格容量の30%と設定して電力系統1から電力供給を受け、蓄電装置12の蓄電量が満充電の50%未満であれば電力系統1から受け取る補給電力:P1を自己インバータ装置13の定格容量の50%と設定して電力系統1から電力供給を受けるような充電運転モードで自己インバータ装置13を動作させることもできる。
 他にも、発電電力が天候に応じて変化する自然エネルギ発電装置を発電装置15として備える自己システム10の場合、制御装置Cが、将来(例えば翌日など)に予測される天候情報に応じて、連系状態への切換条件を変更してもよい。上記第1及び第2実施形態では、蓄電装置12の蓄電量が下限蓄電量未満になると連系状態への切換条件が満たされたと判定する例を示したが、例えばその下限蓄電量の大きさを変更することで、連系状態への切換条件を実質的に変更できる。このような自然エネルギ発電装置の例としては、「晴れ」、「曇り」、「雨」などの天候に応じて発電電力が変化する太陽光発電装置や、風速やその風の吹いている期間などの天候に応じて発電電力が変化する風力発電装置などがある。
 具体的には、複数個の自己システム10のうちの少なくとも一つの自己システム10の交流線11に太陽光発電装置が発電装置15として接続されている場合、制御装置Cは、通信ネットワーク(図示せず)などを介して将来に予測される天候情報を取得し、その天候情報に応じて下限蓄電量の大きさを変更することで連系状態への切換条件を変更する。一例を挙げると、制御装置Cは、翌日に予測される天候が晴れであれば(即ち、蓄電装置12の蓄電量の大きな上昇が期待できれば)、下限蓄電量を蓄電装置12の満充電の50%に設定して、自己システム10の蓄電装置12の蓄電量が満充電の50%未満になったときに連系状態への切換条件が満たされたと判定する。更に、制御装置Cは、翌日に予測される天候が曇りであれば(即ち、蓄電装置12の蓄電量の上昇が僅かに期待できれば)、下限蓄電量を蓄電装置12の満充電の60%に設定して、自己システム10の蓄電装置12の蓄電量が満充電の60%未満になったときに連系状態への切換条件が満たされたと判定する。また更に、制御装置Cは、翌日に予測される天候が雨であれば(即ち、蓄電装置12の蓄電量の上昇がほとんど期待できなければ)、下限蓄電量を蓄電装置12の満充電の80%に設定して、自己システム10の蓄電装置12の蓄電量が満充電の80%未満になったときに連系状態への切換条件が満たされたと判定するように改変することもできる。
 他にも、制御装置Cが、電力供給システムSを構成する複数の自己システム10での蓄電装置12での実際の蓄電量の合計が、全ての蓄電装置12の満充電時の蓄電量の合計に対する所定割合未満(例えば50%未満)になったときに連系状態への切換条件が満たされたと判定するように改変することもできる。
 他にも、制御装置Cが、電力系統1から電力の供給を受けるときの買電の電力単価が、設定単価未満になったときに連系状態への切換条件が満たされたと判定するように改変することもできる。
 更に、制御装置Cが、上述した切換条件を複数個組み合わせて採用してもよい。例えば、制御装置Cが、遮断装置2を介して電力系統1に連系され得る自己システム10の蓄電装置12の蓄電量が下限蓄電量未満であること、及び、設定時刻に到達したことの何れか一方が満たされたことを、連系状態への切換条件としてもよい。その場合、制御装置Cは、蓄電装置12の蓄電量が下限蓄電量未満になっていなくても、設定時刻になれば連系状態への切換条件が満たされたと判定し、或いは、設定時刻の前であっても、蓄電装置12の蓄電量が下限蓄電量未満になれば連系状態への切換条件が満たされたと判定する。
<2>
 上記第1及び第2実施形態では、制御装置Cが、電力供給システムSを構成する一つの自己システム10の交流線11に対して電力系統1が連系されているとき、及び、電力系統1が連系されていないときの両方で(即ち、自己インバータ装置13を解列時運転モードで動作させているとき、及び、充電運転モードで動作させているときの両方で)、連繋インバータ装置20に対して上記電力融通制御を行わせる例を説明したが、連繋インバータ装置20に行わせる制御の内容を変更してもよい。
 例えば、制御装置Cが、電力供給システムSを構成する一つの自己システム10Aの交流線11に対して電力系統1が連系されているとき、即ち、上述した充電運転モードで自己システム10Aの自己インバータ装置13を動作させているとき、隣接する二つの自己システムの間で連繋インバータ装置20が融通する電力を上記補給電力が大きくなるにつれて大きくするような制御を行わせてもよい。つまり、制御装置Cは、連繋インバータ装置20が上記補給電力P1の関数で決定される電力の融通を行うように制御してもよい。
<3>
 上記第3実施形態では、本発明に係る電力供給システムS3の構成例を図4に示したが、電力供給システムS3の構成は適宜変更可能である。例えば、図4では、充電用インバータ装置3を自己システム10Aに対して接続した例を示したが、充電用インバータ装置3を自己システム10Bに対して接続してもよい。或いは、複数の自己システム10に対して充電用インバータ装置3が各別に接続されるような構成も可能である。
<4>
 上記第3実施形態では、充電開始条件を、充電用インバータ装置3を介して電力系統1に連系される自己システム10の蓄電装置12の蓄電量が下限蓄電量未満であることとした場合の例を説明したが、この充電開始条件の内容は適宜変更可能である。例えば、設定時刻に到達したか否かを、充電開始条件としてもよい。つまり、制御装置Cが、設定時刻になれば充電開始条件が満たされたと判定して、充電用インバータ装置3に対して充電運転モードでの動作を行わせてもよい。このように、設定時刻に到達したときに充電開始条件が満たされたとすることで、設定時刻において定期的に電力系統1から受け取る補給電力で蓄電装置12の充電を行うことができる。例えば、1日の中で電力需要が増大する時間帯の前に上記設定時刻を設定しておけば、電力需要が増大する時間帯に先立って電力需要者Dに対する電力の供給余力を大きくしておくことができる。
 更に、充電用インバータ装置3が電力系統1から受け取る補給電力:P1の大きさに関しても、上記第3実施形態と別の設定手法を採用してもよい。
 例えば、本別実施形態のように、設定時刻に到達したときに上記充電開始条件が満たされたと判定するようにした場合、充電開始条件が満たされた時点での自己システム10Aの蓄電装置12の蓄電量は様々であるため、充電用インバータ装置3が電力系統1から供給を受ける補給電力:P1をその蓄電量に応じて変化させてもよい。具体的には、制御装置Cは、充電開始条件が満たされたと判定したときの、充電用インバータ装置3を介して電力系統1に接続される自己システム10Aの蓄電装置12の蓄電量の大きさに応じて、充電運転モードにおいて充電用インバータ装置3が電力系統1から受け取る補給電力:P1の大きさを変更してもよい。
 例えば、制御装置Cは、充電開始条件が満たされたと判定すると、充電用インバータ装置3を介して電力系統1に連系される自己システム10Aの蓄電装置12の蓄電量を検出する。そして、制御装置Cは、その蓄電装置12の蓄電量が少ないほど電力系統1から受け取る補給電力:P1が大きくなるように充電用インバータ装置3を動作させる。例えば、制御装置Cは、蓄電装置12の蓄電量が満充電の50%以上のレベルであれば電力系統1から受け取る補給電力:P1を充電用インバータ装置3の定格容量の30%と設定して電力系統1から電力供給を受け、蓄電装置12の蓄電量が満充電の50%未満であれば電力系統1から受け取る補給電力:P1を充電用インバータ装置3の定格容量の50%と設定して電力系統1から電力供給を受けるような充電運転モードで充電用インバータ装置3を動作させることもできる。
 他にも、発電電力が天候に応じて変化する自然エネルギ発電装置を発電装置15として備える自己システム10の場合、制御装置Cが、将来(例えば翌日など)に予測される天候情報に応じて、充電開始条件を変更してもよい。上記第3実施形態では、蓄電装置12の蓄電量が下限蓄電量未満になると充電開始条件が満たされたと判定する例を示したが、例えばその下限蓄電量の大きさを変更することで、充電開始条件を実質的に変更できる。このような自然エネルギ発電装置の例としては、「晴れ」、「曇り」、「雨」などの天候に応じて発電電力が変化する太陽光発電装置や、風速やその風の吹いている期間などの天候に応じて発電電力が変化する風力発電装置などがある。
 具体的には、複数個の自己システム10のうちの少なくとも一つの自己システム10の交流線11に太陽光発電装置が発電装置15として接続されている場合、制御装置Cは、通信ネットワーク(図示せず)などを介して将来に予測される天候情報を取得し、その天候情報に応じて下限蓄電量の大きさを変更することで連系状態への切換条件を変更する。一例を挙げると、制御装置Cは、翌日に予測される天候が晴れであれば(即ち、蓄電装置12の蓄電量の大きな上昇が期待できれば)、下限蓄電量を蓄電装置12の満充電の50%に設定して、自己システム10の蓄電装置12の蓄電量が満充電の50%未満になったときに充電開始条件が満たされたと判定する。更に、制御装置Cは、翌日に予測される天候が曇りであれば(即ち、蓄電装置12の蓄電量の上昇が僅かに期待できれば)、下限蓄電量を蓄電装置12の満充電の60%に設定して、自己システム10の蓄電装置12の蓄電量が満充電の60%未満になったときに充電開始条件が満たされたと判定する。また更に、制御装置Cは、翌日に予測される天候が雨であれば(即ち、蓄電装置12の蓄電量の上昇がほとんど期待できなければ)、下限蓄電量を蓄電装置12の満充電の80%に設定して、自己システム10の蓄電装置12の蓄電量が満充電の80%未満になったときに充電開始条件が満たされたと判定するように改変することもできる。
 他にも、制御装置Cが、電力供給システムS3を構成する複数の自己システム10での蓄電装置12での実際の蓄電量の合計が、全ての蓄電装置12の満充電時の蓄電量の合計に対する所定割合未満(例えば50%未満)になったときに充電開始条件が満たされたと判定するように改変することもできる。
 他にも、制御装置Cが、電力系統1から電力の供給を受けるときの買電の電力単価が、設定単価未満になったときに充電開始条件が満たされたと判定するように改変することもできる。
 更に、制御装置Cが、上述した切換条件を複数個組み合わせて採用してもよい。例えば、制御装置Cが、遮断装置2を介して電力系統1に連系され得る自己システム10の蓄電装置12の蓄電量が下限蓄電量未満であること、及び、設定時刻に到達したことの何れか一方が満たされたことを、連系状態への切換条件としてもよい。その場合、制御装置Cは、蓄電装置12の蓄電量が下限蓄電量未満になっていなくても、設定時刻になれば連系状態への切換条件が満たされたと判定し、或いは、設定時刻の前であっても、蓄電装置12の蓄電量が下限蓄電量未満になれば連系状態への切換条件が満たされたと判定する。
<5>
 上記第3実施形態では、制御装置Cが、充電用インバータ装置3に対して充電運転モードで動作させているとき、及び、充電運転モードで動作させていないときの両方で、連繋インバータ装置20に対して上記電力融通制御を行わせる例を説明したが、連繋インバータ装置20に行わせる制御の内容を変更してもよい。
 例えば、制御装置Cが、充電用インバータ装置3に対して充電運転モードで動作させているとき、即ち、自己システム10が電力系統1から補給電力:P1の供給を受けているとき、隣接する二つの自己システムの間で連繋インバータ装置20が融通する電力を上記補給電力が大きくなるにつれて大きくするような制御を行わせてもよい。つまり、制御装置Cは、連繋インバータ装置20が上記補給電力P1の関数で決定される電力の融通を行うように制御してもよい。
<6>
 上記第4実施形態では、本発明に係る電力供給システムS4の構成例を図6に示したが、電力供給システムS4の構成は適宜変更可能である。例えば、図6では、電力変換装置4を自己システム10Aの交流線11に対して接続した例を示したが、電力変換装置4を自己システム10Bの交流線11に対して接続してもよい。或いは、複数の自己システム10に対して電力変換装置4が各別に接続されるような構成も可能である。
<7>
 上記第4実施形態では、補給開始条件を、電力変換装置4を介して電力系統1に連系される自己システム10の蓄電装置12の蓄電量が下限蓄電量未満であることとした場合の例を説明したが、この補給開始条件の内容は適宜変更可能である。例えば、設定時刻に到達したか否かを、補給開始条件としてもよい。つまり、制御装置Cが、設定時刻になれば補給開始条件が満たされたと判定して、電力変換装置4に対して補給運転モードでの動作を行わせてもよい。このように、設定時刻に到達したときに補給開始条件が満たされたとすることで、設定時刻において定期的に電力系統1から受け取る補給電力で蓄電装置12の充電を行うことができる。例えば、1日の中で電力需要が増大する時間帯の前に上記設定時刻を設定しておけば、電力需要が増大する時間帯に先立って電力需要者Dに対する電力の供給余力を大きくしておくことができる。
 更に、電力変換装置4が電力系統1から受け取る補給電力:P1の大きさに関しても、上記第4実施形態と別の設定手法を採用してもよい。
 例えば、本別実施形態のように、設定時刻に到達したときに上記補給開始条件が満たされたと判定するようにした場合、補給開始条件が満たされた時点での自己システム10Aの蓄電装置12の蓄電量は様々であるため、電力変換装置4が電力系統1から供給を受ける補給電力:P1をその蓄電量に応じて変化させてもよい。具体的には、制御装置Cは、補給開始条件が満たされたと判定したときの、電力変換装置4を介して電力系統1に接続される自己システム10Aの蓄電装置12の蓄電量の大きさに応じて、補給運転モードにおいて電力変換装置4が電力系統1から受け取る補給電力:P1の大きさを変更してもよい。
 例えば、制御装置Cは、補給開始条件が満たされたと判定すると、電力変換装置4を介して電力系統1に連系される自己システム10Aの蓄電装置12の蓄電量を検出する。そして、制御装置Cは、その蓄電装置12の蓄電量が少ないほど電力系統1から受け取る補給電力:P1が大きくなるように電力変換装置4を動作させる。例えば、制御装置Cは、蓄電装置12の蓄電量が満充電の50%以上のレベルであれば電力系統1から受け取る補給電力:P1を電力変換装置4の定格容量の30%と設定して電力系統1から電力供給を受け、蓄電装置12の蓄電量が満充電の50%未満であれば電力系統1から受け取る補給電力:P1を電力変換装置4の定格容量の50%と設定して電力系統1から電力供給を受けるような補給運転モードで電力変換装置4を動作させることもできる。
 他にも、発電電力が天候に応じて変化する自然エネルギ発電装置を発電装置15として備える自己システム10の場合、制御装置Cが、将来(例えば翌日など)に予測される天候情報に応じて、補給開始条件を変更してもよい。上記第4実施形態では、蓄電装置12の蓄電量が下限蓄電量未満になると補給開始条件が満たされたと判定する例を示したが、例えばその下限蓄電量の大きさを変更することで、補給開始条件を実質的に変更できる。このような自然エネルギ発電装置の例としては、「晴れ」、「曇り」、「雨」などの天候に応じて発電電力が変化する太陽光発電装置や、風速やその風の吹いている期間などの天候に応じて発電電力が変化する風力発電装置などがある。
 具体的には、複数個の自己システム10のうちの少なくとも一つの自己システム10の交流線11に太陽光発電装置が発電装置15として接続されている場合、制御装置Cは、通信ネットワーク(図示せず)などを介して将来に予測される天候情報を取得し、その天候情報に応じて下限蓄電量の大きさを変更することで連系状態への切換条件を変更する。一例を挙げると、制御装置Cは、翌日に予測される天候が晴れであれば(即ち、蓄電装置12の蓄電量の大きな上昇が期待できれば)、下限蓄電量を蓄電装置12の満充電の50%に設定して、自己システム10の蓄電装置12の蓄電量が満充電の50%未満になったときに補給開始条件が満たされたと判定する。更に、制御装置Cは、翌日に予測される天候が曇りであれば(即ち、蓄電装置12の蓄電量の上昇が僅かに期待できれば)、下限蓄電量を蓄電装置12の満充電の60%に設定して、自己システム10の蓄電装置12の蓄電量が満充電の60%未満になったときに補給開始条件が満たされたと判定する。また更に、制御装置Cは、翌日に予測される天候が雨であれば(即ち、蓄電装置12の蓄電量の上昇がほとんど期待できなければ)、下限蓄電量を蓄電装置12の満充電の80%に設定して、自己システム10の蓄電装置12の蓄電量が満充電の80%未満になったときに補給開始条件が満たされたと判定するように改変することもできる。
 他にも、制御装置Cが、電力供給システムS4を構成する複数の自己システム10での蓄電装置12での実際の蓄電量の合計が、全ての蓄電装置12の満充電時の蓄電量の合計に対する所定割合未満(例えば50%未満)になったときに補給開始条件が満たされたと判定するように改変することもできる。
 他にも、制御装置Cが、電力系統1から電力の供給を受けるときの買電の電力単価が、設定単価未満になったときに補給開始条件が満たされたと判定するように改変することもできる。
 更に、制御装置Cが、上述した切換条件を複数個組み合わせて採用してもよい。例えば、制御装置Cが、遮断装置2を介して電力系統1に連系され得る自己システム10の蓄電装置12の蓄電量が下限蓄電量未満であること、及び、設定時刻に到達したことの何れか一方が満たされたことを、連系状態への切換条件としてもよい。その場合、制御装置Cは、蓄電装置12の蓄電量が下限蓄電量未満になっていなくても、設定時刻になれば連系状態への切換条件が満たされたと判定し、或いは、設定時刻の前であっても、蓄電装置12の蓄電量が下限蓄電量未満になれば連系状態への切換条件が満たされたと判定する。
<8>
 上記第4実施形態では、制御装置Cが、電力変換装置4に対して補給運転モードで動作させているとき、及び、補給運転モードで動作させていないときの両方で、連繋インバータ装置20に対して上記電力融通制御を行わせる例を説明したが、連繋インバータ装置20に行わせる制御の内容を変更してもよい。
 例えば、制御装置Cが、電力変換装置4に対して補給運転モードで動作させているとき、即ち、自己システム10が電力系統1から補給電力:P1の供給を受けているとき、隣接する二つの自己システムの間で連繋インバータ装置20が融通する電力を上記補給電力が大きくなるにつれて大きくするような制御を行わせてもよい。つまり、制御装置Cは、連繋インバータ装置20が上記補給電力P1の関数で決定される電力の融通を行うように制御してもよい。
<9>
 上記第4実施形態では、電力変換装置4が、交流/直流変換部4aと、直流/交流変換部4bと、それらの間を接続する直流接続部4cとを有するように構成される例を説明したが、他の構成の電力変換装置4を用いることもできる。例えば、交流電力を、直流部を経ずに所望の電圧及び周波数の交流電力に直接変換するマトリクスコンバータなどの直接型の交流/交流変換回路を用いて電力変換装置4を構成してもよい。
 本発明は、電力需要者に対する電力の供給余力を大きくしておくことができる電力供給システムに利用できる。
 

Claims (18)

  1.  複数の電力需要者が接続されている交流線と、蓄電装置と、前記蓄電装置と前記交流線とを接続する自己インバータ装置とを有する自己システムを複数個備え、
     複数個の前記自己システムが電気的に直列接続されるように、一つの前記自己システムが有する前記蓄電装置と他の一つの前記自己システムが有する前記交流線とを接続する連繋インバータ装置を前記自己システム同士の間に備える電力供給システムであって、
     複数個の前記自己システムのうちの一つの自己システムの前記交流線と外部の電力系統とを連系状態及び解列状態の何れか一方に切換可能な遮断装置と、
     前記自己インバータ装置及び前記連繋インバータ装置及び前記遮断装置の動作を制御可能な制御装置とを備え、
     前記制御装置は、
     前記遮断装置を介して前記電力系統に連系され得る前記自己システムの前記交流線と前記電力系統とが前記解列状態にあるとき、複数個の前記自己システムのそれぞれの前記自己インバータ装置を、前記交流線での電力の電圧が目標電圧となるように及び前記交流線での電力の周波数が前記蓄電装置の蓄電量に応じて決定される目標周波数となるように制御する解列時運転モードで動作させ、
     前記連系状態への切換条件が満たされたと判定すると、前記遮断装置を介して前記電力系統に連系され得る前記自己システムについて、前記解列時運転モードでの前記自己インバータ装置の動作を停止させると共に前記遮断装置を動作させて前記連系状態に切り換えた後、前記電力系統から受け取る補給電力を前記蓄電装置への充電に用いる充電運転モードで前記自己インバータ装置を動作させる電力供給システム。
  2.  前記制御装置は、設定時刻に到達すると前記連系状態への切換条件が満たされたと判定する請求項1に記載の電力供給システム。
  3.  前記制御装置は、前記遮断装置を介して前記電力系統に連系され得る前記自己システムの前記蓄電装置の蓄電量が下限蓄電量未満になると前記連系状態への切換条件が満たされたと判定する請求項1又は2に記載の電力供給システム。
  4.  前記制御装置は、前記連系状態への切換条件が満たされたと判定したときの、前記遮断装置を介して前記電力系統に連系され得る前記自己システムの前記蓄電装置の蓄電量の大きさに応じて、前記充電運転モードにおいて前記自己インバータ装置が前記電力系統から受け取る前記補給電力の大きさを変更する請求項1~3の何れか一項に記載の電力供給システム。
  5.  前記制御装置は、前記充電運転モードで前記自己インバータ装置を動作させているとき、隣接する二つの前記自己システムの間で前記連繋インバータ装置が融通する電力を前記補給電力が大きくなるにつれて大きくする請求項1~4の何れか一項に記載の電力供給システム。
  6.  複数の電力需要者が接続されている交流線と、蓄電装置と、前記蓄電装置と前記交流線とを接続する自己インバータ装置とを有する自己システムを複数個備え、
     複数個の前記自己システムが電気的に直列接続されるように、一つの前記自己システムが有する前記蓄電装置と他の一つの前記自己システムが有する前記交流線とを接続する連繋インバータ装置を前記自己システム同士の間に備える電力供給システムであって、
     複数個の前記自己システムのうちの一つの自己システムの前記蓄電装置と外部の電力系統との間を接続し、前記電力系統から受け取る補給電力を前記蓄電装置への充電に利用させることができる充電用インバータ装置と、
     前記自己インバータ装置及び前記連繋インバータ装置及び前記充電用インバータ装置の動作を制御する制御装置とを備え、
     前記制御装置は、
     複数個の前記自己システムのそれぞれの前記自己インバータ装置を、前記交流線での電力の電圧が目標電圧となるように及び前記交流線での電力の周波数が前記蓄電装置の蓄電量に応じて決定される目標周波数となるように制御し、
     充電開始条件が満たされたと判定すると、前記電力系統から前記補給電力を受け取って前記蓄電装置への充電に利用させる充電運転モードで前記充電用インバータ装置を動作させる電力供給システム。
  7.  前記制御装置は、設定時刻に到達すると前記充電開始条件が満たされたと判定する請求項6に記載の電力供給システム。
  8.  前記制御装置は、前記充電用インバータ装置を介して前記電力系統に接続される前記自己システムの前記蓄電装置の蓄電量が下限蓄電量未満になると前記充電開始条件が満たされたと判定する請求項6又は7に記載の電力供給システム。
  9.  前記制御装置は、前記充電開始条件が満たされたと判定したときの、前記充電用インバータ装置を介して前記電力系統に接続される前記自己システムの前記蓄電装置の蓄電量の大きさに応じて、前記充電運転モードにおいて前記充電用インバータ装置が前記電力系統から受け取る前記補給電力の大きさを変更する請求項6~8の何れか一項に記載の電力供給システム。
  10.  前記制御装置は、前記充電運転モードで前記充電用インバータ装置を動作させているとき、隣接する二つの前記自己システムの間で前記連繋インバータ装置が融通する電力を前記補給電力が大きくなるにつれて大きくする請求項6~9の何れか一項に記載の電力供給システム。
  11.  複数の電力需要者が接続されている交流線と、蓄電装置と、前記蓄電装置と前記交流線とを接続する自己インバータ装置とを有する自己システムを複数個備え、
     複数個の前記自己システムが電気的に直列接続されるように、一つの前記自己システムが有する前記蓄電装置と他の一つの前記自己システムが有する前記交流線とを接続する連繋インバータ装置を前記自己システム同士の間に備える電力供給システムであって、
     複数個の前記自己システムのうちの一つの自己システムの前記交流線と外部の電力系統とを接続する電力変換装置と、
     前記自己インバータ装置及び前記連繋インバータ装置及び前記電力変換装置の動作を制御可能な制御装置とを備え、
     前記制御装置は、
     複数個の前記自己システムのそれぞれの前記自己インバータ装置を、前記交流線での電力の電圧が目標電圧となるように及び前記交流線での電力の周波数が前記蓄電装置の蓄電量に応じて決定される目標周波数となるように制御し、
     前記一つの自己システムの前記交流線への前記電力系統から受け取る補給電力の供給を開始する補給開始条件が満たされたと判定すると、前記電力系統から補給電力を受け取り且つ当該補給電力の周波数を前記目標周波数に調節して前記交流線に供給する補給運転モードで前記電力変換装置を動作させる電力供給システム。
  12.  前記制御装置は、設定時刻に到達すると前記補給開始条件が満たされたと判定する請求項11に記載の電力供給システム。
  13.  前記制御装置は、前記電力変換装置を介して前記電力系統に接続される前記自己システムの前記蓄電装置の蓄電量が下限蓄電量未満になると前記補給開始条件が満たされたと判定する請求項11又は12に記載の電力供給システム。
  14.  前記電力変換装置が、前記電力系統から供給される前記補給電力を所望の直流電力に変換する交流/直流変換部と、当該交流/直流変換部で生成された直流電力を所望の交流電力に変換して前記交流線に供給する直流/交流変換部と、前記交流/直流変換部と前記直流/交流変換部との間を接続する直流接続部とを有する請求項11~13の何れか一項に記載の電力供給システム。
  15.  前記制御装置は、前記補給開始条件が満たされたと判定したときの、前記電力変換装置を介して前記電力系統に接続される前記自己システムの前記蓄電装置の蓄電量の大きさに応じて、前記補給運転モードにおいて前記電力変換装置が前記電力系統から受け取る前記補給電力の大きさを変更する請求項11~14の何れか一項に記載の電力供給システム。
  16.  前記制御装置は、前記補給運転モードで前記電力変換装置を動作させているとき、隣接する二つの前記自己システムの間で前記連繋インバータ装置が融通する電力を前記補給電力が大きくなるにつれて大きくする請求項11~15の何れか一項に記載の電力供給システム。
  17.  複数個の前記自己システムのうちの少なくとも一つの自己システムの前記交流線に、発電電力が天候に応じて変化する自然エネルギ発電装置が接続され、
     前記制御装置は、将来に予測される天候に応じて前記下限蓄電量の大きさを変更する請求項3又は8又は13に記載の電力供給システム。
  18.  前記制御装置は、一つの前記連繋インバータ装置を介して電気的に接続されて互いに隣接している二つの前記自己システムに関して、それぞれの前記蓄電装置の蓄電量に応じて決定されている前記目標周波数に基づいて、前記蓄電装置の蓄電量が相対的に大きい自己システムから、前記蓄電装置の蓄電量が相対的に小さい自己システムへと電力を融通するように前記連繋インバータ装置の動作を制御する請求項1~17の何れか一項に記載の電力供給システム。
     
PCT/JP2012/063339 2012-05-24 2012-05-24 電力供給システム Ceased WO2013175612A1 (ja)

Priority Applications (7)

Application Number Priority Date Filing Date Title
CN201280073400.4A CN104662764A (zh) 2012-05-24 2012-05-24 电力供给系统
JP2014516590A JP5945594B2 (ja) 2012-05-24 2012-05-24 電力供給システム
EP12877259.7A EP2858200B1 (en) 2012-05-24 2012-05-24 Power supply system
US14/402,255 US9866022B2 (en) 2012-05-24 2012-05-24 Power supply system
PCT/JP2012/063339 WO2013175612A1 (ja) 2012-05-24 2012-05-24 電力供給システム
AU2012380449A AU2012380449B2 (en) 2012-05-24 2012-05-24 Power supply system
PH12014502631A PH12014502631A1 (en) 2012-05-24 2014-11-24 Power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/063339 WO2013175612A1 (ja) 2012-05-24 2012-05-24 電力供給システム

Publications (1)

Publication Number Publication Date
WO2013175612A1 true WO2013175612A1 (ja) 2013-11-28

Family

ID=49623343

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/063339 Ceased WO2013175612A1 (ja) 2012-05-24 2012-05-24 電力供給システム

Country Status (7)

Country Link
US (1) US9866022B2 (ja)
EP (1) EP2858200B1 (ja)
JP (1) JP5945594B2 (ja)
CN (1) CN104662764A (ja)
AU (1) AU2012380449B2 (ja)
PH (1) PH12014502631A1 (ja)
WO (1) WO2013175612A1 (ja)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015159662A (ja) * 2014-02-24 2015-09-03 大阪瓦斯株式会社 電力供給システム
JP2015171294A (ja) * 2014-03-10 2015-09-28 大阪瓦斯株式会社 電力供給システム
JP2015173517A (ja) * 2014-03-11 2015-10-01 大阪瓦斯株式会社 電力供給システム
JP2015201992A (ja) * 2014-04-09 2015-11-12 大阪瓦斯株式会社 電力供給システム
JP2015233384A (ja) * 2014-06-10 2015-12-24 大阪瓦斯株式会社 電力需給システム
JP2015233385A (ja) * 2014-06-10 2015-12-24 大阪瓦斯株式会社 電力需給システム
KR20190020316A (ko) * 2016-06-15 2019-02-28 파워블록스 에이쥐 전기 에너지 공급 유닛 및 그 제어 방법

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102014212451B4 (de) * 2014-06-27 2023-09-07 Vitesco Technologies GmbH Vorrichtung und Verfahren zur Regelung eines Ladezustands eines elektrischen Energiespeichers
FR3066863B1 (fr) * 2017-05-24 2020-10-09 Commissariat Energie Atomique Dispositif d'interfacage entre un reseau electrique general et un reseau electrique local permettant un echange local d'energie
US10959359B2 (en) * 2017-06-30 2021-03-23 Toshiba Mitsubishi-Electric Industrial Systems Corporation Power conversion device
DE102018104604A1 (de) * 2018-02-28 2019-08-29 Sma Solar Technology Ag Vorrichtung zur Verbindung eines Teilnetzes mit einem Wechselspannungsnetz und Verfahren zur Regelung einer elektrischen Leistung
CN110912227A (zh) * 2019-11-29 2020-03-24 惠州Tcl移动通信有限公司 一种充放电结构及充电方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006174540A (ja) * 2004-12-13 2006-06-29 Takenaka Komuten Co Ltd 自律分散制御型蓄電システム
WO2010103650A1 (ja) 2009-03-12 2010-09-16 Vpec株式会社 交流の自律分散型の電力システム
JP2011061970A (ja) * 2009-09-10 2011-03-24 Rikiya Abe 多端子型非同期連系装置、電力機器制御端末装置と電力ネットワークシステムおよびその制御方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6985799B2 (en) * 2003-05-13 2006-01-10 Bae Systems Controls, Inc. Energy storage modules and management system
JP4648138B2 (ja) 2005-09-12 2011-03-09 三菱電機株式会社 電力バッファ装置
JP4944578B2 (ja) * 2006-11-14 2012-06-06 財団法人電力中央研究所 低圧系統の自立運転方法及び低圧系統の自立運転システム
WO2011055186A1 (ja) 2009-11-06 2011-05-12 パナソニック電工株式会社 配電システム
CN201742093U (zh) 2010-06-30 2011-02-09 周锡卫 一种层级构造的分布式电源智能电网系统
CN101895115B (zh) 2010-06-30 2013-03-13 周锡卫 一种层级构造的分布式电源智能电网构建方法
JP5609379B2 (ja) 2010-07-28 2014-10-22 パナソニック株式会社 ハイブリッド電源装置
CN202009272U (zh) 2011-05-10 2011-10-12 杭州绿安智能电网技术有限公司 层级分布式电网系统
CN102427243B (zh) 2011-10-28 2014-05-07 华中科技大学 一种将风电场和常规电厂联合并网的多端直流输电系统

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006174540A (ja) * 2004-12-13 2006-06-29 Takenaka Komuten Co Ltd 自律分散制御型蓄電システム
WO2010103650A1 (ja) 2009-03-12 2010-09-16 Vpec株式会社 交流の自律分散型の電力システム
JP2011061970A (ja) * 2009-09-10 2011-03-24 Rikiya Abe 多端子型非同期連系装置、電力機器制御端末装置と電力ネットワークシステムおよびその制御方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015159662A (ja) * 2014-02-24 2015-09-03 大阪瓦斯株式会社 電力供給システム
JP2015171294A (ja) * 2014-03-10 2015-09-28 大阪瓦斯株式会社 電力供給システム
JP2015173517A (ja) * 2014-03-11 2015-10-01 大阪瓦斯株式会社 電力供給システム
JP2015201992A (ja) * 2014-04-09 2015-11-12 大阪瓦斯株式会社 電力供給システム
JP2015233384A (ja) * 2014-06-10 2015-12-24 大阪瓦斯株式会社 電力需給システム
JP2015233385A (ja) * 2014-06-10 2015-12-24 大阪瓦斯株式会社 電力需給システム
KR20190020316A (ko) * 2016-06-15 2019-02-28 파워블록스 에이쥐 전기 에너지 공급 유닛 및 그 제어 방법
US11296537B2 (en) 2016-06-15 2022-04-05 Power-Blox Ag Electrical energy supply unit and control therefor
KR102415745B1 (ko) * 2016-06-15 2022-07-01 파워블록스 에이쥐 전기 에너지 공급 유닛 및 그 제어 방법

Also Published As

Publication number Publication date
EP2858200A1 (en) 2015-04-08
US9866022B2 (en) 2018-01-09
US20150207322A1 (en) 2015-07-23
PH12014502631A1 (en) 2015-01-26
JPWO2013175612A1 (ja) 2016-01-12
EP2858200A4 (en) 2016-03-02
JP5945594B2 (ja) 2016-07-05
AU2012380449B2 (en) 2017-03-16
EP2858200B1 (en) 2018-08-08
AU2012380449A1 (en) 2014-12-18
CN104662764A (zh) 2015-05-27

Similar Documents

Publication Publication Date Title
JP5945594B2 (ja) 電力供給システム
US8710699B2 (en) Dual use photovoltaic system
US11205902B2 (en) Energy storage system
US20130147274A1 (en) Power management apparatus and method of operating the same
CN107005057B (zh) 用于在与公用电网断开期间协调风电场的控制的方法和控制器
CN112234597B (zh) 一种低压直流协调控制方法、系统及装置
JP2010130836A (ja) 電力供給システム及び電力切替装置
JP5475387B2 (ja) 電力供給システムの電源最適化装置
WO2013015256A1 (ja) 電力管理システム及び管理方法
WO2011114422A1 (ja) 電力供給システム、電力供給方法、プログラム、記録媒体及び電力供給制御装置
KR20170026695A (ko) 하이브리드 에너지저장 시스템
KR102222560B1 (ko) 에너지 저장 시스템
KR20150085227A (ko) 에너지 저장 시스템 및 그의 제어 방법
JP2015233403A (ja) 電力充電供給装置
JP2016103915A (ja) 蓄電池システムおよび蓄電方法
US11205911B2 (en) Energy storage system
JP2014121151A (ja) 蓄電システム及び電力供給システム
JP5820984B2 (ja) 配電システム
CN103166303A (zh) 电能管理装置及其操作方法
JP2020043748A (ja) 電力変換システム
JP2012227999A (ja) 太陽光蓄発電システム
JP6704479B2 (ja) 電力供給システム、電力供給機器及び電力供給システムの制御方法
JP6208617B2 (ja) 電力制御システム、電力制御装置、および電力制御システムの制御方法
JP5879559B2 (ja) 配電システム
WO2025105186A1 (ja) Dcマイクログリッド、およびdcマイクログリッドの制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12877259

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2014516590

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2012877259

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2012380449

Country of ref document: AU

Date of ref document: 20120524

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: IDP00201408085

Country of ref document: ID

WWE Wipo information: entry into national phase

Ref document number: 14402255

Country of ref document: US