WO2014120080A1 - Lng carrier construction method - Google Patents

Lng carrier construction method Download PDF

Info

Publication number
WO2014120080A1
WO2014120080A1 PCT/SG2013/000036 SG2013000036W WO2014120080A1 WO 2014120080 A1 WO2014120080 A1 WO 2014120080A1 SG 2013000036 W SG2013000036 W SG 2013000036W WO 2014120080 A1 WO2014120080 A1 WO 2014120080A1
Authority
WO
WIPO (PCT)
Prior art keywords
structural block
lng
lng carrier
existing
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/SG2013/000036
Other languages
French (fr)
Inventor
Asok Kumar NEDUMARAN
Wen Sin Chong
Kok Seng Foo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seatrium Offshore and Marine Technology Centre Pte Ltd
Original Assignee
Keppel Offshore and Marine Technology Centre Pte Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Keppel Offshore and Marine Technology Centre Pte Ltd filed Critical Keppel Offshore and Marine Technology Centre Pte Ltd
Priority to US14/764,367 priority Critical patent/US10668996B2/en
Priority to EP13873541.0A priority patent/EP2951083B1/en
Priority to SG11201504307YA priority patent/SG11201504307YA/en
Priority to AU2013377134A priority patent/AU2013377134B2/en
Priority to BR112015016443A priority patent/BR112015016443A2/en
Priority to PCT/SG2013/000036 priority patent/WO2014120080A1/en
Publication of WO2014120080A1 publication Critical patent/WO2014120080A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B83/00—Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems
    • B63B83/10—Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems for increasing cargo capacity
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/14—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed pressurised
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00—Hulls characterised by their structure or component parts
    • B63B3/02—Hulls assembled from prefabricated sub-units
    • B63B3/04—Hulls assembled from prefabricated sub-units with permanently-connected sub-units
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/10—Building or assembling vessels from prefabricated hull blocks, i.e. complete hull cross-sections
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/20—Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B83/00—Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems
    • B63B83/20—Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems for conversion to a different use, e.g. for converting tankers into a FPSO-FLNG units

Definitions

  • the present invention relates to a method for vessel construction and in particular, to a method for vessel modification to increase the storage and/or deck space capacity of existing vessels to serve similar or a different purposes.
  • LNG Carriers There are existing Liquid Natural Gas (LNG) Carriers in the market serving as LNG transportation vessels, and some of them are approaching the end of the charterer period, and/or available for life-extension program for continuous services as the LNG Carriers or other purposes.
  • LNG Carriers are usually well-maintained vessel and in particularly the LNG storage tanks are still at good conditions.
  • These existing carriers are mainly of 4 types of containment systems:
  • MOSS Type LNG carriers has very limited deck space available for more gas processing facilities, and this imposes limitation for its suitability to be converted into FLNG; some of the earlier generation of LNG carriers are also lesser in LNG storage capacities, e.g. below 130,000 m which are less ideal as FSRU receiving terminal.
  • a structural block is prefabricated with necessary full set or partial set of the components and structure for LNG storage and/or treatment processes.
  • the structural block may contain one or more LNG tank(s) with the same or different configuration or containment system as that of the existing LNG carrier.
  • the added LNG storage can be either MOSS, or other types, i.e. Membrane, SPB or Type-C tanks.
  • the structural block may also contain a regasification plant or a liquefaction plant with related gas processing plant and function as FLNG or FSRU together with the LNG storage tanks on the vessel.
  • the structural block can be part of second existing LNG carrier which may contain LNG tank with the same or different configuration or containment system as that of the first existing LNG carrier. In this case only LNG tank from second existing LNG carrier can utilize with new structural block but hull structure should match as per the first existing LNG carrier.
  • An existing LNG carrier is cut apart to form a forward section and an aft section.
  • the fabrication of the new structural block may be carried out at a shipyard, but during the fabrication of the structural block, the LNG vessel needs not be present at the shipyard.
  • fabrication of the structural block may be carried out at a workshop or a fabrication area, which is independently operable from a shipyard used for cutting the LNG carrier. In either situation, this will allow the LNG carriers to continue to operate as LNG transportation vessel, during the structural block fabrication period.
  • One or more structural blocks may be fabricated based on optimized working schedule, construction sequence and coordination with the LNG carrier work process.
  • the existing LNG carrier Upon near completion of the structural block, the existing LNG carrier will be dry- docked for cutting of the hull for vessel assembly.
  • the existing hull When the existing hull is separated into forward and aft sections, either one or both sections are moved away from each other to form a space there between.
  • the new structural block is then placed into the space and jointed to the forward and aft sections, by welding for example, to form an integrated new vessel.
  • the structural block provides the new vessel with increased LNG storage and space capacity, to meet the increased demand or new functions.
  • relevant LNG- process functions are added to the existing LNG carrier which originally possesses only the LNG storage and transportation capabilities.
  • the new integrated vessel can still be functional as LNG Carrier, and at the same time capable of utilizing it as FLNG or FSRU.
  • LNG-RV LNG Regasification Vessel
  • the new integration vessel contains different LNG containment systems, which may give further advantage to allow deck-space, and/or flexibility in terms of cargo operation. For example, they may serve as pressurized storage tanks for better BOG (Boil-off-Gas) handling.
  • BOG Bit-off-Gas
  • Fig. 1A is a partial cross sectional side view of an existing LNG carrier
  • Fig. IB is a partial top view of Fig. 1 A;
  • Fig. 1C is a block diagram showing a method of LNG carrier construction according to one embodiment of the present invention.
  • Fig. 2A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1 A according to one embodiment of the present invention
  • Fig. 2B is a partial top view of Fig. 2 A;
  • Fig. 2C is a partial cross sectional side view of a LNG carrier constructed according to the method shown in Figs. 2A and 2B;
  • Fig. 2D is a partial top view of Fig. 2C;
  • Fig. 3 A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1A according to an alternative embodiment of the present invention
  • Fig. 3B is a partial top view of Fig. 3A;
  • Fig. 3C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 3A and 3B;
  • Fig. 3D is a partial top view of Fig. 3C;
  • Fig. 4A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1 A according to an alternative embodiment of the present invention
  • Fig. 4B is a partial top view of Fig. 4A;
  • Fig. 4C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 4A and 4B;
  • Fig. 4D is a partial top view of Fig. 4C
  • Fig. 5A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1A according to an alternative embodiment of the present invention
  • Fig. 5B is a partial top view of Fig. 5 A;
  • Fig. 5C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 5A and 5B;
  • Fig. 5D is a partial top view of Fig. 5C;
  • Fig. 6A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1 A according to an alternative embodiment of the present invention
  • Fig. 6B is a partial top view, of Fig. 6 A;
  • Fig. 6C is a partial cross sectional side view of a LNG carrier constructed according to the method shown in Figs. 6A and 6B;
  • Fig. 6D is a partial top view of Fig. 6C;
  • Fig. 7A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1A according to a further embodiment of the present invention.
  • Fig. 7B is a partial top view of Fig. 7A;
  • Fig. 7C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 7 A and 7B;
  • Fig. 7D is a partial top view of Fig. 7C;
  • Fig. 8A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to a still further embodiment of the present invention.
  • Fig. 8B is a partial top view of Fig. 8A;
  • Fig. 8C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 8 A and 8B;
  • Fig. 8D is a partial top view of Fig. 8C;
  • Fig. 9A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to another further embodiment of the present invention.
  • Fig. 9B is a partial top view of Fig. 9A
  • Fig. 9C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 9A and 9B;
  • Fig. 9D is a partial top view of Fig. 9C;
  • Fig. 10A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to another further embodiment of the present invention.
  • Fig. 10B is a partial top view of Fig. 10A;
  • Fig. IOC is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 10A and 10B;
  • Fig. 10D is a partial top view of Fig. IOC.
  • Fig. 11 A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to another further embodiment of the present invention.
  • Fig. 1 IB is a partial top view of Fig. 11 A;
  • Fig. 11C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 11 A and 1 IB;
  • Fig. 1 ID is a partial top view of Fig. 11C.
  • Figs. 1 A and IB show an existing LNG carrier 20 based on which a method of vessel construction according to one embodiment of the present invention may be applied.
  • Existing LNG Carrier 20 includes a bow 201, a stern 209 and a midship between bow 201 and stern 209.
  • the midship includes four segments 202, 204, 206 and 208.
  • Each segment has a corresponding first, second, third and fourth LNG tank 212, 214, 216, 218 built therein.
  • Each individual LNG tank has its fixed storage capacity and hence the total storage and transportation capacity of the vessel is the sum capacity of all the individual LNG tanks.
  • a method 250 for constructing an LNG carrier according to one embodiment of the present invention as shown in Fig.
  • a structural block is fabricated (block 252) or provided as a prefabricated unit from other sources.
  • An existing LNG Carrier is cut apart into a forward section and an aft section (block 254).
  • the structural block is placed into a space formed between the forward section and the aft section (block 256) and then the structural block is jointed to the forward and aft sections (block 258) to form an integrated new LNG carrier.
  • measurements and/or site inspections may be carried out to determine the characteristics of the existing LNG carrier, e.g. the dimensions, piping / cable layouts / configurations, hook-up points and connection interfaces, etc. Such information may be used for the fabrication of the structural block to ensure compatibility. In situations where such information is available, e.g. from previous measurements / inspections, it may be used directly for the fabrication of the structural block.
  • a structural block 220 e.g. an LNG storage tank, a regasification plant or both, is fabricated at a first site, e.g. a fabrication plant.
  • a second site e.g. in this case a shipyard dock can perform its normal operations without being affected by the structural block fabrication.
  • an existing LNG carrier e.g. existing LNG carrier 20 may be brought to the shipyard dock, and separated by e.g. cutting.
  • the structural block may be fabricated at the same side as that used to cut the existing vessel, e.g. a shipyard dock or fabrication site, but the existing vessel needs not be present during the fabrication.
  • the existing vessel can dry dock to undergo the cutting and vessel assembly process.
  • FIG. 2A and 2B cutting is performed between stern 209 and the fourth LNG tank 218, forming a forward section 232 which includes bow 201, first LNG tank 212, second LNG tank 214, third LNG tank 216 and fourth LNG tank 218, and an aft section 236 which is the stern 209.
  • a space 234 is formed between forward section 232 and aft section 236.
  • Structural block 220 is then placed in space 234 by floating or heave lift crane, with the forward section 232 jointed to front end 222 of structural block 220 and the aft section 236 jointed to rear end 226 of structural block 220.
  • the structural block 220 together with the forward section 232 and aft section 236, form a new vessel 22 with the structural block 220 integrated to the existing LNG carrier, as shown in Figs. 2C and 2D.
  • the LNG tank integrated into the structural block 220 may be the same type and configuration as that in the existing vessel.
  • Such tank may be selected from a group consisting of a MOSS type tank, a Gaztransport & Technigaz (GTT) tank, a self- supporting prismatic type B (SPB) tank, an independent type A tank and an independent type C tank.
  • embodiments of the present invention provides new integrated vessels having lengthened hull with increased LNG storage and space capacity and/or added LNG process capability. Relevant industrial demand can be met with a much shorter delivery schedule than that required to build a new vessel from sketch, and with a greatly reduced CAPEX (Capital Expenditure). Embodiments of the present invention also enable reviving of existing, small-capacity LNG carriers which contributes to further cost-effective of the overall economics.
  • an existing vessel may be separated into forward and aft sections at a different location, for integration of a structural block therebetween.
  • an existing vessel 30 is cut apart into a forward section 332 and an aft section 336. Cutting is performed between a third LNG tank 316 and a fourth LNG tank 318, hence the forward section 332 includes the bow 301, first, second and third LNG tanks 312, 314 and 316.
  • the aft section 336 includes fourth tank 318 and the stern 309.
  • a prefabricated structural block 320 e.g.
  • an existing vessel 40, 50, 60 may be cut apart at amidship section (between a second LNG tank 414 and third LNG tank 416, Figs. 4A and 4B), a forward section (between a first LNG tank 512 and second LNG tank 514, Figs. 5A and 5B) or a forward bow section
  • a prefabricated structural block 420, 520, 620 is then placed at the space 434, 534, 634 formed by the cutting of the existing vessel, joining with the cut-apart forward and aft sections of the existing vessel and form integrated new vessel 42 (Figs. 4C, 4D), 52 (Figs. 5C, 5D) or 62 (Figs. 6C, 6D).
  • a prefabricated structural block 720 may include a liquefaction plant and/or one or more LNG storage tanks.
  • An existing LNG carrier 70 is cut apart into a forward section 732 and an aft section 736, forming a space 734 therebetween.
  • Structural block 720 is then placed in space 734 and joint to forward and aft sections 732, 736 to form a new LNG carrier 72 which has a liquefaction facility integrated into an existing LNG carrier. Similar to previous embodiments, cutting of existing vessel may be performed at various different locations of the hull, based on actual requirements, and integrate the structural block at these locations.
  • one or more intermediate structural decks 752 can be installed inside of the new structural block to form deck space for machinery, gas LNG processing plants, or other purposes.
  • a prefabricated structural block 820 includes a new bow 821 and a regasification plant and/or one or more LNG storage tanks 826.
  • a first existing LNG carrier 80 is cut apart into a forward section 831 and an aft section 836.
  • Forward section 831 is a bow of first existing LNG carrier 80.
  • the forward section 831 (in this case, the bow) is removed and the structural block 820 is joint to aft section 836 to form a new LNG carrier 82 which has a regasification facility integrated into first existing LNG carrier 80, together with the new bow 821.
  • Structural block 820 may also include a turret 828 built on bow 821. Turret 828 provides a non-rotating platform for supporting the mooring lines and flexible risers dedicated for gas export/import and associated control/service lines.
  • Either one or both the bow 821 / turret 828 and the LNG storage tanks / regasification plant 826 may be obtained from a second existing LNG carrier /
  • a prefabricated structural block 920 includes a new bow 921 and a liquefaction plant and/or one or more LNG storage tanks 926.
  • a first existing LNG carrier 90 is cut apart into a forward section 931 and an aft section 936.
  • Forward section 931 is a bow of first existing LNG carrier 90.
  • the forward section 931 (in this case, the bow) is removed and the structural block 920 is joint to aft section 936 to form a new LNG carrier 92 which has a liquefaction facility integrated into first existing LNG carrier 90, together with the new bow 921.
  • Structural block 920 may also include a turret 928 built on new bow 921.
  • Turret 928 provides a non-rotating platform for supporting the mooring lines and flexible risers dedicated for gas export/import and associated control/service lines.
  • Either one or both the bow 921 / turret 928 and the LNG storage tanks / liquefaction plant 926 may be obtained from a second existing LNG carrier / liquefaction plant, or built from sketch.
  • a prefabricated structural block 1020 includes a stern 1029 and a regasification plant and/or one or more LNG storage tanks 1026.
  • a first existing LNG carrier 100 is cut apart into a forward section 1032 and an aft section 1039.
  • Aft section 1039 is a stern of first existing LNG carrier 100.
  • the structural block 1020 is joint to forward section 1032 to form a new LNG carrier 102 which has a regasification facility integrated into first existing LNG carrier 100, together with the new stern 1029.
  • Either one or both the stern 1029 and the LNG storage tanks / regasification plant 1026 may be obtained from a second existing LNG carrier / regasification plant, or built from sketch.
  • a prefabricated structural block 1 120 includes a stern 1129 and, a liquefaction plant and/or one or more LNG storage tanks 1126.
  • a first existing LNG carrier 110 is cut apart into a forward section 1132 and an aft section 1139.
  • Aft section 1139 is a stern of first existing LNG carrier 110.
  • the structural block 1120 is joint to forward section 1132 to form a new LNG carrier 112 which has a liquefaction facility integrated into first existing LNG carrier 110, together with the new stern 1129.
  • Either one or both the stern 1129 and the LNG storage tanks / liquefaction plant 1126 may be obtained from a second existing LNG carrier / liquefaction plant, or built from sketch.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

A structural block is fabricated with necessary components and structure for LNG storage and/or process. The structural block may be an LNG tank with the same configuration as that in an LNG carrier. The structural bock may also be a regasification plant or a liquefaction plant to be used for LNG process. An existing vessel, e.g. an LNG carrier, is cut apart to form a forward section and a aft section. The forward section and the aft section are moved away from each other to form a space therebetween. The structural block is then placed into the space and jointed to the forward and aft sections, by welding for example, to form an integrated new vessel. The structural block provides the new vessel with increased LNG storage and transportation capabilities as well as regasification and/or liquefaction process facilities to meet the increased demand for LNG storage, transportation and processing.

Description

LNG CARRIER CONSTRUCTION METHOD
TECHNICAL FIELD
The present invention relates to a method for vessel construction and in particular, to a method for vessel modification to increase the storage and/or deck space capacity of existing vessels to serve similar or a different purposes.
BACKGROUND
There are existing Liquid Natural Gas (LNG) Carriers in the market serving as LNG transportation vessels, and some of them are approaching the end of the charterer period, and/or available for life-extension program for continuous services as the LNG Carriers or other purposes. LNG Carriers are usually well-maintained vessel and in particularly the LNG storage tanks are still at good conditions. These existing carriers are mainly of 4 types of containment systems:
1) IGC Independent Tank Type-B MOSS System (Spherical Dome)
2) IGC Independent Tank Type-B SPB System (ΓΗΙ)
3) Membrane Type LNG Containment System (GTT)
4) IGC Independent Tank Type-C Pressurized System
Similar to FPSO conversion from crude oil tanker, there are markets for these existing LNG carriers to be converted into offshore or near-shore oil and gas processing facilities, such as LNG export or import facilities, as they term as FLNG (Floating Liquefied Natural Gas) units and FSRU (Floating Storage & Regasification Unit).
However, some of these existing LNG carriers have their limitation to be redeployed for these purposes and thus there exists a need for technical solutions. Some of these limitations are related to lacking of available space and/or storage capacities on existing LNG carrier to better serve its new purposes. For example, MOSS Type LNG carriers has very limited deck space available for more gas processing facilities, and this imposes limitation for its suitability to be converted into FLNG; some of the earlier generation of LNG carriers are also lesser in LNG storage capacities, e.g. below 130,000 m which are less ideal as FSRU receiving terminal.
As for existing LNG carriers, these vessels have been optimized to have maximum storage and transportation efficiency. Existing LNG carriers have fully utilized the available space of the vessel for the LNG storage tanks, hence there is no enough space to further increase the storage capacity on a given vessel. In addition, such vessels do not have facilities required to process the LNG, e.g. the regasification process facility and/or liquefaction process facility, as these are conventionally carried out at the offshore or near shore terminals. These existing LNG carriers are also usually less efficient than the newer generation bigger LNG carriers, which are built with larger LNG storage capacities with higher transportation efficiencies. This also means that the older and smaller capacity yet still functional vessels are at competitive disadvantage even if they continue to function for LNG transportation as compare with the newer generation of LNG carriers. These existing LNG carriers may be converted to be used as FLNG or FSRU, however in some cases, limited due to storage space constraints.
SUMMARY OF THE INVENTION
To meet higher LNG storage capacity requirement and deck space for additional gas processing facilities, an added structural section is proposed to be integrated with the existing LNG carriers, for additional storage and deck space requirement. Embodiments of the present invention provide solutions for existing LNG carriers to be reused for LNG storage and transportation beyond their original capacity. In addition, embodiments of the present invention provide solutions to enable existing LNG carriers to perform LNG process functions such as regasification and/or liquefaction. According to one embodiment, a structural block is prefabricated with necessary full set or partial set of the components and structure for LNG storage and/or treatment processes. The structural block may contain one or more LNG tank(s) with the same or different configuration or containment system as that of the existing LNG carrier. For example, where the existing LNG carrier is a MOSS type LNG carrier, the added LNG storage can be either MOSS, or other types, i.e. Membrane, SPB or Type-C tanks. The structural block may also contain a regasification plant or a liquefaction plant with related gas processing plant and function as FLNG or FSRU together with the LNG storage tanks on the vessel. The structural block can be part of second existing LNG carrier which may contain LNG tank with the same or different configuration or containment system as that of the first existing LNG carrier. In this case only LNG tank from second existing LNG carrier can utilize with new structural block but hull structure should match as per the first existing LNG carrier.
An existing LNG carrier is cut apart to form a forward section and an aft section. The fabrication of the new structural block may be carried out at a shipyard, but during the fabrication of the structural block, the LNG vessel needs not be present at the shipyard. Alternatively, fabrication of the structural block may be carried out at a workshop or a fabrication area, which is independently operable from a shipyard used for cutting the LNG carrier. In either situation, this will allow the LNG carriers to continue to operate as LNG transportation vessel, during the structural block fabrication period. One or more structural blocks may be fabricated based on optimized working schedule, construction sequence and coordination with the LNG carrier work process.
Upon near completion of the structural block, the existing LNG carrier will be dry- docked for cutting of the hull for vessel assembly. When the existing hull is separated into forward and aft sections, either one or both sections are moved away from each other to form a space there between. The new structural block is then placed into the space and jointed to the forward and aft sections, by welding for example, to form an integrated new vessel. The structural block provides the new vessel with increased LNG storage and space capacity, to meet the increased demand or new functions. In embodiments where the structural block includes a regasification plant and/or liquefaction plant, relevant LNG- process functions are added to the existing LNG carrier which originally possesses only the LNG storage and transportation capabilities. Embodiments of the present invention can provide the following advantages:
1) The existing vessels are only needed during vessel assembly period in the yard, which minimizes the period for the vessel to be present in a shipyard. This will maximize the utilization of the LNG Carriers;
2) The new integrated vessel can still be functional as LNG Carrier, and at the same time capable of utilizing it as FLNG or FSRU. This makes the new units flexible for multiple deployment, for example LNG-RV (LNG Regasification Vessel) which can cross function as FSRU and as LNG Carriers.
3) The new integration vessel contains different LNG containment systems, which may give further advantage to allow deck-space, and/or flexibility in terms of cargo operation. For example, they may serve as pressurized storage tanks for better BOG (Boil-off-Gas) handling.
4) This may also allow the new structure block and vessel assembly to be done separately at most effective arrangement, and transported for final integration. The new structure block with LNG processes (Liqufaction and/or Regasification) with related gas processing modules maybe able to be fully tested and commissioned, as much as possible, prior to cutting of the vessel. This allows added advantage to reduce risk and unnecessary downtime of the LNG carriers.
Other aspects and advantages of the present invention will become apparent from the following detailed description, illustrating by way of example the inventive concept of the present invention.
BRffiF DESCRIPTION OF THE DRAWINGS
These and other aspects of the present invention will be described in detail with reference to the accompanying drawings, in which:
Fig. 1A is a partial cross sectional side view of an existing LNG carrier;
Fig. IB is a partial top view of Fig. 1 A;
Fig. 1C is a block diagram showing a method of LNG carrier construction according to one embodiment of the present invention;
Fig. 2A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1 A according to one embodiment of the present invention;
Fig. 2B is a partial top view of Fig. 2 A;
Fig. 2C is a partial cross sectional side view of a LNG carrier constructed according to the method shown in Figs. 2A and 2B;
Fig. 2D is a partial top view of Fig. 2C;
Fig. 3 A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1A according to an alternative embodiment of the present invention;
Fig. 3B is a partial top view of Fig. 3A;
Fig. 3C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 3A and 3B;
Fig. 3D is a partial top view of Fig. 3C;
Fig. 4A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1 A according to an alternative embodiment of the present invention;
Fig. 4B is a partial top view of Fig. 4A;
Fig. 4C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 4A and 4B;
Fig. 4D is a partial top view of Fig. 4C; Fig. 5A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1A according to an alternative embodiment of the present invention;
Fig. 5B is a partial top view of Fig. 5 A;
Fig. 5C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 5A and 5B;
Fig. 5D is a partial top view of Fig. 5C;
Fig. 6A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1 A according to an alternative embodiment of the present invention;
Fig. 6B is a partial top view, of Fig. 6 A;
Fig. 6C is a partial cross sectional side view of a LNG carrier constructed according to the method shown in Figs. 6A and 6B;
Fig. 6D is a partial top view of Fig. 6C;
Fig. 7A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1A according to a further embodiment of the present invention; \
Fig. 7B is a partial top view of Fig. 7A;
Fig. 7C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 7 A and 7B;
Fig. 7D is a partial top view of Fig. 7C;
Fig. 8A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to a still further embodiment of the present invention;
Fig. 8B is a partial top view of Fig. 8A;
Fig. 8C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 8 A and 8B;
Fig. 8D is a partial top view of Fig. 8C;
Fig. 9A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to another further embodiment of the present invention;
Fig. 9B is a partial top view of Fig. 9A; Fig. 9C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 9A and 9B;
Fig. 9D is a partial top view of Fig. 9C;
Fig. 10A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to another further embodiment of the present invention;
Fig. 10B is a partial top view of Fig. 10A;
Fig. IOC is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 10A and 10B;
Fig. 10D is a partial top view of Fig. IOC.
Fig. 11 A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to another further embodiment of the present invention;
Fig. 1 IB is a partial top view of Fig. 11 A;
Fig. 11C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 11 A and 1 IB;
Fig. 1 ID is a partial top view of Fig. 11C.
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
Figs. 1 A and IB show an existing LNG carrier 20 based on which a method of vessel construction according to one embodiment of the present invention may be applied. Existing LNG Carrier 20 includes a bow 201, a stern 209 and a midship between bow 201 and stern 209. The midship includes four segments 202, 204, 206 and 208. Each segment has a corresponding first, second, third and fourth LNG tank 212, 214, 216, 218 built therein. Each individual LNG tank has its fixed storage capacity and hence the total storage and transportation capacity of the vessel is the sum capacity of all the individual LNG tanks. In a method 250 for constructing an LNG carrier according to one embodiment of the present invention, as shown in Fig. 1C, a structural block is fabricated (block 252) or provided as a prefabricated unit from other sources. An existing LNG Carrier is cut apart into a forward section and an aft section (block 254). The structural block is placed into a space formed between the forward section and the aft section (block 256) and then the structural block is jointed to the forward and aft sections (block 258) to form an integrated new LNG carrier.
Before an existing LNG carrier is cut, measurements and/or site inspections may be carried out to determine the characteristics of the existing LNG carrier, e.g. the dimensions, piping / cable layouts / configurations, hook-up points and connection interfaces, etc. Such information may be used for the fabrication of the structural block to ensure compatibility. In situations where such information is available, e.g. from previous measurements / inspections, it may be used directly for the fabrication of the structural block.
Further details of this and other embodiments will be illustrated below in conjunction with drawings.
As shown in Figs. 2A and 2B, a structural block 220, e.g. an LNG storage tank, a regasification plant or both, is fabricated at a first site, e.g. a fabrication plant. During the fabrication of the structural block 220, a second site e.g. in this case a shipyard dock can perform its normal operations without being affected by the structural block fabrication. When the structural block fabrication is completed, an existing LNG carrier e.g. existing LNG carrier 20 may be brought to the shipyard dock, and separated by e.g. cutting.
Alternatively, the structural block may be fabricated at the same side as that used to cut the existing vessel, e.g. a shipyard dock or fabrication site, but the existing vessel needs not be present during the fabrication. When fabrication of the structural block is completed, the existing vessel can dry dock to undergo the cutting and vessel assembly process.
In the embodiment shown in Figs. 2A and 2B, cutting is performed between stern 209 and the fourth LNG tank 218, forming a forward section 232 which includes bow 201, first LNG tank 212, second LNG tank 214, third LNG tank 216 and fourth LNG tank 218, and an aft section 236 which is the stern 209. A space 234 is formed between forward section 232 and aft section 236. Structural block 220 is then placed in space 234 by floating or heave lift crane, with the forward section 232 jointed to front end 222 of structural block 220 and the aft section 236 jointed to rear end 226 of structural block 220. Upon joining, the structural block 220 together with the forward section 232 and aft section 236, form a new vessel 22 with the structural block 220 integrated to the existing LNG carrier, as shown in Figs. 2C and 2D.
The LNG tank integrated into the structural block 220 may be the same type and configuration as that in the existing vessel. Such tank may be selected from a group consisting of a MOSS type tank, a Gaztransport & Technigaz (GTT) tank, a self- supporting prismatic type B (SPB) tank, an independent type A tank and an independent type C tank.
Building an FSRU or FLNG by utilizing an existing, smaller capacity LNG carrier, embodiments of the present invention provides new integrated vessels having lengthened hull with increased LNG storage and space capacity and/or added LNG process capability. Relevant industrial demand can be met with a much shorter delivery schedule than that required to build a new vessel from sketch, and with a greatly reduced CAPEX (Capital Expenditure). Embodiments of the present invention also enable reviving of existing, small-capacity LNG carriers which contributes to further cost-effective of the overall economics.
According to another embodiment, an existing vessel may be separated into forward and aft sections at a different location, for integration of a structural block therebetween. As shown in Figs. 3A, 3B, 3C and 3D, an existing vessel 30 is cut apart into a forward section 332 and an aft section 336. Cutting is performed between a third LNG tank 316 and a fourth LNG tank 318, hence the forward section 332 includes the bow 301, first, second and third LNG tanks 312, 314 and 316. The aft section 336 includes fourth tank 318 and the stern 309. A prefabricated structural block 320 e.g. a regasification plant, an LNG storage tank or a combination thereof, is then placed into the space 334 formed between forward section 332 and aft section 336, and jointed to forward and aft sections 332, 336 to form a new integrated vessel 32 with the structural block 320 integrated to the existing LNG carrier, as shown in Figs. 3C and 3D. Alternatively, as shown in respective Figs. 4A to 4D, 5A to 5D and 6A to 6D, an existing vessel 40, 50, 60 may be cut apart at amidship section (between a second LNG tank 414 and third LNG tank 416, Figs. 4A and 4B), a forward section (between a first LNG tank 512 and second LNG tank 514, Figs. 5A and 5B) or a forward bow section
(between bow 601 and first LNG tank 612, Figs. 6A and 6B). A prefabricated structural block 420, 520, 620 is then placed at the space 434, 534, 634 formed by the cutting of the existing vessel, joining with the cut-apart forward and aft sections of the existing vessel and form integrated new vessel 42 (Figs. 4C, 4D), 52 (Figs. 5C, 5D) or 62 (Figs. 6C, 6D).
In a further embodiment, as shown in Figs. 7A to 7D, a prefabricated structural block 720 may include a liquefaction plant and/or one or more LNG storage tanks. An existing LNG carrier 70, is cut apart into a forward section 732 and an aft section 736, forming a space 734 therebetween. Structural block 720 is then placed in space 734 and joint to forward and aft sections 732, 736 to form a new LNG carrier 72 which has a liquefaction facility integrated into an existing LNG carrier. Similar to previous embodiments, cutting of existing vessel may be performed at various different locations of the hull, based on actual requirements, and integrate the structural block at these locations. In the case that no LNG storage tank is installed, one or more intermediate structural decks 752 can be installed inside of the new structural block to form deck space for machinery, gas LNG processing plants, or other purposes.
In a further embodiment shown in Figs. 8A to 8D, a prefabricated structural block 820 includes a new bow 821 and a regasification plant and/or one or more LNG storage tanks 826. A first existing LNG carrier 80, is cut apart into a forward section 831 and an aft section 836. Forward section 831 is a bow of first existing LNG carrier 80. After cutting the first existing LNG carrier 80, the forward section 831 (in this case, the bow) is removed and the structural block 820 is joint to aft section 836 to form a new LNG carrier 82 which has a regasification facility integrated into first existing LNG carrier 80, together with the new bow 821. Structural block 820 may also include a turret 828 built on bow 821. Turret 828 provides a non-rotating platform for supporting the mooring lines and flexible risers dedicated for gas export/import and associated control/service lines.
Either one or both the bow 821 / turret 828 and the LNG storage tanks / regasification plant 826 may be obtained from a second existing LNG carrier /
regasification plant, or built from sketch.
In another further embodiment shown in Figs. 9A to 9D, a prefabricated structural block 920 includes a new bow 921 and a liquefaction plant and/or one or more LNG storage tanks 926. A first existing LNG carrier 90, is cut apart into a forward section 931 and an aft section 936. Forward section 931 is a bow of first existing LNG carrier 90. After cutting the first existing LNG carrier 90, the forward section 931 (in this case, the bow) is removed and the structural block 920 is joint to aft section 936 to form a new LNG carrier 92 which has a liquefaction facility integrated into first existing LNG carrier 90, together with the new bow 921.
Structural block 920 may also include a turret 928 built on new bow 921. Turret 928 provides a non-rotating platform for supporting the mooring lines and flexible risers dedicated for gas export/import and associated control/service lines.
Either one or both the bow 921 / turret 928 and the LNG storage tanks / liquefaction plant 926 may be obtained from a second existing LNG carrier / liquefaction plant, or built from sketch.
In another further embodiment shown in Figs. 10A to 10D, a prefabricated structural block 1020 includes a stern 1029 and a regasification plant and/or one or more LNG storage tanks 1026. A first existing LNG carrier 100, is cut apart into a forward section 1032 and an aft section 1039. Aft section 1039 is a stern of first existing LNG carrier 100. After cutting the first existing LNG carrier 100, the aft section 1039 (in this case, the stern) is removed and the structural block 1020 is joint to forward section 1032 to form a new LNG carrier 102 which has a regasification facility integrated into first existing LNG carrier 100, together with the new stern 1029.
Either one or both the stern 1029 and the LNG storage tanks / regasification plant 1026 may be obtained from a second existing LNG carrier / regasification plant, or built from sketch.
In another further embodiment shown in Figs. 11 A to 1 ID, a prefabricated structural block 1 120 includes a stern 1129 and, a liquefaction plant and/or one or more LNG storage tanks 1126. A first existing LNG carrier 110 is cut apart into a forward section 1132 and an aft section 1139. Aft section 1139 is a stern of first existing LNG carrier 110. After cutting the first existing LNG carrier 110, the aft section 1 139 (in this case, the stern) is removed and the structural block 1120 is joint to forward section 1132 to form a new LNG carrier 112 which has a liquefaction facility integrated into first existing LNG carrier 110, together with the new stern 1129.
Either one or both the stern 1129 and the LNG storage tanks / liquefaction plant 1126 may be obtained from a second existing LNG carrier / liquefaction plant, or built from sketch.
Although embodiments of the present invention have been illustrated in conjunction with the accompanying drawings and described in the foregoing detailed description, it should be appreciated that the present invention is not limited to the embodiments disclosed. Therefore, the present invention should be understood to be capable of numerous rearrangements, modifications, alternatives and substitutions without departing from the spirit of the invention as set forth and recited by the following claims.

Claims

A method for constructing an FLNG, FSRU or a LNG carrier, the method comprising:
separating a first existing LNG carrier to form a forward section and an aft section;
placing a structural block into a space between the forward section and the aft section, the structural block having a front end and a rear end;
joining the forward section to the front end of the structural block and joining the aft section to the rear end of the structural block to form a new integrated vessel,
wherein the structural block is fabricated prior to separating the first existing LNG carrier.
The method of claim 1, wherein the structural block includes one or more LNG storage tanks.
The method of claim 2, wherein the LNG storage tank is selected from a group consisting of a MOSS type tank, a Gaztransport & Technigaz (GTT) tank, a self- supporting prismatic type B (SPB) tank, an independent type A tank and an independent type C tank.
The apparatus of claim 1, wherein the structural block includes a gas process facility.
The apparatus of claim 4, wherein the gas process facility includes a regasification plant.
The apparatus of claim 4, wherein the gas process facility includes a liquefaction plant.
7. The apparatus of claim 1, wherein the structural block is fabricated at a first site and separating an existing vessel is carried out at a second site, wherein the first site and the second site are independently operable from each other.
8. The apparatus of claim 1, wherein the structural block is fabricated at a site while the existing vessel is absent from the site.
9. The method of claim 1, wherein the structural block is a structure section of a second existing LNG carrier.
10. The method of claim 1 further comprising, prior to separating the first existing LNG carrier, determining characteristics of the first existing LNG carrier for fabrication of the structural block.
11. A method for constructing an FLNG, FSRU or a LNG carrier, the method
comprising:
separating a first existing LNG carrier to form a forward section and an aft section;
joining a structural block with one of the forward section and the aft section to form a new integrated vessel
wherein the structural block is fabricated prior to separating the first existing LNG carrier.
12. The method of claim 11, wherein the structural block includes one or more LNG storage tanks.
13. The method of claim 12, wherein the LNG storage tank is selected from a group consisting of a MOSS type tank, a Gaztransport & Technigaz (GTT) tank, a self- supporting prismatic type B (SPB) tank, an independent type A tank and an independent type C tank.
14. The apparatus of claim 11, wherein the structural block includes a gas process facility.
15. The apparatus of claim 14, wherein the gas process facility includes a
regasification plant.
16. The apparatus of claim 14, wherein the gas process facility includes a liquefaction plant.
17. The apparatus of claim 1, wherein the structural block is fabricated at a first site and separating the first existing vessel is carried out at a second site, wherein the first site and the second site are independently operable from each other.
18. The apparatus of claim 1 1 , wherein the structural block is fabricated at a site while the first existing vessel is absent from the site.
19. The method of claim 11, wherein the structural block is a structure section of a
second existing LNG carrier.
20. The method of claim 1 1 , wherein the structural block includes a bow section of a second LNG carrier, the forward section of the first existing LNG carrier is a bow of the first existing LNG earner, the method comprising jointing the structural block to the aft section of the first LNG carrier to form the new integrated LNG caixier.
21. The method of claim 20, wherein the structural block further includes a turret built on the bow section.
22. The method of claim 1 1 , wherein the structural block includes a stern section of a second LNG carrier, the aft section of the first existing LNG caixier is a stern of the first existing LNG carrier, the method comprising jointing the structural block to the forward section of the first LNG carrier to form the new integrated LNG carrier. The method of claim 11 further comprising, prior to separating the first existing LNG carrier, determining characteristics of the first existing LNG carrier for fabrication of the structural block.
PCT/SG2013/000036 2013-01-29 2013-01-29 Lng carrier construction method Ceased WO2014120080A1 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
US14/764,367 US10668996B2 (en) 2013-01-29 2013-01-29 LNG carrier construction method
EP13873541.0A EP2951083B1 (en) 2013-01-29 2013-01-29 Lng carrier construction method
SG11201504307YA SG11201504307YA (en) 2013-01-29 2013-01-29 Lng carrier construction method
AU2013377134A AU2013377134B2 (en) 2013-01-29 2013-01-29 LNG carrier construction method
BR112015016443A BR112015016443A2 (en) 2013-01-29 2013-01-29 gnl conveyor construction method
PCT/SG2013/000036 WO2014120080A1 (en) 2013-01-29 2013-01-29 Lng carrier construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/SG2013/000036 WO2014120080A1 (en) 2013-01-29 2013-01-29 Lng carrier construction method

Publications (1)

Publication Number Publication Date
WO2014120080A1 true WO2014120080A1 (en) 2014-08-07

Family

ID=51262666

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/SG2013/000036 Ceased WO2014120080A1 (en) 2013-01-29 2013-01-29 Lng carrier construction method

Country Status (6)

Country Link
US (1) US10668996B2 (en)
EP (1) EP2951083B1 (en)
AU (1) AU2013377134B2 (en)
BR (1) BR112015016443A2 (en)
SG (1) SG11201504307YA (en)
WO (1) WO2014120080A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015152825A1 (en) * 2014-04-03 2015-10-08 Keppel Offshore & Marine Technology Centre Pte Ltd Method of integrating new built structural block and sponson with existing lng carrier
WO2023102595A1 (en) * 2021-12-07 2023-06-15 Charlie Six Pty Ltd Liquified gas power vessel

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102127821B1 (en) * 2016-01-25 2020-06-30 현대중공업 주식회사 Carrier
WO2018078688A1 (en) * 2016-10-24 2018-05-03 千代田化工建設株式会社 Floating-type liquified hydrocarbon gas plant manufacturing method
US11383453B2 (en) * 2017-01-12 2022-07-12 Swift IP, LLC Methods of repairing and waterproofing articles
JP7227728B2 (en) * 2018-10-10 2023-02-22 三菱造船株式会社 How to use existing ships
JP7442965B2 (en) * 2018-10-10 2024-03-05 三菱造船株式会社 Ship manufacturing method
KR102577082B1 (en) * 2018-10-11 2023-09-11 닛키 글로벌 가부시키가이샤 floating structure
KR102631760B1 (en) * 2018-12-03 2024-01-31 닛키 글로벌 가부시키가이샤 Method for manufacturing floating body equipment equipped with natural gas liquefaction device
CN112078758A (en) * 2020-08-03 2020-12-15 沪东中华造船(集团)有限公司 Method for converting LNG ship into FSRU

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54146398A (en) 1978-05-04 1979-11-15 Hitachi Zosen Corp Method of remodelling existing tanker into oil storing tank floating on sea
WO2005056377A2 (en) 2003-08-12 2005-06-23 Excelerate Energy Limited Partnership Shipboard regasification for lng carriers with alternate propulsion plants
WO2005113328A1 (en) 2004-05-14 2005-12-01 Exxonmobil Upstream Research Company Single-compartment liquefied natural gas carrier
WO2009104091A2 (en) 2008-02-20 2009-08-27 Single Buoy Moorings, Inc. Construction of fpdso vessel
EP2228294A1 (en) 2009-03-09 2010-09-15 RAM LNG Holdings Limited Vessel for transport of liquefied natural gas
RU2433060C1 (en) 2010-05-05 2011-11-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Калининградский государственный технический университет" Method of ship reconstruction
EP2412624A1 (en) 2010-07-30 2012-02-01 Samsung Heavy Industries Co., Ltd. Cargo tank for liquefied gas carrier ship

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4936319B1 (en) * 1966-03-16 1974-09-28
GB9617209D0 (en) * 1996-08-16 1996-09-25 Mcdermott Sa J Ray Vessel turret systems
US7293600B2 (en) * 2002-02-27 2007-11-13 Excelerate Energy Limited Parnership Apparatus for the regasification of LNG onboard a carrier

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54146398A (en) 1978-05-04 1979-11-15 Hitachi Zosen Corp Method of remodelling existing tanker into oil storing tank floating on sea
WO2005056377A2 (en) 2003-08-12 2005-06-23 Excelerate Energy Limited Partnership Shipboard regasification for lng carriers with alternate propulsion plants
WO2005113328A1 (en) 2004-05-14 2005-12-01 Exxonmobil Upstream Research Company Single-compartment liquefied natural gas carrier
WO2009104091A2 (en) 2008-02-20 2009-08-27 Single Buoy Moorings, Inc. Construction of fpdso vessel
EP2228294A1 (en) 2009-03-09 2010-09-15 RAM LNG Holdings Limited Vessel for transport of liquefied natural gas
RU2433060C1 (en) 2010-05-05 2011-11-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Калининградский государственный технический университет" Method of ship reconstruction
EP2412624A1 (en) 2010-07-30 2012-02-01 Samsung Heavy Industries Co., Ltd. Cargo tank for liquefied gas carrier ship

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015152825A1 (en) * 2014-04-03 2015-10-08 Keppel Offshore & Marine Technology Centre Pte Ltd Method of integrating new built structural block and sponson with existing lng carrier
WO2023102595A1 (en) * 2021-12-07 2023-06-15 Charlie Six Pty Ltd Liquified gas power vessel

Also Published As

Publication number Publication date
EP2951083B1 (en) 2018-12-19
US10668996B2 (en) 2020-06-02
EP2951083A1 (en) 2015-12-09
AU2013377134A1 (en) 2015-07-02
AU2013377134B2 (en) 2017-08-31
US20150367915A1 (en) 2015-12-24
EP2951083A4 (en) 2017-03-08
SG11201504307YA (en) 2015-08-28
BR112015016443A2 (en) 2017-07-11

Similar Documents

Publication Publication Date Title
US10668996B2 (en) LNG carrier construction method
EP2838784B1 (en) Floating lng plant comprising a first and a second converted lng carrier and a method for obtaining the floating lng plant
EP2983981B1 (en) Systems and methods for floating dockside liquefaction of natural gas
JP6585305B2 (en) Natural gas liquefaction ship
KR102396966B1 (en) Vessel hull for use as a hull of a floating hydrocarbon storage and/or processing plant, method for producing such a vessel hull, vessel comprising such a vessel hull, as well method for producing such a vessel having such a vessel hull
EP1383676B1 (en) Vessel and unloading system
EP3131807B1 (en) Method of integrating new built structural block and sponson with existing lng carrier
CN114630983A (en) Method of supplying LNG from a supply hub using a dual-purpose LNG carrier and a smaller capacity storage at a receiving terminal
CN107074327B (en) LNG carrier and method for manufacturing such LNG carrier
KR101300707B1 (en) Topside load support structure of floating ocean construct
KR101996278B1 (en) Natural Gas Liquefaction Plant System Using Cartridge Type LNG Barge, And LNG Storage And Transportation Method For The Plant
KR101246076B1 (en) Floating mooring apparatus and method for unloading liguefied natural gas using the same
KR101778809B1 (en) A floating facility for processing gas
KR20120000973A (en) Topside layout of offshore structures
KR20160031747A (en) Lng fpso and reconstructing method using lng carrier
WO2005056379A1 (en) Modular offshore hydrocarbon storage and/or processing structure
Carpenter Barge LNG Offers Benefits in Deepwater and Onshore Developments
KR101488940B1 (en) Floating ocean structure and method for constructing a floating ocean structure
KR20260035041A (en) Offshore structure
KR20260035043A (en) Offshore structure
KR20140026002A (en) Topside module arrange structure in fpso
KR20260035042A (en) Offshore structure
KR20260035022A (en) Offshore structure
KR20260035023A (en) Offshore structure
CA2839107C (en) Lng export terminal

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13873541

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2013873541

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2013377134

Country of ref document: AU

Date of ref document: 20130129

Kind code of ref document: A

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112015016443

Country of ref document: BR

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 14764367

Country of ref document: US

ENP Entry into the national phase

Ref document number: 112015016443

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20150708