WO2014120080A1 - Lng carrier construction method - Google Patents
Lng carrier construction method Download PDFInfo
- Publication number
- WO2014120080A1 WO2014120080A1 PCT/SG2013/000036 SG2013000036W WO2014120080A1 WO 2014120080 A1 WO2014120080 A1 WO 2014120080A1 SG 2013000036 W SG2013000036 W SG 2013000036W WO 2014120080 A1 WO2014120080 A1 WO 2014120080A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- structural block
- lng
- lng carrier
- existing
- tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B83/00—Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems
- B63B83/10—Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems for increasing cargo capacity
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
- B63B25/02—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
- B63B25/08—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
- B63B25/12—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
- B63B25/02—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
- B63B25/08—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
- B63B25/12—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
- B63B25/14—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed pressurised
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
- B63B25/02—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
- B63B25/08—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
- B63B25/12—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
- B63B25/16—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B3/00—Hulls characterised by their structure or component parts
- B63B3/02—Hulls assembled from prefabricated sub-units
- B63B3/04—Hulls assembled from prefabricated sub-units with permanently-connected sub-units
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
- B63B73/10—Building or assembling vessels from prefabricated hull blocks, i.e. complete hull cross-sections
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
- B63B73/20—Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B83/00—Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems
- B63B83/20—Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems for conversion to a different use, e.g. for converting tankers into a FPSO-FLNG units
Definitions
- the present invention relates to a method for vessel construction and in particular, to a method for vessel modification to increase the storage and/or deck space capacity of existing vessels to serve similar or a different purposes.
- LNG Carriers There are existing Liquid Natural Gas (LNG) Carriers in the market serving as LNG transportation vessels, and some of them are approaching the end of the charterer period, and/or available for life-extension program for continuous services as the LNG Carriers or other purposes.
- LNG Carriers are usually well-maintained vessel and in particularly the LNG storage tanks are still at good conditions.
- These existing carriers are mainly of 4 types of containment systems:
- MOSS Type LNG carriers has very limited deck space available for more gas processing facilities, and this imposes limitation for its suitability to be converted into FLNG; some of the earlier generation of LNG carriers are also lesser in LNG storage capacities, e.g. below 130,000 m which are less ideal as FSRU receiving terminal.
- a structural block is prefabricated with necessary full set or partial set of the components and structure for LNG storage and/or treatment processes.
- the structural block may contain one or more LNG tank(s) with the same or different configuration or containment system as that of the existing LNG carrier.
- the added LNG storage can be either MOSS, or other types, i.e. Membrane, SPB or Type-C tanks.
- the structural block may also contain a regasification plant or a liquefaction plant with related gas processing plant and function as FLNG or FSRU together with the LNG storage tanks on the vessel.
- the structural block can be part of second existing LNG carrier which may contain LNG tank with the same or different configuration or containment system as that of the first existing LNG carrier. In this case only LNG tank from second existing LNG carrier can utilize with new structural block but hull structure should match as per the first existing LNG carrier.
- An existing LNG carrier is cut apart to form a forward section and an aft section.
- the fabrication of the new structural block may be carried out at a shipyard, but during the fabrication of the structural block, the LNG vessel needs not be present at the shipyard.
- fabrication of the structural block may be carried out at a workshop or a fabrication area, which is independently operable from a shipyard used for cutting the LNG carrier. In either situation, this will allow the LNG carriers to continue to operate as LNG transportation vessel, during the structural block fabrication period.
- One or more structural blocks may be fabricated based on optimized working schedule, construction sequence and coordination with the LNG carrier work process.
- the existing LNG carrier Upon near completion of the structural block, the existing LNG carrier will be dry- docked for cutting of the hull for vessel assembly.
- the existing hull When the existing hull is separated into forward and aft sections, either one or both sections are moved away from each other to form a space there between.
- the new structural block is then placed into the space and jointed to the forward and aft sections, by welding for example, to form an integrated new vessel.
- the structural block provides the new vessel with increased LNG storage and space capacity, to meet the increased demand or new functions.
- relevant LNG- process functions are added to the existing LNG carrier which originally possesses only the LNG storage and transportation capabilities.
- the new integrated vessel can still be functional as LNG Carrier, and at the same time capable of utilizing it as FLNG or FSRU.
- LNG-RV LNG Regasification Vessel
- the new integration vessel contains different LNG containment systems, which may give further advantage to allow deck-space, and/or flexibility in terms of cargo operation. For example, they may serve as pressurized storage tanks for better BOG (Boil-off-Gas) handling.
- BOG Bit-off-Gas
- Fig. 1A is a partial cross sectional side view of an existing LNG carrier
- Fig. IB is a partial top view of Fig. 1 A;
- Fig. 1C is a block diagram showing a method of LNG carrier construction according to one embodiment of the present invention.
- Fig. 2A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1 A according to one embodiment of the present invention
- Fig. 2B is a partial top view of Fig. 2 A;
- Fig. 2C is a partial cross sectional side view of a LNG carrier constructed according to the method shown in Figs. 2A and 2B;
- Fig. 2D is a partial top view of Fig. 2C;
- Fig. 3 A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1A according to an alternative embodiment of the present invention
- Fig. 3B is a partial top view of Fig. 3A;
- Fig. 3C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 3A and 3B;
- Fig. 3D is a partial top view of Fig. 3C;
- Fig. 4A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1 A according to an alternative embodiment of the present invention
- Fig. 4B is a partial top view of Fig. 4A;
- Fig. 4C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 4A and 4B;
- Fig. 4D is a partial top view of Fig. 4C
- Fig. 5A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1A according to an alternative embodiment of the present invention
- Fig. 5B is a partial top view of Fig. 5 A;
- Fig. 5C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 5A and 5B;
- Fig. 5D is a partial top view of Fig. 5C;
- Fig. 6A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1 A according to an alternative embodiment of the present invention
- Fig. 6B is a partial top view, of Fig. 6 A;
- Fig. 6C is a partial cross sectional side view of a LNG carrier constructed according to the method shown in Figs. 6A and 6B;
- Fig. 6D is a partial top view of Fig. 6C;
- Fig. 7A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier of Fig. 1A according to a further embodiment of the present invention.
- Fig. 7B is a partial top view of Fig. 7A;
- Fig. 7C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 7 A and 7B;
- Fig. 7D is a partial top view of Fig. 7C;
- Fig. 8A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to a still further embodiment of the present invention.
- Fig. 8B is a partial top view of Fig. 8A;
- Fig. 8C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 8 A and 8B;
- Fig. 8D is a partial top view of Fig. 8C;
- Fig. 9A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to another further embodiment of the present invention.
- Fig. 9B is a partial top view of Fig. 9A
- Fig. 9C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 9A and 9B;
- Fig. 9D is a partial top view of Fig. 9C;
- Fig. 10A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to another further embodiment of the present invention.
- Fig. 10B is a partial top view of Fig. 10A;
- Fig. IOC is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 10A and 10B;
- Fig. 10D is a partial top view of Fig. IOC.
- Fig. 11 A is a partial cross sectional side view showing construction of an LNG carrier using an existing LNG carrier according to another further embodiment of the present invention.
- Fig. 1 IB is a partial top view of Fig. 11 A;
- Fig. 11C is a partial cross sectional side view of an LNG carrier constructed according to the method shown in Figs. 11 A and 1 IB;
- Fig. 1 ID is a partial top view of Fig. 11C.
- Figs. 1 A and IB show an existing LNG carrier 20 based on which a method of vessel construction according to one embodiment of the present invention may be applied.
- Existing LNG Carrier 20 includes a bow 201, a stern 209 and a midship between bow 201 and stern 209.
- the midship includes four segments 202, 204, 206 and 208.
- Each segment has a corresponding first, second, third and fourth LNG tank 212, 214, 216, 218 built therein.
- Each individual LNG tank has its fixed storage capacity and hence the total storage and transportation capacity of the vessel is the sum capacity of all the individual LNG tanks.
- a method 250 for constructing an LNG carrier according to one embodiment of the present invention as shown in Fig.
- a structural block is fabricated (block 252) or provided as a prefabricated unit from other sources.
- An existing LNG Carrier is cut apart into a forward section and an aft section (block 254).
- the structural block is placed into a space formed between the forward section and the aft section (block 256) and then the structural block is jointed to the forward and aft sections (block 258) to form an integrated new LNG carrier.
- measurements and/or site inspections may be carried out to determine the characteristics of the existing LNG carrier, e.g. the dimensions, piping / cable layouts / configurations, hook-up points and connection interfaces, etc. Such information may be used for the fabrication of the structural block to ensure compatibility. In situations where such information is available, e.g. from previous measurements / inspections, it may be used directly for the fabrication of the structural block.
- a structural block 220 e.g. an LNG storage tank, a regasification plant or both, is fabricated at a first site, e.g. a fabrication plant.
- a second site e.g. in this case a shipyard dock can perform its normal operations without being affected by the structural block fabrication.
- an existing LNG carrier e.g. existing LNG carrier 20 may be brought to the shipyard dock, and separated by e.g. cutting.
- the structural block may be fabricated at the same side as that used to cut the existing vessel, e.g. a shipyard dock or fabrication site, but the existing vessel needs not be present during the fabrication.
- the existing vessel can dry dock to undergo the cutting and vessel assembly process.
- FIG. 2A and 2B cutting is performed between stern 209 and the fourth LNG tank 218, forming a forward section 232 which includes bow 201, first LNG tank 212, second LNG tank 214, third LNG tank 216 and fourth LNG tank 218, and an aft section 236 which is the stern 209.
- a space 234 is formed between forward section 232 and aft section 236.
- Structural block 220 is then placed in space 234 by floating or heave lift crane, with the forward section 232 jointed to front end 222 of structural block 220 and the aft section 236 jointed to rear end 226 of structural block 220.
- the structural block 220 together with the forward section 232 and aft section 236, form a new vessel 22 with the structural block 220 integrated to the existing LNG carrier, as shown in Figs. 2C and 2D.
- the LNG tank integrated into the structural block 220 may be the same type and configuration as that in the existing vessel.
- Such tank may be selected from a group consisting of a MOSS type tank, a Gaztransport & Technigaz (GTT) tank, a self- supporting prismatic type B (SPB) tank, an independent type A tank and an independent type C tank.
- embodiments of the present invention provides new integrated vessels having lengthened hull with increased LNG storage and space capacity and/or added LNG process capability. Relevant industrial demand can be met with a much shorter delivery schedule than that required to build a new vessel from sketch, and with a greatly reduced CAPEX (Capital Expenditure). Embodiments of the present invention also enable reviving of existing, small-capacity LNG carriers which contributes to further cost-effective of the overall economics.
- an existing vessel may be separated into forward and aft sections at a different location, for integration of a structural block therebetween.
- an existing vessel 30 is cut apart into a forward section 332 and an aft section 336. Cutting is performed between a third LNG tank 316 and a fourth LNG tank 318, hence the forward section 332 includes the bow 301, first, second and third LNG tanks 312, 314 and 316.
- the aft section 336 includes fourth tank 318 and the stern 309.
- a prefabricated structural block 320 e.g.
- an existing vessel 40, 50, 60 may be cut apart at amidship section (between a second LNG tank 414 and third LNG tank 416, Figs. 4A and 4B), a forward section (between a first LNG tank 512 and second LNG tank 514, Figs. 5A and 5B) or a forward bow section
- a prefabricated structural block 420, 520, 620 is then placed at the space 434, 534, 634 formed by the cutting of the existing vessel, joining with the cut-apart forward and aft sections of the existing vessel and form integrated new vessel 42 (Figs. 4C, 4D), 52 (Figs. 5C, 5D) or 62 (Figs. 6C, 6D).
- a prefabricated structural block 720 may include a liquefaction plant and/or one or more LNG storage tanks.
- An existing LNG carrier 70 is cut apart into a forward section 732 and an aft section 736, forming a space 734 therebetween.
- Structural block 720 is then placed in space 734 and joint to forward and aft sections 732, 736 to form a new LNG carrier 72 which has a liquefaction facility integrated into an existing LNG carrier. Similar to previous embodiments, cutting of existing vessel may be performed at various different locations of the hull, based on actual requirements, and integrate the structural block at these locations.
- one or more intermediate structural decks 752 can be installed inside of the new structural block to form deck space for machinery, gas LNG processing plants, or other purposes.
- a prefabricated structural block 820 includes a new bow 821 and a regasification plant and/or one or more LNG storage tanks 826.
- a first existing LNG carrier 80 is cut apart into a forward section 831 and an aft section 836.
- Forward section 831 is a bow of first existing LNG carrier 80.
- the forward section 831 (in this case, the bow) is removed and the structural block 820 is joint to aft section 836 to form a new LNG carrier 82 which has a regasification facility integrated into first existing LNG carrier 80, together with the new bow 821.
- Structural block 820 may also include a turret 828 built on bow 821. Turret 828 provides a non-rotating platform for supporting the mooring lines and flexible risers dedicated for gas export/import and associated control/service lines.
- Either one or both the bow 821 / turret 828 and the LNG storage tanks / regasification plant 826 may be obtained from a second existing LNG carrier /
- a prefabricated structural block 920 includes a new bow 921 and a liquefaction plant and/or one or more LNG storage tanks 926.
- a first existing LNG carrier 90 is cut apart into a forward section 931 and an aft section 936.
- Forward section 931 is a bow of first existing LNG carrier 90.
- the forward section 931 (in this case, the bow) is removed and the structural block 920 is joint to aft section 936 to form a new LNG carrier 92 which has a liquefaction facility integrated into first existing LNG carrier 90, together with the new bow 921.
- Structural block 920 may also include a turret 928 built on new bow 921.
- Turret 928 provides a non-rotating platform for supporting the mooring lines and flexible risers dedicated for gas export/import and associated control/service lines.
- Either one or both the bow 921 / turret 928 and the LNG storage tanks / liquefaction plant 926 may be obtained from a second existing LNG carrier / liquefaction plant, or built from sketch.
- a prefabricated structural block 1020 includes a stern 1029 and a regasification plant and/or one or more LNG storage tanks 1026.
- a first existing LNG carrier 100 is cut apart into a forward section 1032 and an aft section 1039.
- Aft section 1039 is a stern of first existing LNG carrier 100.
- the structural block 1020 is joint to forward section 1032 to form a new LNG carrier 102 which has a regasification facility integrated into first existing LNG carrier 100, together with the new stern 1029.
- Either one or both the stern 1029 and the LNG storage tanks / regasification plant 1026 may be obtained from a second existing LNG carrier / regasification plant, or built from sketch.
- a prefabricated structural block 1 120 includes a stern 1129 and, a liquefaction plant and/or one or more LNG storage tanks 1126.
- a first existing LNG carrier 110 is cut apart into a forward section 1132 and an aft section 1139.
- Aft section 1139 is a stern of first existing LNG carrier 110.
- the structural block 1120 is joint to forward section 1132 to form a new LNG carrier 112 which has a liquefaction facility integrated into first existing LNG carrier 110, together with the new stern 1129.
- Either one or both the stern 1129 and the LNG storage tanks / liquefaction plant 1126 may be obtained from a second existing LNG carrier / liquefaction plant, or built from sketch.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Water Supply & Treatment (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
Claims
Priority Applications (6)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/764,367 US10668996B2 (en) | 2013-01-29 | 2013-01-29 | LNG carrier construction method |
| EP13873541.0A EP2951083B1 (en) | 2013-01-29 | 2013-01-29 | Lng carrier construction method |
| SG11201504307YA SG11201504307YA (en) | 2013-01-29 | 2013-01-29 | Lng carrier construction method |
| AU2013377134A AU2013377134B2 (en) | 2013-01-29 | 2013-01-29 | LNG carrier construction method |
| BR112015016443A BR112015016443A2 (en) | 2013-01-29 | 2013-01-29 | gnl conveyor construction method |
| PCT/SG2013/000036 WO2014120080A1 (en) | 2013-01-29 | 2013-01-29 | Lng carrier construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/SG2013/000036 WO2014120080A1 (en) | 2013-01-29 | 2013-01-29 | Lng carrier construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2014120080A1 true WO2014120080A1 (en) | 2014-08-07 |
Family
ID=51262666
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/SG2013/000036 Ceased WO2014120080A1 (en) | 2013-01-29 | 2013-01-29 | Lng carrier construction method |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US10668996B2 (en) |
| EP (1) | EP2951083B1 (en) |
| AU (1) | AU2013377134B2 (en) |
| BR (1) | BR112015016443A2 (en) |
| SG (1) | SG11201504307YA (en) |
| WO (1) | WO2014120080A1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2015152825A1 (en) * | 2014-04-03 | 2015-10-08 | Keppel Offshore & Marine Technology Centre Pte Ltd | Method of integrating new built structural block and sponson with existing lng carrier |
| WO2023102595A1 (en) * | 2021-12-07 | 2023-06-15 | Charlie Six Pty Ltd | Liquified gas power vessel |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102127821B1 (en) * | 2016-01-25 | 2020-06-30 | 현대중공업 주식회사 | Carrier |
| WO2018078688A1 (en) * | 2016-10-24 | 2018-05-03 | 千代田化工建設株式会社 | Floating-type liquified hydrocarbon gas plant manufacturing method |
| US11383453B2 (en) * | 2017-01-12 | 2022-07-12 | Swift IP, LLC | Methods of repairing and waterproofing articles |
| JP7227728B2 (en) * | 2018-10-10 | 2023-02-22 | 三菱造船株式会社 | How to use existing ships |
| JP7442965B2 (en) * | 2018-10-10 | 2024-03-05 | 三菱造船株式会社 | Ship manufacturing method |
| KR102577082B1 (en) * | 2018-10-11 | 2023-09-11 | 닛키 글로벌 가부시키가이샤 | floating structure |
| KR102631760B1 (en) * | 2018-12-03 | 2024-01-31 | 닛키 글로벌 가부시키가이샤 | Method for manufacturing floating body equipment equipped with natural gas liquefaction device |
| CN112078758A (en) * | 2020-08-03 | 2020-12-15 | 沪东中华造船(集团)有限公司 | Method for converting LNG ship into FSRU |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS54146398A (en) | 1978-05-04 | 1979-11-15 | Hitachi Zosen Corp | Method of remodelling existing tanker into oil storing tank floating on sea |
| WO2005056377A2 (en) | 2003-08-12 | 2005-06-23 | Excelerate Energy Limited Partnership | Shipboard regasification for lng carriers with alternate propulsion plants |
| WO2005113328A1 (en) | 2004-05-14 | 2005-12-01 | Exxonmobil Upstream Research Company | Single-compartment liquefied natural gas carrier |
| WO2009104091A2 (en) | 2008-02-20 | 2009-08-27 | Single Buoy Moorings, Inc. | Construction of fpdso vessel |
| EP2228294A1 (en) | 2009-03-09 | 2010-09-15 | RAM LNG Holdings Limited | Vessel for transport of liquefied natural gas |
| RU2433060C1 (en) | 2010-05-05 | 2011-11-10 | Федеральное государственное образовательное учреждение высшего профессионального образования "Калининградский государственный технический университет" | Method of ship reconstruction |
| EP2412624A1 (en) | 2010-07-30 | 2012-02-01 | Samsung Heavy Industries Co., Ltd. | Cargo tank for liquefied gas carrier ship |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS4936319B1 (en) * | 1966-03-16 | 1974-09-28 | ||
| GB9617209D0 (en) * | 1996-08-16 | 1996-09-25 | Mcdermott Sa J Ray | Vessel turret systems |
| US7293600B2 (en) * | 2002-02-27 | 2007-11-13 | Excelerate Energy Limited Parnership | Apparatus for the regasification of LNG onboard a carrier |
-
2013
- 2013-01-29 WO PCT/SG2013/000036 patent/WO2014120080A1/en not_active Ceased
- 2013-01-29 EP EP13873541.0A patent/EP2951083B1/en active Active
- 2013-01-29 US US14/764,367 patent/US10668996B2/en active Active
- 2013-01-29 AU AU2013377134A patent/AU2013377134B2/en not_active Ceased
- 2013-01-29 BR BR112015016443A patent/BR112015016443A2/en not_active Application Discontinuation
- 2013-01-29 SG SG11201504307YA patent/SG11201504307YA/en unknown
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS54146398A (en) | 1978-05-04 | 1979-11-15 | Hitachi Zosen Corp | Method of remodelling existing tanker into oil storing tank floating on sea |
| WO2005056377A2 (en) | 2003-08-12 | 2005-06-23 | Excelerate Energy Limited Partnership | Shipboard regasification for lng carriers with alternate propulsion plants |
| WO2005113328A1 (en) | 2004-05-14 | 2005-12-01 | Exxonmobil Upstream Research Company | Single-compartment liquefied natural gas carrier |
| WO2009104091A2 (en) | 2008-02-20 | 2009-08-27 | Single Buoy Moorings, Inc. | Construction of fpdso vessel |
| EP2228294A1 (en) | 2009-03-09 | 2010-09-15 | RAM LNG Holdings Limited | Vessel for transport of liquefied natural gas |
| RU2433060C1 (en) | 2010-05-05 | 2011-11-10 | Федеральное государственное образовательное учреждение высшего профессионального образования "Калининградский государственный технический университет" | Method of ship reconstruction |
| EP2412624A1 (en) | 2010-07-30 | 2012-02-01 | Samsung Heavy Industries Co., Ltd. | Cargo tank for liquefied gas carrier ship |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2015152825A1 (en) * | 2014-04-03 | 2015-10-08 | Keppel Offshore & Marine Technology Centre Pte Ltd | Method of integrating new built structural block and sponson with existing lng carrier |
| WO2023102595A1 (en) * | 2021-12-07 | 2023-06-15 | Charlie Six Pty Ltd | Liquified gas power vessel |
Also Published As
| Publication number | Publication date |
|---|---|
| EP2951083B1 (en) | 2018-12-19 |
| US10668996B2 (en) | 2020-06-02 |
| EP2951083A1 (en) | 2015-12-09 |
| AU2013377134A1 (en) | 2015-07-02 |
| AU2013377134B2 (en) | 2017-08-31 |
| US20150367915A1 (en) | 2015-12-24 |
| EP2951083A4 (en) | 2017-03-08 |
| SG11201504307YA (en) | 2015-08-28 |
| BR112015016443A2 (en) | 2017-07-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10668996B2 (en) | LNG carrier construction method | |
| EP2838784B1 (en) | Floating lng plant comprising a first and a second converted lng carrier and a method for obtaining the floating lng plant | |
| EP2983981B1 (en) | Systems and methods for floating dockside liquefaction of natural gas | |
| JP6585305B2 (en) | Natural gas liquefaction ship | |
| KR102396966B1 (en) | Vessel hull for use as a hull of a floating hydrocarbon storage and/or processing plant, method for producing such a vessel hull, vessel comprising such a vessel hull, as well method for producing such a vessel having such a vessel hull | |
| EP1383676B1 (en) | Vessel and unloading system | |
| EP3131807B1 (en) | Method of integrating new built structural block and sponson with existing lng carrier | |
| CN114630983A (en) | Method of supplying LNG from a supply hub using a dual-purpose LNG carrier and a smaller capacity storage at a receiving terminal | |
| CN107074327B (en) | LNG carrier and method for manufacturing such LNG carrier | |
| KR101300707B1 (en) | Topside load support structure of floating ocean construct | |
| KR101996278B1 (en) | Natural Gas Liquefaction Plant System Using Cartridge Type LNG Barge, And LNG Storage And Transportation Method For The Plant | |
| KR101246076B1 (en) | Floating mooring apparatus and method for unloading liguefied natural gas using the same | |
| KR101778809B1 (en) | A floating facility for processing gas | |
| KR20120000973A (en) | Topside layout of offshore structures | |
| KR20160031747A (en) | Lng fpso and reconstructing method using lng carrier | |
| WO2005056379A1 (en) | Modular offshore hydrocarbon storage and/or processing structure | |
| Carpenter | Barge LNG Offers Benefits in Deepwater and Onshore Developments | |
| KR101488940B1 (en) | Floating ocean structure and method for constructing a floating ocean structure | |
| KR20260035041A (en) | Offshore structure | |
| KR20260035043A (en) | Offshore structure | |
| KR20140026002A (en) | Topside module arrange structure in fpso | |
| KR20260035042A (en) | Offshore structure | |
| KR20260035022A (en) | Offshore structure | |
| KR20260035023A (en) | Offshore structure | |
| CA2839107C (en) | Lng export terminal |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13873541 Country of ref document: EP Kind code of ref document: A1 |
|
| DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
| WWE | Wipo information: entry into national phase |
Ref document number: 2013873541 Country of ref document: EP |
|
| ENP | Entry into the national phase |
Ref document number: 2013377134 Country of ref document: AU Date of ref document: 20130129 Kind code of ref document: A |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112015016443 Country of ref document: BR |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 14764367 Country of ref document: US |
|
| ENP | Entry into the national phase |
Ref document number: 112015016443 Country of ref document: BR Kind code of ref document: A2 Effective date: 20150708 |