WO2015016288A1 - エネルギー管理システム、表示装置、表示方法及びプログラム - Google Patents

エネルギー管理システム、表示装置、表示方法及びプログラム Download PDF

Info

Publication number
WO2015016288A1
WO2015016288A1 PCT/JP2014/070140 JP2014070140W WO2015016288A1 WO 2015016288 A1 WO2015016288 A1 WO 2015016288A1 JP 2014070140 W JP2014070140 W JP 2014070140W WO 2015016288 A1 WO2015016288 A1 WO 2015016288A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
image
measurement
unit
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2014/070140
Other languages
English (en)
French (fr)
Inventor
一郎 丸山
聡司 峯澤
矢部 正明
吉川 利彰
裕信 矢野
大介 飯澤
田中 顕一郎
崇 荻野
正之 小松
雄喜 小川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to KR1020187014466A priority Critical patent/KR20180058236A/ko
Priority to US14/908,241 priority patent/US20160172906A1/en
Priority to CN201480042844.0A priority patent/CN105409091B/zh
Priority to KR1020197009135A priority patent/KR20190037371A/ko
Priority to EP14833040.0A priority patent/EP3029805B1/en
Priority to KR1020167005014A priority patent/KR20160036598A/ko
Publication of WO2015016288A1 publication Critical patent/WO2015016288A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/10Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by displaying of information or by user interaction, e.g. supervisory control and data acquisition [SCADA] systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Definitions

  • the present invention relates to an energy management system, a display device, a display method, and a program.
  • the present invention has been made under the above circumstances, and aims to effectively reduce the energy consumed by equipment installed in a house.
  • an energy management system of the present invention includes a first measurement unit that measures power supplied from a commercial power system to a house, and a second measurement unit that measures power generated by a distributed power source.
  • the third measurement unit that measures the power supplied to each of the plurality of electrical devices installed in the house, the measurement results of the first measurement unit and the second measurement unit are stored, and the measurement result of the third measurement unit is stored.
  • a storage unit that stores the positional information of the electrical device, a processing device that displays an image indicating the measurement result stored in the storage unit in a form instructed by the user, and an image displayed on the display device
  • a selection unit for selecting an object constituting the image, and the processing device is displayed on the display device each time the object constituting the image is selected by the user using the selection unit. The image is changed to a new image corresponding to the selected object.
  • the measurement result of the power supplied to each of the plurality of electric devices installed in the house is stored together with the position information of the electric device. Therefore, the user can see the power consumption for each device or for each place where the electrical device is installed. Thereby, the user's consciousness about energy saving increases, and as a result, it is possible to effectively reduce the energy consumed by the device installed in the house.
  • FIG. 1 is a block diagram of an energy management system 100.
  • the energy management system 100 is installed in a house whose interior is divided into a plurality of sections.
  • This energy management system 100 is a system used for monitoring and controlling electric devices used in a house, as represented by HEMS (Home Energy Management System).
  • HEMS Home Energy Management System
  • FIG. 2 is a schematic diagram of the house 10 in which the energy management system 100 is installed.
  • the house 10 is a detached house in which, for example, a father H1, a mother H2, and a child H3 live.
  • This house 10 is divided into rooms R1 to R4 and a shared section X1.
  • the user of the living room R1 is mainly the father H1
  • the user of the living room R2 is mainly the mother H2
  • the user of the living room R3 is mainly the child H3.
  • the living room R4 is a living room including a so-called kitchen and living room.
  • This living room R4 is commonly used by the father H1, the mother H2, and the child H3.
  • the shared section X1 is a section including a toilet, a bath, a washroom, and the like.
  • the lighting device 31 and the air conditioning device 41 are arranged in the living room R1, the lighting device 32 and the air conditioning device 42 are arranged in the living room R2, and the lighting device 33 and the air conditioning device 43 are arranged in the living room R3.
  • the lighting device 34, the air conditioner 44, and the cooking appliance 51 are arranged, and in the common section X1, the lighting device 35 and the washing / drying machine 52 are arranged.
  • a power generator 20 is provided on the roof of the house 10.
  • the power generation device 20 is a solar power generation device that converts sunlight into electrical energy.
  • the power generation device 20 includes a solar cell module installed on the roof of the house 10, an inverter unit for connecting the solar cell module to the power system of the house 10, and the like.
  • FIG. 3 is a system diagram of the electric equipment and the commercial power system arranged in the house 10. As shown in FIG. 3, the power generation device 20, the lighting devices 31 to 35, the air conditioning devices 41 to 44, the cooking home appliance 51, and the washing and drying machine 52 are connected in parallel to the commercial power system.
  • the energy management system 100 displays the power consumed by the electrical equipment installed in the house 10, the power generated by the power generation device 20, and the like on the father H ⁇ b> 1, the mother H ⁇ b> 2, and the child H ⁇ b> 3 as users. It is a device for.
  • the energy management system 100 includes a control unit 101 that executes an image generation program Pr1 stored in the auxiliary storage unit 103, a main storage unit 102 that is a work area of the control unit 101, and a user.
  • An input unit 104 for receiving the command a display unit 105 for displaying various information to the user, power meters 71 to 84 connected to the interface 106, a gas meter 91 and a water meter 92 connected to the interface 106, And a system bus 107 for connecting the above-described units.
  • the control unit 101 is a processing device that executes processing according to the image generation program Pr1 stored in the auxiliary storage unit 103.
  • the main storage unit 102 includes a RAM (Random Access Memory) and the like.
  • the image generation program Pr1 executed by the control unit 101 is expanded in the main storage unit 102.
  • the auxiliary storage unit 103 is a storage device including a non-volatile memory such as a magnetic disk or a semiconductor memory.
  • the auxiliary storage unit 103 stores an image generation program Pr1 executed by the control unit 101.
  • the auxiliary storage unit 103 receives the measurement values output from the wattmeters 71 to 84 via the interface 106 and stores them in time series.
  • the input unit 104 has a touch panel, input keys, and the like.
  • the touch panel of the input unit 104 is disposed so as to overlap the display unit 105, and forms a GUI (Graphical User Interface) together with the display unit 105.
  • a command from the user is input via the input unit 104 and notified to the control unit 101 via the system bus 107.
  • the input unit 104 is used to select an object in the image, for example.
  • the display unit 105 is a display device including a VRAM, a liquid crystal display (Liquid Crystal Display), and the like.
  • the display unit 105 displays the processing result of the control unit 101 and the like.
  • the wattmeter 71 is provided on a lead-in line for drawing the electric power of the commercial power system into the house 10.
  • the wattmeter 71 measures the power supplied to the house 10 from the commercial power system.
  • the wattmeter 71 outputs the measurement signal S1 which shows the value according to the measured electric power (refer FIG. 1).
  • the wattmeter 72 is also provided on a lead-in line for drawing power from the commercial power grid into the house 10.
  • the wattmeter 72 measures the power supplied from the house 10 to the commercial power system.
  • the wattmeter 72 outputs measurement signal S2 which shows the value according to the measured electric power.
  • the wattmeter 73 is disposed at the power generation end of the power generation device 20 installed in the house 10. And the wattmeter 73 measures the electric power generated by the electric power generating apparatus 20, and outputs measurement signal S3 which shows the value according to the measured electric power.
  • the wattmeters 74 to 84 are, for example, arranged in the receptacles to which the electric devices arranged in the living rooms R1 to R4 and the shared section X1 are connected. Then, the wattmeters 74 to 84 measure the power supplied to each device and output measurement signals S4 to S14 indicating values corresponding to the measured power.
  • the wattmeters 74, 76, 78, 80, and 83 measure the power supplied to the lighting devices 31 to 35, that is, the power consumed by the lighting devices 31 to 35.
  • the electric power consumed by the air conditioners 41 to 44 is measured by the wattmeters 75, 77, 79 and 81.
  • the power consumed by the cooking appliance 51 and the washing / drying machine 52 is measured by the wattmeters 82 and 84.
  • the gas meter 91 is provided in a gas pipe drawn into the house 10.
  • the gas meter 91 measures the flow rate of the gas supplied to the house 10.
  • the gas meter 91 outputs measurement signal S15 which shows the value according to the measured flow volume.
  • the water meter 92 is provided in a water pipe drawn into the house 10.
  • the water meter 92 measures the flow rate of tap water supplied to the house 10.
  • the water meter 92 outputs measurement signal S16 which shows the value according to the measured flow volume.
  • the measurement signals S1 to S14 output from the wattmeters 71 to 84, the measurement signal S15 output from the gas meter 91, and the measurement signal S16 output from the water meter 92 are received by the interface 106.
  • the control unit 101 reads the power P1 (t) to P14 (t) indicated by the measurement signals S1 to S14 received by the interface 106 and the flow rates F1 (t) and F2 (t) indicated by the measurement signals S15 and S16. Then, it is stored in the auxiliary storage unit 103 in time series. t is the time stored in the auxiliary storage unit 103, and Pn (t), F1 (t), and F2 (t) indicate the power Pn and the flow rates F1 and F2 at the time t. Note that n is an integer from 1 to 14.
  • FIG. 4 is a diagram schematically showing the powers P1 (t) to P14 (t) and the flow rates F1 (t) and F2 (t) stored in the auxiliary storage unit 103.
  • the powers P1 (t) to P14 (t) and the like are stored in time series as measurement result information associated with position information, device information, and user information.
  • the location information indicates the location where the measurement target of the power meter that outputs the power Pn (t) is located.
  • the position information “lead line” indicates that the electric powers P1 (t) and P2 (t) are electric power passing through the lead line.
  • the position information “power generation end” indicates that the power P3 (t) is the power generated by the power generation device 20.
  • the location information “rooms R1 to R4” and “shared section” is the power consumed by the electric devices P4 (t) to P14 (t) installed in the rooms R1 to R4 or the shared section X1. Indicates that there is.
  • the position information “gas pipe” indicates that the flow rate F1 (t) is the amount of gas supplied to the house 10
  • the position information “water pipe” indicates that the flow rate F2 (t) is equal to the house 10 Indicates the amount of tap water supplied.
  • the device information indicates a measurement target of a power meter that outputs power Pn (t).
  • the device information “power generation device” indicates that the measurement target of the power P3 (t) is the power generation device 20.
  • the device information “lighting device” indicates that the measurement targets of the powers P4 (t), P6 (t), P8 (t), P10 (t), and P13 (t) are the lighting devices 31 to 35.
  • the device information “air conditioner” indicates that the measurement targets of the electric powers P5 (t), P7 (t), P9 (t), and P11 (t) are the air conditioners 41 to 44.
  • the device information “cooking home appliance” indicates that the measurement target of the power P12 (t) is the cooking home appliance 51, and the device information “washing dryer” indicates that the measurement target of the power P14 (t) is the washing dryer 52.
  • the user information indicates the user of the electrical device whose power Pn (t) is to be measured.
  • the user information “Father” indicates that the user of the lighting device 31 that is the measurement target of the power P4 (t) and the air conditioning device 41 that is the measurement target of the power P5 (t) is the father H1.
  • the user information “mother” includes a lighting device 32 to be measured for power P6 (t), an air conditioner 42 to be measured for power P7 (t), a cooking appliance 51 to be measured for power P12 (t), and power It shows that the user of the washing / drying machine 52 to be measured in P14 (t) is the mother H2.
  • the user information “child” indicates that the user of the lighting device 33 that is the measurement target of the power P8 (t) and the air conditioning device 43 that is the measurement target of the power P9 (t) is the child H3.
  • Position information, device information, and user information are stored in the auxiliary storage unit 103 by the control unit 101.
  • the control unit 101 may acquire position information, device information, and user information via the interface 106 by communication with an electric device.
  • the control unit 101 may acquire position information, device information, and user information from the user via the input unit 104.
  • the control unit 101 reads out and executes an image generation program Pr1 for generating an image to be displayed on the display unit 105 from the auxiliary storage unit 103.
  • FIG. 5 is a diagram illustrating an example of the initial image PH1.
  • the initial image PH1 displays a list of four transition destination images PH2 to PH5.
  • an image PH2 indicating the current power usage status
  • an image PH3 indicating the power saving target
  • an image PH4 indicating the power consumption by device
  • an image PH5 indicating the consumption of gas and tap water are displayed. .
  • the control unit 101 enlarges the image PH ⁇ b> 4 indicating the power consumption by device as illustrated in FIG. 7. And display.
  • a circle graph is shown in the image PH4 indicating the power consumption by device.
  • This pie chart is composed of eight fan-shaped graphic patterns GP1 to GP8 indicating the amount of power consumed for each device.
  • the areas of the graphic patterns GP1 to GP8 indicate the ratio of the power consumption of each electric device. The ratio of the power consumption amount is obtained by dividing the power consumption amount of the electric device by the sum of the power consumption amounts of the respective electric devices.
  • the graphic pattern GP1 indicates the ratio of the power consumption of the electric device having the largest power consumption
  • the graphic pattern GP2 indicates the ratio of the power consumption of the electric device having the second largest power consumption
  • the pattern GP3 indicates the ratio of the power consumption of the electrical device with the third largest power consumption
  • the graphic pattern GP4 indicates the ratio of the power consumption of the electrical device with the fourth largest power consumption
  • the graphic pattern GP5 indicates 5
  • the power consumption rate of the electrical equipment with the largest power consumption is shown
  • the graphic pattern GP6 shows the power consumption rate of the electrical equipment with the sixth largest power consumption
  • the graphic pattern GP7 is the seventh power consumption. It shows the ratio of the amount of power consumption of electrical equipment with a large amount.
  • the graphic pattern GP8 indicates the ratio of the sum of the power consumption amounts of the electric devices whose power consumption amount is the eighth or later.
  • the ratio of the power consumption amount in the upper seven electric devices is displayed in a comparable manner (list display).
  • the electric appliance with the largest amount of power consumption is the air conditioner 44, and the air conditioner 41, the cooking appliance 51, the air conditioner 43, the washer / dryer 52, the air conditioner 42, and the lighting device It can be easily understood that the power consumption is decreasing in the order of 34.
  • the amount of power consumed by each device is calculated by integrating the power P3 (t) to P14 (t) shown in FIG. 4 with a range of 24 hours.
  • the control unit 101 obtains the power amounts Ph3 to Ph14 of each device based on the powers P3 (t) to P14 (t).
  • the graphic patterns GP1 to GP8 indicating the ratios of the electric power amounts Ph3 to Ph14 are respectively arranged on the screen of the display unit 105, thereby generating the pie chart shown in FIG.
  • the colors of the graphic patterns GP1 to GP8 constituting the pie chart are preset, and the graphic patterns GP1 to GP8 are filled with a predetermined color or pattern in descending order.
  • FIG. 7 the result of March 6 is displayed as an example, but the user touches the text of (March 6) in the image to show the calendar as shown in FIG. A pop-up window PW1 can be displayed. And the user can display the pie chart which shows the performance of a desired month and day by selecting the date of this pop-up window PW1.
  • Image PH4a is a graph which shows the change of the electric power for every electric equipment.
  • the area of the area A1 sandwiched between the horizontal axis and the broken line and the areas A2 to A8 sandwiched between the broken lines represent the electric energy.
  • the contents of the areas A1 to A8 embody the contents of the graphic patterns GP1 to GP8 of FIG. Specifically, the graphic patterns GP1 to GP8 indicate the ratio of power consumption, while the areas A1 to A8 indicate the power consumption.
  • the control unit 101 generates a graph of the image PH4a based on the powers P4 (t) to P14 (t).
  • the colors or fill patterns of the graphic patterns GP1 to GP8 preferably coincide with the colors and fill patterns of the areas A1 to A8.
  • the control unit 101 compares the power P1 (t) with the power P2 (t). And the control part 101 displays the mark M1 which shows power purchase in the time slot
  • control unit 101 highlights the touched area as shown in FIG. 10, and names of the electrical devices corresponding to the touched area, etc. Is displayed.
  • the control unit 101 displays a pie chart indicating the individual power consumption as shown in FIG.
  • the graphic patterns GP11 to GP13 indicate the percentage of electric power consumption of the electric devices assigned to the father H1, the mother H2, and the child H3, and the graphic pattern GP14 indicates the father H1, the mother H2, and the child H3.
  • the ratio of the amount of power consumption of the electrical equipment not assigned to any of them is shown.
  • the graphic patterns GP21 to GP25 display the power consumption ratios in the living rooms R1 to R4 and the shared section X1.
  • the amount of power consumed for each location can be calculated using the location information in FIG.
  • the control unit 101 calculates the amount of power consumed in the room R1 using the sum of the power P4 (t) and the power P5 (t).
  • a graphic pattern having a size corresponding to the calculated electric energy is formed.
  • the power consumed for each user can be calculated using the user information shown in FIG.
  • control unit 101 uses the sum of power P4 (t) and power P5 (t) to calculate the power consumed by father H1.
  • the amount is calculated, and a graphic pattern having a size corresponding to the calculated amount of power is formed.
  • the control unit 101 generates the image PH4b by placing the graphic patterns GP11 to GP14 and GP21 to GP25 formed as described above on the screen of the display unit 105.
  • the user of the living room R1 is the father H1
  • the user of the living room R2 is the mother H2
  • the user of the living room R3 is the child H3.
  • the graphic pattern GP11 and the graphic pattern GP22, the graphic pattern GP12 and the graphic pattern GP23, and the graphic pattern GP13 and the graphic pattern GP25 which are related to each other, are filled with a similar color or a similar pattern.
  • the user touches the area where the text indicating the date is displayed to display the pop-up window PW1 shown in FIG. 8, and specifies the date through the pop-up window PW1. By doing so, information of a desired date can be displayed as the image PH4b.
  • the control unit 101 When the image PH2 is touched by the user while the initial image PH1 shown in FIG. 5 is being displayed, the control unit 101, as shown in FIG. 12 as an example, displays an image PH2 indicating the current power usage status. Magnify and display. As the current power usage situation, there are three possible modes: Mode 1, Mode 2, and Mode 3.
  • Aspect 1 is a mode in which electric equipment installed in the house 10 is operated with the electric power generated by the power generation device 20 and electric power is sold by causing surplus power to flow in the commercial power system.
  • Aspect 2 is an aspect in which the electric device installed in the house 10 is operated by both the electric power generated by the power generation device 20 and the electric power from the commercial power system.
  • Aspect 3 is an aspect in which an electric device installed in the house 10 is operated with electric power supplied from a commercial power system.
  • FIG. 12 is an image PH2a showing the current power usage status in aspect 1.
  • the image PH2a includes a bar graph B1 indicating generated power, a bar graph B2 indicating power consumption, and a bar graph B3 indicating power sales power.
  • the control unit 101 has a bar graph B1 having a size corresponding to the value of power P3 (t) shown in FIG. 4, a bar graph B3 having a size corresponding to the value of power P2 (t), and power P3 (t).
  • An image PH2a is generated by arranging a bar graph B2 having a size corresponding to the difference from the power P2 (t) on the screen of the display unit 105.
  • FIG. 13 is an image PH2b showing the current power usage status in aspect 2.
  • the image PH2b includes a bar graph B1 indicating generated power, a bar graph B2 indicating power consumption, and a bar graph B3 indicating power purchase power.
  • the control unit 101 has a bar graph B1 having a size corresponding to the value of the power P3 (t) shown in FIG. 4, a bar graph B3 having a size corresponding to the value of the power P1 (t), and a power P3 (t).
  • the image PH2b is generated.
  • FIG. 14 is an image PH2c showing the current power usage status in the third mode.
  • the image PH2c includes a bar graph B2 indicating power consumption and a bar graph B3 indicating power purchase power.
  • the control unit 101 generates an image PH2c by arranging bar graphs B3 and B2 having a size corresponding to the value of the power P1 (t) shown in FIG. 4 on the screen of the display unit 105.
  • the control unit 101 When the image PH3 is touched by the user while the initial image PH1 shown in FIG. 5 is displayed, the control unit 101 enlarges and displays the image PH3 indicating the power saving target as shown in FIG. To do.
  • the image PH3 indicating the power saving target for example, a bar graph B4 indicating the power consumption per month last year, a bar graph B5 indicating the power consumption of this month, and a line LN indicating the power saving target are shown.
  • control unit 101 arranges the bar graphs B4 and B5 having a size corresponding to a value obtained by multiplying a value obtained by integrating the power P1 (t) by a charge per unit power amount on the screen of the display unit 105.
  • the line LN indicating the power saving target input via the input unit 104 is arranged on the screen of the display unit 105, thereby generating the image PH3.
  • control unit 101 displays a pop-up window PW2 on which the pie chart shown in the image PH4 in FIG. 7 is displayed as shown in FIG.
  • the control unit 101 shows the transition of consumption of gas and tap water as shown in FIG.
  • the image PH5 is enlarged and displayed.
  • line graphs LG1 and LG2 showing temporal changes in the flow rates of gas and tap water are shown.
  • the control unit 101 arranges the line graph LG1 corresponding to the gas flow rate F1 (t) and the line graph LG2 corresponding to the tap water flow rate F2 (t) on the screen of the display unit 105, whereby the image PH5 is displayed. Generate.
  • the user touches the images PH2 to PH5 constituting the initial image PH1 to display the contents of the accumulated data as images PH2 to PH5 indicating desired information. Can be made. For this reason, by visually recognizing each of the images PH2 to PH5, etc., the user's awareness of energy saving increases, and as a result, it is expected to effectively reduce the energy consumed by the electrical equipment installed in the house 10. it can.
  • the power consumption and the like are displayed for each electrical device. For this reason, the user can easily recognize which electric device has the most effective energy saving action. Thereby, energy can be effectively reduced.
  • the power consumption is displayed for each section (R1 to R4, X1) of the house 10. For this reason, the user can easily recognize which partition has the most effective energy saving action. Thereby, energy can be effectively reduced.
  • the power consumption is displayed for each user (H1, H2, H3) as shown in the image PH4b in FIG. For this reason, the user can easily recognize who is most effective in energy-saving behavior. Thereby, energy can be effectively reduced.
  • the display unit 105, the control unit 101, the main storage unit 102, the auxiliary storage unit 103, the input unit 104, and the like constitute the display device according to the present invention.
  • this invention is not limited by each embodiment.
  • the control unit 101 may display an image PH6 indicating the power sale performance, for example, as shown in FIG.
  • Each bar graph can be obtained from the electric power P1 (t) and the electric power P2 (t).
  • a bar graph extending downward from a line indicating zero indicates the amount of purchased electric power, and a bar graph extending upward from the line indicating zero is the electric power sold power amount. Indicates.
  • the graphic patterns GP1 to GP8 constituting the pie chart are arranged in descending order of area. Not limited to this, the arrangement order may be changed based on an instruction from the user.
  • the power consumption in the electric device with low power consumption is also displayed by the graphic pattern GP8.
  • the control part 101 is good also as displaying the power consumption with a graphic pattern only about the electric equipment with especially large power consumption.
  • the graphic pattern for the electrical equipment in the same section is filled with the same color or pattern.
  • the color of the graphic pattern for an electric device with a large variation in power consumption may be filled with a specific color or pattern.
  • the power generated by the power generator 20, the lighting devices 31 to 35, the air conditioners 41 to 44, the cooking appliance 51, and the power consumed by the washing / drying machine 52 is measured by the wattmeters 71-84.
  • the present invention is not limited to this.
  • the power measuring device 86 is provided in the lead-in line of each device such as the power generation device 20, the lighting devices 31 to 35, the air conditioning devices 41 to 44, the cooking appliance 51, and the washing / drying machine 52.
  • the power consumed by each device may be measured using a CT (Current Transformer) 85.
  • each CT 85 is connected to the power measuring device 86.
  • the power measuring device 86 monitors the secondary current of each CT85.
  • measurement signals S1 to S14 indicating the power for each device are output to the interface 106.
  • the control unit 101 of the energy management system 100 can display the power information of each device on the display unit 105.
  • the power measurement unit is an example.
  • the control unit 101 displays information indicating the power measured by each device. It is good also as acquiring from.
  • the input unit 104 and the display unit 105 constitute a GUI.
  • the functions of the input unit 104 and the display unit 105 may be realized using a communication terminal such as a smartphone.
  • the lighting device, the air conditioner, the cooked home appliance, and the washer / dryer have been described as examples of the electric device installed in the house 10. Not only this but an electric water heater etc. can be considered as an electric equipment installed in the house 10.
  • the images PH1 to PH5 and the like in the above embodiment are examples, and the present invention is not limited to this.
  • the image displayed on the display unit 105 is changed to a new image corresponding to the selected object.
  • images PH2 to PH5 constituting the initial image PH1 are selected as objects
  • the images PH2 to PH5 are enlarged and displayed (see FIGS. 7, 12, 15, and 17).
  • a pop-up window PW1 for designating the date is displayed (see FIG. 8).
  • a graph related to the selected date is displayed.
  • the image PH4a is displayed (see FIG. 9).
  • the graph is changed (see FIG. 11).
  • the initial screen is displayed. Is displayed (see FIG. 19).
  • the objects constituting the image are not limited to these.
  • the object for changing the image may be an icon indicating a device, a user, a position, or the like.
  • the object constituting the image may be the image itself.
  • the function of the energy management system 100 according to the above embodiment can be realized by dedicated hardware or by using a normal computer.
  • the image generation program Pr1 stored in the auxiliary storage unit 103 is readable by a computer such as a flexible disk, a CD-ROM (Compact Disk Read-Only Memory), a DVD (Digital Versatile Disk), and an MO (Magnet-Optical Disk). It may be stored in a recording medium and distributed and installed in a computer.
  • a computer such as a flexible disk, a CD-ROM (Compact Disk Read-Only Memory), a DVD (Digital Versatile Disk), and an MO (Magnet-Optical Disk). It may be stored in a recording medium and distributed and installed in a computer.
  • the image generation program Pr1 is usually stored in a disk device or the like of a server device on a communication network such as the Internet, and may be downloaded as necessary.
  • the energy management system of the present invention is suitable for energy management.
  • the display device, the display method, and the program of the present invention are suitable for displaying the power usage status.
  • 10 houses, 20 power generators, 31-35 lighting devices, 41-44 air conditioners, 51 cooking appliances, 52 washing dryers, 71-84 power meters, 85 CT, 86 power measuring devices, 91 gas meters, 92 water meters, 100 Energy management system, 101 control unit, 102 main storage unit, 103 auxiliary storage unit, 104 input unit, 105 display unit, 106 interface, 107 system bus, A1-A8 area, B1-B5 bar graph, GP1-GP8, GP11-GP14 , GP22 to GP25 graphic patterns, H1 father, H2 mother, H3 children, LG1, LG2 line graph, M1, M2 mark, PH1 to PH6 images, PW1, PW2 pop-up window, PH2a, PH2b, PH2c, PH4a, PH4 Image, R1 ⁇ R4 room, S1 ⁇ S16 measurement signal, X1 shared partition.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

 第1電力計(71,72)は、商用電力系統から住宅に供給される電力を計測する。第2電力計(73)は、分散型電源によって発電された電力を計測する。第3電力計(74~84)は、複数の電気機器それぞれに供給される電力を計測する。補助記憶部(103)は、電力の計測結果を記憶する。入力部(104)は、表示部(105)に表示される画像を構成するオブジェクトを選択するために用いられる。制御部(101)は、入力部(104)を用いて、ユーザによって画像を構成するオブジェクトが選択されるごとに、表示部(105)に表示されている画像を、選択されたオブジェクトに応じた新たな画像に変更する。

Description

エネルギー管理システム、表示装置、表示方法及びプログラム
 本発明は、エネルギー管理システム、表示装置、表示方法及びプログラムに関する。
 近年、地球温暖化、エネルギー資源の枯渇などの問題への対応が急務となっており、CO排出量の削減、或いはエネルギー消費量の削減を目的とする取り組みが重要視されている。このような背景から、一戸建て住宅、マンション等の集合住宅についても、太陽光発電システムに代表される分散型発電システムの設置が進められている。
 この種の分散型発電システムによって発電された電力は、その大部分が、発電システムが設置された建物で利用されるが、一部は、電力会社に売電される。そこで、発電システムで発電された電力と、商用電力系統から供給された電力とを比較可能に表示して、居住者に省エネに対する動機付けを行うシステムが提案されている(例えば特許文献1参照)。
 特許文献1に開示されるシステムでは、太陽光発電システムによって発電された電力量を示す棒グラフと、住戸で消費された電力量を示す棒グラフとが、隣接して表示される。このため、居住者は、発電電力量と消費電力量とを容易に比較することが可能となる。
特開2008-141843号公報
 電力についての省エネ化を推進する場合には、住戸に設置される電気設備各々の消費電力を個別に比較することで、効率よく省エネ化を推進することが可能になると考えられる。しかしながら、特許文献1に開示されたシステムでは、電気機器それぞれで消費された電力量を比較することができない。
 また、住宅全体で使用されるエネルギーについての省エネ化を実現するためには、電力だけではなく、水道、ガスなどの資源の消費量を抑制することも重要となる。しかしながら、上記特許文献1に開示されるシステムでは、発電電力と消費電力に関する情報しか表示されない。このため、電力以外のエネルギーについての省エネ化を推進することが困難である。
 本発明は、上述の事情の下になされたもので、住宅に設置される機器で消費されるエネルギーを、効果的に削減することを目的とする。
 上記目的を達成するため、本発明のエネルギー管理システムは、商用電力系統から住宅に供給される電力を計測する第1計測部と、分散型電源によって発電された電力を計測する第2計測部と、住宅に設置される複数の電気機器それぞれに供給される電力を計測する第3計測部と、第1計測部及び第2計測部の計測結果を記憶するとともに、第3計測部の計測結果を、電気機器の位置情報とともに記憶する記憶部と、記憶部に記憶された計測結果を示す画像を、ユーザから指示された形態で、表示装置に表示する処理装置と、表示装置に表示される画像を構成するオブジェクトを選択するための選択部と、を備え、処理装置は、選択部を用いて、ユーザによって画像を構成するオブジェクトが選択されるごとに、表示装置に表示されている画像を、選択されたオブジェクトに応じた新たな画像に変更する。
 本発明によれば、住宅に設置される複数の電気機器それぞれに供給される電力の計測結果が、電気機器の位置情報とともに記憶される。このため、ユーザは、機器ごとに、或いは電気機器が設置される場所ごとに、電力消費量を見ることができる。これにより、ユーザの省エネ化に対する意識が高まり、結果的に、住宅に設置される機器で消費されるエネルギーを、効果的に削減することが可能となる。
本実施形態に係るエネルギー管理システムのブロック図である。 エネルギー管理システムが設置される住宅の概要を示す図である。 住宅に配置された電気機器と商用電力系統の系統図である。 補助記憶部に記憶された情報を模試的に示す図である。 初期画像を示す図である。 タッチ操作を説明するための図である。 機器別消費電力量を示す画像を示す図である。 ポップアップウインドを示す図である。 電気機器ごとの電力量の変化を示すグラフを含む画像を示す図である。 タッチされた領域が強調表示された画像を示す図である。 個別消費電力量を示す円グラフを含む図を示す図である。 現在の電力利用状況を示す画面を示す図である。 現在の電力利用状況を示す画面を示す図である。 現在の電力利用状況を示す画面を示す図である。 節電目標を表す画像を示す図である。 ポップアップウインドを示す図である。 ガス及び水道水の消費量の推移を表す画像を示す図である。 売電実績を示す画像を示す図である。 画像の遷移を説明するための図である。 CTの配置を示す図である。 エネルギー管理システムの変形例を示す図である。
 以下、本発明の一実施形態を図面を参照しつつ説明する。図1は、エネルギー管理システム100のブロック図である。エネルギー管理システム100は、内部が複数の区画に区分された住宅に設置される。このエネルギー管理システム100は、HEMS(Home Energy Management System)などに代表されるように、住宅で使用される電気機器等の監視及び制御に用いられるシステムである。
 図2は、エネルギー管理システム100が設置される住宅10の概略図である。図2に示されるように、住宅10は、例えば父親H1、母親H2、及び子供H3が居住する戸建て住宅である。この住宅10は、内部が居室R1~R4と、共用区画X1に区分されている。本実施形態では、居室R1の使用者は主として父親H1であり、居室R2の使用者は主として母親H2であり、居室R3の使用者は主として子供H3である。居室R4は、いわゆるキッチンとリビングが含まれる居室である。この居室R4は、父親H1、母親H2、及び子供H3が共通に使用する。また、共用区画X1は、トイレ、風呂、洗面所などを含む区画である。
 居室R1には照明装置31と空調装置41が配置され、居室R2には照明装置32と空調装置42が配置され、居室R3には照明装置33と空調装置43が配置されている。そして、居室R4には、照明装置34と空調装置44と調理家電51が配置され、共用区画X1には照明装置35と洗濯乾燥機52が配置されている。
 住宅10の屋根には発電装置20が設けられている。発電装置20は、太陽光を電気エネルギーに変換する太陽光発電装置である。この発電装置20は、住宅10の屋根に設置される太陽電池モジュールと、太陽電池モジュールを住宅10の電力系統に連系させるためのインバータユニットなどを有している。
 図3は、住宅10に配置された電気機器と商用電力系統の系統図である。図3に示されるように、発電装置20、照明装置31~35、空調装置41~44、調理家電51、及び洗濯乾燥機52それぞれは、商用電力系統に並列に接続されている。
 本実施形態に係るエネルギー管理システム100は、住宅10に設置された電気機器で消費される電力、発電装置20によって発電された電力などを、ユーザとしての父親H1、母親H2、子供H3に表示するための装置である。
 図1に示されるように、エネルギー管理システム100は、補助記憶部103に記憶された画像生成プログラムPr1を実行する制御部101と、制御部101の作業領域となる主記憶部102と、ユーザからの指令を受け付けるための入力部104と、ユーザに種々の情報を表示する表示部105と、インタフェース106に接続される電力計71~84と、インタフェース106に接続されるガスメータ91及び水道メータ92と、上記各部を接続するシステムバス107とを有している。
 制御部101は、補助記憶部103に記憶されている画像生成プログラムPr1に従って処理を実行する処理装置である。
 主記憶部102は、RAM(Random Access Memory)等を含んで構成される。制御部101に実行される画像生成プログラムPr1は、主記憶部102に展開される。
 補助記憶部103は、磁気ディスク、半導体メモリ等の不揮発性メモリを含んで構成される記憶装置である。この補助記憶部103は、制御部101が実行する画像生成プログラムPr1を記憶している。また、補助記憶部103は、電力計71~84から出力された計測値を、インタフェース106を介して受信して、時系列的に記憶する。
 入力部104は、タッチパネル、入力キーなどを有している。入力部104のタッチパネルは、表示部105に重ねて配置され、当該表示部105とともにGUI(Graphical User Interface)を構成する。ユーザからの指令は、入力部104を介して入力され、システムバス107を経由して制御部101に通知される。入力部104は、例えば、画像中のオブジェクトを選択するために用いられる。
 表示部105は、VRAM、液晶ディスプレイ(Liquid Crystal Display)などから構成される表示装置である。表示部105は、制御部101の処理結果などを表示する。
 図3に示されるように、電力計71は、商用電力系統の電力を住宅10に引き込むための引き込み線に設けられている。この電力計71は、商用電力系統から住宅10に供給される電力を計測する。そして、電力計71は、計測した電力に応じた値を示す計測信号S1を出力する(図1参照)。
 電力計72も、電力計71と同様に、商用電力系統の電力を住宅10に引き込むための引き込み線に設けられている。この電力計72は、住宅10から商用電力系統に供給される電力を計測する。そして、電力計72は、計測した電力に応じた値を示す計測信号S2を出力する。
 電力計73は、住宅10に設置される発電装置20の発電端に配置されている。そして、電力計73は、発電装置20によって発電された電力を計測し、計測した電力に応じた値を示す計測信号S3を出力する。
 電力計74~84は、例えば、居室R1~R4、及び共用区画X1に配置された電気機器が接続されるレセプタクルなどに配置されている。そして、電力計74~84は、各機器に供給される電力を計測し、計測した電力に応じた値を示す計測信号S4~S14を出力する。
 エネルギー管理システム100では、電力計74,76,78,80,83によって、照明装置31~35に供給される電力、すなわち、照明装置31~35で消費される電力が計測される。また、電力計75,77,79,81によって、空調装置41~44で消費される電力が計測される。そして、電力計82,84によって、調理家電51,洗濯乾燥機52で消費される電力が計測される。
 ガスメータ91は、住宅10へ引き込まれるガス管に設けられている。ガスメータ91は、住宅10へ供給されるガスの流量を計測する。そして、ガスメータ91は、計測した流量に応じた値を示す計測信号S15を出力する。
 水道メータ92は、住宅10へ引き込まれる水道管に設けられている。水道メータ92は、住宅10へ供給される水道水の流量を計測する。そして、水道メータ92は、計測した流量に応じた値を示す計測信号S16を出力する。
 電力計71~84から出力される計測信号S1~S14、ガスメータ91から出力される計測信号S15、及び水道メータ92から出力される計測信号S16は、インタフェース106に受信される。制御部101は、インタフェース106に受信された計測信号S1~S14に示される電力P1(t)~P14(t)、計測信号S15,S16に示される流量F1(t),F2(t)を読み出して、時系列的に補助記憶部103に格納する。tは、補助記憶部103に記憶された時刻であり、Pn(t),F1(t),F2(t)は時刻tにおける電力Pn,流量F1,F2を示す。なお、nは1から14までの整数である。
 図4は、補助記憶部103に記憶された電力P1(t)~P14(t)、流量F1(t),F2(t)を模式的に示す図である。図4に示されるように、電力P1(t)~P14(t)等は、位置情報、機器情報、及びユーザ情報と関連付けられた計測結果情報として、時系列的に記憶される。
 位置情報は、電力Pn(t)を出力する電力計の計測対象が位置する場所を示す。例えば、位置情報「引き込み線」は、電力P1(t),P2(t)が引き込み線を通過する電力であることを示す。また、位置情報「発電端」は、電力P3(t)が、発電装置20が発電した電力であることを示す。また、位置情報「居室R1~R4」,「共用区画」は、電力P4(t)~P14(t)が、居室R1~R4、又は共用区画X1に設置された電気機器によって消費された電力であることを示す。同様に、位置情報「ガス管」は、流量F1(t)が、住宅10に供給されたガスの量であることを示し、位置情報「水道管」は、流量F2(t)が、住宅10に供給された水道水の量であることを示す。
 機器情報は、電力Pn(t)を出力する電力計の計測対象を示す。例えば、機器情報「発電装置」は、電力P3(t)の計測対象が発電装置20であることを示す。同様に、機器情報「照明装置」は、電力P4(t),P6(t),P8(t),P10(t),P13(t)の計測対象が照明装置31~35であることを示す。機器情報「空調装置」は、電力P5(t),P7(t),P9(t),P11(t)の計測対象が空調装置41~44であることを示す。また、機器情報「調理家電」は、電力P12(t)の計測対象が調理家電51であることを示し、機器情報「洗濯乾燥機」は、電力P14(t)の計測対象が洗濯乾燥機52であることを示す。
 ユーザ情報は、電力Pn(t)の計測対象の電気機器のユーザを示す。例えば、ユーザ情報「父親」は、電力P4(t)の計測対象の照明装置31と、電力P5(t)の計測対象の空調装置41のユーザが父親H1であることを示す。ユーザ情報「母親」は、電力P6(t)の計測対象の照明装置32と、電力P7(t)の計測対象の空調装置42と、電力P12(t)の計測対象の調理家電51と、電力P14(t)の計測対象の洗濯乾燥機52のユーザが母親H2であることを示す。ユーザ情報「子供」は、電力P8(t)の計測対象の照明装置33と、電力P9(t)の計測対象の空調装置43のユーザが子供H3であることを示す。
 位置情報、機器情報、及びユーザ情報は、制御部101によって補助記憶部103に格納される。制御部101は、電気機器との通信によりインタフェース106を介して位置情報、機器情報及びユーザ情報を取得してもよい。また、制御部101は、ユーザから入力部104を介して位置情報、機器情報及びユーザ情報を取得してもよい。
 次に、上述のように構成されたエネルギー管理システム100の動作について説明する。エネルギー管理システム100が起動されると、制御部101は、補助記憶部103から表示部105に表示する画像を生成するための画像生成プログラムPr1を読み出して実行する。
 そして、制御部101は、最初に表示部105に、初期画像PH1を表示する。図5は、初期画像PH1の一例を示す図である。図5に示されるように、初期画像PH1には、遷移先の4つの画像PH2~PH5の一覧が表示される。エネルギー管理システム100では、現在の電力利用状況を示す画像PH2、節電目標を示す画像PH3、機器別消費電力量を示す画像PH4、並びに、ガス及び水道水の消費量を示す画像PH5が表示される。
 例えば図6に示されるように、機器別消費電力量を示す画像PH4がユーザにタッチされると、制御部101は、図7に示されるように、機器別消費電力量を示す画像PH4を拡大して表示する。
 機器別消費電力量を示す画像PH4には、円グラフが示される。この円グラフは、機器ごとに消費された電力量を示す8つの扇状のグラフィックパターンGP1~GP8から構成される。画像PH4に示される円グラフでは、グラフィックパターンGP1~GP8の面積が各電気機器の消費電力量の割合を示している。消費電力量の割合とは、電気機器の消費電力量を、各電気機器の消費電力量の和で除したものである。
 本実施形態では、グラフィックパターンGP1は最も消費電力量が大きい電気機器の消費電力量の割合を示し、グラフィックパターンGP2が2番目に消費電力量が大きい電気機器の消費電力量の割合を示し、グラフィックパターンGP3が3番目に消費電力量が大きい電気機器の消費電力量の割合を示し、グラフィックパターンGP4が4番目に消費電力量が大きい電気機器の消費電力量の割合を示し、グラフィックパターンGP5が5番目に消費電力量が大きい電気機器の消費電力量の割合を示し、グラフィックパターンGP6が6番目に消費電力量が大きい電気機器の消費電力量の割合を示し、グラフィックパターンGP7が7番目に消費電力量が大きい電気機器の消費電力量の割合を示している。また、グラフィックパターンGP8は、消費電力量の割合の大きさが8番目以降の電気機器の消費電力量の総和の割合を示している。
 これにより、画像PH4では、上位7つの電気機器での消費電力量の割合が、比較可能に表示されることになる(一覧表示)。例えば、図7に示される円グラフからは、最も消費電力量が大きい電気機器が空調装置44であり、空調装置41、調理家電51、空調装置43、洗濯乾燥機52、空調装置42、照明装置34の順に消費電力量が小さくなっていることを容易に把握することができる。
 各機器が消費した電力量については、図4に示される電力P3(t)~P14(t)が、範囲を24時間として積分されることにより算出される。制御部101は、電力P3(t)~P14(t)に基づいて、各機器の電力量Ph3~Ph14を求める。そして、電力量Ph3~Ph14の割合を示すグラフィックパターンGP1~GP8を、それぞれ表示部105の画面に配置することにより、図7に示される円グラフを生成する。
 本実施形態では、円グラフを構成するグラフィックパターンGP1~GP8の色が予め設定されており、グラフィックパターンGP1~GP8は、大きい順に予め定められた色、或いはパターンで塗りつぶされる。また、図7では、一例として3月6日の実績が表示されているが、ユーザは、画像中の(3月6日)のテキストをタッチして図8に示されるように、カレンダーを示すポップアップウインドPW1を表示させることができる。そして、ユーザは、このポップアップウインドPW1の日付を選択することにより、所望の月日の実績を示す円グラフを表示させることができる。
 また、ユーザは、画像PH4をタッチすることで、図9に示される画像PH4aを表示部105に表示させることができる。画像PH4aは、電気機器ごとの電力の変化を示すグラフである。画像PH4aのグラフでは、横軸と折れ線に挟まれる領域A1、折れ線同士に挟まれる領域A2~A8の面積が電力量を表す。また、領域A1~A8の内容は図7のグラフィックパターンGP1~GP8の内容を具体化したものである。具体的には、グラフィックパターンGP1~GP8は、消費電力量の割合を示すものであるが、領域A1~A8は、消費電力の大きさを示すものである。
 各電気機器の消費電力の大きさは、図4に示される電力P4(t)~P14(t)で示される。このため、制御部101は、電力P4(t)~P14(t)に基づいて、画像PH4aのグラフを生成する。エネルギー管理システム100では、グラフィックパターンGP1~GP8の色又は塗りつぶしパターンは、領域A1~A8の色及び塗りつぶしパターンと一致していることが好ましい。
 また、エネルギー管理システム100では、制御部101は、電力P1(t)と電力P2(t)とを比較する。そして、制御部101は、電力P1(t)の値が正である時間帯に、買電を示すマークM1を表示する。一方、制御部101は、電力P2(t)の値が正である時間帯に、売電を示すマークM2を表示する。
 また、制御部101は、ユーザによって、領域A1~A8がタッチされたときには、図10に示されるように、タッチされた領域を強調表示するとともに、タッチされた領域に対応する電気機器の名称などを表示する。
 制御部101は、ユーザによって、機器別消費電力を示す画像PH4aがタッチされると、図11に示されるように、個別消費電力量を示す円グラフを表示する。この円グラフでは、グラフィックパターンGP11~GP13によって、父親H1、母親H2、子供H3に割り当てられた電気機器の消費電力量の割合が示され、グラフィックパターンGP14によって、父親H1、母親H2、子供H3のいずれにも割り当てられていない電気機器の消費電力量の割合が示される。また、グラフィックパターンGP21~GP25によって、居室R1~R4及び共用区画X1での消費電力量の割合が表示される。
 場所ごとに消費される電力量については、図4の位置情報を利用して算出することができる。制御部101は、例えば、居室R1で消費された電力量を算出する場合には、電力P4(t)と電力P5(t)の和を用いて、居室R1で消費された電力量を算出し、算出した電力量に応じた大きさのグラフィックパターンを形成する。
 ユーザごとに消費される電力については、図4のユーザ情報を利用して算出することができる。制御部101は、例えば、父親H1に割り当てられた電気機器が消費した電力量を算出する場合には、電力P4(t)と電力P5(t)の和を用いて、父親H1が消費した電力量を算出し、算出した電力量に応じた大きさのグラフィックパターンを形成する。
 そして、制御部101は、上述したように形成したグラフィックパターンGP11~GP14,GP21~GP25を、表示部105の画面に配置することにより、画像PH4bを生成する。
 本実施形態では、居室R1の使用者が父親H1であり、居室R2の使用者が母親H2であり、居室R3の使用者が子供H3である。このため、相互に関連する、グラフィックパターンGP11とグラフィックパターンGP22、グラフィックパターンGP12とグラフィックパターンGP23、グラフィックパターンGP13とグラフィックパターンGP25が同系色の色、或いは同系統のパターンで塗りつぶされる。
 この画面が表示されているときには、ユーザは、日付を示すテキストが示される領域をタッチすることで、図8に示されるポップアップウインドPW1を表示させ、このポップアップウインドPW1を介して年月日を指定することで、所望の日付の情報を画像PH4bとして表示させることができる。
 エネルギー管理システム100では、画像PH4bがユーザによってタッチされると、表示部105に図5に示される初期画面が表示される。
 図5に示される初期画像PH1が表示されているときに、ユーザによって画像PH2がタッチされると、制御部101は、一例として図12に示されるように、現在の電力利用状況を示す画像PH2を拡大して表示する。現在の電力利用状況としては、態様1、態様2、態様3の3つの態様が考えられる。
 態様1は、発電装置20によって発電された電力で住宅10に設置された電気機器を稼動するとともに、余剰電力を商用電力系統に潮流させることによって売電する態様である。態様2は、発電装置20によって発電された電力と商用電力系統からの電力双方で、住宅10に設置された電気機器を稼動する態様である。態様3は、商用電力系統から供給される電力で、住宅10に設置された電気機器を稼動する態様である。
 図12は、態様1における現在の電力利用状況を示す画像PH2aである。図12に示されるように、画像PH2aは、発電電力を示す棒グラフB1、消費電力を示す棒グラフB2、売電電力を示す棒グラフB3から構成される。制御部101は、図4に示される電力P3(t)の値に応じた大きさの棒グラフB1と、電力P2(t)の値に応じた大きさの棒グラフB3と、電力P3(t)と電力P2(t)との差に応じた大きさの棒グラフB2を、表示部105の画面に配置することにより、画像PH2aを生成する。
 図13は、態様2における現在の電力利用状況を示す画像PH2bである。図13に示されるように、画像PH2bは、発電電力を示す棒グラフB1、消費電力を示す棒グラフB2、買電電力を示す棒グラフB3から構成される。制御部101は、図4に示される電力P3(t)の値に応じた大きさの棒グラフB1と、電力P1(t)の値に応じた大きさの棒グラフB3と、電力P3(t)と電力P1(t)との和に応じた大きさの棒グラフB2を、表示部105の画面に配置することにより、画像PH2bを生成する。
 図14は、態様3における現在の電力利用状況を示す画像PH2cである。図14に示されるように、画像PH2cは、消費電力を示す棒グラフB2、買電電力を示す棒グラフB3から構成される。制御部101は、図4に示される電力P1(t)の値に応じた大きさの棒グラフB3、B2を、表示部105の画面に配置することにより、画像PH2cを生成する。
 エネルギー管理システム100では、画像PH2a~PH2cがユーザによってタッチされると、表示部105に図5に示される初期画面が表示される。
 図5に示される初期画像PH1が表示されているときに、ユーザによって画像PH3がタッチされると、制御部101は、図15に示されるように、節電目標を示す画像PH3を拡大して表示する。節電目標を示す画像PH3には、例えば昨年の1ヶ月あたりの電力消費量を示す棒グラフB4と、今月の電力消費量を示す棒グラフB5と、節電目標を示すラインLNが示される。
 制御部101は、例えば、電力P1(t)を積分した値に、単位電力量あたりの料金を乗じて得られる値に対応する大きさの各棒グラフB4,B5を、表示部105の画面に配置するとともに、入力部104を介して入力された節電目標を示すラインLNを、表示部105の画面に配置することにより、画像PH3を生成する。
 この画面が表示されているときには、ユーザは、棒グラフB4,B5の下方に示されるテキストが示される領域をタッチすることで、図8に示されるポップアップウインドPW1を表示させ、このポップアップウインドPW1を介して年月を指定することで、所望の月の消費電力量を示す棒グラフB4,B5を表示させることができる。
 また、制御部101は、ユーザによって、棒グラフB4,B5がタッチされたときには、図16に示されるように、図7の画像PH4に示される円グラフが示されるポップアップウインドPW2を表示させる。
 エネルギー管理システム100では、画像PH3がユーザによってタッチされると、表示部105に図5に示される初期画面が表示される。
 図5に示される初期画像PH1が表示されているときに、ユーザによって画像PH5がタッチされると、制御部101は、図17に示されるように、ガス及び水道水の消費量の推移を示す画像PH5を拡大して表示する。ガス及び水道水の消費量を示す画像PH5には、ガスと水道水の流量の時間的変化を示す線グラフLG1,LG2が示される。
 制御部101は、ガスの流量F1(t)に対応する線グラフLG1と、水道水の流量F2(t)に対応する線グラフLG2を、表示部105の画面に配置することにより、画像PH5を生成する。
 エネルギー管理システム100では、画像PH5がユーザによってタッチされると、表示部105に図5に示される初期画面が表示される。
 以上説明したように、本実施形態では、ユーザは、初期画像PH1を構成する画像PH2~PH5をタッチすることで、蓄積されたデータの内容を、所望の情報を示す画像PH2~PH5等として表示させることができる。このため、各画像PH2~PH5等を視認することで、ユーザそれぞれの省エネ化に対する意識が高まり、結果的に住宅10に設置される電気機器で消費されるエネルギーを効果的に削減することが期待できる。
 本実施形態では、図7の画像PH4,図9の画像PH4aに示されるように、電気機器ごとに消費電力などが表示される。このため、ユーザは、どの電気機器についての省エネ行動が最も効果的であるかを容易に認識することが可能となる。これにより、エネルギーを効果的に削減することが可能となる。
 本実施形態では、図11の画像PH4bに示されるように、住宅10の区画(R1~R4,X1)ごとに消費電力量が表示される。このため、ユーザは、どの区画についての省エネ行動が最も効果的であるかを容易に認識することが可能となる。これにより、エネルギーを効果的に削減することが可能となる。
 本実施形態では、図11の画像PH4bに示されるように、ユーザ(H1,H2,H3)ごとに消費電力が表示される。このため、ユーザは、誰の省エネ行動が最も効果的であるかを容易に認識することが可能となる。これにより、エネルギーを効果的に削減することが可能となる。
 なお、本実施形態では、表示部105、制御部101、主記憶部102、補助記憶部103、入力部104などにより、本発明に係る表示装置が構成される。
 以上、本発明の実施形態について説明したが、本発明は各実施形態によって限定されるものではない。例えば、住宅10が居室R1~R4と共用区画X1の5つに区分されている場合について説明した。これに限らず、住宅10は、6つ以上の区画に区分されていてもよい。
 上記実施形態において、ユーザによる節電目標の設定の際に、制御部101は、例えば図18に示されるように、売電実績を示す画像PH6を表示することとしてもよい。各棒グラフは、電力P1(t),電力P2(t)から求めることができ、零を示す線から下方に延びる棒グラフが買電電力量を示し、零を示す線から上方に延びる棒グラフが売電電力量を示す。売電実績を確認することで、ユーザは、正確に省エネの目標を設定することが可能となる。
 上記実施形態では、図19に示されるように、表示部105に表示される画像が、画像PH1、画像PH2a,PH2b,PH2cの順に遷移するか、画像PH1、画像PH3の順に遷移するか、画像PH1、画像PH4、画像PH4a、画像PH4bの順に遷移するか、画像PH1、画像PH5の順に遷移する場合について説明した。表示部105に表示される画像が遷移する順番は、図19に示される場合に限られるものではなく、ユーザによって任意に設定することが可能である。
 上記実施形態では、図7等に示されるように円グラフを構成するグラフィックパターンGP1~GP8が、面積の大きい順に配列された。これに限らず、ユーザからの指示に基づいて、配列順を変更するようにしてもよい。
 上記実施形態では、図7等に示されるように、消費電力が少ない電気機器における消費電力も、グラフィックパターンGP8によって表示された。これに限らず、制御部101は、消費電力が特に多い電気機器についてのみ、その消費電力をグラフィックパターンで表示することとしてもよい。また、同じ区画の電気機器についてのグラフィックパターンについては、同系統の色又はパターンで塗りつぶすのが望ましい。さらに、消費電力の変動が多い電気機器についてのグラフィックパターンの色を、特定の色又はパターンで塗りつぶすこととしてもよい。
 上記実施形態では、図1及び図3に示されるように、発電装置20によって発電される電力、照明装置31~35、空調装置41~44、調理家電51、洗濯乾燥機52で消費される電力、商用電力系統から住宅10へ供給される電力等が、電力計71~84によって計測されることとした。本発明はこれに限定されるものではない。
 例えば、図20に示されるように、電力計測装置86が、発電装置20、照明装置31~35、空調装置41~44、調理家電51、洗濯乾燥機52などの各機器の引き込み線に設けられたCT(Current Transformer)85を用いて、各機器で消費される電力を計測することとしてもよい。
 図20に示されるように、CT85それぞれの二次側は、電力計測装置86に接続される。電力計測装置86は、各CT85の二次電流を監視する。そして、図21に示されるように、各機器についての電力を示す計測信号S1~S14を、インタフェース106へ出力する。これにより、エネルギー管理システム100の制御部101は、各機器での電力情報を、表示部105へ表示することが可能となる。
 また、上記電力の計測手段は一例であり、例えば各機器が消費電力を計測する機能を有している場合には、制御部101は、各機器によって計測された電力を示す情報を、当該機器から取得することとしてもよい。
 上記実施形態では、入力部104と表示部105はGUIを構成するものとした。これに限らず、入力部104と表示部105の機能をスマートホンなどの通信端末を用いて実現してもよい。
 上記実施形態では、住宅10に設置される電気機器として、照明装置、空調装置、調理家電、洗濯乾燥機を例にあげて説明した。これに限らず、住宅10に設置される電気機器としては電気給湯器などが考えられる。
 上記実施形態における各画像PH1~PH5等は、一例であって、本発明は、これに限定されるものではない。
 上記実施形態では、画像PH1~PH5を構成するオブジェクトがユーザのタッチ操作によって選択されると、表示部105に表示される画像は、選択されたオブジェクトに応じた新たな画像に変更された。
 例えば、初期画像PH1を構成する画像PH2~PH5(図5,6を参照)がオブジェクトとして選択されると、画像PH2~PH5が拡大して表示された(図7,12,15,17を参照)。また、オブジェクトの例として、画像を構成するテキストが選択されると、年月日を指定するためのポップアップウインドPW1が表示された(図8を参照)。さらに、このポップアップウインドPW1に示される日付がオブジェクトとして選択されると、選択された日付に関するグラフが表示された。
 また、画像PH4のうち、テキスト以外の領域がオブジェクトとして選択されると、画像PH4aが表示された(図9を参照)。同様に、画像PH4aの一部以外が選択されると、グラフが変更され(図11を参照)、画像PH4b,PH2a~PH2c,PH3,PH5各々の大部分がオブジェクトとして選択されると、初期画面が表示された(図19を参照)。
 また、画像PH4aを構成する領域A1~A8がオブジェクトとして選択されると、選択された領域が強調表示された(図10を参照)。また、画像PH3を構成する棒グラフB4,B5が選択されると、ポップアップウインドPW2が表示された(図16を参照)。
 しかしながら、画像を構成するオブジェクトは、これらに限られない。例えば、画像を変更するためのオブジェクトは、機器、ユーザ又は位置などを示すアイコンであってもよい。画像を構成するオブジェクトは、画像自体であってもよい。
 上記実施形態に係るエネルギー管理システム100の機能は、専用のハードウェアによっても、また、通常のコンピュータを用いても実現することができる。
 補助記憶部103に記憶されている画像生成プログラムPr1は、フレキシブルディスク、CD-ROM(Compact Disk Read-Only Memory)、DVD(Digital Versatile Disk)、MO(Magnet-Optical Disk)等のコンピュータ読み取り可能な記録媒体に格納して配布され、コンピュータにインストールされたものであってもよい。
 また、画像生成プログラムPr1は、通常インターネット等の通信ネットワーク上のサーバ装置が有するディスク装置等に格納されており、必要に応じてダウンロードされたものであってもよい。
 本発明は、本発明の広義の精神と範囲を逸脱することなく、様々な実施形態及び変形が可能とされるものである。また、上述した実施形態は、本発明を説明するためのものであり、本発明の範囲を限定するものではない。つまり、本発明の範囲は、実施形態ではなく、請求の範囲によって示される。そして、請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、本発明の範囲内とみなされる。
 この出願は、2013年7月30日に出願された日本国特許出願2013-157489号に基づく。本明細書中に日本国特許出願2013-157489号の明細書、特許請求の範囲、図面全体を参照として取り込むものとする。
 本発明のエネルギー管理システムはエネルギーの管理に適している。本発明の表示装置、表示方法、及びプログラムは、電力の利用状況の表示に適している。
 10 住宅、20 発電装置、31~35 照明装置、41~44 空調装置、51 調理家電、52 洗濯乾燥機、71~84 電力計、85 CT、86 電力計測装置、91 ガスメータ、92 水道メータ、100 エネルギー管理システム、101 制御部、102 主記憶部、103 補助記憶部、104 入力部、105 表示部、106 インタフェース、107 システムバス、A1~A8 領域、B1~B5 棒グラフ、GP1~GP8,GP11~GP14,GP22~GP25 グラフィックパターン、H1 父親、H2 母親、H3 子供、LG1,LG2 線グラフ、M1,M2 マーク、PH1~PH6 画像、PW1,PW2 ポップアップウインド、PH2a,PH2b,PH2c,PH4a,PH4b 画像、R1~R4 居室、S1~S16 計測信号、X1 共用区画。

Claims (11)

  1.  商用電力系統から住宅に供給される電力を計測する第1計測部と、
     分散型電源によって発電された電力を計測する第2計測部と、
     前記住宅に設置される複数の電気機器それぞれに供給される電力を計測する第3計測部と、
     前記第1計測部及び前記第2計測部の計測結果を記憶するとともに、前記第3計測部の計測結果を、前記電気機器の位置情報とともに記憶する記憶部と、
     前記記憶部に記憶された計測結果を示す画像を、ユーザから指示された形態で、表示装置に表示する処理装置と、
     前記表示装置に表示される画像を構成するオブジェクトを選択するための選択部と、
     を備え、
     前記処理装置は、
     前記選択部を用いて、ユーザによって画像を構成する前記オブジェクトが選択されるごとに、前記表示装置に表示されている画像を、選択された前記オブジェクトに応じた新たな画像に変更するエネルギー管理システム。
  2.  前記処理装置は、初期画像として、前記表示装置に表示される画像の一覧を、前記表示装置に表示する請求項1に記載のエネルギー管理システム。
  3.  前記処理装置は、前記第3計測部の計測結果を、前記電気機器ごとに、一覧表示する請求項1又は2に記載のエネルギー管理システム。
  4.  前記処理装置は、前記第3計測部の計測結果を、前記位置情報に示される位置ごとに、一覧表示する請求項1から3のいずれか一項に記載のエネルギー管理システム。
  5.  前記処理装置は、前記第3計測部の計測結果を、前記位置に応じた系統の色で示されるグラフとして、前記表示装置に表示する請求項4に記載のエネルギー管理システム。
  6.  前記記憶部は、前記電気機器と前記電気機器を使用するユーザとの対応関係を示す対応情報を記憶し、
     前記処理装置は、前記対応情報に基づいて、前記第3計測部の計測結果を、ユーザごとに、一覧表示する請求項1から5のいずれか一項に記載のエネルギー管理システム。
  7.  前記処理装置は、前記第3計測部の計測結果を、ユーザに応じた系統の色で示されるグラフとして、前記表示装置に表示する請求項6に記載のエネルギー管理システム。
  8.  前記住宅に供給される水道又はガスの消費量を計測する第4計測部を備え、
     前記処理装置は、前記第4計測部の計測結果を示す画像を、ユーザから指示された形態で前記表示装置に表示する請求項1から7のいずれか一項に記載のエネルギー管理システム。
  9.  商用電力系統から住宅に供給される電力の計測結果、分散型電源によって発電された電力の計測結果、及び前記住宅に設置される複数の電気機器それぞれに供給される電力の計測結果を記憶する記憶部と、
     前記記憶部に記憶された計測結果を示す画像を、ユーザから指示された形態で、表示部に表示する処理装置と、
     を備える表示装置。
  10.  商用電力系統から住宅に供給される電力を計測する第1計測工程と、
     分散型電源によって発電された電力を計測する第2計測工程と、
     前記住宅に設置される複数の電気機器それぞれに供給される電力を計測する第3計測工程と、
     前記第1計測工程と前記第2計測工程とにおける計測結果を記憶装置に格納する第1格納工程と、
     前記第3計測工程における計測結果を、前記電気機器の位置情報とともに前記記憶装置に格納する第2格納工程と、
     前記記憶装置に格納された計測結果を示す画像を、ユーザから指示された形態で、表示装置に表示する表示工程と、
     を含み、
     前記表示工程では、ユーザによって画像を構成するオブジェクトが選択されるごとに、前記表示装置に表示されている画像を、選択された前記オブジェクトに応じた新たな画像に変更する、表示方法。
  11.  コンピュータに、
     住宅に供給される電力と分散型電源によって発電された電力の計測結果を記憶装置に格納する第1格納手順、
     前記住宅に設置される複数の電気機器それぞれに供給される電力の計測結果を、前記電気機器の位置情報とともに前記記憶装置に格納する第2格納手順、
     前記記憶装置に格納された計測結果を示す画像を、ユーザから指示された形態で、表示装置に表示する表示手順、
     を実行させ、
     前記表示手順では、ユーザによって画像を構成するオブジェクトが選択されるごとに、前記表示装置に表示されている画像を、選択された前記オブジェクトに応じた新たな画像に変更する、プログラム。
PCT/JP2014/070140 2013-07-30 2014-07-30 エネルギー管理システム、表示装置、表示方法及びプログラム Ceased WO2015016288A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
KR1020187014466A KR20180058236A (ko) 2013-07-30 2014-07-30 에너지 관리 시스템, 표시 장치, 표시 방법 및 프로그램
US14/908,241 US20160172906A1 (en) 2013-07-30 2014-07-30 Energy management system, display device, display method, and program
CN201480042844.0A CN105409091B (zh) 2013-07-30 2014-07-30 能源管理系统、显示装置以及显示方法
KR1020197009135A KR20190037371A (ko) 2013-07-30 2014-07-30 에너지 관리 시스템, 표시 장치, 표시 방법 및 프로그램
EP14833040.0A EP3029805B1 (en) 2013-07-30 2014-07-30 Energy management system, display device, display method, and program
KR1020167005014A KR20160036598A (ko) 2013-07-30 2014-07-30 에너지 관리 시스템, 표시 장치, 표시 방법 및 프로그램

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013-157489 2013-07-30
JP2013157489A JP5892982B2 (ja) 2013-07-30 2013-07-30 エネルギー管理システム、表示装置、表示方法及びプログラム

Publications (1)

Publication Number Publication Date
WO2015016288A1 true WO2015016288A1 (ja) 2015-02-05

Family

ID=52431818

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/070140 Ceased WO2015016288A1 (ja) 2013-07-30 2014-07-30 エネルギー管理システム、表示装置、表示方法及びプログラム

Country Status (6)

Country Link
US (1) US20160172906A1 (ja)
EP (1) EP3029805B1 (ja)
JP (1) JP5892982B2 (ja)
KR (3) KR20180058236A (ja)
CN (1) CN105409091B (ja)
WO (1) WO2015016288A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017038356A1 (ja) * 2015-08-31 2017-03-09 シャープ株式会社 電力情報管理装置、電力情報管理システム、および、電力情報管理方法

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5891931B2 (ja) * 2012-04-27 2016-03-23 ソニー株式会社 表示制御装置、表示制御方法、表示制御プログラムおよび携帯端末
JP6851007B2 (ja) * 2016-04-14 2021-03-31 パナソニックIpマネジメント株式会社 表示方法、プログラム、および表示システム
JP6736957B2 (ja) * 2016-04-25 2020-08-05 住友電気工業株式会社 表示プログラム、端末装置、および電力管理システム
JP2018049509A (ja) * 2016-09-23 2018-03-29 アズビル株式会社 グラフ表示装置および表示方法
KR20180088165A (ko) 2017-01-26 2018-08-03 엘지전자 주식회사 에너지 관리 장치 및 그의 동작 방법
KR102658469B1 (ko) * 2017-01-26 2024-04-18 엘지전자 주식회사 에너지 관리 장치 및 그의 동작 방법
JP6725750B2 (ja) * 2017-03-28 2020-07-22 東芝エネルギーシステムズ株式会社 監視システム、画像情報提供装置、クライアント制御装置、画像情報提供プログラム、及びクライアント制御プログラム
US11047115B2 (en) * 2017-06-02 2021-06-29 H2Optimize, LLC Water meter system and method
JP6566153B1 (ja) * 2017-10-16 2019-08-28 Dic株式会社 ネマチック液晶組成物及びこれを用いた液晶表示素子
JP2020129254A (ja) * 2019-02-08 2020-08-27 株式会社メルカリ プログラム、情報処理装置、及び情報処理方法
CN110601368B (zh) * 2019-09-27 2020-12-01 珠海格力电器股份有限公司 能源系统显示终端及显示方法、局域能源互联网系统
US12182385B2 (en) 2021-11-08 2024-12-31 Tyco Fire & Security Gmbh Building automation system with resource consumption tracking features
CN116774594A (zh) * 2022-03-17 2023-09-19 宝洁公司 数字家庭控制和推荐
JP7493086B1 (ja) 2023-08-18 2024-05-30 東芝ライフスタイル株式会社 アプリケーションプログラム、端末装置、家電機器管理システム、および家電機器管理方法
GB2639622A (en) * 2024-03-19 2025-10-01 Boss Cabins Ltd Welfare cabin control system
CN119271329A (zh) * 2024-09-14 2025-01-07 上海摩瓦新能源科技有限公司 能源数据的显示方法、装置、终端、介质以及程序产品

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002189779A (ja) * 2000-12-22 2002-07-05 Tokyo Energy Research:Kk エネルギー情報処理システム並びにサーバ及びエネルギー情報処理装置並びに記録媒体
JP2004140997A (ja) * 2001-05-08 2004-05-13 Sanyo Electric Co Ltd 分散発電システムとそれを利用可能なエネルギー管理システム
JP2008141843A (ja) 2006-11-30 2008-06-19 Matsushita Electric Works Ltd エネルギー機器稼動状況表示モニター
WO2009066740A1 (ja) * 2007-11-20 2009-05-28 Panasonic Electric Works Co., Ltd. エネルギーマネジメントシステム
JP2011120428A (ja) * 2009-12-07 2011-06-16 Daiwa House Industry Co Ltd 宅内電力使用量管理システム
JP2013106414A (ja) * 2011-11-11 2013-05-30 Sharp Corp 電力管理装置、電力管理装置の制御方法および制御プログラム
WO2013088584A1 (ja) * 2011-12-14 2013-06-20 京セラ株式会社 表示端末、電力制御システム、および表示方法

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101377864B1 (ko) * 2007-05-15 2014-03-25 엘지전자 주식회사 영상표시장치 및 그 제어방법
WO2009052121A2 (en) * 2007-10-14 2009-04-23 Gilbert Masters Electrical energy usage monitoring system
US8396678B2 (en) * 2008-08-11 2013-03-12 Edward L. Davis Peakpower energy management and control system method and apparatus
JP5512212B2 (ja) * 2009-09-29 2014-06-04 パナソニック株式会社 電力管理システム
US20120215370A1 (en) * 2009-10-26 2012-08-23 Lg Electronics Inc. Network system and method of controlling the same
WO2012148596A1 (en) * 2011-04-29 2012-11-01 Electric Transportation Engineering Corporation, D/B/A Ecotality North America System for measuring electricity and method of providing and using the same
JP5085751B2 (ja) * 2011-02-28 2012-11-28 株式会社東芝 電子機器及び情報出力方法
JP5318172B2 (ja) * 2011-09-30 2013-10-16 株式会社東芝 電子機器およびプログラム
US9494625B2 (en) * 2011-11-11 2016-11-15 Sharp Kabushiki Kaisha Power management device, method of controlling power management device, and program for controlling power management device
JP2013118599A (ja) * 2011-12-05 2013-06-13 Canon Inc 管理システム、管理装置、管理方法、及びプログラム
JP5643791B2 (ja) * 2012-07-23 2014-12-17 株式会社東芝 電力需給制御装置及び電力需給制御方法
US9728964B2 (en) * 2013-03-15 2017-08-08 Vivint, Inc. Power production monitoring or control

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002189779A (ja) * 2000-12-22 2002-07-05 Tokyo Energy Research:Kk エネルギー情報処理システム並びにサーバ及びエネルギー情報処理装置並びに記録媒体
JP2004140997A (ja) * 2001-05-08 2004-05-13 Sanyo Electric Co Ltd 分散発電システムとそれを利用可能なエネルギー管理システム
JP2008141843A (ja) 2006-11-30 2008-06-19 Matsushita Electric Works Ltd エネルギー機器稼動状況表示モニター
WO2009066740A1 (ja) * 2007-11-20 2009-05-28 Panasonic Electric Works Co., Ltd. エネルギーマネジメントシステム
JP2011120428A (ja) * 2009-12-07 2011-06-16 Daiwa House Industry Co Ltd 宅内電力使用量管理システム
JP2013106414A (ja) * 2011-11-11 2013-05-30 Sharp Corp 電力管理装置、電力管理装置の制御方法および制御プログラム
WO2013088584A1 (ja) * 2011-12-14 2013-06-20 京セラ株式会社 表示端末、電力制御システム、および表示方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017038356A1 (ja) * 2015-08-31 2017-03-09 シャープ株式会社 電力情報管理装置、電力情報管理システム、および、電力情報管理方法
JPWO2017038356A1 (ja) * 2015-08-31 2018-06-14 シャープ株式会社 電力情報管理装置、電力情報管理システム、および、電力情報管理方法

Also Published As

Publication number Publication date
KR20180058236A (ko) 2018-05-31
JP5892982B2 (ja) 2016-03-23
CN105409091B (zh) 2019-06-18
KR20160036598A (ko) 2016-04-04
EP3029805B1 (en) 2018-12-26
EP3029805A4 (en) 2017-02-15
US20160172906A1 (en) 2016-06-16
KR20190037371A (ko) 2019-04-05
CN105409091A (zh) 2016-03-16
EP3029805A1 (en) 2016-06-08
JP2015029371A (ja) 2015-02-12

Similar Documents

Publication Publication Date Title
JP5892982B2 (ja) エネルギー管理システム、表示装置、表示方法及びプログラム
CN102136102B (zh) 针对消费者能源消耗的分析
Palacios-Garcia et al. Stochastic model for lighting's electricity consumption in the residential sector. Impact of energy saving actions
US11435772B2 (en) Systems and methods for optimizing energy usage using energy disaggregation data and time of use information
US20110015798A1 (en) Building Energy Usage Auditing, Reporting, and Visualization
JP5861100B2 (ja) 省エネルギー化提案システム、省エネルギー化提案方法
KR101434296B1 (ko) 공동 주택의 에너지 소비량 모니터링 장치 및 방법
US20170122773A1 (en) Resource Consumption Monitoring System, Platform and Method
US20140340075A1 (en) Power management device, method of controlling power management device, and program for controlling power management device
JP6016152B2 (ja) エネルギーマネジメントシステム及びサーバ装置
WO2015046320A1 (ja) ホームエネルギーマネージメントシステム及びホームエネルギーマネージメント方法
JP7038314B2 (ja) 表示制御方法、表示制御プログラム、及び表示制御システム
JP2013033401A (ja) 住宅用エネルギー消費量予測装置
JP6883749B2 (ja) プログラム、情報端末装置の制御方法、表示システム、端末制御装置、および表示装置
JP6851007B2 (ja) 表示方法、プログラム、および表示システム
JP6123139B2 (ja) 省エネルギー化提案システム、省エネルギー化サーバ、省エネルギー化提案方法
JP6202988B2 (ja) 電力計測システム、電力計測方法、及びプログラム
JP6971070B2 (ja) 電力管理装置、電力管理方法、電力管理プログラム
JP2010182146A (ja) 用途分解装置および用途分解プログラム
JP2009074965A (ja) エネルギー消費削減支援装置
EP2675112A1 (en) Method and energy management unit for load scheduling in building automation
JP5875556B2 (ja) エネルギー管理システム、表示装置、表示方法及びプログラム
JP2011141763A (ja) 用途分解装置、用途分解方法、及び用途分解プログラム
JP2017118345A (ja) エネルギ表示装置
JP6074727B2 (ja) エネルギーマネジメントシステム及びサーバ装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201480042844.0

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14833040

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14908241

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2014833040

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 20167005014

Country of ref document: KR

Kind code of ref document: A