一种空调功耗估算方法及装置 Download PDFInfo
- Publication number
- WO2018201996A1 WO2018201996A1 PCT/CN2018/085032 CN2018085032W WO2018201996A1 WO 2018201996 A1 WO2018201996 A1 WO 2018201996A1 CN 2018085032 W CN2018085032 W CN 2018085032W WO 2018201996 A1 WO2018201996 A1 WO 2018201996A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- air conditioner
- power
- air
- air conditioners
- power consumption
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F11/46—Improving electric energy efficiency or saving
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2140/00—Control inputs relating to system states
- F24F2140/60—Energy consumption
Definitions
- the invention relates to the technical field of air conditioners, and in particular to a method and a device for estimating power consumption of an air conditioner.
- the embodiment of the invention provides a method and a device for estimating the power consumption of an air conditioner, so as to solve the problem that the estimation of the power consumption of the air conditioner in the prior art is performed by using laboratory data, and the error is relatively large.
- a brief summary is given below. This generalization is not a general comment, nor is it intended to identify key/critical constituent elements or to describe the scope of protection of these embodiments. Its sole purpose is to present some concepts in a simplified form as a prelude to the following detailed description.
- a method for estimating an air conditioner power consumption is provided.
- an air conditioning power consumption estimating method includes:
- the operating parameters include: each of the first ones in the T period
- the estimated power consumption during the T period includes:
- the power consumption of the second air conditioner during the T time period is calculated according to the following formula, including:
- determining the power correction coefficient ⁇ i of the n first air conditioners according to the model of the n first air conditioners and the model number of the second air conditioner including:
- the method further includes:
- the set temperature of the second air conditioner in the T period is a second temperature, the second temperature and the first Different temperature
- the calculating the actual power consumption W2 of the second air conditioner during the T period includes:
- Acquiring operating parameters of the second air-conditioning period T comprising: a conditioning period T m times reported power P y, and the operating time corresponding to each of the power P y t y;
- the actual power consumption W2 is calculated according to the following formula:
- y 1, 2, . . . , m
- m is a positive integer not less than 1.
- estimating, according to the model of the n first air conditioners and the operating parameters of the first air conditioners in the T period, the set temperature of the second air conditioner in the T period is the first temperature Power consumption; in the present embodiment, when estimating the power consumption of the air conditioner, the data used is not calculated according to the laboratory data, but by retrieving the model and operating parameters of the first air conditioners of the same area and the same operating time period. And based on these parameters, it is estimated that the second air conditioner consumes power during the period.
- the operating parameters of the n first air conditioners are collected during the same running time period, and the parameters are determined by the geographic location, outdoor environment, indoor environment, floor type, model, etc. of each of the first air conditioners.
- the estimated power consumption of the second air conditioner also corresponds to the time period, so the power consumption of the air conditioner converted by the embodiment is more accurate than the calculation method by the experimental data in the prior art.
- an air conditioner power consumption estimating device is provided.
- an air conditioning power consumption estimating device includes: a signal receiver and a processor; wherein
- the processor is configured to determine, according to the model of the n first air conditioners and the model of the second air conditioner, a power correction coefficient ⁇ i of the n first air conditioners; and, according to the n first air conditioners
- the operating parameters of each of the first air conditioners in the T period and the power correction coefficient ⁇ i calculate the power consumption of the second air conditioner in the T period.
- the processor is further configured to calculate the first n units of each first air-conditioned air conditioner correction power P i; and, n is calculated according to the first station in each of the first air-conditioned air conditioning power P i of the corrected Average corrected power of n first air conditioners And, according to the average corrected power of the n first air conditioners Calculating an estimated power consumption W1 of the second air conditioner in the T period.
- the processor is further configured to calculate a corrected power P i of each of the n first air conditioners according to the following formula:
- the processor is further configured to determine a coefficient a 0 of the second air conditioner according to a model of the second air conditioner;
- the processor is further configured to acquire an operating parameter of the second air conditioner in a T time period, including: m times power P y reported by the second air conditioner in the T time period, and corresponding to each power P y running time t y ;
- the actual power consumption W2 is calculated according to the following formula:
- estimating, according to the model of the n first air conditioners and the operating parameters of the first air conditioners in the T period, the set temperature of the second air conditioner in the T period is the first temperature Power consumption; in the present embodiment, when estimating the power consumption of the air conditioner, the data used is not calculated according to the laboratory data, but by retrieving the model and operating parameters of the first air conditioners of the same area and the same operating time period. And based on these parameters, it is estimated that the second air conditioner consumes power during the period.
- the operating parameters of the n first air conditioners are collected during the same running time period, and the parameters are determined by the geographic location, outdoor environment, indoor environment, floor type, model, etc. of each of the first air conditioners.
- the estimated power consumption of the second air conditioner also corresponds to the time period, so the power consumption of the air conditioner converted by the embodiment is more accurate than the calculation method by the experimental data in the prior art.
- FIG. 1 is a schematic flow chart of a method for estimating power consumption of an air conditioner according to an exemplary embodiment
- FIG. 2 is a schematic flow chart of a method for estimating power consumption of an air conditioner according to an exemplary embodiment
- FIG. 3 is a block diagram of an air conditioner power consumption estimating apparatus according to an exemplary embodiment.
- the power saving amount of the air conditioner is determined according to the difference between the estimated power consumption of the air conditioner and the actual power consumption of the air conditioner during the period after the power saving control, such as the adjustment of the air conditioner from the first state to the second state, that is, the T period. .
- the actual power consumption of the air conditioner can be calculated according to the power and time of the air conditioner feedback, but the estimated power consumption of the air conditioner needs to be calculated according to the laboratory data.
- the overall concept of the present invention is to obtain the model and operating parameters of the plurality of air conditioners in the first state during the T time period; and calculate the estimated power consumption in the T period when the air conditioner is in the first state according to the above parameters. .
- the first state refers to a state before the air conditioner performs power saving control
- the second state refers to a state after the air conditioner performs power saving control
- the first state and the second state may be settings for the air conditioner.
- the temperature is adjusted, for example, the first temperature is adjusted to the second temperature; or the air speed is adjusted, for example, the first wind speed is adjusted to the second wind speed.
- the first air conditioner is a type of air conditioner that retrieves its model and operating parameters from the database when calculating the estimated power consumption of the second air conditioner; the operating state of the first air conditioner in the T period is compared with the second air conditioner The operating state before the power saving control is the same, that is, the first air conditioner is in the first state.
- the first air conditioner and the second air conditioner are located in the same area, such as the same city or the same area, and the outdoor environment is basically the same.
- the second air conditioner is an air conditioner that performs power saving control in the present invention and needs to calculate its estimated power consumption.
- the second air conditioner is in the first state before the power saving control, and is in the first state; after the power saving control is performed on the second air conditioner, the second air conditioner is adjusted from the first state to the second state.
- the model number of the first air conditioner or the second air conditioner refers to a type of parameter that can reflect the number of air conditioners and the energy consumption level, such as the machine model and the machine code.
- the energy consumption level can be represented by the energy efficiency label, which can be divided into five grades according to national standards.
- the grade 1 indicates that the product has reached the international advanced level and the energy consumption is the lowest; the grade 2 indicates that the product is more energy-saving; the grade 3 indicates the product energy.
- the efficiency is the average level of the Chinese market; the grade 4 indicates that the product energy efficiency is lower than the market average; the grade 5 is the product market access indicator, and the products below the level are not allowed to be produced and sold; or it may be in accordance with the industry standard or Enterprise standards, graded.
- the power correction coefficient is determined according to the model of the first air conditioner and the model of the second air conditioner, and is used to correct the power of the first air conditioner, thereby calculating the correction power of the first air conditioner.
- the estimated power consumption is the power consumption of the second air conditioner before the power saving control, that is, in the first state, corresponding to the power consumption in the T period.
- the actual power consumption is the power consumption of the second air conditioner after the power saving control, that is, in the second state, corresponding to the T time period.
- FIG. 1 is a schematic flow chart of an embodiment of the present invention. As shown in Figure 1:
- an air conditioning power consumption estimating method includes:
- Step S101 acquiring the model numbers of the n first air conditioners in the same area and the operating parameters of the first air conditioners in the T time period; the operating parameters include: the first air conditioners in the T time period
- Step S102 determining, according to the model of the n first air conditioners and the model number of the second air conditioner, the power correction coefficient ⁇ i of the n first air conditioners;
- Step S103 calculating, according to the operating parameter of the first air conditioner in the n first air conditioners in the T time period and the power correction coefficient ⁇ i , the pre-determination of the second air conditioner in the T period Estimate power consumption W1.
- the estimated power consumption of the second air conditioner in the T period is calculated according to the model of the n first air conditioners and the operating parameters of the first air conditioners in the T period.
- the data used is not calculated according to the laboratory data, but the model and operating parameters of the n first air conditioners in the same area and the same running time period are retrieved, and according to these The parameter calculates the estimated power consumption W1 of the second air conditioner.
- the operating parameters of the n first air conditioners are collected during the same running time period, and the parameters are determined by the geographic location, outdoor environment, indoor environment, floor type, model, etc. of each of the first air conditioners.
- the estimated power consumption W1 of the second air conditioner also corresponds to the time period, so the power consumption of the air conditioner converted by the embodiment is more accurate than the calculation method by the experimental data in the prior art.
- the set temperature of the second home appliance before the power saving control is the first temperature
- the set temperature is set to the second temperature.
- the set temperature of the n first air conditioners obtained in the above embodiment is the first temperature
- the calculated estimated power consumption is the work of the second home appliance when the set temperature is the first temperature. Consumption.
- the second home appliance adjusts the set temperature to achieve the purpose of power saving. Therefore, in the embodiment, the first state in which the n first home appliances are located refers to the set temperature being the first temperature.
- the second state in which the second home appliance is subjected to the power saving control means that the set temperature is the second temperature.
- the model and operating parameters of the n first air conditioners may be obtained from the cloud server or other devices.
- a cloud server or other device is used to monitor the running status of the air conditioner in the same area, such as the first state and the second state.
- the cloud server or other device is actively reported to the current power. Therefore, the cloud server or other device also records the power of each air conditioner and the running time corresponding to the power.
- the power correction coefficient ⁇ i of the n first air conditioners may be queried from a local or cloud server or other device.
- the power correction coefficient ⁇ i of the air conditioner of different models is recorded, and according to the model of the first air conditioner and the model of the second air conditioner, the power correction coefficient ⁇ i of the first air conditioner can be directly queried.
- the coefficients corresponding to the air conditioners in different numbers of horses and different energy consumption levels are recorded; as shown in Table 1.
- the model of the air conditioner corresponds to the number of air conditioners and the energy consumption level. By identifying the model of the air conditioner, the number of air conditioners and the energy consumption level can be determined.
- step S102 specifically includes:
- the coefficients ⁇ i of the n first air conditioners i.e., ⁇ 1 , ⁇ 2 , ..., ⁇ n , can be calculated.
- step S103 includes:
- a specific calculation method and a corresponding formula for calculating the estimated power consumption W1 are given. After acquiring the model and state parameters of the n first air conditioners, calculating the corrected power P i of each of the first air conditioners, and then averaging the calculated correction powers P i to calculate the average corrected power of the n first air conditioners That is, the second air conditioner is in the first state before the power saving control is performed, and the estimated power consumption in the T time end; then the calculated in the above step Multiplying T, the estimated power consumption W1 of the second air conditioner during the T period is calculated.
- the method further includes calculating a power saving amount of the second air conditioner after performing the power saving control. For example, after the second air conditioner adjusts the temperature from the first temperature to the second temperature after performing the power saving control, the actual power consumption W2 of the second air conditioner in the T period is calculated, and then the T period is calculated according to W1 and W2.
- the power saving of the second air conditioner that is, the power consumption saving value ⁇ W.
- the power consumption saving value ⁇ W of the second air conditioner in the T period is calculated
- step of calculating the actual power consumption W2 specifically includes:
- Obtaining a second parameter in the air-conditioning operation period T comprising: a second air-conditioning in the reported time period T P y m-th power, and the operating time corresponding to each of the power P y t y;
- y 1, 2, . . . , m
- m is a positive integer not less than 1.
- the actual power consumption W2 is calculated according to the operating parameter of the second air conditioner in the T time period, and the second air conditioner reports its current power whenever the power changes during operation, thereby acquiring at least the T time period.
- the operating parameter of the second air conditioner in the T time period may be a database record at the local end, or obtained from a cloud server or other device.
- FIG. 2 is a schematic flowchart diagram of a method for estimating power consumption of an air conditioner according to an embodiment of the present invention. As shown in FIG. 2, the method includes:
- Step S201 according to the power saving control scheme, the set temperature of the user air conditioner is adjusted from T11 to T12;
- Step S202 calculate the actual power consumption W2 of the user air conditioner in the T time period, such as 10:00-11:00;
- Step S203 collecting operation data of a plurality of air conditioners with the set temperature T11 in the same area, and calculating the estimated power consumption W1;
- the calculation method of the power consumption of each first air conditioner is the same as that of Equation 6.
- the coefficient correction is performed according to the corresponding energy consumption level and the number of horses, and 100 units are calculated, and the average corrected power of the first air conditioner is calculated.
- Step S204 calculating the power saving amount of 10:00-11:00 according to the estimated power consumption W1 and the actual power consumption W2 of the user air conditioner.
- the correction factor refers to Table 1.
- Table 1 records the average unit energy consumption of the same number of devices with the same energy consumption level in the past year.
- the air conditioner of a user in a certain area is 1p, the second-level energy consumption, which is operated by T11 to T12 for 1 hour.
- the same type of air conditioner is set at T11 temperature within this hour.
- the estimated power consumption W1 of the user air conditioner at the set temperature of T11 is:
- the above embodiment provides a specific implementation manner of the method for estimating the power consumption of the air conditioner according to the present invention.
- the first air conditioner is between 10:00 and 11:00.
- the operating parameters are calculated, and the second air conditioner is calculated, that is, the estimated power consumption of the user air conditioner at 1 hour from 10:00 to 11:00.
- the power consumption of the air conditioner converted by the embodiment is more accurate.
- FIG. 3 shows an air conditioner power consumption estimating device according to an embodiment of the present invention. As shown in Figure 3,
- an air conditioning power consumption estimating device includes: a signal receiver 301 and a processor 302; wherein
- the processor 302 is configured to determine, according to the model of the n first air conditioners and the model of the second air conditioner, a power correction coefficient ⁇ i of the n first air conditioners; and, according to the n first air conditioners
- the operating parameters of the first air conditioner in the T period and the power correction coefficient ⁇ i are used to calculate the estimated power consumption of the second air conditioner in the T period.
- the estimated power consumption of the second air conditioner in the T period is calculated according to the model of the n first air conditioners and the operating parameters of the first air conditioners in the T period.
- the data used is not calculated according to the laboratory data, but the model and operating parameters of the n first air conditioners in the same region and the same running time period are retrieved, and according to these The parameter calculates the estimated power consumption W1 of the second air conditioner.
- the operating parameters of the n first air conditioners are collected during the same running time period, and the parameters are determined by the geographic location, outdoor environment, indoor environment, floor type, model, etc. of each of the first air conditioners.
- the estimated power consumption W1 of the second air conditioner also corresponds to the time period, so the power consumption of the air conditioner converted by the embodiment is more accurate than the calculation method by the experimental data in the prior art.
- the set temperature of the second home appliance before the power saving control is the first temperature
- the set temperature is set to the second temperature.
- the set temperature of the n first air conditioners obtained in the above embodiment is the first temperature
- the estimated power consumption calculated by the processor 302 is the second time period when the second home appliance is at the first temperature. Power consumption inside.
- the second home appliance adjusts the set temperature to achieve the purpose of power saving. Therefore, in the embodiment, the first state in which the n first home appliances are located refers to the set temperature being the first temperature.
- the second state in which the second home appliance is subjected to the power saving control means that the set temperature is the second temperature.
- the signal receiver 301 is further configured to acquire the model and operating parameters of the n first air conditioners from the cloud server or other devices.
- a cloud server or other device is used to monitor the running status of the air conditioner in the same area, such as the first state and the second state. When the power of the air conditioner changes, the cloud server or other device is actively reported to the current power. Therefore, the cloud server or other device also records the power of each air conditioner and the running time corresponding to the power.
- the processor 302 can query the power correction coefficient ⁇ i of the n first air conditioners from a local or cloud server or other device.
- the power correction coefficient ⁇ i of the air conditioner of different models is recorded, and according to the model of the first air conditioner and the model of the second air conditioner, the first air conditioner can be directly inquired.
- Power correction factor ⁇ i is recorded, and according to the model of the first air conditioner and the model of the second air conditioner, the first air conditioner can be directly inquired.
- the coefficients corresponding to the air conditioners in different numbers of horses and different energy consumption levels are recorded; as shown in Table 1.
- the model of the air conditioner corresponds to the number of air conditioners and the energy consumption level.
- the processor 302 is further configured to determine a coefficient a 0 of the second air conditioner according to a model of the second air conditioner; and determine, according to a model of the n first air conditioners, the n first a coefficient a i of the air conditioner; and, according to formula 4, calculating a power correction coefficient ⁇ i of the n first air conditioners;
- the coefficients ⁇ i of the n first air conditioners i.e., ⁇ 1 , ⁇ 2 , ..., ⁇ n , can be calculated.
- the processor 302 is further configured to calculate the first n units of each first conditioning the air conditioner correction power P i; and, n according to the first station in each of the first air-conditioned air conditioner calculates the correction power P i The average corrected power of the n first air conditioners And, according to the average corrected power of the n first air conditioners Calculating an estimated power consumption W1 of the second air conditioner in the T period.
- the processor 302 is further configured to calculate, according to Formula 1, the corrected power P i of each of the n air conditioners in the first air conditioner:
- processor 302 is further configured to calculate an average corrected power of the n first air conditioners according to Formula 2
- processor 302 is further configured to calculate an estimated power consumption W1 of the second air conditioner in the T period according to Equation 3;
- the processor 302 calculates the corrected power P i of each of the first air conditioners, and then averages the calculated corrected powers P i to calculate n firsts.
- Average corrected power of air conditioner that is, the second air conditioner is in the first state before the power saving control is performed, and the estimated power consumption in the T time end; then the calculated in the above step Multiplying T, the estimated power consumption W1 of the second air conditioner during the T period is calculated.
- the processor 302 is further configured to calculate a power saving amount of the second air conditioner after performing the power saving control. For example, after the second air conditioner performs the power saving control, the set temperature is adjusted from the first temperature to the second temperature, and the processor 302 is configured to calculate the actual power consumption W2 of the second air conditioner in the T period, and then according to the W1. And W2 calculates the power consumption of the second air conditioner in the T period, that is, the power consumption saving value ⁇ W.
- the processor 302 is further configured to calculate, according to Formula 5, a power consumption saving value ⁇ W of the second air conditioner in the T period;
- the processor 302 is further configured to acquire the operating parameters of the second air conditioner in the T time period, including: the m powers P y reported by the second air conditioner in the T time period, and corresponding to each runtime power P y t y;
- y 1, 2, . . . , m
- m is a positive integer not less than 1.
- the actual power consumption W2 is calculated by the processor 302 according to the operating parameter of the second air conditioner during the T time period, and the second air conditioner reports its current power whenever the power changes during operation, thereby acquiring its current time. At least one operating power within the segment, and corresponding runtime.
- the operating parameter of the second air conditioner in the T time period may be a database record at the local end, or the signal receiver 301 is obtained from a cloud server or other device.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air Conditioning Control Device (AREA)
Abstract
一种空调功耗估算方法,包括:获取与第二空调处于同一地区的n台第一空调的型号和各第一空调在T时间段内的运行参数(S101);该运行参数包括:在T时间段内各第一空调上报的s次功率Pix,以及对应于各功率Pix的运行时间tix;根据n台第一空调的型号和第二空调的型号,确定n台第一空调的功率修正系数αi(S102);根据n台第一空调中各第一空调在T时间段内的运行参数和功率修正系数αi,计算第二空调在T时间段内的预估功耗W1(S103)。另外还公开了一种空调功耗估算装置。
Description
本申请基于申请号为201710302173.2、申请日为2017.05.02的中国专利申请提出,并要求该中国专利申请的优先权,该中国专利申请的全部内容在此引入本申请作为参考。
本发明涉及空调技术领域,特别涉及一种空调功耗估算方法及装置。
随着科技进步与文化发展,产业开发及经济活动需要消耗大量的能源。能源并非取之不尽用之不竭,此外非清洁型能源的消耗皆会带来环境污染,在面对温室效应、能源高价格趋势以及传统能源的耗竭等问题时,对于如何节能、并对节能效果给出正确的评估,成为全球最关心的议题。在现有技术中,如空调技术领域,出现了许多节能控制方法,在测算节电量时,对于空调功耗的估算一般是依靠实验室数据进行计算。但这种方法,误差比较大,空调功耗受地理位置、室外环境、室内环境、户型、机型等多种因素影响。
发明内容
本发明实施例提供了一种空调功耗估算方法及装置,以解决现有技术中空调功耗的估算采用实验室数据进行计算,误差比较大的问题。为了对披露的实施例的一些方面有一个基本的理解,下面给出了简单的概括。该概括部分不是泛泛评述,也不是要确定关键/重要组成元素或描绘这些实施例的保护范围。其唯一目的是用简单的形式呈现一些概念,以此作为后面的详细说明的序言。
根据本发明实施例的第一方面,提供了一种空调功耗估算方法。
在一些示例性的实施例中,一种空调功耗估算方法,包括:
获取与第二空调处于同一地区的n台第一空调的型号和各所述第一空调在T时间段内的运行参数;所述运行参数包括:在所述T时间段内各所述第一空调上报的s次功率P
ix,以及对应于各功率P
ix的运行时间t
ix;i=1,2,…,n,n为不小于1的正整数;x=1,2,...,s,s为不小于1的正整数;
根据所述n台第一空调的型号和第二空调的型号,确定所述n台第一空调的功率修正系数α
i;
根据所述n台第一空调中各所述第一空调在T时间段内的运行参数和所述功率修正系数α
i,计算在所述T时间段内所述第二空调的功耗。
在一些说明性的实施例中,所述根据所述n台第一空调的各所述第一空调在T时间段内的运行参数和所述功率修正系数α
i,计算所述第二空调在所述T时间段内的预估功耗,包括:
计算所述n台第一空调中各第一空调的修正功率P
i;
在一些说明性的实施例中,根据下述公式计算在所述T时间段内所述第二空调的功耗,包括:
根据公式1,计算所述n台第一空调中各第一空调的修正功率P
i:
在一些说明性的实施例中,所述根据所述n台第一空调的型号和第二空调的型号,确定所述n台第一空调的功率修正系数α
i,包括:
根据所述第二空调的型号,确定所述第二空调的系数a
0;
根据所述n台第一空调的型号,确定所述n台第一空调的系数a
i;
根据公式4,计算所述n台第一空调的功率修正系数α
i;
在一些说明性的实施例中,在所述计算在所述T时间段内所述第二空调的功耗后,还包括:
计算所述第二空调在所述T时间段内的实际功耗W2;所述第二空调在所述T时间段内的设定温度为第二温度,所述第二温度与所述第一温度不同;
根据下述公式计算所述第二空调在所述T时间段内的功耗节约值ΔW;
ΔW=W1-W2。
在一些说明性的实施例中,所述计算所述第二空调在所述T时间段内的实际功耗W2,包括:
获取所述第二空调在T时间段内的运行参数,包括:所述T时间段内空调上报的m次功率P
y,以及对应于各功率P
y的运行时间t
y;
根据下述公式计算所述实际功耗W2:
其中,y=1,2,...,m,m为不小于1的正整数。
在上述实施例中,根据n台第一空调的型号和各所述第一空调在T时间段内的运行参数,估算所述第二空调在T时间段内设定温度为第一温度时的功耗;在本实施例中,估算空调功耗时,采用的数据不是根据实验室数据计算的,而是通过调取相同地区、相同运行时间段的n台第一空调的型号和运行参数,并根据这些参数估算所是第二空调在该时间段的功耗。在本实施例中,所述n台第一空调的运行参数是在同一运行时间段采集的,这些参数受每台所述第一空调的地理位置、室外环境、室内环境、户型、机型等因素的影响;此外,估算的第二空调的功耗也对应于该时间段,因此相对现有技术中通过实验数据计算的方式来说,本实施例换算出的空调功耗更准确。
根据本发明实施例的第二方面,提供了一种空调功耗估算装置。
在一些示例性的实施例中,一种空调功耗估算装置,包括:信号接收器和处理器;其中,
所述信号接收器,用于获取与第二空调处于同一地区的n台第一空调的型号和各所述第一空调在T时间段内的运行参数;所述运行参数包括:在所述T时间段内各所述第一空调上报的s次功率P
ix,以及对应于各功率P
ix的运行时间t
ix;其中,x=1,2,...,s,s为不小于1的正整数;i=1,2,…,n,n为不小于1的正整数;
所述处理器,用于根据所述n台第一空调的型号和第二空调的型号,确定所述n台第一空调的功率修正系数α
i;以及,根据所述n台第一空调中各所述第一空调在T时间段内的运行参数和所述功率修正系数α
i,计算在所述T时间段内所述第二空调的功耗。
在一些说明性的实施例中,
所述处理器,还用于计算所述n台第一空调中各第一空调的修正功率P
i;以及,根据所述n台第一空调中各第一空调的修正功率P
i计算所述n台第一空调的平均修正功率
以及,根据所述n台第一空调的平均修正功率
计算所述T时间段内所述第二空调的预估功耗W1。
在一些说明性的实施例中,
所述处理器,还用于根据下述公式计算所述n台第一空调中各第一空调的修正功率P
i:
在一些说明性的实施例中,
所述处理器,还用于根据所述第二空调的型号,确定所述第二空调的系数a
0;
根据所述n台第一空调的型号,确定所述n台第一空调的系数a
i;
根据下述公式计算所述n台第一空调的功率修正系数α
i;
在一些说明性的实施例中,
所述处理器,还用于获取所述第二空调在T时间段内的运行参数,包括:在所述T时间段内所述第二空调上报的m次功率P
y,以及对应于各功率P
y的运行时间t
y;
根据下述公式,计算所述实际功耗W2:
其中,y=1,2,...,m,m为不小于1的正整数;
根据下述公式,计算所述第二空调在所述T时间段内的功耗节约值ΔW;
ΔW=W1-W2。
本发明实施例提供的技术方案可以包括以下有益效果:
在上述实施例中,根据n台第一空调的型号和各所述第一空调在T时间段内的运行参数,估算所述第二空调在T时间段内设定温度为第一温度时的功耗;在本实施例中,估算空调功耗时,采用的数据不是根据实验室数据计算的,而是通过调取相同地区、相同运行时间段的n台第一空调的型号和运行参数,并根据这些参数估算所是第二空调在该时间段的功耗。在本实施例中,所述n台第一空调的运行参数是在同一运行时间段采集的,这些参数受每台所述第一空调的地理位置、室外环境、室内环境、户型、机型等因素的影响;此外,估算的第二空调的功耗也对应于该时间段,因此相对现有技术中通过实验数据计算的方式来说,本实施例换算出的空调功耗更准确。
应当理解的是,以上的一般描述和后文的细节描述仅是示例性和解释性的,并不能限制本发明。
此处的附图被并入说明书中并构成本说明书的一部分,示出了符合本发明的实施例,并与说明书一起用于解释本发明的原理。
图1是根据一示例性实施例示出的一种空调功耗估算方法的流程示意图;
图2是根据一示例性实施例示出的一种空调功耗估算方法的流程示意图;
图3是根据一示例性实施例示出的一种空调功耗估算装置的框图。
以下描述和附图充分地示出本发明的具体实施方案,以使本领域的技术人员能够实践它们。实施例仅代表可能的变化。除非明确要求,否则单独的部件和功能是可选的,并且操作的顺序可以变化。一些实施方案的部分和特征可以被包括在或替换其他实施方案的部分和特征。本发明的实施方案的范围包括权利要求书的整个范围,以及权利要求书的所有可获得的等同物。在本文中,各实施方案可以被单独地或总地用术语“发明”来表示,这仅仅是为了方便,并且如果事实上公开了超过一个的发明,不是要自动地限制该应用的范围为任何单个发明或发明构思。本文中,诸如第一和第二等之类的关系术语仅仅用于将一个实体或者操作与另一个实体或操作区分开来,而不要求或者暗示这些实体或操作之间存在任何实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素。本文中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。对于实施例公开的结构、产品等而言,由于其与实施例公开的部分相对应,所以描述的比较简单,相关之处参见方法部分说明即可。
在现有技术中,需要在空调进行节电控制后,对空调的节电量进行计算。节电量是根据空调在节电控制后,如空调从第一状态调整到第二状态的这段时间,即T时间段内,空调的预估功耗与空调的实际功耗的差值确定的。在上述过程中,空调的实际功耗可以根据空调反馈的功率和时间计算出,但空调的预估功耗是需要根据实验室的数据计算的。但因空调所在的地理位置、室外环境、室内环境、户型、机型等因素会对空调的功耗产生影响,因此实验室的数据无法反映空调实际的运行状态,计算出的预估功耗误差较大。本发明的整体构思是,获取T时间段内,处于第一状态的多台空调的型号和运行参数;根据上述参数,计算出空调在第一状态时,T时间段内的,预估功耗。
在本发明中,第一状态是指空调进行节电控制前所处的状态,第二状态是指空调进行节电控制后所处的状态,第一状态和第二状态可以是对空调设定温度的调节,如第一温度调至第二温度;也可也是空调风速的调节,如第一风速档位调至第二风速档位。
第一空调,是在计算第二空调的预估功耗时,从数据库调取其型号和运行参数的一类空调;第一空调在T时间段内的运行状态,与所述第二空调在进行节电控制前的运行状态相同,即第一空调位于第一状态。第一空调与第二空调位于同一地区,如同一市或同一区,室外环境基本相同。
第二空调,是本发明中进行节电控制,并需要计算其预估功耗的空调。第二空调在节电控制前与第一空调相同,处于第一状态;在对第二空调进行节电控制后,第二空调从第一状态调整至第二状态。
第一空调或第二空调的型号,是指可以反映空调匹数和能耗等级的一类参数,如机器型号、机器编码。
能耗等级,可以由能效标识进行表示,可以按照国家标准划分为五个等级,等级1表示产品节电已达到国际先进水平,能耗最低;等级2表示产品比较节电;等级3表示产品能源效率为我国市场的平均水平;等级4表示产品能源效率低于市场平均水平;等级5是产品市场准入指标,低于该等级要求的产品不允许生产和销售;也可以是按照本行业标准或企业标准,进行等级划分。
功率修正系数,是根据第一空调的型号和第二空调的型号确定的,用以对第一空调的功率进行修正,进而算出第一空调的修正功率。
预估功耗,是第二空调在进行节电控制前,即在第一状态时,对应于T时间段内的功耗。
实际功耗,是第二空调在进行节电控制后,即在第二状态时,对应于T时间段内的功耗。
图1示出了本发明实施例的流程示意图。如图1所示:
在一些示例性的实施例中,一种空调功耗估算方法,包括:
步骤S101,获取处于同一地区的n台第一空调的型号和各所述第一空调在T时间段内的运行参数;所述运行参数包括:在所述T时间段内各所述第一空调上报的s次功率P
ix,以及对应于各功率P
ix的运行时间t
ix;i=1,2,…,n,n为不小于1的正整数;x=1,2,...,s,s为不小于1的正整数;
步骤S102,根据所述n台第一空调的型号和第二空调的型号,确定所述n台第一空调的功率修正系数α
i;
步骤S103,根据所述n台第一空调中各所述第一空调在T时间段内的运行参数和所述功率修正系数α
i,计算所述第二空调在所述T时间段内的预估功耗W1。
在上述实施例中,根据n台第一空调的型号和各所述第一空调在T时间段内的运行参数,计算第二空调在T时间段内的预估功耗。在本实施例中,估算空调功耗时, 采用的数据不是根据实验室数据计算的,而是通过调取同一地区、同一运行时间段的n台第一空调的型号和运行参数,并根据这些参数计算第二空调的预估功耗W1。在本实施例中,所述n台第一空调的运行参数是在同一运行时间段采集的,这些参数受每台所述第一空调的地理位置、室外环境、室内环境、户型、机型等因素的影响;此外,第二空调的预估功耗W1也对应于该时间段,因此相对现有技术中通过实验数据计算的方式来说,本实施例换算出的空调功耗更准确。
在一些可选的实施例中,第二家电在节电控制前的设定温度为第一温度,在节电控制后,将设定温度设为第二温度。则上述实施例中调取的n台第一空调的设定温度为第一温度,计算出的预估功耗是第二家电在设定温度为第一温度时,运行T时间段内的功耗。在本实施例中,第二家电通过调整设定温度,进而达到节电的目的,因此在本实施例中,n台第一家电所处的第一状态,是指设定温度为第一温度;第二家电进行节电控制后所处的第二状态,是指设定温度为第二温度。
在一些可选的实施例中,步骤S101,可以从云服务器或其他设备获取n台第一空调的型号和运行参数。云服务器或其他设备,用于对同一地区的空调的运行状态,如第一状态和第二状态,进行监测,当空调的功率发生变化时,会主动上报云服务器或其他设备,告知其当前功率,因此云服务器或其他设备还记录各空调的功率,以及对应于该功率的运行时间。
在一些可选的实施例中,步骤S102,可以从本地或云服务器或其他设备,查询n台第一空调的功率修正系数α
i。
可选的,在数据库中,记录了不同型号的空调的功率修正系数α
i,根据第一空调的型号和第二空调的型号,可以直接查询到第一空调的功率修正系数α
i。
可选的,在数据库中,记录了空调在不同匹数和不同能耗等级所对应的系数;如表1。
| 匹数 | 一级能耗 | 二级能耗 | 三级能耗 |
| 1P | A11 | A12 | A13 |
| 1.5P | A21 | A22 | A23 |
| 2P | A31 | A32 | A33 |
| 3P | A41 | A42 | A43 |
表1
其中,空调的型号对应于空调的匹数和能耗等级,通过识别空调的型号,可以确定空调的匹数和能耗等级。
进一步的,所述步骤S102具体包括:
根据所述第二空调的型号,确定所述第二空调的系数a
0;
根据所述n台第一空调的型号,确定所述n台第一空调的系数a
i;
根据公式4,计算所述n台第一空调的功率修正系数α
i;
如,第二空调的型号对应的匹数为1P,能耗等级为一级能耗,则a
0为A11;共获取n台第一空调,分别编号为1到n,其中编号为3(即,i=3)的第一空调的型号对应的匹数为3P,能耗等级为二级能耗,则a
3=A42;根据以上信息和公式4,可以算出α
3=A42/A11。类似的,可以算出n台第一空调的系数α
i,即α
1,α
2,…,α
n。
在一些说明性的实施例中,步骤S103,包括:
计算所述n台第一空调中各第一空调的修正功率P
i;
进一步的,
根据公式1,计算所述n台第一空调中各第一空调的修正功率P
i:
进一步的,
进一步的,
根据公式3,计算在所述T时间段内所述第二空调的预估功耗W1;
上述实施例,给出了计算预估功耗W1的具体计算方法和相应的公式。在获取n台第一空调的型号和状态参数后,计算各第一空调的修正功率P
i,然后再将计算出的修正功率P
i取平均,算出n台第一空调的平均修正功率
即第二空调在未进行节电控制前,处于第一状态,在T时间端内的预估功耗;然后再将上述步骤中算出的
与T相乘,计算出在T时间段内所述第二空调的预估功耗W1。
在一些可选的实施例中,还包括计算第二空调在进行节电控制后的节电量。如,第二空调在进行节电控制后,设定温度从第一温度调至第二温度,则计算第二空调在 T时间段内的实际功耗W2,然后根据W1和W2计算T时间段内第二空调的节电量,即功耗节约值ΔW。
进一步的,根据公式5,计算所述第二空调在所述T时间段内的功耗节约值ΔW;
ΔW=W1-W2 (5)。
进一步的,计算实际功耗W2的步骤,具体包括:
获取第二空调在T时间段内的运行参数,包括:在所述T时间段内第二空调上报的m次功率P
y,以及对应于各功率P
y的运行时间t
y;
根据公式6,计算所述实际功耗W2:
其中,y=1,2,...,m,m为不小于1的正整数。
上述实施例,实际功耗W2是根据第二空调在T时间段的运行参数算出的,第二空调在运行时每当功率发生变化会上报其当前功率,从而获取其在T时间段内的至少一个运行功率,以及相应的运行时间。
可选的,第二空调在T时间段内的运行参数可以是在本端的数据库记录,或者从云服务器或其他设备上获取。
在一些说明性的实施例中,在步骤S101中,先获取与第二空调的型号相同的m台第一空调,其中m为小于等于n的正整数。若m小于n,则再随机获取n-m台第一空调。如n为100台,则先在数据库中获取与第二空调相同型号的设定温度为第一温度的第一空调,若当前数据库中符合该条件的第一空调仅为60台,则剩下的40台则随机在数据库中获取设定温度为第一温度的第一空调。进一步的,m台第一空调与第二空调的型号相同,则功率修正系数α
i=1。在上述实施例中,在数据库中优先获取与第二空调同型号的第一空调,以保证抽取的第一空调的运行环境最接近第二空调,进而提高预估功耗的准确度。
为了对上述实施例给出具体的说明,图2示出了本发明实施例的一种空调功耗估算方法的流程示意图。如图2所示,所述方法包括:
步骤S201,根据节电控制方案,将用户空调的设定温度从T11调节为T12;
步骤S202,根据上报的功率,计算T时间段内,如10:00-11:00,所述用户空调的实际功耗W2;
根据上报功率的情况,获取的数据如下:
P
1=700W,10min;P
2=1000W,20min;P
3=800W,15min;P
4=600W,15min;
计算W2=48KW·min=2880*10
3J。
步骤S203,采集同一地区的多台设定温度为T11的空调的运行数据,计算预估功耗W1;
考虑到某一地区相同型号的数量会有所不同,我们规定采集同一地区的100台空调进行估算T11温度下的功耗情况。优先考虑相同型号的空调,当相同型号的空调不够100台时,再随机抽取凑够100台。根据这100台设备功耗的加权平均来估算T11温度下的功耗W1。
其中,W1的具体计算方法如下:
步骤S204,根据预估功耗W1和用户空调的实际功耗W2,计算10:00-11:00的节电量。
修正系数参照表1,表1记录了过去一年相同匹数相同能耗等级的设备的平均单位能耗情况。
举例说明,某一地区的用户空调是1p,二级能耗的,由T11调节到T12温度下运行了1个小时,该地区,相同型号的空调在这一个小时内设定在T11温度下的有60台,则这60台的修正系数α
1-60=1,其余的40台由在1个小时内设定在T11温度下的其他型号的空调中抽取,假设我们抽的全是1p,1级能耗的,则这40台的修正系数为α
61-100=A12/A11。
则用户空调在T11设定温度下的预估功耗W1为:
上述实施例给出了本发明一种空调功耗估算方法的具体实施方式,在上述实施例中,根据100台第一空调的型号和各所述第一空调在10:00到11:00的运行参数,计算第二空调,即用户空调在10:00到11:00这1小时的预估功耗。相对现有技术中通过实验数据计算的方式来说,本实施例换算出的空调功耗更准确。
图3示出了本发明实施例的一种空调功耗估算装置。如图3所示,
在一些示例性的实施例中,一种空调功耗估算装置,包括:信号接收器301和处理器302;其中,
所述信号接收器301,用于获取n台第一空调的型号和各所述第一空调在T时间段内的运行参数;所述运行参数包括:在所述T时间段内各所述第一空调上报的s次功率P
ix,以及对应于各功率P
ix的运行时间t
ix;其中,x=1,2,...,s,s为不小于1的正整数;i=1,2,…,n,n为不小于1的正整数;
所述处理器302,用于根据所述n台第一空调的型号和第二空调的型号,确定所述n台第一空调的功率修正系数α
i;以及,根据所述n台第一空调中各所述第一空调在T时间段内的运行参数和所述功率修正系数α
i,计算所述第二空调在所述T时间段内的预估功耗。
在上述实施例中,根据n台第一空调的型号和各所述第一空调在T时间段内的运行参数,计算第二空调在T时间段内的预估功耗。在本实施例中,估算空调功耗时,采用的数据不是根据实验室数据计算的,而是通过调取同一地区、同一运行时间段的n台第一空调的型号和运行参数,并根据这些参数计算第二空调的预估功耗W1。在本实施例中,所述n台第一空调的运行参数是在同一运行时间段采集的,这些参数受每台所述第一空调的地理位置、室外环境、室内环境、户型、机型等因素的影响;此外,第二空调的预估功耗W1也对应于该时间段,因此相对现有技术中通过实验数据计算的方式来说,本实施例换算出的空调功耗更准确。
在一些可选的实施例中,第二家电在节电控制前的设定温度为第一温度,在节电控制后,将设定温度设为第二温度。则上述实施例中调取的n台第一空调的设定温度为第一温度,处理器302计算出的预估功耗是第二家电在设定温度为第一温度时,运行T时间段内的功耗。在本实施例中,第二家电通过调整设定温度,进而达到节电的目的,因此在本实施例中,n台第一家电所处的第一状态,是指设定温度为第一温度;第二家电进行节电控制后所处的第二状态,是指设定温度为第二温度。
在一些可选的实施例中,信号接收器301,还用于可以从云服务器或其他设备获取n台第一空调的型号和运行参数。云服务器或其他设备,用于对同一地区的空调的运行状态,如第一状态和第二状态,进行监测,当空调的功率发生变化时,会主动上 报云服务器或其他设备,告知其当前功率,因此云服务器或其他设备还记录各空调的功率,以及对应于该功率的运行时间。
在一些可选的实施例中,处理器302可以从本地或云服务器或其他设备,查询n台第一空调的功率修正系数α
i。
可选的,在本地或云服务器或其他设备的数据库中,记录了不同型号的空调的功率修正系数α
i,根据第一空调的型号和第二空调的型号,可以直接查询到第一空调的功率修正系数α
i。
可选的,在数据库中,记录了空调在不同匹数和不同能耗等级所对应的系数;如表1。其中,空调的型号对应于空调的匹数和能耗等级,通过识别空调的型号,可以确定空调的匹数和能耗等级。
进一步的,处理器302,还用于根据所述第二空调的型号,确定所述第二空调的系数a
0;以及,根据所述n台第一空调的型号,确定所述n台第一空调的系数a
i;以及,根据公式4,计算所述n台第一空调的功率修正系数α
i;
如,第二空调的型号对应的匹数为1P,能耗等级为一级能耗,则a
0为A11;共获取n台第一空调,分别编号为1到n,其中编号为3(即,i=3)的第一空调的型号对应的匹数为3P,能耗等级为二级能耗,则a
3=A42;根据以上信息和公式4,可以算出α
3=A42/A11。类似的,可以算出n台第一空调的系数α
i,即α
1,α
2,…,α
n。
在一些可选的实施例中,
所述处理器302,还用于计算所述n台第一空调中各第一空调的修正功率P
i;以及,根据所述n台第一空调中各第一空调的修正功率P
i计算所述n台第一空调的平均修正功率
;以及,根据所述n台第一空调的平均修正功率
计算所述T时间段内所述第二空调的预估功耗W1。
进一步的,所述处理器302,还用于根据公式1,计算所述n台第一空调中各第一空调的修正功率P
i:
进一步的,所述处理器302,还用于根据公式3,计算所述T时间段内所述第二 空调的预估功耗W1;
上述实施例,给出了计算预估功耗W1的具体计算方法和相应的公式。在信号接收器301获取n台第一空调的型号和状态参数后,处理器302计算各第一空调的修正功率P
i,然后再将计算出的修正功率P
i取平均,算出n台第一空调的平均修正功率
,即第二空调在未进行节电控制前,处于第一状态,在T时间端内的预估功耗;然后再将上述步骤中算出的
与T相乘,计算出在T时间段内所述第二空调的预估功耗W1。
在一些可选的实施例中,处理器302还用于计算第二空调在进行节电控制后的节电量。如,第二空调在进行节电控制后,设定温度从第一温度调至第二温度,则处理器302,用于计算第二空调在T时间段内的实际功耗W2,然后根据W1和W2计算T时间段内第二空调的节电量,即功耗节约值ΔW。
在一些可选的实施例中,
所述处理器302,还用于根据公式5,计算所述第二空调在所述T时间段内的功耗节约值ΔW;
ΔW=W1-W2 (5)。
在一些可选的实施例中,
所述处理器302,还用于获取所述第二空调在T时间段内的运行参数,包括:在所述T时间段内所述第二空调上报的m次功率P
y,以及对应于各功率P
y的运行时间t
y;
根据公式6,计算所述实际功耗W2:
其中,y=1,2,...,m,m为不小于1的正整数。
在上述实施例,实际功耗W2是处理器302根据第二空调在T时间段的运行参数算出的,第二空调在运行时每当功率发生变化会上报其当前功率,从而获取其在T时间段内的至少一个运行功率,以及相应的运行时间。
可选的,第二空调在T时间段内的运行参数可以是在本端的数据库记录,或者是信号接收器301从云服务器或其他设备上获取的。
应当理解的是,本发明并不局限于上面已经描述并在附图中示出的流程及结构,并且可以在不脱离其范围进行各种修改和改变。本发明的范围仅由所附的权利要求来限制。
Claims (11)
- 一种空调功耗估算方法,其特征在于,包括:获取与第二空调处于同一地区的n台第一空调的型号和各所述第一空调在T时间段内的运行参数;所述运行参数包括:在所述T时间段内各所述第一空调上报的s次功率P ix,以及对应于各功率P ix的运行时间t ix;i=1,2,…,n,n为不小于1的正整数;x=1,2,...,s,s为不小于1的正整数;根据所述n台第一空调的型号和所述第二空调的型号,确定所述n台第一空调的功率修正系数α i;根据所述n台第一空调中各所述第一空调在T时间段内的运行参数和所述功率修正系数α i,计算所述第二空调在所述T时间段内的预估功耗W1。
- 如权利要求4所述的方法,其特征在于,在所述计算在所述T时间段内所述第二空调的预估功耗后,还包括:计算所述第二空调在所述T时间段内的实际功耗W2;根据下述公式,计算所述第二空调在所述T时间段内的功耗节约值ΔW;ΔW=W1-W2。
- 一种空调功耗估算装置,其特征在于,包括:信号接收器和处理器;其中,所述信号接收器,用于获取与第二空调处于同一地区的n台第一空调的型号和各所述第一空调在T时间段内的运行参数;所述运行参数包括:在所述T时间段内各所述第一空调上报的s次功率P ix,以及对应于各功率P ix的运行时间t ix;其中,x=1,2,...,s,s为不小于1的正整数;i=1,2,…,n,n为不小于1的正整数;所述处理器,用于根据所述n台第一空调的型号和第二空调的型号,确定所述n台第一空调的功率修正系数α i;以及,根据所述n台第一空调中各所述第一空调在T时间段内的运行参数和所述功率修正系数α i,计算所述第二空调在所述T时间段内的预估功耗。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP18794528.2A EP3546842B1 (en) | 2017-05-02 | 2018-04-28 | Air conditioner power consumption estimation method and device |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710302173.2 | 2017-05-02 | ||
| CN201710302173.2A CN107246705B (zh) | 2017-05-02 | 2017-05-02 | 一种空调功耗估算方法及装置 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2018201996A1 true WO2018201996A1 (zh) | 2018-11-08 |
| WO2018201996A9 WO2018201996A9 (zh) | 2019-01-03 |
Family
ID=60016870
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2018/085032 Ceased WO2018201996A1 (zh) | 2017-05-02 | 2018-04-28 | 一种空调功耗估算方法及装置 |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP3546842B1 (zh) |
| CN (1) | CN107246705B (zh) |
| WO (1) | WO2018201996A1 (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112287281A (zh) * | 2020-10-14 | 2021-01-29 | 珠海格力电器股份有限公司 | 耗电量确定方法、装置及空调机组 |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107246705B (zh) * | 2017-05-02 | 2019-11-05 | 青岛海尔空调器有限总公司 | 一种空调功耗估算方法及装置 |
| CN108008184B (zh) * | 2017-10-31 | 2021-05-25 | 青岛海尔空调电子有限公司 | 一种多联机制冷运行分户计量方法及系统 |
| CN108833491A (zh) * | 2018-05-24 | 2018-11-16 | 朔联科技(上海)有限公司 | 物联网系统的能耗统计方法及服务器 |
| CN109116775B (zh) * | 2018-08-07 | 2021-05-04 | 珠海格力电器股份有限公司 | 电器设备的能耗管理方法、装置、存储介质及电器设备 |
| CN109374963B (zh) * | 2018-09-30 | 2021-09-28 | 四川长虹空调有限公司 | 一种空调电量计算方法 |
| CN112781177B (zh) * | 2021-01-05 | 2022-05-20 | 广东美的暖通设备有限公司 | 预测空调运行功率的方法、装置、电子设备及存储介质 |
| CN117350438B (zh) * | 2023-11-13 | 2024-08-16 | 国网冀北电力有限公司 | 基于商业空调参数的需求响应申报量评估测算方法、系统 |
| JP2026011013A (ja) * | 2024-07-10 | 2026-01-23 | ダイキン工業株式会社 | 推定方法、推定装置及びプログラム |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0886490A (ja) * | 1994-09-14 | 1996-04-02 | Toshiba Corp | 熱負荷予測装置 |
| CN101893309A (zh) * | 2010-07-19 | 2010-11-24 | 宁波奥克斯电气有限公司 | 变频空调节能运转的控制方法 |
| CN104977461A (zh) * | 2015-01-26 | 2015-10-14 | 广东美的制冷设备有限公司 | 空调用电量的计算方法和电子设备 |
| CN105135592A (zh) * | 2015-07-06 | 2015-12-09 | Tcl集团股份有限公司 | 一种空调自适应调节方法及系统 |
| US20170017735A1 (en) * | 2015-07-13 | 2017-01-19 | Tata Consultancy Services Limited | System and method for energy sample forecasting of hvac-r systems |
| CN107246705A (zh) * | 2017-05-02 | 2017-10-13 | 青岛海尔空调器有限总公司 | 一种空调功耗估算方法及装置 |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3783929B2 (ja) * | 2001-08-21 | 2006-06-07 | ダイキン工業株式会社 | 省エネルギー効果推定方法およびその装置 |
| JP4450541B2 (ja) * | 2002-06-07 | 2010-04-14 | 三機工業株式会社 | 省エネルギー評価方法及び省エネルギー評価手段 |
| JP4147204B2 (ja) * | 2004-06-01 | 2008-09-10 | 北斗電子工業株式会社 | 消費電力削減量の評価支援方法、評価支援装置、および電力制御装置 |
| JP4634242B2 (ja) * | 2005-07-08 | 2011-02-16 | 株式会社山武 | 省エネルギー量推定装置、方法、およびプログラム |
| JP2011257073A (ja) * | 2010-06-09 | 2011-12-22 | Panasonic Electric Works Co Ltd | エネルギー管理装置 |
| JP6374702B2 (ja) * | 2014-05-21 | 2018-08-15 | アズビル株式会社 | 省エネルギー効果算出方法および装置 |
| CN104318073B (zh) * | 2014-10-08 | 2018-01-05 | 中国建筑设计院有限公司 | 单栋居住建筑的电气能耗模拟及节能的方法 |
| CN104990210B (zh) * | 2015-06-24 | 2017-12-12 | 广东美的制冷设备有限公司 | 空调器、空调器的室内机及其的功率估算控制方法、装置 |
| CN106403207A (zh) * | 2016-10-24 | 2017-02-15 | 珠海格力电器股份有限公司 | 用于暖通空调系统的基于负荷预测的控制系统和控制方法 |
-
2017
- 2017-05-02 CN CN201710302173.2A patent/CN107246705B/zh active Active
-
2018
- 2018-04-28 EP EP18794528.2A patent/EP3546842B1/en active Active
- 2018-04-28 WO PCT/CN2018/085032 patent/WO2018201996A1/zh not_active Ceased
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0886490A (ja) * | 1994-09-14 | 1996-04-02 | Toshiba Corp | 熱負荷予測装置 |
| CN101893309A (zh) * | 2010-07-19 | 2010-11-24 | 宁波奥克斯电气有限公司 | 变频空调节能运转的控制方法 |
| CN104977461A (zh) * | 2015-01-26 | 2015-10-14 | 广东美的制冷设备有限公司 | 空调用电量的计算方法和电子设备 |
| CN105135592A (zh) * | 2015-07-06 | 2015-12-09 | Tcl集团股份有限公司 | 一种空调自适应调节方法及系统 |
| US20170017735A1 (en) * | 2015-07-13 | 2017-01-19 | Tata Consultancy Services Limited | System and method for energy sample forecasting of hvac-r systems |
| CN107246705A (zh) * | 2017-05-02 | 2017-10-13 | 青岛海尔空调器有限总公司 | 一种空调功耗估算方法及装置 |
Non-Patent Citations (1)
| Title |
|---|
| See also references of EP3546842A4 |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112287281A (zh) * | 2020-10-14 | 2021-01-29 | 珠海格力电器股份有限公司 | 耗电量确定方法、装置及空调机组 |
| CN112287281B (zh) * | 2020-10-14 | 2023-06-30 | 珠海格力电器股份有限公司 | 耗电量确定方法、装置及空调机组 |
Also Published As
| Publication number | Publication date |
|---|---|
| EP3546842A4 (en) | 2020-01-01 |
| CN107246705B (zh) | 2019-11-05 |
| CN107246705A (zh) | 2017-10-13 |
| WO2018201996A9 (zh) | 2019-01-03 |
| EP3546842A1 (en) | 2019-10-02 |
| EP3546842B1 (en) | 2023-02-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2018201996A1 (zh) | 一种空调功耗估算方法及装置 | |
| Aksoezen et al. | Building age as an indicator for energy consumption | |
| Yan et al. | A multi-level energy performance diagnosis method for energy information poor buildings | |
| Ko et al. | Baseline building energy modeling of cluster inverse model by using daily energy consumption in office buildings | |
| CN106992523B (zh) | 一种用于含光伏和热负荷的电力系统的潮流计算方法 | |
| CN107103387B (zh) | 一种基于户均设备总功率及入住系数的负荷预测方法 | |
| CN110276699A (zh) | 一种公共机构能耗定额指标制定方法、系统和存储介质 | |
| JP2011163710A (ja) | 原単位算出システム及びこれを実行させるためのプログラム並びこのプログラムを記録した記録媒体 | |
| Iyengar et al. | Watthome: A data-driven approach for energy efficiency analytics at city-scale | |
| CN118690951B (zh) | 地源热泵空调系统自愿减排数据评估方法、系统及装置 | |
| CN103679289B (zh) | 基于多元回归外推法的电力负荷预测方法 | |
| JP2016192064A (ja) | 費用予測装置およびプログラム | |
| CN117709582A (zh) | 一种能耗计量统计及能流呈现方法、装置、系统及介质 | |
| CN111199339A (zh) | 一种用户节能量确定方法及装置 | |
| Mohammadabadi et al. | Validation of the energy demand load profile estimator “PROFet” for Trondheim non-residential buildings | |
| CN110795698A (zh) | 一种夏季电量分析方法及可读存储介质 | |
| US20190272000A1 (en) | Method and System for Rating Building Energy Performance | |
| CN105488302A (zh) | 一种公共建筑节能改造节能量测量方法 | |
| CN119204437B (zh) | 一种基于用户画像的电碳协同智能推送方法 | |
| CN114936470A (zh) | 一种智能电表可靠性评估方法 | |
| CN108596478A (zh) | 一种基于物理网的建筑能源管理方法 | |
| TW201820246A (zh) | 取得用電戶之負載運作機率之方法及取得用電戶群組之負載運作機率之方法 | |
| CN113011045B (zh) | 夏季用电负荷中空调功率获取方法及计算机可读介质 | |
| CN105548750B (zh) | 基于多数据处理的变电站电流二次回路状态评估方法 | |
| CN112560934B (zh) | 多尺度电力消费行为分析方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18794528 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2018794528 Country of ref document: EP Effective date: 20190627 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |