WO2019138070A1 - Coreset and qcl association in beam recovery procedure - Google Patents
Coreset and qcl association in beam recovery procedure Download PDFInfo
- Publication number
- WO2019138070A1 WO2019138070A1 PCT/EP2019/050683 EP2019050683W WO2019138070A1 WO 2019138070 A1 WO2019138070 A1 WO 2019138070A1 EP 2019050683 W EP2019050683 W EP 2019050683W WO 2019138070 A1 WO2019138070 A1 WO 2019138070A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- transmission configuration
- configuration indication
- node
- coreset
- control resource
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0686—Hybrid systems, i.e. switching and simultaneous transmission
- H04B7/0695—Hybrid systems, i.e. switching and simultaneous transmission using beam selection
- H04B7/06952—Selecting one or more beams from a plurality of beams, e.g. beam training, management or sweeping
- H04B7/06964—Re-selection of one or more beams after beam failure
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/08—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the receiving station
- H04B7/0868—Hybrid systems, i.e. switching and combining
- H04B7/088—Hybrid systems, i.e. switching and combining using beam selection
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/0005—Control or signalling for completing the hand-off
- H04W36/0083—Determination of parameters used for hand-off, e.g. generation or modification of neighbour cell lists
- H04W36/0085—Hand-off measurements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/06—Reselecting a communication resource in the serving access point
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/24—Reselection being triggered by specific parameters
- H04W36/30—Reselection being triggered by specific parameters by measured or perceived connection quality data
- H04W36/305—Handover due to radio link failure
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/34—Reselection control
- H04W36/36—Reselection control by user or terminal equipment
- H04W36/362—Conditional handover
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/046—Wireless resource allocation based on the type of the allocated resource the resource being in the space domain, e.g. beams
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/50—Allocation or scheduling criteria for wireless resources
- H04W72/54—Allocation or scheduling criteria for wireless resources based on quality criteria
- H04W72/542—Allocation or scheduling criteria for wireless resources based on quality criteria using measured or perceived quality
Definitions
- This invention relates generally to beam management and recovery procedures and, in particular, 3GPP New Radio (NR) physical layer design, focusing on beam recovery procedures and how control resource set (CORESET) and Quasi-colocation (QCL) associations are determined by gNB and UE.
- NR 3GPP New Radio
- a UE can be configured with up to 3 CORESETs and together 10 search space sets within a configured bandwidth part (BWP).
- CORESET defines physical time and frequency resources on which NR-PDCCH (Physical Downlink Control Channel) can be transmitted.
- NR-PDCCH Physical Downlink Control Channel
- Search space set defines PDCCH monitoring related time domain parameters such as monitoring periodicity: In other words, search space parameters provide a UE with information when trying to detect NR-PDCCH from a certain CORESET.
- a QCL framework is used for defining a“transmit beam” for different downlink physical signals and channels such as those for periodic, semi-persistent, and aperiodic CSI- RS, NR-PDCCH, and NR-PDSCH (Physical Downlink Shared Channel).
- a UE is configured with a transmission configuration indication (TCI) table in which each row/state is associated with one or two reference signals (RSs) that act as a source RS(s) in terms of different QCL parameters (e.g., delay spread, average delay, doppler spread, doppler shift, spatial RX) for the certain downlink signal.
- TCI transmission configuration indication
- Source RS may be e.g. SS/PBCH Block (Synchronization signal/Physical Broadcast Channel), CSI-RS, TRS (tracking reference signal), DMRS
- SS/PBCH block consists of PSS, SSS (Primary, Secondary SS) and symbols carrying PBCH, including PBCH DMRS and has total length of 4 symbols.
- Invention is not limited to the potential alternative transmission methods of SS/PBCH block in time or frequency domain (in other words, for instance, instead of sending 4 symbols, if the SS block components may be transmitted in frequency domain, for example, using only one symbol, that would satisfy this aspect).
- each CORESET may be associated to one or multiple above mentioned TCI rows (or TCI states).
- MAC-CE level activation signaling is used to control that which one of the multiple TCI states is active at a time per CORESET.
- UE may be configured with multiple CORESETs
- Search space set related parameters associated to the CORESET define time domain monitoring pattern from which the UE knows when to monitor certain CORESET; then, from associated (active) TCI state of the CORESET, the UE knows how to set its RX beam.
- FIG. 1 provides an exemplary TCI table configured for the UE where QCL type A means Doppler spread, Doppler shift, delay spread, average delay and QCL type D means spatial RX.
- QCL type A means Doppler spread
- Doppler shift means Doppler shift
- delay spread means spatial RX.
- QCL type D means spatial RX.
- TCI index 0 determines source RS(s) for a certain physical signal or channel
- the UE can determine that it can set its RX beam as it was set for receiving the SS/PBCH block #n.
- TCI index 1 determines source RS(s) for a certain physical signal or channel
- the UE can determine that it can set its RX beam as it was set for receiving the CSI-RS # (of RS set #B).
- FIG. 2 illustrates the case that UE has been configured two CORESETs with one or multiple TCI state associations.
- CORESET #0 For the CORESET #0, MAC-CE signaling is used to activate one TCI state at a time.
- the UE can be configured with a dedicated CORESET for monitoring gNB response for the beam failure recovery request (BFRQ, sometimes abbreviated as BFRR). This is referred as CORESET-BFR (Beam Failure Recovery) herein after.
- BFRQ beam failure recovery request
- CORESET-BFR Beam Failure Recovery
- the UE assumes that the CORESET-BFR is spatially QCL’d with DL RS of the UE identified (and indicated) candidate beam by the beam failure recovery request. In other words, the UE indicates candidate beam (or candidate downlink RS) using an uplink preamble signal that is associated with it.
- RAN1#91 it was agreed that only periodic CSI-RS or SSB which is spatially QCL’d with PDCCH DMRS is used for beam failure detection.
- the monitored BFD (beam failure detection) resources (among the possible periodic RS configured to be QCL’d with PDCCH) can be specifically configured for RS for beam failure detection. If not configured, then by default the UE assumes for beam failure detection that at least one of SSB or periodic CSI-RS is QCL’d with the PDCCH DMRS.
- the network can configure the UE with contention free resources from the PRACH resource pool.
- Contention free resources can be associated with SSBs or CSI-RS.
- the RS in the list are referred as candidate beams and indicated by a Candidate-beam-RS-list.
- candidate beams are referred as candidate beams and indicated by a Candidate-beam-RS-list.
- the recovery to CSI-RS candidate is done via QCL association to the SSB.
- the quality of downlink RS used for beam failure detection has to be below a specific quality threshold for N (or N-consecutive) beam failure monitoring instances (done periodically).
- N or N-consecutive beam failure monitoring instances
- failure is agreed to be done based on hypothetical PDCCH BLER, determined from beam failure RS.
- the quality of all RS need to be below the quality threshold for number of beam failure instances to declare failure.
- N-consecutive failure instances may be needed to declare failure.
- eNB or eNodeB Evolved Node B (LTE base station)
- FIG. 1 is TCI table configured for the UE
- FIG. 2 is a schematic of a UE configured with two CORESETs with one or multiple TCI state associations
- FIG. 3 is a block diagram of one possible and non-limiting exemplary system in which the exemplary embodiments may be practiced
- FIG. 4 is a logic flow diagram an exemplary method, a result of execution of computer program instructions embodied on a computer readable memory, functions performed by logic implemented in hardware, and/or interconnected means for performing functions in accordance with exemplary embodiments s; and.
- FIG. 5 is a logic flow diagram another exemplary method, a result of execution of computer program instructions embodied on a computer readable memory, functions performed by logic implemented in hardware, and/or interconnected means for performing functions in accordance with exemplary embodiments.
- the current Application discloses beam recovery procedures including control resource set (CORESET) and quasi co-location (QCL) association.
- CORESET control resource set
- QCL quasi co-location
- TS38.213 appears to consider an embodiment when Beam-Failure- Detection-RS-ResourceConfig is not configured by higher layer, and higher layer parameter TCI-StatesPDCCFI defines TCI state for RS resource sets for beam recovery.
- the TS 38.213 says“A UE is configured with one control resource set by higher layer parameter Beam-failure- Recovery-Response-CORESET.
- a UE can be configured, for a serving cell, with a set of periodic CSI-RS resource configuration indexes by higher layer parameter Beam-Failure- Detection-RS-ResourceConfig and with a set of CSI-RS resource configuration indexes and/or SS/PBCH block indexes by higher layer parameter Candidate-Beam-RS-List for radio link quality measurements on the serving cell. If the UE is not provided with higher layer parameter Beam-Failure-Detection-RS-ResourceConfig, the UE determines to include SS/PBCH blocks and periodic CSI-RS configurations with same values for higher layer parameter TCI- StatesPDCCH as for control resource sets that the UE is configured for monitoring PDCCH as described in Subclause 10.1”
- a UE monitors CORESET-BFR for gNB response. For recovery using dedicated resources, the UE monitors for DL transmission with its C-RNTI, when detected the failure recovery can be considered to be successful.
- the current invention proposes that when a UE transmits recovery request indicating a candidate beam that is configured as TCI state but is not active (the UE does not monitor PDCCH on inactive TCI states), it will monitor the CORESET corresponding to that TCI state instead of CORESET-BFR.
- the method of this invention can also be extended to cover beam recovery using dedicated random access signals (contention free random access).
- the dedicated signals may be configured from PRACH signal space
- the procedure may differ (whether it is a beam recovery procedure or random access procedure.
- random access gNB responds UE with a message using RA-RNTI and using CORESET configured for monitoring RAR (random access response). Also in this case when UE performs recovery to a TCI state associated with current CORESET for PDCCH reception, UE would not be monitoring RAR response but instead monitoring gNB response (with its C- RNTI) on the CORESET associated with indicated TCI state.
- network may transmit RAR as a response to dedicated RA preamble using C-RNTI.
- the indicated TCI state may be associated to multiple CORESETs, UE needs to potentially monitor all the associated
- CORESETs for gNB recovery response For gNB recovery response.
- UE monitors gNB response for the configured time duration of ResponseWindowSize-BFR (an example of a name). Duration may be expressed as millisecond, symbols or slot (set of symbols), subframes etc.
- Duration may be expressed as millisecond, symbols or slot (set of symbols), subframes etc.
- CORESET which is considered to be a default CORESET (could be indicated by network or fixed to be the lowest/highest
- DL RS potential candidate beams
- the default CORESET configuration for monitoring beam failure recovery response is typically configured with a larger set of PRBs to allow use of a higher aggregation level (e.g., to compensate for the loss of dedicated beam), using more of the system capacity.
- alignment of an additional CORESET with other CORESETs may not be optimal which may lead to poorer CORESET resource utilization or higher PDCCFI blockaging e.g. which would limit the gNB scheduling flexibility.
- the UE when selecting candidate beams for beam recovery, may prioritize candidate beams that are configured as TCI states (but are not active and are above the candidate beam selection threshold) over the other candidate beams. If multiple inactive TCI states are above the candidate beam threshold and can be indicated using dedicated beam recovery resource UE may select TCI state with highest signal quality in terms of hypothetical PDCCH BLER, RSRP, RSRQ or the like. In one aspect it may be beneficial for the UE to select TCI that has the hypothetical PDCCH BLER below Qin/IS (in-sync threshold) threshold used in radio link monitoring procedure (RLM) instead of basing the selection on merely RSRP measurement as the RSRP measurement does not take into account the interference. As an example, the RSRP measurement can be done on SS block signals, CSI-RS or on a combination of SS block and CSI-RS signals. As beam failure detection may be based on the same reference signals and hypothetical PDCCH BLER threshold values
- radio link recovery timer T310 can be stopped by counting number of IS indications at RRC, indicated by L1 when the radio link is determined to be in IS condition (the hypothetical PDCCH BLER is below threshold).
- T310 expires i.e. the radio link is not considered to be in IS condition it will cause RRC to declare radio link failure (RLF).
- Example values for IS/OOS are e.g. 2% for IS and 10% for OOS (other values are not excluded and may be configured by network. Thus, selecting TCI for recovery that is in IS condition from RLM perspective may prevent the RLF.
- the UE could select TCI with lowest measured BLER on potentially detected candidate beams.
- Candidate selection may therefore be done in 2 stages i.e. first based on RSRP and then select candidate in IS condition from RLM perspective or select the candidate based on lowest measured hypothetical PDCCH BLER.
- the alternative would be to consider only BLER.
- the UE may prefer to perform recovery to candidate beam (DL RS) with IS condition regardless whether the candidate is a configured TCI state.
- the UE may need to indicate then the recovery using contention based mechanism such as contention based random access.
- gNB may request UE to report N-highest quality beams (downlink RS such as SS block and/or CSI-RS).
- downlink RS such as SS block and/or CSI-RS
- Report may consist of beam/downlink RS identifier and additionally the quality level such as RSRP.
- the UE may be required to report beams with hypothetical PDCCH BLER below the aforementioned IS threshold (e.g. 2%). This would allow gNB to configure new TCI states or indicate an inactive TCI state to be active.
- a CORESET beam recovery procedure where a downlink reference signal (DL RS) corresponding to a transmission configuration indication (TCI) state activated for certain CORESET is determined as beam failure detection resource. Also proposed is the QCL association beam recovery procedure, where a UE may transmit UL request signal to require switching an active TCI state of the CORESET to a currently deactivated TCI state of the same CORESET. In principle, a condition or rule based UE initiated change of active TCI state is proposed.
- DL RS downlink reference signal
- TCI transmission configuration indication
- BFRQ beam failure recovery request
- DL RS corresponding to a TCI state activated (by means of MAC-CE) for a certain CORESET is determined as beam failure detection resource.
- Other DL RSs associated to TCI states configured for the CORESET may be configured to be associated to dedicated UL signal (PRACH resources for beam failure recovery) for beam failure recovery request. Then, if the UE triggers beam recovery procedure using a dedicated UL signal associated to DL RS
- the UE will remain monitoring response from the gNB using the CORESET associated (through the TCI) with the DL RS instead of dedicated beam recovery CORESET(-BFR).
- a method similar to that of this invention may also be used when performing recovery using RA procedure with CFRA resource. Both beam failure recovery and contention free random access resources may be configured from same the pool of PRACH resource but actual procedure may differ.
- the contention free signals may be configured from a preamble resource pool that can be used to transmit preamble signal when UE is in uplink-synchronized state i.e. UE has obtained Timing Advance and thus the signaling resource pool may have more preambles since the preamble signal does not have to take into account the timing uncertainty of an uplink transmission.
- a preamble resource pool that can be used to transmit preamble signal when UE is in uplink-synchronized state i.e. UE has obtained Timing Advance and thus the signaling resource pool may have more preambles since the preamble signal does not have to take into account the timing uncertainty of an uplink transmission.
- Such signals are for example scheduling request (SR) as in LTE.
- a fast NR-PDCCH beam switch procedure where the UE may transmit UL request signal to require switching an active TCI state of the CORESET to a currently deactivated TCI state of the same CORESET.
- the gNB may configure, similar to above, the UL BFRQ resources associated with deactivated TCI states of the certain CORESET.
- the UE transmits BRFQ signal associated to the certain TCI state of the CORESET, then the UE implicitly assumes that the TCI state as active in the CORESET and the UE tries to detect PDCCH, confirming the switch from the CORESET assuming the requested new active TCI state.
- the gNB may confirm the switch by scheduling DL/UL grant using C-RNTI or in an explicit TCI state configuration message (MAC CE/DCI).
- MAC CE/DCI TCI state configuration message
- This whole functionality may be configurable per CORESET, whether the UE may request switching active TCI state per CORESET or not.
- UE When UE has declared a beam failure of an active TCI state for a specific CORESET, it can indicate the switch to an inactive TCI state in the same CORESET as being considered as recovery from a special case, as a failure of subset of control links, or as a partial beam failure.
- There may be further rules defined for fast switching for instance, if the quality of inactive TCI state (measured using corresponding DL RS) becomes offset better (quality of inactive TCI state becomes is higher than quality of an active TCI state + offset value) than current active TCI state (where the offset value may be positive, negative or zero).
- Quality in this case may refer to RSRP, RSRQ, hypothetical PDCCH BLER, SINR, etc. of the DL RS/TCI state.
- the UE would follow beam recovery related procedures for the CORESET. In other words, for the CORESETs for which a“fast NR-PDCCH beam switch request” procedure is disabled, the UE follows beam recovery procedure.
- FIG. 3 is a block diagram of one possible and non-limiting exemplary system in which the exemplary embodiments may be practiced.
- a user equipment (UE) 1 10 is in wireless communication with a wireless network 100.
- a UE is a wireless, typically mobile device that can access a wireless network.
- the UE 1 10 includes one or more processors 120, one or more memories 125, and one or more transceivers 130 interconnected through one or more buses 127.
- Each of the one or more transceivers 130 includes a receiver, Rx, 132 and a transmitter, Tx, 133.
- the one or more buses 127 may be address, data, or control buses, and may include any interconnection mechanism, such as a series of lines on a motherboard or integrated circuit, fiber optics or other optical communication equipment, and the like.
- the one or more transceivers 130 are connected to one or more antennas 128.
- the one or more memories 125 include computer program code 123.
- the YYY module allows functionality for the usage of control resources for data transmission where any method or examples of such embodiments discussed herein can be practiced.
- the UE 1 10 includes a YYY module 140, comprising one of or both parts 140-1 and/or 140-2, which may be implemented in a number of ways.
- the YYY module 140 may be implemented in hardware as YYY module 140-1 , such as being
- the YYY module 140-1 may be implemented also as an integrated circuit or through other hardware such as a programmable gate array.
- the YYY module 140 may be implemented as YYY module 140- 2, which is implemented as computer program code 123 and is executed by the one or more processors 120.
- the one or more memories 125 and the computer program code 123 may be configured to, with the one or more processors 120, cause the user equipment 1 10 to perform one or more of the operations as described herein.
- the UE 110 communicates with eNB 170 via a wireless link 1 11.
- the eNB (an evolved NodeB or a New Radio 5G NodeB, which would denoted as gNB) 170 is a base station (e.g., for LTE, long term evolution, or 5G base station) that provides access by wireless devices such as the UE 1 10 to the wireless network 100.
- the eNB 170 includes one or more processors 152, one or more memories 155, one or more network interfaces (N/W l/F(s)) 161 , and one or more transceivers 160 interconnected through one or more buses 157.
- Each of the one or more transceivers 160 includes a receiver, Rx, 162 and a transmitter, Tx, 163.
- the one or more transceivers 160 are connected to one or more antennas 158.
- the one or more memories 155 include computer program code 153.
- the ZZZ module allows functionality for the usage of control resources for data transmission where any method or examples of such embodiments discussed herein can be practiced.
- the eNB 170 includes a ZZZ module 150, comprising one of or both parts 150-1 and/or 150-2, which may be implemented in a number of ways.
- the ZZZ module 150 may be implemented in hardware as ZZZ module 150-1 , such as being implemented as part of the one or more processors 152.
- the ZZZ module 150-1 may be implemented also as an integrated circuit or through other hardware such as a programmable gate array.
- the ZZZ module 150 may be implemented as ZZZ module 150-2, which is implemented as computer program code 153 and is executed by the one or more processors 152.
- the one or more memories 155 and the computer program code 153 are configured to, with the one or more processors 152, cause the eNB 170 to perform one or more of the operations as described herein.
- the one or more network interfaces 161 communicate over a network such as via the links 176 and 131.
- Two or more eNBs 170 communicate using, e.g., link 176.
- the link 176 may be wired or wireless or both and may implement, e.g., an X2 interface.
- the one or more buses 157 may be address, data, or control buses, and may include any interconnection mechanism, such as a series of lines on a motherboard or integrated circuit, fiber optics or other optical communication equipment, wireless channels, and the like.
- the one or more transceivers 160 may be implemented as a remote radio head (RRFI) 195, with the other elements of the eNB 170 being physically in a different location from the RRFI, and the one or more buses 157 could be implemented in part as fiber optic cable to connect the other elements of the eNB 170 to the RRFI 195.
- RRFI remote radio head
- each cell can correspond to a single carrier and an eNB may use multiple carriers. So if there are three 120-degree cells per carrier and two carriers, then the eNB has a total of 6 cells.
- the wireless network 100 may include a network control element (NCE) 190 that may include MME (Mobility Management Entity)/SGW (Serving Gateway) functionality, and which provides connectivity with a further network, such as a telephone network and/or a data communications network (e.g., the Internet).
- the eNB 170 is coupled via a link 131 to the NCE 190.
- the link 131 may be implemented as, e.g., an S1 interface.
- the NCE 190 includes one or more processors 175, one or more memories 171 , and one or more network interfaces (N/W l/F(s)) 180, interconnected through one or more buses 185.
- the one or more memories 171 include computer program code 173.
- the one or more memories 171 and the computer program code 173 are configured to, with the one or more processors 175, cause the NCE 190 to perform one or more operations.
- the wireless network 100 may implement network virtualization, which is the process of combining hardware and software network resources and network functionality into a single, software-based administrative entity, a virtual network.
- Network virtualization involves platform virtualization, often combined with resource virtualization.
- Network virtualization is categorized as either external, combining many networks, or parts of networks, into a virtual unit, or internal, providing network-like functionality to software containers on a single system. Note that the virtualized entities that result from the network virtualization may still be implemented, at some level, using hardware such as processors 152 or 175 and memories 155 and 171 , and also such virtualized entities create technical effects.
- the computer readable memories 125, 155, and 171 may be of any type suitable to the local technical environment and may be implemented using any suitable data storage technology, such as semiconductor based memory devices, flash memory, magnetic memory devices and systems, optical memory devices and systems, fixed memory and removable memory.
- the computer readable memories 125, 155, and 171 may be means for performing storage functions.
- the processors 120, 152, and 175 may be of any type suitable to the local technical environment, and may include one or more of general purpose computers, special purpose computers, microprocessors, digital signal processors (DSPs) and processors based on a multi-core processor architecture, as non-limiting examples.
- the processors 120, 152, and 175 may be means for performing functions, such as controlling the UE 1 10, eNB 170, and other functions as described herein.
- the various embodiments of the user equipment 1 10 can include, but are not limited to, cellular phones such as smart devices, tablets, personal digital assistants (PDAs) having wireless communication capabilities, portable computers having wireless communication capabilities, image capture devices such as digital cameras having wireless communication capabilities, gaming devices having wireless communication capabilities, music storage and playback appliances having wireless communication capabilities, internet appliances permitting wireless Internet access and browsing, tablets with wireless
- cellular phones such as smart devices, tablets, personal digital assistants (PDAs) having wireless communication capabilities, portable computers having wireless communication capabilities, image capture devices such as digital cameras having wireless communication capabilities, gaming devices having wireless communication capabilities, music storage and playback appliances having wireless communication capabilities, internet appliances permitting wireless Internet access and browsing, tablets with wireless
- PDAs personal digital assistants
- portable computers having wireless communication capabilities
- image capture devices such as digital cameras having wireless communication capabilities
- gaming devices having wireless communication capabilities
- music storage and playback appliances having wireless communication capabilities
- internet appliances permitting wireless Internet access and browsing, tablets with wireless
- various embodiments of the user equipment include machines, communicators and categories of equipment, which are not primarily or not at all in use by human interaction.
- the current architecture in LTE networks is fully distributed in the radio and fully centralized in the core network.
- the low latency requires bringing the content close to the radio which leads to local break out and multi-access edge computing (MEC).
- 5G may use edge cloud and local cloud architecture.
- Edge computing covers a wide range of technologies such as wireless sensor networks, mobile data acquisition, mobile signature analysis, cooperative distributed peer-to-peer ad hoc networking and processing also classifiable as local cloud/fog computing and grid/mesh computing, dew computing, mobile edge computing, cloudlet, distributed data storage and retrieval, autonomic self-healing networks, remote cloud services and augmented reality.
- edge cloud may mean node operations to be carried out, at least partly, in a server, host or node operationally coupled to a remote radio head or base station comprising radio parts. It is also possible that node operations will be distributed among a plurality of servers, nodes or hosts. It should also be understood that the distribution of labor between core network operations and base station operations may differ from that of the LTE or even be non-existent. Some other technology advancements probably to be used are Software-Defined Networking (SDN), Big Data, and all-IP, which may change the way networks are being constructed and managed.
- SDN Software-Defined Networking
- Big Data Big Data
- all-IP all-IP
- An exemplary embodiment comprises a radio node connected to a server.
- Exemplary embodiments implementing the system allow the edge cloud server and the radio node as stand-alone apparatuses communicating with each other via a radio path or via a wired connection or they may be located in a same entity communicating via a wired connection.
- FIG. 4 is a logic flow diagram for a beam recovery procedure employing
- CORESET and CQL association by illustrating the operation of an exemplary method 400, a result of execution of computer program instructions embodied on a computer readable memory, functions performed by logic implemented in hardware, and/or interconnected means for performing functions in accordance with exemplary embodiments. Parts or all of method 400 could be performed in module YYY or module ZZZ as appropriate.
- the UE is configured in a number of ways.
- the UE is configured with a TCI table to indicate source RSs for different QCL parameters.
- the UE is configured with one or multiple CORESETs for NR-PDCCFI reception.
- the UE is configured with multiple TCI states (multiple transmit beams) associated with a CORESET.
- the UE is configured with a TCI state that is active for the CORESET.
- the UE is also configured with the BFRQ resource associated with one or multiple TCI states associated with a CORESET.
- the UE determines a beam failure and detects a replacement candidate beam.
- the UE In response to the replacement candidate beam being associated with a TCI state associated with a CORESET, per item 406, the UE triggers a BFRQ resource transmission associated with the replacement candidate beam. [0095] Thereafter, as seen in item 408, the UE monitors the CORESET of the DL RS associated with the replacement candidate beam via TCI linkage for PDCCH to receive a response to BFRQ.
- FIG. 5 is a logic flow diagram for a beam recovery procedure employing
- CORESET and CQL association by illustrating the operation of an exemplary method 500, a result of execution of computer program instructions embodied on a computer readable memory, functions performed by logic implemented in hardware, and/or interconnected means for performing functions in accordance with exemplary embodiments. Parts or all of method 500 could be performed in module YYY or module ZZZ as appropriate.
- the UE in this exemplary embodiment is also configured with the following as shown in item 502: a TCI table to indicate source RSs for different QCL parameters; one or multiple CORESETs for NR-PDCCFI reception; multiple TCI states (multiple transmit beams) associated with a CORESET; a TCI state that is active for the CORESET; and the BFRQ resource associated with one or multiple TCI states associated with a CORESET.
- a TCI table to indicate source RSs for different QCL parameters
- one or multiple CORESETs for NR-PDCCFI reception multiple TCI states (multiple transmit beams) associated with a CORESET
- a TCI state that is active for the CORESET and the BFRQ resource associated with one or multiple TCI states associated with a CORESET.
- UE is further configured with the CORESET having a fast PDCCFI beam switch request procedure enabled.
- the UE determines a deactivated TCI state and linked transmit beam to be a replacement candidate beam where the replacement candidate beam would be better than a current active PDCCFI beam.
- the UE transmits a BFRQ resource associated with the deactivated TCI state as shown in item 508.
- Item 510 shows that the UE monitors the CORESET, which the DL RS of the replacement candidate beam is associated with, via the TCI linkage for the replacement candidate PDCCFI beam, to receive a response to the transmitted BFRQ resource.
- the UE receives PDCCFI from the gNB from the CORESET within a time window in item 512. Finally, as shown in item 514, the UE determines that the gNB has confirmed a new active TCI state for the CORESET to use the replacement candidate PDCCFI beam.
- embodiments disclosed herein is that by enabling the recovery to be performed to RS resources that are already associated with UE specific CORESET, system PDCCH capacity can be preserved.
- a further advantage or technical effect of one or more of the exemplary embodiments disclosed herein is that it allows a fast NR-PDCCH beam switch procedure to be enabled (second embodiment) without need for first requesting beam measurement results from the UE before performing transmit beam change.
- An example of an embodiment, which can be referred to as item 1 is a method comprising: determining a second beam for a node in a wireless communications system to switch to from a first beam; transmitting a BFRQ resource associated with the second beam; and monitoring a CORESET of a DL RS associated with the second beam via TCI linkage for PDCCH to receive a response to the BFRQ resource transmission.
- An example of a further embodiment, which can be referred to as item 2, is the method of item 1 where the node is configured with the CORESET having a fast PDCCH beam switch request procedure enabled.
- An example of a further embodiment, which can be referred to as item 3, is the method of any preceding item, further comprising: receiving a PDCCH from the CORESET within a time window.
- An example of a further embodiment, which can be referred to as item 4, is the method of any preceding item, further comprising: ascertaining confirmation for the switch to a new active TCI state for the CORESET.
- An example of a further embodiment, which can be referred to as item 5, is the method of any preceding item where the determining comprises favoring a deactivated or inactive TCI state of the second beam over the PDCCH of the first beam.
- An example of a further embodiment, which can be referred to as item 6, is the method of item 5 where the favoring comprises assessing the quality of the inactive TCI state, measured using corresponding DL RS, to be higher than quality of an active TCI state of the first beam plus an offset value, where the offset value may be positive, negative or zero, or higher than a predetermined threshold value.
- An example of a further embodiment, which can be referred to as item 7, is the method of any of items 1 - 4 further comprising: prior to the determining, detecting a failure of the first beam.
- An example of a further embodiment, which can be referred to as item 8, is the method of item 7, further comprising: after the determining, in response to the second beam being associated with a TCI states also associated with the CORESET, triggering the transmitting.
- An example of a further embodiment, which can be referred to as item 9, is the method of any preceding item where the node is a user equipment.
- An example of an embodiment, which can be referred to as item 10, is the method of any preceding item where the node is configured with a TCI table to indicate source RSs for different QCL parameters.
- An example of a further embodiment, which can be referred to as item 1 1 is the method of any preceding item where the node is configured with one or more CORESETs for NR-PDCCH reception.
- An example of a further embodiment, which can be referred to as item 12, is the method of any preceding item where the node is configured with multiple TCI states (multiple transmit beams) associated with each CORESET of the one or more CORESETs.
- An example of a further embodiment, which can be referred to as item 13, is the method of any preceding item where the node is configured with a TCI state that is active for a CORESET.
- An example of a further embodiment, which can be referred to as item 14, is the method of any preceding item where the node is configured with the BFRQ resource associated with one or multiple TCI states associated with a CORESET.
- An example of another embodiment, which can be referred to as item 15, is an apparatus comprising: determining a second beam for a node in a wireless communications system to switch to from a first beam; transmitting a BFRQ resource associated with the second beam; and monitoring a CORESET of a DL RS associated with the second beam via TCI linkage for PDCCFI to receive a response to the BFRQ resource transmission.
- An example of another further embodiment, which can be referred to as item 16, is the apparatus of item 15 where the node is configured with the CORESET having a fast PDCCFI beam switch request procedure enabled.
- An example of another further embodiment, which can be referred to as item 17, is the apparatus of any of items 15 - 16, where the at least one memory and the computer code are further configured, with the at least one processor, to cause the apparatus to at least perform the following: receiving a PDCCH from the CORESET within a time window.
- An example of another further embodiment, which can be referred to as item 18, is the apparatus of any of items 15 - 17, further comprising: ascertaining confirmation for the switch to a new active TCI state for the CORESET.
- An example of another further embodiment, which can be referred to as item 19, is the apparatus of any of items 15 - 18 where the determining comprises favoring a
- An example of another further embodiment, which can be referred to as item 20, is the apparatus of item 19 where the favoring comprises assessing the quality of the inactive TCI state, measured using corresponding DL RS, to be higher than quality of an active TCI state of the first beam plus an offset value, where the offset value may be positive, negative or zero, or higher than a predetermined threshold value.
- An example of another further embodiment, which can be referred to as item 21 is the apparatus of any of items 15 - 18, where at least one processor and at least one memory including computer program code are further configured, with the at least one processor, to cause the apparatus to at least perform the following: prior to the determining, detecting a failure of the first beam.
- An example of another further embodiment, which can be referred to as item 22, is the apparatus of item 21 , where the at least one memory and the computer code are further configured, with the at least one processor, to cause the apparatus to at least perform the following: after the determining, in response to the second beam being associated with a TCI states also associated with the CORESET, triggering the transmitting.
- An example of another further embodiment, which can be referred to as item 23, is the apparatus of any of items 15 - 22 where the node is a user equipment.
- An example of another further embodiment, which can be referred to as item 24, is the apparatus of any of items 15 - 23 where the node is configured with a TCI table to indicate source RSs for different QCL parameters.
- An example of another further embodiment, which can be referred to as item 25, is the apparatus of any of items 15 - 24 where the node is configured with one or more
- An example of another further embodiment, which can be referred to as item 26, is the apparatus of any of items 15 - 25 where the node is configured with multiple TCI states (multiple transmit beams) associated with each CORESET of the one or more CORESETs.
- An example of another further embodiment, which can be referred to as item 27, is the apparatus of any of items 15 - 26 where the node is configured with a TCI state that is active for a CORESET.
- An example of another further embodiment, which can be referred to as item 28, is the apparatus of any of items 15 - 27 where the node is configured with the BFRQ resource associated with one or multiple TCI states associated with a CORESET.
- An example of yet another embodiment which can be referred to as item 29, is an apparatus comprising means for determining a second beam for a node in a wireless communications system to switch to from a first beam; transmitting a BFRQ resource associated with the second beam; and monitoring a CORESET of a DL RS associated with the second beam via TCI linkage for PDCCFI to receive a response to the BFRQ resource transmission.
- An example of yet other embodiments is the apparatus of item 29 additionally preforming the steps of any of the methods of any of items 2 - 14.
- An example of a still further embodiment, which can be referred to as item 30, is a computer program code with code for performing any of the methods of claims 1 - 14.
- An example of another still further embodiment, which can be referred to as item 31 is a computer program product where the computer program of item 30 is embodied on a non-transitory computer readable medium.
- An example of yet another embodiment which can be referred to as item 32, is a computer program product embodied on a non-transitory computer-readable medium in which a computer program is stored that, when being executed by a computer, is configured to provide instructions to control or carry out any of the methods of items 1 - 14.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Quality & Reliability (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Method, apparatus, and computer program product for a CORESET beam recovery procedure and a QCL association beam recovery procedure where a condition or rule based UE initiated change of active TCI state is used. The CORESET beam recovery procedure involves a downlink reference signal corresponding to a transmission configuration indication state activated for certain CORESET being determined as a beam failure detection resource. The QCL association beam recovery procedure concerns a UE transmitting a UL request signal to require switching an active TCI state of the CORESET to a currently deactivated TCI state of the same CORESET.
Description
CORESET AND QCL ASSOCIATION IN BEAM RECOVERY PROCEDURE
TECHNICAL FIELD
[0001] This invention relates generally to beam management and recovery procedures and, in particular, 3GPP New Radio (NR) physical layer design, focusing on beam recovery procedures and how control resource set (CORESET) and Quasi-colocation (QCL) associations are determined by gNB and UE.
BACKGROUND
[0002] This section is intended to provide a background or context to the invention disclosed below. The description herein may include concepts that could be pursued, but are not necessarily ones that have been previously conceived, implemented, or described.
Therefore, unless otherwise explicitly indicated herein, what is described in this section is not prior art to the description in this application and is not admitted to be prior art by inclusion in this section.
[0003] A UE can be configured with up to 3 CORESETs and together 10 search space sets within a configured bandwidth part (BWP). CORESET defines physical time and frequency resources on which NR-PDCCH (Physical Downlink Control Channel) can be transmitted.
Search space set defines PDCCH monitoring related time domain parameters such as monitoring periodicity: In other words, search space parameters provide a UE with information when trying to detect NR-PDCCH from a certain CORESET.
[0004] A QCL framework is used for defining a“transmit beam” for different downlink physical signals and channels such as those for periodic, semi-persistent, and aperiodic CSI- RS, NR-PDCCH, and NR-PDSCH (Physical Downlink Shared Channel). As such, a UE is configured with a transmission configuration indication (TCI) table in which each row/state is associated with one or two reference signals (RSs) that act as a source RS(s) in terms of different QCL parameters (e.g., delay spread, average delay, doppler spread, doppler shift, spatial RX) for the certain downlink signal. When a spatial RX QCL parameter is to be configured for the certain source RS, the UE can assume the same RX beam (or RX spatial filter) can be applied when receiving a target physical signal or physical channel as was used for receiving the source RS. Source RS may be e.g. SS/PBCH Block (Synchronization
signal/Physical Broadcast Channel), CSI-RS, TRS (tracking reference signal), DMRS
(demodulation reference signal) or the like. SS/PBCH block consists of PSS, SSS (Primary, Secondary SS) and symbols carrying PBCH, including PBCH DMRS and has total length of 4 symbols. Invention is not limited to the potential alternative transmission methods of SS/PBCH block in time or frequency domain (in other words, for instance, instead of sending 4 symbols, if the SS block components may be transmitted in frequency domain, for example, using only one symbol, that would satisfy this aspect).
[0005] For determining the transmit beam for the NR-PDCCH, it has previously been agreed that each CORESET may be associated to one or multiple above mentioned TCI rows (or TCI states). In cases where the CORESET is associated with more than one TCI states, MAC-CE level activation signaling is used to control that which one of the multiple TCI states is active at a time per CORESET. UE may be configured with multiple CORESETs
[0006] Search space set related parameters associated to the CORESET define time domain monitoring pattern from which the UE knows when to monitor certain CORESET; then, from associated (active) TCI state of the CORESET, the UE knows how to set its RX beam.
[0007] FIG. 1 provides an exemplary TCI table configured for the UE where QCL type A means Doppler spread, Doppler shift, delay spread, average delay and QCL type D means spatial RX. Thus, when TCI index 0 determines source RS(s) for a certain physical signal or channel, the UE can determine that it can set its RX beam as it was set for receiving the SS/PBCH block #n. Correspondingly, when TCI index 1 determines source RS(s) for a certain physical signal or channel, the UE can determine that it can set its RX beam as it was set for receiving the CSI-RS # (of RS set #B).
[0008] FIG. 2 illustrates the case that UE has been configured two CORESETs with one or multiple TCI state associations. For the CORESET #0, MAC-CE signaling is used to activate one TCI state at a time.
[0009] It has been further previously agreed that for beam recovery procedure the UE can be configured with a dedicated CORESET for monitoring gNB response for the beam failure recovery request (BFRQ, sometimes abbreviated as BFRR). This is referred as CORESET-BFR (Beam Failure Recovery) herein after. Based on the agreement in RAN1#90bis, the UE assumes that the CORESET-BFR is spatially QCL’d with DL RS of the UE identified (and indicated) candidate beam by the beam failure recovery request. In other words, the UE indicates candidate beam (or candidate downlink RS) using an uplink preamble signal that is associated with it.
[0010] In RAN1#91 it was agreed that only periodic CSI-RS or SSB which is spatially
QCL’d with PDCCH DMRS is used for beam failure detection. The monitored BFD (beam failure detection) resources (among the possible periodic RS configured to be QCL’d with PDCCH) can be specifically configured for RS for beam failure detection. If not configured, then by default the UE assumes for beam failure detection that at least one of SSB or periodic CSI-RS is QCL’d with the PDCCH DMRS.
[0011] For recovery purposes, when a UE has declared beam failure, the network can configure the UE with contention free resources from the PRACH resource pool. Contention free resources can be associated with SSBs or CSI-RS. The RS in the list are referred as candidate beams and indicated by a Candidate-beam-RS-list. To indicate a candidate, if both CSI-RS and SSB are listed but only SSBs are associated with dedicated recovery preamble resources, then the recovery to CSI-RS candidate is done via QCL association to the SSB.
[0012] To declare beam failure, the quality of downlink RS used for beam failure detection has to be below a specific quality threshold for N (or N-consecutive) beam failure monitoring instances (done periodically). Currently failure is agreed to be done based on hypothetical PDCCH BLER, determined from beam failure RS. In the case where multiple RS are used (e.g., if UE has multiple PDCCH links or NW has configured multiple beam failure RS), then the quality of all RS need to be below the quality threshold for number of beam failure instances to declare failure. Alternative, N-consecutive failure instances may be needed to declare failure.
[0013] Limitations of these previously agreed to proposals include the fact that currently DL RSs associated to active TCI states configured for the CORESET are evaluated for beam failure detection and when UE declares beam failure (all the active TCI states are considered to be in failure condition so that beam failure can be declared) and transmits BFRQ it is monitoring the CORESET-BFR for gNB response. In discussions regarding NR, which seems suboptimal in certain cases. The current limitation of state of the art is that when UE indicates recovery (regardless of which DL RS is indicated as new candidate by a dedicated recovery signal) it is required to monitor CORESET-BFR. Thus, the current invention moves beyond the current techniques and/or materials.
[0014] Abbreviations that may be found in the specification and/or the drawing figures are either defined in the text or defined below in the following list of abbreviations:
[0015] 2G Second Generation
[0016] 3G Third Generation
[0017] 3GPP Third Generation Partnership Project
[0018] 5G Fifth Generation
[0019] 5G-NB Fifth Generation Node B
[0020] BFR Beam Failure Recovery
[0021] BFRQ Beam Failure Recovery Request
[0022] BLER Block Error Ratio
[0023] BS Base Station
[0024] BSI Beam State Information
[0025] BRI Beam Refinement Information
[0026] BRS Beam Reference Signal
[0027] BRRS Beam Refinement Reference Signal
[0028] CCE Control Channel Element
[0029] CORESET Control Resource Set
[0030] C-RNTI Cell Radio Network Temporary Identifier
[0031] DL Downlink
[0032] DMRS Demodulation Reference Signal
[0033] eNB or eNodeB Evolved Node B (LTE base station)
[0034] gNB NR/5G Node B
[0035] NB NodeB, base station
[0036] MAC-CE Medium Access Control - Control Element
[0037] NR New Radio
[0038] PDCCH Physical Downlink Control Channel
[0039] PUCCH Physical Uplink Control Channel
[0040] PUSCH Physical Uplink Shared Channel
[0041] QCL Quasi Co-location
[0042] RA Random Access
[0043] ReTx Retransmission or retransmitting
[0044] RRH Remote radio head
[0045] RS Reference Signal
[0046] RSRP Reference Signal Received Power
[0047] RSRQ Reference Signal Received Quality
[0048] Rx, RX Reception or receiving
[0049] SINR Signal to Interference and Noise Ratio
[0050] SR Scheduling Request
[0051] TCI Transmission Configuration Indication
[0052] TS Technical Specification or Technical Standard
[0053] Tx, TC Transmission or transmitting
[0054] TXRU Transceiver Unit
[0055] UE User Equipment or mobile station
[0056] UL Uplink
BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In the attached Drawing Figures:
[0058] FIG. 1 is TCI table configured for the UE;
[0059] FIG. 2 is a schematic of a UE configured with two CORESETs with one or multiple TCI state associations;
[0060] FIG. 3 is a block diagram of one possible and non-limiting exemplary system in which the exemplary embodiments may be practiced;
[0061] FIG. 4 is a logic flow diagram an exemplary method, a result of execution of computer program instructions embodied on a computer readable memory, functions performed by logic implemented in hardware, and/or interconnected means for performing functions in accordance with exemplary embodiments s; and.
[0062] FIG. 5 is a logic flow diagram another exemplary method, a result of execution of computer program instructions embodied on a computer readable memory, functions performed by logic implemented in hardware, and/or interconnected means for performing functions in accordance with exemplary embodiments.
DETAILED DESCRIPTION OF THE DRAWINGS
[0063] The current Application discloses beam recovery procedures including control resource set (CORESET) and quasi co-location (QCL) association.
[0064] Please note that examples and embodiments discussed herein are not intended to be limiting. Moreover, the word“exemplary” as used herein means“serving as an example, instance, or illustration.” Thus, any embodiment described herein as“exemplary” is not necessarily to be construed as preferred or advantageous over other embodiments. All of the embodiments described in this Detailed Description are exemplary embodiments provided to enable persons skilled in the art to make or use the invention and not to limit the scope of the invention which is defined by the claims.
[0065] As discussed above, a problem that arises based on current agreements is that all (periodic) DL RSs associated to active TCI states configured for the CORESET are
evaluated for beam failure detection. In addition, currently a UE monitors only dedicated CORESET-BFR for beam failure when it has indicated new candidate to gNB via dedicated preamble.
[0066] For instance, TS38.213 appears to consider an embodiment when Beam-Failure- Detection-RS-ResourceConfig is not configured by higher layer, and higher layer parameter TCI-StatesPDCCFI defines TCI state for RS resource sets for beam recovery. The TS 38.213 says“A UE is configured with one control resource set by higher layer parameter Beam-failure- Recovery-Response-CORESET. A UE can be configured, for a serving cell, with a set of periodic CSI-RS resource configuration indexes by higher layer parameter Beam-Failure- Detection-RS-ResourceConfig and with a set of CSI-RS resource configuration indexes and/or SS/PBCH block indexes by higher layer parameter Candidate-Beam-RS-List for radio link quality measurements on the serving cell. If the UE is not provided with higher layer parameter Beam-Failure-Detection-RS-ResourceConfig, the UE determines to include SS/PBCH blocks and periodic CSI-RS configurations with same values for higher layer parameter TCI- StatesPDCCH as for control resource sets that the UE is configured for monitoring PDCCH as described in Subclause 10.1”
[0067] However, it seems that when a UE is not configured separately for the failure detection RS, there is implicit configuration of PDCCH beam(s) (TCI state/states that are active) as beam failure detection RS. In this case, with the method in the invention, when a UE performs beam recovery for an inactive TCI state, it would not need to monitor (and gNB does not need to transmit) the CORESET-BFR
[0068] Prior to this invention, when transmitting recovery using dedicated signals, a UE monitors CORESET-BFR for gNB response. For recovery using dedicated resources, the UE monitors for DL transmission with its C-RNTI, when detected the failure recovery can be considered to be successful. The current invention proposes that when a UE transmits recovery request indicating a candidate beam that is configured as TCI state but is not active (the UE does not monitor PDCCH on inactive TCI states), it will monitor the CORESET corresponding to that TCI state instead of CORESET-BFR. The method of this invention can also be extended to cover beam recovery using dedicated random access signals (contention free random access). Although for beam recovery the dedicated signals may be configured from PRACH signal space, the procedure may differ (whether it is a beam recovery procedure or random access procedure. In random access gNB responds UE with a message using RA-RNTI and using CORESET configured for monitoring RAR (random access response). Also in this case when UE performs recovery to a TCI state associated with current CORESET for PDCCH reception,
UE would not be monitoring RAR response but instead monitoring gNB response (with its C- RNTI) on the CORESET associated with indicated TCI state. In one alternative network may transmit RAR as a response to dedicated RA preamble using C-RNTI.
[0069] As an additional aspect of the invention, since the indicated TCI state may be associated to multiple CORESETs, UE needs to potentially monitor all the associated
CORESETs for gNB recovery response. UE monitors gNB response for the configured time duration of ResponseWindowSize-BFR (an example of a name). Duration may be expressed as millisecond, symbols or slot (set of symbols), subframes etc. In case the TCI indicated by UE is associated with multiple CORESETs, the following rules could be used to determine whether UE monitors all the CORESETs, subset of CORESET, or only one, as the following alternatives show:
Alt1. UE monitors all CORESET during the response window
Alt2. UE monitors CORESET with smaller ID
Alt3. UE monitors CORESET which is considered to be a default CORESET (could be indicated by network or fixed to be the lowest/highest
CORESET ID
Alt4. UE monitors CORESET that has associated search space set with higher maximum CCE aggregation level
Alt5. In case the CORESETs are transmitted with specific time domain pattern, UE monitors the CORESET according to the pattern during the recovery response window
[0070] In the situation where there are potential candidate beams (DL RS) that are above a quality threshold in the TCI state configured for the CORESET but are not currently active, it would be suboptimal to switch the recovery monitoring to another CORESET. In other words, the default CORESET configuration for monitoring beam failure recovery response is typically configured with a larger set of PRBs to allow use of a higher aggregation level (e.g., to compensate for the loss of dedicated beam), using more of the system capacity. Furthermore, alignment of an additional CORESET with other CORESETs may not be optimal which may lead to poorer CORESET resource utilization or higher PDCCFI blockaging e.g. which would limit the gNB scheduling flexibility.
[0071] In one additional aspect of the invention, when selecting candidate beams for beam recovery, the UE may prioritize candidate beams that are configured as TCI states (but are not active and are above the candidate beam selection threshold) over the other candidate beams. If multiple inactive TCI states are above the candidate beam threshold and can be
indicated using dedicated beam recovery resource UE may select TCI state with highest signal quality in terms of hypothetical PDCCH BLER, RSRP, RSRQ or the like. In one aspect it may be beneficial for the UE to select TCI that has the hypothetical PDCCH BLER below Qin/IS (in-sync threshold) threshold used in radio link monitoring procedure (RLM) instead of basing the selection on merely RSRP measurement as the RSRP measurement does not take into account the interference. As an example, the RSRP measurement can be done on SS block signals, CSI-RS or on a combination of SS block and CSI-RS signals. As beam failure detection may be based on the same reference signals and hypothetical PDCCH BLER threshold values
(Qout/OOS (out-of-sync)) as used for radio link monitoring, it may be likely that radio link problem is detected by RRC layer causing it to start radio link recovery timer T310. This timer can be stopped by counting number of IS indications at RRC, indicated by L1 when the radio link is determined to be in IS condition (the hypothetical PDCCH BLER is below threshold). In case the T310 expires i.e. the radio link is not considered to be in IS condition it will cause RRC to declare radio link failure (RLF). Example values for IS/OOS are e.g. 2% for IS and 10% for OOS (other values are not excluded and may be configured by network. Thus, selecting TCI for recovery that is in IS condition from RLM perspective may prevent the RLF. Alternatively, the UE could select TCI with lowest measured BLER on potentially detected candidate beams. Candidate selection may therefore be done in 2 stages i.e. first based on RSRP and then select candidate in IS condition from RLM perspective or select the candidate based on lowest measured hypothetical PDCCH BLER. Naturally the alternative would be to consider only BLER. In more general view and in one further example, the UE may prefer to perform recovery to candidate beam (DL RS) with IS condition regardless whether the candidate is a configured TCI state. The UE may need to indicate then the recovery using contention based mechanism such as contention based random access. Furthermore, as a response to beam recovery failure request gNB may request UE to report N-highest quality beams (downlink RS such as SS block and/or CSI-RS). Report may consist of beam/downlink RS identifier and additionally the quality level such as RSRP. In one additional example the UE may be required to report beams with hypothetical PDCCH BLER below the aforementioned IS threshold (e.g. 2%). This would allow gNB to configure new TCI states or indicate an inactive TCI state to be active.
[0072] Proposed herein is a CORESET beam recovery procedure, where a downlink reference signal (DL RS) corresponding to a transmission configuration indication (TCI) state activated for certain CORESET is determined as beam failure detection resource. Also proposed is the QCL association beam recovery procedure, where a UE may transmit UL request signal to require switching an active TCI state of the CORESET to a currently
deactivated TCI state of the same CORESET. In principle, a condition or rule based UE initiated change of active TCI state is proposed.
[0073] The proposed operation would be that UE monitors from all configured
CORESETs the active TCI state (or states) DL RS for determining the beam failure. If all active TCIs associated with one or multiple CORESETs are in failure condition, then then UE looks also to DL RS of nonactive TCI states of these CORESETs. If non-active TCI state DL RS are alive (i.e. the signal quality in terms of RSRP, RSRQ SINR, hypothetical PDCCH BLER etc. is considered to be good), then the UE initializes beam failure recovery request (BFRQ) using the configured contention free random access resources configured for beam failure recovery corresponding to that TCI state. Then, then UE monitors for BRFQ response on CORESET associated with the indicated TCI state (indicated by BRFQ preamble), instead of on the dedicated CORESET or default CORESET for beam failure recovery.
[0074] Specifically, in a first incarnation of the present invention, it is proposed that DL RS corresponding to a TCI state activated (by means of MAC-CE) for a certain CORESET is determined as beam failure detection resource. Other DL RSs associated to TCI states configured for the CORESET may be configured to be associated to dedicated UL signal (PRACH resources for beam failure recovery) for beam failure recovery request. Then, if the UE triggers beam recovery procedure using a dedicated UL signal associated to DL RS
corresponding to a TCI state configured in a deactivated state for the certain CORESET, the UE will remain monitoring response from the gNB using the CORESET associated (through the TCI) with the DL RS instead of dedicated beam recovery CORESET(-BFR). A method similar to that of this invention may also be used when performing recovery using RA procedure with CFRA resource. Both beam failure recovery and contention free random access resources may be configured from same the pool of PRACH resource but actual procedure may differ.
Alternatively, or additionally the contention free signals may be configured from a preamble resource pool that can be used to transmit preamble signal when UE is in uplink-synchronized state i.e. UE has obtained Timing Advance and thus the signaling resource pool may have more preambles since the preamble signal does not have to take into account the timing uncertainty of an uplink transmission. Such signals are for example scheduling request (SR) as in LTE.
[0075] In another incarnation, a fast NR-PDCCH beam switch procedure is proposed, where the UE may transmit UL request signal to require switching an active TCI state of the CORESET to a currently deactivated TCI state of the same CORESET. In other words, the gNB may configure, similar to above, the UL BFRQ resources associated with deactivated TCI states of the certain CORESET. When the UE transmits BRFQ signal associated to the certain TCI
state of the CORESET, then the UE implicitly assumes that the TCI state as active in the CORESET and the UE tries to detect PDCCH, confirming the switch from the CORESET assuming the requested new active TCI state. There may a certain window defined/configured for how long a UE can assume a response from the gNB for the beam switch request. The gNB may confirm the switch by scheduling DL/UL grant using C-RNTI or in an explicit TCI state configuration message (MAC CE/DCI). In case a TCI state is associated with multiple
CORESETS, similar rules may be applied as described for beam recovery.
[0076] This whole functionality may be configurable per CORESET, whether the UE may request switching active TCI state per CORESET or not.
[0077] When UE has declared a beam failure of an active TCI state for a specific CORESET, it can indicate the switch to an inactive TCI state in the same CORESET as being considered as recovery from a special case, as a failure of subset of control links, or as a partial beam failure. There may be further rules defined for fast switching, for instance, if the quality of inactive TCI state (measured using corresponding DL RS) becomes offset better (quality of inactive TCI state becomes is higher than quality of an active TCI state + offset value) than current active TCI state (where the offset value may be positive, negative or zero). Quality in this case may refer to RSRP, RSRQ, hypothetical PDCCH BLER, SINR, etc. of the DL RS/TCI state.
[0078] For the“not” situation, the UE would follow beam recovery related procedures for the CORESET. In other words, for the CORESETs for which a“fast NR-PDCCH beam switch request” procedure is disabled, the UE follows beam recovery procedure.
[0079] Before turning to a further discussion of the current invention, we turn to FIG. 3, which is a block diagram of one possible and non-limiting exemplary system in which the exemplary embodiments may be practiced.
[0080] Please note that the word“exemplary” is used herein to mean“serving as an example, instance, or illustration.” Any embodiment described herein as“exemplary” is not necessarily to be construed as preferred or advantageous over other embodiments. All of the embodiments described in this Detailed Description are exemplary embodiments provided to enable persons skilled in the art to make or use the invention and not to limit the scope of the invention which is defined by the claims
[0081] In FIG. 3, a user equipment (UE) 1 10 is in wireless communication with a wireless network 100. A UE is a wireless, typically mobile device that can access a wireless network. The UE 1 10 includes one or more processors 120, one or more memories 125, and one or more transceivers 130 interconnected through one or more buses 127. Each of the one
or more transceivers 130 includes a receiver, Rx, 132 and a transmitter, Tx, 133. The one or more buses 127 may be address, data, or control buses, and may include any interconnection mechanism, such as a series of lines on a motherboard or integrated circuit, fiber optics or other optical communication equipment, and the like. The one or more transceivers 130 are connected to one or more antennas 128. The one or more memories 125 include computer program code 123. Note that the YYY module allows functionality for the usage of control resources for data transmission where any method or examples of such embodiments discussed herein can be practiced. The UE 1 10 includes a YYY module 140, comprising one of or both parts 140-1 and/or 140-2, which may be implemented in a number of ways. The YYY module 140 may be implemented in hardware as YYY module 140-1 , such as being
implemented as part of the one or more processors 120. The YYY module 140-1 may be implemented also as an integrated circuit or through other hardware such as a programmable gate array. In another example, the YYY module 140 may be implemented as YYY module 140- 2, which is implemented as computer program code 123 and is executed by the one or more processors 120. For instance, the one or more memories 125 and the computer program code 123 may be configured to, with the one or more processors 120, cause the user equipment 1 10 to perform one or more of the operations as described herein. The UE 110 communicates with eNB 170 via a wireless link 1 11.
[0082] The eNB (an evolved NodeB or a New Radio 5G NodeB, which would denoted as gNB) 170 is a base station (e.g., for LTE, long term evolution, or 5G base station) that provides access by wireless devices such as the UE 1 10 to the wireless network 100. The eNB 170 includes one or more processors 152, one or more memories 155, one or more network interfaces (N/W l/F(s)) 161 , and one or more transceivers 160 interconnected through one or more buses 157. Each of the one or more transceivers 160 includes a receiver, Rx, 162 and a transmitter, Tx, 163. The one or more transceivers 160 are connected to one or more antennas 158. The one or more memories 155 include computer program code 153. Note that the ZZZ module allows functionality for the usage of control resources for data transmission where any method or examples of such embodiments discussed herein can be practiced. The eNB 170 includes a ZZZ module 150, comprising one of or both parts 150-1 and/or 150-2, which may be implemented in a number of ways. The ZZZ module 150 may be implemented in hardware as ZZZ module 150-1 , such as being implemented as part of the one or more processors 152. The ZZZ module 150-1 may be implemented also as an integrated circuit or through other hardware such as a programmable gate array. In another example, the ZZZ module 150 may be implemented as ZZZ module 150-2, which is implemented as computer program code 153 and
is executed by the one or more processors 152. For instance, the one or more memories 155 and the computer program code 153 are configured to, with the one or more processors 152, cause the eNB 170 to perform one or more of the operations as described herein. The one or more network interfaces 161 communicate over a network such as via the links 176 and 131. Two or more eNBs 170 communicate using, e.g., link 176. The link 176 may be wired or wireless or both and may implement, e.g., an X2 interface.
[0083] The one or more buses 157 may be address, data, or control buses, and may include any interconnection mechanism, such as a series of lines on a motherboard or integrated circuit, fiber optics or other optical communication equipment, wireless channels, and the like. For example, the one or more transceivers 160 may be implemented as a remote radio head (RRFI) 195, with the other elements of the eNB 170 being physically in a different location from the RRFI, and the one or more buses 157 could be implemented in part as fiber optic cable to connect the other elements of the eNB 170 to the RRFI 195.
[0084] It is noted that description herein indicates that“cells” perform functions, but it should be clear that the eNB that forms the cell would perform the functions. The cell makes up part of an eNB. That is, there can be multiple cells per eNB. For instance, there could be three cells for a single eNB carrier frequency and associated bandwidth, each cell covering one-third of a 360-degree area so that the single eNB’s coverage area covers an approximate oval or circle. Furthermore, each cell can correspond to a single carrier and an eNB may use multiple carriers. So if there are three 120-degree cells per carrier and two carriers, then the eNB has a total of 6 cells.
[0085] The wireless network 100 may include a network control element (NCE) 190 that may include MME (Mobility Management Entity)/SGW (Serving Gateway) functionality, and which provides connectivity with a further network, such as a telephone network and/or a data communications network (e.g., the Internet). The eNB 170 is coupled via a link 131 to the NCE 190. The link 131 may be implemented as, e.g., an S1 interface. The NCE 190 includes one or more processors 175, one or more memories 171 , and one or more network interfaces (N/W l/F(s)) 180, interconnected through one or more buses 185. The one or more memories 171 include computer program code 173. The one or more memories 171 and the computer program code 173 are configured to, with the one or more processors 175, cause the NCE 190 to perform one or more operations.
[0086] The wireless network 100 may implement network virtualization, which is the process of combining hardware and software network resources and network functionality into a single, software-based administrative entity, a virtual network. Network virtualization involves
platform virtualization, often combined with resource virtualization. Network virtualization is categorized as either external, combining many networks, or parts of networks, into a virtual unit, or internal, providing network-like functionality to software containers on a single system. Note that the virtualized entities that result from the network virtualization may still be implemented, at some level, using hardware such as processors 152 or 175 and memories 155 and 171 , and also such virtualized entities create technical effects.
[0087] The computer readable memories 125, 155, and 171 may be of any type suitable to the local technical environment and may be implemented using any suitable data storage technology, such as semiconductor based memory devices, flash memory, magnetic memory devices and systems, optical memory devices and systems, fixed memory and removable memory. The computer readable memories 125, 155, and 171 may be means for performing storage functions. The processors 120, 152, and 175 may be of any type suitable to the local technical environment, and may include one or more of general purpose computers, special purpose computers, microprocessors, digital signal processors (DSPs) and processors based on a multi-core processor architecture, as non-limiting examples. The processors 120, 152, and 175 may be means for performing functions, such as controlling the UE 1 10, eNB 170, and other functions as described herein.
[0088] In general, the various embodiments of the user equipment 1 10 can include, but are not limited to, cellular phones such as smart devices, tablets, personal digital assistants (PDAs) having wireless communication capabilities, portable computers having wireless communication capabilities, image capture devices such as digital cameras having wireless communication capabilities, gaming devices having wireless communication capabilities, music storage and playback appliances having wireless communication capabilities, internet appliances permitting wireless Internet access and browsing, tablets with wireless
communication capabilities, as well as portable units or terminals that incorporate combinations of such functions. In addition, various embodiments of the user equipment include machines, communicators and categories of equipment, which are not primarily or not at all in use by human interaction.
[0089] The current architecture in LTE networks is fully distributed in the radio and fully centralized in the core network. The low latency requires bringing the content close to the radio which leads to local break out and multi-access edge computing (MEC). 5G may use edge cloud and local cloud architecture. Edge computing covers a wide range of technologies such as wireless sensor networks, mobile data acquisition, mobile signature analysis, cooperative distributed peer-to-peer ad hoc networking and processing also classifiable as local cloud/fog
computing and grid/mesh computing, dew computing, mobile edge computing, cloudlet, distributed data storage and retrieval, autonomic self-healing networks, remote cloud services and augmented reality. In radio communications, using edge cloud may mean node operations to be carried out, at least partly, in a server, host or node operationally coupled to a remote radio head or base station comprising radio parts. It is also possible that node operations will be distributed among a plurality of servers, nodes or hosts. It should also be understood that the distribution of labor between core network operations and base station operations may differ from that of the LTE or even be non-existent. Some other technology advancements probably to be used are Software-Defined Networking (SDN), Big Data, and all-IP, which may change the way networks are being constructed and managed.
[0090] One possible manner to carry out embodiments described herein is with an edge cloud using a distributed computing system. An exemplary embodiment comprises a radio node connected to a server. Exemplary embodiments implementing the system allow the edge cloud server and the radio node as stand-alone apparatuses communicating with each other via a radio path or via a wired connection or they may be located in a same entity communicating via a wired connection.
[0091] FIG. 4 is a logic flow diagram for a beam recovery procedure employing
CORESET and CQL association by illustrating the operation of an exemplary method 400, a result of execution of computer program instructions embodied on a computer readable memory, functions performed by logic implemented in hardware, and/or interconnected means for performing functions in accordance with exemplary embodiments. Parts or all of method 400 could be performed in module YYY or module ZZZ as appropriate.
[0092] As can be seen from FIG. 4, In item 402, the UE is configured in a number of ways. First, the UE is configured with a TCI table to indicate source RSs for different QCL parameters. The UE is configured with one or multiple CORESETs for NR-PDCCFI reception. Then the UE is configured with multiple TCI states (multiple transmit beams) associated with a CORESET. And, then the UE is configured with a TCI state that is active for the CORESET. The UE is also configured with the BFRQ resource associated with one or multiple TCI states associated with a CORESET.
[0093] Given these configurations , per item 404, the UE determines a beam failure and detects a replacement candidate beam.
[0094] In response to the replacement candidate beam being associated with a TCI state associated with a CORESET, per item 406, the UE triggers a BFRQ resource transmission associated with the replacement candidate beam.
[0095] Thereafter, as seen in item 408, the UE monitors the CORESET of the DL RS associated with the replacement candidate beam via TCI linkage for PDCCH to receive a response to BFRQ.
[0096] FIG. 5 is a logic flow diagram for a beam recovery procedure employing
CORESET and CQL association by illustrating the operation of an exemplary method 500, a result of execution of computer program instructions embodied on a computer readable memory, functions performed by logic implemented in hardware, and/or interconnected means for performing functions in accordance with exemplary embodiments. Parts or all of method 500 could be performed in module YYY or module ZZZ as appropriate.
[0097] As with item 402 described above, the UE in this exemplary embodiment is also configured with the following as shown in item 502: a TCI table to indicate source RSs for different QCL parameters; one or multiple CORESETs for NR-PDCCFI reception; multiple TCI states (multiple transmit beams) associated with a CORESET; a TCI state that is active for the CORESET; and the BFRQ resource associated with one or multiple TCI states associated with a CORESET.
[0098] In this exemplary embodiment, per item 504, UE is further configured with the CORESET having a fast PDCCFI beam switch request procedure enabled.
[0099] Given these configurations , per item 506, the UE determines a deactivated TCI state and linked transmit beam to be a replacement candidate beam where the replacement candidate beam would be better than a current active PDCCFI beam.
[0100] The UE transmits a BFRQ resource associated with the deactivated TCI state as shown in item 508.
[0101] Item 510 shows that the UE monitors the CORESET, which the DL RS of the replacement candidate beam is associated with, via the TCI linkage for the replacement candidate PDCCFI beam, to receive a response to the transmitted BFRQ resource.
[0102] The UE receives PDCCFI from the gNB from the CORESET within a time window in item 512. Finally, as shown in item 514, the UE determines that the gNB has confirmed a new active TCI state for the CORESET to use the replacement candidate PDCCFI beam.
[0103] If desired, the different functions discussed herein may be performed in a different order and/or concurrently with each other. Furthermore, if desired, one or more of the above-described functions may be optional or may be combined.
[0104] Although various aspects of the invention are set out in the independent claims, other aspects of the invention comprise other combinations of features from the described
embodiments and/or the dependent claims with the features of the independent claims, and not solely the combinations explicitly set out in the claims.
[0105] Without in any way limiting the scope, interpretation, or application of the claims appearing below, an advantage or technical effect of one or more of the exemplary
embodiments disclosed herein is that by enabling the recovery to be performed to RS resources that are already associated with UE specific CORESET, system PDCCH capacity can be preserved.
[0106] A further advantage or technical effect of one or more of the exemplary embodiments disclosed herein is that it allows a fast NR-PDCCH beam switch procedure to be enabled (second embodiment) without need for first requesting beam measurement results from the UE before performing transmit beam change.
[0107] An example of an embodiment, which can be referred to as item 1 , is a method comprising: determining a second beam for a node in a wireless communications system to switch to from a first beam; transmitting a BFRQ resource associated with the second beam; and monitoring a CORESET of a DL RS associated with the second beam via TCI linkage for PDCCH to receive a response to the BFRQ resource transmission.
[0108] An example of a further embodiment, which can be referred to as item 2, is the method of item 1 where the node is configured with the CORESET having a fast PDCCH beam switch request procedure enabled.
[0109] An example of a further embodiment, which can be referred to as item 3, is the method of any preceding item, further comprising: receiving a PDCCH from the CORESET within a time window.
[0110] An example of a further embodiment, which can be referred to as item 4, is the method of any preceding item, further comprising: ascertaining confirmation for the switch to a new active TCI state for the CORESET.
[0111] An example of a further embodiment, which can be referred to as item 5, is the method of any preceding item where the determining comprises favoring a deactivated or inactive TCI state of the second beam over the PDCCH of the first beam.
[0112] An example of a further embodiment, which can be referred to as item 6, is the method of item 5 where the favoring comprises assessing the quality of the inactive TCI state, measured using corresponding DL RS, to be higher than quality of an active TCI state of the first beam plus an offset value, where the offset value may be positive, negative or zero, or higher than a predetermined threshold value.
[0113] An example of a further embodiment, which can be referred to as item 7, is the method of any of items 1 - 4 further comprising: prior to the determining, detecting a failure of the first beam.
[0114] An example of a further embodiment, which can be referred to as item 8, is the method of item 7, further comprising: after the determining, in response to the second beam being associated with a TCI states also associated with the CORESET, triggering the transmitting.
[0115] An example of a further embodiment, which can be referred to as item 9, is the method of any preceding item where the node is a user equipment.
[0116] An example of an embodiment, which can be referred to as item 10, is the method of any preceding item where the node is configured with a TCI table to indicate source RSs for different QCL parameters.
[0117] An example of a further embodiment, which can be referred to as item 1 1 , is the method of any preceding item where the node is configured with one or more CORESETs for NR-PDCCH reception.
[0118] An example of a further embodiment, which can be referred to as item 12, is the method of any preceding item where the node is configured with multiple TCI states (multiple transmit beams) associated with each CORESET of the one or more CORESETs.
[0119] An example of a further embodiment, which can be referred to as item 13, is the method of any preceding item where the node is configured with a TCI state that is active for a CORESET.
[0120] An example of a further embodiment, which can be referred to as item 14, is the method of any preceding item where the node is configured with the BFRQ resource associated with one or multiple TCI states associated with a CORESET.
[0121] An example of another embodiment, which can be referred to as item 15, is an apparatus comprising: determining a second beam for a node in a wireless communications system to switch to from a first beam; transmitting a BFRQ resource associated with the second beam; and monitoring a CORESET of a DL RS associated with the second beam via TCI linkage for PDCCFI to receive a response to the BFRQ resource transmission.
[0122] An example of another further embodiment, which can be referred to as item 16, is the apparatus of item 15 where the node is configured with the CORESET having a fast PDCCFI beam switch request procedure enabled.
[0123] An example of another further embodiment, which can be referred to as item 17, is the apparatus of any of items 15 - 16, where the at least one memory and the computer code
are further configured, with the at least one processor, to cause the apparatus to at least perform the following: receiving a PDCCH from the CORESET within a time window.
[0124] An example of another further embodiment, which can be referred to as item 18, is the apparatus of any of items 15 - 17, further comprising: ascertaining confirmation for the switch to a new active TCI state for the CORESET.
[0125] An example of another further embodiment, which can be referred to as item 19, is the apparatus of any of items 15 - 18 where the determining comprises favoring a
deactivated or inactive TCI state of the second beam over the PDCCH of the first beam.
[0126] An example of another further embodiment, which can be referred to as item 20, is the apparatus of item 19 where the favoring comprises assessing the quality of the inactive TCI state, measured using corresponding DL RS, to be higher than quality of an active TCI state of the first beam plus an offset value, where the offset value may be positive, negative or zero, or higher than a predetermined threshold value.
[0127] An example of another further embodiment, which can be referred to as item 21 , is the apparatus of any of items 15 - 18, where at least one processor and at least one memory including computer program code are further configured, with the at least one processor, to cause the apparatus to at least perform the following: prior to the determining, detecting a failure of the first beam.
[0128] An example of another further embodiment, which can be referred to as item 22, is the apparatus of item 21 , where the at least one memory and the computer code are further configured, with the at least one processor, to cause the apparatus to at least perform the following: after the determining, in response to the second beam being associated with a TCI states also associated with the CORESET, triggering the transmitting.
[0129] An example of another further embodiment, which can be referred to as item 23, is the apparatus of any of items 15 - 22 where the node is a user equipment.
[0130] An example of another further embodiment, which can be referred to as item 24, is the apparatus of any of items 15 - 23 where the node is configured with a TCI table to indicate source RSs for different QCL parameters.
[0131] An example of another further embodiment, which can be referred to as item 25, is the apparatus of any of items 15 - 24 where the node is configured with one or more
CORESETs for NR-PDCCH reception.
[0132] An example of another further embodiment, which can be referred to as item 26, is the apparatus of any of items 15 - 25 where the node is configured with multiple TCI states (multiple transmit beams) associated with each CORESET of the one or more CORESETs.
[0133] An example of another further embodiment, which can be referred to as item 27, is the apparatus of any of items 15 - 26 where the node is configured with a TCI state that is active for a CORESET.
[0134] An example of another further embodiment, which can be referred to as item 28, is the apparatus of any of items 15 - 27 where the node is configured with the BFRQ resource associated with one or multiple TCI states associated with a CORESET.
[0135] An example of yet another embodiment, which can be referred to as item 29, is an apparatus comprising means for determining a second beam for a node in a wireless communications system to switch to from a first beam; transmitting a BFRQ resource associated with the second beam; and monitoring a CORESET of a DL RS associated with the second beam via TCI linkage for PDCCFI to receive a response to the BFRQ resource transmission.
[0136] An example of yet other embodiments, is the apparatus of item 29 additionally preforming the steps of any of the methods of any of items 2 - 14.
[0137] An example of a still further embodiment, which can be referred to as item 30, is a computer program code with code for performing any of the methods of claims 1 - 14.
[0138] An example of another still further embodiment, which can be referred to as item 31 , is a computer program product where the computer program of item 30 is embodied on a non-transitory computer readable medium.
[0139] An example of yet another embodiment, which can be referred to as item 32, is a computer program product embodied on a non-transitory computer-readable medium in which a computer program is stored that, when being executed by a computer, is configured to provide instructions to control or carry out any of the methods of items 1 - 14.
[0140] It is also noted herein that while the above describes examples of embodiments of the invention, these descriptions should not be viewed in a limiting sense. Rather, there are several variations and modifications which may be made without departing from the scope of the present invention as defined in the appended claims.
Claims
1. A method comprising:
determining a second beam for a node in a wireless communications system to switch to from a first beam;
transmitting a beam failure recovery request resource associated with the second beam; and
monitoring a control resource set of a downlink reference signal associated with the second beam via transmission configuration indication linkage for physical downlink control channel to receive a response to the beam failure recovery request resource transmission.
2. The method of claim 1 , wherein the node is configured with the control resource set having a fast physical downlink control channel beam switch request procedure enabled.
3. The method of any preceding claim, further comprising: receiving a physical downlink control channel from the control resource set within a time window.
4. The method of any preceding claim, further comprising: ascertaining confirmation for the switch to a new active transmission configuration indication state for the control resource set.
5. The method of any preceding claim, wherein the determining comprises favoring a
deactivated or inactive transmission configuration indication state of the second beam over the physical downlink control channel of the first beam.
6. The method of claim 5, wherein the favoring comprises assessing the quality of the
inactive transmission configuration indication state, measured using corresponding downlink reference signal, to be higher than quality of an active transmission
configuration indication state of the first beam plus an offset value, where the offset value may be positive, negative or zero, or higher than a predetermined threshold value.
7. The method of any of claims 1 - 4, further comprising: prior to the determining, detecting a failure of the first beam.
8. The method of claim 7, further comprising: after the determining, in response to the second beam being associated with a transmission configuration indication states also associated with the control resource set, triggering the transmitting.
9. The method of any preceding claim, wherein the node is a user equipment.
10. The method of any preceding claim, wherein the node is configured with a transmission configuration indication table to indicate source reference signals for different quasi co- location parameters.
1 1 . The method of any preceding claim, wherein the node is configured with one or more control resource sets for new radio physical downlink control channel reception.
12. The method of any preceding claim, wherein the node is configured with multiple
transmission configuration indication states associated with each control resource set of the one or more control resource sets.
13. The method of any preceding claim, wherein the node is configured with a transmission configuration indication state that is active for a control resource set.
14. The method of any preceding claim, wherein the node is configured with the beam
failure recovery request resource associated with one or multiple transmission configuration indication states associated with a control resource set.
15. The method of any preceding claim, wherein the transmission configuration indication state is linked to a transmit beam.
16. An apparatus comprising:
at least one processor and at least one memory including computer program code, wherein the at least one memory and the computer code are configured, with the at least one processor, to cause the apparatus to at
least perform the following:
determining a second beam for a node in a wireless communications system to switch to from a first beam;
transmitting a beam failure recovery request resource associated with the second beam; and
monitoring a control resource set of a downlink reference signal associated with the second beam via transmission configuration indication linkage for physical downlink control channel to receive a response to the beam failure recovery request resource transmission.
17. The apparatus of claim 16, wherein the node is configured with the control resource set having a fast physical downlink control channel beam switch request procedure enabled.
18. The apparatus of any of claims 16 - 17, wherein the at least one memory and the
computer code are further configured, with the at least one processor, to cause the apparatus to at least perform the following: receiving a physical downlink control channel from the control resource set within a time window.
19. The apparatus of any of claims 16 - 18, wherein the at least one memory and the
computer code are further configured, with the at least one processor, to cause the apparatus to at least perform the following: ascertaining confirmation for the switch to a new active transmission configuration indication state for the control resource set.
20. The apparatus of any of claims 16 - 19, wherein the determining comprises favoring a deactivated or inactive transmission configuration indication state of the second beam over the physical downlink control channel of the first beam.
21 . The apparatus of claim 20, wherein the favoring comprises assessing the quality of the inactive transmission configuration indication state, measured using corresponding downlink reference signal, to be higher than quality of an active transmission
configuration indication state of the first beam plus an offset value, where the offset value may be positive, negative or zero, or higher than a predetermined threshold value.
22. The apparatus of any of claims 16 - 19, wherein the at least one memory and the
computer code are further configured, with the at least one processor, to cause the apparatus to at least perform the following: prior to the determining, detecting a failure of the first beam.
23. The apparatus of claim 22, wherein the at least one memory and the computer code are further configured, with the at least one processor, to cause the apparatus to at least perform the following: after the determining, in response to the second beam being associated with a transmission configuration indication states also associated with the control resource set, triggering the transmitting.
24. The apparatus of any of claims 16 - 23, wherein the node is a user equipment.
25. The apparatus of any of claims 16 - 24, wherein the node is configured with a
transmission configuration indication table to indicate source reference signals for different quasi co-location parameters.
26. The apparatus of any of claims 16 - 25, wherein the node is configured with one or more control resource sets for new radio physical downlink control channel reception.
27. The apparatus of any of claims 16 - 26, wherein the node is configured with multiple transmission configuration indication states associated with each control resource set of the one or more control resource sets.
28. The apparatus of any of claims 16 - 27, wherein the node is configured with a
transmission configuration indication state that is active for a control resource set.
29. The apparatus of any of claims 16 - 28, wherein the node is configured with the beam failure recovery request resource associated with one or multiple transmission configuration indication states associated with a control resource set.
30. The apparatus of any of claims 16 - 29, wherein the transmission configuration
indication state is linked to a transmit beam.
31 . An apparatus with means for performing any of the methods of claims 1 - 15.
32. A computer program product embodied on a non-transitory computer-readable medium in which a computer program is stored that, when being executed by a computer, is configured to provide instructions to control or carry out: any of the methods of claims 1 15
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP19705285.5A EP3738221A1 (en) | 2018-01-12 | 2019-01-11 | Coreset and qcl association in beam recovery procedure |
| US16/959,585 US11751183B2 (en) | 2018-01-12 | 2019-01-11 | CORESET and QCL association in beam recovery procedure |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201862616737P | 2018-01-12 | 2018-01-12 | |
| US62/616,737 | 2018-01-12 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2019138070A1 true WO2019138070A1 (en) | 2019-07-18 |
Family
ID=65433633
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/EP2019/050683 Ceased WO2019138070A1 (en) | 2018-01-12 | 2019-01-11 | Coreset and qcl association in beam recovery procedure |
| PCT/EP2019/050707 Ceased WO2019138081A1 (en) | 2018-01-12 | 2019-01-11 | Utilizing interference measurements in beam recovery procedure |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/EP2019/050707 Ceased WO2019138081A1 (en) | 2018-01-12 | 2019-01-11 | Utilizing interference measurements in beam recovery procedure |
Country Status (4)
| Country | Link |
|---|---|
| US (2) | US11259306B2 (en) |
| EP (2) | EP3738221A1 (en) |
| CN (1) | CN111869127B (en) |
| WO (2) | WO2019138070A1 (en) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2021178314A1 (en) * | 2020-03-06 | 2021-09-10 | Qualcomm Incorporated | User equipment requests for a number of transmission configuration indicator states |
| WO2021182863A1 (en) * | 2020-03-10 | 2021-09-16 | 엘지전자 주식회사 | Method and device for assessing radio link quality in wireless communication system |
| US11259306B2 (en) | 2018-01-12 | 2022-02-22 | Nokia Technologies Oy | Utilizing interference measurements in beam recovery procedure |
| KR20220024983A (en) * | 2019-08-09 | 2022-03-03 | 후아웨이 테크놀러지 컴퍼니 리미티드 | Beam failover method, device and system |
| WO2022141074A1 (en) * | 2020-12-29 | 2022-07-07 | 北京小米移动软件有限公司 | Beam indication method, beam indication apparatus and storage medium |
| WO2023283844A1 (en) | 2021-07-14 | 2023-01-19 | Nec Corporation | Methods, devices and computer storage media for communication |
| CN116830705A (en) * | 2021-01-13 | 2023-09-29 | 苹果公司 | TCI chain design |
| CN117335937A (en) * | 2020-04-08 | 2024-01-02 | Idac控股公司 | Wireless transmitting/receiving unit and method implemented therein |
| US12132558B2 (en) | 2019-11-06 | 2024-10-29 | Beijing Xiaomi Mobile Software Co., Ltd. | Method and device for allocating beam failure detection resources |
| JP2025160170A (en) * | 2019-08-16 | 2025-10-22 | インターデイジタル パテント ホールディングス インコーポレイテッド | Beam failure detection and recovery using multi-TRP and multi-panel transmissions |
Families Citing this family (64)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102472292B1 (en) | 2018-01-10 | 2022-11-30 | 삼성전자 주식회사 | Method and apparatus for performing contention-based and non- contention-based beam failure recovery in a wireless communication system |
| US10805148B2 (en) * | 2018-02-05 | 2020-10-13 | Ofinno, Llc | Beam failure recovery request procedure |
| US20190297603A1 (en) | 2018-03-23 | 2019-09-26 | Samsung Electronics Co., Ltd. | Method and apparatus for beam management for multi-stream transmission |
| WO2019193727A1 (en) * | 2018-04-05 | 2019-10-10 | 株式会社Nttドコモ | User device |
| WO2019241975A1 (en) * | 2018-06-21 | 2019-12-26 | Oppo广东移动通信有限公司 | Wireless link monitoring method, terminal device, and network device |
| CN112673581B (en) * | 2018-07-12 | 2024-02-13 | 株式会社Ntt都科摩 | user terminal |
| US11196524B2 (en) * | 2018-07-18 | 2021-12-07 | Qualcomm Incorporated | Multi-beam CSI feedback |
| WO2020041366A1 (en) * | 2018-08-20 | 2020-02-27 | Intel Corporation | Control resource set selection for channel state information reference signal-based radio link monitoring |
| KR102602381B1 (en) * | 2018-10-05 | 2023-11-16 | 삼성전자주식회사 | Apparatus and method for synchronization using wireless communication network in wireless communication system |
| EP3648368A1 (en) | 2018-10-31 | 2020-05-06 | Comcast Cable Communications, LLC | Beam management for cells in wireless communications |
| US11251931B2 (en) * | 2018-11-07 | 2022-02-15 | Qualcomm Incorporated | Active transmission configuration indication states |
| US11184132B2 (en) | 2018-11-14 | 2021-11-23 | Mediatek Inc. | Transmission configuration indication (TCI)—state indication for non-coherent joint transmission (NCJT) channel state information (CSI) reporting |
| US11438887B2 (en) * | 2019-01-11 | 2022-09-06 | Qualcomm Incorporated | Default beam identification and beam failure detection in cross carrier scheduling |
| WO2020157977A1 (en) * | 2019-02-01 | 2020-08-06 | 株式会社Nttドコモ | Terminal and wireless communication method |
| WO2020164566A1 (en) | 2019-02-15 | 2020-08-20 | FG Innovation Company Limited | Method and apparatus for acknowledging scell beam failure recovery request |
| US10492130B1 (en) * | 2019-03-20 | 2019-11-26 | Qualcomm Incorporated | Search scheduling for wireless communications |
| US12016021B2 (en) * | 2019-04-05 | 2024-06-18 | Qualcomm Incorporated | Reporting uplink control information in a random access procedure |
| CN113940132B (en) * | 2019-04-11 | 2023-12-12 | 株式会社Ntt都科摩 | User terminal and wireless communication method |
| US11303345B2 (en) * | 2019-05-02 | 2022-04-12 | Ofinno, Llc | Beam failure recovery procedure in carrier aggregation |
| EP3979686A1 (en) * | 2019-05-31 | 2022-04-06 | Ntt Docomo, Inc. | User terminal and wireless communication method |
| CN111601371B (en) * | 2019-06-27 | 2022-03-01 | 维沃移动通信有限公司 | Link management method, wake-up signal detection method, terminal device and network device |
| EP4005138A1 (en) | 2019-07-31 | 2022-06-01 | Ofinno, LLC | Random access procedure in multiple transmission and reception points |
| KR20260090028A (en) * | 2019-08-13 | 2026-06-16 | 광동 오포 모바일 텔레커뮤니케이션즈 코포레이션 리미티드 | Apparatus and method for beam failure recovery |
| US11831381B2 (en) * | 2019-10-04 | 2023-11-28 | Intel Corporation | Beam failure recovery for uplink |
| US12082191B2 (en) | 2019-10-04 | 2024-09-03 | Qualcomm Incorporated | Beam failure detection reference signal for a secondary cell |
| US10993264B1 (en) * | 2019-10-15 | 2021-04-27 | Qualcomm Incorporated | Multiplexing channel state information reports in multiple transmit-receive point (TRP) scenarios |
| US11497021B2 (en) * | 2019-11-04 | 2022-11-08 | Samsung Electronics Co., Ltd. | Method and apparatus for fast beam management |
| US11265944B1 (en) * | 2020-01-07 | 2022-03-01 | Sprint Communications Company L.P. | Simultaneous wireless data communication over fifth generation new radio (5GNR) and long term evolution (LTE) |
| US11115990B2 (en) | 2020-01-31 | 2021-09-07 | Qualcomm Incorporated | UE autonomous beam selection |
| US11743112B2 (en) * | 2020-05-12 | 2023-08-29 | Qualcomm Incorporated | UE requested BFD/BFR reference signal |
| WO2021226903A1 (en) | 2020-05-14 | 2021-11-18 | Apple Inc. | Selecting reference signals for determining beam failure detection and radio link monitoring |
| WO2021233609A1 (en) * | 2020-05-22 | 2021-11-25 | Nokia Technologies Oy | Failure recovery in cellular communication networks |
| US11757519B2 (en) * | 2020-06-26 | 2023-09-12 | Qualcomm Incorporated | Beam failure handling |
| WO2022029369A1 (en) * | 2020-08-04 | 2022-02-10 | Nokia Technologies Oy | Indication of feasible quasi-colocation (qcl) sources for fast beam indication |
| CN116076030B (en) * | 2020-08-05 | 2026-03-24 | 苹果公司 | Physical downlink control channel transmission in wireless communication |
| US11172451B1 (en) | 2020-08-06 | 2021-11-09 | At&T Intellectual Property I, L.P. | Uplink power control mechanism for dual connectivity networks |
| US11825321B2 (en) * | 2020-09-23 | 2023-11-21 | Qualcomm Incorporated | Beam failure detection using mixed downlink reference signal |
| EP4218300A4 (en) * | 2020-09-24 | 2024-09-18 | Qualcomm Incorporated | New beam identification for physical downlink control channel (pdcch) repetition |
| CN115699601B (en) * | 2020-09-29 | 2025-12-09 | Lg电子株式会社 | Method and apparatus for recovering from beam faults in a wireless communication system |
| CN116848909A (en) * | 2021-01-14 | 2023-10-03 | 中兴通讯股份有限公司 | Reference signaling schemes in wireless communications |
| WO2022151125A1 (en) | 2021-01-14 | 2022-07-21 | Qualcomm Incorporated | Techniques for directional signal strength indication and beam-specific measurement threshold |
| MX2023006683A (en) * | 2021-01-14 | 2023-08-22 | Zte Corp | SYSTEMS AND METHODS FOR DETERMINING BEAM FAULT RECOVERY INFORMATION. |
| US12519532B2 (en) | 2021-03-30 | 2026-01-06 | Samsung Electronics Co., Ltd. | Beam failure recovery for MBS UEs |
| WO2022216012A1 (en) * | 2021-04-06 | 2022-10-13 | 엘지전자 주식회사 | Method for transmitting/receiving pdcch in wireless communication system, and device therefor |
| US12224827B2 (en) * | 2021-04-27 | 2025-02-11 | Nokia Technologies Oy | Beam failure detection and/or beam failure recovery procedures |
| EP4324237A4 (en) * | 2021-05-11 | 2024-05-15 | ZTE Corporation | METHODS, DEVICES AND SYSTEMS FOR BEAM FAILURE RECOVERY |
| US20240267978A1 (en) * | 2021-06-14 | 2024-08-08 | Nokia Technologies Oy | Enhanced beam management in cellular communication networks |
| WO2022265141A1 (en) * | 2021-06-18 | 2022-12-22 | 엘지전자 주식회사 | Method for performing beam management in wireless communication system and device therefor |
| US11889489B2 (en) * | 2021-07-09 | 2024-01-30 | Qualcomm Incorporated | Beam failure detection and recovery |
| US20250008563A1 (en) * | 2021-08-04 | 2025-01-02 | Telefonaktiebolaget Lm Ericsson (Publ) | Random access partitioning and random access report |
| US20240276554A1 (en) * | 2021-08-06 | 2024-08-15 | Qualcomm Incorporated | Ue initiated unified tci switching |
| US12150052B2 (en) * | 2021-09-22 | 2024-11-19 | Apple Inc. | Power efficient beam recovery procedures |
| US12015938B2 (en) * | 2021-09-24 | 2024-06-18 | Qualcomm Incorporated | Techniques for autonomous beam failure indicator counting |
| CN116193519A (en) * | 2021-11-29 | 2023-05-30 | 华为技术有限公司 | A communication method and device |
| US20250048450A1 (en) * | 2021-12-10 | 2025-02-06 | Beijing Xiaomi Mobile Software Co., Ltd. | Threshold determination method and device for contention-free random access (cfra), storage medium, and apparatus |
| CN116419280A (en) * | 2021-12-29 | 2023-07-11 | 华为技术有限公司 | Communication method, terminal device, network device and communication system |
| WO2023133754A1 (en) * | 2022-01-13 | 2023-07-20 | Zte Corporation | System and method for determining a beam state of a downlink signal in a link recovery procedure |
| US20230292145A1 (en) * | 2022-03-08 | 2023-09-14 | Sharp Kabushiki Kaisha | User equipments, base stations and methods for beam indication with extended tci framework for pdcch |
| CN114902585B (en) * | 2022-04-08 | 2024-11-01 | 北京小米移动软件有限公司 | A threshold determination method/device/equipment and storage medium |
| WO2024020848A1 (en) * | 2022-07-27 | 2024-02-01 | Lenovo (Beijing) Limited | Method and apparatus of dynamic adaption of spatial elements |
| WO2024211412A1 (en) * | 2023-04-04 | 2024-10-10 | Interdigital Patent Holdings, Inc. | Methods, architectures, apparatuses and systems for beam failure recovery |
| WO2024211415A1 (en) * | 2023-04-04 | 2024-10-10 | Interdigital Patent Holdings, Inc. | Methods, architectures, apparatuses and systems for beam failure recovery |
| WO2024229771A1 (en) * | 2023-05-10 | 2024-11-14 | 北京小米移动软件有限公司 | Processing method, apparatus, device, and storage medium |
| WO2026014638A1 (en) * | 2024-07-11 | 2026-01-15 | 엘지전자 주식회사 | Apparatus and method for adaptively changing waveform in wireless communication system |
Family Cites Families (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8989794B2 (en) * | 2011-06-20 | 2015-03-24 | Qualcomm Incorporated | Method and apparatus for unplanned deployment of base stations |
| IN2014KN00830A (en) | 2011-09-16 | 2015-10-02 | Samsung Electronics Co Ltd | |
| CN107005858B (en) * | 2015-02-13 | 2020-09-29 | 联发科技(新加坡)私人有限公司 | Method for beam tracking and recovery and user equipment |
| US10700752B2 (en) * | 2016-01-14 | 2020-06-30 | Samsung Electronics Co., Ltd. | System, method, and apparatus of beam-tracking and beam feedback operation in a beam-forming based system |
| ES2958669T3 (en) * | 2016-05-10 | 2024-02-13 | Nokia Solutions & Networks Oy | Beam selection method, system and apparatus |
| US10148337B2 (en) * | 2017-02-01 | 2018-12-04 | Samsung Electronics Co., Ltd. | Beam management of downlink data channel and downlink control channel for 5G next radio systems |
| CN110235386B (en) * | 2017-02-02 | 2022-05-13 | 瑞典爱立信有限公司 | Device, network node and method for processing beam forming communication link |
| US11139881B2 (en) * | 2017-03-23 | 2021-10-05 | Ntt Docomo, Inc. | User terminal and radio communication method |
| US11134492B2 (en) * | 2017-04-12 | 2021-09-28 | Samsung Electronics Co., Ltd. | Method and apparatus for beam recovery in next generation wireless systems |
| US11419173B2 (en) * | 2017-08-09 | 2022-08-16 | Idac Holdings, Inc. | Methods and systems for beam recovery and management |
| JP7099481B2 (en) * | 2017-08-11 | 2022-07-12 | 富士通株式会社 | How to set trigger conditions for beam failure events, devices and communication systems |
| US11477789B2 (en) * | 2017-11-15 | 2022-10-18 | Idac Holdings, Inc. | Methods, apparatuses and systems for configuring/reconfiguring physical channel monitoring occasion in a wireless network |
| WO2019099659A1 (en) * | 2017-11-15 | 2019-05-23 | Idac Holdings, Inc. | Beam management in a wireless network |
| JP7059373B2 (en) * | 2017-11-17 | 2022-04-25 | エルジー エレクトロニクス インコーポレイティド | A method for beam failure recovery in a wireless communication system and a device for that purpose |
| CN109803423A (en) * | 2017-11-17 | 2019-05-24 | 华为技术有限公司 | Signal transmission method, related equipment and system |
| US11050478B2 (en) * | 2017-12-19 | 2021-06-29 | Samsung Electronics Co., Ltd. | Method and apparatus for beam reporting in next generation wireless systems |
| US10784944B2 (en) * | 2018-01-09 | 2020-09-22 | Ofinno, Llc | Timing advance in beam failure recovery request transmission |
| US10863570B2 (en) * | 2018-01-09 | 2020-12-08 | Comcast Cable Communications, Llc | Beam selection in beam failure recovery request retransmission |
| WO2019138070A1 (en) | 2018-01-12 | 2019-07-18 | Nokia Technologies Oy | Coreset and qcl association in beam recovery procedure |
-
2019
- 2019-01-11 WO PCT/EP2019/050683 patent/WO2019138070A1/en not_active Ceased
- 2019-01-11 EP EP19705285.5A patent/EP3738221A1/en active Pending
- 2019-01-11 US US16/960,612 patent/US11259306B2/en active Active
- 2019-01-11 EP EP19705286.3A patent/EP3738222A1/en active Pending
- 2019-01-11 CN CN201980018474.XA patent/CN111869127B/en active Active
- 2019-01-11 US US16/959,585 patent/US11751183B2/en active Active
- 2019-01-11 WO PCT/EP2019/050707 patent/WO2019138081A1/en not_active Ceased
Non-Patent Citations (5)
| Title |
|---|
| MEDIATEK: "Summary from offline for beam recovery mechanism", vol. RAN WG1, no. Hangzhou, China; 20170515 - 20170517, 18 May 2017 (2017-05-18), XP051285306, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_89/Docs/> [retrieved on 20170518] * |
| QUALCOMM: "Beam management for NR", vol. RAN WG1, no. Prague, P.R. Czechia; 20171009 - 20171013, 8 October 2017 (2017-10-08), XP051341723, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/> [retrieved on 20171008] * |
| RAN1: "LS to RAN2 on Beam Failure Recovery", vol. RAN WG2, no. Vancouver, Canada; 20180122 - 20180126, 8 January 2018 (2018-01-08), XP051385540, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5FAHs/2018%5F01%5FNR/Docs/> [retrieved on 20180108] * |
| SAMSUNG: "On Beam Management, Measurement and Reporting", vol. RAN WG1, no. Prague, CZ; 20171009 - 20171013, 8 October 2017 (2017-10-08), XP051340791, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/> [retrieved on 20171008] * |
| See also references of EP3738221A1 * |
Cited By (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US11259306B2 (en) | 2018-01-12 | 2022-02-22 | Nokia Technologies Oy | Utilizing interference measurements in beam recovery procedure |
| KR20220024983A (en) * | 2019-08-09 | 2022-03-03 | 후아웨이 테크놀러지 컴퍼니 리미티드 | Beam failover method, device and system |
| EP3989470A4 (en) * | 2019-08-09 | 2022-08-10 | Huawei Technologies Co., Ltd. | BEAM FAILURE RECOVERY METHOD, DEVICE AND SYSTEM |
| US12368493B2 (en) | 2019-08-09 | 2025-07-22 | Huawei Technologies Co., Ltd. | Beam failure recovery method, device, and system |
| KR102778011B1 (en) | 2019-08-09 | 2025-03-11 | 후아웨이 테크놀러지 컴퍼니 리미티드 | Beam failure recovery method, device and system |
| JP7823263B2 (en) | 2019-08-16 | 2026-03-03 | インターデイジタル パテント ホールディングス インコーポレイテッド | Beam failure detection and recovery using multi-TRP and multi-panel transmissions |
| JP2025160170A (en) * | 2019-08-16 | 2025-10-22 | インターデイジタル パテント ホールディングス インコーポレイテッド | Beam failure detection and recovery using multi-TRP and multi-panel transmissions |
| US12132558B2 (en) | 2019-11-06 | 2024-10-29 | Beijing Xiaomi Mobile Software Co., Ltd. | Method and device for allocating beam failure detection resources |
| US11716725B2 (en) | 2020-03-06 | 2023-08-01 | Qualcomm Incorporated | User equipment requests for a number of transmission configuration indicator states |
| WO2021178314A1 (en) * | 2020-03-06 | 2021-09-10 | Qualcomm Incorporated | User equipment requests for a number of transmission configuration indicator states |
| EP4120581A4 (en) * | 2020-03-10 | 2023-08-16 | Lg Electronics Inc. | METHOD AND DEVICE FOR ASSESSING RADIO LINK QUALITY IN A WIRELESS COMMUNICATION SYSTEM |
| US12206480B2 (en) | 2020-03-10 | 2025-01-21 | Lg Electronics Inc. | Method and device for assessing radio link quality in wireless communication system |
| WO2021182863A1 (en) * | 2020-03-10 | 2021-09-16 | 엘지전자 주식회사 | Method and device for assessing radio link quality in wireless communication system |
| CN117335937A (en) * | 2020-04-08 | 2024-01-02 | Idac控股公司 | Wireless transmitting/receiving unit and method implemented therein |
| WO2022141074A1 (en) * | 2020-12-29 | 2022-07-07 | 北京小米移动软件有限公司 | Beam indication method, beam indication apparatus and storage medium |
| CN116830705A (en) * | 2021-01-13 | 2023-09-29 | 苹果公司 | TCI chain design |
| EP4371356A4 (en) * | 2021-07-14 | 2024-08-28 | NEC Corporation | COMPUTER COMMUNICATION METHODS, DEVICES AND STORAGE MEDIA |
| WO2023283844A1 (en) | 2021-07-14 | 2023-01-19 | Nec Corporation | Methods, devices and computer storage media for communication |
Also Published As
| Publication number | Publication date |
|---|---|
| US11751183B2 (en) | 2023-09-05 |
| WO2019138081A1 (en) | 2019-07-18 |
| EP3738221A1 (en) | 2020-11-18 |
| CN111869127A (en) | 2020-10-30 |
| US20200389884A1 (en) | 2020-12-10 |
| US20200404559A1 (en) | 2020-12-24 |
| CN111869127B (en) | 2023-09-01 |
| US11259306B2 (en) | 2022-02-22 |
| EP3738222A1 (en) | 2020-11-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11751183B2 (en) | CORESET and QCL association in beam recovery procedure | |
| US11924755B2 (en) | Facilitating discontinuous reception for mutli-panel user equipment | |
| US11515925B2 (en) | Selecting and using a subset of beam failure detection resources | |
| US10182457B2 (en) | Methods for transmitting and receiving physical random access channel (PRACH), base station and user equipment | |
| US10959282B1 (en) | 5G beam group discontinuous reception | |
| US10200895B2 (en) | Radio link monitoring methods for wireless systems with multiple coverage levels | |
| EP3064024B1 (en) | Method, communication device and computer program | |
| US20200068378A1 (en) | Opportunistic use of drs instances in lte-u stand alone systems | |
| CN110999395B (en) | Enhanced radio link monitoring for new radios | |
| US20260032722A1 (en) | Adapting maximum allowed cca failures based on single occasion periodicity | |
| US20220174733A1 (en) | Method and Apparatus for Channel Access Adaptation and Computer Readable Medium | |
| JP7822961B2 (en) | Reference signal selection for determining beam failure detection and radio link monitoring | |
| JP2026516258A (en) | Improved physical downlink control channel (PDCCH) order for physical random access channel (PRACH) transmission in lower layer triggered mobility (LTM) | |
| CN118830308A (en) | Communication method, terminal device and network device | |
| US12621872B2 (en) | Random access | |
| WO2019229292A1 (en) | Radio link evaluation for bandwidth parts | |
| CN117561767A (en) | Beam failure recovery | |
| WO2019218301A1 (en) | Network-assisted beam scheduling mechanism for directional beamforming transmission | |
| US20250266896A1 (en) | Beam failure processing method, device, and readable storage medium | |
| RU2787469C1 (en) | Improving mobility in the connected state | |
| CN119923922A (en) | Beam determination method and device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19705285 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2019705285 Country of ref document: EP Effective date: 20200812 |