WO2019148980A1 - 能源互联网系统、能源路由转换设备和能量控制方法 - Google Patents
能源互联网系统、能源路由转换设备和能量控制方法 Download PDFInfo
- Publication number
- WO2019148980A1 WO2019148980A1 PCT/CN2018/120843 CN2018120843W WO2019148980A1 WO 2019148980 A1 WO2019148980 A1 WO 2019148980A1 CN 2018120843 W CN2018120843 W CN 2018120843W WO 2019148980 A1 WO2019148980 A1 WO 2019148980A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- energy
- power
- parameter
- conversion device
- distribution network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
- H02J13/13—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network
- H02J13/1337—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network involving the use of Internet protocols
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/46—Controlling the sharing of generated power between the generators, sources or networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M1/00—Details of apparatus for conversion
- H02M1/10—Arrangements incorporating converting means for enabling loads to be operated at will from different kinds of power supplies, e.g. from AC or DC
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2101/00—Supply or distribution of decentralised, dispersed or local electric power generation
- H02J2101/20—Dispersed power generation using renewable energy sources
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2101/00—Supply or distribution of decentralised, dispersed or local electric power generation
- H02J2101/20—Dispersed power generation using renewable energy sources
- H02J2101/22—Solar energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2101/00—Supply or distribution of decentralised, dispersed or local electric power generation
- H02J2101/20—Dispersed power generation using renewable energy sources
- H02J2101/22—Solar energy
- H02J2101/24—Photovoltaics
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2101/00—Supply or distribution of decentralised, dispersed or local electric power generation
- H02J2101/20—Dispersed power generation using renewable energy sources
- H02J2101/28—Wind energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2207/00—Details of circuit arrangements for charging or discharging batteries or supplying loads from batteries
- H02J2207/40—Details of circuit arrangements for charging or discharging batteries or supplying loads from batteries adapted for charging from various sources, e.g. AC, DC or multivoltage
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/008—Circuit arrangements for power supply or distribution technologies responsive to energy trading
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S10/123—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/128—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol
Definitions
- the present disclosure relates to the field of energy information, and in particular, to an energy internet system, an energy route conversion device, and an energy control method.
- an energy Internet system including: an AC side energy route conversion device, including a plurality of first routing ends; and a DC side energy route conversion device, including a plurality of second routing ends, wherein each The second routing end is connected to the corresponding first routing end through a corresponding DC bus; the plurality of energy devices are connected to the DC bus through the corresponding first AC/DC converter or the first DC converter; wherein, the AC side energy route The conversion device and the DC side energy route conversion device collect energy information of the energy device, and adjust the energy of each energy device based on the energy balance constraint condition.
- the AC side energy route conversion device further includes an AC access terminal configured to access the AC power distribution network device; the DC side energy route conversion device further includes a DC access terminal configured to pass the second DC The converter is connected to the DC distribution network equipment.
- the AC side energy route conversion device is an AC side energy router; the DC side energy route conversion device is a DC side energy router.
- the AC side energy routing conversion device includes a plurality of third AC to DC converters; wherein a first end of each of the third AC to DC converters is coupled, and a second of each of the third AC to DC converters The terminal serves as a first routing end;
- the DC-side energy route conversion device includes a plurality of third DC converters; wherein a first end of each of the third DC converters is connected, and a second end of each of the third DC converters is configured The second routing end.
- the AC side energy route conversion device adjusts the energy of the energy device and the AC distribution network device based on the energy balance constraint after collecting the energy information of the energy device and the AC distribution device.
- the DC side energy route conversion device after collecting the energy information of the energy device and the DC distribution device, the DC side energy route conversion device adjusts the energy of the energy device and the DC distribution device based on the energy balance constraint.
- the energy device is at least one of an energy storage device, a powered device, and a power generating device.
- the energy device has a behavioral characteristic.
- the energy information includes voltage parameters, current parameters, power parameters, and power parameters.
- an energy route conversion device comprising: an energy collection unit configured to collect energy information of a plurality of energy devices; and an energy distribution unit configured to adjust each of the energy balance constraints The energy of the energy equipment is regulated.
- the energy harvesting unit is further configured to collect energy information of the distribution grid device; the energy distribution unit is further configured to adjust energy of the distribution grid device and the energy device based on the energy balance constraint.
- the energy harvesting unit is further configured to acquire energy information on each of the DC buses; the energy distribution unit is further configured to adjust energy on each of the DC buses based on energy balance constraints.
- the energy information includes voltage parameters, current parameters, power parameters, and power parameters.
- the energy device is at least one of an energy storage device, a powered device, and a power generating device.
- the energy balance constraint includes: the voltage parameter, the current parameter, the power parameter, and the power parameter of the power generation device, the energy storage device, the power device, and the distribution network device are each within respective respective threshold ranges.
- the energy balance constraint further includes: a sum of power of the power generation device, the energy storage device, the power device, and the distribution network device is 0; the power generation device, the energy storage device, the power device, and the distribution network device The sum of the currents is zero.
- the energy balance constraint further includes: the sum of the powers of the respective DC bus bars is 0; and the sum of the currents of the respective DC bus bars is zero.
- the power parameter of the power generating device is related to the voltage parameter, the current parameter, and the characteristic parameter of the power generating device;
- the power parameter of the energy storage device is related to the voltage parameter, the current parameter, the temperature parameter, and the capacity parameter of the energy storage device;
- the power parameters of the electrical equipment are related to the voltage parameters and current parameters of the electrical equipment;
- the power parameters of the power distribution equipment are related to the voltage parameters, current parameters and power factor parameters of the distribution network equipment.
- an energy control method comprising: collecting energy information of a plurality of energy devices; and adjusting energy of each energy device based on energy balance constraints.
- the method further comprises: collecting energy information of the distribution network device; and adjusting energy of the distribution network device and the energy device based on the energy balance constraint.
- the method further includes: collecting energy information on each of the DC bus bars; and adjusting energy on each of the DC bus bars based on energy balance constraints.
- an energy routing conversion device comprising: a memory; and a processor coupled to the memory, the processor being configured to perform an energy control method as described above based on instructions stored in the memory.
- a computer readable storage medium having stored thereon computer program instructions that, when executed by a processor, implement the steps of the energy control method described above.
- 1 is a block diagram showing the structure of some embodiments of the disclosed energy internet system.
- FIG. 2 is a schematic structural diagram of still another embodiment of the energy internet system of the present disclosure.
- FIG. 3 is a schematic structural diagram of still another embodiment of the energy internet system of the present disclosure.
- FIG. 4 is a schematic structural diagram of still another embodiment of the energy internet system of the present disclosure.
- FIG. 5 is a schematic structural diagram of still another embodiment of the energy internet system of the present disclosure.
- FIG. 6 is a schematic structural diagram of some embodiments of an energy route conversion device according to the present disclosure.
- FIG. 7 is a flow diagram of some embodiments of an energy control method of the present disclosure.
- FIG. 8 is a schematic flow chart of other embodiments of the energy control method of the present disclosure.
- FIG. 9 is a schematic flow chart of still another embodiment of the energy control method of the present disclosure.
- FIG. 10 is a schematic structural diagram of some embodiments of an energy route conversion device according to the present disclosure.
- FIG. 11 is a schematic structural diagram of some embodiments of an energy route conversion device according to the present disclosure.
- the energy internet system includes an AC side energy route conversion device 110, a DC side energy route conversion device 120, and a plurality of energy devices 130.
- the AC side energy route conversion device 110 can convert AC power into DC power, and can also implement energy information collection and information routing functions.
- the DC-side energy route conversion device 120 is capable of converting one DC voltage value to another DC voltage value, and implementing energy information collection and information routing functions.
- the AC side energy route switching device 110 includes a plurality of first routing ends
- the DC side energy route switching device 120 includes a plurality of second routing ends.
- the number of the first routing ends is the same as the number of the second routing ends, and each second routing end passes
- the corresponding DC bus is connected to the corresponding first routing end. Only two first routing ends and two second routing ends, that is, corresponding to the two-dimensional energy Internet system, are shown in FIG. 1. Those skilled in the art should understand that more energy can be set according to actual conditions. Internet system.
- the energy device 130 can be an energy storage device, a power device or a power generation device, etc., and the energy device 130 can be connected to the DC bus through a corresponding first AC/DC converter or a first DC converter, for example, as shown in FIG. If the energy device 130 is an energy storage device, it can be connected to the DC bus through a DC/DC converter; if the energy device 130 is an AC power device, it is connected to the DC bus through a DC/AC converter, if the energy device 130 is a DC power device such as a kitchen appliance, and is connected to a DC bus through a DC/DC converter. If the energy device 130 is a low-voltage DC power device such as illumination, the DC/DC converter can be connected to the low voltage again.
- the busbar ensures the safety of low-voltage DC power; if the energy equipment 130 is a power generation equipment, such as a distributed wind turbine, it is connected to the DC bus through an AC/DC converter, and if it is a photovoltaic module, it passes through a DC/DC converter.
- the power plant can also be connected to the DC bus via a corresponding DC/DC converter or AC/DC converter for other clean energy sources.
- the bus voltage value of each level can be defined as any other DC voltage level.
- the information exchange between the AC side energy route conversion device 110, the DC side energy route conversion device 120, and the plurality of energy devices 130 may employ no-master communication.
- the AC side energy route conversion device 110 and the DC side energy route conversion device 120 collect the energy information of each energy device 130, and adjust the energy of each energy device 130 based on the energy balance constraint condition, thereby implementing the energy Internet.
- System energy exchange runs in balance.
- the AC side energy route switching device 110 further includes an AC access terminal configured to access the AC power distribution network device 140; the DC side energy route conversion device 120 further A DC access terminal is included that is configured to access the DC distribution grid device 150 via a second DC converter. That is, the energy internet system of the present disclosure can be operated on the grid or off-grid.
- the AC side energy route conversion device 110 based on the energy information of the energy device 130 and the AC distribution device 140, is based on the energy balance constraint. The energy of the energy device 130 and the AC distribution network device 140 is adjusted.
- the DC side energy route conversion device 120 based on the energy information of the energy device 130 and the DC distribution device 150, is based on the energy balance constraint. The energy of the energy device 130 and the DC distribution network device 150 is adjusted.
- the AC side energy route conversion device is the AC side energy router 410
- the DC side energy route conversion device is the DC side energy router 420.
- the energy router can maintain the energy supply and demand balance of the energy internet system from the energy point of view, and independently route the energy transmission direction to realize energy freedom. distribution. This embodiment is described by taking a three-dimensional energy internet system as an example.
- the three first routing ends of the AC side energy router 410 are respectively connected to the three second routing ends of the DC side energy router 420 through a DC bus.
- the power device 430 can pass the DC/DC converter if it is a DC load.
- the power supply device 430 is connected to the ⁇ 3 node of the DC bus through the DC/AC converter, and the power device 430 has a behavioral feature, that is, it can collect itself in real time. Energy information such as voltage parameters, current parameters, power parameters, and power parameters, as well as operating state parameters, and reports each parameter, and can receive commands issued by the system.
- the energy storage device 440 can be connected to the ⁇ 2 node of the DC bus through a DC/DC converter, and the power generation device 450 can be connected to the ⁇ 1 node of the DC bus through a DC/DC converter, where ⁇ 1, ⁇ 2, ⁇ 3 of the DC bus in the figure,
- the ⁇ 4, ⁇ 1, ⁇ 2, ⁇ 3, and ⁇ 4 nodes and the like can also be connected to corresponding energy devices, which is not shown in FIG.
- the AC access end of the AC side energy router 410 can be connected to the AC distribution network device 460, and the DC side energy router 420 can be connected to the DC distribution network device 470 through a DC/DC converter.
- the AC side energy router 410 can also disconnect the AC distribution network, and the DC side energy router 420 can disconnect the DC distribution network.
- the multi-dimensional energy Internet system in this embodiment may be an AC/DC dual ring network system, or may be a dual closed loop operation, or may be a single ring network such as an AC ring network or a DC ring network.
- the AC side energy router 410 collects energy information of the power device 430, the energy storage device 440, the power generation device 450, and the AC power distribution network device 460, respectively, for the power device 430, energy storage based on energy balance constraints.
- Apparatus 440, power generation equipment 450, and AC distribution grid equipment 460 perform energy conditioning. The conversion loss and other losses of the system can be neglected, and an energy balance relationship should exist at the DC bus connection point under the premise of an energy flow direction.
- the power equipment 430, the energy storage equipment 440, the power generation equipment 450, and the AC distribution network equipment 460 can participate in the autonomous scheduling response according to the autonomous control of the AC side energy router 410.
- the energy balance constraint includes: the voltage parameter, the current parameter, the power parameter, and the power parameter of the power device 430, the energy storage device 440, the power generation device 450, and the AC distribution network device 460 are respectively within respective respective threshold ranges, and the power device is used.
- the sum of the power of the energy storage device 440, the power generation device 450, and the AC distribution network device 460 is 0, and the sum of the currents is also zero.
- the sum of the sum of the power and the current of the three DC buses is zero.
- the DC-side energy router 420 collects energy information of the powered device 430, the energy storage device 440, the power generating device 450, and the DC power distribution device 470, respectively, based on the energy balance constraint, the powered device 430, the energy storage device
- the device 440, the power generating device 450, and the DC distribution network device 470 perform energy adjustment in a manner similar to the previous embodiment.
- the autonomous control and stability of the power generation equipment, the energy storage equipment, the power equipment, and the distribution network equipment are solved under the energy internet system architecture. Operation, as well as economic scheduling issues.
- each device can respond to the adjustment of power demand, which can make the system quickly achieve energy balance and ensure reliable and safe operation of the system. Reduce system circulation problems.
- FIG. 5 is a schematic structural diagram of still another embodiment of the energy internet system of the present disclosure. This embodiment is described by taking a three-dimensional energy internet system as an example, wherein the AC side energy route conversion device includes three third AC/DC converters (AC/DC) 510, 511, and 512, and the DC side energy route conversion device includes three.
- Third DC converters (DC/DC) 520, 521 and 522 wherein the first end of the third AC/DC converter 510, the first end of the third AC-DC converter 511, and the third AC-DC converter 512 The first end is connected to the PC node, the first end of the third DC converter 520, the first end of the third DC converter 521, and the first end of the third DC converter 522 are connected to the DPC node.
- each third DC-DC converter serves as a first routing end
- the second end of each third DC converter serves as a second routing end, that is, the second end of the third AC-DC converter 510 passes the DC bus Connected to the second end of the third DC converter 520
- the second end of the third AC-DC converter 511 is connected to the second end of the third DC converter 521 through the DC bus
- the second end of the third AC-DC converter 512 The terminal is connected to the second end of the third DC converter 522 through a DC bus.
- the AC distribution network device 460 is connected to the PC node
- the DC power distribution device 470 is connected to the DPC node
- the power device 430, the energy storage device 440, and the power generation device 450 are consistent with the connection relationship in FIG.
- the third AC/DC converters 510, 511 and 512 and the third DC converters 520, 521 and 522 can carry the sensors, the metering elements to realize the operating state and energy monitoring of the components, and can also be externally attached.
- the meter is implemented to achieve an energy balance between the various dimensions and between the various energy equipment and distribution network equipment.
- an unowned communication mode can be employed between the converters. Because the multi-dimensional system adopts the networking mode of AC and DC interconnection and the form of no-master scheduling, it determines the equal and parallel architecture among the single-dimension systems in the system. It is convenient for the “plug and play” of distributed systems, and at the same time, realizes the free distribution of energy, synergistic complementarity and integrated and balanced operation.
- FIG. 6 is a schematic structural diagram of some embodiments of an energy route conversion device according to the present disclosure.
- the energy route conversion device may be an AC side energy route conversion device, or may be a DC side energy route conversion device, and the energy route conversion device includes an energy collection unit 610 and an energy distribution unit 620, wherein the energy collection unit 610 and the energy distribution unit The 620 is electrically connected, the energy collecting unit 610 can be implemented by a metering meter, a sensor, and the energy allocating unit 620 can be implemented by a controller, wherein the controller can be a specific hardware device composed of a PLC, an integrated circuit, related components, and the like.
- the energy harvesting unit 610 is configured to collect energy information of a plurality of energy devices, wherein the energy information includes a voltage parameter, a current parameter, a power parameter, and a power parameter.
- the energy distribution unit 620 is configured to adjust the energy of each energy device based on the energy balance constraints to achieve an energy balance between the devices.
- the energy collection unit 610 is further configured to collect energy information of the distribution network device, and the energy distribution unit 620 is configured to perform matching based on the energy balance constraint. The energy of the grid equipment and energy equipment is adjusted.
- the energy harvesting unit 610 is further configured to collect energy information on each of the DC buses, and the energy distribution unit 620 is further configured to be based on energy balance constraints for each of the DC buses. The energy is adjusted to achieve an energy balance between energy Internet systems of all dimensions.
- the energy balance constraint includes: a voltage parameter u, a current parameter i, a power parameter p, and a power parameter q of the power generation device, the energy storage device, the power device, and the distribution network device respectively in respective respective threshold ranges Inside. That is, the power generation equipment, energy storage equipment, power equipment and distribution network equipment in the energy Internet system operate within the scope of their own redundancy, as shown in the following formula:
- (u, i, p, q) gene , (u, i, p, q) bat , (u, i, p, q) grid , (u, i, p, q) load are power generation equipment, Voltage parameter u, current parameter i, power parameter p and power parameter q value of energy storage equipment, distribution network equipment and power equipment during stable operation, (u, i, p, q) gene_min , (u, i, p , q) bat_min , (u, i, p, q) grid_min , (u, i, p, q) load_min are the voltage parameters u, current parameters of power generation equipment, energy storage equipment, distribution network equipment and electrical equipment i, the minimum value of the power parameter p and the power parameter q, (u, i, p, q) gene_max , (u, i, p, q) bat_max , (u, i, p, q
- the power parameter of the power generation equipment p gene f(f 1 (u, i, s), f 2 (u, i, s)].
- the power parameters of the power generation equipment are related to the voltage parameters, current parameters and characteristic parameters
- different types of new energy power generation equipment have different characteristic parameters, for example, the characteristic parameters of photovoltaic power generation include parameters such as illumination; and the characteristic parameters of wind power generation include parameters such as wind speed.
- Power parameters of distribution network equipment That is, the power parameters of the distribution network equipment are related to the voltage parameters, current parameters and power factor parameters.
- the voltage parameter u, the current parameter i, the power parameter p and the power parameter q of the network device should satisfy the following conditions:
- (u, i, p, q) gene_n , (u, i, p, q) bat_n , (u, i, p, q) grid_n , (u, i, p, q) load_n are power generation equipment, Voltage parameter u, current parameter i, power parameter p and electric quantity parameter q value in the same dimension when energy storage equipment, distribution network equipment and electrical equipment are stably operated, (u, i, p, q) gene_n_min , ( u,i,p,q) bat_n_min , (u,i,p,q) grid_n_min , (u,i,p,q) load_n_min are in the same place for power generation equipment, energy storage equipment, distribution network equipment and electrical equipment.
- Each single-dimensional system in a multi-dimensional system is a parallel, independent entity with autonomous control capabilities, which realizes masterless communication with each other, and energy data can participate in control scheduling in real time.
- the rated power of the power generation equipment, the energy storage equipment, the distribution network equipment, and the electrical equipment in the system may be configured in a limit architecture of 1:1:1:3. details as follows:
- the power generation equipment is photovoltaic power generation, and the rated power generation is 5kW; the rated charge and discharge power of the energy storage equipment is 5kW, the capacity is 20kwh (dischargeable for 4 hours); the rated working power of the power grid side is 5kW; the rated power of the electrical equipment is 15kW.
- the power generation equipment, energy storage equipment, and distribution network equipment are all full-power output; when the photovoltaic power generation is reduced by 3 kW, in order to ensure that the constraints are met, the self-regulating power consumption of the electrical equipment is also reduced by 3 kW.
- the photovoltaic power generation equipment, the energy storage equipment, and the distribution network equipment are in a 1:1:1 configuration relationship (power generation equipment, energy storage equipment, and distribution network equipment). Autonomously adjusted by a reduction of 1 kW each or a specific adjustment ratio.
- the limit adjustment mode is a single energy regulation.
- the system configures the photovoltaic power generation equipment to be 5 kW, the energy storage equipment power is 5 kW, and the electrical load power is 10 kW, which is equivalent to the 1:1:2 off-grid limit architecture of power generation equipment, energy storage equipment, and electrical equipment;
- the photovoltaic or load energy changes, in the above energy balance relationship, the adjustment is performed in a configuration ratio or a specific adjustment manner.
- the system ⁇ , the system ⁇ , and the system ⁇ are all operating normally separately, and the system real-time monitoring finds that the system ⁇ energy suddenly increases by 10 kW, and is internally adjusted by the system ⁇ to Each component reaches the upper limit of its own allowable redundancy capability, and 4kW cannot be absorbed.
- the energy is dispatched to the system ⁇ and the system ⁇ for consumption, and the system ⁇ and the system ⁇ are allocated according to the preset scheduling method in advance. Adjust it yourself.
- the scheduling system ⁇ or (and) system ⁇ performs Energy supplements.
- the Energy Internet can also set up certain operating modes or customized schedules through the management system. For example, when the system ⁇ runs at the peak electricity price, it may require the photovoltaic equipment and other power generation equipment to not charge the energy storage equipment, and then connect to the grid to generate revenue; when the valley electricity price is charged by the grid equipment, the energy storage equipment is charged.
- FIG. 7 is a flow diagram of some embodiments of an energy control method of the present disclosure.
- the energy information includes a voltage parameter, a current parameter, a power parameter, and a power parameter.
- the energy of each energy device is adjusted based on the energy balance constraints.
- the energy equipment is an energy storage device, a power device, a power generation device, etc., and energy balance constraints have been described in detail in the above embodiments, and will not be further elaborated herein.
- the default distribution network that is, the energy Internet system is operated off-grid, and the energy and energy system can be balanced and stably operated by scheduling the energy of the energy equipment.
- FIG. 8 is a schematic flow chart of other embodiments of the energy control method of the present disclosure.
- step 810 energy information for the distribution grid device and the plurality of energy devices is acquired.
- the energy of the distribution grid equipment and the energy equipment is adjusted based on the energy balance constraints.
- the distribution network that is, the energy Internet system is connected to the grid, and the energy network system can be balanced and stably operated by scheduling the energy of the distribution network equipment and the energy equipment.
- FIG. 9 is a schematic flow chart of still another embodiment of the energy control method of the present disclosure. If the energy internet system is a multi-dimensional system, the method includes:
- step 910 energy information on each of the DC busses is acquired. That is, the voltage parameter, current parameter, power parameter and power parameter of each dimension system are detected.
- the energy on each of the DC busses is adjusted based on the energy balance constraints. Judging the energy flow of each dimension system, based on the energy balance constraints of each dimension, comprehensively scheduling the energy of each dimension system.
- each dimension voltage parameter, current parameter, power parameter, and power parameter should satisfy the energy balance constraint condition, thereby achieving system energy balance, so that the system can operate stably.
- FIG. 10 is a schematic structural diagram of some embodiments of an energy route conversion device according to the present disclosure.
- the device includes a memory 1010 and a processor 1020.
- the memory 1010 can be a magnetic disk, a flash memory, or any other non-volatile storage medium.
- the memory is configured to store the instructions in the embodiment corresponding to Figures 7-9.
- the processor 1020 is coupled to the memory 1010 and can be implemented as one or more integrated circuits, such as a microprocessor or a microcontroller.
- the processor 1020 is configured to execute instructions stored in a memory.
- the device 1100 includes a memory 1110 and a processor 1120.
- Processor 1120 is coupled to memory 1110 via BUS bus 1130.
- the device 1100 can also be connected to the external storage device 1150 via the storage interface 1140 for invoking external data, and can also be connected to the network or another computer system (not shown) via the network interface 1160. It will not be described in detail here.
- the energy exchange balancing operation of the energy internet system can be realized by storing the data instruction through the memory and processing the above instruction by the processor.
- a computer readable storage medium having stored thereon computer program instructions that, when executed by a processor, implement the steps of the method of the embodiment of FIGS. 7-9.
- a processor may implement the steps of the method of the embodiment of FIGS. 7-9.
- the present disclosure may be provided as a method, apparatus, or computer program product. Accordingly, the present disclosure may take the form of an entirely hardware embodiment, an entirely software embodiment, or a combination of software and hardware aspects. Moreover, the present disclosure may take the form of a computer program product embodied on one or more computer-usable non-transitory storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer usable program code. .
- the computer program instructions can also be stored in a computer readable memory that can direct a computer or other programmable data processing device to operate in a particular manner, such that the instructions stored in the computer readable memory produce an article of manufacture comprising the instruction device.
- the apparatus implements the functions specified in one or more blocks of a flow or a flow and/or block diagram of the flowchart.
- These computer program instructions can also be loaded onto a computer or other programmable data processing device such that a series of operational steps are performed on a computer or other programmable device to produce computer-implemented processing for execution on a computer or other programmable device.
- the instructions provide steps for implementing the functions specified in one or more of the flow or in a block or blocks of a flow diagram.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Direct Current Feeding And Distribution (AREA)
Abstract
Description
Claims (23)
- 一种能源互联网系统,包括:交流侧能源路由转换设备,包括多个第一路由端;直流侧能源路由转换设备,包括多个第二路由端,其中,每个第二路由端通过相应的直流母线与对应的第一路由端连接;多个能源设备,通过相应的第一交直流转换器或第一直流转换器连接至直流母线上;其中,所述交流侧能源路由转换设备和所述直流侧能源路由转换设备采集所述能源设备的能量信息,基于能量平衡约束条件,对各个能源设备的能量进行调节。
- 根据权利要求1所述的能源互联网系统,其中,所述交流侧能源路由转换设备还包括交流接入端,被配置为接入交流配电网设备;所述直流侧能源路由转换设备还包括直流接入端,被配置为通过第二直流转换器接入直流配电网设备。
- 根据权利要求1所述的能源互联网系统,其中,所述交流侧能源路由转换设备为交流侧能源路由器;所述直流侧能源路由转换设备为直流侧能源路由器。
- 根据权利要求1所述的能源互联网系统,其中,所述交流侧能源路由转换设备包括多个第三交直流转换器;其中,每个第三交直流转换器的第一端相连接,每个第三交直流转换器的第二端作为第一路由端;所述直流侧能源路由转换设备包括多个第三直流转换器;其中,每个第三直流转换器的第一端相连接,每个第三直流转换器的第二端作为第二路由端。
- 根据权利要求2所述的能源互联网系统,其中,所述交流侧能源路由转换设备在采集到所述能源设备和所述交流配电网设备的能量信息后,基于能量平衡约束条件,对所述能源设备和所述交流配电网设备的能量进行调节。
- 根据权利要求2所述的能源互联网系统,其中,所述直流侧能源路由转换设备在采集到所述能源设备和所述直流配电网设备的能量信息后,基于能量平衡约束条件,对所述能源设备和所述直流配电网设备的能量进行调节。
- 根据权利要求1-6任一所述的能源互联网系统,其中,所述能源设备至少为储能设备、用电设备和发电设备中的一个。
- 根据权利要求7所述的能源互联网系统,其中,所述能源设备具有行为特征。
- 根据权利要求1-6任一所述的能源互联网系统,其中,所述能量信息包括电压参数、电流参数、功率参数和电量参数。
- 一种能源路由转换设备,包括:能量采集单元,被配置为采集多个能源设备的能量信息;能量分配单元,被配置为基于能量平衡约束条件,对各个能源设备的能量进行调节。
- 根据权利要求10所述的能源路由转换设备,其中,所述能量采集单元还被配置为采集配电网设备的能量信息;所述能量分配单元还被配置为基于能量平衡约束条件,对所述配电网设备和所述能源设备的能量进行调节。
- 根据权利要求11所述的能源路由转换设备,其中,所述能量采集单元还被配置为采集各直流母线上的能量信息;所述能量分配单元还被配置为基于能量平衡约束条件,对所述各直流母线上的能量进行调节。
- 根据权利要求12所述的能源路由转换设备,其中,所述能量信息包括电压参数、电流参数、功率参数和电量参数。
- 根据权利要求13所述的能源路由转换设备,其中,所述能源设备至少为储能设备、用电设备和发电设备中的一个。
- 根据权利要求14所述的能源路由转换设备,其中,所述能量平衡约束条件包括:所述发电设备、所述储能设备、所述用电设备和所述配电网设备的电压参数、电流参数、功率参数和电量参数分别在各自相应的阈值范围内。
- 根据权利要求15所述的能源路由转换设备,其中,所述能量平衡约束条件还包括:所述发电设备、所述储能设备、所述用电设备和所述配电网设备的功率之和为0;所述发电设备、所述储能设备、所述用电设备和所述配电网设备的电流之和为0。
- 根据权利要求15或16所述的能源路由转换设备,其中,所述能量平衡约束条件还包括:各直流母线的功率之和为0;各直流母线的电流之和为0。
- 根据权利要求14所述的能源路由转换设备,其中,所述发电设备的功率参数与所述发电设备的电压参数、电流参数和特性参数相关;所述储能设备的功率参数与所述储能设备的电压参数、电流参数、温度参数和容量参数相关;所述用电设备的功率参数与所述用电设备的电压参数和电流参数相关;所述配电网设备的功率参数与所述配电网设备的电压参数、电流参数和功率因数参数相关。
- 一种能量控制方法,包括:采集多个能源设备的能量信息;基于能量平衡约束条件,对各个能源设备的能量进行调节。
- 根据权利要求19所述的能量控制方法,还包括:采集配电网设备的能量信息;基于能量平衡约束条件,对所述配电网设备和所述能源设备的能量进行调节。
- 根据权利要求19或20所述的能量控制方法,还包括:采集各直流母线上的能量信息;基于能量平衡约束条件,对所述各直流母线上的能量进行调节。
- 一种能源路由转换设备,包括:存储器;以及耦接至所述存储器的处理器,所述处理器被配置为基于存储在所述存储器的指令执行如权利要求19-21任一所述的能量控制方法。
- 一种计算机可读存储介质,其上存储有计算机程序指令,该指令被处理器执行时实现权利要求19-21任一所述的能量控制方法的步骤。
Priority Applications (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP18903156.0A EP3748796B1 (en) | 2018-02-02 | 2018-12-13 | Energy internet system |
| ES18903156T ES2914823T3 (es) | 2018-02-02 | 2018-12-13 | Sistema de Internet de energía |
| JP2020541714A JP7079334B2 (ja) | 2018-02-02 | 2018-12-13 | エネルギインターネットシステム、エネルギルーティング変換機器及びエネルギ制御方法 |
| KR1020207024771A KR102632197B1 (ko) | 2018-02-02 | 2018-12-13 | 에너지 인터넷 시스템, 에너지 라우팅 변환 장치 및 에너지 제어 방법 |
| US16/966,846 US11936183B2 (en) | 2018-02-02 | 2018-12-13 | Energy-internet system, energy routing conversion device, and energy control method |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810108480.1 | 2018-02-02 | ||
| CN201810108480.1A CN108199376B (zh) | 2018-02-02 | 2018-02-02 | 能源互联网系统、能源路由转换设备和能量控制方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2019148980A1 true WO2019148980A1 (zh) | 2019-08-08 |
Family
ID=62592390
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2018/120843 Ceased WO2019148980A1 (zh) | 2018-02-02 | 2018-12-13 | 能源互联网系统、能源路由转换设备和能量控制方法 |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US11936183B2 (zh) |
| EP (1) | EP3748796B1 (zh) |
| JP (1) | JP7079334B2 (zh) |
| KR (1) | KR102632197B1 (zh) |
| CN (1) | CN108199376B (zh) |
| ES (1) | ES2914823T3 (zh) |
| PT (1) | PT3748796T (zh) |
| WO (1) | WO2019148980A1 (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110535121A (zh) * | 2019-08-27 | 2019-12-03 | 东北大学 | 一种交直流混联电网的两阶段多目标动态优化调度方法 |
| CN113077101A (zh) * | 2021-04-16 | 2021-07-06 | 华北电力大学 | 面向能源互联网调配管理的数字化系统及方法 |
| CN117650634A (zh) * | 2024-01-30 | 2024-03-05 | 国网山东省电力公司青州市供电公司 | 一种电网储能设备智能管控装置、系统及管控方法 |
| CN120601515A (zh) * | 2025-05-20 | 2025-09-05 | 武汉大学 | 一种面向配电网分区的电能路由器优化配置方法及装置 |
Families Citing this family (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108199376B (zh) * | 2018-02-02 | 2024-03-26 | 珠海格力电器股份有限公司 | 能源互联网系统、能源路由转换设备和能量控制方法 |
| CN109274087B (zh) | 2018-10-12 | 2024-08-09 | 珠海格力电器股份有限公司 | 直流家居用电系统及基于该系统的家用电器的接线方法 |
| CN110061519A (zh) * | 2019-03-06 | 2019-07-26 | 中国电力科学研究院有限公司 | 一种应用于分布式能源系统的电能矩阵装置 |
| CN110718965A (zh) * | 2019-10-16 | 2020-01-21 | 珠海格力电器股份有限公司 | 能源在线监测方法、装置及系统 |
| CN111340271B (zh) * | 2020-02-13 | 2022-04-08 | 清华大学 | 一种基于供热相量模型的电-热多能流系统优化调度方法 |
| CN111224430A (zh) * | 2020-03-11 | 2020-06-02 | 青岛科技大学 | 一种基于分布式能源物联网的平衡供电系统及方法 |
| CN111276990B (zh) * | 2020-03-30 | 2025-05-16 | 珠海格力电器股份有限公司 | 能源互联网系统、能源供应控制方法与装置 |
| US11545834B1 (en) * | 2021-10-28 | 2023-01-03 | Atieva, Inc. | Balancing power from electric vehicle in vehicle-to-building supply |
| CN114372673A (zh) * | 2021-12-08 | 2022-04-19 | 杭州鸿晟电力设计咨询有限公司 | 一种综合能源管理系统效益评估方法 |
| CN114678862A (zh) * | 2022-02-28 | 2022-06-28 | 中国电力科学研究院有限公司 | 一种城市能源互联网对等配电网络的结构形态 |
| WO2023175847A1 (ja) * | 2022-03-17 | 2023-09-21 | 本田技研工業株式会社 | 制御装置、電力供給システム、制御方法、およびプログラム |
| CN118646002B (zh) * | 2024-08-06 | 2024-11-22 | 深圳和润达科技有限公司 | 电源系统的用电能源智能配置方法及装置 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104485727A (zh) * | 2014-12-26 | 2015-04-01 | 广州市香港科大霍英东研究院 | 一种离网光伏发电储能系统及其能量调度方法 |
| CN104701882A (zh) * | 2015-03-25 | 2015-06-10 | 成都鼎智汇科技有限公司 | 一种可自动实现能量平衡的微电网系统的监控方法 |
| CN106329530A (zh) * | 2016-10-26 | 2017-01-11 | 广东工业大学 | 一种交直流智能家庭微网协同系统及其运行方法 |
| CN108199376A (zh) * | 2018-02-02 | 2018-06-22 | 珠海格力电器股份有限公司 | 能源互联网系统、能源路由转换设备和能量控制方法 |
Family Cites Families (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5164245B2 (ja) * | 2007-03-29 | 2013-03-21 | 大阪瓦斯株式会社 | 電力中継装置、電力機器、及び、電力中継方法 |
| JP2009142023A (ja) * | 2007-12-05 | 2009-06-25 | Paru Cosmo Kk | 広域電力データ総合管理システム及び広域電力データ総合管理プログラム |
| JP5612920B2 (ja) * | 2010-06-27 | 2014-10-22 | 国立大学法人 東京大学 | 多端子型電力変換装置と電力システムならびにその制御プログラム |
| ES2777887T3 (es) * | 2010-05-03 | 2020-08-06 | Siemens Gamesa Renewable Energy As | Sistema para intercambiar energía eléctrica entre una batería y una red eléctrica y procedimiento respectivo |
| US8384359B2 (en) * | 2011-10-21 | 2013-02-26 | General Electric Company | System, charging device, and method of charging a power storage device |
| US9563215B2 (en) * | 2012-07-14 | 2017-02-07 | Causam Energy, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
| JP5882156B2 (ja) * | 2012-07-23 | 2016-03-09 | 株式会社デンソー | 電力制御装置 |
| US20150207316A1 (en) | 2012-08-16 | 2015-07-23 | Robert Bosch Gmbh | Dc building system with energy storage and control system |
| US20140265607A1 (en) * | 2013-03-15 | 2014-09-18 | Neofocal Systems, Inc. | System And Method For Loop-Based Direct Current Electrical Power Transmission System |
| KR101681817B1 (ko) | 2014-12-30 | 2016-12-01 | 주식회사 엘지씨엔에스 | 배터리 충전 회로의 전압 안정화 장치 및 방법, 전압 안정화 장치를 포함하는 배터리 충전 시스템 |
| CN104638645B (zh) * | 2015-02-12 | 2017-03-08 | 东北大学 | 一种能源互联网及其分级控制系统与控制方法 |
| CN104682430B (zh) * | 2015-02-16 | 2016-08-17 | 东北大学 | 一种应用于能源互联网的能源路由器装置 |
| CN107437823B (zh) * | 2016-05-27 | 2022-03-08 | 松下知识产权经营株式会社 | 电力传送系统 |
| CN106356902A (zh) * | 2016-11-01 | 2017-01-25 | 东南大学 | 一种适用于能量互联网中多能协同综合能源网络的能量管理方法 |
| CN106655267B (zh) * | 2016-12-26 | 2019-08-16 | 上海电力学院 | 一种考虑多微网互动的能源局域网及控制方法 |
| CN106786771A (zh) * | 2017-01-22 | 2017-05-31 | 中国电力科学研究院 | 一种能源互联网用能源路由器及能源处理方法 |
| CN207835060U (zh) * | 2018-02-02 | 2018-09-07 | 珠海格力电器股份有限公司 | 能源互联网系统和能源路由转换设备 |
-
2018
- 2018-02-02 CN CN201810108480.1A patent/CN108199376B/zh active Active
- 2018-12-13 JP JP2020541714A patent/JP7079334B2/ja active Active
- 2018-12-13 PT PT189031560T patent/PT3748796T/pt unknown
- 2018-12-13 WO PCT/CN2018/120843 patent/WO2019148980A1/zh not_active Ceased
- 2018-12-13 KR KR1020207024771A patent/KR102632197B1/ko active Active
- 2018-12-13 ES ES18903156T patent/ES2914823T3/es active Active
- 2018-12-13 EP EP18903156.0A patent/EP3748796B1/en active Active
- 2018-12-13 US US16/966,846 patent/US11936183B2/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104485727A (zh) * | 2014-12-26 | 2015-04-01 | 广州市香港科大霍英东研究院 | 一种离网光伏发电储能系统及其能量调度方法 |
| CN104701882A (zh) * | 2015-03-25 | 2015-06-10 | 成都鼎智汇科技有限公司 | 一种可自动实现能量平衡的微电网系统的监控方法 |
| CN106329530A (zh) * | 2016-10-26 | 2017-01-11 | 广东工业大学 | 一种交直流智能家庭微网协同系统及其运行方法 |
| CN108199376A (zh) * | 2018-02-02 | 2018-06-22 | 珠海格力电器股份有限公司 | 能源互联网系统、能源路由转换设备和能量控制方法 |
Non-Patent Citations (1)
| Title |
|---|
| See also references of EP3748796A4 |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110535121A (zh) * | 2019-08-27 | 2019-12-03 | 东北大学 | 一种交直流混联电网的两阶段多目标动态优化调度方法 |
| CN113077101A (zh) * | 2021-04-16 | 2021-07-06 | 华北电力大学 | 面向能源互联网调配管理的数字化系统及方法 |
| CN117650634A (zh) * | 2024-01-30 | 2024-03-05 | 国网山东省电力公司青州市供电公司 | 一种电网储能设备智能管控装置、系统及管控方法 |
| CN117650634B (zh) * | 2024-01-30 | 2024-05-07 | 国网山东省电力公司青州市供电公司 | 一种电网储能设备智能管控装置、系统及管控方法 |
| CN120601515A (zh) * | 2025-05-20 | 2025-09-05 | 武汉大学 | 一种面向配电网分区的电能路由器优化配置方法及装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| US20210044146A1 (en) | 2021-02-11 |
| CN108199376A (zh) | 2018-06-22 |
| CN108199376B (zh) | 2024-03-26 |
| PT3748796T (pt) | 2022-05-16 |
| EP3748796A4 (en) | 2021-03-03 |
| KR102632197B1 (ko) | 2024-02-01 |
| US11936183B2 (en) | 2024-03-19 |
| ES2914823T3 (es) | 2022-06-16 |
| JP2021513315A (ja) | 2021-05-20 |
| JP7079334B2 (ja) | 2022-06-01 |
| EP3748796B1 (en) | 2022-03-02 |
| EP3748796A1 (en) | 2020-12-09 |
| KR20200111246A (ko) | 2020-09-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2019148980A1 (zh) | 能源互联网系统、能源路由转换设备和能量控制方法 | |
| JP2023009060A (ja) | 送電網ネットワークのゲートウェイアグリゲーション | |
| CN110323785B (zh) | 源网荷储互动的多电压等级直流配电网优化调度方法 | |
| CN205646811U (zh) | 一种光伏直交流混合微电网系统 | |
| CN105552914B (zh) | 一种基于电价的交直流混合微电网分层控制方法 | |
| CN109066822B (zh) | 一种基于电力电子变压器的多点分散式配电系统调度方法 | |
| McClurg et al. | A series-stacked architecture for high-efficiency data center power delivery | |
| CN115833210B (zh) | 一种多机并联储能系统及其充放电控制方法 | |
| Park et al. | Battery management for grid-connected PV systems with a battery | |
| CN117318124A (zh) | 多储能设备的控制方法、储能设备及供电系统 | |
| CN107092975B (zh) | 一种基于储能损耗积分的交直流混合微网经济优化方法 | |
| CN116780603A (zh) | 交直流配电网过载优化方法、装置、电子设备及存储介质 | |
| Hasan et al. | Management of EVs for Mitigating Unbalance in a LV Distribution Grid | |
| CN115238992A (zh) | 一种电力系统源荷储的协调优化方法、装置及电子设备 | |
| Diaz et al. | Energy management system with equalization algorithm for distributed energy storage systems in PV-active generator based low voltage DC microgrids | |
| CN116742668A (zh) | 一种储能系统、光储系统及储能变流器的控制方法 | |
| CN117748685A (zh) | 供电电路的充电控制方法、供电设备及储能设备 | |
| CN115173566A (zh) | 一种基于vacon工业变频器的电能量路由器控制系统、方法和存储介质 | |
| Ichikawa et al. | Usb pd based microgrid for accelerating the power grid transition to a low carbon future | |
| CN109599898B (zh) | 提高分布式电源消纳的控制方法及装置 | |
| Song et al. | An Improved Power Margin-Based Coordinated Control Strategy for Hybrid AC/DC Microgrids | |
| JP2023500471A (ja) | 過電流保護の統合によるマイクログリッドの三次制御の方法および装置 | |
| CN119010028B (zh) | 加入光伏储能的变电站交直流电源系统控制方法及装置 | |
| CN118971128B (zh) | 微电网供电系统及直流组网能量管理方法 | |
| Finamor et al. | Solar photovoltaic static conversion system applied to a smart microgrid |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18903156 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2020541714 Country of ref document: JP Kind code of ref document: A |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 20207024771 Country of ref document: KR Kind code of ref document: A |
|
| ENP | Entry into the national phase |
Ref document number: 2018903156 Country of ref document: EP Effective date: 20200902 |