WO2022060190A1 - 무선 통신 시스템에서 프론트홀 전송을 위한 장치 및 방법 - Google Patents
무선 통신 시스템에서 프론트홀 전송을 위한 장치 및 방법 Download PDFInfo
- Publication number
- WO2022060190A1 WO2022060190A1 PCT/KR2021/012893 KR2021012893W WO2022060190A1 WO 2022060190 A1 WO2022060190 A1 WO 2022060190A1 KR 2021012893 W KR2021012893 W KR 2021012893W WO 2022060190 A1 WO2022060190 A1 WO 2022060190A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- layer
- nulling
- control message
- information
- base station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/022—Site diversity; Macro-diversity
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/0413—MIMO systems
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/0413—MIMO systems
- H04B7/0452—Multi-user MIMO systems
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0613—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission
- H04B7/0615—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal
- H04B7/0617—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal for beam forming
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0686—Hybrid systems, i.e. switching and simultaneous transmission
- H04B7/0695—Hybrid systems, i.e. switching and simultaneous transmission using beam selection
- H04B7/06952—Selecting one or more beams from a plurality of beams, e.g. beam training, management or sweeping
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0453—Resources in frequency domain, e.g. a carrier in FDMA
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W88/00—Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
- H04W88/08—Access point devices
- H04W88/085—Access point devices with remote components
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W92/00—Interfaces specially adapted for wireless communication networks
- H04W92/04—Interfaces between hierarchically different network devices
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W92/00—Interfaces specially adapted for wireless communication networks
- H04W92/04—Interfaces between hierarchically different network devices
- H04W92/12—Interfaces between hierarchically different network devices between access points and access point controllers
Definitions
- This disclosure generally relates to a wireless communication system, and more particularly, to an apparatus and method for fronthaul transmission in a wireless communication system.
- the 5G communication system or the pre-5G communication system is called a 4G network after (Beyond 4G Network) communication system or an LTE (Long Term Evolution) system after (Post LTE) system.
- the 5G communication system is being considered for implementation in a very high frequency (mmWave) band (eg, such as a 60 gigabyte (60 GHz) band).
- mmWave very high frequency
- FD-MIMO Full Dimensional MIMO
- array antenna, analog beam-forming, and large scale antenna technologies are being discussed.
- an evolved small cell an advanced small cell, a cloud radio access network (cloud radio access network, cloud RAN), and an ultra-dense network (ultra-dense network)
- D2D Device to Device communication
- wireless backhaul moving network
- cooperative communication Coordinated Multi-Points (CoMP)
- CoMP Coordinated Multi-Points
- FQAM Hybrid Frequency Shift Keying and Quadrature Amplitude Modulation
- SWSC Small Cell Superposition Coding
- ACM Advanced Coding Modulation
- FBMC Fan Bank Multi Carrier
- NOMA Non Orthogonal Multiple Access
- SCMA Sparse Code Multiple Access
- the base station may be divided into a digital unit (DU) and a radio unit (RU), a fronthaul for communication between the DU and the RU is defined, and transmission through the fronthaul is required.
- DU digital unit
- RU radio unit
- the present disclosure provides a method and apparatus for constructing a control message transmitted over a fronthaul interface.
- the present disclosure provides a method and apparatus for improving reception performance of a terminal located at a cell boundary when operating a digital unit (DU) and a radio unit (RU) in a wireless communication system.
- DU digital unit
- RU radio unit
- a method performed by a digital unit (DU) of a base station in a wireless communication system includes a process of setting a section extension field including additional information in a first control message; , transmitting the first control message to a radio unit (RU) of the base station, and the first control message may include information about one or more terminals scheduled to the base station.
- DU digital unit
- RU radio unit
- a method performed by a radio unit (RU) of a base station in a wireless communication system includes a process of receiving a first control message in which a section extension field is set from a digital unit (DU) of the base station; A process of receiving a second control message including channel information for terminals within the coverage of the base station from the DU, and a beamforming weight (BFW) based on the first control message and the second control message ), and transmitting a downlink signal based on the BFW.
- a radio unit (RU) of a base station in a wireless communication system includes a process of receiving a first control message in which a section extension field is set from a digital unit (DU) of the base station; A process of receiving a second control message including channel information for terminals within the coverage of the base station from the DU, and a beamforming weight (BFW) based on the first control message and the second control message ), and transmitting a downlink signal based on the BFW.
- BFW beamforming weight
- the method and apparatus include a parameter indicating whether a nulling layer is present in a control message transmitted on a fronthaul, thereby providing a CB (cooperative multi-point) cooperative beamforming).
- FIG. 1A illustrates a wireless communication system according to various embodiments of the present disclosure.
- FIG. 1B illustrates an example of a fronthaul structure according to a function split of a base station according to various embodiments of the present disclosure.
- FIG. 2 illustrates a configuration of a digital unit (DU) in a wireless communication system according to various embodiments of the present disclosure.
- FIG 3 illustrates a configuration of a radio unit (RU) in a wireless communication system according to various embodiments of the present disclosure.
- FIG. 4 illustrates an example of function split in a wireless communication system according to various embodiments of the present disclosure.
- FIG 5 illustrates an example of cooperative communication between base stations according to various embodiments of the present disclosure.
- FIG. 6 illustrates an operation flow of an RU for beam nulling according to various embodiments of the present disclosure.
- FIG. 7 illustrates a frame format of an extended section of a control message according to various embodiments of the present disclosure.
- FIG. 8 illustrates a frame format of an extended section of a control message according to various embodiments of the present disclosure.
- FIG 9 illustrates a signal flow for setting a nulling dimension function according to various embodiments of the present disclosure.
- FIG. 10 illustrates an example of a connection between a DU and an RU according to an embodiment of the present disclosure.
- Terms referring to signals eg, message, information, preamble, signal, signaling, sequence, stream
- terms referring to resources eg, symbol
- subframe subframe
- radio frame radio frame
- subcarrier subcarrier
- RE resource element
- RB resource block
- BWP bandwidth part
- Terms for state eg step, operation, procedure
- terms referring to data eg packet, user stream, information, bit, symbol) , codeword
- terms referring to channels terms referring to control information (eg, downlink control information (DCI), medium access control element (MAC CE), radio resource control (RRC) signaling), network objects
- DCI downlink control information
- MAC CE medium access control element
- RRC radio resource control
- network objects referring to (network entities), terms referring to components of the device, and the like are exemplified for convenience of description. Accordingly, the present disclosure is not limited to the terms described below, and other terms having equivalent technical meanings may be used.
- an expression of more than or less than may be used, but this is only a description for expressing an example. It's not about exclusion. Conditions described as 'more than' may be replaced with 'more than', conditions described as 'less than', and conditions described as 'more than and less than' may be replaced with 'more than and less than'.
- the present disclosure describes various embodiments using terms used in some communication standards (eg, 3rd Generation Partnership Project (3GPP), extensible radio access network (xRAN), and open-radio access network (O-RAN)).
- 3GPP 3rd Generation Partnership Project
- xRAN extensible radio access network
- OF-RAN open-radio access network
- 1A illustrates a wireless communication system according to various embodiments of the present disclosure.
- 1A illustrates a base station 110 , a terminal 120 , and a terminal 130 as some of nodes using a wireless channel in a wireless communication system.
- 1A shows only one base station, other base stations that are the same as or similar to the base station 110 may be further included.
- the base station 110 is a network infrastructure that provides wireless access to the terminals 120 and 130 .
- the base station 110 has coverage defined as a certain geographic area based on a distance capable of transmitting a signal.
- the base station 110 includes an 'access point (AP)', an 'eNodeB (eNodeB)', a '5G node (5th generation node)', a 'next generation nodeB' , gNB)', 'wireless point', 'transmission/reception point (TRP)', or other terms having an equivalent technical meaning.
- Each of the terminal 120 and the terminal 130 is a device used by a user, and performs communication with the base station 110 through a wireless channel.
- the link from the base station 110 to the terminal 120 or the terminal 130 is downlink (DL), and the link from the terminal 120 or the terminal 130 to the base station 110 is uplink (UL). ) is referred to as
- the terminal 120 and the terminal 130 may perform communication through a mutual wireless channel.
- a device-to-device link (D2D) between the terminal 120 and the terminal 130 is referred to as a sidelink, and the sidelink may be mixed with a PC5 interface.
- at least one of the terminal 120 and the terminal 130 may be operated without the user's involvement.
- At least one of the terminal 120 and the terminal 130 is a device that performs machine type communication (MTC) and may not be carried by the user.
- MTC machine type communication
- Each of the terminals 120 and 130 includes 'user equipment (UE)', 'customer premises equipment (CPE)', 'mobile station', 'subscriptions 'subscriber station', 'remote terminal', 'wireless terminal', electronic device', or 'user device' or other having an equivalent technical meaning may be referred to as terms.
- the base station 110 , the terminal 120 , and the terminal 130 may perform beamforming.
- the base station and the terminal can transmit and receive radio signals in a relatively low frequency band (eg, frequency range 1 (FR1) of NR).
- the base station and the terminal can transmit and receive radio signals in a relatively high frequency band (eg, FR2 of NR, mmWave bands (eg, 28 GHz, 30 GHz, 38 GHz, 60 GHz)).
- FR1 frequency range 1
- FR2 of NR mmWave bands
- the base station 110 may perform communication with the terminal 120 within a frequency range corresponding to FR1.
- the base station may perform communication with the terminal 120 within a frequency range corresponding to FR2.
- the base station 110 , the terminal 120 , and the terminal 130 may perform beamforming.
- the beamforming may include transmit beamforming and receive beamforming. That is, the base station 110 , the terminal 120 , and the terminal 130 may impart directivity to a transmission signal or a reception signal.
- the base station 110 and the terminals 120 and 130 may select serving beams through a beam search or beam management procedure. After serving beams are selected, subsequent communication may be performed through a resource having a QCL relationship with a resource transmitting the serving beams.
- the first antenna port and the second antenna port are said to be in a QCL relationship.
- a wide range of characteristics include delay spread, Doppler spread, Doppler shift, average gain, average delay, spatial receiver parameter. may include at least one of
- the UE may or may not perform beamforming.
- the base station may or may not perform beamforming. That is, only one of the base station and the terminal may perform beamforming, or neither the base station nor the terminal may perform beamforming.
- a beam means a spatial flow of a signal in a wireless channel, and is formed by one or more antennas (or antenna elements), and this formation process may be referred to as beamforming.
- Beamforming may include analog beamforming and digital beamforming (eg, precoding).
- a reference signal transmitted based on beamforming is, for example, a demodulation-reference signal (DM-RS), a channel state information-reference signal (CSI-RS), and a synchronization signal/physical broadcast channel (SS/PBCH).
- DM-RS demodulation-reference signal
- CSI-RS channel state information-reference signal
- SS/PBCH synchronization signal/physical broadcast channel
- SRS sounding reference signal
- an IE such as a CSI-RS resource or an SRS-resource may be used, and this configuration may include information associated with a beam.
- Beam-related information means whether the configuration (eg, CSI-RS resource) uses the same spatial domain filter as that of another configuration (eg, another CSI-RS resource in the same CSI-RS resource set) or different It may mean whether a spatial domain filter is used, which reference signal is QCL (quasi-co-located), and what type (eg, QCL type A, B, C, D) if QCL is performed.
- QCL quadsi-co-located
- each base station has a digital processing unit (DU) and a radio frequency (RF) processing unit (RF processing unit, or RU (radio) unit))).
- DU digital processing unit
- RF radio frequency
- RU radio frequency unit
- the DU and the RU of the base station are separated, one or more RUs are connected to one DU through a wired network, and one or more RUs distributed geographically to cover a specific area are placed structure has been proposed.
- the arrangement structure and extension examples of the base station according to various embodiments of the present disclosure will be described with reference to FIG. 1B.
- FIG. 1B illustrates an example of a fronthaul structure according to functional separation of a base station according to various embodiments of the present disclosure. Unlike backhaul between the base station and the core network, the fronthaul refers to entities between the WLAN and the base station.
- the base station 110 may include a DU 160 and an RU 180 .
- the fronthaul 170 between the DU 160 and the RU 180 may be operated through the F x interface.
- an interface such as enhanced common public radio interface (eCPRI) or radio over ethernet (ROE) may be used.
- eCPRI enhanced common public radio interface
- ROE radio over ethernet
- the DU performs functions for packet data convergence protocol (PDCP), radio link control (RLC), media access control (MAC), and physical (PHY) and , the RU may be implemented to further perform functions for the PHY layer in addition to a radio frequency (RF) function.
- PDCP packet data convergence protocol
- RLC radio link control
- MAC media access control
- PHY physical
- RF radio frequency
- the DU 160 may be in charge of an upper layer function of the wireless network.
- the DU 160 may perform a function of the MAC layer and a part of the PHY layer.
- a part of the PHY layer is performed at a higher stage among the functions of the PHY layer, for example, channel encoding (or channel decoding), scrambling (or descrambling), modulation (or demodulation), layer mapping (layer) mapping) (or layer demapping).
- O-RAN DU when the DU 160 conforms to the O-RAN standard, it may be referred to as an O-DU (O-RAN DU).
- the DU 160 may be replaced with a first network entity for a base station (eg, gNB) in embodiments of the present disclosure.
- a base station eg, gNB
- the RU 180 may be in charge of a lower layer function of the wireless network.
- the RU 180 may perform a part of the PHY layer, an RF function.
- a part of the PHY layer is performed at a relatively lower stage than the DU 160 among the functions of the PHY layer.
- IFFT conversion or FFT conversion
- CP insertion CP removal
- digital beamforming may include An example of this specific functional separation is detailed in FIG. 4 .
- RU 180 is an 'access unit (AU) ', 'access point (access point, AP)', 'transmission / reception point (transmission / reception point, TRP)', 'remote radio equipment (remote radio head, RRH) ) ', 'radio unit (RU)' or other terms having an equivalent technical meaning may be referred to.
- AU access unit
- AP access point
- TRP transmission / reception point
- RRH remote radio head
- RU radio head
- the DU 160 may be replaced with a second network entity for a base station (eg, gNB) in embodiments of the present disclosure.
- gNB base station
- FIG. 1B illustrates that the base station includes a DU and an RU
- the base station is configured to perform a function of a centralized unit (CU) configured to perform a function of upper layers (eg, packet data convergence protocol, RRC) of an access network and a lower layer
- CU centralized unit
- RRC packet data convergence protocol
- the distributed unit (DU) may include a digital unit (DU) and a radio unit (RU) of FIG. 1B .
- the base station may be implemented in a structure in which CUs, DUs, and RUs are arranged in order.
- An interface between a CU and a distributed unit (DU) may be referred to as an F1 interface.
- a centralized unit may be connected to one or more DUs, and may be in charge of a function of a higher layer than the DU.
- the CU may be responsible for the functions of a radio resource control (RRC) and a packet data convergence protocol (PDCP) layer, and the DU and the RU may be responsible for the functions of a lower layer.
- the DU performs radio link control (RLC), media access control (MAC), and some functions (high PHY) of the PHY (physical) layer, and the RU may be responsible for the remaining functions (low PHY) of the PHY layer.
- a digital unit may be included in a distributed unit (DU) according to a distributed arrangement implementation of a base station.
- various embodiments of the present disclosure include an arrangement in which a base station including a CU or a DU without a CU is directly connected to the core network (that is, , CU and DU are integrated into one entity and implemented).
- FIG. 2 illustrates a configuration of a digital unit (DU) in a wireless communication system according to various embodiments of the present disclosure.
- the configuration illustrated in FIG. 2 may be understood as a configuration of the DU 160 of FIG. 1B as a part of a base station.
- Terms such as '... unit' and '... group' used below mean a unit that processes at least one function or operation, which may be implemented as hardware or software or a combination of hardware and software.
- the DU 160 may include a communication unit 210 , a storage unit 220 , and a control unit 230 .
- the communication unit 210 may perform functions for transmitting and receiving signals in a wired communication environment.
- the communication unit 210 may include a wired interface for controlling a direct connection between the device and the device through a transmission medium (eg, copper wire, optical fiber).
- a transmission medium eg, copper wire, optical fiber
- the communication unit 210 may transmit an electrical signal to another device through a copper wire or perform conversion between an electrical signal and an optical signal.
- the communication unit 210 may be connected to a radio unit (RU).
- the communication unit 210 may be connected to a core network or connected to a central unit (CU) or a distributed unit (DU) in a distributed arrangement.
- CU central unit
- DU distributed unit
- the communication unit 210 may perform functions for transmitting and receiving signals in a wireless communication environment. For example, the communication unit 210 may perform a function of converting a baseband signal and a bit stream according to a physical layer standard of the system. For example, when transmitting data, the communication unit 210 may generate complex symbols by encoding and modulating the transmitted bit stream. Also, when receiving data, the communication unit 210 may restore a received bit stream by demodulating and decoding the baseband signal. Also, the communication unit 210 may include a plurality of transmission/reception paths. Also, according to an embodiment, the communication unit 210 may be connected to the core network or connected to other nodes (eg, integrated access backhaul (IAB)).
- IAB integrated access backhaul
- the communication unit 210 may transmit and receive signals.
- the communication unit 210 may include at least one transceiver.
- the communication unit 210 may transmit a synchronization signal, a reference signal, system information, a message, a control message, a stream, control information, or data.
- the communication unit 210 may perform beamforming.
- the communication unit 210 may transmit and receive signals as described above. Accordingly, all or part of the communication unit 210 may be referred to as a 'transmitter', 'receiver', or 'transceiver'. In addition, in the following description, transmission and reception performed through a wireless channel may be used to mean that the above-described processing is performed by the communication unit 210 .
- the communication unit 210 may further include a backhaul communication unit for connecting to the core network or another base station.
- the backhaul communication unit may provide an interface for performing communication with other nodes in the network. That is, the backhaul communication unit converts a bit string transmitted from a base station to another node, for example, another access node, another base station, upper node, core network, etc. into a physical signal, and converts a physical signal received from another node into a bit string. can be converted
- the storage 220 may store data such as a basic program, an application program, and setting information for the operation of the DU 160 .
- the storage 220 may include a memory.
- the storage unit 220 may be configured as a volatile memory, a non-volatile memory, or a combination of a volatile memory and a non-volatile memory.
- the storage 220 may provide the stored data according to the request of the controller 230 .
- the controller 230 may control overall operations of the DU 160 .
- the control unit 230 may transmit and receive a signal through the communication unit 210 (or through the backhaul communication unit).
- the control unit 230 may write and read data in the storage unit 220 .
- the control unit 230 may perform functions of a protocol stack required by the communication standard.
- the controller 230 may include at least one processor.
- the controller 230 controls a section extension field including a parameter indicating whether a layer is nulled with respect to a control message (eg, section type 5). field) can be set.
- the controller 230 may control the DU 160 to perform operations according to various embodiments to be described later.
- the configuration of the DU 160 shown in FIG. 2 is only an example, and examples of DUs performing various embodiments of the present disclosure from the configuration shown in FIG. 2 are not limited. According to various embodiments, some configurations may be added, deleted, or changed.
- FIG. 3 illustrates a configuration of a radio unit (RU) in a wireless communication system according to various embodiments of the present disclosure.
- the configuration illustrated in FIG. 3 may be understood as a configuration of the RU 180 of FIG. 1B as a part of a base station.
- Terms such as '... unit' and '... group' used below mean a unit that processes at least one function or operation, which may be implemented as hardware or software or a combination of hardware and software.
- the RU 180 may include a communication unit 310 , a storage unit 320 , and a control unit 330 .
- the communication unit 310 may perform functions for transmitting and receiving signals through a wireless channel. For example, the communication unit 310 may up-convert a baseband signal into a radio frequency (RF) band signal, transmit it through an antenna, and down-convert an RF band signal received through the antenna into a baseband signal.
- the communication unit 310 may include a transmission filter, a reception filter, an amplifier, a mixer, an oscillator, a digital-to-analog converter (DAC), an analog-to-digital converter (ADC), and the like.
- DAC digital-to-analog converter
- ADC analog-to-digital converter
- the communication unit 310 may include a plurality of transmission/reception paths. Furthermore, the communication unit 310 may include an antenna unit. The communication unit 310 may include at least one antenna array composed of a plurality of antenna elements. In terms of hardware, the communication unit 310 may include a digital circuit and an analog circuit (eg, a radio frequency integrated circuit (RFIC)). Here, the digital circuit and the analog circuit may be implemented as one package. Also, the communication unit 310 may include a plurality of RF chains. The communication unit 310 may perform beamforming. The communication unit 310 may apply a beamforming weight to a signal to be transmitted/received in order to provide directionality according to the setting of the control unit 330 to the signal. According to an embodiment, the communication unit 310 may include a radio frequency (RF) block (or RF unit).
- RF radio frequency
- the communication unit 310 may transmit/receive a signal.
- the communication unit 310 may include at least one transceiver.
- the communication unit 310 may transmit a downlink signal.
- the downlink signal includes a synchronization signal (SS), a reference signal (RS) (eg, a cell-specific reference signal (CRS), a demodulation (DM)-RS), and system information (eg, master information (MIB)).
- SS synchronization signal
- RS reference signal
- CRS cell-specific reference signal
- DM demodulation
- MIB master information
- SIB system information block
- SIB system information block
- RMSI remaining system information
- OSI other system information
- the communication unit 310 may receive an uplink signal.
- the uplink signal includes a random access-related signal (eg, a random access preamble (RAP) (or Msg1 (message 1)), Msg3 (message 3)), a reference signal (eg, a sounding reference signal (SRS), DM). -RS), or a power headroom report (PHR), and the like.
- RAP random access preamble
- Msg1 messagessage 1
- Msg3 messagessage 3
- a reference signal eg, a sounding reference signal (SRS), DM).
- SRS sounding reference signal
- DM DM
- -RS power headroom report
- PHR power headroom report
- the communication unit 310 may transmit and receive signals as described above. Accordingly, all or part of the communication unit 310 may be referred to as a 'transmitter', 'receiver', or 'transceiver'. In addition, in the following description, transmission and reception performed through a wireless channel are used in the meaning of including processing as described above by the communication unit 310 .
- the storage unit 320 stores data such as a basic program, an application program, and setting information for the operation of the RU 180 .
- the storage unit 320 may be configured as a volatile memory, a non-volatile memory, or a combination of a volatile memory and a non-volatile memory.
- the storage unit 320 may provide stored data according to the request of the control unit 330 .
- the controller 330 may control overall operations of the RU 180 .
- the control unit 330 may transmit and receive signals through the communication unit 310 .
- the control unit 330 may write and read data in the storage unit 320 .
- the control unit 330 may perform the functions of the protocol stack required by the communication standard.
- the controller 330 may include at least one processor.
- the controller 330 beams in a zero-forcing (ZF) method based on a control message (eg, section type 5) received from the DU 160 to be applied to a downlink signal.
- a beamforming weight (BFW) may be calculated.
- the controller 330 may control the RU 180 to perform operations according to various embodiments to be described later.
- the configuration of the RU 180 shown in FIG. 3 is only an example, and examples of RUs performing various embodiments of the present disclosure from the configuration shown in FIG. 3 are not limited. According to various embodiments, some configurations may be added, deleted, or changed.
- 5G communication system e.g, 5 th generation (5G) communication system (or introduction of NR (new radio) communication system)
- 5G 5 th generation
- NR new radio
- the frequency band used further increases and the cell radius of the base station becomes very small.
- the number of RUs required to be installed has further increased
- the amount of data transmitted has increased by more than 10 times, and the transmission capacity of the wired network transmitted through the fronthaul has greatly increased. Due to these factors, the installation cost of the wired network in the 5G communication system may increase significantly.
- the DU (digital unit) modem Techniques for lowering the fronthaul transmission capacity by transferring some functions of a modem to a radio unit (RU) have been proposed, and these techniques may be referred to as 'function split'.
- a method of extending the role of the RU responsible for only a radio frequency (RF) function to some functions of the physical layer is considered.
- the throughput of the RU may increase to increase the transmission bandwidth in the fronthaul, and at the same time, the delay time requirement constraint due to the response processing may be lowered.
- the virtualization gain decreases and the size/weight/cost of the RU increases.
- MAC medium access control
- the base station In the case of downlink (DL) transmitting a signal to a terminal through a wireless network, the base station sequentially performs channel encoding/scrambling, modulation, layer mapping, antenna mapping, resource element (RE) mapping, digital beamforming (eg: precoding), inverse fast fourier transform (IFFT) transform/cyclic prefix (CP) insertion, and RF transform may be performed.
- the base station In the case of uplink (UL) receiving a signal from a terminal through a wireless network, the base station sequentially performs RF conversion, fast fourier transform (FFT) conversion/CP removal, and digital beamforming (pre-combining).
- FFT fast fourier transform
- the first separation of functions 405 may be separation of RF functions and PHY functions.
- the first separation of functions is a case in which the PHY function within the RU is not substantially implemented, and may be referred to as, for example, Option 8.
- the second function separation 410 allows the RU to perform IFFT transform/CP insertion and UL to FFT transform/CP removal of the PHY function, and allows the DU to perform the remaining PHY functions.
- the second function separation 410 may be referred to as Option 7-1.
- the third function separation 420a allows the RU to perform DL-to-IFFT transformation/CP insertion and UL-to-FFT transformation/CP removal and digital beamforming of the PHY function, and allows the DU to perform the remaining PHY functions.
- the third function separation 420a may be referred to as Option 7-2x Category A.
- the fourth function separation 420b allows the RU to perform digital beamforming in both DL and UL, and the DU to perform higher PHY functions after digital beamforming.
- the fourth function separation 420b may be referred to as Option 7-2x Category B.
- the fifth function separation 425 allows the RU to perform up to RE mapping (or RE demapping) in both DL and UL, and allows the DU to perform higher PHY functions after RE mapping (or RE demapping).
- the fifth function separation 425 may be referred to as Option 7-2.
- the sixth function separation 430 allows the RU to perform modulation (or demodulation) in both DL and UL, and allows the DU to perform higher-order PHY functions until modulation (or demodulation).
- the sixth function separation 430 may be referred to as Option 7-3.
- the seventh function separation 440 allows the RU to perform encoding/scrambling (or decoding/descrambling) in both the DL and UL, and the DU to perform subsequent higher-order PHY functions until modulation (or demodulation).
- the seventh function separation 440 may be referred to as Option 6.
- function separation eg, the fourth function separation 420b
- separation of functions at a too high layer may cause a burden on the implementation of the RU because the control interface becomes complicated and a plurality of PHY processing blocks in the RU are included.
- Appropriate separation of functions may be required depending on the arrangement and implementation of RUs and RUs.
- the third function separation 420a or lower functions Separation eg, second function separation 410
- the fourth function separation 420b or higher function separation eg, the sixth function separation 430
- various embodiments in the present disclosure will be based on the third function separation 420a (category A) or the fourth function separation 420b (category B) for performing beamforming processing in the RU, unless otherwise limited. Although described, it does not exclude the configuration of the embodiment through other functional separations.
- the functional configuration, signaling, or operation of FIGS. 5 to 10 which will be described later, may be applied not only to the third function separation 420a or the fourth function separation 420b but also to other function separations.
- a message when a message is transmitted between a DU (eg, the DU 160 of FIG. 1B ) and an RU (eg, the RU 180 of FIG. 1B ), the standards of eCPRI and O-RAN as a fronthaul interface are It is exemplarily described.
- An eCPRI header and an O-RAN header, and additional fields may be included in the Ethernet payload of the message.
- various embodiments of the present disclosure are described using standard terms of eCPRI or O-RAN, but other expressions having the same meaning as each term may be used instead of various embodiments of the present disclosure.
- Ethernet and eCPRI which are easy to share with a network
- the eCPRI header and the O-RAN header may be included in the Ethernet payload.
- the eCPRI header may be located in front of the Ethernet payload.
- the contents of the eCPRI header are as follows.
- ⁇ ecpriRtcid / ecpriPcid (2 bytes): x, y, z can be configured through the management plane (M-plane).
- This field may indicate a transmission path (extended antenna-carrier (eAxC) in eCPRI) of a control message according to various embodiments during multi-layer transmission.
- ⁇ CU_Port_ID (x bits): Identifies the channel card. Classification possible including modem (2 bits for channel card, 2 bits for Modem)
- BandSector_ID (y bits): Classified according to Cell/Sector
- CC_ID (z bits): Classified according to component carrier
- RU_Port_ID (w bits): classified according to layer, T, antenna, etc.
- Sequence ID is managed by ecpriRtcid/ecpriPcid, and Sequence ID and subsequence ID are separately managed. Radio-transport-level fragmentation is possible using Subsequence ID (different from Application-level fragmentation)
- the application protocol of the fronthaul is a control plane (C-plane), a user plane (U-plane), a synchronization plane (S-plane), and a management plane (M -plane) may be included.
- C-plane control plane
- U-plane user plane
- S-plane synchronization plane
- M -plane management plane
- the control plane may be configured to provide scheduling information and beamforming information through a control message.
- the user plane may include user's downlink data (IQ data or SSB/RS), uplink data (IQ data or SRS/RS), or PRACH data.
- the above-described weight vector of the beamforming information may be multiplied by the user's data.
- the sync plane may be related to timing and synchronization.
- the management plane may be related to initial setup, non-realtime reset or reset, and non-realtime report.
- Section Type may indicate the purpose of a control message transmitted in the control plane.
- the uses for each section type are as follows.
- sectionType 0: DL idle/guard periods - Tx blanking for power saving
- SectionType 1: Map BF index or weight (O-RAN mandatory BF method) to RE of DL/UL channel
- sectionType 3: Map beamforming index or weight to RE of PRACH and mixed-numerology channel
- sectionType 7: used for LAA support
- terminals 501, 503, 505, and 507 are scheduled to the base station 510
- terminals 509, 511, and 513 are scheduled to the base station 530
- 520 and 540 are each of the base stations ( It is assumed that coverage of 510 and 530 is indicated.
- cooperative transmission may be referred to as cooperative multi-point (CoMP) transmission.
- the CoMP transmission technology is a technology in which two or more transmission cells cooperate to communicate with a terminal located at a cell boundary, thereby reducing ICI and increasing throughput.
- CoMP transmission technology avoids that base stations are scheduled with the same time/frequency resource based on sharing scheduling information between base stations (e.g., cooperative scheduling (CS)), or transmits the same data together (e.g., joint transmission (JT) )), or by allocating different spatial resources (beam patterns) to cell edge terminals (eg, cooperative beamforming (CB)), the reception performance of the terminal can be improved.
- CS cooperative scheduling
- JT joint transmission
- CB cooperative beamforming
- CB which is one of the CoMP transmission technologies, is a method of improving reception performance for a terminal by setting a beamforming weight to a terminal located at a cell boundary in such a way that adjacent base stations minimize interference.
- base stations 510 and 530 may estimate downlink channel information for the terminal 509 and utilize it for scheduling for downlink transmission.
- the downlink signal of the base station 510 transmitted using the same time/frequency resource for the downlink signal transmitted from the base station 530 to the terminal 509 is It may act as an ICI and cause deterioration of the reception performance of the terminal 509 .
- the base station 510 transmits a downlink signal to the terminals 501 , 503 , and 505 using the same time/frequency resource as that of the base station 530 , but beam nulling in the direction to the terminal 509 .
- the beamforming weight to be nulling it is possible to improve the reception performance of the terminal 509 .
- the base station 510 may be configured with RU #1 and DU, and the base station 530 may include RU #2 and DU.
- each cell is configured in a different RU but connected to one DU, so that the DU may be configured to collect channel information in each RU.
- the base station 510 may be configured with RU #1 and DU #1, and the base station 530 may be configured with RU #2 and DU #2.
- RU #1 and DU #1 may be connected through a fronthaul interface, and RU #2 and DU #2 may be connected through a fronthaul interface.
- DU #1 and DU #2 may use a backhaul interface (eg, X2, XN) to share channel information in each cell with each other.
- the base station 510 performs multi-user (MU) beamforming
- transmitting the beamformed signal to the terminal 509 scheduled to the adjacent base station 530 is ICI to the terminal 509 .
- the ICI problem may be further exacerbated. Therefore, as the base station 510, it is necessary to null the beam in the direction of the terminal 509 located at the cell boundary.
- the DU 160 may transmit scheduling information to the RU 180 through a control message (eg, section type 5).
- the scheduling information may be resource information indicating UEs scheduled for one or more layers included in a resource block (RB) to be transmitted by the RU 180 . Accordingly, the scheduling information only indicates the UE allocated to the resource on the RB, and does not indicate whether to null the corresponding layer. If the RU 180 performs MU beamforming based only on such scheduling information, the reception performance of the UE located at the cell boundary is inevitably deteriorated due to ICI. Accordingly, the DU 160 needs to indicate the nulling layer to the RU 180 .
- channel information of terminals existing within cell coverage, scheduling information, and information on the nulling layer may be required. That is, channel information may be required to obtain a beamforming weight, and scheduling information and information on a nulling layer may be required to indicate whether a specific layer on a specific RB is nulled. Accordingly, in order to reduce overhead, it is necessary to transmit scheduling information and information on a nulling layer together.
- the DU 160 may transmit downlink channel information regarding terminals existing within cell coverage to the RU 180 through the first control message.
- the DU 160 may transmit to the RU 180 information about a UE scheduled for a resource on the RB and information indicating whether to null for each layer through the second control message.
- the RU 180 may generate a multi-user (MU) channel matrix based on the first control message.
- the RU 180 may obtain a beamforming weight by nulling a specific layer based on the generated MU channel matrix and the second control message.
- the RU 180 may transmit a downlink signal by applying beamforming to transmission data based on the generated beamforming weight.
- MU multi-user
- the ICI problem can be minimized as a terminal located at the cell boundary.
- the RU 180 allocates power to be allocated to the nulled layer to another layer and transmits it, the transmission performance of the RU 180 may also be improved.
- the beamforming weight is obtained including the channel information of the terminal, the beam transmitted to the scheduled terminal is transmitted to the terminal located at the cell boundary as ICI. can be prevented from affecting it.
- This technique can also be applied to an NR communication system.
- a channel state information resource indicator (CRI) or an SS/PBCH block resource indicator (SSBRI) may be used. Nulling may be achieved by not applying a beamforming weight (precoding) related to a corresponding resource indicator within a cell.
- precoding beamforming weight
- FIG. 6 illustrates an operation flow of a radio unit (RU) for beam nulling according to various embodiments of the present disclosure.
- the RU 180 may receive information necessary for beamforming weight calculation from a digital unit (DU) 160 .
- the RU 180 may receive information necessary for beamforming weight calculation from the DU 160 through a fronthaul.
- information necessary for calculating the beamforming weight may include a nulling dimension indicator.
- the nulling dimension indicator may indicate whether nulling is performed for each layer on the RB.
- the RU 180 may periodically receive the nulling dimension indicator from the DU 160 through section type 5 . A period in which the nulling dimension indicator is received may be the same as a slot that is a time unit of scheduling.
- the information necessary for calculating the beamforming weight may include scheduling information.
- the scheduling information may include resource information about UEs scheduled for each layer on a resource block (RB).
- the RU 180 may periodically receive scheduling information from the DU 160 through section type 5. A period in which scheduling information is received may be the same as a slot, which is a time unit of scheduling.
- the RU 180 may receive the nulling dimension indicator and scheduling information from the DU 160 together through section type 5. That is, the RU 180 may reduce a fronthaul overhead by transmitting a nulling dimension indicator and scheduling information together.
- information necessary for calculating the beamforming weight may include channel information.
- the channel information may include downlink channel information for terminals included in the coverage of the base station.
- the channel information may include downlink channel information for UEs scheduled by the RU 180 .
- the RU 180 may periodically receive channel information from the DU 160 through section type 6 .
- a period in which channel information is received may be longer than a slot, which is a scheduling time unit.
- the RU 180 may obtain a beamforming weight.
- the RU 180 may obtain a beamforming weight based on a zero-forcing (ZF) method.
- the RU 180 may generate a multi-user (MU) channel matrix based on the received channel information.
- the MU channel matrix may be generated by overlapping the received channel information for each of the terminals with different layers. That is, the RU 180 may generate an MU channel matrix including both channel information for a terminal to be actually scheduled and channel information for a terminal to be nulled.
- the RU 180 may obtain an inverse matrix for the generated MU channel matrix.
- the RU 180 may acquire nulling layer zero-masking based on the nulling dimension indicator for the obtained inverse matrix.
- the nulling layer zero masking may be a method of substituting a zero vector for a component corresponding to the layer of the terminal to be nulled among the components of the obtained inverse matrix.
- the RU 180 may obtain a beamforming weight by performing a power normalization operation after performing nulling layer zero masking.
- the power normalization operation may be performed to allocate the same transmit power to each layer or to prevent transmit power per antenna from exceeding a reference value.
- the ZF method has been described in operation 620, this is only an example, and various embodiments of the present disclosure may obtain a beamforming weight for nulling a beam for one or more terminals based on a nulling dimension indicator. there is.
- the RU 180 may apply beamforming to the transmitted data.
- the RU 180 may apply beamforming to the transmission data by multiplying the obtained beamforming weight by the transmission data for each layer. Accordingly, the downlink signal to which beamforming is applied will be transmitted to minimize inter cell interference (ICI) in the direction of the nulled terminal.
- ICI inter cell interference
- the RU 180 may perform CB transmission by obtaining a beamforming weight based on channel information of terminals within coverage and a nulling dimension indicator. That is, in order to perform CB transmission, the RU 180 must be able to identify a nulling layer. However, referring to the xRAN/ORAN standard, since a field indicating whether a layer is nulled is not defined in the scheduling information transmitted by the DU 160 to the RU 180 , the CB transmission method cannot be supported. As a result, in order to support the CB transmission scheme, it is necessary to include information indicating whether each layer is null in the scheduling information.
- FIG. 7 illustrates a frame format of an extended section of a control message according to various embodiments of the present disclosure.
- the frame format of the extended session indicating whether or not null for one layer is described.
- control message may be referred to as section type 5, and the extended section of the control message includes an extension flag (ef), an extension type (extType), and an extension length (extension). length, extLen), and may include a null dimension indicator (nullDimensionInd).
- the extension flag may indicate that there is a section extension after a header.
- the extension flag is 1-bit information and may indicate that there is a section extension using 0 or 1. That is, the extension flag indicates that a parameter additionally defined in section type 5 exists after the header, thereby providing extensibility for the parameter of section type 5 without the need to create a new section type.
- the extension flag may be disposed after a beam identifier (beamId) or user equipment identifier (ueId) field.
- the extension type may indicate the type of an additionally provided parameter.
- the extension type may consist of 7 bits of information.
- the extension length may indicate the length of the section extension.
- the extended length may consist of 8 to 16 bits of information.
- a radio unit RU may identify that an additionally provided parameter is information indicating whether one layer is null.
- the null dimension indicator may indicate whether a layer corresponding to the control message is nulled.
- the null dimension indicator may be composed of 8 bits of information.
- the RU may calculate a beamforming weight based on a zero-forcing (ZF) method based on the null dimension indicator. For example, when the null dimension indicator indicates that the layer corresponding to the control message is null, the RU may perform zero-masking on the corresponding layer in operation 630 .
- ZF zero-forcing
- the RU 180 receiving it can identify a nulling layer.
- FIG. 8 illustrates a frame format of an extended section of a control message according to various embodiments of the present disclosure.
- a frame format of an extended session indicating whether null for a plurality of layers is described.
- the control message may be referred to as section type 5, and the extended section of the control message includes an extension flag (ef), an extension type (extType), and an extension length ( extension length, extLen).
- the extended section of the control message when utilized together with extension type 10, includes one or more null indicators (eg, null dimension indicator, nullDimensionInd) of the first port (1 st port), the second a null dimension indicator of the 2nd port, a null dimension indicator of a third port, and a null dimension indicator of a fourth port). That is, when used together with extension type 10, since a plurality of null dimension indicators can be transmitted with one control message, overhead in the control plane can be reduced.
- null indicators eg, null dimension indicator, nullDimensionInd
- the extension flag may indicate that there is a section extension after a header.
- the extension flag is 1-bit information and may indicate that there is a section extension using 0 or 1.
- the extension flag may be disposed after a beam identifier (beamId) or user equipment identifier (ueId) field. That is, the extension flag indicates that a parameter additionally defined in section type 5 exists after the header, thereby providing extensibility for the parameter of section type 5 without the need to create a new section type.
- the extension type may indicate the type of an additionally provided parameter.
- the extension type may consist of 7 bits of information.
- the extension length may indicate the length of the section extension.
- the extended length may consist of 8 to 16 bits of information.
- a radio unit RU may identify that an additionally provided parameter is information indicating whether the four layers are null.
- the null dimension indicator of the first port may indicate whether a layer corresponding to antenna port 1 of the RU is null.
- the null dimension indicator of the second port may indicate whether a layer corresponding to antenna port 2 of the RU is null.
- the null dimension indicator of the third port may indicate whether the layer corresponding to the antenna port 3 of the RU is null.
- the null dimension indicator of the fourth port may indicate whether a layer corresponding to antenna port 4 of the RU is null.
- null indicators for four ports
- the extended session may include four or more null indicators (eg, 8, 16, 32) dogs, 64, etc.).
- each nulling dimension indicator is included in a control message including information on UEs scheduled for each layer, so that the RU 180 receiving the nulling layer can be identified.
- FIG. 9 illustrates a signal flow for setting a nulling dimension function according to various embodiments of the present disclosure.
- the operations shown in FIG. 9 may be performed during a cell-setup process or a cell operation process.
- a digital unit (DU) 160 may receive a nulling capability report from a radio unit (RU) 180 .
- the nulling capability report may include a parameter regarding whether the RU 180 supports a function of generating a beamforming weight in consideration of a nulling layer.
- a management plane (mplane) parameter may be configured as shown in Table 1 below.
- Module o-ran-uplane-conf +--rw module-capability +--ro ru-capabilities
- the DU 160 may transmit a nulling configuration to the RU 180 .
- the nulling configuration may include a parameter instructing the RU 180 to activate or deactivate a function for generating a beamforming weight in consideration of a nulling layer.
- management plane parameters may be configured as shown in Table 2 below.
- FIG. 10 illustrates an example of a connection between a DU and an RU according to an embodiment of the present disclosure.
- the above-described embodiments according to the present disclosure have been described on the premise that the base station 510 and the base station 530 perform cooperative multi-point (CoMP) transmission.
- embodiments according to the present disclosure may also be applied between a plurality of radio units (RUs) connected to one digital unit (DU).
- RUs radio units
- DU digital unit
- a DU may be connected to a plurality of RUs.
- CoMP transmission may be performed.
- the DU provides channel information and nulling layer to O-RU #0. By transmitting the information on , the downlink signal transmitted by O-RU #0 can be adjusted to be beam nulled in the direction to the terminal.
- a DU may be connected to various types of RUs.
- the RU is shown to perform CoMP based on the nulling indicator.
- the DU according to embodiments of the present disclosure transmits a nulling indicator to the RU, and the RU calculates a beamforming weight based on a nulling layer according to the nulling indicator, thereby performing MU-MIMO with high performance gain.
- the DU identifies the capability of the RU, and does not transmit a nulling layer indicator to the RU It is also one of the present disclosure It can be understood as an embodiment.
- the DU may receive a nulling capability report from a plurality of RUs connected through a fronthaul.
- the DU does not establish an extended session to an RU that does not support a function of generating a beamforming weight in consideration of a nulling layer based on the received nulling capability report, thereby leading to fronthaul overhead (overhead) can be reduced.
- a digital unit is a nulling layer in section type 5
- a technique for constructing a section extension field that includes parameters related to ? has been described. Specifically, referring to ORAN, which is a standard for technical specifications, section type 5 including information about a UE scheduled for a layer on the RB does not include a parameter indicating whether a nulling layer is present, so according to the content of the current specification The CB scheme cannot be implemented.
- a beam for a terminal located at a cell boundary can be nulled by applying the beamforming weight generated in the method to a downlink signal. That is, according to various embodiments of the present disclosure, it is possible to reduce inter cell interference (ICI) and increase throughput from the viewpoint of the terminal located at the cell boundary, and by nulling one or more beams from the viewpoint of the base station. , interference between adjacent beams can be reduced, and power that would have been allocated to the nulling layer can be allocated to another layer, so that the transmission performance of the base station can be improved.
- ICI inter cell interference
- a method performed by a digital unit (DU) of a base station in a wireless communication system includes a process of identifying a nulling layer, and a first including information about the nulling layer. It may include transmitting a control message to a radio unit (RU) of the base station.
- DU digital unit
- RU radio unit
- the information on the nulling layer may indicate a layer to which a signal is not transmitted during multi-user (MU) beamforming.
- MU multi-user
- the first control message further includes scheduling information, and the scheduling information includes resource allocation information about UEs scheduled to one or more layers of a resource block (RB), and the one or more The layers may include the nulling layer.
- scheduling information includes resource allocation information about UEs scheduled to one or more layers of a resource block (RB), and the one or more The layers may include the nulling layer.
- the method includes transmitting a second control message including downlink channel information for terminals within the coverage of the base station to the RU, the first control message and the second control
- the message may be transmitted in a control plane.
- the method includes transmitting a third control message including a parameter for deactivating a layer nulling function to the RU, and the third control message is to be transmitted in a management plane.
- a method performed by a radio unit (RU) of a base station in a wireless communication system includes a process of receiving a first control message in which a section extension field is set from a digital unit (DU) of the base station; , receiving a second control message including downlink channel information for terminals within the coverage of the base station from the DU, and beamforming based on the first control message and the second control message
- the method may include calculating a beamforming weight (BFW) and transmitting a downlink signal based on the BFW, and the first control message may include scheduling information.
- BFW beamforming weight
- the scheduling information includes a parameter indicating one or more terminals scheduled to one or more layers of a resource block (RB), and the section extension field includes a nulling dimension ( nulling dimension) or not).
- the process of calculating a beamforming weight (BFW) based on the first control message and the second control message includes a ZF based on the downlink channel information and the section extension field. It may include a process of calculating the BFW in a (zero-forcing) method.
- the first control message and the second control message may be received in a control plane.
- the method includes receiving a third control message including a parameter for deactivating a layer nulling function from the RU, wherein the third control message is to be received in a management plane.
- a digital unit (DU) of a base station in a wireless communication system includes at least one transceiver and at least one processor operatively connected to the at least one transceiver, and the at least one processor may be configured to identify a nulling layer and transmit a first control message including information on the nulling layer to a radio unit (RU) of the base station.
- RU radio unit
- the information on the nulling layer may indicate a layer to which a signal is not transmitted during multi-user (MU) beamforming.
- MU multi-user
- the first control message further includes scheduling information, and the scheduling information includes resource allocation information about UEs scheduled in one or more layers of a resource block (RB), and the one or more The layers may include the nulling layer.
- the scheduling information includes resource allocation information about UEs scheduled in one or more layers of a resource block (RB), and the one or more The layers may include the nulling layer.
- the at least one processor is configured to transmit a second control message including downlink channel information for terminals within coverage of the base station to the RU to the RU, and the first control message and the second control message may be transmitted in a control plane.
- the at least one processor may be configured to transmit a third control message including a parameter for deactivating a layer nulling function in a management plane.
- a radio unit (RU) of a base station in a wireless communication system includes at least one transceiver and at least one processor operatively connected to the at least one transceiver, the at least one processor receives a first control message in which a section extension field is set from a digital unit (DU) of the base station, and transmits a second control message including downlink channel information for terminals within coverage of the base station to the DU configured to receive from , calculate a beamforming weight (BFW) based on the first control message and the second control message, and transmit a downlink signal based on the BFW,
- the control message may include scheduling information.
- the scheduling information includes a parameter indicating one or more terminals scheduled to one or more layers of a resource block (RB), and the section extension field includes a nulling dimension ( nulling dimension) or not).
- the at least one processor may be configured to calculate the BFW in a zero-forcing (ZF) method based on the downlink channel information and the section extension field.
- ZF zero-forcing
- the at least one processor may be configured to receive the first control message and the second control message in a control plane.
- the at least one processor may be configured to receive, in a management palne, a third control message including a parameter for deactivating a layer nulling function.
- a computer-readable storage medium storing one or more programs (software modules) may be provided.
- One or more programs stored in the computer-readable storage medium are configured to be executable by one or more processors in an electronic device (device).
- One or more programs include instructions for causing an electronic device to execute methods according to embodiments described in a claim or specification of the present disclosure.
- Such programs include random access memory, non-volatile memory including flash memory, read only memory (ROM), electrically erasable programmable ROM (electrically erasable programmable read only memory, EEPROM), magnetic disc storage device, compact disc-ROM (CD-ROM), digital versatile discs (DVDs), or other It may be stored in an optical storage device or a magnetic cassette. Alternatively, it may be stored in a memory composed of a combination of some or all thereof. In addition, each configuration memory may be included in plurality.
- non-volatile memory including flash memory, read only memory (ROM), electrically erasable programmable ROM (electrically erasable programmable read only memory, EEPROM), magnetic disc storage device, compact disc-ROM (CD-ROM), digital versatile discs (DVDs), or other It may be stored in an optical storage device or a magnetic cassette. Alternatively, it may be stored in a memory composed of a combination of some or all thereof. In addition, each configuration memory may be included in plurality.
- the program is transmitted through a communication network consisting of a communication network such as the Internet, an intranet, a local area network (LAN), a wide area network (WAN), or a storage area network (SAN), or a combination thereof. It may be stored on an attachable storage device that can be accessed. Such a storage device may be connected to a device implementing an embodiment of the present disclosure through an external port. In addition, a separate storage device on the communication network may be connected to the device implementing the embodiment of the present disclosure.
- a communication network such as the Internet, an intranet, a local area network (LAN), a wide area network (WAN), or a storage area network (SAN), or a combination thereof. It may be stored on an attachable storage device that can be accessed.
- Such a storage device may be connected to a device implementing an embodiment of the present disclosure through an external port.
- a separate storage device on the communication network may be connected to the device implementing the embodiment of the present disclosure.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
본 개시(disclosure)는 LTE(long term evolution)와 같은 4G(4th generation) 통신 시스템 이후 보다 높은 데이터 전송률을 지원하기 위한 5G(5th generation) 또는 pre-5G 통신 시스템에 관한 것이다. 본 개시의 다양한 실시 예들에 따르면, 무선 통신 시스템에서, 기지국의 DU(digital unit)에 의해 수행되는 방법은, 제1 제어 메시지에 부가 정보를 포함하는 섹션 확장 필드(section extension field)를 설정하는 과정과, 상기 제1 제어 메시지를 상기 기지국의 RU(radio unit)에게 전송하는 과정을 포함할 수 있고, 상기 제1 제어 메시지는 상기 기지국에 스케줄링 된 하나 이상의 단말들에 관한 정보를 포함할 수 있다.
Description
본 개시(disclosure)는 일반적으로 무선 통신 시스템에 관한 것으로, 보다 구체적으로 무선 통신 시스템에서 프론트홀(fronthaul) 전송을 위한 장치 및 방법에 관한 것이다.
4G(4th generation) 통신 시스템 상용화 이후 증가 추세에 있는 무선 데이터 트래픽 수요를 충족시키기 위해, 개선된 5G(5th generation) 통신 시스템 또는 pre-5G 통신 시스템을 개발하기 위한 노력이 이루어지고 있다. 이러한 이유로, 5G 통신 시스템 또는 pre-5G 통신 시스템은 4G 네트워크 이후(Beyond 4G Network) 통신 시스템 또는 LTE(Long Term Evolution) 시스템 이후(Post LTE) 시스템이라 불리어지고 있다.
높은 데이터 전송률을 달성하기 위해, 5G 통신 시스템은 초고주파(mmWave) 대역(예를 들어, 60기가(60GHz) 대역과 같은)에서의 구현이 고려되고 있다. 초고주파 대역에서의 전파의 경로손실 완화 및 전파의 전달 거리를 증가시키기 위해, 5G 통신 시스템에서는 빔포밍(beamforming), 거대 배열 다중 입출력(massive MIMO), 전차원 다중입출력(Full Dimensional MIMO, FD-MIMO), 어레이 안테나(array antenna), 아날로그 빔형성(analog beam-forming), 및 대규모 안테나(large scale antenna) 기술들이 논의되고 있다.
또한 시스템의 네트워크 개선을 위해, 5G 통신 시스템에서는 진화된 소형 셀, 개선된 소형 셀(advanced small cell), 클라우드 무선 액세스 네트워크(cloud radio access network, cloud RAN), 초고밀도 네트워크(ultra-dense network), 기기 간 통신(Device to Device communication, D2D), 무선 백홀(wireless backhaul), 이동 네트워크(moving network), 협력 통신(cooperative communication), CoMP(Coordinated Multi-Points), 및 수신 간섭제거(interference cancellation) 등의 기술 개발이 이루어지고 있다.
이 밖에도, 5G 시스템에서는 진보된 코딩 변조(Advanced Coding Modulation, ACM) 방식인 FQAM(Hybrid Frequency Shift Keying and Quadrature Amplitude Modulation) 및 SWSC(Sliding Window Superposition Coding)과, 진보된 접속 기술인 FBMC(Filter Bank Multi Carrier), NOMA(Non Orthogonal Multiple Access), 및 SCMA(Sparse Code Multiple Access) 등이 개발되고 있다.
무선 통신 시스템에서 전송 용량이 증감함에 따라, 기지국을 기능적으로 분리하는 기능 분리(function split)가 적용되고 있다. 기능 분리에 따라, 기지국은 DU(digital unit), RU(radio unit)으로 분리될 수 있으며, DU 및 RU 간 통신을 위한 프론트홀(fronthaul)이 정의되고, 프론트홀을 통한 전송이 요구된다.
상술된 바와 같은 논의를 바탕으로, 본 개시(disclosure)는, 프론트홀(fronthaul) 인터페이스(interface)상에서 전송되는 제어 메시지를 구성하기 위한 방법 및 장치를 제공한다.
또한, 본 개시는, 무선 통신 시스템에서 DU(digital unit) 및 RU(radio unit) 운용 시, 셀 경계에 위치한 단말의 수신 성능을 개선하기 위한 방법 및 장치를 제공한다.
본 개시의 다양한 실시 예들에 따르면, 무선 통신 시스템에서 기지국의 DU(digital unit)에 의해 수행되는 방법은, 제1 제어 메시지에 부가 정보를 포함하는 섹션 확장 필드(section extension field)를 설정하는 과정과, 상기 제1 제어 메시지를 상기 기지국의 RU(radio unit)에게 전송하는 과정을 포함할 수 있고, 상기 제1 제어 메시지는 상기 기지국에 스케줄링 된 하나 이상의 단말들에 관한 정보를 포함할 수 있다.
본 개시의 다양한 실시 예들에 따르면, 무선 통신 시스템에서 기지국의 RU(radio unit)에 의해 수행되는 방법은 섹션 확장 필드가 설정된 제1 제어 메시지를 상기 기지국의 DU(digital unit)로부터 수신하는 과정과, 상기 기지국의 커버리지 내의 단말들에 대한 채널 정보를 포함하는 제2 제어 메시지를 상기 DU로부터 수신하는 과정과, 상기 제1 제어 메시지 및 상기 제2 제어 메시지에 기반하여, 빔포밍 가중치(beamforming weight, BFW)를 계산하는 과정과, 상기 BFW에 기반하여, 하향링크 신호를 전송하는 과정을 포함할 수 있다.
본 개시의 다양한 실시 예들에 따른 방법 및 장치는, 프론트홀(fronthaul)상에서 전송되는 제어 메시지에 널링 레이어(nulling layer) 여부를 지시하는 파라미터를 포함시킴으로써, CoMP(cooperative multi-point)에 따른 CB(cooperative beamforming)을 운용할 수 있게 한다.
본 개시에서 얻을 수 있는 효과는 이상에서 언급된 효과들로 제한되지 않으며, 언급되지 않은 또 다른 효과들은 아래의 기재로부터 본 개시가 속하는 기술 분야에서 통상의 지식을 가진 자에게 명확하게 이해될 수 있을 것이다.
도 1a는 본 개시의 다양한 실시 예들에 따른 무선 통신 시스템을 도시한다.
도 1b는 본 개시의 다양한 실시 예들에 따른 기지국의 기능적 분리(function split)에 따른 프론트홀(fronthaul) 구조의 예를 도시한다.
도 2는 본 개시의 다양한 실시 예들에 따른 무선 통신 시스템에서 DU(digital unit)의 구성을 도시한다.
도 3은 본 개시의 다양한 실시 예들에 따른 무선 통신 시스템에서 RU(radio unit)의 구성을 도시한다.
도 4는 본 개시의 다양한 실시 예들에 따른 무선 통신 시스템에서 기능 분리(function split)의 예를 도시한다.
도 5는 본 개시의 다양한 실시 예들에 따른 기지국들 간 협력 통신의 예를 도시한다.
도 6은 본 개시의 다양한 실시 예들에 따른 빔 널링(beam nulling)을 위한 RU의 동작 흐름을 도시한다.
도 7은 본 개시의 다양한 실시 예들에 따른 제어 메시지의 확장된 섹션(section)의 프레임 포맷(frame format)을 도시한다.
도 8은 본 개시의 다양한 실시 예들에 따른 제어 메시지의 확장된 섹션(section)의 프레임 포맷을 도시한다.
도 9는 본 개시의 다양한 실시 예들에 따른 널링 차원(nulling dimension) 기능 설정을 위한 신호 흐름을 도시한다.
도 10은 본 개시의 일 실시 예에 따른 DU 및 RU 간 연결의 예를 도시한다.
본 개시에서 사용되는 용어들은 단지 특정한 실시 예를 설명하기 위해 사용된 것으로, 다른 실시 예의 범위를 한정하려는 의도가 아닐 수 있다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함할 수 있다. 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 용어들은 본 개시에 기재된 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가질 수 있다. 본 개시에 사용된 용어들 중 일반적인 사전에 정의된 용어들은, 관련 기술의 문맥상 가지는 의미와 동일 또는 유사한 의미로 해석될 수 있으며, 본 개시에서 명백하게 정의되지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다. 경우에 따라서, 본 개시에서 정의된 용어일지라도 본 개시의 실시 예들을 배제하도록 해석될 수 없다.
이하에서 설명되는 본 개시의 다양한 실시 예들에서는 하드웨어적인 접근 방법을 예시로서 설명한다. 하지만, 본 개시의 다양한 실시 예들에서는 하드웨어와 소프트웨어를 모두 사용하는 기술을 포함하고 있으므로, 본 개시의 다양한 실시 예들이 소프트웨어 기반의 접근 방법을 제외하는 것은 아니다.
이하 설명에서 사용되는 신호를 지칭하는 용어(예: 메시지, 정보, 프리앰블, 신호, 시그널링(signaling), 시퀀스(sequence), 스트림(stream))), 자원을 지칭하는 용어(예: 심볼(symbol), 슬롯(slot), 서브프레임(subframe), 무선 프레임(radio frame), 서브캐리어(subcarrier), RE(resource element), RB(resource block), BWP(bandwidth part), 기회(occasion)), 연산 상태를 위한 용어(예: 단계(step), 동작(operation), 절차(procedure)), 데이터를 지칭하는 용어(예: 패킷, 사용자 스트림, 정보(information), 비트(bit), 심볼(symbol), 코드워드(codeword)), 채널을 지칭하는 용어, 제어 정보를 지칭하는 용어(예: DCI(downlink control information), MAC CE(medium access control element), RRC(radio resource control) signaling), 네트워크 객체(network entity)들을 지칭하는 용어, 장치의 구성 요소를 지칭하는 용어 등은 설명의 편의를 위해 예시된 것이다. 따라서, 본 개시가 후술되는 용어들에 한정되는 것은 아니며, 동등한 기술적 의미를 가지는 다른 용어가 사용될 수 있다.
또한, 본 개시에서, 특정 조건의 만족(satisfied), 충족(fulfilled) 여부를 판단하기 위해, 초과 또는 미만의 표현이 사용될 수 있으나, 이는 일 예를 표현하기 위한 기재일 뿐 이상 또는 이하의 기재를 배제하는 것이 아니다. '이상'으로 기재된 조건은 '초과', '이하'로 기재된 조건은 '미만', '이상 및 미만'으로 기재된 조건은 '초과 및 이하'로 대체될 수 있다.
또한, 본 개시는, 일부 통신 규격(예: 3GPP(3rd Generation Partnership Project), xRAN(extensible radio access network), O-RAN(open-radio access network)에서 사용되는 용어들을 이용하여 다양한 실시 예들을 설명하지만, 이는 설명을 위한 예시일 뿐이다. 본 개시의 다양한 실시 예들은, 다른 통신 시스템에서도, 용이하게 변형되어 적용될 수 있다.
도 1a는 본 개시의 다양한 실시 예들에 따른 무선 통신 시스템을 도시한다. 도 1a은 무선 통신 시스템에서 무선 채널을 이용하는 노드(node)들의 일부로서, 기지국(110), 단말(120), 단말(130)을 예시한다. 도 1a은 하나의 기지국만을 도시하나, 기지국(110)과 동일 또는 유사한 다른 기지국이 더 포함될 수 있다.
기지국(110)은 단말들(120, 130)에게 무선 접속을 제공하는 네트워크 인프라스트럭쳐(infrastructure)이다. 기지국(110)은 신호를 송신할 수 있는 거리에 기반하여 일정한 지리적 영역으로 정의되는 커버리지(coverage)를 가진다. 기지국(110)은 기지국(base station) 외에 '액세스 포인트(access point, AP)', '이노드비(eNodeB, eNB)', '5G 노드(5th generation node)', '지노드비(next generation nodeB, gNB)', '무선 포인트(wireless point)', '송수신 포인트(transmission/reception point, TRP)' 또는 이와 동등한 기술적 의미를 가지는 다른 용어로 지칭될 수 있다.
단말(120) 및 단말(130) 각각은 사용자에 의해 사용되는 장치로서, 기지국(110)과 무선 채널을 통해 통신을 수행한다. 기지국(110)에서 단말(120) 또는 단말(130)을 향하는 링크는 하향링크(downlink, DL), 단말(120) 또는 단말(130)에서 기지국(110)을 향하는 링크는 상향링크(uplink, UL)라 지칭된다. 또한, 단말(120) 및 단말(130)은 상호 간 무선 채널을 통해 통신을 수행할 수 있다. 이때, 단말(120) 및 단말(130) 간 링크(device-to-device link; D2D)는 사이드링크(sidelink)라 지칭되며, 사이드링크는 PC5 인터페이스와 혼용될 수 있다. 경우에 따라, 단말(120) 및 단말(130) 중 적어도 하나는 사용자의 관여 없이 운영될 수 있다. 즉, 단말(120) 및 단말(130) 중 적어도 하나는 기계 타입 통신(machine type communication, MTC)을 수행하는 장치로서, 사용자에 의해 휴대되지 아니할 수 있다. 단말(120) 및 단말(130) 각각은 단말(terminal) 외 '사용자 장비(user equipment, UE)', '고객 댁내 장치'(customer premises equipment, CPE), '이동국(mobile station)', '가입자국(subscriber station)', '원격 단말(remote terminal)', '무선 단말(wireless terminal)', 전자 장치(electronic device)', 또는 '사용자 장치(user device)' 또는 이와 동등한 기술적 의미를 가지는 다른 용어로 지칭될 수 있다.
기지국(110), 단말(120), 단말(130)은 빔포밍을 수행할 수 있다. 기지국과 단말은 상대적으로 낮은 주파수 대역(예: NR의 FR1(frequency range 1))에서 무선 신호를 송신 및 수신할 수 있다. 또한, 기지국과 단말은 상대적으로 높은 주파수 대역(예: NR의 FR2, 밀리미터 파(mmWave) 대역(예: 28GHz, 30GHz, 38GHz, 60GHz))에서 무선 신호를 송신 및 수신할 수 있다. 일부 실시 예들에서, 기지국(110)은 단말(120)과 FR1에 대응하는 주파수 범위 내에서 통신을 수행할 수 있다. 일부 실시 예들에서, 기지국은 단말(120)과 FR2에 대응하는 주파수 범위 내에서 통신을 수행할 수 있다. 이때, 채널 이득의 향상을 위해, 기지국(110), 단말(120), 단말(130)은 빔포밍(beamforming)을 수행할 수 있다. 여기서, 빔포밍은 송신 빔포밍 및 수신 빔포밍을 포함할 수 있다. 즉, 기지국(110), 단말(120), 단말(130)은 송신 신호 또는 수신 신호에 방향성(directivity)을 부여할 수 있다. 이를 위해, 기지국(110) 및 단말들(120, 130)은 빔 탐색(beam search) 또는 빔 관리(beam management) 절차를 통해 서빙(serving) 빔들을 선택할 수 있다. 서빙 빔들이 선택된 후, 이후 통신은 서빙 빔들을 송신한 자원과 QCL 관계에 있는 자원을 통해 수행될 수 있다.
제1 안테나 포트 상의 심볼을 전달한 채널의 광범위한(large-scale) 특성들이 제2 안테나 포트 상의 심볼을 전달한 채널로부터 추정될(inferred) 수 있다면, 제1 안테나 포트 및 제2 안테나 포트는 QCL 관계에 있다고 평가될 수 있다. 예를 들어, 광범위한 특성들은 지연 스프레드(delay spread), 도플러 스프레드(doppler spread), 도플러 쉬프트(doppler shift), 평균 이득(average gain), 평균 지연(average delay), 공간적 수신 파라미터(spatial receiver parameter) 중 적어도 하나를 포함할 수 있다.
도 1a에서는 기지국 및 단말 모두가 빔포밍을 수행하는 것으로 도시되었으나, 본 개시의 다양한 실시 예들이 반드시 이에 한정되는 것은 아니다. 일부 실시 예들에서, 단말은 빔포밍을 수행하거나 수행하지 않을 수 있다. 또한, 기지국은 빔포밍을 수행하거나 수행하지 않을 수 있다. 즉, 기지국 및 단말 중 어느 하나만 빔포밍을 수행하거나, 또는 기지국 및 단말 모두 빔포밍을 수행하지 않을 수도 있다.
본 개시에서 빔(beam)이란 무선 채널에서 신호의 공간적인 흐름을 의미하는 것으로서, 하나 이상의 안테나(혹은 안테나 엘리멘트들(antenna elements)들)에 의해 형성되고, 이러한 형성 과정은 빔포밍으로 지칭될 수 있다. 빔포밍은 아날로그 빔포밍과 디지털 빔포밍(예: 프리코딩)을 포함할 수 있다. 빔포밍에 기반하여 전송되는 기준 신호(reference signal)는, 예로, DM-RS(demodulation-reference signal), CSI-RS(channel state information-reference signal), SS/PBCH(synchronization signal/physical broadcast channel), SRS(sounding reference signal)를 포함할 수 있다. 또한, 각 기준 신호에 대한 구성(configuration)으로서, CSI-RS resource 혹은 SRS-resource 등과 같은 IE가 사용될 수 있으며, 이러한 구성은 빔과 연관된(associated with) 정보를 포함할 수 있다. 빔과 연관된 정보란, 해당 구성(예: CSI-RS resource)이 다른 구성(예: 동일한 CSI-RS resource set 내 다른 CSI-RS resource)과 동일한 공간 도메인 필터(spatial domain filter)를 사용하는지 아니면 다른 공간 도메인 필터를 사용하는지 여부, 또는 어떤 기준 신호와 QCL(quasi-co-located)되어 있는지, QCL 되어 있다면 어떤 유형(예: QCL type A, B, C, D)인지를 의미할 수 있다.
종래에, 비교적 기지국의 셀반경이 큰 통신 시스템에서, 각 기지국은 각 기지국이 디지털 처리부(digital processing unit, 또는 DU(digital unit)) 및 RF(radio frequency) 처리부(RF processing unit, 또는 RU(radio unit))의 기능을 포함하도록 설치되었다. 그러나, 4G(4th generation) 및/또는 그 이후의 통신 시스템에서 높은 주파수 대역이 사용되고, 기지국의 셀반경이 작아짐에 따라, 특정 지역을 커버하기 위한 기지국들의 수가 증가하였고, 증가된 기지국을 설치하기 위한 사업자의 설치 비용 부담이 증가하였다. 기지국의 설치 비용을 최소화하기 위해, 기지국의 DU와 RU가 분리되어 하나의 DU에 하나 이상의 RU들이 유선 망을 통해 연결되고, 특정 지역을 커버하기위해 지형적으로 분산된(distributed) 하나 이상의 RU들이 배치되는 구조가 제안되었다. 이하, 도 1b를 통해 본 개시의 다양한 실시 예들에 따른 기지국의 배치 구조 및 확장 예들이 서술된다.
도 1b는 본 개시의 다양한 실시 예들에 따른 기지국의 기능적 분리에 따른 프론트홀(fronthaul) 구조의 예를 도시한다. 프론트홀이란, 기지국에서 코어망 사이의 백홀(backhaul)과 달리, 무선랜과 기지국 사이의 엔티티들 사이를 지칭한다.
도 1b를 참고하면, 기지국(110)은 DU(160)와 RU(180)을 포함할 수 있다. DU(160)과 RU(180) 사이의 프론트홀(170)은 Fx 인터페이스를 통해 운용될 수 있다. 프론트홀(170)의 운용을 위해, 예를 들어, eCPRI(enhanced common public radio interface), ROE(radio over ethernet)와 같은 인터페이스가 사용될 수 있다.
통신 기술이 발달함에 따라 모바일 데이터 트래픽이 증가하고, 이에 따라 디지털 유닛과 무선 유닛 사이의 프론트홀에서 요구되는 대역폭 요구량이 크게 증가하였다. C-RAN(centralized/cloud radio access network)와 같은 배치에서, DU는 PDCP(packet data convergence protocol), RLC(radio link control), MAC(media access control), PHY(physical)에 대한 기능들을 수행되고, RU는 RF(radio frequency) 기능에 더하여 PHY 계층에 대한 기능들을 보다 더 수행하도록 구현될 수 있다.
DU(160)은 무선 망의 상위 계층 기능을 담당할 수 있다. 예를 들어, DU(160)은 MAC 계층의 기능, PHY 계층의 일부를 수행할 수 있다. 여기서, PHY 계층의 일부란, PHY 계층의 기능들 중에서 보다 높은 단계에서 수행되는 것으로, 일 예로, 채널 인코딩(혹은 채널 디코딩), 스크램블링(혹은 디스크램블링), 변조(혹은 복조), 레이어 매핑(layer mapping)(혹은 레이어 디매핑)을 포함할 수 있다. 일 실시 예에 따라, DU(160)이 O-RAN 규격에 따르는 경우, O-DU(O-RAN DU)로 지칭될 수 있다. DU(160)은, 필요에 따라 본 개시의 실시 예들에서 기지국(예: gNB)을 위한 제1 네트워크 엔티티로 대체되어 표현될 수 있다.
RU(180)은 무선 망의 하위 계층 기능을 담당할 수 있다. 예를 들어, RU(180)은 PHY 계층의 일부, RF 기능을 수행할 수 있다. 여기서, PHY 계층의 일부란, PHY 계층의 기능들 중에서 DU(160)보다 상대적으로 낮은 단계에서 수행되는 것으로, 일 예로, IFFT 변환(혹은 FFT 변환), CP 삽입(CP 제거), 디지털 빔포밍을 포함할 수 있다. 이러한 구체적인 기능 분리의 예는 도 4에서 자세히 서술된다. RU(180)은 '액세스 유닛(access unit, AU) ', '액세스 포인트(access point, AP)', '송수신 포인트(transmission/reception point, TRP)', '원격 무선 장비(remote radio head, RRH) ', '무선 유닛(radio unit, RU)' 또는 이와 동등한 기술적 의미를 가지는 다른 용어로 지칭될 수 있다. 일 실시 예에 따라, RU(180)이 O-RAN 규격에 따르는 경우, O-RU(O-RAN RU)로 지칭될 수 있다. DU(160)은, 필요에 따라 본 개시의 실시 예들에서 기지국(예: gNB)을 위한 제2 네트워크 엔티티로 대체되어 표현될 수 있다.
도 1b는 기지국이 DU와 RU를 포함하는 것으로 서술되었으나, 본 개시의 다양한 실시 예들은 이에 한정되지 않는다. 일부 실시 예들에서, 기지국은 액세스 망의 상위 계층(upper layers)(예: PDCP(packet data convergence protocol, RRC))의 기능을 수행하도록 구성되는 CU(centralized unit)와 하위 계층의 기능을 수행하도록 구성되는 DU(distributed unit)에 따른 분산형 배치(distributed deployment)로 구현될 수 있다. 이 때, DU(distributed unit)는 도 1b의 DU(digital unit)과 RU(radio unit)을 포함할 수 있다. 코어(예: 5GC(5G core) 혹은 NGC(next generation core)) 망과 무선망(RAN) 사이에서, 기지국은 CU, DU, RU 순으로 배치되는 구조로 구현될 수 있다. CU와 DU(distributed unit) 간 인터페이스는 F1 인터페이스로 지칭될 수 있다.
CU(centralized unit)는 하나 이상의 DU들과 연결되어, DU보다 상위 계층의 기능을 담당할 수 있다. 예를 들어, CU는 RRC(radio resource control) 및 PDCP(packet data convergence protocol) 계층의 기능을 담당하고, DU와 RU가 하위 계층의 기능을 담당할 수 있다. DU는, RLC(radio link control), MAC(media access control), PHY(physical) 계층의 일부 기능들(high PHY)을 수행하고, RU는 PHY 계층의 나머지 기능들(low PHY)을 담당할 수 있다. 또한, 일 예로, DU(digital unit)는 기지국의 분산형 배치 구현에 따라, DU(distributed unit)에 포함될 수 있다. 이하, 별도의 정의가 없는 한 DU(digital unit)와 RU의 동작들로 서술되나, 본 개시의 다양한 실시 예들은, CU를 포함하는 기지국 배치 혹은 CU없이 DU가 직접 코어망과 연결되는 배치(즉, CU와 DU가 하나의 엔티티로 통합되어 구현) 모두에 적용될 수 있다.
도 2는 본 개시의 다양한 실시 예들에 따른 무선 통신 시스템에서 DU(digital unit)의 구성을 도시한다. 도 2에 예시된 구성은 기지국의 일부로서 도 1b의 DU(160)의 구성으로서 이해될 수 있다. 이하 사용되는 '...부', '...기' 등의 용어는 적어도 하나의 기능이나 동작을 처리하는 단위를 의미하며, 이는 하드웨어나 소프트웨어 또는 하드웨어 및 소프트웨어의 결합으로 구현될 수 있다.
도 2를 참고하면, DU(160)는 통신부(210), 저장부(220), 제어부(230)를 포함할 수 있다.
통신부(210)는 유선 통신 환경에서 신호를 송수신하기 위한 기능들을 수행할 수 있다. 통신부(210)는 전송 매체(transmission medium)(예: 구리선, 광섬유)를 통해 장치와 장치 간의 직접적인 연결을 제어하기 위한 유선 인터페이스를 포함할 수 있다. 예를 들어, 통신부(210)는 구리선을 통해 다른 장치에게 전기적 신호를 전달하거나, 전기적 신호와 광신호 간 변환을 수행할 수 있다. 통신부(210)는 RU(radio unit)과 연결될 수 있다. 통신부(210)는 코어망에 연결되거나 분산형 배치의 CU(central unit) 또는 DU(distributed unit)에 연결될 수 있다.
통신부(210)는 무선 통신 환경에서, 신호를 송수신하기 위한 기능들을 수행할 수 있다. 예를 들어, 통신부(210)는 시스템의 물리 계층 규격에 따라 기저대역 신호 및 비트열 간 변환 기능을 수행할 수 있다. 예를 들어, 데이터 송신 시, 통신부(210)는 송신 비트열을 부호화 및 변조함으로써 복소 심볼들을 생성할 수 있다. 또한, 데이터 수신 시, 통신부(210)는 기저대역 신호를 복조 및 복호화를 통해 수신 비트열을 복원할 수 있다. 또한, 통신부(210)는 다수의 송수신 경로(path)들을 포함할 수 있다. 또한, 일 실시 예에 따라, 통신부(210)는 코어망에 연결되거나 다른 노드들(예: IAB(integrated access backhaul)과 연결될 수 있다.
통신부(210)는 신호를 송수신할 수 있다. 이를 위해, 통신부(210)는 적어도 하나의 송수신기(transceiver)를 포함할 수 있다. 예를 들어, 통신부(210)는 동기 신호(synchronization signal), 기준 신호(reference signal), 시스템 정보, 메시지, 제어 메시지, 스트림, 제어 정보 또는 데이터 등을 전송할 수 있다. 또한, 통신부(210)는 빔포밍(beamforming)을 수행할 수 있다.
통신부(210)는 상술된 바와 같이 신호를 송신 및 수신할 수 있다. 이에 따라, 통신부(210)의 전부 또는 일부는 '송신부', '수신부' 또는 '송수신부'로 지칭될 수 있다. 또한, 이하 설명에서, 무선 채널을 통해 수행되는 송신 및 수신은 통신부(210)에 의해 상술된 바와 같은 처리가 수행되는 것을 포함하는 의미로 사용될 수 있다.
도 2에서는 도시되지 않았으나, 통신부(210)는 코어망 혹은 다른 기지국과 연결되기 위한 백홀 통신부를 더 포함할 수 있다. 백홀 통신부는 네트워크 내 다른 노드들과 통신을 수행하기 위한 인터페이스를 제공할 수 있다. 즉, 백홀 통신부는 기지국에서 다른 노드, 예를 들어, 다른 접속 노드, 다른 기지국, 상위 노드, 코어 네트워크 등으로 송신되는 비트열을 물리적 신호로 변환하고, 다른 노드로부터 수신되는 물리적 신호를 비트열로 변환할 수 있다.
저장부(220)는 DU(160)의 동작을 위한 기본 프로그램, 응용 프로그램, 설정 정보 등의 데이터를 저장할 수 있다. 저장부(220)는 메모리(memory)를 포함할 수 있다. 저장부(220)는 휘발성 메모리, 비휘발성 메모리 또는 휘발성 메모리와 비휘발성 메모리의 조합으로 구성될 수 있다. 그리고, 저장부(220)는 제어부(230)의 요청에 따라 저장된 데이터를 제공할 수 있다.
제어부(230)는 DU(160)의 전반적인 동작들을 제어할 수 있다. 예를 들어, 제어부(230)는 통신부(210)를 통해(또는 백홀 통신부를 통해) 신호를 송신 및 수신할 수 있다. 또한, 제어부(230)는 저장부(220)에 데이터를 기록하고, 읽을 수 있다. 그리고, 제어부(230)는 통신 규격에서 요구하는 프로토콜 스택(protocol stack)의 기능들을 수행할 수 있다. 이를 위해, 제어부(230)는 적어도 하나의 프로세서(processor)를 포함할 수 있다. 다양한 실시 예들에 따를 때, 제어부(230)는 제어 메시지(예: 섹션 타입(section type) 5)에 대해 레이어(layer)의 널링(nulling) 여부를 지시하는 파라미터를 포함하는 섹션 확장 필드(section extension field)를 설정할 수 있다. 다양한 실시 예들에 따라, 제어부(230)는 DU(160)가 후술하는 다양한 실시 예들에 따른 동작들을 수행하도록 제어할 수 있다.
도 2에 도시된 DU(160)의 구성은, 일 예일뿐, 도 2에 도시된 구성으로부터 본 개시의 다양한 실시 예들을 수행하는 DU의 예가 한정되지 않는다. 다양한 실시 예들에 따라, 일부 구성이 추가, 삭제, 변경될 수 있다.
도 3은 본 개시의 다양한 실시 예들에 따른 무선 통신 시스템에서 RU(radio unit)의 구성을 도시한다. 도 3에 예시된 구성은 기지국의 일부로서 도 1b의 RU(180)의 구성으로서 이해될 수 있다. 이하 사용되는 '...부', '...기' 등의 용어는 적어도 하나의 기능이나 동작을 처리하는 단위를 의미하며, 이는 하드웨어나 소프트웨어 또는 하드웨어 및 소프트웨어의 결합으로 구현될 수 있다.
도 3을 참고하면, RU(180)은 통신부(310), 저장부(320), 제어부(330)을 포함할 수 있다.
통신부(310)는 무선 채널을 통해 신호를 송수신하기 위한 기능들을 수행할 수 있다. 예를 들어, 통신부(310)은 기저대역 신호를 RF(radio frequency) 대역 신호로 상향변환한 후 안테나를 통해 송신하고, 안테나를 통해 수신되는 RF 대역 신호를 기저대역 신호로 하향변환 할 수 있다. 예를 들어, 통신부(310)은 송신 필터, 수신 필터, 증폭기, 믹서, 오실레이터, DAC(digital-to-analog converter), ADC(analog-to-digital converter) 등을 포함할 수 있다.
또한, 통신부(310)는 다수의 송수신 경로(path)들을 포함할 수 있다. 나아가, 통신부(310)는 안테나부를 포함할 수 있다. 통신부(310)는 다수의 안테나 엘리멘트(element)들로 구성된 적어도 하나의 안테나 어레이를 포함할 수 있다. 하드웨어의 측면에서, 통신부(310)는 디지털 회로 및 아날로그 회로(예: RFIC(radio frequency integrated circuit))로 구성될 수 있다. 여기서, 디지털 회로 및 아날로그 회로는 하나의 패키지로 구현될 수 있다. 또한, 통신부(310)는 다수의 RF 체인들을 포함할 수 있다. 통신부(310)은 빔포밍을 수행할 수 있다. 통신부(310)는 송수신하고자 하는 신호에 제어부(330)의 설정에 따른 방향성을 부여하기 위해, 신호에 빔포밍(beamforming) 가중치를 적용할 수 있다. 일 실시 예에 따라, 통신부(310)는 RF(radio frequency) 블록(또는 RF 부)을 포함할 수 있다.
또한, 통신부(310)는 신호를 송수신할 수 있다. 이를 위해, 통신부(310)는 적어도 하나의 송수신기(transceiver)를 포함할 수 있다. 통신부(310)는 하향링크 신호를 송신할 수 있다. 하향링크 신호는 동기 신호(synchronization signal, SS), 기준 신호(reference signal, RS)(예: CRS(cell-specific reference signal), DM(demodulation)-RS), 시스템 정보(예: MIB(master information block), SIB(system information block), RMSI(remaining system information), OSI(other system information)), 설정 메시지(configuration message), 제어 정보(control information) 또는 하향링크 데이터 등을 포함할 수 있다. 또한, 통신부(310)은 상향링크 신호를 수신할 수 있다. 상향링크 신호는 랜덤 액세스 관련 신호(예: 랜덤 액세스 프리앰블(random access preamble, RAP)(또는 Msg1(message 1)), Msg3(message 3)), 기준 신호(예: SRS(sounding reference signal), DM-RS), 또는 전력 헤드룸 보고(power headroom report, PHR) 등을 포함할 수 있다.
통신부(310)는 상술된 바와 같이 신호를 송신 및 수신할 수 있다. 이에 따라, 통신부(310)의 전부 또는 일부는 '송신부', '수신부' 또는 '송수신부'로 지칭될 수 있다. 또한, 이하 설명에서 무선 채널을 통해 수행되는 송신 및 수신은 통신부(310)에 의해 상술한 바와 같은 처리가 수행되는 것을 포함하는 의미로 사용된다.
저장부(320)는 RU(180)의 동작을 위한 기본 프로그램, 응용 프로그램, 설정 정보 등의 데이터를 저장한다. 저장부(320)는 휘발성 메모리, 비휘발성 메모리 또는 휘발성 메모리와 비휘발성 메모리의 조합으로 구성될 수 있다. 그리고, 저장부(320)는 제어부(330)의 요청에 따라 저장된 데이터를 제공할 수 있다.
제어부(330)는 RU(180)의 전반적인 동작들을 제어할 수 있다. 예를 들어, 제어부(330)는 통신부(310)를 통해 신호를 송신 및 수신할 수 있다. 또한, 제어부(330)는 저장부(320)에 데이터를 기록하고, 읽을 수 있다. 그리고, 제어부(330)는 통신 규격에서 요구하는 프로토콜 스택의 기능들을 수행할 수 있다. 이를 위해, 제어부(330)는 적어도 하나의 프로세서(processor)를 포함할 수 있다.
다양한 실시 예들에 따를 때, 제어부(330)는 하향링크 신호에 적용할 DU(160)로부터 수신한 제어 메시지(예: 섹션 타입(section type) 5)에 기반하여 ZF(zero-forcing) 방식으로 빔포밍 가중치(beamforming weight, BFW)를 계산할 수 있다. 다양한 실시 예들에 따라, 제어부(330)는 RU(180)가 후술하는 다양한 실시 예들에 따른 동작들을 수행하도록 제어할 수 있다.
도 3에 도시된 RU(180)의 구성은, 일 예일뿐, 도 3에 도시된 구성으로부터 본 개시의 다양한 실시 예들을 수행하는 RU의 예가 한정되지 않는다. 다양한 실시 예들에 따라, 일부 구성이 추가, 삭제, 변경될 수 있다.
도 4는 본 개시의 다양한 실시 예들에 따른 무선 통신 시스템에서 기능 분리(function split)의 예를 도시한다. 무선 통신 기술이 발전함에 따라(예: 5G(5th generation) 통신 시스템(또는, NR(new radio) 통신 시스템의 도입), 사용 주파수 대역이 더욱 더 증가하였고, 기지국의 셀 반경이 매우 작아짐에 따라 설치가 요구되는 RU들의 수는 더욱 증가하였다. 또한, 5G 통신 시스템에서, 전송되는 데이터의 양이 크게는 10배이상 증가하여, 프론트홀(fronthaul)로 전송되는 유선 망의 전송 용량은 크게 증가하였다. 이러한 요인들에 의해, 5G 통신 시스템에서 유선 망의 설치 비용은 매우 크게 증가할 수 있다. 따라서, 유선 망의 전송 용량을 낮추고, 유선 망의 설치 비용을 줄이기 위해, DU(digital unit)의 모뎀(modem)의 일부 기능들을 RU(radio unit)로 전가하여 프론트홀을 전송 용량을 낮추는 기술들이 제안되었고, 이러한 기술들은 '기능 분리(function split)'로 지칭될 수 있다.
DU의 부담을 줄이기 위해 RF(radio frequency) 기능만을 담당하는 RU의 역할을 물리 계층의 일부 기능까지 확대하는 방안이 고려된다. 이 때, RU가 보다 높은 레이어의 기능들을 수행할수록, RU의 처리량이 증가하여 프론트홀에서의 전송 대역폭이 증가함과 동시에 응답 처리로 인한 지연시간 요구사항 제약이 낮아질 수 있다. 한편, RU가 보다 높은 레이어의 기능들을 수행할수록, 가상화 이득이 줄어들고, RU의 크기/무게/비용이 증가한다. 상술된 장점과 단점들의 트레이드-오프(trade-off)를 고려하여, 최적의 기능 분리를 구현할 것이 요구된다.
도 4를 참고하면, MAC(medium access control) 계층 이하의 물리 계층에서의 기능 분리들이 도시된다. 무선망을 통해 단말에게 신호를 전송하는 하향링크(downlink, DL)의 경우, 기지국은 순차적으로 채널 인코딩/스크램블링, 변조, 레이어 매핑, 안테나 매핑, RE(resource element) 매핑, 디지털 빔포밍(예: 프리코딩), IFFT(inverse fast fourier transform) 변환/CP(cyclic prefix) 삽입, 및 RF 변환을 수행할 수 있다. 무선망을 통해 단말로부터 신호를 수신하는 상향링크(uplink, UL)의 경우, 기지국은 순차적으로 RF 변환, FFT(fast fourier transform) 변환/CP 제거, 디지털 빔포밍(프리-컴바이닝(pre-combining)), RE 디매핑, 채널 추정, 레이어 디매핑, 복조, 디코딩/디스크램블링을 수행할 수 있다. 상향링크 기능들 및 하향링크 기능들에 대한 분리는, 상술한 트레이드-오프에 따라 공급 업체들(vendors) 간 필요성, 규격 상의 논의 등에 의해 다양한 유형으로 정의될 수 있다.
제1 기능 분리(405)는 RF 기능과 PHY 기능의 분리일 수 있다. 제1 기능 분리는 실질적으로 RU 내 PHY 기능이 구현되지 않는 것으로서, 일 예로, Option 8로 지칭될 수 있다. 제2 기능 분리(410)는 RU가 PHY 기능의 DL에서 IFFT 변환/CP 삽입 및 UL에서 FFT 변환/CP 제거를 수행하고, DU가 나머지 PHY 기능들을 수행하도록 한다. 일 예로, 제2 기능 분리(410)는 Option 7-1로 지칭될 수 있다. 제3 기능 분리(420a)는 RU가 PHY 기능의 DL에서 IFFT 변환/CP 삽입 및 UL에서 FFT 변환/CP 제거 및 디지털 빔포밍을 수행하고, DU가 나머지 PHY 기능들을 수행하도록 한다. 일 예로, 제3 기능 분리(420a)는 Option 7-2x Category A로 지칭될 수 있다. 제4 기능 분리(420b) RU가 DL 및 UL 모두에서 디지털 빔포밍까지 수행하고, DU가 디지털 빔포밍 이후의 상위 PHY 기능들을 수행하도록 한다. 일 예로, 제4 기능 분리(420b)는 Option 7-2x Category B로 지칭될 수 있다. 제5 기능 분리(425)는 RU가 DL 및 UL 모두에서 RE 매핑(혹은 RE 디매핑)까지 수행하고, DU가 RE 매핑(혹은 RE 디매핑) 이후의 상위 PHY 기능들을 수행하도록 한다. 일 예로, 제5 기능 분리(425)는 Option 7-2 로 지칭될 수 있다. 제6 기능 분리(430)는 RU가 DL 및 UL 모두에서 변조(혹은 복조)까지 수행하고, DU가 변조(혹은 복조)까지 이후의 상위 PHY 기능들을 수행하도록 한다. 일 예로, 제6 기능 분리(430)는 Option 7-3로 지칭될 수 있다. 제7 기능 분리(440)는 RU가 DL 및 UL 모두에서 인코딩/스크램블링(혹은 디코딩/디스크램블링)까지 수행하고, DU가 변조(혹은 복조)까지 이후의 상위 PHY 기능들을 수행하도록 한다. 일 예로, 제7 기능 분리(440)는 Option 6으로 지칭될 수 있다.
일 실시 예에 따라, FR1 MMU와 같이 대용량의 신호 처리가 예상되는 경우, 프론트홀 용량을 줄이기 위하여 상대적으로 높은 계층에서의 기능 분리(예: 제4 기능 분리(420b))가 요구될 수 있다. 또한, 너무 높은 계층에서의 기능 분리(예: 제6 기능 분리(430))는 제어 인터페이스가 복잡해지고, RU 내 다수의 PHY 처리 블록들이 포함되어 RU의 구현에 부담을 야기할 수 있기 때문에, DU와 RU의 배치 및 구현 방식에 따라 적절한 기능 분리가 요구될 수 있다.
일 실시 예에 따라, DU로부터 수신된 데이터의 프리코딩을 처리할 수 없는 경우(즉, RU의 프리코딩 능력(capability)에 한계가 있는 경우), 제3 기능 분리(420a) 혹은 그 이하의 기능 분리(예: 제2 기능 분리(410))가 적용될 수 있다. 반대로, DU로부터 수신된 데이터의 프리코딩을 처리할 능력이 있는 경우, 제4 기능 분리(420b) 혹은 그 이상의 기능 분리(예: 제6 기능 분리(430))이 적용될 수 있다. 이하, 본 개시에서 다양한 실시 예들은 별도의 한정이 없는 한 RU에서 빔포밍 처리를 수행하기 위한 제3 기능 분리(420a)(카테고리 A) 혹은 제4 기능 분리(420b)(카테고리 B)를 기준으로 서술되나, 다른 기능 분리들을 통한 실시 예 구성을 배제하는 것은 아니다. 후술되는 도 5 내지 도 10의 기능적 구성, 시그널링 혹은 동작은 제3 기능 분리(420a) 혹은 제4 기능 분리(420b) 뿐만 아니라 다른 기능 분리에도 적용될 수도 있다.
본 개시의 다양한 실시 예들은, DU(예: 도 1b의 DU(160))와 RU(예: 도 1b의 RU(180)) 간 메시지 전송 시, 프론트홀 인터페이스로서 eCPRI 및 O-RAN의 규격이 예시적으로 서술된다. 메시지의 Ethernet payload에 eCPRI 헤더(header) 및 O-RAN 헤더, 그리고 추가적인 필드가 포함될 수 있다. 이하, eCPRI 또는 O-RAN의 규격 용어를 이용하여, 본 개시의 다양한 실시 예들이 서술되나 각 용어와 동등한 의미를 지닌 다른 표현들이 본 개시의 다양한 실시 예들에 대체되어 사용될 수 있다.
프론트홀의 전송 프로토콜(transport protocol)은, 네트워크와 공유가 용이한 이더넷(ethernet) 및 eCPRI가 사용될 수 있다. 이더넷 페이로드 내에 eCPRI 헤더와 O-RAN의 헤더가 포함될 수 있다. eCPRI 헤더는 이더넷 페이로드 앞단에 위치할 수 있다. eCPRI 헤더의 내용은 하기와 같다.
●ecpriVersion (4 bits): 0001b (fixed value)
●ecpriReserved (3 bits): 0000b (fixed value)
●ecpriConcatenation (1 bit): 0b (fixed value)
●ecpriMessage (1 byte): Message type
●ecpriPayload (2 bytes): Payload size in bytes
●ecpriRtcid / ecpriPcid (2 bytes): 관리 평면(management plane, M-plane)을 통해 x,y,z가 구성될 수 있다. 해당 필드는 다중-레이어 전송 시 다양한 실시 예들에 따른 제어 메시지의 전송 경로(eCPRI에서 eAxC(extended Antenna-carrier))를 나타낼 수 있다.
■CU_Port_ID (x bits): channel card를 구분. Modem까지 포함하여 구분 가능 (2 bits for channel card, 2 bits for Modem)
■BandSector_ID (y bits): Cell/Sector에 따라 구분
■CC_ID (z bits): Component carrier에 따라 구분
■RU_Port_ID (w bits): layer, T, antenna 등에 따라 구분
●ecpriSeqid (2 bytes): ecpriRtcid/ecpriPcid별로 sequence ID가 관리되며 Sequence ID 및 subsequence ID 별도 관리. Subsequence ID를 이용하면 Radio-transport-level fragmentation 가능 (Application-level fragmentation과 다름)
프론트홀의 애플리케이션 프로토콜(application protocol)은 제어 평면(control plane, C-plane), 사용자 플레인(user plane, U-plane), 동기 플레인(synchronization plane, S-plane), 및 관리 평면(management plane, M-plane)를 포함할 수 있다.
제어 평면은, 제어 메시지를 통해 스케줄링 정보와 빔포밍 정보를 제공하도록 구성될 수 있다. 사용자 플레인은 사용자의 하향링크 데이터(IQ 데이터 혹은 SSB/RS), 상향링크 데이터(IQ 데이터 혹은 SRS/RS), 또는 PRACH 데이터를 포함할 수 있다. 상술된 빔포밍 정보의 가중치 벡터는 사용자의 데이터에 곱해질 수 있다. 동기 플레인은 타이밍 및 동기화와 관련될 수 있다. 관리 평면은 초기 설정(initial setup), 비실시간 재설정(non-realtime reset) 혹은 재설정(reset), 비실시간 보고(non-realtime report)와 관련될 수 있다.
제어 평면에서 전송되는 메시지의 유형을 정의하기 위해, Section Type이 정의된다. Section Type은 제어 평면에서 전송되는 제어 메시지의 용도를 나타낼 수 있다. 예를 들어, Section Type 별 용도는 하기와 같다.
■sectionType=0: DL idle/guard periods - Power saving을 위한 Tx blanking 용도
■sectionType=1: DL/UL 채널의 RE에 BF index나 weight (O-RAN mandatory BF 방식) 를 매핑
■sectionType=2: reserved
■sectionType=3: PRACH 와 mixed-numerology 채널의 RE에 beamforming index나 weight 를 매핑
■sectionType=4: reserved
■sectionType=5: RU가 실시간 BF weight 계산을 할 수 있도록 UE 스케쥴링 정보를 전달 (O-RAN optional BF 방식)
■sectionType=6: RU가 실시간 BF weight 계산을 할 수 있도록 주기적으로 UE 채널 정보를 전달 (O-RAN optional BF 방식)
■sectionType=7: LAA 지원에 사용
도 5는 본 개시의 다양한 실시 예들에 따른 기지국들 간 협력 통신의 예를 도시한다. 도 5에서는, 단말들(501, 503, 505, 507)이 기지국(510)에 스케줄링 되고, 단말들(509, 511, 513)이 기지국(530)에 스케줄링 되며, 520 및 540은 각각 기지국들(510, 530)의 커버리지(coverage)를 나타내는 것으로 가정한다.
무선 통신 시스템에서, 다수의 셀(cell)들이 밀집되어 있는 환경에서 발생할 수 있는 셀 간 간섭(inter cee interference, ICI)를 해결하기 위해, 멀티 셀(multi-cell) 간 협력 전송이 채용될 수 있으며, 협력 전송은 CoMP(cooperative multi-point) 전송으로 지칭될 수 있다. CoMP 전송 기술은 두 개 이상의 전송 셀들이 협력하여 셀 경계에 위치한 단말과 통신함으로써, ICI를 줄이고 전송률(throughput)을 높이는 기술이다. CoMP 전송 기술은 기지국들 간 스케줄링 정보를 공유하는 것을 기반으로 기지국들이 동일한 시간/주파수 자원으로 스케줄링 되는 것을 회피(예: cooperative scheduling(CS))하거나, 동일한 데이터를 함께 전송(예: joint transmission(JT))하거나, 셀 경계 단말들에게 서로 다른 공간 자원(beam pattern)을 할당(예: cooperative beamforming(CB))함으로써, 단말의 수신 성능을 개선할 수 있다.
CoMP 전송 기술 중 하나인 CB는 셀 경계에 위치한 단말에 대해 인접 기지국들이 간섭을 최소화하는 형태로 빔포밍 가중치(weight)를 설정함으로써, 해당 단말에 대한 수신 성능을 개선하는 방법이다. 도 5를 참고하면, 셀 경계에 위치한 단말(509)에 대해 기지국들(510, 530)은 각각 단말(509)에 대한 하향링크 채널 정보를 추정하여 하향링크 전송을 위한 스케줄링에 활용할 수 있다. 단말(509)이 기지국(530)에 스케줄링 된 경우, 기지국(530)이 단말(509)에게 전송하는 하향링크 신호에 대해 동일한 시간/주파수 자원을 사용하여 전송되는 기지국(510)의 하향링크 신호는 ICI로 작용하여 단말(509)의 수신 성능 저하의 원인이 될 수 있다. 따라서, 기지국(510)은 기지국(530)과 동일한 시간/주파수 자원을 사용하여 단말들(501, 503, 505)에게 하향링크 신호를 전송하되, 단말(509)에 대한 방향으로는 빔 널링(beam nulling)이 되도록 빔포밍 가중치를 적용함으로써, 단말(509)의 수신 성능을 개선할 수 있다.
도 5에서는 기지국(510), 기지국(530)으로 서술되었으나, 이는 CoMP 환경을 설명하기 위한 예시적인 노드를 나타낸 것일 뿐, 해당 용어가 본 개시의 구현 방식을 한정하는 것은 아니다. 일 실시 예에 따라, 기지국(510)은 RU #1과 DU로 구성될 수 있고, 기지국(530)은 RU #2와 DU로 구성될 수 있다. 다시 말해, 각 셀은 서로 다른 RU에서 구성되나 하나의 DU에 연결되어, DU는 각 RU에서의 채널 정보를 수집하도록 구성될 수 있다. 다른 일 실시 예에 따라, 기지국(510)은 RU #1, DU #1로 구성될 수 있고, 기지국(530)은 RU #2, DU #2로 구성될 수 있다. RU #1과 DU #1은 프론트홀 인터페이스로 연결되고, RU #2와 DU #2는 프론트홀 인터페이스로 연결될 수 있다. 이 때, DU #1과 DU #2는 서로 각 셀에서의 채널 정보를 공유하기 위해 백홀 인터페이스(예: X2, XN)를 이용할 수도 있다.
CoMP 환경에서, 기지국(510)이 MU(multi-user) 빔포밍을 수행하는 경우, 인접 기지국(530)에 스케줄링 된 단말(509)에게 빔포밍 된 신호를 전송하는 것은, 단말(509)에게 ICI를 경험하게 한다. 특히, 밀리미터파 환경에서는 기지국의 커버리지(520, 540)는 줄어드므로, ICI 문제는 더욱 심화될 수 있다. 따라서, 기지국(510)으로서는, 셀 경계에 위치한 단말(509)의 방향으로는 빔을 널링(nulling) 시킬 필요가 있다.
DU(160)는 제어 메시지(예: 섹션 타입(section type) 5)를 통하여 스케줄링 정보를 RU(180)에게 전송할 수 있다. 이 때, 스케줄링 정보는 RU(180)가 전송할 RB(resource block) 상에 포함되는 하나 이상의 레이어들에 스케줄링 된 단말들을 지시하는 자원 정보일 수 있다. 따라서, 스케줄링 정보는 RB 상의 자원에 할당된 단말을 지시할 뿐, 해당 레이어에 대한 널링(nulling) 여부는 지시하지 않는다. 이러한 스케줄링 정보만을 기반으로 RU(180)가 MU 빔포밍을 수행한다면, ICI로 인하여, 셀 경계에 위치한 단말의 수신 성능이 저하될 수밖에 없다. 따라서, DU(160)는 RU(180)에게 널링 레이어를 지시할 필요가 있다.
널링 레이어를 지시하기 위해서는, 셀 커버리지 내에 존재하는 단말들의 채널 정보와, 스케줄링 정보 및 널링 레이어에 관한 정보가 필요할 수 있다. 즉, 채널 정보는 빔포밍 가중치를 획득하는데 필요할 수 있으며, 스케줄링 정보 및 널링 레이어에 관한 정보는 특정 RB상의 특정 레이어에 대한 널링 여부를 지시하는데 필요할 수 있다. 따라서, 오버헤드(overhead)를 낮추기 위해서는 스케줄링 정보와 널링 레이어에 관한 정보가 함께 전송될 필요가 있다.
일 실시 예에 따라, DU(160)는 제1 제어 메시지를 통하여 셀 커버리지 내에 존재하는 단말들에 관한 하향링크 채널 정보를 RU(180)에게 전송할 수 있다. DU(160)는 제2 제어 메시지를 통하여 RB 상의 자원에 스케줄링 된 단말에 관한 정보와 레이어 별로 널링 여부를 지시하는 정보를 RU(180)에게 전송할 수 있다. RU(180)는 제1 제어 메시지를 기반으로 MU(multi-user) 채널 행렬을 생성할 수 있다. RU(180)는 생성된 MU 채널 행렬 및 제2 제어 메시지를 기반으로, 특정 레이어를 널링 시킴으로써, 빔포밍 가중치를 획득할 수 있다. RU(180)는 생성된 빔포밍 가중치를 기반으로 전송 데이터에 빔포밍을 적용하여, 하향링크 신호를 전송할 수 있다.
이 때, 널링된 빔 방향으로는 신호가 전송되지 않으므로, 셀 경계에 위치한 단말로서는 ICI 문제를 최소화할 수 있다. 또한, RU(180)는 널링된 레이어에 할당될 전력을 다른 레이어에 할당하여 전송하게 되므로, RU(180)의 전송 성능 또한 향상될 수 있다. 또한, RU(180)에 셀 경계에 위치한 단말이 스케줄링 되지 않은 경우라도, 해당 단말의 채널 정보를 포함하여 빔포밍 가중치를 획득하므로, 스케줄링 된 단말에게 전송하는 빔이 셀 경계에 위치한 단말에게 ICI로서 영향을 미치지 않도록 할 수 있다.
이러한 기법은 NR 통신 시스템에서도 적용될 수 있다. 네트워크 엔티티(entity)들 간에 널링 시킬 빔을 지시하는 방안으로서, CRI(channel state information resource indicator) 또는 SSBRI(SS/PBCH block resource indicator)가 이용될 수 있다. 셀 내에서 해당 자원 지시자와 관련된 빔포밍 가중치(프리코딩(precoding))을 적용하지 않음으로써 널링을 달성할 수 있다.
도 6은 본 개시의 다양한 실시 예들에 따른 빔 널링(beam nulling)을 위한 RU(radio unit)의 동작 흐름을 도시한다.
동작(610)에서, RU(180)는 DU(digital unit)(160)로부터 빔 포밍 가중치 계산에 필요한 정보를 수신할 수 있다. 일 실시 예에 따라, RU(180)는 프론트홀(fronthaul)을 통해 DU(160)로부터 빔포밍 가중치 계산에 필요한 정보를 수신할 수 있다.
일 실시 예에 따라, 빔포밍 가중치 계산에 필요한 정보는 널링 차원 지시자(nulling dimension indicator)를 포함할 수 있다. 널링 차원 지시자는 RB 상의 각 레이어에 대한 널링(nulling) 여부를 나타낼 수 있다. RU(180)는 섹션 타입 5를 통해 널링 차원 지시자를 DU(160)로부터 주기적으로 수신할 수 있다. 널링 차원 지시자가 수신되는 주기는 스케줄링의 시간 단위인 슬롯과 동일할 수 있다.
일 실시 예에 따라, 빔포밍 가중치 계산에 필요한 정보는 스케줄링 정보를 포함할 수 있다. 스케줄링 정보는 RB(resource block) 상에서 각 레이어 별로 스케줄링 된 단말들에 관한 자원 정보를 포함할 수 있다. 일 실시 예에 따라, RU(180)는 섹션 타입 5를 통해 스케줄링 정보를 DU(160)로부터 주기적으로 수신할 수 있다. 스케줄링 정보가 수신되는 주기는 스케줄링의 시간 단위인 슬롯과 동일할 수 있다. 일 실시 예에 따라, RU(180)는 널링 차원 지시자 및 스케줄링 정보는 섹션 타입 5를 통해 함께 DU(160)로부터 수신할 수 있다. 즉, RU(180)는 널링 차원 지시자 및 스케줄링 정보를 함께 전송함으로써, 프론트홀(fronthaul) 오버헤드(overhead)를 감소시킬 수 있다.
일 실시 예에 따라, 빔포밍 가중치 계산에 필요한 정보는 채널 정보를 포함할 수 있다. 채널 정보는 기지국의 커버리지(coverage) 내에 포함되는 단말들에 대한 하향링크 채널 정보를 포함할 수 있다. 일 실시 예에 따라, 채널 정보는 RU(180)에 스케줄링 되는 단말들에 대한 하향링크 채널 정보를 포함할 수 있다. 일 실시 예에 따라, RU(180)는 섹션 타입 6를 통해 채널 정보를 DU(160)로부터 주기적으로 수신할 수 있다. 일 실시 예에 따라, 채널 정보가 수신되는 주기는 스케줄링의 시간 단위인 슬롯(slot)보다 길 수 있다.
동작(620)에서, RU(180)는 빔포밍 가중치를 획득할 수 있다. 일 실시 예에 따라, RU(180)는 ZF(zero-forcing) 방식에 기반하여 빔포밍 가중치를 획득할 수 있다. RU(180)는 수신된 채널 정보에 기반하여 MU(multi-user) 채널 행렬을 생성할 수 있다. 예를 들어, MU 채널 행렬은 수신된 단말들 각각에 대한 채널 정보를 각각 다른 레이어(layer)로 중첩하여 생성될 수 있다. 즉, RU(180)는 실제 스케줄링 될 단말에 대한 채널 정보 및 널리(nulling) 시킬 단말에 대한 채널 정보 모두를 포함하여 MU 채널 행렬을 생성할 수 있다. RU(180)는 생성된 MU 채널 행렬에 대한 역행렬(inverse matrix)을 획득할 수 있다. RU(180)는 획득된 역행렬에 대해 널링 차원 지시자에 기반하여, 널링 레이어 제로 마스킹(nulling layer zero-masking)을 획득할 수 있다. 널링 레이어 제로 마스킹은 획득된 역행렬의 성분 중 널링될 단말의 레이어에 대응하는 성분을 영벡터로 치환하는 방법일 수 있다. RU(180)는 널링 레이어 제로 마스킹을 수행한 후, 전력 정규화 연산을 수행함으로써, 빔포밍 가중치를 획득할 수 있다. 전력 정규화 연산은 각 레이어 별로 동일한 전송 전력을 할당하거나 안테나 별 전송 전력이 기준치를 초과하는 것을 방지하기 위해 수행될 수 있다. 한편, 동작(620)에서는 ZF 방식이 서술되었으나, 이는 단지 예시일 뿐이며, 본 개시의 다양한 실시 예들은 널링 차원 지시자에 기반하여, 하나 이상의 단말들에 대한 빔을 널링 시키는 빔포밍 가중치를 획득할 수 있다.
동작(630)에서, RU(180)는 전송 데이터에 빔포밍을 적용할 수 있다. 일 실시 예에 따라, RU(180)는 획득된 빔포밍 가중치를 레이어 별 전송 데이터에 곱하여, 전송 데이터에 빔포밍을 적용할 수 있다. 따라서, 빔포밍이 적용된 하향링크 신호는 널링 된 단말 방향으로는 ICI(inter cell interference)를 최소화하도록 전송될 것이다.
상술된 절차를 참고하면, RU(180)는 커버리지(coverage) 내 단말들의 채널 정보와 널링 차원 지시자에 기반하여 빔포밍 가중치를 획득함으로써, CB 전송을 수행할 수 있다. 즉, CB 전송을 수행하기 위해서는 RU(180)가 널링 레이어(nulling layer)를 식별할 수 있어야 한다. 그러나, xRAN/ORAN 규격을 참고하면 DU(160)가 RU(180)에게 전송하는 스케줄링 정보에는 레이어의 널링 여부를 지시하는 필드가 정의되어 있지 않아, CB 전송 방식의 지원이 불가능하다. 결국, CB 전송 방식을 지원하기 위해서는, 스케줄링 정보에 각각의 레이어가 널링인지 여부를 나타내는 정보를 포함시킬 필요가 있다.
도 7은 본 개시의 다양한 실시 예들에 따른 제어 메시지의 확장된 섹션(section)의 프레임 포맷(frame format)을 도시한다. 도 7에서는 하나의 레이어(layer)에 대한 널(null) 여부를 지시하는 확장된 세션의 프레임 포맷에 대해 서술된다.
도 7을 참고하면, 제어 메시지는 섹션 타입(section type) 5로 지칭될 수 있으며, 제어 메시지의 확장된 섹션은 확장 플래그(extension flag, ef) 확장 타입(extension type, extType), 확장 길이(extension length, extLen), 널 차원 지시자(null dimension indicator, nullDimensionInd)를 포함할 수 있다.
일 실시 예에 따라, 확장 플래그는 헤더(header) 뒤에 섹션 확장이 있음을 나타낼 수 있다. 일 실시 예에 따라, 확장 플래그는 1 비트(bit)의 정보로서, 0 또는 1을 사용하여 섹션 확장이 있음을 나타낼 수 있다. 즉, 확장 플래그는 헤더 뒤에 섹션 타입 5에 추가적으로 정의되는 파라미터가 존재함을 지시함으로써, 새로운 섹션 타입을 생성할 필요 없이 섹션 타입 5의 파라미터에 대한 확장성을 제공할 수 있다. 일 실시 예에 따라, 확장 플래그는 빔 식별자(beam identifier, beamId) 또는 단말 식별자(user equipment identifier, ueId) 필드 뒤에 배치될 수 있다.
일 실시 예에 따라, 확장 타입은 추가적으로 제공되는 파라미터의 유형을 지시할 수 있다. 일 실시 예에 따라, 확장 타입은 7 비트의 정보로 구성될 수 있다. 일 실시 예에 따라, 확장 타입이 12인 경우(예: extType = 12), 확장 타입은 추가적으로 제공되는 파라미터가 레이어에 대한 널(null) 여부를 지시하는 파라미터임을 지시할 수 있다. 도 7에서는 확장 타입이 12인 것으로 도시되었으나(extType =12), 이는 예시일 뿐이며, 다른 숫자로 정의될 수 있다.
일 실시 예에 따라, 확장 길이는 섹션 확장의 길이를 나타낼 수 있다. 일 실시 예에 따라, 확장 길이는 8 내지 16 비트의 정보로 구성될 수 있다. 일 실시 예에 따라, 확장 길이가 1인 경우(예: extLen = 0x01), RU(radio unit)는 추가적으로 제공되는 파라미터가 하나의 레이어에 대한 널 여부를 지시하는 정보임을 식별할 수 있다.
일 실시 예에 따라, 널 차원 지시자는 제어 메시지에 대응하는 레이어(layer)에 대한 널링 여부를 나타낼 수 있다. 일 실시 예에 따라, 널 차원 지시자는 8 비트의 정보로 구성될 수 있다. 일 실시 예에 따라, RU는 널 차원 지시자에 기반하여 ZF(zero-forcing) 방식 기반의 빔포밍 가중치를 계산할 수 있다. 예를 들어, RU는 널 차원 지시자가 제어 메시지에 대응하는 레이어가 널임을 지시하는 경우, 동작(630)에서 해당 레이어에 대한 제로 마스킹(zero-masking)을 수행할 수 있다.
상술된 프레임 포맷을 참고하면, 레이어에 스케줄링 된 단말에 관한 정보를 포함하는 제어 메시지에, 널링 차원 지시자를 포함시킴으로써, 이를 수신하는 RU(180)가 널링 레이어를 식별할 수 있게 한다.
도 8은 본 개시의 다양한 실시 예들에 따른 제어 메시지의 확장된 세션(section)의 프레임 포맷(frame format)을 도시한다. 도 8에서는 다수의 레이어(layer)에 대한 널(null) 여부를 지시하는 확장된 세션의 프레임 포맷에 대해 서술된다.
도 8을 참고하면, 제어 메시지는 섹션 타입(section type) 5로 지칭될 수 있으며, 제어 메시지의 확장된 섹션은 확장 플래그(extension flag, ef), 확장 타입(extension type, extType), 확장 길이(extension length, extLen)를 포함할 수 있다. 일 실시 예에 따라, 확장 타입 10과 함께 활용되는 경우, 제어 메시지의 확장된 섹션은 하나 이상의 널 지시자(예: 제1 포트(1st port)의 널 차원 지시자(null dimension indicator, nullDimensionInd), 제2 포트(2nd port)의 널 차원 지시자, 제3 포트의 널 차원 지시자, 제4 포트의 널 차원 지시자)를 포함할 수 있다. 즉, 확장 타입 10과 함께 활용되는 경우, 하나의 제어 메시지로 다수의 널 차원 지시자를 전송할 수 있으므로, 제어 평면(control plane)에서의 오버헤드를 감소시킬 수 있다.
일 실시 예에 따라, 확장 플래그는 헤더(header) 뒤에 섹션 확장이 있음을 나타낼 수 있다. 일 실시 예에 따라, 확장 플래그는 1 비트(bit)의 정보로서, 0 또는 1을 사용하여 섹션 확장이 있음을 나타낼 수 있다. 일 실시 예에 따라, 확장 플래그는 빔 식별자(beam identifier, beamId) 또는 단말 식별자(user equipment identifier, ueId) 필드 뒤에 배치될 수 있다. 즉, 확장 플래그는 헤더 뒤에 섹션 타입 5에 추가적으로 정의되는 파라미터가 존재함을 지시함으로써, 새로운 섹션 타입을 생성할 필요 없이 섹션 타입 5의 파라미터에 대한 확장성을 제공할 수 있다.
일 실시 예에 따라, 확장 타입은 추가적으로 제공되는 파라미터의 유형을 지시할 수 있다. 일 실시 예에 따라, 확장 타입은 7 비트의 정보로 구성될 수 있다. 일 실시 예에 따라, 확장 타입이 12인 경우(예: extType = 12), 확장 타입은 추가적으로 제공되는 파라미터가 레이어에 대한 널(null) 여부를 지시하는 파라미터임을 지시할 수 있다. 도 8에서는 확장 타입이 12인 것으로 도시되었으나(extType = 12), 이는 예시일 뿐이며, 다른 숫자로 정의될 수 있다.
일 실시 예에 따라, 확장 길이는 섹션 확장의 길이를 나타낼 수 있다. 일 실시 예에 따라, 확장 길이는 8 내지 16 비트의 정보로 구성될 수 있다. 일 실시 예에 따라, 확장 길이가 4인 경우(예: extLen = 0x04), RU(radio unit)는 추가적으로 제공되는 파라미터가 4개의 레이어에 대한 널 여부를 지시하는 정보임을 식별할 수 있다.
일 실시 예에 따라, 제1 포트의 널 차원 지시자는 RU의 안테나 포트 1에 대응하는 레이어의 널 여부를 지시할 수 있다. 일 실시 예에 따라, 제2 포트의 널 차원 지시자는 RU의 안테나 포트 2에 대응하는 레이어의 널 여부를 지시할 수 있다. 일 실시 예에 따라, 제3 포트의 널 차원 지시자는 RU의 안테나 포트 3에 대응하는 레이어의 널 여부를 지시할 수 있다. 일 실시 예에 따라, 제4 포트의 널 차원 지시자는 RU의 안테나 포트 4에 대응하는 레이어의 널 여부를 지시할 수 있다.
한편, 도 8에서는 4개의 포트에 대한 널 여부 지시자를 포함하는 것으로 도시되었으나, 이는 예시일 뿐이며, 확장된 세션은 4 개 이상의 널 여부 지시자를 포함할 수 있다(예: 8개, 16개, 32개, 64개 등).
상술된 프레임 포맷을 참고하면, 레이어 별로 스케줄링 된 단말들에 관한 정보를 포함하는 제어 메시지에, 널링 차원 지시자를 각각 포함시킴으로써, 이를 수신하는 RU(180)가 널링 레이어를 식별할 수 있게 한다.
도 9는 본 개시의 다양한 실시 예들에 따른 널링 차원(nulling dimension) 기능 설정을 위한 신호 흐름을 도시한다. 도 9에 도시된 동작들은 셀 셋업(cell-setup) 과정 또는 셀 운용 과정에서 수행될 수 있다.
동작(910)에서, DU(digital unit)(160)은 RU(radio unit)(180)로부터 널링 능력 보고를 수신할 수 있다. 일 실시 예에 따라, 널링 능력 보고는 RU(180)가 널링 레이어(nulling layer)를 고려하여 빔포밍 가중치(beamforming weight)를 생성하는 기능을 지원하는지 여부에 관한 파라미터를 포함할 수 있다. 예를 들어, 아래의 표 1과 같이 관리 평면(management plane, mplane) 파라미터가 구성될 수 있다.
| Module: o-ran-uplane-conf +--rw module-capability +--ro ru-capabilities | +--ro format-of-iq-sample | +--ro dynamic-compression-supported? boolean | +--ro regularization-factor-se-supported? boolean | +--ro little-endian-supported? boolean | +--ro nulling-dimension-supported? boolean |
동작(920)에서, DU(160)는 널링 설정을 RU(180)에게 송신할 수 있다. 일 실시 예에 따라, 널링 설정은 RU(180)가 널링 레이어를 고려하여 빔포밍 가중치를 생성하는 기능을 활성화 또는 비활성화 하도록 지시하는 파라미터를 포함할 수 있다. 예를 들어, 아래의 표 2와 같이 관리 평면 파라미터가 구성될 수 있다.
| Module: o-ran-uplane-conf +--rw user-plane-configuration +--rw general-config | +--rw regularization-factor-se-configured? boolean | +--rw little-endian-byte-order? boolean | +--rw nulling-dimension-configured? boolean |
도 10은 본 개시의 일 실시 예에 따른 DU 및 RU 간 연결의 예를 도시한다. 상술된 본 개시에 따른 실시 예들에서는, 기지국(510)과 기지국(530)이 CoMP(cooperative multi-point) 전송을 수행하는 것을 전제로 설명되었다. 그러나, 하나의 DU(digital unit)에 연결된 복수의 RU(radio unit)들 간에서도 본 개시에 따른 실시 예들이 적용될 수 있다.
도 10을 참고하면, DU는 복수의 RU들과 연결될 수 있다. 이 때, 복수의 RU들 중 인접한 RU들 간에는 커버리지(coverage)가 겹칠 수 있으므로, CoMP 전송을 수행할 수 있다. 예를 들어, O-RU #0과 O-RU #1의 셀 경계에 위치한 단말이 O-RU #1에 스케줄링 된 경우, DU는 O-RU #0에게 채널 정보 및 널링 레이어(nulling layer)에 대한 정보를 전송함으로써, O-RU #0이 전송하는 하향링크 신호가 상기 단말에 대한 방향에서는 빔 널링(beam nulling)되도록 조정할 수 있다.
DU는 다양한 종류의 RU들과 연결될 수 있다. 본 개시에서 RU는 널링 지시자에 기반한 CoMP를 수행하는 것으로 도시되었다. 본 개시의 실시 예들에 따른 DU는 RU에게 널링 지시자를 전송하고, RU는 널링 지시자에 따른 널링 레이어에 기반하여 빔포밍 가중치를 계산함으로써, 성능 이득이 높은 MU-MIMO를 수행할 수 있다. 한편, 상기 RU 뿐만 아니라, 기능을 구비하고 있지 않은 RU가 DU에 연결되고, DU가 이러한 RU의 능력을 식별하고, 널링 레이어(nulling layer) 지시자를 상기 RU에게 전송하지 않는 것 또한 본 개시의 일 실시 예로써 이해될 수 있다. 예를 들어, DU는 프론트홀(fronthaul)로 연결된 복수의 RU들로부터 널링 능력 보고를 수신할 수 있다. DU는 수신된 널링 능력 보고에 기반하여, 널링 레이어(nulling layer)를 고려하여 빔포밍 가중치(beamforming weight)를 생성하는 기능을 지원하지 않는 RU에게는 확장된 세션을 설정하지 않음으로써, 프론트홀 오버헤드(overhead)를 감소시킬 수 있다.
도 1a 내지 도 10을 통하여, CoMP(cooperative multi-point) 전송의 한 방식인 CB(cooperative beamforming)을 구현하기 위하여, DU(digital unit)이 섹션 타입(section type) 5에 널링 레이어(nulling layer)에 관한 파라미터를 포함하는 섹션 확장 필드를 구성하는 기술이 설명되었다. 구체적으로, 기술사양에 관한 규격인 ORAN을 참고하면, RB 상의 레이어에 스케줄링 된 단말에 관한 정보를 포함하는 섹션 타입 5에는 널링 레이어 여부를 지시하는 파라미터가 포함되어 있지 않으므로, 현재 규격의 내용에 따르면 CB 방식은 구현될 수 없다. 본 개시에 따른 다양한 실시 예들에 따르면, CoMP 전송을 수행하는 경우, DU가 스케줄링 정보를 전송하는 섹션 타입 5에 널링 레이어 여부를 지시하는 파라미터를 포함하여 RU에 전송하고, RU는 ZF(zero-forcing) 방식으로 생성된 빔포밍 가중치를 하향링크 신호에 적용함으로써, 셀 경계에 위치한 단말에 대한 빔을 널링시킬 수 있다. 즉, 본 개시에 따른 다양한 실시 예들에 따르면, 셀 경계에 위치한 단말의 관점에서 ICI(inter cell interference)를 줄이고 전송률(throughput)을 늘릴 수 있으며, 기지국의 관점에서 하나 이상의 빔을 널링(nulling) 시킴으로써, 인접 빔 간 간섭을 감소시킬 수 있으며, 널링 레이어(nulling layer)에 할당되었을 전력을 다른 레이어에 할당할 수 있으므로, 기지국의 전송 성능을 향상시킬 수 있다.
본 개시의 다양한 실시 예들에 따르면, 무선 통신 시스템에서 기지국의 DU(digital unit)에 의해 수행되는 방법은, 널링 레이어(nulling layer)를 식별하는 과정과, 상기 널링 레이어에 관한 정보를 포함하는 제1 제어 메시지를 상기 기지국의 RU(radio unit)에게 전송하는 과정을 포함할 수 있다.
일 실시 예에 따라, 상기 널링 레이어에 관한 정보는, MU(multi-user) 빔포밍(beamforming)시 신호가 전송되지 않는 레이어를 지시할 수 있다.
일 실시 예에 따라, 상기 제1 제어 메시지는 스케줄링 정보를 더 포함하고, 상기 스케줄링 정보는 RB(resource block)의 하나 이상의 레이어들에 스케줄링 된 단말들에 관한 자원 할당 정보를 포함하고, 상기 하나 이상의 레이어들은 상기 널링 레이어를 포함할 수 있다.
일 실시 예에 따라, 상기 기지국의 커버리지(coverage) 내의 단말들에 대한 하향링크 채널 정보를 포함하는 제2 제어 메시지를 상기 RU에게 전송하는 과정을 포함하고, 상기 제1 제어 메시지 및 상기 제2 제어 메시지는 제어 평면(control plane)에서 전송될 수 있다.
일 실시 예에 따라, 레이어 널링(layer nulling) 기능을 비활성화하는 파라미터를 포함하는 제3 제어 메시지를 상기 RU에게 전송하는 과정을 포함하고, 상기 제3 제어 메시지는 관리 평면(management plane)에서 전송될 수 있다.
본 개시의 다양한 실시 예들에 따르면, 무선 통신 시스템에서 기지국의 RU(radio unit)에 의해 수행되는 방법은, 섹션 확장 필드가 설정된 제1 제어 메시지를 상기 기지국의 DU(digital unit) 로부터 수신하는 과정과, 상기 기지국의 커버리지(coverage) 내의 단말들에 대한 하향링크 채널 정보를 포함하는 제2 제어 메시지를 상기 DU로부터 수신하는 과정과, 상기 제1 제어 메시지 및 상기 제2 제어 메시지에 기반하여, 빔포밍 가중치(beamforming weight, BFW)를 계산하는 과정과, 상기 BFW에 기반하여, 하향링크 신호를 전송하는 과정을 포함하고, 상기 제1 제어 메시지는 스케줄링 정보를 포함할 수 있다..
일 실시 예에 따라, 상기 스케줄링 정보는 RB(resource block)의 하나 이상의 레이어들에 각각 스케줄링 된 하나 이상의 단말들을 지시하는 파라미터를 포함하고, 상기 섹션 확장 필드는 상기 하나 이상의 레이어들에 대한 널링 차원(nulling dimension) 여부를 나타내는 파라미터를 포함할 수 있다.
일 실시 예에 따라, 상기 제1 제어 메시지 및 상기 제2 제어 메시지에 기반하여, 빔포밍 가중치(beamforming weight, BFW)를 계산하는 과정은, 상기 하향링크 채널 정보 및 상기 섹션 확장 필드에 기반하여 ZF(zero-forcing) 방식으로 상기 BFW를 계산하는 과정을 포함할 수 있다.
일 실시 예에 따라, 상기 제1 제어 메시지 및 상기 제2 제어 메시지는 제어 평면(control plane)에서 수신될 수 있다.
일 실시 예에 따라, 레이어 널링(layer nulling) 기능을 비활성화하는 파라미터를 포함하는 제3 제어 메시지를 상기 RU로부터 수신하는 과정을 포함하고, 상기 제3 제어 메시지는 관리 평면(management plane)에서 수신될 수 있다.
본 개시의 다양한 실시 예들에 따르면, 무선 통신 시스템에서 기지국의 DU(digital unit)은, 적어도 하나의 송수신기 및 상기 적어도 하나의 송수신기에 동작 가능하게 연결된 적어도 하나의 프로세서를 포함하고, 상기 적어도 하나의 프로세서는, 널링 레이어(nulling layer)를 식별하고, 상기 널링 레이어에 관한 정보를 포함하는 제1 제어 메시지를 상기 기지국의 RU(radio unit)에게 전송하도록 구성될 수 있다.
일 실시 예에 따라, 상기 널링 레이어에 관한 정보는, MU(multi-user) 빔포밍(beamforming)시 신호가 전송되지 않는 레이어를 지시할 수 있다.
일 실시 예에 따라, 상기 제1 제어 메시지는 스케줄링 정보를 더 포함하고, 상기 스케줄링 정보는 RB(resource block)의 하나 이상의 레이어들에 스케줄링 된 단말들에 관한 자원 할당 정보를 포함하고, 상기 하나 이상의 레이어들은 상기 널링 레이어를 포함할 수 있다.
일 실시 예에 따라, 상기 적어도 하나의 프로세서는, 상기 기지국의 커버리지(coverage) 내의 단말들에 대한 하향링크 채널 정보를 포함하는 제2 제어 메시지를 상기 RU에게 전송하도록 구성되고, 상기 제1 제어 메시지 및 상기 제2 제어 메시지를 제어 평면(control plane)에서 전송될 수 있다.
일 실시 예에 따라, 상기 적어도 하나의 프로세서는, 레이어 널링(layer nulling) 기능을 비활성화 하는 파라미터를 포함하는 제3 제어 메시지를 관리 평면(management plane)에서 전송하도록 구성될 수 있다.
본 개시의 다양한 실시 예들에 따르면, 무선 통신 시스템에서 기지국의 RU(radio unit)은, 적어도 하나의 송수신기 및 상기 적어도 하나의 송수신기에 동작 가능하게 연결된 적어도 하나의 프로세서를 포함하고, 상기 적어도 하나의 프로세서는, 섹션 확장 필드가 설정된 제1 제어 메시지를 상기 기지국의 DU(digital unit)로부터 수신하고, 상기 기지국의 커버리지(coverage) 내의 단말들에 대한 하향링크 채널 정보를 포함하는 제2 제어 메시지를 상기 DU로부터 수신하고, 상기 제1 제어 메시지 및 상기 제2 제어 메시지에 기반하여, 빔포밍 가중치(beamforming weight, BFW)를 계산하고, 상기 BFW에 기반하여, 하향링크 신호를 전송하도록 구성되고, 상기 제1 제어 메시지는 스케줄링 정보를 포함할 수 있다.
일 실시 예에 따라, 상기 스케줄링 정보는 RB(resource block)의 하나 이상의 레이어들에 각각 스케줄링 된 하나 이상의 단말들을 지시하는 파라미터를 포함하고, 상기 섹션 확장 필드는 상기 하나 이상의 레이어들에 대한 널링 차원(nulling dimension) 여부를 나타내는 파라미터를 포함할 수 있다.
일 실시 예에 따라, 상기 적어도 하나의 프로세서는, 상기 하향링크 채널 정보 및 상기 섹션 확장 필드에 기반하여, ZF(zero-forcing) 방식으로 상기 BFW를 계산하도록 구성될 수 있다.
일 실시 예에 따라, 상기 적어도 하나의 프로세서는, 상기 제1 제어 메시지 및 상기 제2 제어 메시지를 제어 평면(control plane)에서 수신하도록 구성될 수 있다.
일 실시 예에 따라, 상기 적어도 하나의 프로세서는, 레이어 널링(layer nulling) 기능을 비활성화하는 파라미터를 포함하는 제3 제어 메시지를 관리 평면(management palne)에서 수신하도록 구성될 수 있다.
본 개시의 청구항 또는 명세서에 기재된 실시 예들에 따른 방법들은 하드웨어, 소프트웨어, 또는 하드웨어와 소프트웨어의 조합의 형태로 구현될(implemented) 수 있다.
소프트웨어로 구현하는 경우, 하나 이상의 프로그램(소프트웨어 모듈)을 저장하는 컴퓨터 판독 가능 저장 매체가 제공될 수 있다. 컴퓨터 판독 가능 저장 매체에 저장되는 하나 이상의 프로그램은, 전자 장치(device) 내의 하나 이상의 프로세서에 의해 실행 가능하도록 구성된다(configured for execution). 하나 이상의 프로그램은, 전자 장치로 하여금 본 개시의 청구항 또는 명세서에 기재된 실시 예들에 따른 방법들을 실행하게 하는 명령어(instructions)를 포함한다.
이러한 프로그램(소프트웨어 모듈, 소프트웨어)은 랜덤 액세스 메모리 (random access memory), 플래시(flash) 메모리를 포함하는 불휘발성(non-volatile) 메모리, 롬(read only memory, ROM), 전기적 삭제가능 프로그램가능 롬(electrically erasable programmable read only memory, EEPROM), 자기 디스크 저장 장치(magnetic disc storage device), 컴팩트 디스크 롬(compact disc-ROM, CD-ROM), 디지털 다목적 디스크(digital versatile discs, DVDs) 또는 다른 형태의 광학 저장 장치, 마그네틱 카세트(magnetic cassette)에 저장될 수 있다. 또는, 이들의 일부 또는 전부의 조합으로 구성된 메모리에 저장될 수 있다. 또한, 각각의 구성 메모리는 다수 개 포함될 수도 있다.
또한, 프로그램은 인터넷(Internet), 인트라넷(Intranet), LAN(local area network), WAN(wide area network), 또는 SAN(storage area network)과 같은 통신 네트워크, 또는 이들의 조합으로 구성된 통신 네트워크를 통하여 접근(access)할 수 있는 부착 가능한(attachable) 저장 장치(storage device)에 저장될 수 있다. 이러한 저장 장치는 외부 포트를 통하여 본 개시의 실시 예를 수행하는 장치에 접속할 수 있다. 또한, 통신 네트워크상의 별도의 저장장치가 본 개시의 실시 예를 수행하는 장치에 접속할 수도 있다.
상술한 본 개시의 구체적인 실시 예들에서, 개시에 포함되는 구성 요소는 제시된 구체적인 실시 예에 따라 단수 또는 복수로 표현되었다. 그러나, 단수 또는 복수의 표현은 설명의 편의를 위해 제시한 상황에 적합하게 선택된 것으로서, 본 개시가 단수 또는 복수의 구성 요소에 제한되는 것은 아니며, 복수로 표현된 구성 요소라 하더라도 단수로 구성되거나, 단수로 표현된 구성 요소라 하더라도 복수로 구성될 수 있다.
한편 본 개시의 상세한 설명에서는 구체적인 실시 예에 관해 설명하였으나, 본 개시의 범위에서 벗어나지 않는 한도 내에서 여러 가지 변형이 가능함은 물론이다. 그러므로 본 개시의 범위는 설명된 실시 예에 국한되어 정해져서는 아니 되며 후술하는 특허청구의 범위뿐만 아니라 이 특허청구의 범위와 균등한 것들에 의해 정해져야 한다.
Claims (14)
- 무선 통신 시스템에서 DU(disgital unit)에 의해 수행되는 방법에 있어서,널링-레이어(nulling-layer)에 관한 정보를 포함하는 제어 메시지를 RU(radio unit)에게 전송하는 과정을 포함하고,상기 널링-레이어에 관한 정보는 상기 제어 메시지에 포함되는 단말 식별자(user equipment identifier)에 대응하는 레이어가 널링-레이어인지 여부를 지시하는 방법.
- 제1 항에 있어서,상기 제어 메시지의 섹션 타입(section type)이 5인, 방법.
- 제1 항에 있어서,상기 단말 식별자에 대응하는 레이어가 널링 레이어로 설정되는 경우, 상기 대응하는 레이어의 빔포밍 가중치(beamforming weight)는 0으로 설정되는 방법.
- 제1 항에 있어서,상기 널링 레이어에 관한 정보는 8비트로 구성되는 방법.
- 제1 항에 있어서,상기 널링 레이어에 관한 정보는 레이어 별로 지시되는, 방법.
- 제1 항에 있어서,상기 제어 메시지는 확장 플래그(extension flag, ef), 확장 타입(extension type, extType), 및 확장 길이(extension lengion, extLen)를 더 포함하고,상기 확장 플래그는 1비트를 포함하고,상기 확장 타입은 레이어에 대한 널(null) 여부를 지시하는 파라미터를 포함하고, 및상기 확장 길이는 적어도 하나의 워드(word)를 포함하는 방법.
- 무선 통신 시스템에서 RU(radio unit)에 의해 수행되는 방법에 있어서,널링 레이어(nulling layer)에 관한 정보를 포함하는 제어 메시지를 DU(digital unit)으로부터 수신하는 과정; 및단말 식별자(user equipment identifier)들에 대한 빔포밍 가중치(beamforming weight)들을 생성하는 과정을 포함하고,상기 널링 레이어에 관한 정보는 상기 제어 메시지에 포함되는 단말 식별자에 대응하는 레이어가 널링-레이어(nulling-layer)인지 여부를 지시하는 방법.
- 제7 항에 있어서,상기 제어 메시지의 섹션 타입(section type)은 5인, 방법.
- 제7 항에 있어서,상기 빔포밍 가중치들을 생성하는 과정에 있어서, 상기 단말 식별자에 대응하는 레이어가 널링 레이어로 설정되는 경우, 상기 대응하는 레이어의 빔포밍 가중치는 0으로 생성하는 과정을 더 포함하는 방법.
- 제7 항에 있어서,상기 널링 레이어에 관한 정보는 8비트로 구성되는 방법.
- 제7 항에 있어서,상기 널링 레이어에 관한 정보는 레이어 별로 지시되는 방법
- 제7 항에 있어서,상기 제어 메시지는 확장 플래그(extension flag, ef), 확장 타입(extension type, extType), 및 확장 길이(extension lengion, extLen)를 더 포함하고,상기 확장 플래그는 1비트를 포함하고,상기 확장 타입은 레이어에 대한 널(null) 여부를 지시하는 파라미터를 포함하고, 및상기 확장 길이는 적어도 하나의 워드(word)를 포함하는 방법.
- 무선 통신 시스템의 DU(digital unit)에 있어서,적어도 하나의 송수신기(at least one transceiver); 및상기 적어도 하나의 송수신기와 동작적으로(operably) 연결된 적어도 하나의 프로세서(at least one processor)를 포함하고,상기 적어도 하나의 프로세서는 청구항 제1 항 내지 청구항 제6 항 중 하나의 동작을 수행하도록 설정되는, DU.
- 무선 통신 시스템의 RU(radio unit)에 있어서,적어도 하나의 송수신기(at least one transceiver); 및상기 적어도 하나의 송수신기와 동작적으로(operably) 연결된 적어도 하나의 프로세서(at least one processor)를 포함하고,상기 적어도 하나의 프로세서는 청구항 제7 항 내지 청구항 제12 항 중 하나의 동작을 수행하도록 설정되는, RU.
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202180063871.6A CN116195291A (zh) | 2020-09-17 | 2021-09-17 | 用于无线通信系统中的前传传输的设备和方法 |
| EP21869812.4A EP4199629A4 (en) | 2020-09-17 | 2021-09-17 | APPARATUS AND METHOD FOR FRONTHAUL TRANSMISSION IN A WIRELESS COMMUNICATIONS SYSTEM |
| US18/184,221 US12615643B2 (en) | 2020-09-17 | 2023-03-15 | Device and method for fronthaul transmission in wireless communication system |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR10-2020-0120141 | 2020-09-17 | ||
| KR1020200120141A KR20220037318A (ko) | 2020-09-17 | 2020-09-17 | 무선 통신 시스템에서 프론트홀 전송을 위한 장치 및 방법 |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US18/184,221 Continuation US12615643B2 (en) | 2020-09-17 | 2023-03-15 | Device and method for fronthaul transmission in wireless communication system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2022060190A1 true WO2022060190A1 (ko) | 2022-03-24 |
Family
ID=80776301
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/KR2021/012893 Ceased WO2022060190A1 (ko) | 2020-09-17 | 2021-09-17 | 무선 통신 시스템에서 프론트홀 전송을 위한 장치 및 방법 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US12615643B2 (ko) |
| EP (1) | EP4199629A4 (ko) |
| KR (1) | KR20220037318A (ko) |
| CN (1) | CN116195291A (ko) |
| WO (1) | WO2022060190A1 (ko) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2024111314A1 (ja) * | 2022-11-24 | 2024-05-30 | 株式会社Kddi総合研究所 | 効率的な通信のための処理装置、制御装置、制御方法、及びプログラム |
| EP4535691A4 (en) * | 2022-06-23 | 2025-09-03 | Samsung Electronics Co Ltd | FRONTHAUL TRANSMISSION DEVICE AND METHOD IN A WIRELESS COMMUNICATION SYSTEM |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20240195473A1 (en) * | 2021-03-01 | 2024-06-13 | Telefonaktiebolaget Lm Ericsson (Publ) | Antenna power scaling in fronthaul lower layer split |
| CN119300156A (zh) * | 2023-07-10 | 2025-01-10 | 华为技术有限公司 | 一种通信方法及相关设备 |
| WO2025084632A1 (ko) * | 2023-10-16 | 2025-04-24 | 삼성전자주식회사 | 빔포밍 파라미터 셋을 식별하기 위한 전자 장치 및 방법 |
| WO2025127876A1 (ko) * | 2023-12-14 | 2025-06-19 | 삼성전자 주식회사 | 프론트홀 인터페이스를 통해 제어 평면 메시지를 송신 또는 수신하기 위한 방법 및 이를 수행하는 전자 장치 |
| WO2025161002A1 (en) * | 2024-02-04 | 2025-08-07 | Mavenir Systems, Inc. | System and method for power distribution in multiple antenna system |
| WO2026083493A1 (ja) * | 2024-10-15 | 2026-04-23 | 株式会社Nttドコモ | 基地局 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20160373177A1 (en) * | 2013-06-26 | 2016-12-22 | Kyocera Corporation | Base station, communication control method, and processor |
| US20190020392A1 (en) * | 2016-01-08 | 2019-01-17 | Commscope Technologies Llc | System and method for carrier aggregation using beamforming |
| US20190036583A1 (en) * | 2017-07-27 | 2019-01-31 | Qualcomm Incorporated | Coordinated beamforming (cobf) protocol for unmanaged networks |
| US20190289497A1 (en) * | 2018-03-19 | 2019-09-19 | Mavenir Networks, Inc. | System and method for reduction in fronthaul interface bandwidth for cloud ran |
| WO2020110005A1 (en) * | 2018-11-30 | 2020-06-04 | Telefonaktiebolaget Lm Ericsson (Publ) | Communicating using beamforming weights determined at a radio unit |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20050087177A (ko) | 2004-02-25 | 2005-08-31 | 삼성전자주식회사 | 스마트 안테나 제어 장치 및 방법 |
| CN105827368B (zh) | 2009-07-08 | 2019-04-30 | 韩国电子通信研究院 | 联合通信系统中数据收发方法及联合通信方法 |
| WO2014008104A1 (en) | 2012-07-02 | 2014-01-09 | Intel Corporation | Simultaneous transmit and receive |
| US9214996B2 (en) * | 2012-07-06 | 2015-12-15 | Lg Electronics Inc. | Method of receiving or transmitting downlink signal in wireless communication system and device for performing the method |
| KR20140077728A (ko) | 2012-12-14 | 2014-06-24 | 한국전자통신연구원 | 다중 사용자의 상향링크 통신을 위한 간섭 제거 방법 |
| KR101791209B1 (ko) | 2016-06-30 | 2017-11-20 | 서강대학교산학협력단 | 무선 전송 Ponit-to-Multipoint 프론트홀 시스템 |
| US11172444B2 (en) * | 2016-10-10 | 2021-11-09 | Qualcomm Incorporated | Techniques for power control and management |
| WO2018182233A1 (ko) * | 2017-03-30 | 2018-10-04 | 엘지전자 주식회사 | 무선통신시스템에서 직교 또는 비직교 부호 다중 접속 기법을 사용하여 통신을 수행하는 방법 및 장치 |
| KR102164690B1 (ko) | 2017-10-31 | 2020-10-12 | 에스케이 텔레콤주식회사 | 빔 인덱스를 관리하는 방법 및 장치 |
| KR102546177B1 (ko) * | 2017-11-16 | 2023-06-22 | 삼성전자주식회사 | 무선 통신 시스템에서 연결을 관리하기 위한 장치 및 방법 |
| WO2020109892A1 (en) | 2018-11-30 | 2020-06-04 | Telefonaktiebolaget Lm Ericsson (Publ) | Methods for separating reference symbols and user data in a lower layer split |
| WO2020119910A1 (en) * | 2018-12-13 | 2020-06-18 | Telefonaktiebolaget Lm Ericsson (Publ) | Adaptation of beamformed transmission |
| US11375476B2 (en) * | 2019-10-01 | 2022-06-28 | Qualcomm Incorporated | Sidelink feedback transmission with multiple feedback timelines |
-
2020
- 2020-09-17 KR KR1020200120141A patent/KR20220037318A/ko active Pending
-
2021
- 2021-09-17 EP EP21869812.4A patent/EP4199629A4/en active Pending
- 2021-09-17 WO PCT/KR2021/012893 patent/WO2022060190A1/ko not_active Ceased
- 2021-09-17 CN CN202180063871.6A patent/CN116195291A/zh active Pending
-
2023
- 2023-03-15 US US18/184,221 patent/US12615643B2/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20160373177A1 (en) * | 2013-06-26 | 2016-12-22 | Kyocera Corporation | Base station, communication control method, and processor |
| US20190020392A1 (en) * | 2016-01-08 | 2019-01-17 | Commscope Technologies Llc | System and method for carrier aggregation using beamforming |
| US20190036583A1 (en) * | 2017-07-27 | 2019-01-31 | Qualcomm Incorporated | Coordinated beamforming (cobf) protocol for unmanaged networks |
| US20190289497A1 (en) * | 2018-03-19 | 2019-09-19 | Mavenir Networks, Inc. | System and method for reduction in fronthaul interface bandwidth for cloud ran |
| WO2020110005A1 (en) * | 2018-11-30 | 2020-06-04 | Telefonaktiebolaget Lm Ericsson (Publ) | Communicating using beamforming weights determined at a radio unit |
Non-Patent Citations (1)
| Title |
|---|
| See also references of EP4199629A4 * |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4535691A4 (en) * | 2022-06-23 | 2025-09-03 | Samsung Electronics Co Ltd | FRONTHAUL TRANSMISSION DEVICE AND METHOD IN A WIRELESS COMMUNICATION SYSTEM |
| WO2024111314A1 (ja) * | 2022-11-24 | 2024-05-30 | 株式会社Kddi総合研究所 | 効率的な通信のための処理装置、制御装置、制御方法、及びプログラム |
| JP2024076143A (ja) * | 2022-11-24 | 2024-06-05 | 株式会社Kddi総合研究所 | 効率的な通信のための処理装置、制御装置、制御方法、及びプログラム |
| JP7783799B2 (ja) | 2022-11-24 | 2025-12-10 | 株式会社Kddi総合研究所 | 効率的な通信のための処理装置、制御装置、制御方法、及びプログラム |
Also Published As
| Publication number | Publication date |
|---|---|
| EP4199629A4 (en) | 2024-03-20 |
| US20230224919A1 (en) | 2023-07-13 |
| CN116195291A (zh) | 2023-05-30 |
| KR20220037318A (ko) | 2022-03-24 |
| EP4199629A1 (en) | 2023-06-21 |
| US12615643B2 (en) | 2026-04-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2021075935A1 (en) | Device and method for fronthaul transmission in wireless communication system | |
| WO2022060190A1 (ko) | 무선 통신 시스템에서 프론트홀 전송을 위한 장치 및 방법 | |
| WO2022060191A1 (ko) | 무선 통신 시스템에서 프론트홀 전송을 위한 장치 및 방법 | |
| JP7830438B2 (ja) | 無線通信システムにおけるフロントホール伝送のための装置及び方法 | |
| WO2022060186A1 (ko) | 무선 통신 시스템에서 프론트홀 전송을 위한 장치 및 방법 | |
| WO2021086131A1 (en) | Device and method for fronthaul transmission in wireless communication system | |
| WO2021075917A1 (en) | Apparatus and method for managing resource of radio unit of base station in wireless communication system | |
| WO2017034272A1 (en) | Method and apparatus for communication in wireless communication system | |
| WO2021118281A1 (ko) | 무선 접속 망에서 셀 정보를 포함하는 e2 인터페이스 설정을 위한 장치 및 방법 | |
| WO2019074289A1 (ko) | Srs를 전송하는 방법과 이를 위한 단말 | |
| WO2023008976A1 (ko) | 무선 통신 시스템에서 프런트홀 전송을 위한 장치 및 방법 | |
| WO2023014020A1 (ko) | 무선 통신 시스템에서 프런트홀 전송을 위한 장치 및 방법 | |
| WO2019074266A1 (ko) | Srs를 전송 및 수신하는 방법과 이를 위한 통신 장치 | |
| WO2017018783A1 (ko) | 무선 통신 시스템에서 랭크 관련 정보를 결정하는 방법 및 장치 | |
| WO2021256896A1 (ko) | 무선 통신 시스템에서 스펙트럼 공유를 위한 장치 및 방법 | |
| WO2019124957A1 (en) | Apparatus and method for measurement configuration in wireless communication system | |
| WO2021054690A1 (en) | Apparatus and method for allocating guard band in wireless communication system | |
| WO2022030863A1 (ko) | 무선 통신 시스템에서 슬라이스 기반 시스템 접속 설정 정보를 처리하기 위한 장치 및 방법 | |
| WO2020091469A1 (en) | Apparatus and method for controlling measurement operations in wireless communication system | |
| WO2021118314A1 (en) | Apparatus and method for transmitting and receiving signals on multiple bands in wireless communication system | |
| WO2023059031A1 (ko) | 무선 통신 시스템에서 프론트홀 전송을 위한 장치 및 방법 | |
| WO2018084567A1 (ko) | 무선 통신 시스템에서 코어망을 선택하기 위한 장치 및 방법 | |
| WO2023239022A1 (ko) | 프론트홀 인터페이스에서 사용자 평면 메시지를 전송하기 위한 전자 장치 및 방법 | |
| WO2023249356A1 (ko) | 무선 통신 시스템에서 프론트홀 전송을 위한 장치 및 방법 | |
| WO2019050378A1 (ko) | 무선 통신 시스템에서 위상 잡음을 제거하기 위한 방법 및 장치 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21869812 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 202317025047 Country of ref document: IN |
|
| ENP | Entry into the national phase |
Ref document number: 2021869812 Country of ref document: EP Effective date: 20230315 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |