WO2022156545A1 - 集气管组件 - Google Patents

集气管组件 Download PDF

Info

Publication number
WO2022156545A1
WO2022156545A1 PCT/CN2022/070640 CN2022070640W WO2022156545A1 WO 2022156545 A1 WO2022156545 A1 WO 2022156545A1 CN 2022070640 W CN2022070640 W CN 2022070640W WO 2022156545 A1 WO2022156545 A1 WO 2022156545A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
main pipe
sleeve
gas collecting
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2022/070640
Other languages
English (en)
French (fr)
Inventor
王文杰
刘海波
方艺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dunan Artificial Environment Co Ltd
Original Assignee
Zhejiang Dunan Artificial Environment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dunan Artificial Environment Co Ltd filed Critical Zhejiang Dunan Artificial Environment Co Ltd
Priority to JP2023525994A priority Critical patent/JP2024501916A/ja
Priority to KR1020237018623A priority patent/KR20230101859A/ko
Priority to EP22742024.7A priority patent/EP4283220A4/en
Publication of WO2022156545A1 publication Critical patent/WO2022156545A1/zh
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28—HEAT EXCHANGE IN GENERAL
    • F28F—DETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00—Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/02—Header boxes; End plates
    • F28F9/04—Arrangements for sealing elements into header boxes or end plates
    • F28F9/16—Arrangements for sealing elements into header boxes or end plates by permanent joints, e.g. by rolling
    • F28F9/18—Arrangements for sealing elements into header boxes or end plates by permanent joints, e.g. by rolling by welding
    • F28F9/185—Arrangements for sealing elements into header boxes or end plates by permanent joints, e.g. by rolling by welding with additional preformed parts
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K1/00—Soldering, e.g. brazing, or unsoldering
    • B23K1/0008—Soldering, e.g. brazing, or unsoldering specially adapted for particular articles or work
    • B23K1/0012—Brazing of heat exchangers
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00—Branching pipes; Joining pipes to walls
    • F16L41/02—Branch units, e.g. made in one piece, welded, riveted
    • F16L41/03—Branch units, e.g. made in one piece, welded, riveted comprising junction pieces for four or more pipe members
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00—Devices for use where pipes, cables or protective tubing pass through walls or partitions
    • F16L5/02—Sealing
    • F16L5/10—Sealing by using sealing rings or sleeves only
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B39/00—Evaporators; Condensers
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B39/00—Evaporators; Condensers
    • F25B39/02—Evaporators
    • F25B39/028—Evaporators having distributing means
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28—HEAT EXCHANGE IN GENERAL
    • F28F—DETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F21/00—Constructions of heat-exchange apparatus characterised by the selection of particular materials
    • F28F21/08—Constructions of heat-exchange apparatus characterised by the selection of particular materials of metal
    • F28F21/081—Heat exchange elements made from metals or metal alloys
    • F28F21/082—Heat exchange elements made from metals or metal alloys from steel or ferrous alloys
    • F28F21/083—Heat exchange elements made from metals or metal alloys from steel or ferrous alloys from stainless steel
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28—HEAT EXCHANGE IN GENERAL
    • F28F—DETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F21/00—Constructions of heat-exchange apparatus characterised by the selection of particular materials
    • F28F21/08—Constructions of heat-exchange apparatus characterised by the selection of particular materials of metal
    • F28F21/081—Heat exchange elements made from metals or metal alloys
    • F28F21/085—Heat exchange elements made from metals or metal alloys from copper or copper alloys
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28—HEAT EXCHANGE IN GENERAL
    • F28F—DETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00—Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/02—Header boxes; End plates
    • F28F9/04—Arrangements for sealing elements into header boxes or end plates
    • F28F9/16—Arrangements for sealing elements into header boxes or end plates by permanent joints, e.g. by rolling
    • F28F9/18—Arrangements for sealing elements into header boxes or end plates by permanent joints, e.g. by rolling by welding
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28—HEAT EXCHANGE IN GENERAL
    • F28F—DETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00—Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/26—Arrangements for connecting different sections of heat-exchange elements, e.g. of radiators
    • F28F9/262—Arrangements for connecting different sections of heat-exchange elements, e.g. of radiators for radiators
    • F28F9/264—Arrangements for connecting different sections of heat-exchange elements, e.g. of radiators for radiators by sleeves, nipples
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00—Articles made by soldering, welding or cutting
    • B23K2101/04—Tubular or hollow articles
    • B23K2101/14—Heat exchangers
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00—Problems to be solved
    • F25B2500/22—Preventing, detecting or repairing leaks of refrigeration fluids
    • F25B2500/221—Preventing leaks from developing
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28—HEAT EXCHANGE IN GENERAL
    • F28F—DETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F2275/00—Fastening; Joining
    • F28F2275/04—Fastening; Joining by brazing
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28—HEAT EXCHANGE IN GENERAL
    • F28F—DETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F2275/00—Fastening; Joining
    • F28F2275/06—Fastening; Joining by welding

Definitions

  • the present application relates to the technical field of refrigeration, and in particular, to a gas collecting pipe assembly.
  • the gas collecting pipe assembly is often used to distribute the flow of the refrigerant, and this gas collecting pipe assembly is mostly connected to the inlet and outlet ends of the condenser and the evaporator.
  • the main pipe and the branch pipe are directly brazed in the furnace, so that the welding space is limited, and the hardness of the branch pipe after direct brazing in the furnace is too low, which is easy to deform during transportation.
  • the present application provides a gas collecting pipe assembly with high hardness and not easily deformed.
  • a gas collecting pipe assembly includes a main pipe and a branch pipe, the branch pipe is fixed on the main pipe and communicated with the inside of the main pipe; the gas collecting pipe assembly also includes a sleeve, and the outer side wall of the main pipe is provided with a mounting pipe One end of the sleeve is fixed in the installation hole, the other end is located outside the main pipe, one end of the branch pipe extends into the sleeve from the end of the sleeve away from the main pipe, and is connected with the main pipe The casing is welded and connected.
  • the present application solves the problem that the hardness of the branch pipe caused by the direct welding connection between the main pipe and the branch pipe is too low.
  • the sleeve includes a neck section and a flare section, the neck section is connected to the main pipe, and the flare section is connected to the branch pipe.
  • the sleeve further includes a limiting section, the limiting section is located between the constricting section and the flaring section, and the outer diameter of the limiting section is larger than the mounting hole aperture.
  • the limiting section restricts the sleeve from extending too far into the main pipe, which plays a positioning role, ensures sufficient contact between the solder and the welding seam, and avoids leakage.
  • the main pipe is provided with a protruding portion, the mounting hole is opened on the protruding portion, and the constricted portion is connected to the protruding portion.
  • the protruding portion and the main pipe are provided in one piece.
  • the necked section and the main pipe are welded by means of furnace brazing.
  • the flared section and the branch pipe are welded by flame welding.
  • the diameter of the main pipe is defined as D
  • the depth of the sleeve inserted into the main pipe through the installation hole is defined as H
  • D and H satisfy the following relationship Formula: H ⁇ 0.5D.
  • the main pipe is a stainless steel pipe.
  • the sleeve and the branch pipe are copper pipes.
  • the gas collecting pipe assembly provided by the present application solves the problem caused by the direct welding connection of the main pipe and the branch pipe by adopting the method of connecting the sleeve between the main pipe and the branch pipe.
  • the hardness of the branch pipe is too low, and it is easy to deform during transportation.
  • Fig. 1 is the structural schematic diagram of the gas collecting pipe assembly provided by this application;
  • FIG. 2 is a partial enlarged view of A in FIG. 1 .
  • a component when referred to as being “mounted on” another component, it can be directly on the other component or there may also be an intervening component.
  • a component When a component is considered to be “set on” another component, it may be directly set on the other component or there may be a co-existing centered component.
  • a component When a component is said to be “fixed” to another component, it may be directly fixed to the other component or there may also be an intervening component.
  • the present application provides a gas collecting pipe assembly 100 , which is applied in the refrigerant pipeline of the air conditioning system, and is mostly connected to the inlet and outlet ends of the condenser and the evaporator, and is usually used for to distribute the flow of refrigerant.
  • the gas collecting pipe assembly 100 includes a main pipe 10 and a branch pipe 20.
  • the branch pipe 20 is fixed on the main pipe 10 and communicates with the interior of the main pipe 10; 11.
  • One end of the sleeve 30 is fixed in the installation hole 11 and the other end is located outside the main pipe 10.
  • the main pipe and the branch pipe are directly brazed in the furnace, so that the welding space is limited, and the hardness of the branch pipe after direct brazing in the furnace is too low, which is easy to deform during transportation.
  • the sleeve 30 between the main pipe 10 and the branch pipe 20 by connecting the sleeve 30 between the main pipe 10 and the branch pipe 20 , the problem of the branch pipe 20 being too low in hardness and easily deformed during transportation caused by the direct welding connection between the main pipe 10 and the branch pipe 20 is solved.
  • the sleeve 30 is used as the transition pipe for welding the main pipe 10 and the branch pipe 20.
  • the sleeve 30 and the main pipe 10 are brazed in the furnace, and then the branch pipe 20 is welded. 10 and the branch pipe 20 are directly welded and connected, resulting in the problem that the hardness of the branch pipe 20 is too low and is easily deformed during transportation.
  • the material of the main pipe 10 is SUS304 stainless steel; of course, in other embodiments, the material of the main pipe 10 is carbon steel or aluminum, which is not limited herein.
  • the material of the branch pipe 20 is selected from TP2Y copper material; of course, in other embodiments, the material of the branch pipe 20 can also be selected from other types, which is not limited herein.
  • the main pipe 10 is provided with a plurality of installation holes 11 , and a plurality of branch pipes 20 are correspondingly installed in each installation hole 11 .
  • the main pipe 10 is provided with a convex portion 12, the mounting hole 11 is opened on the convex portion 12, and the convex portion 12 and the main pipe 10 are set as one piece.
  • the convex portion 12 is formed by punching the main pipe 10 from the inside of the main pipe 10 toward the outside of the main pipe 10 , so as to facilitate welding between the main pipe 10 and the sleeve 30 .
  • one end of the main pipe 10 also has a connecting section 13, and the connecting section 13 is connected with the pipeline components of the refrigeration system.
  • a plurality of branch pipes 20 are opened on the side of the main pipe 10, and the branch pipes 20 are used for connecting with the system. heat exchanger connection.
  • a copper sleeve 131 is connected to the end of the connecting section 13. Since the main pipe 10 and the connecting section 13 are made of stainless steel, the setting of the copper sleeve 131 is convenient for the connecting section 13 and the pipeline of the refrigeration system made of copper metal material. piece connection.
  • the main pipe 10 is a straight pipe structure
  • the connecting section 13 is a bent pipe section with a bending angle of approximately 180°, so that the connecting section 13 and the main pipe 10 are approximately parallel, so that in the refrigeration system, the system piping components and the gas collecting pipe are connected.
  • the assemblies 100 are generally arranged in parallel, which reduces the assembly space, makes the structure more compact, and improves the space utilization rate.
  • the sleeve 30 includes a necked section 31 and a flared section 32 , the necked section 31 is connected to the main pipe 10 , and the flared section 32 is connected to the branch pipe 20 , thus enhancing the welding between the main pipe 10 and the branch pipe 20 Reliability.
  • the material of the sleeve 30 is made of copper; of course, in other embodiments, the material of the branch pipe 20 can also be made of other types, which is not limited here.
  • the necked section 31 and the main pipe 10 are welded by brazing in the furnace, which not only improves the welding efficiency, but also reduces the cost; of course, in other embodiments, the necked section 31 and the main pipe 10 can also be welded in other ways, which are not limited here.
  • the flared section 32 and the branch pipe 20 are welded by flame welding, which makes the process simpler and the operation technique easier to grasp; of course, in other embodiments, the flared The segment 32 and the branch pipe 20 may also be welded in other ways, which are not limited herein.
  • the sleeve 30 further includes a limiting section 33, the limiting section 33 is located between the constricting section 31 and the flaring section 32, the outer diameter of the limiting section 33 is larger than the diameter of the mounting hole 11, and the limiting section 33 limits the diameter of the mounting hole 11.
  • the sleeve 30 protrudes into the main pipe 10 excessively, which plays a positioning role, ensures the sufficient contact between the solder and the welding seam, and avoids leakage.
  • the diameter of the main pipe 10 is defined as D
  • the depth of the sleeve 30 inserted into the main pipe 10 through the installation hole 11 is defined as H, and D and H satisfy the following relationship: H ⁇ 0.5D; If the pipe 30 is inserted into the main pipe 10 too deeply, the cost will be increased and blockage will be caused;
  • the plurality of branch pipes 20 and the plurality of sleeves 30 are punched. Since the punching is guaranteed by the die, the consistency of the parts is ensured and the precision of the parts is also ensured.
  • the manufacturing process of the gas collector assembly 100 includes the following steps:
  • the first step is to prepare the main pipe 10, cut a stainless steel pipe of suitable length, chamfer the stainless steel pipe, and then use a shrinking machine to shrink both ends of the stainless steel pipe, and then use a drawing machine to pull out the side wall of the stainless steel pipe For welding the mounting hole 11 of the sleeve 30, then use a pipe bender to bend the connecting section 13 of the main pipe 10, and finally clean and dry;
  • the second step is to prepare the branch pipe 20, intercept a copper pipe of suitable length, and align the copper pipe.
  • the sleeve 30 is prepared, the copper pipe of suitable length is intercepted, the copper pipe is chamfered, and then the copper pipe is used for welding one end of the branch pipe 20 using a flaring machine. Flaring is carried out according to the requirements, so that the diameter of the flared section of the copper pipe matches the diameter of the branch pipe 20, and then the end of the copper pipe used for welding the main pipe 10 is narrowed according to the requirements, so that the diameter of the narrowing section of the copper pipe is slightly smaller.
  • the installation hole 11 smaller than the side wall of the main pipe 10 is cleaned and dried at the end; the fourth step, assembling, insert the constricted section 31 of the sleeve 30 into the installation hole 11 of the side wall of the main pipe 10, and insert the solid annular bronze solder sleeve into The branch pipe 20; the fifth step, welding, pass the assembled sleeve 30 and the main pipe 10 through the welding furnace, the temperature of the welding furnace is controlled at 930 ° C, and the speed of the sleeve 30 and the main pipe 10 passing through the welding furnace is 0.3 m/min; sixth Step: Insert the branch pipe 20 into the flared section 32 of the sleeve 30 so that the branch pipe 20 and the main pipe 10 are fixed and welded to each other, and flame welding, laser welding or argon arc welding can be used. Check whether the air tube assembly 100 is poorly welded.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Branch Pipes, Bends, And The Like (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

一种集气管组件,包括主管(10)及支管(20),支管(20)固定于主管(10)上,并与主管(10)的内部连通设置;集气管组件还包括套管(30),主管(10)的外侧壁开设有安装孔(11),套管(30)的一端固定于安装孔(11)内,另一端位于主管(10)外侧,支管(20)的一端从套管(30)远离主管(10)的一端伸入套管(30)内,并与套管(30)焊接连接。

Description

集气管组件
相关申请
本申请要求2021年1月21日申请的,申请号为202120170856.9,发明名称为“集气管组件”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。
技术领域
本申请涉及制冷技术领域,特别是涉及一种集气管组件。
背景技术
在空调系统的制冷剂管路中,常采用集气管组件来分配制冷剂的流动,这种集气管组件大多连接在冷凝器、蒸发器的进出口端。
通常的集气管组件,都是将主管与支管直接进行炉中钎焊,使得焊接空间受限,而且直接炉中钎焊后支管的硬度过低,运输过程中易变形。
发明内容
有鉴于此,针对上述技术问题,本申请提供了一种硬度大、不易变形的集气管组件。
为解决上述技术问题,本申请提供如下技术方案:
一种集气管组件,包括主管及支管,所述支管固定于所述主管上,并与所述主管的内部连通设置;所述集气管组件还包括套管,所述主管的外侧壁开设有安装孔,所述套管的一端固定于所述安装孔内,另一端位于所述主管外侧,所述支管的一端从所述套管远离所述主管的一端伸入所述套管内,并与所述套管焊接连接。
可以理解的是,本申请通过采用在所述主管和所述支管之间连接所述套管的方式,解决了所述主管与所述支管直接焊接连接导致的所述支管硬度太低,且运输时易变形的问题。
在其中一个实施例中,所述套管包括缩口段和扩口段,所述缩口段与所述主管连接,所述扩口段与所述支管连接。
可以理解的是,增强了所述主管与所述支管之间的焊接牢靠性。
在其中一个实施例中,所述套管还包括限位段,所述限位段位于所述缩口段和所述扩口段之间,所述限位段的外径大于所述安装孔的孔径。
可以理解的是,所述限位段限制了所述套管过度伸入所述主管中,起到了定位作用, 确保了焊料与焊缝的充分接触,避免泄漏。
在其中一个实施例中,所述主管上设有凸部,所述安装孔开设于所述凸部上,所述缩口段与所述凸部连接。
可以理解的是,便于所述主管与所述套管之间的焊接。
在其中一个实施例中,所述凸部与所述主管设置为一体式。
在其中一个实施例中,所述缩口段与所述主管通过炉中钎焊的方式进行焊接。
可以理解的是,不仅提升了焊接效率,也降低了成本。
在其中一个实施例中,所述扩口段与所述支管通过火焰焊接的方式进行焊接。
可以理解的是,使得工艺过程更为简单,操作技术更加容易被掌握。
在其中一个实施例中,所述主管的直径定义为D,沿所述安装孔的轴线方向,所述套管通过所述安装孔插入所述主管的深度定义为H,D和H满足以下关系式:H≤0.5D。
可以理解的是,若所述套管插入所述主管过深,则会导致成本增高,还会引起阻塞;若所述套管插入所述主管过浅,则会使得所述套管在与所述主管焊接的时候焊接发黑。
在其中一个实施例中,所述主管为不锈钢管。
在其中一个实施例中,所述套管和所述支管为铜管。
与相关技术相比,本申请提供的集气管组件,通过采用在所述主管和所述支管之间连接所述套管的方式,解决了所述主管与所述支管直接焊接连接导致的所述支管硬度太低,且运输时易变形的问题。
附图说明
图1为本申请提供的集气管组件的结构示意图;
图2为图1中A处的局部放大图。
图中各符号表示含义如下:
100、集气管组件;10、主管;11、安装孔;12、凸部;13、连接段;131、铜套;20、支管;30、套管;31、缩口段;32、扩口段;33、限位段。
具体实施方式
下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。
需要说明的是,当组件被称为“装设于”另一个组件,它可以直接在另一个组件上或者也可以存在居中的组件。当一个组件被认为是“设置于”另一个组件,它可以是直接设置在另一个组件上或者可能同时存在居中组件。当一个组件被认为是“固定于”另一个组件,它可以是直接固定在另一个组件上或者可能同时存在居中组件。
除非另有定义,本文所使用的所有的技术和科学术语与属于本申请的技术领域的技术人员通常理解的含义相同。本文中在本申请的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本申请。本文所使用的术语“或/及”包括一个或多个相关的所列项目的任意的和所有的组合。
请参考图1至图2,本申请提供一种集气管组件100,该集气管组件100应用于空调系统的制冷剂管路中,大多连接于冷凝器、蒸发器的进出口端,通常被用来分配制冷剂的流动。
具体地,集气管组件100包括主管10及支管20,支管20固定于主管10上,并与主管10的内部连通设置;集气管组件100还包括套管30,主管10的外侧壁开设有安装孔11,套管30的一端固定于安装孔11内,另一端位于主管10外侧,支管20的一端从套管30远离主管10的一端伸入套管30内,并与套管30焊接连接。
需要说明的是,通常的集气管组件,都是将主管与支管直接进行炉中钎焊,使得焊接空间受限,而且直接炉中钎焊后支管的硬度过低,运输过程中易变形。而本实施方式中,通过采用在主管10和支管20之间连接套管30的方式,解决了主管10与支管20直接焊接连接导致的支管20硬度太低,且运输时易变形的问题。
可以理解的是,通常情况下来说,由于主管10和支管20之间直接进行焊接的时候会受到体积的限制,当支管20的体积较大时,难以实现二者的焊接;而套管30的体积远远小于支管20的体积,因此本申请中采用套管30作为主管10和支管20焊接的过渡管,先将套管30和主管10炉中钎焊,然后再焊接支管20,解决了主管10与支管20直接焊接连接导致的支管20硬度太低,且运输时易变形的问题。
可选地,在本实施例中,主管10的材质为SUS304不锈钢;当然,在其他实施例中,主管10的材质为碳钢或者铝,在此不作限定。
可选地,在本实施例中,支管20的材质选用TP2Y铜材;当然,在其他实施例中,支管20的材质还可以选用其他类型,在此不作限定。
在本实施例中,主管10上开设有多个安装孔11,多根支管20对应的安装于每个安装孔11中。
如图1所示,主管10上设有凸部12,安装孔11开设于凸部12上,且凸部12与主管 10设置为一体式。
需要说明的是,凸部12是由主管10从主管10内部朝向主管10外部的方向冲压而成的,如此便于主管10与套管30之间的焊接。
具体地,沿主管10轴向方向,主管10的一端还具有连接段13,连接段13与制冷系统的管路件连接,多根支管20开设于主管10的侧面,支管20用于与系统的换热器连接。
进一步地,连接段13的端部连接有铜套131,由于主管10以及连接段13均为不锈钢材质,因此铜套131的设置便于连接段13与使用铜金属材料制成的制冷系统的管路件连接。
具体地,主管10为直管结构,连接段13为折弯角度大致在180°的弯管段,这样使得连接段13和主管10大致平行,便于在制冷系统中,系统管路件与集气管组件100大致平行设置,减少装配空间,结构更为紧凑,提升了空间利用率。
如图2所示,套管30包括缩口段31和扩口段32,缩口段31与主管10连接,扩口段32与支管20连接,如此增强了主管10与支管20之间的焊接牢靠性。
可选地,在本实施例中,套管30的材质选用铜材;当然,在其他实施例中,支管20的材质还可以选用其他类型,在此不作限定。
可以理解的是,由于铜材的热胀冷缩率要高于不锈钢,因此套管30的缩口段31与主管10焊接时,套管30的膨胀幅度要大于主管10,这样便会使得两者之间的焊接更加牢固、可靠。
可选地,在本实施例中,缩口段31与主管10通过炉中钎焊的方式进行焊接,如此不仅提升了焊接效率,也降低了成本;当然,在其他实施例中,缩口段31与主管10也可以采用其他方式进行焊接,在此不作限定。
可选地,在本实施例中,扩口段32与支管20通过火焰焊接的方式进行焊接,如此使得工艺过程更为简单,操作技术更加容易被掌握;当然,在其他实施例中,扩口段32与支管20也可以采用其他方式进行焊接,在此不作限定。
进一步地,套管30还包括限位段33,限位段33位于缩口段31和扩口段32之间,限位段33的外径大于安装孔11的孔径,限位段33限制了套管30过度伸入主管10中,起到了定位作用,确保了焊料与焊缝的充分接触,避免泄漏。
进一步地,主管10的直径定义为D,沿安装孔11的轴线方向,套管30通过安装孔11插入主管10的深度定义为H,D和H满足以下关系式:H≤0.5D;若套管30插入主管10过深,则会导致成本增高,还会引起阻塞;若套管30插入主管10过浅,则会使得套管30在与主管10焊接的时候焊接发黑。
在本实施例中,多根支管20和多个套管30均为冲制而成,因冲压由模具保证,因此在保证了零件的一致性的同时也保证了零件的精度。
在本实施例中,该集气管组件100的制造工艺包括以下步骤:
第一步,制备主管10,截取合适长度的不锈钢管,对不锈钢管倒角处理,然后使用缩口机对不锈钢管两端进行缩口,再使用拉拔机在不锈钢管的侧壁拉拔出用于焊接套管30的安装孔11,然后使用弯管机对主管10的连接段13进行弯管,最后清洗烘干;笫二步,制备支管20,截取适合长度的铜管,对铜管进行倒角处理,最后进行清洗烘干;笫三步,制备套管30,截取适合长度的铜管,对铜管进行倒角处理,然后使用扩口机对铜管用于焊接支管20的一端根据要求进行扩口,使铜管的扩口段直径与支管20相匹配,然后使用缩口机对铜管用于焊接主管10的一端根据要求进行缩口,使铜管的缩口段直径略小于主管10侧壁的安装孔11,最后进行清洗烘干;第四步,装配,将套管30的缩口段31插入主管10侧壁的安装孔11,将固态环状的青铜焊料套装入支管20;第五步,焊接,将装配好的套管30和主管10通过焊炉,焊炉温度控制在930℃,套管30和主管10通过焊炉的速度在0.3米/分;第六步:再将支管20插入套管30的扩口段32使得支管20和主管10相互固定焊接,可以采用火焰焊、激光焊或者氩弧焊,第七步,测漏检验,查看焊接好的集气管组件100有没有焊接不良。
在焊接集气管组件100中的主管10和支管20的过程中,通过在主管10和支管20之间焊接设置起到过渡作用的套管30,便解决了主管10与支管20炉焊导致支管20硬度降低,运输时易变形的问题。
以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。
以上所述实施例仅表达了本申请的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对申请专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本申请构思的前提下,还可以做出若干变形和改进,这些都属于本申请的保护范围。因此,本申请专利的保护范围应以所附权利要求为准。

Claims (10)

  1. 一种集气管组件,包括主管及支管,所述支管固定于所述主管上,并与所述主管的内部连通设置;
    其特征在于,所述集气管组件还包括套管,所述主管的外侧壁开设有安装孔,所述套管的一端固定于所述安装孔内,另一端位于所述主管外侧,所述支管的一端从所述套管远离所述主管的一端伸入所述套管内,并与所述套管焊接连接。
  2. 根据权利要求1所述的集气管组件,其特征在于,所述套管包括缩口段和扩口段,所述缩口段与所述主管连接,所述扩口段与所述支管连接。
  3. 根据权利要求2所述的集气管组件,其特征在于,所述套管还包括限位段,所述限位段位于所述缩口段和所述扩口段之间,所述限位段的外径大于所述安装孔的孔径。
  4. 根据权利要求2所述的集气管组件,其特征在于,所述主管上设有凸部,所述安装孔开设于所述凸部上,所述缩口段与所述凸部连接。
  5. 根据权利要求4所述的集气管组件,其特征在于,所述凸部与所述主管设置为一体式。
  6. 根据权利要求2所述的集气管组件,其特征在于,所述缩口段与所述主管通过炉中钎焊的方式进行焊接。
  7. 根据权利要求2所述的集气管组件,其特征在于,所述扩口段与所述支管通过火焰焊接的方式进行焊接。
  8. 根据权利要求4所述的集气管组件,其特征在于,所述主管的直径定义为D,沿所述安装孔的轴线方向,所述套管通过所述安装孔插入所述主管的深度定义为H,D和H满足以下关系式:H≤0.5D。
  9. 根据权利要求1所述的集气管组件,其特征在于,所述主管为不锈钢管。
  10. 根据权利要求9所述的集气管组件,其特征在于,所述套管和所述支管为铜管。
PCT/CN2022/070640 2021-01-21 2022-01-07 集气管组件 Ceased WO2022156545A1 (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2023525994A JP2024501916A (ja) 2021-01-21 2022-01-07 集気管アセンブリ
KR1020237018623A KR20230101859A (ko) 2021-01-21 2022-01-07 가스 수집관 어셈블리
EP22742024.7A EP4283220A4 (en) 2021-01-21 2022-01-07 Gas collecting pipe assembly

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202120170856.9U CN215063003U (zh) 2021-01-21 2021-01-21 集气管组件
CN202120170856.9 2021-01-21

Publications (1)

Publication Number Publication Date
WO2022156545A1 true WO2022156545A1 (zh) 2022-07-28

Family

ID=79251855

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2022/070640 Ceased WO2022156545A1 (zh) 2021-01-21 2022-01-07 集气管组件

Country Status (5)

Country Link
EP (1) EP4283220A4 (zh)
JP (1) JP2024501916A (zh)
KR (1) KR20230101859A (zh)
CN (1) CN215063003U (zh)
WO (1) WO2022156545A1 (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117773503A (zh) * 2024-01-10 2024-03-29 蚌埠凯盛工程技术有限公司 拉边杆冷却水包的加工方法及拉边机

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN215063003U (zh) * 2021-01-21 2021-12-07 浙江盾安人工环境股份有限公司 集气管组件
JP2026081611A (ja) * 2024-11-05 2026-05-19 ボッシュホームコンフォートジャパン株式会社 室外ユニットおよび冷凍サイクル装置
CN119609603A (zh) * 2024-12-31 2025-03-14 含山瑞可金属有限公司 集液管组件加工方法、集液管组件、换热器及制冷系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102848139A (zh) * 2012-06-08 2013-01-02 浙江三花制冷集团有限公司 一种连接管及其制造方法和集气管组件
CN202813895U (zh) * 2012-08-21 2013-03-20 浙江盾安人工环境股份有限公司 一种空调换热器
CN104015019A (zh) * 2014-05-29 2014-09-03 浙江三花制冷集团有限公司 一种集气管部件的制造方法及使用该集气管部件的热交换器
CN205481966U (zh) * 2016-01-29 2016-08-17 颜兆赞 一种不锈钢集气管组件
CN212338320U (zh) * 2020-03-02 2021-01-12 绍兴新锐大进焊接设备有限公司 一种管口结构及四通阀
CN215063003U (zh) * 2021-01-21 2021-12-07 浙江盾安人工环境股份有限公司 集气管组件

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5360836A (en) * 1976-11-12 1978-05-31 Toa Seiki Co Ltd Constructing method of indoor piping
JPH04288461A (ja) * 1991-03-14 1992-10-13 Matsushita Refrig Co Ltd 冷媒分流器の製造方法
JPH0594593U (ja) * 1991-06-12 1993-12-24 日本軽金属株式会社 異種金属の継手構造
JP2005121131A (ja) * 2003-10-16 2005-05-12 Ranco Japan Ltd 弁ハウジングに管を接合する方法及びそのための接続部材
JP5328724B2 (ja) * 2010-06-30 2013-10-30 三菱電機株式会社 冷媒分配器及びこの冷媒分配器を用いたヒートポンプ装置
CN102873508A (zh) * 2011-11-01 2013-01-16 浙江三花制冷集团有限公司 一种集气管组件的制造方法及空调系统
CN102853513A (zh) * 2012-06-08 2013-01-02 浙江三花制冷集团有限公司 一种集气管组件及一种集气管组件的制造方法
AU2020323253B2 (en) * 2019-07-31 2024-02-01 Daikin Industries, Ltd. Refrigeration apparatus, and refrigerant piping of refrigeration apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102848139A (zh) * 2012-06-08 2013-01-02 浙江三花制冷集团有限公司 一种连接管及其制造方法和集气管组件
CN202813895U (zh) * 2012-08-21 2013-03-20 浙江盾安人工环境股份有限公司 一种空调换热器
CN104015019A (zh) * 2014-05-29 2014-09-03 浙江三花制冷集团有限公司 一种集气管部件的制造方法及使用该集气管部件的热交换器
CN205481966U (zh) * 2016-01-29 2016-08-17 颜兆赞 一种不锈钢集气管组件
CN212338320U (zh) * 2020-03-02 2021-01-12 绍兴新锐大进焊接设备有限公司 一种管口结构及四通阀
CN215063003U (zh) * 2021-01-21 2021-12-07 浙江盾安人工环境股份有限公司 集气管组件

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4283220A4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117773503A (zh) * 2024-01-10 2024-03-29 蚌埠凯盛工程技术有限公司 拉边杆冷却水包的加工方法及拉边机

Also Published As

Publication number Publication date
EP4283220A1 (en) 2023-11-29
JP2024501916A (ja) 2024-01-17
EP4283220A4 (en) 2024-06-19
KR20230101859A (ko) 2023-07-06
CN215063003U (zh) 2021-12-07

Similar Documents

Publication Publication Date Title
EP4283220A1 (en) Gas collecting pipe assembly
US20150033789A1 (en) Heat exchanger and air conditioner provided with heat exchanger
US20110139416A1 (en) Internal Heat Exchanger for Air Conditioning System of Motor Vehicle and Such a Circuit
CN213631075U (zh) 集气管组件
US5092398A (en) Automotive parallel flow type heat exchanger
US20250003691A1 (en) Heat exchanger and air conditioning system having same
JP2013066911A (ja) 銅管とステンレス鋼管の接続体及びその製造方法
JP2023507921A (ja) 消音器及び空調
CN102873508A (zh) 一种集气管组件的制造方法及空调系统
JP5709733B2 (ja) 二重管
CN213685372U (zh) 配管组件、四通阀组件以及空调系统
KR101422074B1 (ko) 열교환용 인아웃렛 파이프의 고정구조
CN101639303B (zh) 一种换热器及包括该换热器的热交换装置
JP2011099620A (ja) 熱交換器
CN210165565U (zh) 换热装置及燃气热水器
CN217636884U (zh) 换热器
WO2022037635A1 (zh) 管组件连接结构、配管组件、四通阀组件及空调系统
KR20160117376A (ko) 입출구파이프를 포함한 열교환기 제조방법
JPH10197186A (ja) 熱交換器
JP2007177848A (ja) 配管
CN218627927U (zh) 集气管及具有其的换热器组件
CN217979241U (zh) 集气管
KR101694671B1 (ko) 입출구파이프를 포함한 열교환기 제조방법
KR101694670B1 (ko) 열교환기용 입출구파이프 연결부재
CN103134238B (zh) 一种空调平行流热交换器及其加工工艺

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22742024

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2023525994

Country of ref document: JP

ENP Entry into the national phase

Ref document number: 20237018623

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 202327042037

Country of ref document: IN

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2022742024

Country of ref document: EP

Effective date: 20230821

WWR Wipo information: refused in national office

Ref document number: 1020237018623

Country of ref document: KR

WWC Wipo information: continuation of processing after refusal or withdrawal

Ref document number: 1020237018623

Country of ref document: KR