WO2023037826A1 - システム - Google Patents

システム Download PDF

Info

Publication number
WO2023037826A1
WO2023037826A1 PCT/JP2022/030907 JP2022030907W WO2023037826A1 WO 2023037826 A1 WO2023037826 A1 WO 2023037826A1 JP 2022030907 W JP2022030907 W JP 2022030907W WO 2023037826 A1 WO2023037826 A1 WO 2023037826A1
Authority
WO
WIPO (PCT)
Prior art keywords
processor
tote
sorter
ctu
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2022/030907
Other languages
English (en)
French (fr)
Inventor
秀隆 小島
琢磨 赤木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Infrastructure Systems and Solutions Corp
Original Assignee
Toshiba Corp
Toshiba Infrastructure Systems and Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Infrastructure Systems and Solutions Corp filed Critical Toshiba Corp
Priority to AU2022341689A priority Critical patent/AU2022341689B2/en
Priority to EP22867148.3A priority patent/EP4400454A4/en
Priority to CA3229619A priority patent/CA3229619A1/en
Publication of WO2023037826A1 publication Critical patent/WO2023037826A1/ja
Priority to US18/588,307 priority patent/US20240199331A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G1/00Storing articles, individually or in orderly arrangement, in warehouses or magazines
    • B65G1/02Storage devices
    • B65G1/04Storage devices mechanical
    • B65G1/137Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/36Sorting apparatus characterised by the means used for distribution
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/36Sorting apparatus characterised by the means used for distribution
    • B07C5/361Processing or control devices therefor, e.g. escort memory
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G1/00Storing articles, individually or in orderly arrangement, in warehouses or magazines
    • B65G1/02Storage devices
    • B65G1/04Storage devices mechanical
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G1/00Storing articles, individually or in orderly arrangement, in warehouses or magazines
    • B65G1/02Storage devices
    • B65G1/04Storage devices mechanical
    • B65G1/0407Storage devices mechanical using stacker cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G1/00Storing articles, individually or in orderly arrangement, in warehouses or magazines
    • B65G1/02Storage devices
    • B65G1/04Storage devices mechanical
    • B65G1/137Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed
    • B65G1/1373Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed for fulfilling orders in warehouses
    • B65G1/1378Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed for fulfilling orders in warehouses the orders being assembled on fixed commissioning areas remote from the storage areas
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/74Feeding, transfer, or discharging devices of particular kinds or types
    • B65G47/94Devices for flexing or tilting travelling structures; Throw-off carriages
    • B65G47/96Devices for tilting links or platform
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading

Definitions

  • the embodiments of the present invention relate to systems.
  • a system uses a sorter to put items into each chute.
  • Such systems sort items into bins through chutes depending on, for example, the destination of the items.
  • the system two-dimensionally arranges the containers into which the goods are placed in a predetermined area in a warehouse or the like. Therefore, the system needs to reserve a large space for storing the container.
  • the system includes a sorter and an automatic transport device.
  • the sorter includes a first tray and an input mechanism.
  • the first tray loads articles.
  • the loading mechanism loads the article from the first tray into the container.
  • the automated transport device includes a gripping mechanism, a drive mechanism, and a processor.
  • a gripping mechanism grips the container.
  • the drive mechanism vertically moves the gripping mechanism.
  • the processor uses the gripping mechanism to acquire the container containing the articles from the sorter, and uses the gripping mechanism and the drive mechanism to lift the container containing the articles from the sorter. Store the container in a shelf that stores the container in the direction.
  • FIG. 1 is a block diagram showing a configuration example of a sorting system according to the first embodiment.
  • FIG. 2 is a top view showing an installation example of the tote according to the first embodiment.
  • FIG. 3 is a side view showing an installation example of the tote according to the first embodiment.
  • FIG. 4 is a diagram illustrating an example of a shelf according to the first embodiment;
  • FIG. 5 is a block diagram showing a configuration example of the control system of the sorting system according to the first embodiment.
  • FIG. 6 is a block diagram showing a configuration example of the partitioning control device according to the first embodiment.
  • FIG. 7 is a block diagram showing a configuration example of the sorter control device according to the first embodiment.
  • FIG. 1 is a block diagram showing a configuration example of a sorting system according to the first embodiment.
  • FIG. 2 is a top view showing an installation example of the tote according to the first embodiment.
  • FIG. 3 is a side view showing an installation example of the tote according
  • FIG. 8 is a block diagram showing a configuration example of the CTU control device according to the first embodiment.
  • FIG. 9 is a side view of the CTU according to the first embodiment;
  • FIG. 10 is a block diagram illustrating a configuration example of a CTU according to the first embodiment;
  • FIG. 11 is a diagram showing a configuration example of sorting destination information according to the first embodiment.
  • FIG. 12 is a diagram showing an operation example of the sorting system according to the first embodiment.
  • FIG. 13 is a diagram showing an operation example of the sorting system according to the first embodiment.
  • FIG. 14 is a flow chart showing an operation example of the partitioning control device according to the first embodiment.
  • FIG. 15 is a flow chart showing an operation example of the sorter control device according to the first embodiment.
  • FIG. 16 is a flow chart showing an operation example of the CTU control device according to the first embodiment.
  • FIG. 17 is a diagram showing an operation example of the sorting system according to the second embodiment.
  • FIG. 18 is a flow chart showing an operation example of the partitioning control device according to the second embodiment.
  • FIG. 19 is a flow chart showing an operation example of the sorter control device according to the second embodiment.
  • FIG. 20 is a flow chart showing an operation example of the CTU control device according to the second embodiment.
  • a sorting system sorts each article into sorting destinations.
  • the sorting system uses a sorter and a high-rise case transfer unit (CTU) to put articles into chutes corresponding to sorting destinations.
  • the sorting system loads items into totes through chutes.
  • the sorting system puts the container into which the article is put into the CTU and stores it on the shelf.
  • CTU high-rise case transfer unit
  • FIG. 1 shows a configuration example of a sorting system 100 according to an embodiment.
  • the sorting system 100 includes an induction 3, a scanner 4, a sorter 5, a plurality of CTUs 7, a plurality of totes 8, a plurality of shelves 9 and a plurality of cage carts 200, and the like.
  • the sorting system 100 conveys articles in the order of the induction 3, the scanner 4, and the sorter 5.
  • the induction 3 puts the articles into the sorter 5.
  • the induction 3 receives articles input by an operator, robot, or the like.
  • the induction 3 uses a conveyer or the like to transport the introduced articles to the sorter 5 .
  • the scanner 4 reads the code attached to the item.
  • the scanner 4 is installed at a position where the code of the article conveyed to the induction 3 can be photographed.
  • a scanner 4 reads a code from an article being conveyed.
  • the code is obtained by encoding the ID that identifies the item. Further, the scanner 4 may read the character string of the ID attached to the article by character recognition processing (OCR (Optical Character Recognition) processing) or the like.
  • OCR Optical Character Recognition
  • the sorter 5 sorts the thrown-in articles.
  • the sorter 5 is composed of a tray 51 (first tray), a pusher 52, a chute 53, and the like.
  • the sorter 5 stacks articles on trays 51 and conveys them.
  • the tray 51 moves in a predetermined direction (rightward in FIG. 1).
  • the sorter 5 pushes the articles from the tray 51 to the chute 53 using the pusher 52 at the timing when the tray 51 arrives in front of the predetermined chute 53 .
  • the pusher 52 (throwing-in mechanism) throws the articles loaded on the tray 51 into the tote 8 .
  • the pusher 52 pushes the articles to a specific chute 53 according to the sorting destination of the articles.
  • the pusher 52 is positioned in the opposite direction to the direction in which the article is pushed out before the induction 3 places the article on the tray 51 .
  • a plurality of chutes 53 are arranged in parallel with the direction in which the tray 51 moves.
  • the chute 53 is a conveying path through which the articles pushed out from the tray 51 pass.
  • the chute 53 is formed in the shape of a slope that extends downward from the tray 51 .
  • the sorter 5 throws articles into the tote 8 from the chute 53 .
  • the sorter 5 may be composed of trays 51 and pushers 52, may be composed of cross belts, may be composed of AGVs, or may be of other mechanisms.
  • the sorter 5 including trays 51 and pushers 52 will be described as an example.
  • the tote 8 is a container into which articles are thrown from the sorter 5.
  • a plurality of totes 8 are installed adjacent to the chute 53 .
  • the tote 8 is positioned to receive articles passing through the chute 53 .
  • the tote 8 is formed in a box shape with an open top.
  • the cart 200 is a container that stores the tote 8 to be dispensed.
  • the cage 200 has a structure capable of moving with the tote 8 stored therein.
  • the CTU 7 is an automatic conveying device that loads and conveys articles.
  • the CTU 7 acquires the tote 8 into which the articles have been put.
  • the CTU 7 acquires the tote 8
  • it moves to the shelf 9.
  • the CTU 7 stores the tote 8 on the shelf 9 .
  • the CTU7 will be detailed later.
  • the shelf 9 stores a plurality of totes 8.
  • the shelf 9 will be detailed later.
  • FIG. 2 is a top view showing an installation example of the tote 8.
  • FIG. 3 is a side view showing an installation example of the tote 8. As shown in FIG.
  • the sorting system 100 comprises a loading platform 6 (first loading platform) on which totes 8 are loaded.
  • the loading platform 6 supports the tote 8 at a predetermined height at which the articles from the chute 53 can be received (at a position at which the articles thrown in from the pusher 52 can be received).
  • the loading platform 6 includes cords 61, guides 62, and the like.
  • Code 61 is a code obtained by encoding an identifier indicating the corresponding chute 53 (or loading table 6).
  • code 61 is a bar code, two-dimensional code, or the like.
  • the cord 61 is formed on the surface facing the chute 53 and the surface facing the chute 53 .
  • a guide 62 is a guide for maintaining the position of the tote 8 .
  • the guide 62 is formed at a predetermined height.
  • the guide 62 consists of a first side between the chute 53 and the tote 8 and two second sides perpendicular to that side. That is, the guide 62 is formed in the shape of a rectangle with an open side facing the first side.
  • the loading table 6 may have a structure in which the tote 8 can be further accommodated in the lower portion or the like.
  • the tote 8 is provided with cords 81 and the like.
  • a code 81 is a code obtained by encoding the identifier indicating the tote 8 .
  • code 81 is a bar code, two-dimensional code, or the like.
  • the cord 81 is formed on the surface facing the chute 53 and the surface facing the chute 53 .
  • FIG. 4 shows a structural example of the shelf 9. As shown in FIG.
  • the shelf 9 is formed with a predetermined height. Also, the shelf 9 is a structure that allows the CTU 7 to acquire or store the tote 8 .
  • the shelf 9 includes a plurality of shelf steps 91 and the like formed side by side in the height direction.
  • the shelf 91 has a depth that allows the tote 8 to be loaded.
  • the shelf 91 has a predetermined width.
  • the shelf 91 stacks the totes 8 in the width direction.
  • the shelf 91 stores four totes 8 in the width direction.
  • the shelf 91 is open in the front direction (or the back direction).
  • the code 92 is a code obtained by encoding identifiers indicating shelf positions and tote positions.
  • code 92 is a bar code, two-dimensional code, or the like. It is attached to the shelf board corresponding to the arrangement position of the tote.
  • the shelves 9 store the totes 8 arranged in the height direction by the shelves 91 .
  • FIG. 5 shows the control system of the sorting system 100.
  • the sorting system 100 includes an induction 3, a scanner 4, a sorter 5, a host device 2, a CTU 7, a sorting control device 10, a sorter control device 20, a CTU control device 30, and the like.
  • the sorting control device 10 connects to the induction 3, the scanner 4, the host device 2, the sorter control device 20 and the CTU control device 30. Also, the sorter control device 20 is connected to the sorter 5 . Also, the CTU controller 30 connects to the CTU 7 .
  • the host device 2 transmits to the sorting control device 10 sorting destination information indicating the article and the sorting destination (destination) of the article.
  • the destination information will be detailed later.
  • the host device 2 is a WMS (Warehouse Management System).
  • the host device 2 is composed of a PC or the like.
  • the sorting control device 10 controls the sorter 5 and the CTU 7 according to the sorting destination information from the host device 2 .
  • the sorting control device 10 controls the sorter 5 through the sorter control device 20 .
  • Section control device 10 also controls CTU 7 through CTU control device 30 .
  • the partition control device 10 is a WES (Warehouse Execution System). Section control device 10 will be described later in detail.
  • the sorter control device 20 controls the sorter 5 according to the control signal from the sorting control device 10 .
  • the sorter control device 20 functions as a controller for the sorter 5 .
  • the sorter control device 20 is a WCS (Warehouse Control System).
  • the sorter control device 20 will be detailed later.
  • the CTU control device 30 controls the CTU 7 according to the control signal from the partition control device 10.
  • CTU controller 30 functions as a controller for CTU 7 .
  • CTU controller 30 is a WCS.
  • the CTU controller 30 will be detailed later.
  • FIG. 6 is a block diagram showing a configuration example of the partition control device 10.
  • the partitioning control device 10 includes a processor 11, a ROM 12, a RAM 13, an NVM 14, a communication section 15, an operation section 16, a display section 17, and the like.
  • the processor 11, ROM 12, RAM 13, NVM 14, communication unit 15, operation unit 16, and display unit 17 are connected to each other via a data bus or the like.
  • the section control device 10 may have a configuration according to need, or a specific configuration may be excluded from the section control device 10 .
  • the processor 11 has a function of controlling the operation of the partitioning control device 10 as a whole.
  • Processor 11 may include an internal cache, various interfaces, and the like.
  • the processor 11 implements various processes by executing programs pre-stored in the internal memory, ROM 12 or NVM 14 .
  • processor 11 controls the functions performed by the hardware circuits.
  • the ROM 12 is a non-volatile memory in which control programs, control data, etc. are stored in advance.
  • the control programs and control data stored in the ROM 12 are installed in advance according to the specifications of the partitioning control device 10 .
  • the RAM 13 is a volatile memory.
  • the RAM 13 temporarily stores data being processed by the processor 11 .
  • RAM 13 stores various application programs based on instructions from processor 11 .
  • the RAM 13 may store data necessary for executing the application program, execution results of the application program, and the like.
  • the NVM 14 is a non-volatile memory in which data can be written and rewritten.
  • the NVM 14 is composed of, for example, a HDD (Hard Disk Drive), SSD (Solid State Drive), flash memory, or the like.
  • the NVM 14 stores control programs, applications, various data, etc. according to the operational use of the partitioning control device 10 .
  • the communication unit 15 is an interface for communicating with the induction 3, the scanner 4, the host device 2, the sorter control device 20, the CTU control device 30, and the like.
  • the communication unit 15 is an interface for transmitting/receiving data to/from the induction 3, the scanner 4, the host device 2, the sorter control device 20, the CTU control device 30, etc. through the network.
  • the communication unit 15 connects to the sorter 5 via the sorter control device 20 .
  • the communication unit 15 connects to the CTU 7 via the CTU control device 30 .
  • the communication unit 15 is an interface that supports wired or wireless LAN (Local Area Network) connection.
  • the communication unit 15 functions as an interface for controlling the sorter 5 and the CTU 7.
  • the communication unit 15 includes an interface for communicating with the induction 3, an interface for communicating with the scanner 4, an interface for communicating with the host device 2, an interface for communicating with the sorter control device 20, and the CTU control device 30. It may be configured from an interface for communicating with.
  • the operation unit 16 receives inputs for various operations from the operator.
  • the operation unit 16 transmits a signal indicating the input operation to the processor 11 .
  • the operation unit 16 may be composed of a touch panel.
  • the display unit 17 displays image data from the processor 11 .
  • the display unit 17 is composed of a liquid crystal monitor.
  • the display section 17 may be formed integrally with the operating section 16 .
  • FIG. 7 is a block diagram showing a configuration example of the sorter control device 20.
  • the sorter control device 20 includes a processor 21, a ROM 22, a RAM 23, an NVM 24, a communication section 25, a sorter interface 26, an operation section 27, a display section 28, and the like.
  • the processor 21, ROM 22, RAM 23, NVM 24, sorter interface 26, communication section 25, operation section 27 and display section 28 are connected to each other via a data bus or the like.
  • the sorter control device 20 may have a configuration other than the configuration shown in FIG. 7, or may have a specific configuration excluded from the sorter control device 20.
  • the processor 21 has a function of controlling the operation of the entire sorter control device 20 .
  • Processor 21 may include an internal cache, various interfaces, and the like.
  • the processor 21 implements various processes by executing programs pre-stored in the internal memory, ROM 22 or NVM 24 .
  • processor 21 controls the functions performed by the hardware circuits.
  • the ROM 22 is a non-volatile memory in which control programs, control data, etc. are stored in advance.
  • the control programs and control data stored in the ROM 22 are installed in advance according to the specifications of the sorter control device 20 .
  • the RAM 23 is a volatile memory.
  • the RAM 23 temporarily stores data being processed by the processor 21 .
  • RAM 23 stores various application programs based on instructions from processor 21 .
  • the RAM 23 may store data necessary for executing the application program, execution results of the application program, and the like.
  • the NVM 24 is a non-volatile memory in which data can be written and rewritten.
  • the NVM 24 is composed of, for example, an HDD, SSD, flash memory, or the like.
  • the NVM 24 stores control programs, applications, various data, and the like according to the operational use of the sorter control device 20 .
  • the communication unit 25 is an interface for communicating with the partitioning control device 10 and the like.
  • the communication unit 25 is an interface for transmitting/receiving data to/from the partitioning control device 10 or the like via a network.
  • the communication unit 25 is an interface that supports wired or wireless LAN connection.
  • the sorter interface 26 is an interface for communicating with the sorter 5.
  • the operation unit 27 receives inputs for various operations from the operator.
  • the operation unit 27 transmits a signal indicating the input operation to the processor 21 .
  • the operation unit 27 may be composed of a touch panel.
  • the display unit 28 displays image data from the processor 21 .
  • the display unit 28 is composed of a liquid crystal monitor.
  • the display section 28 may be formed integrally with the operating section 27 .
  • the communication unit 25 and the sorter interface 26 may be integrally formed.
  • the processor 21 controls the sorter 5 according to control signals from the sorting control device 10 .
  • processor 21 causes sorter 5 to sort predetermined articles into predetermined chutes.
  • the processor 21 pushes the article into the chute at the timing when the article reaches the chute.
  • FIG. 8 is a block diagram showing a configuration example of the CTU control device 30.
  • the CTU control device 30 includes a processor 31, a ROM 32, a RAM 33, an NVM 34, a communication section 35, a CTU interface 36, an operation section 37, a display section 38, and the like.
  • the processor 31, ROM 32, RAM 33, NVM 34, CTU interface 36, communication section 35, operation section 37 and display section 38 are connected to each other via a data bus or the like.
  • the CTU control device 30 may have a configuration other than the configuration shown in FIG.
  • the processor 31 has a function of controlling the operation of the CTU control device 30 as a whole.
  • Processor 31 may include internal caches, various interfaces, and the like.
  • the processor 31 implements various processes by executing programs pre-stored in the internal memory, ROM 32 or NVM 34 .
  • processor 31 controls the functions performed by the hardware circuits.
  • the ROM 32 is a non-volatile memory in which control programs, control data, etc. are stored in advance.
  • the control programs and control data stored in the ROM 32 are installed in advance according to the specifications of the CTU control device 30 .
  • the RAM 33 is a volatile memory.
  • the RAM 33 temporarily stores data being processed by the processor 31 .
  • RAM 33 stores various application programs based on instructions from processor 31 .
  • the RAM 33 may store data necessary for executing the application program, execution results of the application program, and the like.
  • the NVM 34 is a non-volatile memory in which data can be written and rewritten.
  • the NVM 34 is composed of, for example, an HDD, SSD, flash memory, or the like.
  • the NVM 34 stores control programs, applications, various data, etc. according to the operational use of the CTU control device 30 .
  • NVM 34 stores a database of tote 8 inventory locations.
  • the communication unit 35 is an interface for communicating with the partitioning control device 10 and the like.
  • the communication unit 35 is an interface for transmitting/receiving data to/from the partitioning control device 10 or the like via a network.
  • the communication unit 35 is an interface that supports wired or wireless LAN connection.
  • the CTU interface 36 is an interface for communicating with the CTU 7.
  • the CTU interface 36 connects to the CTU 7 by wire or wirelessly.
  • CTU interface 36 may support wireless LAN connectivity.
  • the operation unit 37 receives inputs for various operations from the operator.
  • the operation unit 37 transmits a signal indicating the input operation to the processor 31 .
  • the operation unit 37 may be composed of a touch panel.
  • the display unit 38 displays image data from the processor 31 .
  • the display unit 38 is composed of a liquid crystal monitor.
  • the display section 38 may be formed integrally with the operating section 37 .
  • the communication unit 35 and the CTU interface 36 may be integrally formed.
  • the processor 31 controls the CTU 7 according to the control signal from the partition control device 10. For example, processor 31 causes CTU 7 to move into place. Processor 31 also causes CTU 7 to acquire Thoth 8 . Processor 31 also causes CTU 7 to set tote 8 .
  • FIG. 9 is a side view of CTU7.
  • the CTU 7 has a base 701 .
  • Base 701 functions as a moving mechanism for moving the entire CTU 7 .
  • the base 701 includes a tire 70 and the like, which will be described later.
  • the base 701 may be equipped with a camera or the like for reading a code attached to the floor surface.
  • a member 702 extending upward is formed on the base 701 .
  • the member 702 is composed of two rod-shaped members extending upward and a rod-shaped member extending between the members. That is, the member 702 is formed like a ladder.
  • a plurality of rear trays 703 are formed on the member 702 .
  • the rear tray 703 is a plate-shaped member extending horizontally from the member 702 .
  • the rear tray 703 is loaded with the tote 8 .
  • the rear tray 703 loads one tote 8 .
  • the member 702 is formed with eight rear trays 703 .
  • the number of rear trays 703 formed is not limited to a specific number.
  • a shuttle portion 704 (grasping mechanism) is formed in the member 702 .
  • the shuttle portion 704 is formed in the opposite direction to the rear tray 703 with respect to the member 702 .
  • the shuttle portion 704 can be moved up and down along the member 702 by a driving portion 76 or the like, which will be described later.
  • the shuttle portion 704 grips the tote 8 in front (on the left side in FIG. 9).
  • the shuttle portion 704 loads the gripped tote 8 onto one of the rear trays 703 .
  • the shuttle portion 704 also grips a tote 8 loaded on one of the rear trays 703 .
  • the shuttle portion 704 releases the gripped tote 8 forward.
  • the shuttle unit 704 can acquire the tote 8 from each shelf 91 of the shelf 9 and the loading table 6. In addition, the shuttle section 704 can set the tote 8 on each shelf 91 of the shelf 9 and the loading table 6 .
  • the shuttle unit 704 is equipped with a camera 705 .
  • Camera 705 is installed so as to photograph the front.
  • the camera 705 photographs the cord 61 of the loading table 6, the cord 81 of the tote 8, the cord 92 of the shelf 9, or the like.
  • the camera 705 may be equipped with lighting and the like.
  • FIG. 10 is a block diagram showing an example configuration of the CTU 7.
  • the CTU 7 includes a processor 71, a ROM 72, a RAM 73, an NVM 74, a communication section 75, a driving section 76 (driving mechanism), a battery 78, a charging mechanism 79, tires 70, a shuttle section 704, a camera 705, and the like.
  • the processor 71 has the function of controlling the operation of the CTU 7 as a whole.
  • Processor 71 may include internal caches, various interfaces, and the like.
  • the processor 71 implements various processes by executing programs pre-stored in the internal memory, ROM 72 or NVM 74 .
  • the processor 71 is a CPU (Central Processing Unit).
  • the processor 71 may be realized by hardware such as LSI (Large Scale Integration), ASIC (Application Specific Integrated Circuit), or FPGA (Field-Programmable Gate Array).
  • the ROM 72 is a non-temporary computer-readable storage medium and stores the above program.
  • the ROM 72 also stores data or various set values used by the processor 71 in performing various processes.
  • the RAM 73 is a memory used for reading and writing data.
  • the RAM 73 is used as a so-called work area for storing data temporarily used when the processor 71 performs various processes.
  • the NVM 74 is a non-temporary computer-readable storage medium, and may store the above program. In addition, the NVM 74 stores data used by the processor 71 to perform various processes, data generated by the processes performed by the processor 71, various setting values, and the like.
  • the communication unit 75 is an interface that transmits and receives data to and from the CTU control device 30 and the like through a wireless LAN access point and the like.
  • communication unit 75 supports wireless LAN connection.
  • the drive unit 76 drives the tire 70 .
  • the drive unit 76 is a motor or the like that rotates the tire 70 , and rotates or stops the motor based on a drive signal output from the processor 71 .
  • the power of the motor is transmitted to tires 70 .
  • the CTU 7 moves to the target position by the power from such a motor.
  • the driving section 76 drives the shuttle section 704 .
  • drive unit 76 moves shuttle unit 704 vertically.
  • the driving section 76 causes the shuttle section 704 to perform a gripping operation.
  • the drive unit 76 is a motor or the like that drives the shuttle unit 704 .
  • the driving section 76 may be composed of a mechanism for driving the tire 70 and a mechanism for driving the shuttle section 704 .
  • the battery 78 supplies necessary power to the drive unit 76 and the like.
  • the charging mechanism 79 is a mechanism that connects the charging station and the battery 78 , and the battery 78 is charged with power supplied from the charging station or the like via the charging mechanism 79 .
  • the tire 70 is rotated by the power from the drive section 76.
  • the CTU 7 advances, retreats, or changes direction by rotating the tires 70 .
  • the CTU 7 may have other configurations as needed in addition to the configurations shown in FIGS. 9 and 10, or a specific configuration may be excluded from the CTU 7.
  • the processor 71 performs processing such as acceleration, deceleration, stopping, direction change, and calculation and control necessary for the operation of the shuttle section 704 .
  • the processor 71 executes a program stored in the ROM 72, the NVM 74, or the like based on control signals from the CTU control device 30 or the like, thereby generating drive signals and outputting them to each unit.
  • the processor 71 of the CTU 7 outputs drive signals according to control signals transmitted from the CTU control device 30 . As a result, the CTU 7 moves from its current position to a predetermined position, and performs operations such as gripping, opening, and loading the tote 8 .
  • the functions realized by the partitioning control device 10 are realized by the processor 11 executing a program stored in the internal memory, the ROM 12, the NVM 14, or the like.
  • the processor 11 has a function of acquiring destination information.
  • the sorting destination information indicates the sorting destination of the article.
  • FIG. 11 shows a configuration example of the destination information.
  • the destination information stores records in which "ID" and "destination" are associated with each other.
  • ID is an identifier that identifies an article to be sorted.
  • ID is a numerical value.
  • Destination is the destination of the corresponding article.
  • Destination corresponds to the tote 8 in which the article is stored and the shelf 9 in which the tote 8 is stored. That is, the "destination” is information that allows the processor 11 of the sorting control device 10 to specify the totes 8 into which the articles are put and the racks 9 in which the totes 8 are stored.
  • destination may be information indicating an address (or part of an address). Note that the configuration of the destination information is not limited to a specific configuration.
  • the processor 11 receives the classification destination information from the host device 2 through the communication unit 15 .
  • the processor 11 may transmit a request for the classification destination information to the host device 2 through the communication unit 15 .
  • the processor 11 also has a function of generating 1-pass partition information and 1-pass layout plan information based on the partition destination information.
  • the processor 11 causes the sorter 5 to put the articles into the chute 53 and causes the CTU 7 to store the tote 8 with the articles put into the shelf 9 . That is, the processor 11 puts the articles into the sorter 5 once and sorts them (one-pass sorting).
  • 1-pass classification information is information that specifies the chute 53 into which the article is thrown.
  • the 1-pass classification information is stored in association with the identifier of an article and the chute 53 into which the article is thrown.
  • the one-pass layout plan information is information that specifies the shelf 9 that houses the tote 8 into which the articles from the chute 53 are thrown.
  • the one-pass arrangement plan information stores the identifier of the tote 8, the identifier of the loading table 6 on which the tote 8 is loaded, and the shelf 9 on which the tote 8 is stored, in association with each other.
  • the processor 11 After generating the 1-pass classification information, the processor 11 transmits it to the sorter control device 20 through the communication unit 15 . In addition, when the processor 11 generates the 1-pass placement plan information, it transmits it to the CTU control device 30 through the communication unit 15 . Here, the processor 11 uses the induction 3 to start throwing articles into the sorter 5 .
  • the functions realized by the sorter control device 20 are realized by the processor 21 executing a program stored in the internal memory, the ROM 22, the NVM 24, or the like.
  • the processor 21 has a function of throwing articles into the chute 53 based on the 1-pass classification information.
  • the processor 21 receives the 1-pass section information from the section control device 10 through the communication unit 25 . Upon receiving the 1-pass classification information, the processor 21 generates classification designation information designating the chute 53 into which each article is to be thrown, based on the 1-pass classification information.
  • the processor 21 After generating the classification designation information, the processor 21 causes the sorter 5 to load the articles input from the induction 3 onto the tray 51 . When the sorter 5 loads the articles on the tray 51, the processor 21 acquires the ID read from the article by the scanner 4. FIG.
  • the processor 21 acquires the ID read from the article by the scanner 4 from the section control device 10 via the communication unit 25 .
  • the processor 21 may acquire the ID from the scanner 4 .
  • the processor 21 may acquire an image from the scanner 4, decode a code appearing in the image, and acquire an ID.
  • the processor 21 After obtaining the ID, the processor 21 refers to the classification designation information to identify the chute 53 corresponding to the obtained ID. After identifying the chute 53 , the processor 21 causes the sorter 5 to dump the articles loaded on the tray 51 into the chute 53 through the sorter interface 26 .
  • the processor 21 causes the sorter 5 to throw the articles from the tray 51 into the chute 53 using the pusher 52 at the timing when the tray 51 reaches the chute 53 .
  • Articles pass through the chute 53 and are thrown into the tote 8 .
  • the processor 21 similarly causes the sorter 5 to throw the articles into the chute 53 until one pass sorting is completed.
  • the processor 21 detects that the tote 8 has reached a predetermined amount. For example, if there is volume information associated with the code of the item, the processor 21 adds the volume of each item put into the tote 8, and the total added volume is based on the inner volume of the tote 8. When the volume is equal to or greater than a preset volume threshold, it is determined/detected that the tote 8 has a predetermined volume. If there is no volume information, or if there is volume information but it is used in conjunction with sensor information for determination, the processor 21 detects a certain set height using a reflection sensor 54 attached to each chute as shown in FIG.
  • the processor 21 When articles are piled up above the position, it is determined/detected that the tote 8 has a predetermined amount by combining the information and the volume information. When detecting that the tote 8 has reached a predetermined amount, the processor 21 transmits a control signal (predetermined amount detection signal) indicating that the tote 8 has reached a predetermined amount to the section control device 10 . The predetermined amount detection signal is sent to the CTU controller 30 via the section controller 10 .
  • the functions realized by the CTU control device 30 are realized by the processor 31 executing a program stored in the internal memory, the ROM 32, the NVM 34, or the like.
  • the processor 31 has a function of storing the tote 8 loaded with articles on the shelf 9 based on the one-pass layout plan information.
  • the processor 31 receives 1-pass allocation plan information from the section control device 10 through the communication unit 35 . Upon receiving the one-pass placement plan information, the processor 31 formulates an operation plan for each CTU 7 based on the one-pass placement plan information. Also, here, it is assumed that the CTU 7 does not have the tote 8 loaded on the rear tray 703 .
  • the processor 31 After formulating the action plan, the processor 31 causes one of the CTUs 7 to move to the shelf 9 . Upon moving the CTU 7 to shelf 9 , processor 31 causes the CTU 7 to retrieve an empty tote 8 from shelf 9 . Here, the processor 31 causes the CTU 7 to load each rear tray 703 with an empty tote 8 .
  • the processor 71 of the CTU 7 uses the drive section 76 to move the shuttle section 704 to the height of the shelf 91 where the empty totes 8 are stored.
  • the processor 71 uses the shuttle portion 704 to grip the empty tote 8 and stack it on the rear tray 703 .
  • Processor 71 similarly loads empty totes 8 from shelf 9 onto each rear tray 703 .
  • the processor 31 waits until it receives a predetermined amount detection signal.
  • the processor 31 Upon receiving the predetermined amount detection signal, the processor 31 causes the CTU 7 to move to the position of the tote 8 that has reached the predetermined amount.
  • the processor 71 of the CTU 7 uses the camera 705 to read the code 61 of the loading table 6 or the code 81 of the tote 8, and moves the tote 8 to the front when it reaches a predetermined amount.
  • the processor 31 When the CTU 7 is moved to the position, the processor 31 causes the CTU 7 to acquire a tote 8 that has reached a predetermined amount and set an empty tote 8 .
  • the processor 31 may cause the CTU 7 to set the empty tote 8 placed below the loading table 6 on the loading table 6 .
  • FIG. 12 shows an operation example in which the CTU 7 acquires a tote 8 that has reached a predetermined amount and sets an empty tote 8. As shown in FIG. 12, it is assumed that a predetermined amount of tote 8 is filled with articles P. As shown in FIG. Also, here, the loading table 6 stores an empty tote 8 in the lower part.
  • the processor 71 of the CTU 7 uses the shuttle section 704 and the driving section 76 to acquire the tote 8 that has reached a predetermined amount according to the control from the CTU control device 30 .
  • the processor 71 uses the shuttle section 704 and the drive section 76 to stack the tote 8 of the predetermined amount on one of the rear trays 703 .
  • the processor 71 uses the shuttle section 704 and the drive section 76 to load the empty tote 8 loaded onto one of the rear trays 703.
  • the processor 31 of the CTU control device 30 repeats the above operation until each rear tray 703 of the CTU 7 is loaded with a predetermined amount of totes 8 .
  • the processor 31 moves the CTU 7 to a predetermined shelf 9 .
  • the processor 31 causes the CTU 7 to store a predetermined amount of each tote 8 on the predetermined shelf 9 .
  • the predetermined shelf 9 is a shelf 9 capable of storing the tote 8 .
  • FIG. 13 shows an operation example in which the CTU 7 moves to a predetermined shelf 9 and stores a predetermined amount of tote 8 on the shelf 9 .
  • the processor 71 of the CTU 7 loads a predetermined amount of tote 8 onto the rear tray 703, and drives the drive unit 76 and the like to move the tote 8 to a predetermined shelf 9.
  • the processor 71 uses the shuttle portion 704 to grip the tote 8 that has reached a predetermined amount from the rear tray 703 .
  • the processor 71 uses the drive section 76 to move the shuttle section 704 to the height of the shelf 91 on which the tote 8 can be loaded while the shuttle section 704 is gripping the tote 8 . Moving. Once the shuttle portion 704 is moved, the processor 71 uses the shuttle portion 704 to load the totes 8 onto the shelf 91 .
  • the processor 71 similarly uses the shuttle section 704 and the driving section 76 to store each tote 8 loaded on the rear tray 703 on the predetermined shelf 9 .
  • the processor 71 may store the tote 8 on a plurality of shelves 9 under the control of the CTU control device 30 . Also, the processor 31 of the CTU controller 30 operates each CTU 7 in the same manner.
  • the processor 31 of the CTU control device 30 similarly causes the CTU 7 to store a predetermined amount of tote 8 on the shelf 9 until the 1-pass division is completed.
  • FIG. 14 is a flowchart for explaining an operation example of the partitioning control device 10. As shown in FIG.
  • the processor 11 of the partitioning control device 10 receives partitioning destination information from the host device 2 through the communication unit 15 (S11). Upon receiving the segmentation destination information, the processor 11 generates 1-pass segmentation information based on the segmentation destination information (S12).
  • the processor 11 After generating the 1-pass partition information, the processor 11 generates 1-pass layout plan information (S13). After generating the 1-pass arrangement plan information, the processor 11 transmits the 1-pass classification information to the sorter control device 20 through the communication section 15 (S14).
  • the processor 11 After transmitting the 1-pass classification information to the sorter control device 20, the processor 11 transmits 1-pass arrangement plan information to the CTU control device 30 through the communication unit 15 (S15). After transmitting the one-pass placement plan information to CTU controller 30, processor 11 terminates its operation.
  • FIG. 15 is a flowchart for explaining an operation example of the sorter control device 20.
  • the processor 21 of the sorter control device 20 receives the 1-pass sorting information from the sorting control device 10 through the communication unit 25 (S21). Upon receiving the 1-pass section information, the processor 21 generates section designation information based on the 1-pass section information (S22).
  • the processor 21 After generating the classification designation information, the processor 21 causes the sorter 5 to receive the articles from the induction 3 (S23). After receiving the item, the processor 21 acquires the ID of the item (S24).
  • the processor 21 After acquiring the item ID, the processor 21 causes the sorter 5 to throw the item into the chute 53 corresponding to the ID (S25). When the article is thrown into the chute 53 corresponding to the ID, the processor 21 determines whether the one-pass section is completed (S26).
  • the processor 21 If it is determined that the 1-pass segment has not been completed (S26, NO), the processor 21 returns to S23. When determining that the 1-pass division is complete (S26, YES), the processor 21 terminates the operation.
  • FIG. 16 is a flowchart for explaining an operation example of the CTU control device 30.
  • the processor 31 of the CTU control device 30 receives the 1-pass arrangement plan information through the communication unit 35 (S31). Upon receiving the 1-pass placement plan information, the processor 31 formulates an operation plan based on the 1-pass placement plan information (S32).
  • the processor 31 After formulating the operation plan, the processor 31 causes the CTU 7 to move to the shelf 9 and load the empty tote 8 from the shelf 9 onto the rear tray 703 (S33). When the CTU 7 is loaded with an empty tote 8, the processor 31 waits until it receives a predetermined quantity sense signal.
  • the processor 31 Upon receiving the predetermined amount detection signal (S34), the processor 31 causes the CTU 7 to move the tote 8, which has reached the predetermined amount, to the front, and stack the tote 8, which has reached the predetermined amount, on the rear tray 703 (S35).
  • the processor 31 causes the CTU 7 to set the empty tote 8 loaded on the rear tray 703 on the stacking table 6 (S36).
  • the processor 31 repeats S34 to S36 until each rear tray 703 is loaded with a predetermined amount of totes 8 .
  • the processor 31 moves the CTU 7 to the shelf 9 (S37). After moving to the shelf 9, the processor 31 causes the CTU 7 to store each tote 8 having a predetermined amount on the shelf 9 (S38).
  • the processor 31 determines whether one-pass division is completed (S39).
  • the processor 31 If it is determined that the 1-pass segment has not been completed (S39, NO), the processor 31 returns to S33. If the processor 21 determines that the 1-pass division has been completed (S39, YES), the processor 21 ends the operation. Note that the processor 31 concurrently executes S33 to S38 for each CTU.
  • the processor 31 may cause the CTU 7 to store the tote 8 in which the articles are loaded but not in the predetermined amount on the shelf 9 .
  • the empty tote 8 may be one loaded in the rear tray 703 in advance.
  • the sorting system 100 does not have to include the chute 53 .
  • the articles may be put directly into the tote 8 from the sorter 5 .
  • the sorting system 100 may cause the CTU 7 to transport the tote 8 that has reached a predetermined amount from the shelf 9 to the cart 200 .
  • the sorting system 100 transports a predetermined amount of tote 8 from the shelf 9 to the cart 200 during discharge processing.
  • the sorting system configured as described above uses a sorter to put articles into totes.
  • the sorting system also uses CTUs to store empty totes and full totes in shelves that can store totes vertically. As such, the sorting system is able to arrange the totes in three dimensions. Thus, the sorting system can effectively store totes.
  • (Second embodiment) Next, a second embodiment will be described.
  • the sorting system 100 according to the second embodiment differs from that of the first embodiment in that after one-pass sorting, the articles sorted into the totes 8 are put into the sorter 5 again and sorted (two-pass sorting). . Therefore, other points are denoted by the same reference numerals, and detailed description thereof is omitted.
  • a sorting system 100 according to the second embodiment includes a conveyor 101 (second loading platform), which will be described later. Conveyor 101 will be described later in detail.
  • the functions realized by the partitioning control device 10 are realized by the processor 11 executing a program stored in the internal memory, the ROM 12, the NVM 14, or the like.
  • the partitioning control device 10 according to the second embodiment realizes the following functions in addition to the functions executed by the partitioning control device 10 according to the first embodiment.
  • the processor 11 has a function of generating 2-pass partition information and 2-pass layout plan information based on the partition destination information.
  • the processor 11 causes the CTU 7 to put the articles from the tote 8 on the shelf 9 into the sorter 5 into the chute 53 after the one-pass sorting, and put the tote 8 into the shelf 9 again from the sorter 5 . Let That is, the processor 11 puts the articles into the sorter 5 twice and sorts them (two-pass sorting).
  • the 2-pass classification information is information that specifies the chute 53 into which the article is thrown in the second pass.
  • the 2-pass classification information is stored by associating the item identifier with the chute 53 into which the item is thrown.
  • the 2-pass layout plan information is information that specifies the shelf 9 that stores the tote 8 into which the articles are thrown from the chute 53 in the second pass.
  • the 2-pass arrangement plan information stores the identifier of the tote 8, the identifier of the loading platform 6 on which the tote 8 is loaded, and the shelf 9 on which the tote 8 is stored, in association with each other.
  • the processor 11 generates 2-pass sorting information and 2-pass placement plan information in order to sort the articles in more detail than in the first pass.
  • the processor 11 generates 2-pass sorting information and 2-pass layout plan information so that the articles are re-inserted into the sorter 5 according to the order of the first pass while maintaining the sorting result order of the first pass. There may be.
  • the processor 11 After generating the 2-pass classification information, the processor 11 transmits it to the sorter control device 20 through the communication unit 15 . Also, when the processor 11 generates the 2-pass placement plan information, it transmits it to the CTU control device 30 through the communication unit 15 .
  • the functions realized by the sorter control device 20 are realized by the processor 21 executing a program stored in the internal memory, the ROM 22, the NVM 24, or the like.
  • the sorter control device 20 according to the second embodiment implements the following functions in addition to the functions executed by the sorter control device 20 according to the first embodiment.
  • the processor 21 has a function of throwing articles into the chute 53 based on the 2-pass classification information.
  • the processor 21 receives the 2-pass section information from the section control device 10 through the communication unit 25 . Upon receiving the 2-pass classification information, the processor 21 generates classification designation information that designates the chute 53 into which each article is to be thrown, based on the 2-pass classification information.
  • the processor 21 After generating the classification designation information, the processor 21 causes the sorter 5 to throw the articles into the chute 53 .
  • An example of the operation in which the processor 21 causes the sorter 5 to throw the articles into the chute 53 is the same as that according to the first embodiment, so the explanation is omitted.
  • the functions realized by the CTU control device 30 are realized by the processor 31 executing a program stored in the internal memory, the ROM 32, the NVM 34, or the like.
  • the CTU control device 30 according to the second embodiment implements the following functions in addition to the functions executed by the CTU control device 30 according to the first embodiment.
  • the processor 31 has a function of storing the tote 8 loaded with articles on the shelf 9 based on the 2-pass layout plan information.
  • the processor 31 has a function of transporting the tote 8 loaded with articles from the shelf 9 to the conveyor 101 based on the 2-pass layout plan information.
  • the processor 31 receives the 2-path allocation plan information from the section control device 10 through the communication unit 35 . Upon receiving the 2-pass placement plan information, the processor 31 formulates an operation plan for each CTU 7 based on the 1-pass placement plan information.
  • the processor 31 moves one of the CTUs 7 to the shelf 9 according to the action plan.
  • the processor 31 causes the CTU 7 to retrieve the tote 8 containing the articles from the shelf 9 .
  • the processor 31 causes the CTU 7 in question to move to the conveyor 101 .
  • the processor 31 causes the CTU 7 to set the tote 8 onto the conveyor 101 .
  • FIG. 17 shows an operation example in which the CTU 7 sets the tote 8 from the shelf 9 to the conveyor 101.
  • sorting system 100 comprises conveyor 101 .
  • the conveyor 101 is arranged near the induction 3.
  • two conveyors 101 are arranged with the induction 3 interposed therebetween.
  • the conveyor 101 receives the tote 8 loaded with articles from the CTU 7 .
  • a conveyor 101 conveys the received tote 8 in a predetermined direction.
  • a conveyor 101 loads totes 8 storing articles to be re-thrown into the sorter 5 .
  • Articles in the tote 8 loaded by the conveyor 101 are sequentially fed into the induction 3 by a robot, an operator, or the like.
  • processor 71 of CTU 7 moves to shelf 9 .
  • the processor 71 uses the driving part 76 to move the shuttle part 704 to the height of the shelf 91 on which the predetermined tote 8 is loaded.
  • processor 71 uses shuttle portion 704 to grip tote 8 on shelf 91 .
  • the processor 71 uses the shuttle portion 704 to load the tote 8 onto the rear tray 703 .
  • the processor 71 similarly loads each back tray 703 with a tote 8 .
  • the processor 71 uses the drive unit 76 to move to a position where the tote 8 can be loaded onto one end (starting end) of the conveyor 101 . After moving to that position, the processor 71 uses the shuttle portion 704 to grip the tote 8 on the rear tray 703 .
  • processor 71 Upon gripping a tote 8 , processor 71 uses shuttle assembly 704 to set the gripped tote 8 onto one end of conveyor 101 . Processor 71 similarly sets tote 8 of each rear tray 703 to one end of conveyor 101 .
  • the processor 71 uses the drive unit 76 to move the tote 8 from the other end (end) of the conveyor 101 to a position where it can be obtained.
  • the processor 71 When moved to that position, the processor 71 uses the shuttle portion 704 to grab the empty tote 8 from the other end of the conveyor 101 and load it onto the rear tray 703 . The processor 71 similarly loads each rear tray 703 with an empty tote 8 .
  • the processor 31 acquires a predetermined amount of tote 8 from the stacking table 6 and loads the empty tote 8 on the CTU 7 in the same manner as in the first embodiment. Set on table 6. Further, the processor 31 causes the CTU 7 to store the tote 8 having reached a predetermined amount in the shelf 9 .
  • the processor 31 of the CTU controller 30 similarly operates each CTU 7 until the 2-pass segmentation is completed.
  • FIG. 18 is a flow chart for explaining an operation example of the partitioning control device 10. As shown in FIG.
  • the processor 11 of the partitioning control device 10 receives the partitioning destination information from the host device 2 through the communication unit 15 (S41). Upon receiving the segmentation destination information, the processor 11 generates 2-pass segmentation information based on the segmentation destination information (S42).
  • the processor 11 After generating the 2-pass partition information, the processor 11 generates 2-pass layout plan information (S43). After generating the 2-pass arrangement plan information, the processor 11 transmits the 2-pass classification information to the sorter control device 20 through the communication section 15 (S44).
  • the processor 11 After transmitting the 2-pass classification information to the sorter control device 20, the processor 11 transmits 2-pass arrangement plan information to the CTU control device 30 through the communication unit 15 (S45). Having sent the two-pass placement plan information to CTU controller 30, processor 11 terminates its operation.
  • FIG. 19 is a flowchart for explaining an operation example of the sorter control device 20.
  • the processor 21 of the sorter control device 20 receives the 2-pass sorting information from the sorting control device 10 through the communication unit 25 (S51). Upon receiving the 2-pass partition information, the processor 21 generates partition designation information based on the 2-pass partition information (S52).
  • the processor 21 After generating the classification designation information, the processor 21 causes the sorter 5 to receive the articles from the induction 3 (S53). After receiving the item, the processor 21 acquires the ID of the item (S54).
  • the processor 21 After acquiring the item ID, the processor 21 causes the sorter 5 to throw the item into the chute 53 corresponding to the ID (S55). When the item is thrown into the chute 53 corresponding to the ID, the processor 21 determines whether the 2-pass section has been completed (S56).
  • the processor 21 When determining that the 2-pass segment has not been completed (S56, NO), the processor 21 returns to S53. If it is determined that the 2-pass division is completed (S56, YES), the processor 21 ends the operation.
  • FIG. 20 is a flowchart for explaining an operation example of the CTU control device 30.
  • the processor 31 of the CTU control device 30 receives the 2-pass arrangement plan information through the communication unit 35 (S61). Upon receiving the 2-pass placement plan information, the processor 31 formulates an operation plan based on the 2-pass placement plan information (S62).
  • the processor 31 After formulating the operation plan, the processor 31 causes the CTU 7 to move to the shelf 9 and load the tote 8 loaded with articles from the shelf 9 onto each rear tray 703 (S63). After loading the tote 8 on the CTU 7, the processor 31 moves the CTU 7 to the conveyor 101 (S64).
  • the processor 31 When moved to the conveyor 101, the processor 31 causes the CTU 7 to set each tote 8 to one end of the conveyor 101 (S65). After setting each tote 8, the processor 31 causes the CTU 7 to load an empty tote 8 from the other end of the conveyor 101 onto each rear tray 703 (S66).
  • the processor 31 waits until it receives the predetermined amount detection signal.
  • the processor 31 causes the CTU 7 to move the tote 8 having the predetermined amount on the stacking table 6 to the front and stack the tote 8 having the predetermined amount on the rear tray 703. (S68).
  • the processor 31 causes the CTU 7 to set the empty tote 8 loaded on the rear tray 703 on the stacking table 6 (S69).
  • the processor 31 repeats S67 to S69 until each rear tray 703 is loaded with a predetermined amount of totes 8 .
  • the processor 31 moves the CTU 7 to the shelf 9 (S70). After moving to the shelf 9, the processor 31 causes the CTU 7 to store each tote 8 having a predetermined amount on the shelf 9 (S71).
  • the processor 31 determines whether the 2-pass division has been completed (S72).
  • the processor 31 When determining that the 2-pass segment has not been completed (S72, NO), the processor 31 returns to S63. If it is determined that the 1-pass division is completed (S69, YES), the processor 21 terminates the operation.
  • processor 31 concurrently executes S63 to S71 for each CTU.
  • the sorting system 100 may cause the CTU 7 to transport a predetermined amount of tote 8 from the shelf 9 to the cart 200 after completing the two-pass sorting. For example, the sorting system 100 transports a predetermined amount of tote 8 from the shelf 9 to the cart 200 during discharge processing.
  • the CTU 7 may set the tote 8 containing the articles from the shelf 9 onto a predetermined table or floor surface.
  • the sorting system 100 may not have the conveyor 101 .
  • the sorting system 100 may sort the articles again after completing the two-pass sorting (three-pass sorting).
  • the number of partitions performed by the partitioning system 100 is not limited to any particular number.
  • the sorting system configured as described above puts the articles sorted in one pass into the sorter again and sorts them. As a result, the sorting system can sort the items in more detail. For example, if the sorting system is equipped with n chutes, it can sort the articles into nxn destinations.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

物品が投入された容器を効果的に保管することができるシステムを提供する。実施形態によれば、システムは、ソータと、自動搬送装置と、を備える。前記ソータは、第1のトレイと、投入機構と、を備える。第1のトレイは、物品を積載する。投入機構は、前記第1のトレイから前記物品を容器に投入する。前記自動搬送装置は、把持機構と、駆動機構と、プロセッサと、を備える。把持機構は、前記容器を把持する。駆動機構は、前記把持機構を上下方向に移動させる。プロセッサは、前記把持機構を用いて、前記ソータから前記物品が投入された前記容器を取得し、前記把持機構及び前記駆動機構を用いて、前記ソータから前記物品を投入された前記容器を高さ方向に前記容器を格納する棚に収納する。

Description

システム
 本発明の実施形態は、システムに関する。
 ソータを用いて各シュートに物品を投入するシステムが提供されている。そのようなシステムは、物品の宛先などに応じて、シュートを通じて物品を容器に区分する。
 従来、システムは、倉庫などにおいて、物品が投入された容器を所定の領域に2次元的に配置する。そのため、システムは、容器を保管するために広いスペースを確保する必要がある。
日本国特開2020-132330号公報
 上記の課題を解決するため、物品が投入された容器を効果的に保管することができるシステムを提供する。
 実施形態によれば、システムは、ソータと、自動搬送装置と、を備える。前記ソータは、第1のトレイと、投入機構と、を備える。第1のトレイは、物品を積載する。投入機構は、前記第1のトレイから前記物品を容器に投入する。前記自動搬送装置は、把持機構と、駆動機構と、プロセッサと、を備える。把持機構は、前記容器を把持する。駆動機構は、前記把持機構を上下方向に移動させる。プロセッサは、前記把持機構を用いて、前記ソータから前記物品が投入された前記容器を取得し、前記把持機構及び前記駆動機構を用いて、前記ソータから前記物品を投入された前記容器を高さ方向に前記容器を格納する棚に収納する。
図1は、第1の実施形態に係る区分システムの構成例を示すブロック図である。 図2は、第1の実施形態に係るトートの設置例を示す上面図である。 図3は、第1の実施形態に係るトートの設置例を示す側面図である。 図4は、第1の実施形態に係る棚の例を示す図である。 図5は、第1の実施形態に係る区分システムの制御系の構成例を示すブロック図である。 図6は、第1の実施形態に係る区分制御装置の構成例を示すブロック図である。 図7は、第1の実施形態に係るソータ制御装置の構成例を示すブロック図である。 図8は、第1の実施形態に係るCTU制御装置の構成例を示すブロック図である。 図9は、第1の実施形態に係るCTUの側面図である。 図10は、第1の実施形態に係るCTUの構成例を示すブロック図である。 図11は、第1の実施形態に係る区分先情報の構成例を示す図である。 図12は、第1の実施形態に係る区分システムの動作例を示す図である。 図13は、第1の実施形態に係る区分システムの動作例を示す図である。 図14は、第1の実施形態に係る区分制御装置の動作例を示すフローチャートである。 図15は、第1の実施形態に係るソータ制御装置の動作例を示すフローチャートである。 図16は、第1の実施形態に係るCTU制御装置の動作例を示すフローチャートである。 図17は、第2の実施形態に係る区分システムの動作例を示す図である。 図18は、第2の実施形態に係る区分制御装置の動作例を示すフローチャートである。 図19は、第2の実施形態に係るソータ制御装置の動作例を示すフローチャートである。 図20は、第2の実施形態に係るCTU制御装置の動作例を示すフローチャートである。
実施形態
 以下、図面を参照して実施形態について説明する。 
 実施形態に係る区分システムは、各物品を区分先に区分する。区分システムは、ソータ及び高層ケース搬送ロボット(Case Transfer Unit(CTU))を用いて、区分先に対応するシュートに物品を投入する。区分システムは、シュートを通じて物品をトートに投入する。また、区分システムは、物品が投入された容器をCTUに乗せて棚に格納する。
 図1は、実施形態に係る区分システム100の構成例を示す。図1が示すように、区分システム100は、インダクション3、スキャナ4、ソータ5、複数のCTU7、複数のトート8、複数の棚9及び複数のカゴ車200などを備える。
 ここで、区分システム100は、インダクション3、スキャナ4、及びソータ5の順に物品を運搬する。
 インダクション3は、ソータ5に物品を投入する。インダクション3は、オペレータ又はロボットなどによって投入される物品を受領する。インダクション3は、コンベアなどを用いて、投入された物品を搬送してソータ5に投入する。
 スキャナ4は、物品に添付されているコードを読み取る。たとえば、スキャナ4は、インダクション3に搬送される物品のコードを撮影可能な位置に設置される。スキャナ4は、搬送されている物品からコードを読み取る。
 コードは、物品を識別するIDをエンコードして得られる。また、スキャナ4は、文字認識処理(OCR(Optical Character Recognition)処理)などによって、物品に添付されているIDの文字列を読み取るものであってもよい。
 ソータ5は、投入された物品を区分する。ここでは、ソータ5は、トレイ51(第1のトレイ)、プッシャー52、及びシュート53などから構成される。
 ソータ5は、物品をトレイ51に積載して搬送する。トレイ51は、所定の方向(図1において、右方向)に移動する。 
 ソータ5は、トレイ51が所定のシュート53の前に到着したタイミングでプッシャー52を用いてトレイ51からシュート53に物品を押し出す。
 プッシャー52(投入機構)は、トレイ51に積載されている物品をトート8に投入する。プッシャー52は、物品の区分先に応じて特定のシュート53に物品を押し出す。プッシャー52は、インダクション3がトレイ51に物品を載せる手前で、物品を押し出す方向の対向方向に位置する。
 シュート53は、トレイ51が移動する方向と平行に並んで複数個設置されている。シュート53は、トレイ51から押し出された物品が通過する搬送路である。シュート53は、トレイ51から下方に向かう斜面状に形成されている。 
 ソータ5は、シュート53からトート8に物品を投入する。
 ソータ5は、トレイ51とプッシャー52とから構成されてもよいし、クロスベルトで構成されても、AGVで構成されても、あるいは他の仕組みであってもよい。ここでは、トレイ51とプッシャー52とを備えるソータ5を例として説明する。
 トート8は、ソータ5から物品が投入される容器である。トート8は、シュート53に隣接して複数個設置されている。トート8は、シュート53を通過する物品を受領可能な位置に設置されている。ここでは、トート8は、上面が開放された箱状に形成されている。
 カゴ車200は、払い出されるトート8を格納する容器である。たとえば、カゴ車200は、トート8を格納した状態で移動可能な構造である。
 CTU7は、物品を積載して搬送する自動搬送装置である。CTU7は、物品が投入されたトート8を取得する。CTU7は、トート8を取得すると、棚9に移動する。棚9に移動すると、CTU7は、トート8を棚9に収納する。 
 CTU7については、後に詳述する。
 棚9は、複数のトート8を収納する。棚9について、後に詳述する。
 次に、トート8の設置例について説明する。 
 図2は、トート8の設置例を示す上面図である。また、図3は、トート8の設置例を示す側面図である。
 図2及び図3が示すように、区分システム100は、トート8を積載する積載台6(第1の積載台)を備える。 
 積載台6は、シュート53からの物品を受領可能な所定の高さ(プッシャー52から投入される物品を受領可能な位置)にトート8を支持する。
 積載台6は、コード61及びガイド62などを備える。 
 コード61は、対応するシュート53(又は積載台6)を示す識別子をエンコードして得られたコードである。たとえば、コード61は、バーコード又は二次元コードなどである。コード61は、シュート53に向く面と対向する面に形成されている。
 ガイド62は、トート8の位置を維持するためのガイドである。ガイド62は、所定の高さに形成されている。ガイド62は、シュート53とトート8との間の第1の辺、及び、当該辺に垂直な2つの第2の辺から構成される。即ち、ガイド62は、第1の辺に対向する辺が開放した矩形上に形成されている。 
 なお、積載台6は、下部などに、さらにトート8を収納可能な構造であってもよい。
 トート8は、コード81などを備える。 
 コード81は、トート8を示す識別子をエンコードして得られたコードである。たとえば、コード81は、バーコード又は二次元コードなどである。コード81は、シュート53に向く面と対向する面に形成されている。
 次に、棚9について説明する。 
 図4は、棚9の構造例を示す。 
 棚9は、所定の高さに形成されている。また、棚9は、CTU7がトート8を取得又は収容可能な構造である。
 図4が示すように、棚9は、高さ方向に並んで形成される複数の棚段91などを備える。 
 棚段91は、トート8を積載可能な奥行きを有する。また、棚段91は、所定の幅を有する。棚段91は、幅方向にトート8を積載する。ここでは、棚段91は、幅方向に4つのトート8を格納する。また、棚段91は、正面方向(又は背面方向)において開放されている。
 コード92は、棚位置及びトート位置を示す識別子をエンコードして得られたコードである。たとえば、コード92は、バーコード又は二次元コードなどである。トートの配置位置に対応して、棚板に貼付される。
 棚9は、棚段91により、高さ方向に並べてトート8を収納する。
 次に、区分システム100の制御系について説明する。 
 図5は、区分システム100の制御系を示す。図5が示すように、区分システム100は、インダクション3、スキャナ4、ソータ5、上位装置2、CTU7、区分制御装置10、ソータ制御装置20及びCTU制御装置30などを備える。
 区分制御装置10は、インダクション3、スキャナ4、上位装置2、ソータ制御装置20及びCTU制御装置30に接続する。また、ソータ制御装置20は、ソータ5に接続する。また、CTU制御装置30は、CTU7に接続する。
 上位装置2は、物品と物品の区分先(行先)とを示す区分先情報を区分制御装置10に送信する。区分先情報については、後に詳述する。 
 たとえば、上位装置2は、WMS(Warehouse Management System)である。たとえば、上位装置2は、PCなどから構成される。
 区分制御装置10は、上位装置2からの区分先情報に従って、ソータ5及びCTU7を制御する。区分制御装置10は、ソータ制御装置20を通じてソータ5を制御する。また、区分制御装置10は、CTU制御装置30を通じてCTU7を制御する。たとえば、区分制御装置10は、WES(Warehouse Execution System)である。区分制御装置10については、後に詳述する。
 ソータ制御装置20は、区分制御装置10からの制御信号に従ってソータ5を制御する。ソータ制御装置20は、ソータ5のコントローラとして機能する。たとえば、ソータ制御装置20は、WCS(Warehouse Control System)である。ソータ制御装置20については、後に詳述する。
 CTU制御装置30は、区分制御装置10からの制御信号に従ってCTU7を制御する。CTU制御装置30は、CTU7のコントローラとして機能する。たとえば、CTU制御装置30は、WCSである。CTU制御装置30については、後に詳述する。
 次に、区分制御装置10について説明する。 
 図6は、区分制御装置10の構成例を示すブロック図である。図6が示すように、区分制御装置10は、プロセッサ11、ROM12、RAM13、NVM14、通信部15、操作部16及び表示部17などを備える。
 プロセッサ11と、ROM12、RAM13、NVM14、通信部15、操作部16及び表示部17と、は、データバスなどを介して互いに接続する。 
 なお、区分制御装置10は、図6が示すような構成の他に必要に応じた構成を具備したり、区分制御装置10から特定の構成が除外されたりしてもよい。
 プロセッサ11は、区分制御装置10全体の動作を制御する機能を有する。プロセッサ11は、内部キャッシュ及び各種のインターフェースなどを備えてもよい。プロセッサ11は、内部メモリ、ROM12又はNVM14が予め記憶するプログラムを実行することにより種々の処理を実現する。
 なお、プロセッサ11がプログラムを実行することにより実現する各種の機能のうちの一部は、ハードウエア回路により実現されるものであってもよい。この場合、プロセッサ11は、ハードウエア回路により実行される機能を制御する。
 ROM12は、制御プログラム及び制御データなどが予め記憶された不揮発性のメモリである。ROM12に記憶される制御プログラム及び制御データは、区分制御装置10の仕様に応じて予め組み込まれる。
 RAM13は、揮発性のメモリである。RAM13は、プロセッサ11の処理中のデータなどを一時的に格納する。RAM13は、プロセッサ11からの命令に基づき種々のアプリケーションプログラムを格納する。また、RAM13は、アプリケーションプログラムの実行に必要なデータ及びアプリケーションプログラムの実行結果などを格納してもよい。
 NVM14は、データの書き込み及び書き換えが可能な不揮発性のメモリである。NVM14は、たとえば、HDD(Hard Disk Drive)、SSD(Solid State Drive)又はフラッシュメモリなどから構成される。NVM14は、区分制御装置10の運用用途に応じて制御プログラム、アプリケーション及び種々のデータなどを格納する。
 通信部15は、インダクション3、スキャナ4、上位装置2、ソータ制御装置20及びCTU制御装置30などと通信するためのインターフェースである。たとえば、通信部15は、ネットワークを通じてインダクション3、スキャナ4、上位装置2、ソータ制御装置20及びCTU制御装置30などとデータを送受信するためのインターフェースである。通信部15は、ソータ制御装置20を介してソータ5に接続する。また、通信部15は、CTU制御装置30を介してCTU7に接続する。たとえば、通信部15は、有線又は無線のLAN(Local Area Network)接続をサポートするインターフェースである。
 通信部15は、ソータ5及びCTU7を制御するためのインターフェースとして機能する。
 なお、通信部15は、インダクション3と通信するためのインターフェース、スキャナ4と通信するためのインターフェース、上位装置2と通信するためのインターフェース、ソータ制御装置20と通信するためのインターフェース及びCTU制御装置30と通信するためのインターフェースから構成されるものであってもよい。
 操作部16は、オペレータから種々の操作の入力を受け付ける。操作部16は、入力された操作を示す信号をプロセッサ11へ送信する。操作部16は、タッチパネルから構成されてもよい。
 表示部17は、プロセッサ11からの画像データを表示する。たとえば、表示部17は、液晶モニタから構成される。操作部16がタッチパネルから構成される場合、表示部17は、操作部16と一体的に形成されてもよい。
 次に、ソータ制御装置20について説明する。 
 図7は、ソータ制御装置20の構成例を示すブロック図である。図7が示すように、ソータ制御装置20は、プロセッサ21、ROM22、RAM23、NVM24、通信部25、ソータインターフェース26、操作部27及び表示部28などを備える。
 プロセッサ21と、ROM22、RAM23、NVM24、ソータインターフェース26、通信部25、操作部27及び表示部28と、は、データバスなどを介して互いに接続する。 
 なお、ソータ制御装置20は、図7が示すような構成の他に必要に応じた構成を具備したり、ソータ制御装置20から特定の構成が除外されたりしてもよい。
 プロセッサ21は、ソータ制御装置20全体の動作を制御する機能を有する。プロセッサ21は、内部キャッシュ及び各種のインターフェースなどを備えてもよい。プロセッサ21は、内部メモリ、ROM22又はNVM24が予め記憶するプログラムを実行することにより種々の処理を実現する。
 なお、プロセッサ21がプログラムを実行することにより実現する各種の機能のうちの一部は、ハードウエア回路により実現されるものであってもよい。この場合、プロセッサ21は、ハードウエア回路により実行される機能を制御する。
 ROM22は、制御プログラム及び制御データなどが予め記憶された不揮発性のメモリである。ROM22に記憶される制御プログラム及び制御データは、ソータ制御装置20の仕様に応じて予め組み込まれる。
 RAM23は、揮発性のメモリである。RAM23は、プロセッサ21の処理中のデータなどを一時的に格納する。RAM23は、プロセッサ21からの命令に基づき種々のアプリケーションプログラムを格納する。また、RAM23は、アプリケーションプログラムの実行に必要なデータ及びアプリケーションプログラムの実行結果などを格納してもよい。
 NVM24は、データの書き込み及び書き換えが可能な不揮発性のメモリである。NVM24は、たとえば、HDD、SSD又はフラッシュメモリなどから構成される。NVM24は、ソータ制御装置20の運用用途に応じて制御プログラム、アプリケーション及び種々のデータなどを格納する。
 通信部25は、区分制御装置10などと通信するためのインターフェースである。たとえば、通信部25は、ネットワークを通じて区分制御装置10などとデータを送受信するためのインターフェースである。たとえば、通信部25は、有線又は無線のLAN接続をサポートするインターフェースである。
 ソータインターフェース26は、ソータ5と通信するためのインターフェースである。
 操作部27は、オペレータから種々の操作の入力を受け付ける。操作部27は、入力された操作を示す信号をプロセッサ21へ送信する。操作部27は、タッチパネルから構成されてもよい。
 表示部28は、プロセッサ21からの画像データを表示する。たとえば、表示部28は、液晶モニタから構成される。操作部27がタッチパネルから構成される場合、表示部28は、操作部27と一体的に形成されてもよい。
 なお、通信部25とソータインターフェース26とは、一体的に形成されるものであってもよい。
 プロセッサ21は、区分制御装置10からの制御信号に従ってソータ5を制御する。たとえば、プロセッサ21は、ソータ5に所定の物品を所定のシュートに区分させる。たとえば、プロセッサ21は、当該物品が当該シュートに到達するタイミングで当該物品を当該シュートに押し出す。
 次に、CTU制御装置30について説明する。 
 図8は、CTU制御装置30の構成例を示すブロック図である。図8が示すように、CTU制御装置30は、プロセッサ31、ROM32、RAM33、NVM34、通信部35、CTUインターフェース36、操作部37及び表示部38などを備える。
 プロセッサ31と、ROM32、RAM33、NVM34、CTUインターフェース36、通信部35、操作部37及び表示部38と、は、データバスなどを介して互いに接続する。 
 なお、CTU制御装置30は、図8が示すような構成の他に必要に応じた構成を具備したり、CTU制御装置30から特定の構成が除外されたりしてもよい。
 プロセッサ31は、CTU制御装置30全体の動作を制御する機能を有する。プロセッサ31は、内部キャッシュ及び各種のインターフェースなどを備えてもよい。プロセッサ31は、内部メモリ、ROM32又はNVM34が予め記憶するプログラムを実行することにより種々の処理を実現する。
 なお、プロセッサ31がプログラムを実行することにより実現する各種の機能のうちの一部は、ハードウエア回路により実現されるものであってもよい。この場合、プロセッサ31は、ハードウエア回路により実行される機能を制御する。
 ROM32は、制御プログラム及び制御データなどが予め記憶された不揮発性のメモリである。ROM32に記憶される制御プログラム及び制御データは、CTU制御装置30の仕様に応じて予め組み込まれる。
 RAM33は、揮発性のメモリである。RAM33は、プロセッサ31の処理中のデータなどを一時的に格納する。RAM33は、プロセッサ31からの命令に基づき種々のアプリケーションプログラムを格納する。また、RAM33は、アプリケーションプログラムの実行に必要なデータ及びアプリケーションプログラムの実行結果などを格納してもよい。
 NVM34は、データの書き込み及び書き換えが可能な不揮発性のメモリである。NVM34は、たとえば、HDD、SSD又はフラッシュメモリなどから構成される。NVM34は、CTU制御装置30の運用用途に応じて制御プログラム、アプリケーション及び種々のデータなどを格納する。たとえば、NVM34は、トート8の在庫位置に関するデータベースを格納する。
 通信部35は、区分制御装置10などと通信するためのインターフェースである。たとえば、通信部35は、ネットワークを通じて区分制御装置10などとデータを送受信するためのインターフェースである。たとえば、通信部35は、有線又は無線のLAN接続をサポートするインターフェースである。
 CTUインターフェース36は、CTU7と通信するためのインターフェースである。CTUインターフェース36は、有線又は無線でCTU7に接続する。たとえば、CTUインターフェース36は、無線LAN接続をサポートするものであってもよい。
 操作部37は、オペレータから種々の操作の入力を受け付ける。操作部37は、入力された操作を示す信号をプロセッサ31へ送信する。操作部37は、タッチパネルから構成されてもよい。
 表示部38は、プロセッサ31からの画像データを表示する。たとえば、表示部38は、液晶モニタから構成される。操作部37がタッチパネルから構成される場合、表示部38は、操作部37と一体的に形成されてもよい。
 なお、通信部35とCTUインターフェース36とは、一体的に形成されるものであってもよい。
 プロセッサ31は、区分制御装置10からの制御信号に従ってCTU7を制御する。たとえば、プロセッサ31は、CTU7に、所定の位置に移動させる。また、プロセッサ31は、CTU7に、トート8を取得させる。また、プロセッサ31は、CTU7に、トート8をセットさせる。
 次に、CTU7について説明する。 
 図9は、CTU7の側面図である。
 図9が示すように、CTU7は、ベース701を備える。ベース701は、CTU7全体を移動させる移動機構として機能する。ベース701は、後述するタイヤ70などを備える。なお、ベース701は、床面に貼付されているコードなどを読み取るカメラなどを備えるものであってもよい。
 また、ベース701には、上部に延びる部材702が形成されている。たとえば、部材702は、上方に伸びる2つの棒状の部材と当該部材間に渡って形成される棒状の部材とから構成される。即ち、部材702は、はしご状に形成されている。
 部材702には、複数の背面トレイ703(第2のトレイ)が形成されている。背面トレイ703は、部材702から水平方向に延びる板状の部材である。背面トレイ703は、トート8を積載する。背面トレイ703は、1つのトート8を積載する。
 ここでは、部材702には、8つの背面トレイ703が形成されている。なお、背面トレイ703が形成される個数は、特定の個数に限定されるものではない。
 部材702には、シャトル部704(把持機構)が形成されている。シャトル部704は、部材702に対して背面トレイ703と逆方向に形成されている。シャトル部704は、後述する駆動部76などにより部材702に沿って上下に移動可能である。
 シャトル部704は、前方(図9では、左側)にあるトート8を把持する。シャトル部704は、把持されたトート8を背面トレイ703の1つに積載する。 
 また、シャトル部704は、背面トレイ703の1つに積載されているトート8を把持する。シャトル部704は、把持されたトート8を前方で開放する。
 シャトル部704は、棚9の各棚段91及び積載台6からトート8を取得することができる。また、シャトル部704は、棚9の各棚段91及び積載台6へトート8をセットすることができる。
 シャトル部704は、カメラ705を備える。カメラ705は、前方を撮影するように設置されている。カメラ705は、積載台6のコード61、トート8のコード81又は棚9のコード92などを撮影する。カメラ705は、照明などを備えるものであってもよい。
 次に、CTU7の制御系について説明する。 
 図10は、CTU7の構成例を示すブロック図である。CTU7は、プロセッサ71、ROM72、RAM73、NVM74、通信部75、駆動部76(駆動機構)、バッテリー78、充電機構79、タイヤ70、シャトル部704及びカメラ705などを備える。
 プロセッサ71は、CTU7全体の動作を制御する機能を有する。プロセッサ71は、内部キャッシュ及び各種のインターフェースなどを備えてもよい。プロセッサ71は、内部メモリ、ROM72又はNVM74が予め記憶するプログラムを実行することにより種々の処理を実現する。
 たとえば、プロセッサ71は、CPU(Central Processing Unit)である。なお、プロセッサ71は、LSI(Large Scale Integration)、ASIC(Application Specific Integrated Circuit)、又はFPGA(Field-Programmable Gate Array)等のハードウエアにより実現されてもよい。
 ROM72は、非一時的なコンピュータ可読記憶媒体であり、上記のプログラムを記憶する。また、ROM72は、プロセッサ71が各種の処理を行う上で使用するデータ又は各種の設定値などを記憶する。RAM73は、データの読み書きに用いられるメモリである。RAM73は、プロセッサ71が各種の処理を行う上で一時的に使用するデータを記憶しておく、いわゆるワークエリアなどとして利用される。
 NVM74は、非一時的なコンピュータ可読記憶媒体であり、上記のプログラムを記憶する場合もある。また、NVM74は、プロセッサ71が各種の処理を行う上で使用するデータ、プロセッサ71での処理によって生成されたデータ又は各種の設定値などを保存する。
 通信部75は、無線LANアクセスポイントなどを通じてCTU制御装置30などとデータを送受信するインターフェースである。たとえば、通信部75は、無線LAN接続をサポートする。
 駆動部76は、タイヤ70を駆動する。駆動部76は、タイヤ70を回転させるモータ等であり、プロセッサ71から出力される駆動信号に基づきモータを回転又は停止する。モータの動力は、タイヤ70に伝達される。このようなモータからの動力により、CTU7は、目的位置へ移動する。
 また、駆動部76は、シャトル部704を駆動する。たとえば、駆動部76は、シャトル部704を上下方向に移動させる。また、駆動部76は、シャトル部704の把持動作を行わせる。駆動部76は、シャトル部704を駆動させるモータ等である。
 なお、駆動部76は、タイヤ70を駆動させるための機構と、シャトル部704を駆動させるための機構とから構成されるものであってもよい。
 バッテリー78は、駆動部76等に必要な電力を供給する。充電機構79は、充電ステーションとバッテリー78とを接続する機構であり、バッテリー78は、充電機構79を介して充電ステーションなどから供給される電力により充電される。
 タイヤ70は、駆動部76からの動力によって回転する。CTU7は、タイヤ70の回転により、前進、後退又は方向転換などを行う。
 なお、CTU7は、図9及び図10が示すような構成の他に必要に応じた構成を具備したり、CTU7から特定の構成が除外されたりしてもよい。
 プロセッサ71は、加速、減速、停止、方向転換、及びシャトル部704の動作に必要な演算及び制御などの処理を行う。プロセッサ71は、CTU制御装置30などからの制御信号に基づき、ROM72又はNVM74等に記憶されたプログラムを実行することにより、駆動信号を生成し各部に出力する。
 CTU7のプロセッサ71は、CTU制御装置30から送信される制御信号に応じた駆動信号を出力する。これにより、CTU7は、現在位置から所定の位置への移動、及び、トート8の把持、開放並びに積載などの動作を行う。
 次に、区分制御装置10が実現する機能について説明する。区分制御装置10が実現する機能は、プロセッサ11が内部メモリ、ROM12又はNVM14などに格納されるプログラムを実行することで実現される。
 まず、プロセッサ11は、区分先情報を取得する機能を有する。 
 前述の通り、区分先情報は、物品の区分先を示す。
 図11は、区分先情報の構成例を示す。図11が示すように、区分先情報は、「ID」及び「行先」を対応付けたレコードを格納する。
 「ID」は、区分の対象となる物品を特定する識別子である。ここでは、「ID」は、数値である。 
 「行先」は、対応する物品の行先である。「行先」は、物品が格納されるトート8及び当該トート8が収納される棚9に対応する。即ち、「行先」は、区分制御装置10のプロセッサ11が物品を投入するトート8とトート8が収納される棚9とを特定することができる情報である。
 たとえば、「行先」は、住所(又は住所の一部)を示す情報であってもよい。 
 なお、区分先情報の構成は、特定の構成に限定されるものではない。
 プロセッサ11は、通信部15を通じて区分先情報を上位装置2から受信する。プロセッサ11は、通信部15を通じて区分先情報を要求するリクエストを上位装置2に送信してもよい。
 また、プロセッサ11は、区分先情報に基づいて、1パス区分情報及び1パス配置計画情報を生成する機能を有する。
 ここでは、プロセッサ11は、ソータ5に物品をシュート53に投入させ、CTU7に物品が投入されたトート8を棚9に収納させる。即ち、プロセッサ11は、物品をソータ5に1回投入して区分する(1パス区分)。
 1パス区分情報は、物品を投入するシュート53を特定する情報である。たとえば、1パス区分情報は、物品の識別子と、当該物品を投入するシュート53と、を対応付けて格納する。
 また、1パス配置計画情報は、シュート53からの物品を投入されたトート8を収納する棚9を特定する情報である。たとえば、1パス配置計画情報は、トート8の識別子と、当該トート8を積載する積載台6の識別子と、当該トート8を収納する棚9と、を対応付けて格納する。
 プロセッサ11は、1パス区分情報を生成すると、通信部15を通じてソータ制御装置20へ送信する。 
 また、プロセッサ11は、1パス配置計画情報を生成すると、通信部15を通じてCTU制御装置30へ送信する。 
 ここで、プロセッサ11は、インダクション3を用いて、物品のソータ5への投入を開始する。
 次に、ソータ制御装置20が実現する機能について説明する。ソータ制御装置20が実現する機能は、プロセッサ21が内部メモリ、ROM22又はNVM24などに格納されるプログラムを実行することで実現される。
 プロセッサ21は、1パス区分情報に基づいて、物品をシュート53に投入する機能を有する。
 まず、プロセッサ21は、通信部25を通じて1パス区分情報を区分制御装置10から受信する。1パス区分情報を受信すると、プロセッサ21は、1パス区分情報に基づいて、各物品を投入するシュート53を指定する区分指定情報を生成する。
 区分指定情報を生成すると、プロセッサ21は、ソータ5に、インダクション3から投入される物品をトレイ51へ積載させる。ソータ5が物品をトレイ51に積載すると、プロセッサ21は、スキャナ4が当該物品から読み取ったIDを取得する。
 たとえば、プロセッサ21は、通信部25を通じて、スキャナ4が当該物品から読み取ったIDを区分制御装置10から取得する。なお、プロセッサ21は、スキャナ4からIDを取得してもよい。また、プロセッサ21は、スキャナ4からの画像を取得し、当該画像に写るコードをデコードしてIDを取得するものであってもよい。
 IDを取得すると、プロセッサ21は、区分指定情報を参照して、取得されたIDに対応するシュート53を特定する。シュート53を特定すると、プロセッサ21は、ソータインターフェース26を通じて、ソータ5に、トレイ51に積載されている物品を当該シュート53へ投入させる。
 たとえば、プロセッサ21は、ソータ5に、トレイ51が当該シュート53に到達したタイミングでプッシャー52を用いてトレイ51から物品を当該シュート53に投入させる。物品は、当該シュート53を通過して、トート8に投入される。
 プロセッサ21は、1パス区分が完了するまで、同様に、ソータ5に物品をシュート53へ投入させる。
 また、プロセッサ21は、トート8が所定量になったことを検知する。たとえば、プロセッサ21は、物品のコードに紐付いた、体積情報が存在する場合は、トート8に投入された物品毎に体積を加算し、加算された体積の合計がトート8の内容積を基に予め設定した体積閾値以上となると、トート8が所定量であると判定/検知する。プロセッサ21は、体積情報が無い場合、あるいは体積情報があってもセンサ情報と併用して判定する場合は、図21に示すようなシュート毎に取り付けられた、反射センサ54により、ある設定高さ位置以上に物品が堆積された場合、その情報と前記体積情報との組み合わせにより、トート8が所定量である、と判定/検知する。トート8が所定量になったことを検知すると、プロセッサ21は、トート8が所定量になったことを示す制御信号(所定量検知信号)を区分制御装置10に送信する。所定量検知信号は、区分制御装置10を介して、CTU制御装置30へ送信される。
 次に、CTU制御装置30が実現する機能について説明する。CTU制御装置30が実現する機能は、プロセッサ31が内部メモリ、ROM32又はNVM34などに格納されるプログラムを実行することで実現される。
 プロセッサ31は、1パス配置計画情報に基づいて、物品が投入されたトート8を棚9に収納する機能を有する。
 まず、プロセッサ31は、通信部35を通じて1パス配置計画情報を区分制御装置10から受信する。1パス配置計画情報を受信すると、プロセッサ31は、1パス配置計画情報に基づいて、各CTU7の動作計画を策定する。また、ここでは、CTU7は、背面トレイ703にトート8を積載していないものとする。
 動作計画を策定すると、プロセッサ31は、CTU7の1つに、棚9へ移動させる。当該CTU7に棚9へ移動させると、プロセッサ31は、当該CTU7に棚9から空のトート8を取得させる。ここでは、プロセッサ31は、当該CTU7に、各背面トレイ703へ空のトート8を積載させる。
 CTU7のプロセッサ71は、駆動部76を用いて、空きトート8が格納されている棚段91の高さにシャトル部704を移動する。シャトル部704を移動すると、プロセッサ71は、シャトル部704を用いて、空きトート8を把持し背面トレイ703に積載する。プロセッサ71は、同様に、棚9から空きトート8を各背面トレイ703へ積載する。
 当該CTU7に空のトート8を取得させると、プロセッサ31は、所定量検知信号を受信するまで待機する。
 所定量検知信号を受信すると、プロセッサ31は、当該CTU7に、所定量になったトート8の位置まで移動させる。たとえば、CTU7のプロセッサ71は、カメラ705を用いて積載台6のコード61又はトート8のコード81を読み取って、所定量になったトート8の正面まで移動する。
 当該CTU7に、当該位置まで移動させると、プロセッサ31は、当該CTU7に、所定量になったトート8を取得させ空のトート8をセットさせる。
 なお、プロセッサ31は、CTU7に、積載台6の下部に配置されている空のトート8を積載台6にセットさせてもよい。
 図12は、CTU7が所定量になったトート8を取得し空のトート8をセットする動作例を示す。図12が示すように、所定のトート8が物品Pにより所定量になったものとする。また、ここでは、積載台6は、下部に空のトート8を格納するものとする。
 CTU7のプロセッサ71は、CTU制御装置30からの制御に従って、シャトル部704及び駆動部76を用いて所定量になったトート8を取得する。所定量になったトート8を取得すると、プロセッサ71は、シャトル部704及び駆動部76を用いて、所定量になったトート8を背面トレイ703の1つに積載する。所定量になったトート8を背面トレイ703の1つに積載すると、プロセッサ71は、シャトル部704及び駆動部76を用いて、背面トレイ703の1つに積載されている空のトート8を積載台6にセットする。
 CTU制御装置30のプロセッサ31は、CTU7の各背面トレイ703に所定量となったトート8が積載されるまで上記の動作を繰り返す。
 CTU7の各背面トレイ703に所定量となったトート8が積載されると、プロセッサ31は、CTU7に、所定の棚9まで移動させる。当該所定の棚9まで移動させると、プロセッサ31は、CTU7に、所定量の各トート8を当該所定の棚9に収納させる。たとえば、当該所定の棚9は、トート8を収納可能な棚9である。
 図13は、CTU7が所定の棚9まで移動し所定量のトート8を棚9に収納する動作例を示す。図13が示すように、CTU7のプロセッサ71は、所定量となったトート8を背面トレイ703に積載すると、駆動部76などを駆動して所定の棚9まで移動する。所定の棚9まで移動すると、プロセッサ71は、シャトル部704を用いて背面トレイ703から所定量となったトート8を把持する。
 所定量となったトート8を把持すると、プロセッサ71は、シャトル部704がトート8を把持した状態で、駆動部76を用いて、トート8を積載可能な棚段91の高さまでシャトル部704を移動する。シャトル部704を移動すると、プロセッサ71は、シャトル部704を用いて、棚段91にトート8を積載する。
 プロセッサ71は、同様に、シャトル部704及び駆動部76を用いて、背面トレイ703に積載されている各トート8を所定の棚9に収納する。
 なお、1つの棚9にトート8が収まらない場合には、プロセッサ71は、CTU制御装置30からの制御の従って、複数の棚9にトート8を収納してもよい。 
 また、CTU制御装置30のプロセッサ31は、各CTU7を同様に動作させる。
 CTU制御装置30のプロセッサ31は、1パス区分が完了するまで、同様に、CTU7に所定量になったトート8を棚9に収納させる。
 次に、区分システム100の動作例について説明する。 
 まず、区分制御装置10の操作例について説明する。 
 図14は、区分制御装置10の操作例について説明するためのフローチャートである。
 まず、区分制御装置10のプロセッサ11は、通信部15を通じて区分先情報を上位装置2から受信する(S11)。区分先情報を受信すると、プロセッサ11は、区分先情報に基づいて1パス区分情報を生成する(S12)。
 1パス区分情報を生成すると、プロセッサ11は、1パス配置計画情報を生成する(S13)。1パス配置計画情報を生成すると、プロセッサ11は、通信部15を通じて1パス区分情報をソータ制御装置20に送信する(S14)。
 1パス区分情報をソータ制御装置20に送信すると、プロセッサ11は、通信部15を通じて1パス配置計画情報をCTU制御装置30に送信する(S15)。1パス配置計画情報をCTU制御装置30に送信すると、プロセッサ11は、動作を終了する。
 次に、ソータ制御装置20の動作例について説明する。 
 図15は、ソータ制御装置20の動作例について説明するためのフローチャートである。
 まず、ソータ制御装置20のプロセッサ21は、通信部25を通じて1パス区分情報を区分制御装置10から受信する(S21)。1パス区分情報を受信すると、プロセッサ21は、1パス区分情報に基づいて区分指定情報を生成する(S22)。
 区分指定情報を生成すると、プロセッサ21は、ソータ5に、インダクション3から物品を受領させる(S23)。物品を受領させると、プロセッサ21は、物品のIDを取得する(S24)。
 物品のIDを取得すると、プロセッサ21は、ソータ5に、物品をIDに対応するシュート53に投入させる(S25)。物品をIDに対応するシュート53に投入させると、プロセッサ21は、1パス区分が完了したかを判定する(S26)。
 1パス区分が完了していないと判定すると(S26、NO)、プロセッサ21は、S23に戻る。 
 1パス区分が完了したと判定すると(S26、YES)、プロセッサ21は、動作を終了する。
 次に、CTU制御装置30の動作例について説明する。 
 図16は、CTU制御装置30の動作例について説明するためのフローチャートである。
 まず、CTU制御装置30のプロセッサ31は、通信部35を通じて1パス配置計画情報を受信する(S31)。1パス配置計画情報を受信すると、プロセッサ31は、1パス配置計画情報に基づいて動作計画を策定する(S32)。
 動作計画を策定すると、プロセッサ31は、CTU7に、棚9へ移動させ、棚9から空のトート8を背面トレイ703に積載させる(S33)。CTU7に空のトート8を積載させると、プロセッサ31は、所定量検知信号を受信するまで待機する。
 所定量検知信号を受信する(S34)と、プロセッサ31は、CTU7に、所定量となったトート8の正面へ移動させ、所定量となったトート8を背面トレイ703に積載させる(S35)。
 所定量となったトート8を積載させると、プロセッサ31は、CTU7に、背面トレイ703に積載されている空のトート8を積載台6にセットさせる(S36)。
 プロセッサ31は、各背面トレイ703に所定量となったトート8が積載されるまで、S34乃至S36を繰り返す。
 各背面トレイ703に所定量となったトート8が積載されると、プロセッサ31は、CTU7に棚9へ移動させる(S37)。棚9へ移動させると、プロセッサ31は、CTU7に、所定量となった各トート8を棚9に収納させる(S38)。
 所定量となった各トート8を棚9に収納させると、プロセッサ31は、1パス区分が完了したかを判定する(S39)。
 1パス区分が完了していないと判定すると(S39、NO)、プロセッサ31は、S33に戻る。 
 1パス区分が完了したと判定すると(S39、YES)、プロセッサ21は、動作を終了する。 
 なお、プロセッサ31は、各CTUについて、S33乃至S38を同時並行で実行する。
 また、プロセッサ31は、CTU7に、物品が投入されているが所定量となっていないトート8を棚9に収納させてもよい。 
 また、空のトート8は、背面トレイ703に予め積載されているものであってもよい。
 また、区分システム100は、シュート53を備えなくともよい。たとえば、物品は、ソータ5からトート8に直接投入されるものであってもよい。
 また、区分システム100は、CTU7に、所定量となったトート8を棚9からカゴ車200に搬送させるものであってもよい。たとえば、区分システム100は、排出処理時において、所定量となったトート8を棚9からカゴ車200に搬送させる。
 以上のように構成された区分システムは、ソータを用いて、トートに物品を投入する。また、区分システムは、CTUを用いて、高さ方向にトートを格納することができる棚に、空のトート及び所定量となったトートを収納する。そのため、区分システムは、トートを三次元的に配置することができる。よって、区分システムは、トートを効果的に保管することができる。
(第2の実施形態)
 次に、第2の実施形態について説明する。 
 第2の実施形態に係る区分システム100は、1パス区分した後に、トート8に区分された物品をソータ5に再度投入して区分する(2パス区分)点で第1の実施形態のそれと異なる。従って、その他の点については、同一の符号を付して詳細な説明を省略する。 
 第2の実施形態に係る区分システム100は、後述するコンベア101(第2の積載台)を備える。コンベア101については、後に詳述する。
 次に、区分制御装置10が実現する機能について説明する。区分制御装置10が実現する機能は、プロセッサ11が内部メモリ、ROM12又はNVM14などに格納されるプログラムを実行することで実現される。第2の実施形態に係る区分制御装置10は、第1の実施形態に係る区分制御装置10が実行する機能に加えて、以下の機能を実現する。
 プロセッサ11は、区分先情報に基づいて、2パス区分情報及び2パス配置計画情報を生成する機能を有する。
 ここでは、プロセッサ11は、1パス区分を行った後に、CTU7に棚9のトート8からソータ5へ物品をシュート53に投入させ、ソータ5から物品が投入されたトート8を棚9に再度収納させる。即ち、プロセッサ11は、物品をソータ5に2回投入して区分する(2パス区分)。
 2パス区分情報は、2パス目において、物品を投入するシュート53を特定する情報である。たとえば、2パス区分情報は、物品の識別子と、当該物品を投入するシュート53と、を対応付けて格納する。
 また、2パス配置計画情報は、2パス目において、シュート53からの物品を投入されたトート8を収納する棚9を特定する情報である。たとえば、2パス配置計画情報は、トート8の識別子と、当該トート8を積載する積載台6の識別子と、当該トート8を収納する棚9と、を対応付けて格納する。
 たとえば、プロセッサ11は、1パス目よりもさらに詳細に物品を区分するために、2パス区分情報及び2パス配置計画情報を生成する。また、プロセッサ11は、1パス目における区分結果の順序を維持したまま1パス目の順序に従ってソータ5に物品を再投入するように、2パス区分情報及び2パス配置計画情報を生成するものであってもよい。
 プロセッサ11は、2パス区分情報を生成すると、通信部15を通じてソータ制御装置20へ送信する。 
 また、プロセッサ11は、2パス配置計画情報を生成すると、通信部15を通じてCTU制御装置30へ送信する。
 次に、ソータ制御装置20が実現する機能について説明する。ソータ制御装置20が実現する機能は、プロセッサ21が内部メモリ、ROM22又はNVM24などに格納されるプログラムを実行することで実現される。第2の実施形態に係るソータ制御装置20は、第1の実施形態に係るソータ制御装置20が実行する機能に加えて、以下の機能を実現する。
 プロセッサ21は、2パス区分情報に基づいて、物品をシュート53に投入する機能を有する。
 まず、プロセッサ21は、通信部25を通じて2パス区分情報を区分制御装置10から受信する。2パス区分情報を受信すると、プロセッサ21は、2パス区分情報に基づいて、各物品を投入するシュート53を指定する区分指定情報を生成する。
 区分指定情報を生成すると、プロセッサ21は、ソータ5に、物品をシュート53へ投入させる。プロセッサ21がソータ5に物品をシュート53へ投入させる動作例は、第1の実施形態に係るそれと同様であるため説明を省略する。
 次に、CTU制御装置30が実現する機能について説明する。CTU制御装置30が実現する機能は、プロセッサ31が内部メモリ、ROM32又はNVM34などに格納されるプログラムを実行することで実現される。第2の実施形態に係るCTU制御装置30は、第1の実施形態に係るCTU制御装置30が実行する機能に加えて、以下の機能を実現する。
 プロセッサ31は、2パス配置計画情報に基づいて、物品が投入されたトート8を棚9に収納する機能を有する。
 プロセッサ31は、2パス配置計画情報に基づいて、物品が投入されたトート8を棚9からコンベア101に搬送する機能を有する。
 まず、プロセッサ31は、通信部35を通じて2パス配置計画情報を区分制御装置10から受信する。2パス配置計画情報を受信すると、プロセッサ31は、1パス配置計画情報に基づいて、各CTU7の動作計画を策定する。
 動作計画を策定すると、プロセッサ31は、動作計画に従って、CTU7の1つに、棚9に移動させる。棚9に移動させると、プロセッサ31は、当該CTU7に、物品が投入されたトート8を棚9から取得させる。トート8を棚9から取得させると、プロセッサ31は、当該CTU7に、コンベア101まで移動させる。コンベア101まで移動させると、プロセッサ31は、当該CTU7に、トート8をコンベア101へセットさせる。
 図17は、CTU7がトート8を棚9からコンベア101へセットさせる動作例を示す。前述の通り、区分システム100は、コンベア101を備える。
 コンベア101は、インダクション3の近傍に配置されている。ここでは、コンベア101は、インダクション3を挟んで2つ配置されている。
 コンベア101は、物品が投入されたトート8をCTU7から受領する。コンベア101は、受領されたトート8を所定の方向に搬送する。コンベア101は、ソータ5に再投入される物品を格納しているトート8を積載する。コンベア101が積載しているトート8内の物品は、ロボット又はオペレータなどによってインダクション3に逐次投入される。 
 ここでは、CTU7は、トート8を積載していないものとする。
 まず、CTU7のプロセッサ71は、棚9まで移動する。棚9まで移動すると、プロセッサ71は、駆動部76を用いて、所定のトート8を積載している棚段91の高さまでシャトル部704を移動する。シャトル部704を移動すると、プロセッサ71は、シャトル部704を用いて、棚段91のトート8を把持する。トート8を把持すると、プロセッサ71は、シャトル部704を用いて、背面トレイ703にトート8を積載する。 
 プロセッサ71は、同様に、各背面トレイ703にトート8を積載する。
 各背面トレイ703にトート8を積載すると、プロセッサ71は、駆動部76を用いて、コンベア101の1つの一端(発端)へトート8を投入可能な位置まで移動する。当該位置まで移動すると、プロセッサ71は、シャトル部704を用いて、背面トレイ703のトート8を把持する。
 トート8を把持すると、プロセッサ71は、シャトル部704を用いて、コンベア101の一端へ把持されているトート8をセットする。 
 プロセッサ71は、同様に、各背面トレイ703のトート8をコンベア101の一端へセットする。
 各背面トレイ703のトート8をセットすると、プロセッサ71は、駆動部76を用いて、コンベア101の他端(終端)からトート8を取得可能な位置へ移動する。
 当該位置へ移動すると、プロセッサ71は、シャトル部704を用いて、コンベア101の他端から空のトート8を把持して背面トレイ703に積載する。 
 プロセッサ71は、同様に、各背面トレイ703へ空のトート8を積載する。
 各背面トレイ703へ空のトート8を積載すると、第1の実施形態と同様に、プロセッサ31は、CTU7に、所定量となったトート8を積載台6から取得して空のトート8を積載台6にセットする。また、プロセッサ31は、CTU7に、所定量となったトート8を棚9へ収納させる。
 CTU制御装置30のプロセッサ31は、2パス区分が完了するまで、同様に、各CTU7を動作させる。
 次に、区分システム100の動作例について説明する。 
 まず、区分制御装置10の操作例について説明する。 
 図18は、区分制御装置10の操作例について説明するためのフローチャートである。
 まず、区分制御装置10のプロセッサ11は、通信部15を通じて区分先情報を上位装置2から受信する(S41)。区分先情報を受信すると、プロセッサ11は、区分先情報に基づいて2パス区分情報を生成する(S42)。
 2パス区分情報を生成すると、プロセッサ11は、2パス配置計画情報を生成する(S43)。2パス配置計画情報を生成すると、プロセッサ11は、通信部15を通じて2パス区分情報をソータ制御装置20に送信する(S44)。
 2パス区分情報をソータ制御装置20に送信すると、プロセッサ11は、通信部15を通じて2パス配置計画情報をCTU制御装置30に送信する(S45)。2パス配置計画情報をCTU制御装置30に送信すると、プロセッサ11は、動作を終了する。
 次に、ソータ制御装置20の動作例について説明する。 
 図19は、ソータ制御装置20の動作例について説明するためのフローチャートである。
 まず、ソータ制御装置20のプロセッサ21は、通信部25を通じて2パス区分情報を区分制御装置10から受信する(S51)。2パス区分情報を受信すると、プロセッサ21は、2パス区分情報に基づいて区分指定情報を生成する(S52)。
 区分指定情報を生成すると、プロセッサ21は、ソータ5に、インダクション3から物品を受領させる(S53)。物品を受領させると、プロセッサ21は、物品のIDを取得する(S54)。
 物品のIDを取得すると、プロセッサ21は、ソータ5に、物品をIDに対応するシュート53に投入させる(S55)。物品をIDに対応するシュート53に投入させると、プロセッサ21は、2パス区分が完了したかを判定する(S56)。
 2パス区分が完了していないと判定すると(S56、NO)、プロセッサ21は、S53に戻る。 
 2パス区分が完了したと判定すると(S56、YES)、プロセッサ21は、動作を終了する。
 次に、CTU制御装置30の動作例について説明する。 
 図20は、CTU制御装置30の動作例について説明するためのフローチャートである。
 まず、CTU制御装置30のプロセッサ31は、通信部35を通じて2パス配置計画情報を受信する(S61)。2パス配置計画情報を受信すると、プロセッサ31は、2パス配置計画情報に基づいて動作計画を策定する(S62)。
 動作計画を策定すると、プロセッサ31は、CTU7に、棚9へ移動させ、棚9から物品が投入されたトート8を各背面トレイ703に積載させる(S63)。CTU7にトート8を積載させると、プロセッサ31は、CTU7に、コンベア101へ移動させる(S64)。
 コンベア101へ移動させると、プロセッサ31は、CTU7に、コンベア101の一端へ各トート8をセットさせる(S65)。各トート8をセットさせると、プロセッサ31は、CTU7に、コンベア101の他端から各背面トレイ703へ空のトート8を積載させる(S66)。
 空のトート8を積載させると、プロセッサ31は、所定量検知信号を受信するまで待機する。
 所定量検知信号を受信する(S67)と、プロセッサ31は、CTU7に、積載台6において所定量となったトート8の正面へ移動させ、所定量となったトート8を背面トレイ703に積載させる(S68)。
 所定量となったトート8を積載させると、プロセッサ31は、CTU7に、背面トレイ703に積載されている空のトート8を積載台6にセットさせる(S69)。
 プロセッサ31は、各背面トレイ703に所定量となったトート8が積載されるまで、S67乃至S69を繰り返す。
 各背面トレイ703に所定量となったトート8が積載されると、プロセッサ31は、CTU7に棚9へ移動させる(S70)。棚9へ移動させると、プロセッサ31は、CTU7に、所定量となった各トート8を棚9に収納させる(S71)。
 所定量となった各トート8を棚9に収納させると、プロセッサ31は、2パス区分が完了したかを判定する(S72)。
 2パス区分が完了していないと判定すると(S72、NO)、プロセッサ31は、S63に戻る。 
 1パス区分が完了したと判定すると(S69、YES)、プロセッサ21は、動作を終了する。
 なお、プロセッサ31は、各CTUについて、S63乃至S71を同時並行で実行する。
 また、区分システム100は、2パス区分完了後に、CTU7に、所定量となったトート8を棚9からカゴ車200に搬送させるものであってもよい。たとえば、区分システム100は、排出処理時において、所定量となったトート8を棚9からカゴ車200に搬送させる。
 また、CTU7は、物品が投入されたトート8を棚9から所定の台又は床面にセットするものであってもよい。この場合、区分システム100は、コンベア101を備えなくともよい。
 また、区分システム100は、2パス区分が完了した後に、再度物品を区分するものであってもよい(3パス区分)。区分システム100が行う区分の回数は、特定の回数に限定されるものではない。
 以上のように構成された区分システムは、1パス区分された物品を再度、ソータに投入して区分する。その結果、区分システムは、より詳細に物品を区分することができる。たとえば、区分システムは、n個のシュートを備える場合、物品をn×n個の区分先に区分することができる。
 本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。

 

Claims (9)

  1.  ソータと、自動搬送装置と、を備えるシステムであって、
     前記ソータは、
      物品を積載する第1のトレイと、
      前記第1のトレイから前記物品を容器に投入する投入機構と、
     を備え、
     前記自動搬送装置は、
      前記容器を把持する把持機構と、
      前記把持機構を上下方向に移動させる駆動機構と、
       前記把持機構を用いて、前記ソータから前記物品が投入された前記容器を取得し、
       前記把持機構及び前記駆動機構を用いて、前記ソータから前記物品を投入された前記容器を高さ方向に前記容器を格納する棚に収納する、
      プロセッサと、
     を備える、
    システム。
  2.  前記投入機構により前記物品が投入される位置に前記容器を支持する第1の積載台を備え、
     前記自動搬送装置は、前記容器を積載する第2のトレイを備え、
     前記プロセッサは、前記ソータから前記物品が投入された前記容器を前記第1の積載台から取得した後に、前記把持機構を用いて前記第2のトレイが積載する空の前記容器を前記第1の積載台にセットする、
    請求項1に記載のシステム。
  3.  前記プロセッサは、前記投入機構が投入した前記物品により前記容器が所定量となった場合、前記把持機構を用いて前記ソータから前記物品が投入された前記容器を取得する、請求項1又は2に記載のシステム。
  4.  前記プロセッサは、前記把持機構及び前記駆動機構を用いて、前記棚から空の前記容器を取得し、前記第2のトレイに積載する、
    請求項2に記載のシステム。
  5.  前記第1の積載台は、前記容器の位置を維持するガイドを備える、
    請求項2に記載のシステム。
  6.  前記ソータに再投入される前記物品を格納する前記容器を積載する第2の積載台を備え、
     前記プロセッサは、
      前記把持機構及び前記駆動機構を用いて、前記ソータから前記物品が投入された前記容器を前記棚から取得し、
      前記把持機構を用いて、前記第2の積載台に前記容器を積載する、
    請求項1乃至5の何れか1項に記載のシステム。
  7.  前記プロセッサは、前記把持機構を用いて、空の前記容器を前記第2の積載台から取得する、
    請求項6に記載のシステム。
  8.  前記第2の積載台は、コンベアである、
    請求項6又は7に記載のシステム。
  9.  前記棚は、複数の棚段を備える、
    請求項1乃至8の何れか1項に記載のシステム。
     

     
PCT/JP2022/030907 2021-09-07 2022-08-15 システム Ceased WO2023037826A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
AU2022341689A AU2022341689B2 (en) 2021-09-07 2022-08-15 System
EP22867148.3A EP4400454A4 (en) 2021-09-07 2022-08-15 SYSTEM
CA3229619A CA3229619A1 (en) 2021-09-07 2022-08-15 System
US18/588,307 US20240199331A1 (en) 2021-09-07 2024-02-27 System

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021-145319 2021-09-07
JP2021145319A JP7746082B2 (ja) 2021-09-07 2021-09-07 システム

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US18/588,307 Continuation US20240199331A1 (en) 2021-09-07 2024-02-27 System

Publications (1)

Publication Number Publication Date
WO2023037826A1 true WO2023037826A1 (ja) 2023-03-16

Family

ID=85507575

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/030907 Ceased WO2023037826A1 (ja) 2021-09-07 2022-08-15 システム

Country Status (6)

Country Link
US (1) US20240199331A1 (ja)
EP (1) EP4400454A4 (ja)
JP (1) JP7746082B2 (ja)
AU (1) AU2022341689B2 (ja)
CA (1) CA3229619A1 (ja)
WO (1) WO2023037826A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05270616A (ja) * 1992-03-30 1993-10-19 Daifuku Co Ltd 仕分け設備
JP2005015102A (ja) * 2003-06-24 2005-01-20 Hitachi Industries Co Ltd 仕分けシステム
JP2020132330A (ja) 2019-02-15 2020-08-31 株式会社東芝 物品管理装置、物品管理システム、及びプログラム
CN112974285A (zh) * 2021-04-19 2021-06-18 北京极智嘉科技股份有限公司 一种货物分拣系统、机器人和货物分拣方法
CN213762885U (zh) * 2020-11-11 2021-07-23 山东新北洋信息技术股份有限公司 分拣设备

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05270616A (ja) * 1992-03-30 1993-10-19 Daifuku Co Ltd 仕分け設備
JP2005015102A (ja) * 2003-06-24 2005-01-20 Hitachi Industries Co Ltd 仕分けシステム
JP2020132330A (ja) 2019-02-15 2020-08-31 株式会社東芝 物品管理装置、物品管理システム、及びプログラム
CN213762885U (zh) * 2020-11-11 2021-07-23 山东新北洋信息技术股份有限公司 分拣设备
CN112974285A (zh) * 2021-04-19 2021-06-18 北京极智嘉科技股份有限公司 一种货物分拣系统、机器人和货物分拣方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4400454A4

Also Published As

Publication number Publication date
EP4400454A1 (en) 2024-07-17
AU2022341689A1 (en) 2024-03-07
AU2022341689B2 (en) 2025-09-18
EP4400454A4 (en) 2025-08-27
JP2023038538A (ja) 2023-03-17
JP7746082B2 (ja) 2025-09-30
US20240199331A1 (en) 2024-06-20
CA3229619A1 (en) 2023-03-16

Similar Documents

Publication Publication Date Title
CN108602630B (zh) 用往复托架动态分拣物体的系统和方法
CN109689536B (zh) 用于拣选货品的方法和拣选站
CN113978993B (zh) 料箱调度方法、装置、调度设备、仓储系统及存储介质
CN110733820A (zh) 物流系统及物流控制方法
CN108604091A (zh) 用于动态处理物体的系统和方法
CN109747897A (zh) 基于用户订单的物品装箱方法、装置及控制系统
KR102585593B1 (ko) 이송 로봇을 이용한 물품 분류 방법
US20190359422A1 (en) Picking System
CN211495520U (zh) 物流系统
CN114549263A (zh) 料箱调度方法、装置、调度设备、仓储系统及存储介质
US20230406629A1 (en) System and computer-readable storage medium
KR20230047233A (ko) 물품 적재 및 자동 반출 시스템과 그 방법
JP6559746B2 (ja) 仕分けシステム
JP7524732B2 (ja) 自動倉庫
KR102856064B1 (ko) 물류 시스템 및 물류 제어 방법
WO2023037826A1 (ja) システム
US20230005320A1 (en) Automatic vending machine, and item dispensing method for same
JP7177031B2 (ja) 荷物載置部材特定装置、荷物載置部材特定システム、荷物載置部材特定方法、及び、コンピュータープログラム
CN120641340A (zh) 物料搬运方法和装置
EP4292956A1 (en) Information processing device, information processing method, program, and system
CN117566314A (zh) 货物分拣方法和仓储系统
JP7822828B2 (ja) システム
WO2024166747A1 (ja) 区分システム及び区分方法
JP6891692B2 (ja) 仕分けシステム
JP4227766B2 (ja) 農産物の選別包装方法および装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22867148

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2022341689

Country of ref document: AU

Ref document number: AU2022341689

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 3229619

Country of ref document: CA

ENP Entry into the national phase

Ref document number: 2022341689

Country of ref document: AU

Date of ref document: 20220815

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 11202401059Y

Country of ref document: SG

WWE Wipo information: entry into national phase

Ref document number: 2022867148

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2022867148

Country of ref document: EP

Effective date: 20240408