WO2023249380A1 - 전이중(full-duplex) 통신 시스템에 있어서, 단말 간 간섭 측정을 위한 방법 및 장치 - Google Patents
전이중(full-duplex) 통신 시스템에 있어서, 단말 간 간섭 측정을 위한 방법 및 장치 Download PDFInfo
- Publication number
- WO2023249380A1 WO2023249380A1 PCT/KR2023/008546 KR2023008546W WO2023249380A1 WO 2023249380 A1 WO2023249380 A1 WO 2023249380A1 KR 2023008546 W KR2023008546 W KR 2023008546W WO 2023249380 A1 WO2023249380 A1 WO 2023249380A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- cli
- terminal
- base station
- reception
- transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0048—Allocation of pilot signals, i.e. of signals known to the receiver
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/14—Two-way operation using the same type of signal, i.e. duplex
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B17/00—Monitoring; Testing
- H04B17/30—Monitoring; Testing of propagation channels
- H04B17/309—Measuring or estimating channel quality parameters
- H04B17/345—Interference values
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0686—Hybrid systems, i.e. switching and simultaneous transmission
- H04B7/0695—Hybrid systems, i.e. switching and simultaneous transmission using beam selection
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0686—Hybrid systems, i.e. switching and simultaneous transmission
- H04B7/0695—Hybrid systems, i.e. switching and simultaneous transmission using beam selection
- H04B7/06952—Selecting one or more beams from a plurality of beams, e.g. beam training, management or sweeping
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/08—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the receiving station
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/08—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the receiving station
- H04B7/0868—Hybrid systems, i.e. switching and combining
- H04B7/088—Hybrid systems, i.e. switching and combining using beam selection
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0053—Allocation of signalling, i.e. of overhead other than pilot signals
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/24—Cell structures
- H04W16/28—Cell structures using beam steering
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/08—Testing, supervising or monitoring using real traffic
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/10—Scheduling measurement reports ; Arrangements for measurement reports
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/046—Wireless resource allocation based on the type of the allocated resource the resource being in the space domain, e.g. beams
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1268—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1273—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of downlink data flows
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
Definitions
- This disclosure relates generally to wireless communication systems, and more specifically to an apparatus and method for efficiently measuring interference between terminals in a full-duplex (FD) system.
- FD full-duplex
- 5G 5th Generation
- objects connected to the network may include vehicles, robots, drones, home appliances, displays, smart sensors installed in various infrastructures, construction machinery, and factory equipment.
- Mobile devices are expected to evolve into various form factors such as augmented reality glasses, virtual reality headsets, and hologram devices.
- 6G (6th Generation) era efforts are being made to develop an improved 6G communication system to provide a variety of services by connecting hundreds of billions of devices and objects. For this reason, the 6G communication system is called a Beyond 5G system.
- the 6G communication system which is expected to be realized around 2030, has a maximum transmission speed of Tera (1000 gigabytes) bps (bit per second) and a wireless delay time of 100 microseconds ( ⁇ sec), which is 50 times faster than the 5G communication system and is wireless. Delay time is reduced by 1/10.
- 6G communication systems are being considered for implementation in Terahertz bands (e.g., 95 GHz to 3 THz bands).
- Terahertz bands e.g., 95 GHz to 3 THz bands.
- the importance of technology that can guarantee signal reach, or coverage, is expected to increase in the terahertz band due to more serious path loss and atmospheric absorption compared to the mmWave band introduced in 5G.
- the main technologies to ensure coverage are RF (Radio Frequency) elements, antennas, new waveforms that are better in terms of coverage than OFDM (Orthogonal Frequency Division Multiplexing), beamforming, and massive MIMO.
- OFDM Orthogonal Frequency Division Multiplexing
- multi-antenna transmission technologies such as Full Dimensional MIMO (FD-MIMO), Array Antenna, and Large Scale Antenna must be developed.
- new technologies such as metamaterial-based lenses and antennas, high-dimensional spatial multiplexing technology using Orbital Angular Momentum (OAM), and Reconfigurable Intelligent Surface (RIS) are being discussed to improve the coverage of terahertz band signals.
- OFAM Orbital Angular Momentum
- RIS Reconfigurable Intelligent Surface
- the 6G communication system uses full duplex technology in which the uplink (terminal transmission) and downlink (base station transmission) simultaneously utilize the same frequency resources at the same time.
- network technology that comprehensively utilizes satellites and HAPS (High-altitude Platform Stations), network structure innovation technology that supports mobile base stations, etc. and enables network operation optimization and automation, etc., and conflict based on spectrum usage prediction.
- Dynamic spectrum sharing technology through avoidance, AI-based communication technology that utilizes AI from the technology design stage and internalizes end-to-end AI support functions to realize system optimization, and terminal computing capabilities.
- next-generation distributed computing technologies that realize services of complexity beyond limits by utilizing ultra-high-performance communication and computing resources (MEC, cloud, etc.) is being developed.
- MEC ultra-high-performance communication and computing resources
- cloud etc.
- the connectivity between devices is further strengthened and the network is further improved. Attempts are continuing to optimize, promote softwareization of network entities, and increase the openness of mobile communications.
- the Next Hyper-Connected is created through the hyper-connectivity of the 6G communication system, which includes not only connections between objects but also connections between people and objects. Experience
- 6G communication system will be able to provide services such as Truly Immersive XR, High-Fidelity Mobile Hologram, and Digital Replica.
- services such as remote surgery, industrial automation, and emergency response by improving security and reliability are provided through the 6G communication system, enabling application in various fields such as industry, medicine, automobiles, and home appliances. It will be.
- the base station connects multiple terminals and UL and DL can be transmitted and received simultaneously.
- each UL signal and DL signal may be transmitted and received within an overlapping resource area, and each signal using an overlapping resource area may cause interference to each other.
- Interference occurring between terminals in an FD system may be referred to as cross linked interference (CLI).
- CLI cross linked interference
- the present disclosure seeks to provide an apparatus and method that can effectively transmit and receive signals in a wireless communication system.
- the present disclosure provides an apparatus and method for measuring a beam that minimizes interference between terminals in a full-duplex (FD) system and determining it as a beam for transmitting and receiving downlink or uplink data.
- FD full-duplex
- a method performed by a terminal supporting a full-duplex (FD) system includes receiving at least one cross linked interference-reference signal (CLI-RS) from a base station. receiving resources for, determining at least one CLI-RS reception beam among a plurality of available beams based on the allocated resources, and at least one other CLI-RS reception beam based on the at least one CLI-RS reception beam. Receiving a CLI-RS from a terminal, measuring interference with the at least one other terminal based on the received CLI-RS, and transmitting measurement information generated based on the measured results to the base station. A step of receiving joint scheduling information from the base station based on a downlink reception beam determined based on the measurement information; and a method of receiving a downlink signal from the base station through a downlink reception beam determined based on the joint scheduling information.
- CLI-RS cross linked interference-reference signal
- the method includes sending at least one CLI-RS (cross) to a first terminal. linked interference-reference signal) allocating resources for reception and allocating resources for transmitting at least one CLI-RS to a second terminal, receiving a CLI-RS measurement report from the first terminal, the CLI -Based on the RS measurement report, determining a first beam for downlink reception of the first terminal and a second beam for uplink transmission of the second terminal, the determined first beam and second beam Based on the information, providing joint scheduling information for the first terminal and the second terminal to the first terminal and the second terminal, and based on the joint scheduling information, downlinking to the first terminal It may include transmitting a link signal and receiving an uplink signal from the second terminal.
- FD full-duplex
- a terminal supporting a full-duplex (FD) system includes at least one transceiver and at least one functionally coupled to the at least one transceiver. Includes one processor, wherein the at least one processor is allocated resources for receiving at least one cross linked interference-reference signal (CLI-RS) from a base station, and receives a plurality of resources based on the allocated resources. Determine at least one CLI-RS reception beam among available beams, receive a CLI-RS from at least one other terminal based on the at least one CLI-RS reception beam, and receive a CLI-RS based on the received CLI-RS.
- CLI-RS cross linked interference-reference signal
- Measures interference with the at least one other terminal transmits measurement information generated based on the measurement result to the base station, and transmits a common signal from the base station based on a downlink reception beam determined based on the measurement information. It may be configured to receive scheduling information and receive a downlink signal from the base station through a downlink reception beam determined based on the joint scheduling information.
- a base station supporting a full-duplex (FD) system includes at least one transceiver and at least one functionally coupled to the at least one transceiver. Includes one processor, wherein the at least one processor allocates resources for receiving at least one cross linked interference-reference signal (CLI-RS) to a first terminal and at least one to a second terminal.
- CLI-RS cross linked interference-reference signal
- Allocate resources for CLI-RS transmission receive a CLI-RS measurement report from the first terminal, and based on the CLI-RS measurement report, create a first beam for downlink reception of the first terminal and the Determine a second beam for uplink transmission of a second terminal, and send the first terminal and the second beam to the first terminal and the second terminal based on the determined information about the first beam and the second beam. It may be configured to provide joint scheduling information for a terminal, and, based on the joint scheduling information, transmit a downlink signal to the first terminal and receive an uplink signal from the second terminal.
- the present disclosure provides an apparatus and method that can effectively provide services in a wireless communication system.
- the present disclosure provides an apparatus and method that can effectively transmit and receive signals in a wireless communication system.
- FIG. 1 illustrates a wireless environmental network in a wireless communication system, according to various embodiments of the present disclosure.
- FIG. 2 illustrates the functional configuration of a base station in a wireless communication system, according to various embodiments of the present disclosure.
- Figure 3 shows the functional configuration of a terminal in a wireless communication system according to various embodiments of the present disclosure.
- Figure 4 shows a specific configuration of a communication unit of a base station or terminal in a wireless communication system according to various embodiments of the present disclosure.
- FIG. 5 illustrates an example of a full-duplex (FD) base station communication environment and cross linked interference (CLI) in a wireless communication system, according to various embodiments of the present disclosure.
- FD full-duplex
- CLI cross linked interference
- FIG. 6 illustrates an example of interference measurement between a plurality of terminals in a FD system and data channel scheduling based on measurement, according to various embodiments of the present disclosure.
- FIG. 7 illustrates the flow of signals for measuring interference between a base station and a plurality of terminals and scheduling data based on the measurement in a FD system according to various embodiments of the present disclosure.
- Figures 8A to 8E illustrate various examples of resource allocation for transmission and reception by a base station, according to various embodiments of the present disclosure.
- FIG. 9 illustrates the operational flow of a terminal that is allocated resources for transmission and reception from a base station in an FD system and measures and reports interference, according to various embodiments of the present disclosure.
- FIG. 10 illustrates a signal flow for measuring and reporting interference based on a single beam, according to various embodiments of the present disclosure.
- 11A and 11B show examples of single beam determination for interference measurements, according to various embodiments of the present disclosure.
- FIG. 12 illustrates the operational flow of a terminal measuring and reporting interference based on a single beam, according to various embodiments of the present disclosure.
- FIG. 13 illustrates a signal flow for measuring and reporting interference based on multiple beams, according to various embodiments of the present disclosure.
- FIG. 14A and 14B illustrate examples of multiple beam determination for interference measurements, according to various embodiments of the present disclosure.
- FIG. 15 illustrates an example of measuring interference through beam sweeping based on multiple beams, according to various embodiments of the present disclosure.
- FIG. 16 illustrates the operational flow of a terminal measuring and reporting interference based on multiple beams, according to various embodiments of the present disclosure.
- FIG. 17 illustrates a signal flow for scheduling data channel transmission and reception based on interference measurements, according to various embodiments of the present disclosure.
- FIG. 18 illustrates the operation flow of a base station that receives interference measurement reports from a terminal in an FD system and performs scheduling, according to various embodiments of the present disclosure.
- the present disclosure describes various embodiments using terms defined in some communication standards (e.g., 3rd generation partnership project (3GPP), European telecommunication standards institute (ETSI)), but this is only an example for explanation.
- 3GPP 3rd generation partnership project
- ETSI European telecommunication standards institute
- Various embodiments of the present disclosure can be easily modified and applied to other communication systems.
- expressions of more or less may be used to determine whether a specific condition is satisfied or fulfilled, but this is only a description for expressing an example and excludes descriptions of more or less. It's not about doing it. Conditions written as ‘more than’ can be replaced with ‘more than’, conditions written as ‘less than’ can be replaced with ‘less than’, and conditions written as ‘more than and less than’ can be replaced with ‘greater than and less than’.
- Figure 1 illustrates a wireless environmental network in a wireless communication system according to various embodiments of the present disclosure.
- Figure 1 illustrates a base station 110, a first terminal 120, and a second terminal 130 as some of the nodes that use a wireless channel in a wireless communication system.
- Figure 1 shows only one base station, but other base stations identical or similar to the base station 110 may be further included.
- the base station 110 is a network infrastructure that provides wireless access to terminals 120 and 130.
- Base station 110 has coverage defined as a certain geographic area based on the distance over which signals can be transmitted.
- the base station 110 includes 'access point (AP)', 'eNodeB (eNB)', '5G node (5th generation node)', and 'next generation nodeB'.
- AP access point
- eNB eNodeB
- gNB gNodeB
- TRP transmission/reception point
- Each of the first terminal 120 and the second terminal 130 is a device used by a user and communicates with the base station 110 through a wireless channel. In some cases, at least one of the first terminal 120 and the second terminal 130 may be operated without user involvement. That is, at least one of the first terminal 120 and the second terminal 130 is a device that performs machine type communication (MTC) and may not be carried by the user.
- MTC machine type communication
- Each of the first terminal 120 and the second terminal 130 is a terminal, as well as a 'user equipment (UE)', a 'mobile station', a 'subscriber station', and a 'remote station'. It may be referred to as a 'remote terminal', 'wireless terminal', or 'user device' or other terms with equivalent technical meaning.
- the base station 110, the first terminal 120, and the second terminal 130 may transmit and receive wireless signals in the millimeter wave (mmWave) band (e.g., 28 GHz, 30 GHz, 38 GHz, 60 GHz).
- mmWave millimeter wave
- the base station 110, the first terminal 120, and the second terminal 130 may perform beamforming.
- beamforming may include transmission beamforming and reception beamforming. That is, the base station 110, the first terminal 120, and the second terminal 130 can provide directionality to the transmitted signal or the received signal.
- the base station 110 and the terminals 120 and 130 may select serving beams 112, 113, 121, and 131 through a beam search or beam management procedure. .
- subsequent communication can be performed through a resource in a quasi co-located (QCL) relationship with the resource that transmitted the serving beams 112, 113, 121, and 131. there is.
- QCL quasi co-located
- a first antenna port and a second antenna port are said to be in a QCL relationship if the large-scale characteristics of the channel carrying the symbols on the first antenna port can be inferred from the channel carrying the symbols on the second antenna port. can be evaluated.
- a wide range of characteristics include delay spread, doppler spread, doppler shift, average gain, average delay, and spatial receiver parameters. It may include at least one of:
- Figure 2 shows the functional configuration of a base station in a wireless communication system according to various embodiments of the present disclosure.
- the configuration illustrated in FIG. 2 may be understood as the configuration of the base station 110.
- '... Terms such as 'unit' refer to a unit that processes at least one function or operation, and may be implemented as hardware, software, or a combination of hardware and software.
- the base station includes a wireless communication unit 210, a backhaul communication unit 220, a storage unit 230, and a control unit 240.
- the wireless communication unit 210 performs functions for transmitting and receiving signals through a wireless channel. For example, the wireless communication unit 210 performs a conversion function between a baseband signal and a bit string according to the physical layer standard of the system. For example, when transmitting data, the wireless communication unit 210 generates complex symbols by encoding and modulating the transmission bit string. Additionally, when receiving data, the wireless communication unit 210 restores the received bit stream by demodulating and decoding the baseband signal.
- the wireless communication unit 210 upconverts the baseband signal into a radio frequency (RF) band signal and transmits it through an antenna, and downconverts the RF band signal received through the antenna into a baseband signal.
- the wireless communication unit 210 may include a transmission filter, a reception filter, an amplifier, a mixer, an oscillator, a digital to analog convertor (DAC), an analog to digital convertor (ADC), etc.
- the wireless communication unit 210 may include multiple transmission and reception paths.
- the wireless communication unit 210 may include at least one antenna array composed of a plurality of antenna elements.
- the wireless communication unit 210 may be composed of a digital unit and an analog unit, and the analog unit includes a number of sub-units depending on operating power, operating frequency, etc. It can be composed of:
- a digital unit may be implemented with at least one processor (eg, digital signal processor (DSP)).
- DSP digital signal processor
- the wireless communication unit 210 transmits and receives signals as described above. Accordingly, all or part of the wireless communication unit 210 may be referred to as a 'transmitter', 'receiver', or 'transceiver'. Additionally, in the following description, transmission and reception performed through a wireless channel are used to mean that the processing as described above is performed by the wireless communication unit 210.
- the backhaul communication unit 220 provides an interface for communicating with other nodes in the network. That is, the backhaul communication unit 220 converts a bit string transmitted from the base station to another node, for example, another access node, another base station, upper node, core network, etc., into a physical signal, and converts the physical signal received from the other node into a physical signal. Convert to bit string.
- the storage unit 230 stores data such as basic programs, application programs, and setting information for operation of the base station.
- the storage unit 230 may be comprised of volatile memory, non-volatile memory, or a combination of volatile memory and non-volatile memory. And, the storage unit 230 provides stored data according to the request of the control unit 240.
- the control unit 240 controls the overall operations of the base station. For example, the control unit 240 transmits and receives signals through the wireless communication unit 210 or the backhaul communication unit 220. Additionally, the control unit 240 records and reads data from the storage unit 230. Additionally, the control unit 240 can perform protocol stack functions required by communication standards. According to another implementation example, the protocol stack may be included in the wireless communication unit 210. For this purpose, the control unit 240 may include at least one processor.
- control unit 240 may control the base station to perform operations according to various embodiments described later.
- Figure 3 shows the functional configuration of a terminal in a wireless communication system according to various embodiments of the present disclosure.
- the configuration illustrated in FIG. 3 can be understood as the configuration of the terminal 120.
- '... Terms such as 'unit' refer to a unit that processes at least one function or operation, and may be implemented as hardware, software, or a combination of hardware and software.
- the terminal includes a communication unit 310, a storage unit 320, and a control unit 330.
- the communication unit 310 performs functions for transmitting and receiving signals through a wireless channel. For example, the communication unit 310 performs a conversion function between a baseband signal and a bit string according to the physical layer standard of the system. For example, when transmitting data, the communication unit 310 generates complex symbols by encoding and modulating the transmission bit string. Additionally, when receiving data, the communication unit 310 restores the received bit stream by demodulating and decoding the baseband signal. Additionally, the communication unit 310 upconverts the baseband signal into an RF band signal and transmits it through an antenna, and downconverts the RF band signal received through the antenna into a baseband signal. For example, the communication unit 310 may include a transmission filter, a reception filter, an amplifier, a mixer, an oscillator, a DAC, an ADC, etc.
- the communication unit 310 may include multiple transmission and reception paths. Furthermore, the communication unit 310 may include at least one antenna array composed of multiple antenna elements. In terms of hardware, the communication unit 310 may be composed of digital circuits and analog circuits (eg, radio frequency integrated circuit (RFIC)). Here, the digital circuit and analog circuit can be implemented in one package. Additionally, the communication unit 310 may include multiple RF chains. Furthermore, the communication unit 310 may perform beamforming.
- RFIC radio frequency integrated circuit
- the communication unit 310 transmits and receives signals as described above. Accordingly, all or part of the communication unit 310 may be referred to as a ‘transmitting unit’, a ‘receiving unit’, or a ‘transmitting/receiving unit’. Additionally, in the following description, transmission and reception performed through a wireless channel are used to mean that the processing as described above is performed by the communication unit 310.
- the storage unit 320 stores data such as basic programs, application programs, and setting information for operation of the terminal.
- the storage unit 320 may be comprised of volatile memory, non-volatile memory, or a combination of volatile memory and non-volatile memory. And, the storage unit 320 provides stored data according to the request of the control unit 330.
- the control unit 330 controls the overall operations of the terminal. For example, the control unit 330 transmits and receives signals through the communication unit 310. Additionally, the control unit 330 records and reads data from the storage unit 320. Additionally, the control unit 330 can perform protocol stack functions required by communication standards. To this end, the control unit 330 may include at least one processor or microprocessor, or may be part of a processor. Additionally, a portion of the communication unit 310 and the control unit 330 may be referred to as a communication processor (CP).
- CP communication processor
- control unit 330 may control the terminal to perform operations according to various embodiments described later.
- FIG. 4 shows the configuration of a communication unit in a wireless communication system according to various embodiments of the present disclosure.
- FIG. 4 shows an example of the detailed configuration of the wireless communication unit 210 of FIG. 2 or the communication unit 310 of FIG. 3.
- FIG. 4 illustrates components for performing beamforming as part of the wireless communication unit 210 of FIG. 2 or the communication unit 310 of FIG. 3.
- the wireless communication unit 210 or communication unit 310 includes an encoding and modulation unit 402, a digital beamforming unit 404, a plurality of transmission paths (406-1 to 406-N), and an analog beam. It includes a forming portion 408.
- the encoding and modulation unit 402 performs channel encoding.
- channel encoding at least one of a low density parity check (LDPC) code, a convolution code, and a polar code may be used.
- LDPC low density parity check
- the encoding and modulation unit 402 generates modulation symbols by performing constellation mapping.
- the digital beamforming unit 404 performs beamforming on digital signals (eg, modulation symbols). To this end, the digital beamforming unit 404 multiplies the modulation symbols by beamforming weights.
- beamforming weights are used to change the size and phase of the signal, and may be referred to as a 'precoding matrix', 'precoder', etc.
- the digital beamforming unit 404 outputs digital beamformed modulation symbols to a plurality of transmission paths 406-1 to 406-N.
- the modulation symbols may be multiplexed or the same modulation symbols may be provided to multiple transmission paths 406-1 to 406-N.
- a plurality of transmission paths 406-1 to 406-N convert digital beamformed digital signals into analog signals.
- each of the plurality of transmission paths 406-1 to 406-N may include an inverse fast fourier transform (IFFT) operation unit, a cyclic prefix (CP) insertion unit, a DAC, and an upconversion unit.
- the CP insertion unit is for the OFDM (orthogonal frequency division multiplexing) method, and may be excluded when another physical layer method (e.g., filter bank multi-carrier (FBMC)) is applied. That is, the multiple transmission paths 406-1 to 406-N provide independent signal processing processes for multiple streams generated through digital beamforming. However, depending on the implementation method, some of the components of the multiple transmission paths 406-1 to 406-N may be commonly used.
- the analog beamforming unit 408 performs beamforming on analog signals.
- the digital beamforming unit 404 multiplies the analog signals by beamforming weights.
- beamforming weights are used to change the size and phase of the signal.
- the analog beamforming unit 440 may be configured in various ways. For example, each of the multiple transmission paths 406-1 to 406-N may be connected to one antenna array. As another example, multiple transmission paths 406-1 to 406-N may be connected to one antenna array. As another example, the multiple transmission paths 406-1 to 406-N may be adaptively connected to one antenna array or to two or more antenna arrays.
- FIG. 5 illustrates an example of a full-duplex (FD) base station communication environment and cross linked interference (CLI) in a wireless communication system, according to various embodiments of the present disclosure.
- FD full-duplex
- CLI cross linked interference
- In-band FD communication is a wireless communication technology that simultaneously transmits and receives in the same frequency band.
- FD communication can achieve twice the network throughput compared to HD (half duplex) communication that uses the same frequency band.
- the transmitted signal is It may act as interference to the signal being received.
- FD communication involves simultaneous transmission and reception between a base station and a plurality of terminals, a signal transmitted by one terminal may act as interference to a signal received by another terminal, and this interference signal is called cross linked interference (CLI). It can be defined as:
- full-duplex (FD) communication described below includes not only in-band FD communication, but also subband FD communication or cross division duplex (XDD) FD. It can include all communication, etc.
- Subband FD communication can provide mixed subcarrier use and asynchronous transmission to flexibly apply full-duplex communication.
- the subband full-duplex communication system divides the entire system band into subbands and can simultaneously transmit uplink and downlink data for each subband. At this time, all transmission and reception processes, including synchronization, are performed based on divided subbands, so different subcarriers can be applied to each subband and asynchronous uplink transmission can be performed. Meanwhile, since such transmission for each subband may cause interference between subbands, various methods for preventing interference according to various embodiments of the present disclosure may be applied.
- XDD FD communication does not divide the ratio only in the time domain according to the proportion of uplink and downlink traffic under the TDD (time division duplex) system, but uses frequency division duplex (FDD) system like an FDD (frequency division duplex) system.
- the area may also include a method in which uplink and downlink resources are divided. Interference may occur in XDD FD communication in that it is a scenario where time domain transmission and reception and frequency domain transmission and reception coexist, and various methods for preventing interference according to various embodiments of the present disclosure may be applied.
- the base station 510 can perform one-way FD communication including the first terminal 520 and the second terminal 530.
- the two terminals 520 and 530, UL and DL, that communicate with the base station 510 can respectively perform HD communication with the base station.
- the uplink signal 521 transmitted by the first terminal 520 and the downlink signal 531 received by the second terminal 530 can be transmitted and received at the same time and through the same frequency.
- interference may occur.
- the example 502 of the time axis interference symbol of FIG. 5 shows an example of interference on the time axis due to signal interference between terminals in an FD base station environment.
- the first terminal 520 and the second terminal 530 which share the same frequency, may be configured for uplink or downlink transmission and reception on the same slot (or symbol).
- the uplink signal 521 transmitted by the first terminal 520 and the downlink signal 531 received by the second terminal 530 are transmitted and received at the same time, there is cross link interference (CLI) between them. ) may occur.
- CLI cross link interference
- a base station of the FD system transmits and receives a data channel (e.g., physical uplink shared channel (PUSCH), physical downlink shared channel (PDSCH)) to at least one terminal.
- PUSCH physical uplink shared channel
- PDSCH physical downlink shared channel
- Methods and devices for minimizing possible interference are described.
- the base station allocates resources for transmission and reception of a cross linked interference-reference signal (CLI-RS) to at least one terminal, and receives reports of transmission, reception and measurement of CLI-RS between at least one terminal based on the resources, and transmits and receives a data channel.
- CLI-RS cross linked interference-reference signal
- interference that occurs between transmission and reception of downlink or uplink signals of each terminal in the FD system may be referred to as CLI.
- interference occurring between signal transmission and reception of each terminal in the FD system may include various types of interference, such as UE-to-UE interference and FD interference (Full-Duplex interference). It may be referred to as a term.
- CLI-RS is interpreted as a reference signal for measuring interference between terminals as CLI measurement RS, cross link channel state information RS, UE-to-UE channel information RS, or equivalent terms. It can also be referred to by various terms.
- FIG. 6 illustrates an example of interference measurement between a plurality of terminals in a FD system and data channel scheduling based on measurement, according to various embodiments of the present disclosure. Specifically, referring to FIG. 6, an example of scheduling by measuring terminal-to-device interference at the beam level in an FD system is shown.
- the base station may allocate resources for uplink or downlink transmission and reception to at least one terminal within the coverage of the base station.
- Resources allocated by the base station to at least one terminal may be resources for at least one beam.
- At least one terminal allocated resources for transmission and reception from a base station can perform cross linked interference-reference signal (CLI-RS) measurement (610).
- CLI-RS cross linked interference-reference signal
- at least one UE may determine a beam for transmitting and receiving CLI-RS.
- At least one terminal may determine at least one beam among a plurality of available beams based on allocated resources for CLI-RS transmission and reception.
- at least one terminal may determine a beam to be mapped or grouped to an allocated resource and perform beamforming.
- one or more of the at least one terminal may determine a CLI-RS transmission beam (CLI-RS Tx beam) as a CLI-RS transmission terminal, and another one or more terminals may determine a CLI-RS transmission beam (CLI-RS Tx beam) as a CLI-RS reception terminal.
- the RS reception beam (CLI-RS Rx beam) can be determined.
- the CLI-RS transmission terminal uses at least one CLI-RS transmission beam (Beam#0) among a plurality of available beams (Beam#0, Beam#1, Beam#2, Beam#3). (612) may be determined, and the CLI-RS receiving terminal may receive at least one CLI-RS receiving beam ( B-#0)(614) can be determined.
- the CLI-RS transmitting terminal and the CLI-RS receiving terminal can transmit and receive CLI-RS based on the determined beams 612 and 614, respectively.
- the CLI-RS receiving terminal may mean a CLI-RS measurement terminal, and interference (eg, CLI) may be measured based on the received CLI-RS.
- the CLI-RS receiving terminal that measures interference can report information related to the measurement to the base station. Referring to FIG. 6, it is shown that there is one CLI-RS transmission and one CLI-RS reception terminal, and there is one CLI-RS transmission beam and one CLI-RS reception beam determined by each terminal. It is not limited to this. According to various embodiments of the present disclosure, a CLI-RS transmitting or receiving terminal may include at least one terminal, and the CLI-RS transmitting or receiving beam determined by each terminal may include at least one beam. .
- the base station may perform scheduling of a data channel (eg, PUSCH, PDSCH) for at least one terminal based on the received CLI-RS measurement information (620).
- a base station may schedule a data channel for the same time at the same frequency for at least one terminal.
- the base station schedules signal transmission and reception using the PUSCH transmission beam 622 determined for at least one CLI-RS transmission terminal and simultaneously schedules signal transmission and reception for at least one CLI-RS reception terminal using the determined PDSCH reception beam 624.
- scheduling signals to at least one terminal simultaneously in the FD system of such a base station may be referred to as PDSCH/PUSCH co-scheduling.
- the base station may determine a pair of terminals or at least one beam of at least one terminal that can minimize interference based on the reported CLI-RS measurement. Additionally, the base station may determine the determined terminals or at least one beam as terminals or at least one beam for transmitting and receiving a data channel.
- the CLI-RS transmitting terminal is shown as a UL terminal for transmitting an uplink signal (e.g., PUSCH)
- the CLI-RS receiving terminal is shown as a DL terminal for transmitting a downlink signal (e.g., PDSCH).
- the PUSCH transmission beam 622 scheduled for the UL terminal is identical to the determined CLI-RS transmission beam 612
- the PDSCH reception beam 624 scheduled for the DL terminal is identical to the determined CLI-RS reception beam 614. It is shown.
- the PUSCH transmission beam 622 for transmission of a signal scheduled to the UL terminal is a QCL that is not the same as the determined CLI-RS transmission beam 612.
- the PDSCH reception beam 624 for reception of a signal scheduled for the DL terminal may be a beam in a QCL relationship that is not the same as the determined CLI-RS reception beam 614. .
- the PUSCH transmission beam 622 may be a beam corresponding to the determined CLI-RS reception beam 614.
- the PDSCH reception beam 624 scheduled for the DL terminal may be a beam in a QCL relationship that is not the same as the determined CLI-RS reception beam 614, and the PDSCH reception beam 624 is similar to the determined CLI-RS transmission beam 612. It may be a corresponding beam.
- the base station may schedule the CLI-RS transmission beam 612 as a beam for receiving downlink signals for the CLI-RS transmission terminal, and set the CLI-RS reception beam 614 to the CLI-RS reception terminal. It may also be scheduled as a beam for uplink signal transmission.
- co-scheduling of the base station may be performed based on measurement information reported from a CLI-RS measurement terminal (e.g., CLI-RS receiving terminal), but is not limited to this, and is not limited to the CLI-RS measurement beam and Beams for data channels may not necessarily coincide. Additionally, according to one embodiment, the present disclosure describes co-scheduling for data channel transmission and reception, but is not limited thereto and may include transmission and reception of various signals for uplink or downlink.
- FIG. 7 illustrates the flow of signals for measuring interference between a base station and a plurality of terminals and scheduling data based on the measurement in a FD system according to various embodiments of the present disclosure.
- a base station e.g., gNB
- CLI-RS measurement terminal 720 for transmission and reception of a data channel with minimal interference in the FD system between a base station (e.g., gNB) 710, a CLI-RS measurement terminal 720, and a CLI-RS transmission terminal 730.
- the CLI-RS measuring terminal 720 may be a CLI-RS receiving terminal.
- the reference signal for interference measurement may be referred to as CLI-RS, but is not limited thereto, and includes CLI measurement RS, cross link channel state information RS, and UE-to-UE channel.
- Information RS or equivalent terms may also be referred to as various terms that are interpreted as reference signals for measuring interference between terminals.
- the base station 710 may configure CLI measurement for the CLI-RS measurement terminal 720 and the CLI-RS transmitting terminal 730. Specifically, the base station 710 may allocate resources for reception or transmission to the CLI-RS measurement terminal 720 and the CLI-RS transmission terminal 730, respectively. According to one embodiment, the resource information allocated by the base station 710 may include information about the CLI-RS ID (or index) mapped or grouped for each resource.
- resources allocated by the base station to each terminal may be mapped or grouped into one or more beams. Additionally, according to one embodiment, information about the beam may be explicitly designated in the resources that the base station 710 allocates to each terminal. That is, at least one beam may be mapped or grouped in the resource for CLI-RS reception or transmission that the base station 710 allocates to the CLI-RS measurement or transmission terminal, but is not limited thereto, and is not limited to this, and various implementations of the present disclosure According to examples, the base station may indicate only a CLI-RS resource ID (identifier) for the allocated resource, and determination of at least one beam to be mapped or grouped may be performed by the terminal.
- CLI-RS resource ID identifier
- the terminal for CLI-RS measurement and transmission is shown as one, but according to various embodiments of the present disclosure, the base station is not limited thereto and may include one or more CLI-RS measurement terminals or one or more CLI-RS Resources for CLI-RS measurement or CLI-RS transmission can be allocated to the transmitting terminal.
- the CLI-RS transmission terminal 730 transmits a CLI-RS to the CLI-RS measurement terminal 720 through a CLI-RS transmission beam determined based on the allocated resources for CLI-RS transmission.
- the CLI-RS transmission beam determined by the CLI-RS transmission terminal may include at least one beam, and a CLI-RS transmission operation may be performed in response to the determined at least one CLI-RS transmission beam.
- the CLI-RS transmitting terminal can perform beam sweeping operation during the CLI-RS transmission process.
- the beam sweeping process may include beam adjustment on the receiving side or beam adjustment on the transmitting side.
- the CLI-RS receiving terminal may receive information about the CLI-RS transmission beam (e.g., fixed beam) from the CLI-RS transmitting terminal, and transmit at least one CLI-RS based on the received information.
- the receiving beam can be identified.
- the CLI-RS receiving terminal can transmit information about the identified CLI-RS receiving beam to the CLI-RS transmitting terminal.
- the CLI-RS receiving terminal can receive CLI-RS based on information about the CLI-RS transmission beam and the identified CLI-RS reception beam.
- the CLI-RS transmitting terminal may receive information about the CLI-RS receiving beam (e.g., fixed beam) from the CLI-RS receiving terminal, and transmit at least one CLI-RS based on the received information.
- the transmission beam can be identified.
- the CLI-RS transmission terminal can transmit information about the identified CLI-RS transmission beam to the CLI-RS reception terminal.
- the CLI-RS transmission terminal can transmit CLI-RS based on information about the CLI-RS reception beam and the identified CLI-RS transmission beam. For example, during the beam adjustment (or sweeping) process on the receiving side, the transmission beam may be fixed, and the receiving terminal may perform measurement by sequentially applying the reception beams. In contrast, in the beam adjustment process on the transmitting side, the receiving beam may be fixed, and measurement may be performed by applying the transmitting beams sequentially. In the above-described process, the transmitting terminal and the receiving terminal may provide each other with information about beams for beam sweeping (eg, fixed beams or sequentially applied beams) in order to perform beam sweeping.
- the CLI-RS measurement terminal 720 may receive the CLI-RS from the CLI-RS transmission terminal 730 through a CLI-RS reception beam determined based on the allocated resources for CLI-RS reception.
- the CLI-RS reception beam determined by the CLI-RS reception terminal may include at least one beam, and a CLI-RS reception operation may be performed in response to the determined at least one CLI-RS reception beam.
- the CLI-RS receiving terminal can perform beam sweeping operation during the CLI-RS reception process.
- the above-described beam sweeping operation may include fixing the beam on the receiving side or fixing the beam on the transmitting side.
- the CLI-RS receiving terminal can transmit and receive information about beams for beam sweeping (e.g., fixed beams or sequentially applied beams) with the CLI-RS measuring terminal.
- the CLI-RS receiving terminal may receive information about the CLI-RS transmission beam (e.g., fixed beam) from the CLI-RS transmitting terminal, and transmit at least one CLI-RS based on the received information.
- the receiving beam can be identified.
- the CLI-RS receiving terminal can transmit information about the identified CLI-RS receiving beam to the CLI-RS transmitting terminal.
- the CLI-RS receiving terminal can receive CLI-RS based on information about the CLI-RS transmission beam and the identified CLI-RS reception beam.
- the CLI-RS transmitting terminal may receive information about the CLI-RS receiving beam (e.g., fixed beam) from the CLI-RS receiving terminal, and transmit at least one CLI-RS based on the received information.
- the transmission beam can be identified.
- the CLI-RS transmission terminal can transmit information about the identified CLI-RS transmission beam to the CLI-RS reception terminal.
- the CLI-RS transmission terminal can transmit CLI-RS based on information about the CLI-RS reception beam and the identified CLI-RS transmission beam. For example, in the case where the transmitting side is fixed, the CLI-RS transmitting terminal can transmit information about the fixed beam to the CLI-RS receiving terminal, and the CLI-RS receiving terminal can sequentially change and apply the CLI-RS reception. Information about beams can be transmitted to the CLI-RS transmitting terminal.
- the CLI-RS measurement terminal 720 may perform CLI measurement based on the CLI-RS received from the CLI-RS transmitting terminal 730.
- the CLI-RS measurement terminal 720 may report the measured CLI information to the base station 710.
- the CLI-RS measurement terminal 720 may report CLI-RS measurement information to the base station 710 using CLI-RS reporting resources allocated from the base station 710.
- the CLI-RS measurement terminal 720 may report CLI-RS measurement information to the base station 710 by various methods. Hereinafter, the reporting method that the CLI-RS measurement terminal 720 can determine is described.
- the CLI-RS measurement terminal 720 may report all information about at least one beam pair used for CLI-RS transmission and reception to the base station 710.
- the CLI-RS measurement terminal 720 may report to the base station 710 a CLI-RS index indicating at least one beam pair with the minimum interference value among the measured CLI values. .
- the index of at least one beam pair with the minimum interference value reported by the CLI-RS measurement terminal 720 may be the index of at least one beam pair based on the CLI-RS received from at least one CLI-RS transmitting terminal.
- the information reported by the CLI-RS measurement terminal 720 includes not only the index for the beam pair with the lowest interference value, but also at least one beam pair including the beam pair with the Nth lowest interference value. It may be an index for .
- the N value may be configured in advance by the base station.
- the CLI-RS measurement terminal 720 can calculate the average of the interference values of all at least one beam pair used for CLI-RS transmission and reception, and send information about the average value to the base station ( 710).
- the CLI-RS measurement terminal 720 reports the interference value for at least one beam pair used for CLI-RS transmission and reception to the base station 710 based on the threshold value. You can report. Specifically, according to one embodiment, the CLI-RS measurement terminal 720 may report to the base station 710 information about one or more beam pairs having an interference value less than or equal to a threshold and information about the index thereof. . According to one embodiment, the threshold may be preset by the base station 710, or may be predefined in the terminal itself.
- the CLI-RS measurement terminal 720 may determine the index of some of at least one beam pair used for CLI-RS transmission and reception as a blacklist and report it. Specifically, the CLI-RS measurement terminal 720 may determine one or more beam pairs with high interference values as a blacklist and report it to the base station 710, and the base station 710 may determine one or more beam pairs with high interference values as a blacklist. Scheduling for data channel transmission and reception can be performed except for pairs. According to one embodiment, the CLI-RS measurement terminal 720 may determine to blacklist one or more beam pairs having an interference value greater than or equal to the reference interference value based on a specific reference interference value, and the reference interference value is set by the base station.
- the method of determining the blacklist is not limited to this and may include various methods, such as determining one or more beam pairs in which a specific event has occurred as a blacklist.
- the CLI-RS measurement terminal 720 determines at least one of methods 1) to 5) based on various reasons such as feedback overhead, and sends the CLI-RS measurement information to the base station 710 through the determined method. ) can be reported to.
- CLI-RS measurement information is not limited to being reported according to individual methods, and the CLI-RS measurement terminal 720 uses at least one of methods 1) to 5) or Through the combination, CLI-RS measurement information can be reported to the base station 710.
- the base station 710 may perform scheduling for a terminal for DL reception or a terminal for UL transmission based on CLI-RS measurement information.
- the base station 710 performs CLI-RS transmission and reception based on a channel quality indicator (CQI) reported from at least one terminal in addition to the CLI-RS measurement information reported from the CLI-RS measurement terminal 720.
- CQI channel quality indicator
- Each beam can be determined for
- the base station 710 may provide joint scheduling information to the DL terminal and the UL terminal based on the determined beam.
- the base station 710 may instruct the terminal to use the beam used for CLI-RS measurement for DL or UL.
- the base station 710 may determine the optimal beam pair based on the reported CLI-RS measurement information, and set or schedule the beam direction so that the terminal can transmit and receive data channels through the determined optimal beam pair. can do.
- the base station 710 can use the CLI-RS index to indicate the transmission and reception beam used when transmitting and receiving DL/UL signals.
- the base station 710 includes a beam pair determined to minimize interference among at least one beam that the CLI-RS transmitting terminal 730 used for CSI-RS transmission in step 715.
- Scheduling for UL transmission e.g., PUSCH
- an index e.g., CLI-RS resource number
- the base station 710 provides an index for the CLI-RS reception beam including a beam pair determined to minimize interference among at least one beam used by the CLI-RS specific terminal 730 for CSI-RS reception ( Scheduling for DL transmission (e.g., PDSCH) can be performed to the CLI-RS measurement terminal by indicating the CLI-RS resource number.
- Scheduling for DL transmission e.g., PDSCH
- the base station 710 can estimate the terminal-to-terminal CLI based on the reported CLI-RS measurement information and perform FD co-scheduling between terminals with low CLI values. According to one embodiment, the base station 710 can estimate the CLI between beam pairs of the terminal based on the reported CLI-RS measurement information and perform FD co-scheduling for the beam pair with a low CLI value. . For example, according to one embodiment, the base station 710 may determine the UE pair with the minimum CLI-RS based on the reported CLI-RS measurement information.
- the base station 710 selects one CLI-RS measurement terminal 720 with the minimum interference value based on the CLI value between at least one CLI-RS measurement terminal 720 and at least one CLI-RS transmitting terminal 730. ) and one CLI-RS transmitting terminal pair can be determined. To determine this, the base station 710 may use CLI-RS measurement between one CLI-RS measurement terminal 720 and a plurality of CLI-RS transmitting terminals 730, respectively. Or, without being limited thereto, the base station 710 may use CLI-RS measurement between one CLI-RS transmitting terminal 730 and a plurality of CLI-RS measuring terminals 720.
- the base station 710 unlike the above-described scheduling operation, indicates an index for the CLI-RS reception beam to communicate with the CLI-RS measurement terminal 720.
- PUSCH UL transmission
- DL reception e.g., PDSCH
- beam indication signaling indicating the optimal beam pair may be separately performed.
- the base station and the terminal can use the reference signal to determine an appropriate transmission/reception beam pair through beam management or beam sweeping.
- the base station transmits a transmission configuration indication (TCI) containing beam indication through downlink control information (DCI) to inform the terminal that it is transmitting a downlink signal on the same beam as the configured RS. Status can be transmitted. Therefore, there may be a need to distinguish the beam indication signaling for single link communication described above from the beam indication signaling based on CLI-RS according to various embodiments of the present disclosure.
- TCI transmission configuration indication
- DCI downlink control information
- the base station 710 may set a beam for the data channel using an additional separate bit of DCI to schedule data channel transmission and reception for each terminal using the CLI-RS index.
- the base station 710 may set a beam for a data channel by separately setting a bandwidth part (BWP) in the process of scheduling data channel transmission and reception for each terminal without using additional bits.
- BWP bandwidth part
- the CLI-RS measurement terminal 720 which has received PDSCH scheduling from the base station 710, based on the index of the received beam for CLI-RS reception (e.g., CLI-RS resource number), CLI-RS Depending on the RS ID, it can be determined at what point in time it should operate with the set beam, and the determined beam can be determined as the reception beam for data channel reception.
- the CLI-RS transmitting terminal 730 which has received PUSCH scheduling from the base station 710, at some point according to the CLI-RS ID, based on the index of the received beam for CLI-RS transmission (e.g., CLI-RS resource number). It can be determined whether to operate with the beam set in , and the determined beam can be determined as a transmission beam for data channel transmission.
- the CLI-RS measurement terminal 720 determines the index of the beam for CLI-RS reception. It can be received with PUSCH scheduling and determined as a beam for uplink transmission, or the CLI-RS transmission terminal 730 can receive the index of the beam for CLI-RS transmission with PDSCH scheduling and use it as a beam for downlink reception. You can decide.
- each terminal can receive not only a CLI-RS beam index but also a beam instruction indicating a beam pair through a single link, among the plurality of beam instructions. Which data channel transmission/reception beam is to be determined may be set separately by the base station.
- each terminal can transmit or receive a data channel signal using a set transmission beam or reception beam.
- the CLI-RS measurement terminal 720 may receive a PDSCH transmitted from the base station in a set reception beam direction, or the CLI-RS transmission terminal 730 may transmit the PDSCH to the base station in a set transmission beam direction.
- PUSCH can be transmitted.
- the CLI-RS measurement terminal 720 may transmit a PUSCH to the base station in the set reception beam direction, and the CLI-RS transmitting terminal ( 730) can receive the PDSCH transmitted from the base station in the set transmission beam direction.
- signals transmitted and received by each terminal will be referred to as FD PUSCH or FD PDSCH, but are not limited thereto and may include various signals other than data channels (sounding reference signal (SRS), physical uplink control channel (PUCCH) ), PDCCH (physical downlink control channel), and DMRS (de-modulation reference signal)).
- SRS sounding reference signal
- PUCCH physical uplink control channel
- PDCCH physical downlink control channel
- DMRS de-modulation reference signal
- FIGS. 8A to 8E illustrate various examples of resource allocation for transmission and reception by a base station, according to various embodiments of the present disclosure.
- FIGS. 8A to 8E embodiments of resource allocation for a base station to configure CLI measurement to a CLI-RS measurement terminal and a CLI-RS transmitting terminal are shown.
- the process described in FIGS. 8A to 8E may be the specific content of one of the steps (step 705) depicted in FIG. 7, and the process described in FIGS. 8A to 8E is an independent process. It may mean a process, or it may mean at least one of the processes as one operation among all operations in FIG. 7 .
- the embodiments of resource allocation described through FIGS. 8A to 8E may be used in combination with each other.
- the base station can allocate resources for reception or transmission to the CLI-RS measurement terminal and the CLI-RS transmission terminal, respectively.
- resource information allocated by the base station may include information about a CLI-RS ID (identifier) mapped or grouped for each resource.
- resources allocated by the base station to each terminal may be mapped or grouped into one or more beams.
- information about the beam may be explicitly specified in the resources allocated by the base station to each terminal. That is, at least one beam may be mapped or grouped in the resource for CLI-RS reception or transmission that the base station allocates to the CLI-RS measurement or transmission terminal, but is not limited thereto and may be used in various embodiments of the present disclosure.
- the base station may indicate only a CLI-RS resource ID (i.e., CLI-RS ID) for the allocated resources, and determination of at least one beam to be mapped or grouped may be performed by the terminal.
- resources allocated by the base station may include resources for CLI-RS transmission of the CLI-RS transmitting terminal as well as resources for CLI-RS reception of the CLI-RS receiving terminal.
- resources allocated by the base station may include resources for CLI-RS transmission of the CLI-RS transmitting terminal as well as resources for CLI-RS reception of the CLI-RS receiving terminal.
- a CLI-RS ID may be mapped or grouped to each resource allocated by the base station, but may be assigned to all resources allocated by the base station. Beams for transmitting and receiving CLI-RS may not be mapped or grouped.
- the base station may allocate three consecutive symbols in one slot as resources for CLI-RS.
- resource allocation between the base station and each terminal may be performed in a half duplex (HD) system.
- the base station can map or group CLI-RS IDs to symbols #7, #8, and #9 of slot #2 among slots at the slot level 811 and allocate them as resources for CLI-RS transmission and reception.
- CLI-RS transmission/reception beam pairs may be mapped or grouped in symbols #7, #8, and #9 of slot #2, respectively. That is, different beams may be mapped or grouped in three consecutive resource areas starting from symbol #7 (813).
- Beam#0 among CLI-RS transmission beams and B-#1 among CLI-RS reception beams may be mapped or grouped (815).
- Beam#0 among CLI-RS transmission beams and B-#0 among CLI-RS reception beams may be mapped or grouped (817).
- Beam#1 among CLI-RS transmission beams and B-#1 among CLI-RS reception beams may be mapped or grouped (819).
- the base station may allocate symbols at the same location in consecutive slots as resources for CLI-RS.
- resource allocation between the base station and each terminal may be performed in a half duplex (HD) system.
- the base station may map or group the CLI-RS ID to symbol #7 of slots #2, #3, and #4 among the slots at the slot level 821 and allocate it as a resource for CLI-RS transmission and reception.
- a CLI-RS transmission/reception beam pair may be mapped or grouped in each symbol #7 resource area of slots #2, #3, and #4 (823).
- Beam#0 among CLI-RS transmission beams and B-#1 among CLI-RS reception beams may be mapped or grouped (825).
- Beam#0 among CLI-RS transmission beams and B-#0 among CLI-RS reception beams may be mapped or grouped (827).
- Beam#1 among CLI-RS transmission beams and B-#1 among CLI-RS reception beams may be mapped or grouped (829).
- the base station may allocate three symbols at regular intervals within one slot as resources for CLI-RS.
- resource allocation between the base station and each terminal may be performed in a half duplex (HD) system.
- the base station can map or group CLI-RS IDs to symbols #7, #9, and #11 of slot #2 among slots at the slot level 831 and allocate them as resources for CLI-RS transmission and reception.
- CLI-RS transmission/reception beam pairs may be mapped or grouped in symbols #7, #9, and #11 of slot #2, respectively. That is, different beams may be mapped or grouped in three resource areas with an interval of 1 symbol starting from symbol #7 (833).
- Beam#0 among CLI-RS transmission beams and B-#1 among CLI-RS reception beams may be mapped or grouped (835).
- Beam#0 among CLI-RS transmission beams and B-#0 among CLI-RS reception beams may be mapped or grouped (837).
- Beam#1 among CLI-RS transmission beams and B-#1 among CLI-RS reception beams may be mapped or grouped (839).
- the base station may allocate symbols at the same location in slots with regular intervals as resources for CLI-RS.
- resource allocation between the base station and each terminal may be performed in a half duplex (HD) system.
- the base station may map or group the CLI-RS ID to symbol #7 of slots #2, #4, and #6 among the slots at the slot level 841 and allocate it as a resource for CLI-RS transmission and reception.
- a CLI-RS transmission/reception beam pair may be mapped or grouped in each symbol #7 resource area of slots #2, #4, and #6 (843).
- Beam#0 among CLI-RS transmission beams and B-#1 among CLI-RS reception beams may be mapped or grouped (845).
- Beam#0 among CLI-RS transmission beams and B-#0 among CLI-RS reception beams may be mapped or grouped (847).
- Beam#1 among CLI-RS transmission beams and B-#1 among CLI-RS reception beams may be mapped or grouped (849).
- the base station may allocate any symbol in any slot as a resource for CLI-RS.
- resource allocation between the base station and each terminal may be performed in a half duplex (HD) system.
- the base station maps or groups the CLI-RS ID to symbol #7 of slot #1, symbol #11 of slot #4, and symbol #4 of slot #9 among the slots of the slot level 851 to CLI-RS It can be allocated as a resource for RS transmission and reception.
- a CLI-RS transmission/reception beam pair may be mapped or grouped in the resource areas of symbol #7 of slot #1, symbol #11 of slot #4, and symbol #4 of slot #9 (853).
- Beam#0 among CLI-RS transmission beams and B-#1 among CLI-RS reception beams may be mapped or grouped (855).
- Beam#0 among CLI-RS transmission beams and B-#0 among CLI-RS reception beams may be mapped or grouped (857).
- Beam#1 among CLI-RS transmission beams and B-#1 among CLI-RS reception beams may be mapped or grouped in symbol #4 of slot #9 (859).
- each terminal can determine allocated resources and a corresponding beam, and perform CLI-RS transmission and reception operations based on the determined beam.
- a base station that has received a report of CLI-RS measurement through CLI-RS transmission and reception can determine at least one optimal beam and schedule a data channel for each terminal based on the at least one optimal beam. Scheduling performed by the base station may include a CLI-RS ID corresponding to at least one optimal beam.
- Each terminal scheduled for data channel transmission and reception can select a data channel transmission and reception beam based on the received CLI-RS ID. According to one embodiment, FIGS.
- FIGS. 8A to 8E illustrate a case where each resource region explicitly indicates a beam, but this is not limited to this, and the resource region allocated by the base station to each terminal may include only the CLI-RS ID. and may not explicitly indicate a beam. If a beam is not explicitly indicated in each resource area, the terminal can determine the beam corresponding to the assigned resource and the CLI-RS ID included in the resource through self-determination or various methods without explicit instruction from the base station. .
- FIGS. 8A to 8E illustrate a case where the base station allocates a plurality of resource areas to each terminal, but the present invention is not limited thereto, and the base station may allocate one resource area to each terminal.
- each terminal When each terminal has at least one beam identified based on allocated resources, it can perform CLI-RS transmission, reception, and measurement through a single beam, and the base station receives the CLI-RS measurement report from the CLI-RS measurement terminal. can determine the CLI-RS transmitting terminal with the optimal interference value in relation to the CLI-RS measuring terminal and perform co-scheduling of the FD data channel signal to them.
- FIG. 9 illustrates the operational flow of a terminal that is allocated resources for transmission and reception from a base station in an FD system and measures and reports interference, according to various embodiments of the present disclosure.
- the process described in FIG. 9 may be the specific content of one of the steps (step 705) depicted in FIG. 7, and the process described through FIG. 9 may mean an independent process. Alternatively, it may mean at least one of the processes as one operation among all operations in FIG. 7.
- the following terminals may include a CLI-RS transmitting terminal that determines the CLI-RS transmission beam and transmits the CLI-RS, and a CLI-RS receiving terminal that determines the CLI-RS reception beam and receives the CLI-RS. .
- the terminal may be allocated resources for transmitting and receiving at least one CLI-RS from the base station. Specifically, if the terminal is a CLI-RS transmitting terminal, the terminal may be allocated resources for transmitting a signal from the base station, or if the terminal is a CLI-RS receiving terminal, the terminal may be allocated resources for receiving a signal from the base station. can be assigned.
- resource information allocated by the base station may include information about the CLI-RS ID mapped or grouped for each resource.
- resources allocated by the base station to each terminal may be mapped or grouped into one or more beams. According to one embodiment, information about the beam may be explicitly specified in the resources allocated by the base station to each terminal.
- At least one beam may be mapped or grouped in the resource for CLI-RS reception or transmission that the base station allocates to the CLI-RS measurement or transmission terminal, but is not limited thereto and may be used in various embodiments of the present disclosure. Accordingly, the base station can only indicate a CLI-RS resource ID (identifier) for the allocated resources, and the determination of at least one beam to be mapped or grouped can be performed by the terminal.
- the base station can only indicate a CLI-RS resource ID (identifier) for the allocated resources, and the determination of at least one beam to be mapped or grouped can be performed by the terminal.
- the terminal may identify at least one CLI-RS transmission/reception beam among a plurality of available beams based on resources allocated from the base station.
- the CLI-RS transmission terminal may identify at least one CLI-RS transmission beam among a plurality of available beams based on resources for CLI-RS transmission allocated from the base station.
- the CLI-RS reception terminal may identify at least one CLI-RS reception beam among a plurality of available beams based on resources for CLI-RS reception allocated from the base station.
- the base station may allocate resources for at least one CLI-RS transmission and reception to the terminal, and the terminal identifies the number of CLI-RS transmission and reception beams among a plurality of available beams in the allocated resource for transmission and reception. can do.
- the terminal proceeds to step 925 and can perform operations of transmitting, receiving, measuring, and reporting CLI-RS based on the plurality of CLI-RS beams.
- the process by which the terminal performs an operation based on a plurality of CLI-RS beams is described in detail in FIGS. 13 to 16. Specifically, the terminal can transmit or receive CLI-RS through allocated resources for transmitting and receiving CLI-RS and a plurality of beams determined based on them.
- the CLI-RS measurement terminal may perform CLI-RS measurement for each beam on which CLI-RS transmission and reception is performed and report this to the base station through at least one of the various reporting methods disclosed in FIG. 7.
- the process of performing CLI-RS measurement on a plurality of beam pairs may include at least one of a beam sweeping operation according to fixing the CLI-RS transmission beam or a beam sweeping operation according to fixing the CLI-RS receiving beam.
- the base station that receives the measurement report may determine an optimal beam pair and transmit scheduling information including an index and CLI-RS ID for the optimal beam pair to the terminal.
- the base station that received the measurement report may determine a terminal pair for scheduling based on the CLI value of the CLI-RS measurement terminal and the CLI-RS transmitting terminal with the lowest interference value.
- the terminal proceeds to step 935 and can perform operations of transmitting/receiving, measuring, and reporting CLI-RS based on a single CLI-RS beam.
- the process by which the terminal performs an operation based on single CLI-RS beams is described in detail in FIGS. 10 to 12.
- the terminal can transmit or receive CLI-RS through the allocated resources for CLI-RS transmission and reception and one beam determined based on them.
- the CLI-RS measurement terminal performs CLI-RS measurement on a beam receiving CLI-RS transmitted from one or more CLI-RS transmitting terminals and reports this to the base station through at least one of the various reporting methods disclosed in FIG. 7. You can.
- the base station that received the measurement report may determine the CLI-RS measurement terminal and the CLI-RS transmitting terminal including the optimal beam pair, and include the index and CLI-RS ID for the optimal beam pair.
- the scheduling information can be transmitted to the CLI-RS measuring terminal or the determined CLI-RS transmitting terminal.
- FIGS. 10 to 12 operations related to CLI-RS measurement and reporting by transmitting and receiving a single CLI-RS beam are shown.
- the series of processes depicted in FIGS. 10 to 12 may be specific details of the series of processes (steps 705 to 725) among the steps depicted in FIG. 7, and are described through FIGS. 10 to 12.
- the process may mean an independent process, or it may mean at least one of the processes as one operation among the overall operations of FIG. 7.
- FIG. 10 illustrates a signal flow for measuring and reporting interference based on a single beam, according to various embodiments of the present disclosure. Specifically, referring to FIG. 10, CLI-RS measurement between the base station 1010 and at least one terminal including the CLI-RS measurement terminal 1020 and at least one CLI-RS transmitting terminal 1030 and 1040, and Shows the signal flow for reporting.
- the base station 1010 may configure CLI measurement for the CLI-RS measurement terminal 1020 and the first CLI-RS transmitting terminal 1030. Specifically, the base station 1010 may allocate resources for CLI-RS reception or transmission to the CLI-RS measurement terminal 1020 and the first CLI-RS transmission terminal 1030, respectively. According to one embodiment, the resource information allocated by the base station 1010 may include information about the CLI-RS ID (or index) mapped or grouped for each resource.
- resources allocated by the base station to each terminal may be mapped or grouped into one beam.
- information about the beam may be explicitly specified in the resources that the base station 1010 allocates to each terminal. That is, one beam may be mapped or grouped in the resource for CLI-RS reception or transmission that the base station 1010 allocates to the CLI-RS measurement terminal 1020 or the first CLI-RS transmission terminal 1030.
- information about the beam may not be specified in the resources that the base station 1010 allocates to each terminal. That is, the base station may only indicate a CLI-RS resource ID (identifier) for the allocated resources.
- the determination of at least one beam to be mapped or grouped may be performed by the terminal.
- each terminal through self-determination or various methods, sends a beam corresponding to the allocated resource and the CLI-RS ID included in the resource through the base station's explicit instructions. You can make decisions without instructions.
- the base station 1010 may configure CLI measurement for the CLI-RS measurement terminal 1020 and the second CLI-RS transmitting terminal 1040. Specifically, the base station 1010 may allocate resources for reception or transmission to the CLI-RS measurement terminal 1020 and the second CLI-RS transmission terminal 1040, respectively.
- the information about the resources allocated by the base station to each terminal in step 1015 or the information about the CLI-RS beam is the information about the resources allocated by the base station to each terminal in step 1005 or the CLI-RS beam. It may differ from information about RS beam.
- the resource information allocated by the base station 1010 may include information about the CLI-RS ID (or index) mapped or grouped for each resource.
- resources allocated by the base station to each terminal may be mapped or grouped into one beam.
- information about the beam may be explicitly specified in the resources that the base station 1010 allocates to each terminal. That is, one beam may be mapped or grouped in the resource for CLI-RS reception or transmission that the base station 1010 allocates to the CLI-RS measurement terminal 1020 or the second CLI-RS transmission terminal 1040.
- information about the beam may not be specified in the resources that the base station 1010 allocates to each terminal. That is, the base station may only indicate a CLI-RS resource ID (identifier) for the allocated resources.
- the determination of at least one beam to be mapped or grouped may be performed by the terminal.
- each terminal through self-determination or various methods, sends a beam corresponding to the allocated resource and the CLI-RS ID included in the resource through the base station's explicit instructions. You can make decisions without instructions.
- the first CLI-RS transmission terminal 1030 transmits a CLI-RS to the CLI-RS measurement terminal 1020 through a CLI-RS transmission beam determined based on the allocated resources for CLI-RS transmission. can do.
- the CLI-RS transmission beam determined by the first CLI-RS transmission terminal 1030 or the CLI-RS reception beam determined by the CLI-RS measurement terminal 1020 may include a single beam.
- the CLI-RS transmission beam determined by the first CLI-RS transmission terminal 1030 or the CLI-RS reception beam determined by the CLI-RS measurement terminal 1020 is a beam indicated by the base station 1010, respectively. It can be included.
- the CLI-RS transmission beam determined by the first CLI-RS transmission terminal 1030 or the CLI-RS reception beam determined by the CLI-RS measurement terminal 1020 is determined by the terminal itself (e.g., best effort). It may include a beam determined by etc.
- the first CLI-RS measurement terminal 1030 may transmit a CLI-RS to the CLI-RS measurement terminal 1020 through a CLI-RS transmission beam determined based on allocated resources for CLI-RS transmission.
- the CLI-RS measurement terminal 1020 may receive the CLI-RS from the first CLI-RS transmission terminal 1030 through a CLI-RS reception beam determined based on the allocated resources for CLI-RS reception.
- the CLI-RS measurement terminal 1020 performs CLI measurement based on CLI-RSs received from the first CLI-RS transmitting terminal 1030 and the second CLI-RS transmitting terminal 1040. can do.
- the second CLI-RS transmission terminal 1040 transmits a CLI-RS to the CLI-RS measurement terminal 1020 through a CLI-RS transmission beam determined based on the allocated resources for CLI-RS transmission. can do.
- the CLI-RS transmission beam determined by the second CLI-RS transmission terminal 1040 or the CLI-RS reception beam determined by the CLI-RS measurement terminal 1020 may include a single beam.
- the CLI-RS transmission beam determined by the second CLI-RS transmission terminal 1040 or the CLI-RS reception beam determined by the CLI-RS measurement terminal 1020 is a beam indicated from the base station 1010, respectively. It can be included.
- the CLI-RS transmission beam determined by the second CLI-RS transmission terminal 1040 or the CLI-RS reception beam determined by the CLI-RS measurement terminal 1020 is determined by the terminal itself (e.g., best effort). It may include a beam determined by etc.
- the second CLI-RS measurement terminal 1040 may transmit a CLI-RS to the CLI-RS measurement terminal 1020 through a CLI-RS transmission beam determined based on allocated resources for CLI-RS transmission.
- the CLI-RS measurement terminal 1020 may receive a CLI-RS from the second CLI-RS transmission terminal 1040 through a CLI-RS reception beam determined based on allocated resources for CLI-RS reception.
- the CLI-RS measurement terminal 1020 performs CLI measurement based on CLI-RSs received from the first CLI-RS transmitting terminal 1030 and the second CLI-RS transmitting terminal 1040. can do.
- the CLI-RS measurement terminal 1020 may report the measured CLI information to the base station 1010.
- the CLI-RS measurement terminal 1020 may report CLI-RS measurement information to the base station 1010 by various methods.
- the CLI-RS measurement terminal 1020 may report CLI-RS measurement information to the base station 1010 using the CLI-RS reporting resource allocated from the base station 1010.
- the reporting method that the CLI-RS measurement terminal 1020 can determine is described.
- the CLI-RS measurement terminal 1020 can report all information about at least one beam pair used for CLI-RS transmission and reception to the base station 1010.
- the CLI-RS measurement terminal 1020 may report to the base station 1010 a CLI-RS index indicating at least one beam pair with the minimum interference value among the measured CLI values. .
- the index of at least one beam pair with the minimum interference value reported by the CLI-RS measurement terminal 1020 may be the index of at least one beam pair based on the CLI-RS received from at least one CLI-RS transmitting terminal.
- the information reported by the CLI-RS measurement terminal 1020 includes not only the index for the beam pair with the lowest interference value, but also at least one beam pair including the beam pair with the Nth lowest interference value. It may be an index for .
- the N value may be configured in advance by the base station.
- the CLI-RS measurement terminal 1020 can calculate the average of the interference values of all at least one beam pair used for CLI-RS transmission and reception, and send information about the average value to the base station ( 1010).
- the CLI-RS measurement terminal 1020 reports the interference value for at least one beam pair used for CLI-RS transmission and reception to the base station 1010 based on the threshold value. You can report. Specifically, according to one embodiment, the CLI-RS measurement terminal 1020 may report information about one or more beam pairs having an interference value of less than a threshold and information about the index to the base station 1010. . According to one embodiment, the threshold may be set in advance by the base station 1010, or may be predefined in the terminal itself.
- the CLI-RS measurement terminal 1020 may determine the index of some of at least one beam pair used for CLI-RS transmission and reception as a blacklist and report it. Specifically, the CLI-RS measurement terminal 1020 may determine one or more beam pairs with high interference values as a blacklist and report it to the base station 1010, and the base station 1010 may determine one or more beam pairs included in the blacklist. Scheduling for data channel transmission and reception can be performed except for pairs. According to one embodiment, the CLI-RS measurement terminal 1020 may determine to blacklist one or more beam pairs having an interference value greater than or equal to the reference interference value based on a specific reference interference value, and the reference interference value is set by the base station. It may be or may be predefined in the terminal itself. However, the method of determining the blacklist according to various embodiments of the present disclosure is not limited to this and may include various methods, such as determining one or more beam pairs in which a specific event has occurred as a blacklist.
- the CLI-RS measurement terminal 1020 determines at least one of methods 1) to 5) based on various reasons such as feedback overhead, and sends the CLI-RS measurement information to the base station 1010 through the determined method. ) can be reported to.
- CLI-RS measurement information is not limited to being reported according to individual methods, and the CLI-RS measurement terminal 1020 uses at least one of methods 1) to 5) or Through the combination, CLI-RS measurement information can be reported to the base station 1010.
- the base station 1010 may determine the UE pair with the minimum CLI-RS based on the reported CLI-RS measurement information.
- the base station 1010 selects one CLI-RS measurement terminal 1020 with the minimum interference value based on the CLI value between the CLI-RS measurement terminal 1020 and at least one CLI-RS transmitting terminal 1030, 1040.
- a pair of a CLI-RS transmitting terminal (1030 or 1040) can be determined.
- the base station 1010 may use CLI-RS measurement between one CLI-RS measurement terminal 1020 and a plurality of CLI-RS transmitting terminals 1030 and 1040, respectively.
- the base station 1010 may use CLI-RS measurement between one CLI-RS transmitting terminal and a plurality of CLI-RS measuring terminals.
- the CLI-RS measurement terminal or the CLI-RS transmission terminal determines the CLI-RS reception beam or the CLI-RS transmission beam as one beam, respectively, based on resource allocation from the base station. An example is shown.
- the base station may allocate resources for reception or transmission to the CLI-RS measurement terminal and the CLI-RS transmission terminal, respectively.
- resource information allocated by the base station may include information about the CLI-RS ID (or index) mapped or grouped for each resource.
- resources allocated by the base station to each terminal may be mapped or grouped into one beam.
- resources allocated by the base station to each terminal may be mapped (or grouped) to one beam.
- one resource allocated by the base station to each terminal may include information about the CLI-RS beam mapped to one resource (e.g., resource ID, location of the resource).
- a CLI-RS beam mapped to one resource allocated by the base station may include a coordinated beam. Coordinated beams are the PDSCH beam or PUSCH beam corresponding to the location of resources (e.g. slots or symbols) allocated by the base station to each terminal, the beam used by each terminal when receiving SSB (synchronization signal block), or the beam used by each terminal.
- CSI channel state information
- the base station provides the CLI-RS transmission resource ID (resource ID), information about the steering beam, or CLI-RS resource location (e.g., location within a slot, location within a symbol, resource block (RB) location, or At least one piece of information about a resource element (RE) location may be transmitted.
- the base station provides the CLI-RS measurement terminal with a CLI-RS reception resource ID, information about the steering beam, or CLI-RS resource location (e.g., location within a slot, location within a symbol, resource block (RB) location, or RE). At least one of the information about the location of the resource element can be transmitted.
- CLI-RS transmission and reception resources are provided to each terminal.
- Information including information about ID and steering beam can be set together.
- Each terminal that receives resource and coordination beam information from the base station can adjust the CLI-RS beam based on the received resource and coordination beam information (1115).
- the CLI-RS transmitting terminal may receive information on resource allocation and steering beam from the base station, and the information on the steering beam may be transmitted to the beam of the PUSCH transmission location (symbol) associated with the CLI-RS resource location (symbol).
- the CLI-RS transmission terminal can determine Beam #0 as the CLI-RS transmission beam based on the received information.
- the CLI-RS measurement terminal may receive information about resource allocation and steering beam from the base station, and the information about the steering beam may be transmitted to the beam of the PDSCH reception location (slot) associated with the CLI-RS resource location (slot). It may include information about (e.g., information related to the PDSCH reception beam of the previous slot). Accordingly, the CLI-RS measurement terminal can determine B-#1 as the CLI-RS reception beam based on the received information.
- the CLI-RS measuring terminal and the CLI-RS transmitting terminal may perform CLI-RS transmission and reception operations based on the determined beam.
- resources allocated by the base station to each terminal may be mapped (or grouped) to one beam.
- each terminal makes its own decision (e.g., best effort).
- the CLI-RS beam can be determined by performing:
- the CLI-RS beam that each terminal determines based on resources allocated from the base station may be one beam.
- the terminal may determine the CLI-RS beam on its own based on the resource area allocated from the base station.
- the UE uses the PDSCH beam or PUSCH beam associated with the CLI-RS resource location, the beam used to receive the SSB, and the beam used to receive the CSI-RS.
- the CLI-RS beam may be determined based on at least one of the beams used when transmitting the SRS.
- the PDSCH beam or PUSCH beam associated with the CLI-RS resource location may include the PDSCH beam or PUSCH beam in the slot (or previous slot) of the allocated CLI-RS resource.
- the UE can arbitrarily determine the CLI-RS beam based on the allocated CLI-RS resources.
- the method and standard for self-determination of the CLI-RS beam of the terminal described above are not limited to this and may be predefined according to various embodiments of the present disclosure or may be preset by the base station.
- CLI-RS transmission and reception resources are provided to each terminal. You can set an ID (including, for example, the CLI-RS resource location).
- Each terminal that receives the CLI-RS resource location from the base station can determine the CLI-RS beam based on the received resource information (1125).
- the CLI-RS transmitting terminal may receive information about resource allocation from the base station and determine Beam #0 as the CLI-RS transmission beam based on the terminal's own determination described above.
- the CLI-RS measurement terminal may receive information about resource allocation from the base station, and may determine B-#1 as the CLI-RS reception beam based on the terminal's own determination described above.
- the CLI-RS measuring terminal and the CLI-RS transmitting terminal may perform CLI-RS transmission and reception operations based on the determined beam.
- FIG. 12 illustrates the operational flow of a terminal measuring and reporting interference based on a single beam, according to various embodiments of the present disclosure. Specifically, referring to FIG. 12, it shows the operation flow of a CLI-RS measurement terminal or a CLI-RS transmitting terminal for determining a CLI-RS beam based on resources allocated from the base station.
- the following terminals may include a CLI-RS transmitting terminal that determines the CLI-RS transmission beam and transmits the CLI-RS, and a CLI-RS receiving terminal that determines the CLI-RS reception beam and receives the CLI-RS. .
- the terminal may be allocated resources for CLI-RS transmission and reception from the base station. Specifically, if the terminal is a CLI-RS transmitting terminal, the terminal may be allocated resources for signal transmission from the base station, or if the terminal is a CLI-RS measurement (e.g. receiving) terminal, the terminal may receive a signal from the base station. Resources can be allocated for reception. According to one embodiment, resource information allocated by the base station may include information about the CLI-RS ID mapped or grouped for each resource. According to one embodiment, resources allocated by the base station to each terminal may be mapped or grouped into one or more beams. According to one embodiment, information about the beam may be explicitly specified in the resources allocated by the base station to each terminal.
- At least one beam may be mapped or grouped in the resource for CLI-RS reception or transmission that the base station allocates to the CLI-RS measurement or transmission terminal, but is not limited thereto and may be used in various embodiments of the present disclosure. Accordingly, the base station can only indicate a CLI-RS resource ID (identifier) for the allocated resources, and the determination of at least one beam to be mapped or grouped can be performed by the terminal.
- the base station can only indicate a CLI-RS resource ID (identifier) for the allocated resources, and the determination of at least one beam to be mapped or grouped can be performed by the terminal.
- step 1215 the terminal can determine whether a beam for CLI-RS transmission is explicitly designated in the resources allocated from the base station.
- step 915 of FIG. 9 may be performed before or after step 1215.
- the terminal may identify at least one CLI-RS transmission and reception beam among a plurality of available beams based on resources for transmission and reception allocated from the base station.
- step 1215 if the CLI-RS beam is explicitly designated for the resource allocated to the terminal from the base station, the process proceeds to step 1225.
- resources allocated by the base station to each terminal may be mapped (or grouped) to one beam.
- one resource allocated by the base station to each terminal may include information about the CLI-RS beam mapped to one resource (e.g., resource ID, location of the resource).
- a CLI-RS beam mapped to one resource allocated by the base station may include a coordinated beam. Coordinated beams are the PDSCH beam or PUSCH beam corresponding to the location of resources (e.g.
- CSI channel state information
- the base station provides the CLI-RS transmission resource ID (resource ID), information about the steering beam, or CLI-RS resource location (e.g., location within a slot, location within a symbol, resource block (RB) location, or At least one piece of information about a resource element (RE) location may be transmitted.
- the base station provides the CLI-RS measurement terminal with a CLI-RS reception resource ID, information about the steering beam, or CLI-RS resource location (e.g., location within a slot, location within a symbol, resource block (RB) location, or RE). At least one of the information about the location of the resource element can be transmitted.
- each terminal that receives resource and coordination beam information from the base station may determine a CLI-RS beam based on the received resource and coordination beam information.
- the CLI-RS measuring terminal and the CLI-RS transmitting terminal may perform CLI-RS transmission and reception operations based on the determined beam.
- the CLI-RS transmitting terminal may transmit a CLI-RS to the CLI-RS measuring terminal based on the determined transmission beam.
- the CLI-RS measuring terminal may receive the CLI-RS from the CLI-RS transmitting terminal and measure the CLI based on the received CLI-RS.
- step 1215 if the terminal does not explicitly include the CLI-RS beam in the resources allocated from the base station, the process proceeds to step 1235.
- resources allocated by the base station to each terminal may be mapped (or grouped) to one beam.
- each terminal makes its own decision (e.g., best effort).
- the CLI-RS beam can be determined by performing: According to one embodiment, the CLI-RS beam that each terminal determines based on the resources allocated from the base station may be one beam.
- the terminal may determine the CLI-RS beam on its own based on the resource area allocated from the base station.
- the UE uses the PDSCH beam or PUSCH beam associated with the CLI-RS resource location, the beam used to receive the SSB, and the beam used to receive the CSI-RS.
- the CLI-RS beam may be determined based on at least one of the beams used when transmitting the SRS.
- the PDSCH beam or PUSCH beam associated with the CLI-RS resource location may include the PDSCH beam or PUSCH beam in the slot (or previous slot) of the allocated CLI-RS resource.
- the UE can arbitrarily determine the CLI-RS beam based on the allocated CLI-RS resources.
- the method and standard for self-determination of the CLI-RS beam of the terminal described above are not limited to this and may be predefined according to various embodiments of the present disclosure or may be preset by the base station.
- each terminal that receives the CLI-RS resource location from the base station may determine the CLI-RS beam based on the received resource information. If the UE determines the CLI-RS beam in step 1235, the process proceeds to step 1225.
- the CLI-RS measuring terminal and the CLI-RS transmitting terminal may perform a CLI-RS transmission and reception operation based on the determined beam.
- the CLI-RS transmitting terminal may transmit a CLI-RS to the CLI-RS measuring terminal based on the determined transmission beam.
- the CLI-RS measuring terminal may receive the CLI-RS from the CLI-RS transmitting terminal and measure the CLI based on the received CLI-RS.
- the CLI-RS measurement terminal can perform CLI-RS measurement based on CLI-RS transmission and reception operations and report CLI-RS measurement information to the base station.
- the UE's CLI-RS measurement information reporting operation may follow the method of step 725 of FIG. 7.
- FIGS. 13 to 16 operations related to CLI-RS measurement and reporting by transmitting and receiving a plurality of CLI-RS beams are shown.
- the series of processes depicted in FIGS. 13 to 16 may be specific content for the series of processes (steps 705 to 725) among the steps depicted in FIG. 7, and are described through FIGS. 13 to 16.
- the process may mean an independent process, or it may mean at least one of the processes as one operation among the overall operations of FIG. 7.
- FIG. 13 illustrates a signal flow for measuring and reporting interference based on multiple beams, according to various embodiments of the present disclosure. Specifically, referring to FIG. 13, CLI-RS measurement and reporting between the base station 1310 and at least one terminal including the CLI-RS measurement terminal 1320 and at least one CLI-RS transmitting terminal 1330. Shows the signal flow for:
- the base station 1310 may configure CLI measurement for the CLI-RS measurement terminal 1320 and the CLI-RS transmitting terminal 1330. Specifically, the base station 1310 may allocate resources for reception or transmission to the CLI-RS measurement terminal 1320 and the CLI-RS transmission terminal 1330, respectively.
- the resource information allocated by the base station 1310 may include information about the CLI-RS ID mapped or grouped for each resource. According to one embodiment, resources allocated by the base station to each terminal may be mapped or grouped into one beam. According to one embodiment, information about the beam may be explicitly specified in the resources that the base station 1310 allocates to each terminal.
- one beam may be mapped or grouped in the resource for CLI-RS reception or transmission that the base station 1310 allocates to the CLI-RS measurement terminal 1320 or the CLI-RS transmission terminal 1330.
- information about the beam may not be specified in the resources that the base station 1310 allocates to each terminal. That is, the base station may indicate only a CLI-RS resource ID (identifier) for the allocated resources.
- the determination of at least one beam to be mapped or grouped may be performed by the terminal. For example, if a beam is not explicitly indicated in each resource area, each terminal, through self-determination or various methods, sends a beam corresponding to the allocated resource and the CLI-RS ID included in the resource through the base station's explicit instructions. You can make decisions without instructions.
- the CLI-RS measurement terminal 1320 and the CLI-RS transmission terminal 1330 may determine a plurality of CLI-RS reception beams and a plurality of CLI-RS transmission beams, respectively. .
- the CLI-RS transmitting terminal and the CLI-RS receiving terminal may perform a beam sweeping operation during the CLI-RS transmission and reception process.
- the beam sweeping process may include beam adjustment on the receiving side or beam adjustment on the transmitting side.
- the CLI-RS receiving terminal may receive information about the CLI-RS transmission beam (e.g., fixed beam) from the CLI-RS transmitting terminal, and transmit at least one CLI-RS based on the received information.
- the receiving beam can be identified.
- the CLI-RS receiving terminal can transmit information about the identified CLI-RS receiving beam to the CLI-RS transmitting terminal.
- the CLI-RS receiving terminal can receive CLI-RS based on information about the CLI-RS transmission beam and the identified CLI-RS reception beam.
- the CLI-RS transmitting terminal may receive information about the CLI-RS receiving beam (e.g., fixed beam) from the CLI-RS receiving terminal, and transmit at least one CLI-RS based on the received information.
- the transmission beam can be identified.
- the CLI-RS transmission terminal can transmit information about the identified CLI-RS transmission beam to the CLI-RS reception terminal.
- the CLI-RS transmission terminal can transmit CLI-RS based on information about the CLI-RS reception beam and the identified CLI-RS transmission beam. For example, during the beam adjustment (or sweeping) process on the receiving side, the transmission beam may be fixed, and the receiving terminal may perform measurement by sequentially applying the reception beams. In contrast, in the beam adjustment process on the transmitting side, the receiving beam may be fixed, and measurement may be performed by applying the transmitting beams sequentially.
- the transmitting terminal and the receiving terminal may provide each other with information about beams for beam sweeping (eg, fixed beams or sequentially applied beams) in order to perform beam sweeping.
- the CLI-RS transmitting terminal can transmit information about the fixed beam to the CLI-RS receiving terminal, and the CLI-RS receiving terminal can sequentially change and apply the CLI-RS reception.
- Information about beams can be transmitted to the CLI-RS transmitting terminal.
- the CLI-RS transmission terminal 1330 transmits a CLI-RS to the CLI-RS measurement terminal 1320 through a CLI-RS transmission beam determined based on the allocated resources for CLI-RS transmission.
- the CLI-RS transmission beam determined by the CLI-RS transmission terminal 1330 or the CLI-RS reception beam determined by the CLI-RS measurement terminal 1320 may include one of a plurality of beams.
- the CLI-RS transmission beam determined by the CLI-RS transmission terminal 1330 or the CLI-RS reception beam determined by the CLI-RS measurement terminal 1320 may each include a beam indicated from the base station 1310. You can.
- the CLI-RS transmission beam determined by the CLI-RS transmitting terminal 1330 or the CLI-RS receiving beam determined by the CLI-RS measuring terminal 1320 is determined by the terminal itself (e.g., best effort), etc. It may include a determined beam.
- the CLI-RS measurement terminal 1330 transmits CLI-RS through one beam (e.g., CLI-RS transmission Beam#0, Beam#X) among the CLI-RS transmission beams determined based on the allocated resources for CLI-RS transmission.
- CLI-RS can be transmitted to the RS measurement terminal 1320.
- the CLI-RS measurement terminal 1330 may provide information about one determined beam to the CLI-RS measurement terminal 1320.
- the CLI-RS measurement terminal 1320 sequentially applies the CLI-RS reception beam (e.g., CLI-RS reception Beam#0, Beam#X) determined based on the allocated resources for CLI-RS reception to receive the CLI-RS.
- CLI-RS can be received from the transmitting terminal 1330.
- the CLI-RS measuring terminal 1330 can provide information about sequentially applied reception beams to the CLI-RS transmitting terminal 1330.
- the CLI-RS transmitting terminal may transmit the CLI-RS through each of the determined CLI-RS transmission beams
- the CLI-RS receiving terminal may transmit the CLI-RS transmitted by each of the CLI-RS transmission beams. It can be received through the determined CLI-RS reception beams.
- the CLI-RS transmission terminal 1330 may transmit CLI-RS through one of the CLI-RS transmission beams (e.g., CLI-RS transmission Beam#0), and the CLI-RS measurement terminal ( 1320) may receive CLI-RS through at least one of the CLI-RS reception beams (e.g., CLI-RS reception Beam#0 to Beam#X) (step 1315).
- the CLI-RS transmission beams e.g., CLI-RS transmission Beam#0
- the CLI-RS measurement terminal may receive CLI-RS through at least one of the CLI-RS reception beams (e.g., CLI-RS reception Beam#0 to Beam#X) (step 1315).
- the CLI-RS transmission terminal 1330 may transmit CLI-RS through one of the CLI-RS transmission beams (e.g., CLI-RS transmission Beam#X), and the CLI-RS measurement terminal 1320 Can receive CLI-RS through at least one of the CLI-RS reception beams (e.g., CLI-RS reception Beam#0 to Beam#X) (step 1325).
- the above-described steps 1315 to 1325 may operate similarly to the beam sweeping operation according to transmission beam fixation, but are not limited thereto, and according to various embodiments of the present disclosure, the beam sweeping operation according to reception beam fixation It can be done.
- the CLI-RS measurement terminal 1320 may perform CLI measurement based on CLI-RSs received from the CLI-RS transmitting terminal 1330.
- the CLI-RS measurement terminal 1320 may report the measured CLI information to the base station 1310.
- the CLI-RS measurement terminal 1320 may report CLI-RS measurement information to the base station 1310 by various methods.
- the CLI-RS measurement terminal 1320 may report CLI-RS measurement information to the base station 1310 using the CLI-RS reporting resource allocated from the base station 3010.
- the reporting method that the CLI-RS measurement terminal 1320 can determine is described.
- the CLI-RS measurement terminal 1320 can report all information about at least one beam pair used for CLI-RS transmission and reception to the base station 1310.
- the CLI-RS measurement terminal 1020 may report to the base station 1310 a CLI-RS index indicating at least one beam pair with the minimum interference value among the measured CLI values. .
- the index of at least one beam pair with the minimum interference value reported by the CLI-RS measurement terminal 1320 may be the index of at least one beam pair based on the CLI-RS received from at least one CLI-RS transmitting terminal.
- the information reported by the CLI-RS measurement terminal 1320 includes not only the index for the beam pair with the lowest interference value, but also at least one beam pair including the beam pair with the Nth lowest interference value. It may be an index for .
- the N value may be configured in advance by the base station.
- the CLI-RS measurement terminal 1320 can calculate the average of the interference values of all at least one beam pair used for CLI-RS transmission and reception, and send information about the average value to the base station ( 1310).
- the CLI-RS measurement terminal 1320 reports the interference value for at least one beam pair used for CLI-RS transmission and reception to the base station 1310 based on the threshold value. You can report. Specifically, according to one embodiment, the CLI-RS measurement terminal 1320 may report information about one or more beam pairs having an interference value of less than a threshold and information about the index to the base station 1310. . According to one embodiment, the threshold may be set in advance by the base station 1310, or may be predefined in the terminal itself.
- the CLI-RS measurement terminal 1320 may determine the index of some of at least one beam pair used for CLI-RS transmission and reception as a blacklist and report it. Specifically, the CLI-RS measurement terminal 1320 may determine one or more beam pairs with high interference values as a blacklist and report it to the base station 1310, and the base station 1310 may determine one or more beam pairs with high interference values as a blacklist. Scheduling for data channel transmission and reception can be performed except for pairs. According to one embodiment, the CLI-RS measurement terminal 1320 may determine to blacklist one or more beam pairs having an interference value greater than or equal to the reference interference value based on a specific reference interference value, and the reference interference value is set by the base station.
- the method of determining the blacklist is not limited to this and may include various methods, such as determining one or more beam pairs in which a specific event has occurred as a blacklist.
- the CLI-RS measurement terminal 1320 determines at least one of methods 1) to 5) based on various reasons such as feedback overhead, and sends the CLI-RS measurement information to the base station 1310 through the determined method. ) can be reported to.
- CLI-RS measurement information is not limited to being reported according to individual methods, and the CLI-RS measurement terminal 1320 uses at least one of methods 1) to 5) or Through the combination, CLI-RS measurement information can be reported to the base station 1310.
- the CLI-RS measurement terminal or the CLI-RS transmission terminal determines the CLI-RS reception beam or the CLI-RS transmission beam as one beam, respectively, based on resource allocation from the base station. An example is shown.
- the base station may allocate resources for reception or transmission to the CLI-RS measurement terminal and the CLI-RS transmission terminal, respectively.
- resource information allocated by the base station may include information about the CLI-RS ID mapped or grouped for each resource.
- resources allocated by the base station to each terminal may be mapped or grouped into one beam.
- a plurality of resources allocated by the base station to each terminal may each be mapped (or grouped) to a plurality of beams.
- a plurality of resources allocated by the base station to each terminal may include information (e.g., resource ID, location of the resource) about the CLI-RS beam mapped to the plurality of resources.
- CLI-RS beams mapped to a plurality of resources allocated by the base station may include coordinated beams. Coordinated beams are the PDSCH beam or PUSCH beam corresponding to the location of resources (e.g. slots or symbols) allocated by the base station to each terminal, the beam used by each terminal when receiving SSB (synchronization signal block), or the beam used by each terminal.
- CSI channel state information
- the base station provides the CLI-RS transmission resource ID (resource ID), information about the steering beam, or CLI-RS resource location (e.g., location within a slot, location within a symbol, resource block (RB) location, or At least one piece of information about a resource element (RE) location may be transmitted.
- the base station provides the CLI-RS measurement terminal with a CLI-RS reception resource ID, information about the steering beam, or CLI-RS resource location (e.g., location within a slot, location within a symbol, resource block (RB) location, or RE). At least one of the information about the location of the resource element can be transmitted.
- the base station provides resources including symbol #7 in slot #2 and resources including symbol #9 in slot #2 to the CLI-RS transmitting terminal and the CLI-RS measuring terminal.
- information including CLI-RS transmission/reception resource ID and information on the steering beam can be set for each terminal.
- information about the steering beam set by the base station may be individually mapped for each resource.
- Each terminal that has received resources including symbol #7 of slot #2 and steering beam information mapped thereto from the base station can adjust the CLI-RS beam based on the received resources and steering beam information (1415, 1417).
- each terminal that has received resources including symbol #9 of slot #2 and steering beam information mapped thereto from the base station can adjust the CLI-RS beam based on the received resources and steering beam information (1417).
- the CLI-RS transmitting terminal may receive information about resource allocation and a steering beam mapped thereto from the base station, and the information about the steering beam is a PUSCH transmission location (symbol) associated with the CLI-RS resource location (symbol).
- the information about the beam is a PUSCH transmission location (symbol) associated with the CLI-RS resource location (symbol).
- may include information about the beam e.g., information related to the PUSCH transmission beam for another symbol in the same slot).
- the CLI-RS measurement terminal may receive information about resource allocation and steering beam from the base station, and the information about the steering beam may be transmitted to the beam of the PDSCH reception location (slot) associated with the CLI-RS resource location (slot). It may include information about (e.g., information related to the PDSCH reception beam of the previous slot).
- the CLI-RS transmission terminal may determine Beam #0 mapped to the resource including symbol #7 of slot #2 as the CLI-RS transmission beam based on the received information (1415).
- the CLI-RS measurement terminal may determine B-#1 mapped to the resource including symbol #7 of slot #2 as the CLI-RS reception beam based on the received information (1415).
- the CLI-RS transmission terminal may determine Beam #1 mapped to the resource including symbol #9 of slot #2 as the CLI-RS transmission beam based on the received information (1417) .
- the CLI-RS measurement terminal may determine B-#0 mapped to the resource including symbol #9 of slot #2 as the CLI-RS reception beam based on the received information (1417).
- the CLI-RS measuring terminal and the CLI-RS transmitting terminal may perform CLI-RS transmission and reception operations based on the determined beam.
- resources allocated by the base station to each terminal may be mapped (or grouped) to one beam.
- each terminal when the plurality of resources allocated by the base station to each terminal do not include information about the CLI-RS beam mapped to the plurality of resources, each terminal performs its own decision (e.g., best effort).
- the CLI-RS beam can be determined.
- the CLI-RS beam that each terminal determines based on a plurality of resources allocated from the base station may be one beam for each resource.
- the terminal may determine the CLI-RS beam on its own based on the resource area allocated from the base station.
- the UE uses the PDSCH beam or PUSCH beam associated with the CLI-RS resource location, the beam used to receive the SSB, and the beam used to receive the CSI-RS.
- the CLI-RS beam may be determined based on at least one of the beams used when transmitting the SRS.
- the PDSCH beam or PUSCH beam associated with the CLI-RS resource location may include the PDSCH beam or PUSCH beam in the slot (or previous slot) of the allocated CLI-RS resource.
- the UE can arbitrarily determine the CLI-RS beam based on the allocated CLI-RS resources.
- the method and standard for self-determination of the CLI-RS beam of the terminal described above are not limited to this and may be predefined according to various embodiments of the present disclosure or may be preset by the base station.
- the base station provides resources including symbol #7 in slot #2 and resources including symbol #9 in slot #2 to the CLI-RS transmitting terminal and the CLI-RS measuring terminal.
- a CLI-RS transmission/reception resource ID (e.g., including the CLI-RS resource location) can be set for each terminal.
- Each terminal that receives the CLI-RS resource location from the base station can determine the CLI-RS beam based on the received resource information (1425, 1427).
- the CLI-RS transmitting terminal may receive information about resource allocation including symbol #7 of slot #2 from the base station, and send Beam #0 to the CLI-RS based on the above-described terminal self-determination. It can be determined by the transmission beam (1425).
- the CLI-RS measurement terminal may receive information about resource allocation including symbol #7 of slot #2 from the base station, and select B-#1 as CLI- based on the above-described terminal self-determination. It can be determined by the RS reception beam (1425). Additionally, according to one embodiment, the CLI-RS transmitting terminal may receive information about resource allocation including symbol #9 of slot #2 from the base station, and select Beam #2 as CLI based on the above-described terminal self-determination. -Can be determined by RS transmission beam (1427). According to one embodiment, the CLI-RS measurement terminal may receive information on resource allocation including symbol #9 of slot #2 from the base station, and select B-#0 as CLI- based on the above-described terminal self-determination.
- the beam determined based on the resource allocation including symbol #9 of slot #2 may be determined in a different direction from the beam determined based on the resource allocation including symbol #9 of slot #2.
- the CLI-RS measuring terminal and the CLI-RS transmitting terminal may perform CLI-RS transmission and reception operations based on the determined beam.
- FIGS. 14A and 14B an example in which resources including symbol #7 of slot #2 and resources including symbol #9 of slot #2 are allocated is shown in FIGS. 14A and 14B, but is not limited thereto.
- the number of resource areas and numbers allocated by the base station may be plural, and accordingly, the number of CLI-RS beams selected by the terminal may also be plural.
- FIG. 15 illustrates an example of measuring interference through beam sweeping based on multiple beams, according to various embodiments of the present disclosure. Specifically, referring to FIG. 15, it shows various examples for transmitting and measuring CLI-RS between a CLI-RS transmitting terminal and a CLI-RS measuring terminal.
- the base station may allocate a plurality of resources for transmission and reception to the CLI-RS transmitting terminal and the CLI-RS measuring terminal.
- a plurality of resources for transmission and reception allocated to each terminal may include information about the mapped CLI-RS beam.
- the operation of determining the CLI-RS beam to which the UE is mapped is specifically shown in FIG. 14A.
- each terminal may independently determine a CLI-RS beam mapped to each beam based on a plurality of allocated resources for transmission and reception.
- the operation in which the UE determines the CLI-RS beam on its own is specifically shown in FIG. 14b.
- the base station may allocate resources for symbols #7 and #9 in slot #2 and resources for symbols #7 and #9 in slot #4 to each terminal (1510).
- each terminal allocated a plurality of resources may determine a CLI-RS beam based on the allocated resources. According to one embodiment, each terminal may determine a CLI-RS beam based on information about the CLI-RS beam mapped to a plurality of resources. According to one embodiment, each terminal may independently determine a CLI-RS transmission beam and a CLI-RS reception beam mapped to each beam based on a plurality of allocated resources for transmission and reception.
- each terminal may transmit and receive CLI-RS through a beam sweeping operation based on the determined CLI-RS transmission beam and CLI-RS reception beam (1520).
- a transmission and reception operation of fixing the CLI-RS transmission beam and sweeping the CLI-RS reception beam may be performed (1521).
- a transmission and reception operation of fixing the CLI-RS reception beam and sweeping the CLI-RS transmission beam may be performed (1523).
- each terminal can transmit and receive a CLI-RS beam through various methods (e.g., transmission and reception through a random CLI-RS beam).
- the beam sweeping process described above may be substantially the same as step 715 of FIG. 7.
- the CLI-RS transmitting terminal and the CLI-RS measuring terminal use the resource 1533 of symbol #7 in slot #2, the resource 1534 of symbol #7 in slot #4, and the symbol # of slot #2.
- Beam#0 is determined as the CLI-RS transmission beam and B-#0, B-#1, and B-#2, respectively.
- B-#3 can be determined as the CLI-RS reception beam. That is, by determining that there are four CLI-RS reception beams that can be used for one CLI-RS transmission beam, CLI-RS transmission and reception for each beam pair according to CLI-RS transmission beam fixation and CLI-RS reception beam sweeping. This can be done.
- the CLI-RS transmission and reception beam of each terminal may be determined based on a beam explicitly designated by the base station or based on the decision of the terminal itself, as described above.
- the CLI-RS transmitting terminal and the CLI-RS measuring terminal use the resource 1543 of symbol #7 in slot #2, the resource 1544 of symbol #7 in slot #4, and the symbol # of slot #2.
- Beam#0, Beam#1, Beam#2, and Beam#3 are determined as CLI-RS transmission beams, respectively, and B- #0 can be determined as the CLI-RS reception beam. That is, by determining that there are four CLI-RS transmission beams that can be used for one CLI-RS reception beam, CLI-RS transmission and reception for each beam pair according to CLI-RS reception beam fixation and CLI-RS transmission beam sweeping. This can be done.
- the CLI-RS transmission and reception beam of each terminal may be determined based on a beam explicitly designated by the base station or based on the decision of the terminal itself, as described above.
- the CLI-RS receiving terminal may receive information about the CLI-RS transmission beam (e.g., fixed beam) from the CLI-RS transmitting terminal, and transmit at least one CLI-RS based on the received information.
- the receiving beam can be identified.
- the CLI-RS receiving terminal can transmit information about the identified CLI-RS receiving beam to the CLI-RS transmitting terminal.
- the CLI-RS receiving terminal can receive CLI-RS based on information about the CLI-RS transmission beam and the identified CLI-RS reception beam.
- the CLI-RS transmitting terminal may receive information about the CLI-RS receiving beam (e.g., fixed beam) from the CLI-RS receiving terminal, and transmit at least one CLI-RS based on the received information.
- the transmission beam can be identified.
- the CLI-RS transmitting terminal can transmit information about the identified CLI-RS transmitting beam to the CLI-RS receiving terminal.
- the CLI-RS transmission terminal can transmit CLI-RS based on information about the CLI-RS reception beam and the identified CLI-RS transmission beam.
- FIG. 16 illustrates the operational flow of a terminal measuring and reporting interference based on multiple beams, according to various embodiments of the present disclosure. Specifically, referring to FIG. 16, it shows the operation flow of a CLI-RS measurement terminal or a CLI-RS transmitting terminal for determining a CLI-RS beam based on resources allocated from the base station.
- the following terminals may include a CLI-RS transmitting terminal that determines the CLI-RS transmission beam and transmits the CLI-RS, and a CLI-RS receiving terminal that determines the CLI-RS reception beam and receives the CLI-RS. .
- the terminal may be allocated resources for CLI-RS transmission and reception from the base station. Specifically, if the terminal is a CLI-RS transmitting terminal, the terminal may be allocated resources for signal transmission from the base station, or if the terminal is a CLI-RS measurement (e.g. receiving) terminal, the terminal may receive a signal from the base station. Resources can be allocated for reception. According to one embodiment, resource information allocated by the base station may include information about the CLI-RS ID mapped or grouped for each resource. According to one embodiment, resources allocated by the base station to each terminal may be mapped or grouped into one or more beams. According to one embodiment, information about the beam may be explicitly specified in the resources allocated by the base station to each terminal.
- At least one beam may be mapped or grouped in the resource for CLI-RS reception or transmission that the base station allocates to the CLI-RS measurement or transmission terminal, but is not limited thereto and may be used in various embodiments of the present disclosure. Accordingly, the base station can only indicate a CLI-RS resource ID (identifier) for the allocated resources, and the determination of at least one beam to be mapped or grouped can be performed by the terminal.
- the base station can only indicate a CLI-RS resource ID (identifier) for the allocated resources, and the determination of at least one beam to be mapped or grouped can be performed by the terminal.
- step 1615 the terminal can determine whether a beam for CLI-RS transmission is explicitly designated in the resources allocated from the base station.
- step 915 of FIG. 9 may be performed before or after step 1615.
- the terminal may identify at least one CLI-RS transmission and reception beam among a plurality of available beams based on resources for transmission and reception allocated from the base station.
- step 1615 if the CLI-RS beam is explicitly designated for a plurality of resources allocated to the terminal from the base station, the process proceeds to step 1625.
- resources allocated by the base station to each terminal may be mapped (or grouped) to one beam.
- a plurality of resources allocated by the base station to each terminal may include information (e.g., resource ID, location of the resource) about the CLI-RS beam mapped to the plurality of resources.
- the CLI-RS beam mapped to a plurality of resources allocated by the base station may include a coordinated beam. Coordinated beams are the PDSCH beam or PUSCH beam corresponding to the location of resources (e.g.
- CSI channel state information
- the base station provides the CLI-RS transmission resource ID (resource ID), information about the steering beam, or CLI-RS resource location (e.g., location within a slot, location within a symbol, resource block (RB) location, or At least one piece of information about a resource element (RE) location may be transmitted.
- the base station provides the CLI-RS measurement terminal with a CLI-RS reception resource ID, information about the steering beam, or CLI-RS resource location (e.g., location within a slot, location within a symbol, resource block (RB) location, or RE). At least one of the information about the location of the resource element can be transmitted.
- each terminal that has received a plurality of resources and steering beam information from the base station may determine a plurality of CLI-RS beams based on the received plurality of resources and steering beam information.
- the CLI-RS measuring terminal and the CLI-RS transmitting terminal may perform CLI-RS transmission and reception operations based on the determined plurality of beams.
- each terminal can transmit and receive CLI-RS through the determined CLI-RS beam.
- a transmission and reception operation may be performed to fix the CLI-RS transmission beam and sweep the CLI-RS reception beam.
- a transmission and reception operation may be performed to fix the CLI-RS reception beam and sweep the CLI-RS transmission beam.
- each terminal can transmit and receive a CLI-RS beam through various methods (e.g., transmission and reception through a random CLI-RS beam).
- the process of transmitting, receiving, and measuring CLI-RS through a plurality of CLI-RS transmission beams or CLI-RS reception beams is specifically shown in FIGS. 7, 14a, and 14b.
- step 1615 if the terminal does not explicitly include the CLI-RS beam in the resources allocated from the base station, the process proceeds to step 1635.
- resources allocated by the base station to each terminal may be mapped (or grouped) to one beam.
- each terminal when the plurality of resources allocated by the base station to each terminal do not include information about the CLI-RS beam mapped to the plurality of resources, each terminal performs its own decision (e.g., best effort).
- the CLI-RS beam can be determined.
- the terminal may determine the CLI-RS beam on its own based on the resource area allocated from the base station.
- the UE uses the PDSCH beam or PUSCH beam associated with the CLI-RS resource location, the beam used to receive the SSB, and the beam used to receive the CSI-RS.
- the CLI-RS beam may be determined based on at least one of the beams used when transmitting the SRS.
- the PDSCH beam or PUSCH beam associated with the CLI-RS resource location may include the PDSCH beam or PUSCH beam in the slot (or previous slot) of the allocated CLI-RS resource.
- the UE can arbitrarily determine the CLI-RS beam based on the allocated CLI-RS resources.
- each terminal that receives the CLI-RS resource location from the base station may determine the CLI-RS beam based on the received resource information. If the UE determines the CLI-RS beam in step 1635, the process proceeds to step 1625.
- the CLI-RS measuring terminal and the CLI-RS transmitting terminal may perform a CLI-RS transmission and reception operation based on the determined plurality of beams.
- each terminal can transmit and receive CLI-RS through the determined CLI-RS beam.
- a transmission and reception operation may be performed to fix the CLI-RS transmission beam and sweep the CLI-RS reception beam.
- a transmission and reception operation may be performed to fix the CLI-RS reception beam and sweep the CLI-RS transmission beam.
- each terminal can transmit and receive a CLI-RS beam through various methods (e.g., transmission and reception through a random CLI-RS beam).
- the process of transmitting, receiving, and measuring CLI-RS through a plurality of CLI-RS transmission beams or CLI-RS reception beams is specifically shown in FIGS. 7, 14a, and 14b.
- the CLI-RS measurement terminal may perform CLI-RS measurement for each CLI-RS beam pair based on the CLI-RS received from the CLI-RS transmitting terminal and provide CLI-RS measurement information. It can be reported to the base station.
- the UE's CLI-RS measurement information reporting operation may follow the method of step 725 of FIG. 7.
- FIGS. 17 and 18 scheduling and transmission and reception operations of a data channel based on CLI-RS measurement and reporting are shown.
- the series of processes depicted in FIGS. 17 and 18 may be specific content for a series of processes (steps 735 to 755) among the steps depicted in FIG. 7, and are described through FIGS. 17 and 18
- the process may mean an independent process, or it may mean at least one of the processes as one operation among the overall operations of FIG. 7.
- FIG. 17 illustrates a signal flow for scheduling data channel transmission and reception based on interference measurements, according to various embodiments of the present disclosure.
- the base station 1710 may determine a beam for downlink reception and a beam for uplink transmission based on the measurement result or CQI (channel quality indicator) value reported from the CLI-RS measurement terminal.
- the base station 1710 may provide co-scheduling information to the DL terminal 1720 or the UL terminal 1730 based on information about the determined beam.
- the base station 1710 may schedule PDUSCH or PUSCH to the DL terminal or UL terminal at the same time under the FD system.
- the base station 1710 co-schedules the DL terminal 1720 or the UL terminal 1730 to use the beam used by the CLI-RS transmitting terminal and the CLI-RS receiving terminal when transmitting and receiving CLI-RS. You can.
- the base station 1710 can co-schedule the DL terminal 1720 or the UL terminal 1730 using the CLI-RS index.
- the CLI-RS index used by the base station 1710 may indicate a reception beam used when receiving a PDSCH or a transmission beam used when transmitting a PUSCH.
- the present disclosure describes PDSCH and PUSCH, but is not limited thereto and may include various downlink or uplink signals.
- the DL terminal 1720 may include a CLI-RS measurement terminal or a CLI-RS transmission terminal
- the UL terminal 1730 may also include a CLI-RS measurement terminal or a CLI-RS transmission terminal. You can.
- the base station 1710 may perform scheduling for the terminal 1720 for DL reception or the terminal 1730 for UL transmission based on CLI-RS measurement information.
- the base station 1710 may perform scheduling based on a channel quality indicator (CQI) reported from at least one terminal in addition to the CLI-RS measurement information reported from the CLI-RS measurement terminal.
- CQI channel quality indicator
- the base station 1710 may instruct the terminal to use the beam used for CLI-RS measurement for DL or UL.
- the base station 1710 may determine the optimal beam pair based on the reported CLI-RS measurement information, and set or schedule the beam direction so that the terminal can transmit and receive data channels through the determined optimal beam pair. can do.
- the base station 1710 can use the CLI-RS index to indicate the transmission and reception beam used when transmitting and receiving DL/UL signals.
- the base station 1710 provides information on a CLI-RS transmission beam including a beam pair determined to minimize interference among at least one beam used by the CLI-RS transmission terminal for CSI-RS transmission.
- Scheduling for UL transmission e.g., PUSCH
- an index e.g., CLI-RS resource number
- the base station 1710 may provide an index for a CLI-RS reception beam including a beam pair determined to minimize interference among at least one beam used by a CLI-RS specific terminal to receive CSI-RS (e.g., CLI-RS reception beam).
- CSI-RS e.g., CLI-RS reception beam
- -RS resource number can be indicated to perform scheduling for DL transmission (e.g., PDSCH) to the CLI-RS measurement terminal.
- the base station 1710 can estimate the terminal-to-terminal CLI based on the reported CLI-RS measurement information and perform FD co-scheduling between terminals with low CLI values.
- the base station 1710 can estimate the CLI between beam pairs of the terminal based on the reported CLI-RS measurement information and perform FD co-scheduling for the beam pair with a low CLI value.
- the base station 1710 transmits UL to the CLI-RS measurement terminal by indicating an index for the CLI-RS reception beam.
- Scheduling can be performed for (e.g., PUSCH), and scheduling for DL reception (e.g., PDSCH) can be performed to the CLI-RS transmitting terminal by indicating an index for the CLI-RS transmission beam.
- beam indication signaling indicating the optimal beam pair may be separately performed.
- the base station and the terminal can use the reference signal to determine an appropriate transmission/reception beam pair through beam management or beam sweeping.
- the base station transmits a transmission configuration indication (TCI) containing beam indication through downlink control information (DCI) to inform the terminal that it is transmitting a downlink signal on the same beam as the configured RS. Status can be transmitted. Therefore, there may be a need to distinguish the beam indication signaling for single link communication described above from the beam indication signaling based on CLI-RS according to various embodiments of the present disclosure.
- TCI transmission configuration indication
- DCI downlink control information
- the base station 1710 may set a beam for the data channel using an additional separate bit of DCI to schedule data channel transmission and reception for each terminal using the CLI-RS index.
- the base station 1710 may set a beam for a data channel by separately setting a bandwidth part (BWP) in the process of scheduling data channel transmission and reception for each terminal without using additional separate bits.
- BWP bandwidth part
- the DL terminal 1720 which has received PDSCH scheduling from the base station 1710, enters the CLI-RS ID based on the index of the received beam for CLI-RS reception (e.g., CLI-RS resource number). Accordingly, it can be determined at what point in time it should operate with the set beam, and the determined beam can be determined as the reception beam for data channel reception.
- the UL terminal 1730 which has received PUSCH scheduling from the base station 1710, sets at some point according to the CLI-RS ID based on the index of the received beam for CLI-RS transmission (e.g., CLI-RS resource number). It can be determined whether to operate as a beam, and the determined beam can be determined as a transmission beam for data channel transmission.
- the DL terminal 1720 may be a CLI-RS transmitting terminal
- the UL terminal 1730 may be a CLI-RS measurement terminal.
- each terminal can receive not only a CLI-RS beam index but also a beam instruction indicating a beam pair through a single link, among the plurality of beam instructions. Which data channel transmission/reception beam is to be determined may be set separately by the base station.
- each terminal can transmit or receive a data channel signal using a set transmission beam or reception beam.
- the DL terminal 1720 may receive a PDSCH transmitted from the base station in a set reception beam direction, or the UL terminal 1730 may transmit a PUSCH to the base station in a set transmission beam direction.
- the DL terminal 1720 may be a CLI-RS transmitting terminal
- the UL terminal 1730 may be a CLI-RS measuring terminal. there is.
- signals transmitted and received by each terminal will be referred to as FD PUSCH or FD PDSCH, but are not limited thereto and may include various signals other than data channels (sounding reference signal (SRS), physical uplink control channel (PUCCH) ), PDCCH (physical downlink control channel), and DMRS (de-modulation reference signal)).
- SRS sounding reference signal
- PUCCH physical uplink control channel
- PDCCH physical downlink control channel
- DMRS de-modulation reference signal
- FIG. 18 illustrates the operation flow of a base station that receives interference measurement reports from a terminal in an FD system and performs scheduling, according to various embodiments of the present disclosure.
- the base station may configure CLI measurement for the CLI-RS measurement terminal and at least one CLI-RS transmitting terminal. Specifically, the base station may allocate at least one resource for CLI-RS reception or transmission to the CLI-RS measurement terminal and at least one CLI-RS transmission terminal, respectively.
- resource information allocated by the base station may include information about the CLI-RS ID (or index) mapped or grouped for each resource.
- resources allocated by the base station to each terminal may be mapped or grouped into one or more beams. Each terminal can identify the number of resources that the base station allocates to each terminal, and the related process may be similar to the operation specifically described in FIG. 9.
- information about the beam may be explicitly specified in the resources allocated by the base station to each terminal. That is, at least one beam may be mapped or grouped in resources for CLI-RS reception or transmission that the base station allocates to CLI-RS measurement or at least one CLI-RS transmission terminal, but is not limited thereto, and the present disclosure is not limited thereto.
- the base station may indicate only a CLI-RS resource ID (identifier) for the allocated resource, and determination of at least one beam to be mapped or grouped may be performed by the terminal. The above-described process may be similar to the operation specifically described in FIG. 12 or FIG. 16.
- the base station may receive a report of the measured CLI information from the CLI-RS measurement terminal.
- the CLI-RS measurement terminal may report CLI-RS measurement information to the base station using CLI-RS reporting resources allocated from the base station.
- a base station can receive CLI-RS measurement information from a CLI-RS measurement terminal by various methods.
- the method by which the base station receives CLI-RS measurement information from the CLI-RS measurement terminal may include at least one or a combination of methods 1) to 5) described in step 725 of FIG. 7.
- the CLI-RS measurement information reported by the base station includes information measured based on various methods or a combination of CLI-RS transmission, reception and measurement described in FIGS. 9 to 16. can do.
- the base station may determine a beam for DL reception and a beam for UL transmission based on CLI-RS measurement information.
- the base station may provide co-scheduling information to the terminal for DL and the terminal for UL based on the determined information about the beam for DL reception and the beam for UL reception.
- the base station may perform scheduling based on a channel quality indicator (CQI) reported from at least one terminal in addition to the CLI-RS measurement information reported from the CLI-RS measurement terminal. Specifically, the base station may instruct the terminal to use the beam used for CLI-RS measurement for DL or UL.
- CQI channel quality indicator
- the base station can determine the optimal beam pair based on the reported CLI-RS measurement information, and set or schedule the beam direction so that the terminal can transmit and receive data channels, etc. through the determined optimal beam pair. .
- the base station can use the CLI-RS index to indicate the transmission and reception beam used when transmitting and receiving DL/UL signals.
- the base station provides an index (e.g., : CLI-RS resource number) can be indicated to perform scheduling for UL transmission (e.g., PUSCH) to the CLI-RS transmitting terminal.
- the base station may provide an index for the CLI-RS reception beam including a beam pair determined to minimize interference among at least one beam used by a CLI-RS specific terminal to receive CSI-RS (e.g., CLI-RS resource number) can be indicated to perform scheduling for DL transmission (e.g., PDSCH) to the CLI-RS measurement terminal.
- the base station can estimate the terminal-to-terminal CLI based on the reported CLI-RS measurement information and perform FD co-scheduling between terminals with low CLI values.
- the base station can estimate the CLI between beam pairs of the terminal based on the reported CLI-RS measurement information and perform FD co-scheduling on the beam pair with a low CLI value.
- the base station transmits UL to the CLI-RS measurement terminal 720 by indicating an index for the CLI-RS reception beam, unlike the above-described scheduling operation. Scheduling can be performed for (e.g., PUSCH), and scheduling for DL reception (e.g., PDSCH) can be performed to the CLI-RS transmitting terminal by indicating an index for the CLI-RS transmission beam.
- Scheduling can be performed for (e.g., PUSCH), and scheduling for DL reception (e.g., PDSCH) can be performed to the CLI-RS transmitting terminal by indicating an index for the CLI-RS transmission beam.
- beam indication signaling indicating the optimal beam pair may be separately performed.
- the base station and the terminal can use the reference signal to determine an appropriate transmission/reception beam pair through beam management or beam sweeping.
- the base station transmits a transmission configuration indication (TCI) containing beam indication through downlink control information (DCI) to inform the terminal that it is transmitting a downlink signal on the same beam as the configured RS. Status can be transmitted. Therefore, there may be a need to distinguish the beam indication signaling for single link communication described above from the beam indication signaling based on CLI-RS according to various embodiments of the present disclosure.
- TCI transmission configuration indication
- DCI downlink control information
- the base station may set a beam for the data channel using an additional separate bit of DCI to schedule data channel transmission and reception for each terminal using the CLI-RS index.
- the base station may set a beam for the data channel by separately setting the BWP (bandwidthpart) in the process of scheduling data channel transmission and reception for each terminal without using additional separate bits.
- the base station may transmit or receive a data channel signal using a transmission beam or a reception beam set by each terminal based on scheduling.
- the DL terminal may receive a PDSCH transmitted from the base station in a set reception beam direction, or the UL terminal may transmit a PUSCH to the base station in a set transmission beam direction.
- signals transmitted and received by each terminal will be referred to as FD PUSCH or FD PDSCH, but are not limited thereto and may include various signals other than data channels (sounding reference signal (SRS), physical uplink control channel (PUCCH) ), PDCCH (physical downlink control channel), and DMRS (de-modulation reference signal)).
- SRS sounding reference signal
- PUCCH physical uplink control channel
- PDCCH physical downlink control channel
- DMRS de-modulation reference signal
- a method performed by a terminal supporting a full-duplex (FD) system includes receiving at least one cross linked interference-reference signal (CLI-RS) from a base station. Allocating resources for, determining at least one CLI-RS reception beam among a plurality of available beams based on the allocated resources, receiving CLI-RS based on the at least one CLI-RS reception beam. Receiving from at least one other terminal, measuring interference with the at least one other terminal based on the received CLI-RS, and transmitting measurement information generated based on the measurement result to the base station. A step of receiving joint scheduling information from the base station based on a downlink reception beam determined based on the measurement information; and a method of receiving a downlink signal from the base station through a downlink reception beam determined based on the joint scheduling information.
- CLI-RS cross linked interference-reference signal
- the method includes determining whether resources for a plurality of CLI-RS reception beams are allocated based on the allocated resources, and resources for the plurality of CLI-RS reception beams. When allocated, the step of determining the plurality of CLI-RS reception beams based on the resource may be further included.
- the method may further include receiving the CLI-RS by performing beam sweeping based on the determined plurality of CLI-RS reception beams.
- receiving the CLI-RS by performing beam sweeping includes receiving CLI-RS transmission beam information from the at least one other terminal, and identifying the plurality of CLI-RS reception beams based on the CLI-RS reception beam, transmitting information about the identified CLI-RS reception beam to the at least one other terminal, and the CLI-RS transmission beam information and the identified CLI-RS reception beam. It may further include receiving the CLI-RS through a plurality of CLI-RS reception beams.
- determining at least one CLI-RS reception beam among a plurality of available beams based on the allocated resources may include identifying a predetermined CLI-RS beam based on the allocated resources. If possible, the indicated CLI-RS beam is determined as the CLI-RS reception beam, and if a predetermined CLI-RS beam cannot be identified based on the allocated resources, it is based on the allocated resources and a specific criterion. The step of determining the CLI-RS reception beam may be further included.
- determining the indicated CLI-RS beam as the CLI-RS reception beam includes receiving information about a steering beam mapped to the allocated resource, It includes determining a CLI-RS reception beam based on information, wherein the steering beam includes a physical downlink shared channel (PDSCH) beam, a physical uplink shared channel (PUSCH) beam, and an SSB ( It may include at least one of a beam used to receive a synchronization signal block) or a beam used to receive a channel state information-reference signal (CSI-RS).
- PDSCH physical downlink shared channel
- PUSCH physical uplink shared channel
- SSB It may include at least one of a beam used to receive a synchronization signal block
- CSI-RS channel state information-reference signal
- the step of determining the CLI-RS reception beam based on the allocated resources and a specific criterion includes selecting the CLI-RS reception beam based on the PDSCH beam or PUSCH beam associated with the location of the allocated resource. It may include a decision step.
- the method includes sending at least one CLI-RS (cross) to a first terminal. linked interference-reference signal) allocating resources for reception and allocating resources for transmitting at least one CLI-RS to a second terminal, receiving a CLI-RS measurement report from the first terminal, the CLI -Based on the RS measurement report, determining a first beam for downlink reception of the first terminal and a second beam for uplink transmission of the second terminal, the determined first beam and second beam Based on the information, providing joint scheduling information for the first terminal and the second terminal to the first terminal and the second terminal, and based on the joint scheduling information, downlinking to the first terminal It may include transmitting a link signal and receiving an uplink signal from the second terminal.
- FD full-duplex
- the CLI-RS measurement report may include at least one of a full CLI report, a minimum CLI report, a CLI average report, a threshold-based CLI report, or a blacklist report.
- the joint scheduling information is used to transmit and receive signals with the first terminal or the second terminal in a half-duplex (HD) method, and the first terminal or the second terminal through higher layer signaling. 2 Can be provided to the terminal.
- HD half-duplex
- a terminal supporting a full-duplex (FD) system includes at least one transceiver and at least one functionally coupled to the at least one transceiver. Includes one processor, wherein the at least one processor is allocated resources for receiving at least one cross linked interference-reference signal (CLI-RS) from a base station, and receives a plurality of resources based on the allocated resources. Determine at least one CLI-RS reception beam among available beams, receive a CLI-RS from at least one other terminal based on the at least one CLI-RS reception beam, and receive a CLI-RS based on the received CLI-RS.
- CLI-RS cross linked interference-reference signal
- Measures interference with the at least one other terminal transmits measurement information generated based on the measurement result to the base station, and transmits a common signal from the base station based on a downlink reception beam determined based on the measurement information. It may be configured to receive scheduling information and receive a downlink signal from the base station through a downlink reception beam determined based on the joint scheduling information.
- the at least one processor determines whether resources for a plurality of CLI-RS reception beams are allocated based on the allocated resources, and determines whether resources for the plurality of CLI-RS reception beams are allocated. When resources are allocated, it may be further configured to determine the plurality of CLI-RS reception beams based on the resources.
- the at least one processor may be further configured to receive the CLI-RS by performing beam sweeping based on the determined plurality of CLI-RS reception beams.
- the at least one processor receives CLI-RS transmission beam information from the at least one other terminal, and receives the CLI-RS transmission beam information. Identifying the plurality of CLI-RS reception beams based on one transmission beam information, transmitting information about the identified CLI-RS reception beam to the at least one other terminal, and the CLI-RS transmission beam information and It may be further configured to receive the CLI-RS through the identified plurality of CLI-RS reception beams.
- the at least one processor in order to determine at least one CLI-RS reception beam among a plurality of available beams based on the allocated resources, uses a predetermined CLI -If the RS beam can be identified, the indicated CLI-RS beam is determined as the CLI-RS reception beam, and if a predetermined CLI-RS beam cannot be identified based on the allocated resource, the allocated CLI-RS beam is determined. It may be further configured to determine the CLI-RS reception beam based on resources and specific criteria.
- the at least one processor receives information about a steering beam mapped to the allocated resource, and It is configured to determine a CLI-RS reception beam based on information about the received steering beam, and the steering beam is a physical downlink shared channel (PDSCH) beam and a physical uplink shared channel (PUSCH) corresponding to the location of the allocated resource. It may include at least one of a beam, a beam used to receive a synchronization signal block (SSB), or a beam used to receive a channel state information-reference signal (CSI-RS).
- PDSCH physical downlink shared channel
- PUSCH physical uplink shared channel
- CSI-RS channel state information-reference signal
- the at least one processor determines the CLI-RS reception beam based on the PDSCH beam or PUSCH beam associated with the location of the allocated resource. Can be configured to determine the CLI-RS reception beam.
- a base station supporting a full-duplex (FD) system includes at least one transceiver and at least one functionally coupled to the at least one transceiver. Includes one processor, wherein the at least one processor allocates resources for receiving at least one cross linked interference-reference signal (CLI-RS) to a first terminal and at least one to a second terminal.
- CLI-RS cross linked interference-reference signal
- Allocate resources for CLI-RS transmission receive a CLI-RS measurement report from the first terminal, and based on the CLI-RS measurement report, create a first beam for downlink reception of the first terminal and the Determine a second beam for uplink transmission of a second terminal, and send the first terminal and the second beam to the first terminal and the second terminal based on the determined information about the first beam and the second beam. It may be configured to provide joint scheduling information for a terminal, and, based on the joint scheduling information, transmit a downlink signal to the first terminal and receive an uplink signal from the second terminal.
- the CLI-RS measurement report may include at least one of a full CLI report, a minimum CLI report, a CLI average report, a threshold-based CLI report, or a blacklist report.
- the joint scheduling information is used to transmit and receive signals with the first terminal or the second terminal in a half-duplex (HD) method, and the first terminal or the second terminal through higher layer signaling. 2 Can be provided to the terminal.
- HD half-duplex
- a computer-readable storage medium that stores one or more programs (software modules) may be provided.
- One or more programs stored in a computer-readable storage medium are configured to be executable by one or more processors in an electronic device (configured for execution).
- One or more programs include instructions that cause the electronic device to execute methods according to embodiments described in the claims or specification of the present disclosure.
- These programs may include random access memory, non-volatile memory, including flash memory, read only memory (ROM), and electrically erasable programmable ROM. (electrically erasable programmable read only memory, EEPROM), magnetic disc storage device, compact disc-ROM (CD-ROM), digital versatile discs (DVDs), or other types of disk storage. It can be stored in an optical storage device or magnetic cassette. Alternatively, it may be stored in a memory consisting of a combination of some or all of these. Additionally, multiple configuration memories may be included.
- non-volatile memory including flash memory, read only memory (ROM), and electrically erasable programmable ROM. (electrically erasable programmable read only memory, EEPROM), magnetic disc storage device, compact disc-ROM (CD-ROM), digital versatile discs (DVDs), or other types of disk storage. It can be stored in an optical storage device or magnetic cassette. Alternatively, it may be stored in a memory consisting of a combination of some or all of these. Additionally, multiple configuration memories may
- the program may be distributed through a communication network such as the Internet, an intranet, a local area network (LAN), a wide area network (WAN), or a storage area network (SAN), or a combination thereof. It may be stored on an attachable storage device that is accessible. This storage device can be connected to a device performing an embodiment of the present disclosure through an external port. Additionally, a separate storage device on a communications network may be connected to the device performing embodiments of the present disclosure.
- a communication network such as the Internet, an intranet, a local area network (LAN), a wide area network (WAN), or a storage area network (SAN), or a combination thereof. It may be stored on an attachable storage device that is accessible. This storage device can be connected to a device performing an embodiment of the present disclosure through an external port. Additionally, a separate storage device on a communications network may be connected to the device performing embodiments of the present disclosure.
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mobile Radio Communication Systems (AREA)
- Transceivers (AREA)
Abstract
Description
Claims (15)
- 무선 통신 시스템에 있어서, FD(full-duplex) 시스템을 지원하는 단말에 의해 수행되는 방법은,기지국으로부터 적어도 하나의 CLI-RS(cross linked interference-reference signal) 수신을 위한 자원을 할당 받는 단계;상기 할당 받은 자원에 기반하여 복수의 이용 가능한 빔들 중 적어도 하나의 CLI-RS 수신 빔을 결정하는 단계;상기 적어도 하나의 CLI-RS 수신 빔에 기반하여 적어도 하나의 다른 단말로부터 CLI-RS를 수신하는 단계;상기 수신한 CLI-RS에 기반하여 상기 적어도 하나의 다른 단말과의 간섭을 측정하는 단계;상기 측정한 결과에 기반하여 생성된 측정 정보를 상기 기지국에게 송신하는 단계;상기 측정 정보에 기반하여 결정된 하향링크 수신 빔에 기반하여, 상기 기지국으로부터 공동 스케줄링 정보를 수신하는 단계; 및상기 공동 스케줄링 정보에 기반하여 결정된 하향링크 수신 빔을 통해, 상기 기지국으로부터 하향링크 신호를 수신하는 방법을 포함하는 방법.
- 청구항 1에 있어서, 상기 방법은,상기 할당 받은 자원에 기반하여 복수의 CLI-RS 수신 빔들을 위한 자원을 할당 받았는지 여부를 결정하는 단계; 및상기 복수의 CLI-RS 수신 빔들을 위한 자원을 할당 받은 경우, 상기 자원에 기반하여 상기 복수의 CLI-RS 수신 빔들을 결정하는 단계를 더 포함하는 방법.
- 청구항 2에 있어서, 상기 방법은,상기 결정한 복수의 CLI-RS 수신 빔들에 기반하여 빔 스위핑(beam sweeping)을 수행하여 상기 CLI-RS를 수신하는 단계를 더 포함하는 방법.
- 청구항 3에 있어서, 빔 스위핑(beam sweeping)을 수행하여 상기 CLI-RS를 수신하는 단계는,상기 적어도 하나의 다른 단말로부터 CLI-RS 송신 빔 정보를 수신하는 단계;상기 수신한 송신 빔 정보에 기반하여 상기 복수의 CLI-RS 수신 빔들을 식별하는 단계;상기 식별한 CLI-RS 수신 빔에 대한 정보를 상기 적어도 하나의 다른 단말에게 송신하는 단계; 및상기 CLI-RS 송신 빔 정보 및 상기 식별한 복수의 CLI-RS 수신 빔들을 통해 상기 CLI-RS를 수신하는 단계를 더 포함하는 방법.
- 청구항 1에 있어서, 상기 할당 받은 자원에 기반하여 복수의 이용 가능한 빔들 중 적어도 하나의 CLI-RS 수신 빔을 결정하는 단계는,상기 할당 받은 자원에 기반하여, 소정의 CLI-RS 빔을 식별할 수 있는 경우, 지시된 CLI-RS 빔을 상기 CLI-RS 수신 빔으로 결정하고,상기 할당 받은 자원에 기반하여 소정의 CLI-RS 빔을 식별할 수 없는 경우, 상기 할당 받은 자원 및 특정 기준에 기반하여 상기 CLI-RS 수신 빔을 결정하는 단계를 더 포함하는 방법.
- 청구항 5에 있어서, 상기 지시된 CLI-RS 빔을 상기 CLI-RS 수신 빔으로 결정하는 단계는,상기 할당 받은 자원에 맵핑되는 조정 빔에 대한 정보를 수신하는 단계; 및상기 수신한 조정 빔에 대한 정보에 기반하여 CLI-RS 수신 빔을 결정하는 단계를 포함하고,상기 조정 빔은 상기 할당 받은 자원의 위치에 해당하는 PDSCH(physical downlink shared channel) 빔, PUSCH(physical uplink shared channel) 빔, SSB(synchronization signal block)를 수신할 때 사용한 빔 또는 CSI-RS(channel state information-reference signal)를 수신할 때 사용한 빔 중 적어도 하나를 포함하는 방법.
- 청구항 5에 있어서, 상기 할당 받은 자원 및 특정 기준에 기반하여 상기 CLI-RS 수신 빔을 결정하는 단계는,상기 할당 받은 자원의 위치와 연관된 PDSCH 빔 또는 PUSCH 빔에 기반하여 CLI-RS 수신 빔을 결정하는 단계를 포함하는 방법.
- 무선 통신 시스템에 있어서, FD(full-duplex) 시스템을 지원하는 기지국에 의해 수행되는 방법에 있어서, 상기 방법은,제1 단말에게 적어도 하나의 CLI-RS(cross linked interference-reference signal) 수신을 위한 자원을 할당하고, 제2 단말에게 적어도 하나의 CLI-RS 송신을 위한 자원을 할당하는 단계;상기 제1 단말로부터 CLI-RS 측정 보고를 수신하는 단계;상기 CLI-RS 측정 보고에 기반하여, 상기 제1 단말의 하향링크 수신을 위한 제1 빔 및 상기 제2 단말의 상향링크 송신을 위한 제2 빔을 결정하는 단계;상기 결정된 제1 빔 및 제2 빔에 대한 정보에 기반하여, 상기 제1 단말 및 상기 제2 단말에게 상기 제1 단말 및 상기 제2 단말에 대한 공동 스케줄링 정보를 제공하는 단계; 및상기 공동 스케줄링 정보에 기반하여, 상기 제1 단말에게 하향링크 신호를 송신하고 상기 제2 단말로부터 상향링크 신호를 수신하는 단계를 포함하는 방법.
- 청구항 8에 있어서, 상기 CLI-RS 측정 보고는,CLI 전부 보고, 최소 CLI 보고, CLI 평균 보고, 임계 값에 기반한 CLI 보고 또는 블랙리스트 보고 중 적어도 하나를 포함하는 방법.
- 청구항 8에 있어서, 상기 공동 스케줄링 정보는,상기 제1 단말 또는 상기 제2 단말과 HD(half-duplex) 방식으로 신호를 송수신하기 위하여 사용되고, 및상위 계층 시그널링을 통해 상기 제1 단말 또는 상기 제2 단말에게 제공되는 방법.
- 무선 통신 시스템에 있어서, FD(full-duplex) 시스템을 지원하는 단말은,적어도 하나의 송수신부(transceiver); 및상기 적어도 하나의 송수신부와 기능적으로 결합된 적어도 하나의 프로세서(processor)를 포함하고,상기 적어도 하나의 프로세서는,기지국으로부터 적어도 하나의 CLI-RS(cross linked interference-reference signal) 수신을 위한 자원을 할당 받고,상기 할당 받은 자원에 기반하여 복수의 이용 가능한 빔들 중 적어도 하나의 CLI-RS 수신 빔을 결정하고,상기 적어도 하나의 CLI-RS 수신 빔에 기반하여 적어도 하나의 다른 단말로부터 CLI-RS를 수신하고,상기 수신한 CLI-RS에 기반하여 상기 적어도 하나의 다른 단말과의 간섭을 측정하고,상기 측정한 결과에 기반하여 생성된 측정 정보를 상기 기지국에게 송신하고,상기 측정 정보에 기반하여 결정된 하향링크 수신 빔에 기반하여, 상기 기지국으로부터 공동 스케줄링 정보를 수신하고, 및상기 공동 스케줄링 정보에 기반하여 결정된 하향링크 수신 빔을 통해, 상기 기지국으로부터 하향링크 신호를 수신하도록 구성되는 장치.
- 청구항 11에 있어서, 상기 적어도 하나의 프로세서는,상기 할당 받은 자원에 기반하여 복수의 CLI-RS 수신 빔들을 위한 자원을 할당 받았는지 여부를 결정하고, 및상기 복수의 CLI-RS 수신 빔들을 위한 자원을 할당 받은 경우, 상기 자원에 기반하여 상기 복수의 CLI-RS 수신 빔들을 결정하도록 더 구성되는 장치.
- 청구항 12에 있어서, 상기 적어도 하나의 프로세서는,상기 결정한 복수의 CLI-RS 수신 빔들에 기반하여 빔 스위핑(beam sweeping)을 수행하여 상기 CLI-RS를 수신하도록 더 구성되는 장치.
- 청구항 13에 있어서, 빔 스위핑(beam sweeping)을 수행하여 상기 CLI-RS를 수신하기 위해, 상기 적어도 하나의 프로세서는,상기 적어도 하나의 다른 단말로부터 CLI-RS 송신 빔 정보를 수신하고,상기 수신한 송신 빔 정보에 기반하여 상기 복수의 CLI-RS 수신 빔들을 식별하고,상기 식별한 CLI-RS 수신 빔에 대한 정보를 상기 적어도 하나의 다른 단말에게 송신하고, 및상기 CLI-RS 송신 빔 정보 및 상기 식별한 복수의 CLI-RS 수신 빔들을 통해 상기 CLI-RS를 수신하도록 더 구성되는 장치.
- 청구항 11에 있어서, 상기 할당 받은 자원에 기반하여 복수의 이용 가능한 빔들 중 적어도 하나의 CLI-RS 수신 빔을 결정하기 위해, 상기 적어도 하나의 프로세서는,상기 할당 받은 자원에 기반하여, 소정의 CLI-RS 빔을 식별할 수 있는 경우, 지시된 CLI-RS 빔을 상기 CLI-RS 수신 빔으로 결정하고,상기 할당 받은 자원에 기반하여 소정의 CLI-RS 빔을 식별할 수 없는 경우, 상기 할당 받은 자원 및 특정 기준에 기반하여 상기 CLI-RS 수신 빔을 결정하도록 더 구성되는 장치.
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US18/877,914 US20250379714A1 (en) | 2022-06-23 | 2023-06-20 | Method and device for measuring interference between terminals in full-duplex communication system |
| EP23827492.2A EP4529037A4 (en) | 2022-06-23 | 2023-06-20 | METHOD AND DEVICE FOR MEASURING INTERFERENCE BETWEEN TERMINALS IN A FULL DUPLEX COMMUNICATION SYSTEM |
| CN202380047662.1A CN119384800A (zh) | 2022-06-23 | 2023-06-20 | 用于在全双工通信系统中测量终端之间的干扰的方法和设备 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR10-2022-0076912 | 2022-06-23 | ||
| KR1020220076912A KR20240000211A (ko) | 2022-06-23 | 2022-06-23 | 전이중(full-duplex) 통신 시스템에 있어서, 단말 간 간섭 측정을 위한 방법 및 장치 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2023249380A1 true WO2023249380A1 (ko) | 2023-12-28 |
Family
ID=89380264
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/KR2023/008546 Ceased WO2023249380A1 (ko) | 2022-06-23 | 2023-06-20 | 전이중(full-duplex) 통신 시스템에 있어서, 단말 간 간섭 측정을 위한 방법 및 장치 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20250379714A1 (ko) |
| EP (1) | EP4529037A4 (ko) |
| KR (1) | KR20240000211A (ko) |
| CN (1) | CN119384800A (ko) |
| WO (1) | WO2023249380A1 (ko) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20240147277A1 (en) * | 2022-10-28 | 2024-05-02 | Qualcomm Incorporated | Cross-link interference (cli) measurement in subband full-duplex (sbfd) operation |
| US20250055583A1 (en) * | 2023-08-13 | 2025-02-13 | Qualcomm Incorporated | Cross-link interference reference signal resource pool |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2021248397A1 (en) * | 2020-06-11 | 2021-12-16 | Qualcomm Incorporated | Cross-link interference measurement over multiple beams |
| WO2022047732A1 (en) * | 2020-09-04 | 2022-03-10 | Qualcomm Incorporated | Cli measurement enabled with aoa estimation |
| US20220095144A1 (en) * | 2019-01-11 | 2022-03-24 | Qualcomm Incorporated | Measurement and reporting for ue-to-ue interference |
| US20220159662A1 (en) * | 2019-03-22 | 2022-05-19 | Apple Inc. | Cross-link interference (cli) radio resource management (rrm) measurement |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US11271699B1 (en) * | 2017-11-09 | 2022-03-08 | Verana Networks, Inc. | Wireless mesh network |
| WO2020237661A1 (en) * | 2019-05-31 | 2020-12-03 | Qualcomm Incorporated | Downlink beam management enhancement for full duplex |
-
2022
- 2022-06-23 KR KR1020220076912A patent/KR20240000211A/ko active Pending
-
2023
- 2023-06-20 WO PCT/KR2023/008546 patent/WO2023249380A1/ko not_active Ceased
- 2023-06-20 EP EP23827492.2A patent/EP4529037A4/en active Pending
- 2023-06-20 US US18/877,914 patent/US20250379714A1/en active Pending
- 2023-06-20 CN CN202380047662.1A patent/CN119384800A/zh active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20220095144A1 (en) * | 2019-01-11 | 2022-03-24 | Qualcomm Incorporated | Measurement and reporting for ue-to-ue interference |
| US20220159662A1 (en) * | 2019-03-22 | 2022-05-19 | Apple Inc. | Cross-link interference (cli) radio resource management (rrm) measurement |
| WO2021248397A1 (en) * | 2020-06-11 | 2021-12-16 | Qualcomm Incorporated | Cross-link interference measurement over multiple beams |
| WO2022047732A1 (en) * | 2020-09-04 | 2022-03-10 | Qualcomm Incorporated | Cli measurement enabled with aoa estimation |
Non-Patent Citations (2)
| Title |
|---|
| QUALCOMM INCORPORATED: "Feasibility and techniques for Subband non-overlapping full duplex", 3GPP DRAFT; R1-2205031, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. e-Meeting; 20220509 - 20220520, 29 April 2022 (2022-04-29), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP052191697 * |
| See also references of EP4529037A4 * |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20240147277A1 (en) * | 2022-10-28 | 2024-05-02 | Qualcomm Incorporated | Cross-link interference (cli) measurement in subband full-duplex (sbfd) operation |
| US12425911B2 (en) * | 2022-10-28 | 2025-09-23 | Qualcomm Incorporated | Cross-link interference (CLI) measurement in subband full-duplex (SBFD) operation |
| US20250055583A1 (en) * | 2023-08-13 | 2025-02-13 | Qualcomm Incorporated | Cross-link interference reference signal resource pool |
Also Published As
| Publication number | Publication date |
|---|---|
| US20250379714A1 (en) | 2025-12-11 |
| KR20240000211A (ko) | 2024-01-02 |
| CN119384800A (zh) | 2025-01-28 |
| EP4529037A1 (en) | 2025-03-26 |
| EP4529037A4 (en) | 2025-10-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2021049907A1 (en) | Random access response and contention resolution | |
| WO2018084616A1 (en) | Apparatus and method for beam management in wireless communication system | |
| WO2022055329A1 (en) | Method and apparatus for timing adjustment in a wireless communication system | |
| WO2018062925A1 (en) | Method and device for performing a random access in wireless communication system | |
| WO2022014833A1 (ko) | 무선 통신 시스템에서 주파수 자원 할당 방법 및 장치 | |
| WO2017213461A1 (en) | Method and apparatus for measurement reference signal and synchronization | |
| WO2019083260A1 (ko) | 무선 통신 시스템에서 상향링크 기준신호 또는 채널의 송수신 방법 및 장치 | |
| WO2022071781A1 (en) | Frequency adjustment in wireless transmission and reception | |
| WO2018021865A1 (ko) | 무선 통신 시스템에서 단말의 채널 상태 정보 보고 방법 및 이를 지원하는 장치 | |
| WO2021107609A1 (en) | Method and apparatus for sharing frequency resource dynamically in wireless communication system | |
| WO2018062737A1 (en) | Apparatus and method for supporting mixed numerology in wireless communication system | |
| WO2018128524A1 (en) | Method and apparatus for selecting random access channel in wireless communication systems | |
| EP3847776A1 (en) | An apparatus and a method for determining activation state of secondary cell and user equipment in wireless communication system | |
| WO2023128080A1 (ko) | 무선 통신 시스템에서 간섭 신호 측정을 제어하는 방법 및 장치 | |
| WO2020036433A1 (ko) | 무선 통신 시스템에서의 빔 정보 설정 및 지시 방법 및 장치 | |
| WO2023249380A1 (ko) | 전이중(full-duplex) 통신 시스템에 있어서, 단말 간 간섭 측정을 위한 방법 및 장치 | |
| WO2023059031A1 (ko) | 무선 통신 시스템에서 프론트홀 전송을 위한 장치 및 방법 | |
| WO2022203324A1 (ko) | 무선 통신 시스템에서 간섭 측정 방법 및 장치 | |
| WO2024101742A1 (en) | Method and apparatus for reporting csi in a wireless communication system | |
| WO2023249356A1 (ko) | 무선 통신 시스템에서 프론트홀 전송을 위한 장치 및 방법 | |
| WO2018084588A1 (en) | Method and apparatus for reporting channel state information | |
| WO2018143778A1 (en) | Method and apparatus for controlling power in a wireless communication system | |
| WO2025023713A1 (ko) | Ptrs의 송수신을 위한 방법 및 장치 | |
| WO2023055168A1 (ko) | 무선 통신 시스템에서 iab 노드의 빔 운영을 위한 장치 및 방법 | |
| WO2022211440A1 (ko) | 무선 통신 시스템에서 우선순위에 기초하여 사이드링크 릴레이 탐색 메시지를 전송하는 방법 및 장치 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 23827492 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2023827492 Country of ref document: EP Ref document number: 202380047662.1 Country of ref document: CN |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 202417100981 Country of ref document: IN |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 18877914 Country of ref document: US |
|
| ENP | Entry into the national phase |
Ref document number: 2023827492 Country of ref document: EP Effective date: 20241217 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWP | Wipo information: published in national office |
Ref document number: 202380047662.1 Country of ref document: CN |
|
| WWP | Wipo information: published in national office |
Ref document number: 18877914 Country of ref document: US |