WO2024228532A1 - Scheduling and beam design in jpta - Google Patents
Scheduling and beam design in jpta Download PDFInfo
- Publication number
- WO2024228532A1 WO2024228532A1 PCT/KR2024/005831 KR2024005831W WO2024228532A1 WO 2024228532 A1 WO2024228532 A1 WO 2024228532A1 KR 2024005831 W KR2024005831 W KR 2024005831W WO 2024228532 A1 WO2024228532 A1 WO 2024228532A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- rbs
- jpta
- beams
- ues
- map
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0686—Hybrid systems, i.e. switching and simultaneous transmission
- H04B7/0695—Hybrid systems, i.e. switching and simultaneous transmission using beam selection
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0613—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission
- H04B7/0615—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal
- H04B7/0617—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal for beam forming
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0613—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission
- H04B7/0615—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal
- H04B7/0619—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal using feedback from receiving side
- H04B7/0636—Feedback format
- H04B7/0639—Using selective indices, e.g. of a codebook, e.g. pre-distortion matrix index [PMI] or for beam selection
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0001—Arrangements for dividing the transmission path
- H04L5/0014—Three-dimensional division
- H04L5/0023—Time-frequency-space
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/046—Wireless resource allocation based on the type of the allocated resource the resource being in the space domain, e.g. beams
Definitions
- the present disclosure relates generally to wireless communication systems and, more specifically, the present disclosure relates to scheduling and beam design in joint phase-time arrays (JPTAs).
- JPTAs joint phase-time arrays
- 5G 5th-generation
- connected things may include vehicles, robots, drones, home appliances, displays, smart sensors connected to various infrastructures, construction machines, and factory equipment.
- Mobile devices are expected to evolve in various form-factors, such as augmented reality glasses, virtual reality headsets, and hologram devices.
- 6G communication systems are referred to as beyond-5G systems.
- 6G communication systems which are expected to be commercialized around 2030, will have a peak data rate of tera (1,000 giga)-level bps and a radio latency less than 100 ⁇ sec, and thus will be 50 times as fast as 5G communication systems and have the 1/10 radio latency thereof.
- a full-duplex technology for enabling an uplink transmission and a downlink transmission to simultaneously use the same frequency resource at the same time
- a network technology for utilizing satellites, high-altitude platform stations (HAPS), and the like in an integrated manner
- HAPS high-altitude platform stations
- an improved network structure for supporting mobile base stations and the like and enabling network operation optimization and automation and the like
- a dynamic spectrum sharing technology via collison avoidance based on a prediction of spectrum usage an use of artificial intelligence (AI) in wireless communication for improvement of overall network operation by utilizing AI from a designing phase for developing 6G and internalizing end-to-end AI support functions
- a next-generation distributed computing technology for overcoming the limit of UE computing ability through reachable super-high-performance communication and computing resources (such as mobile edge computing (MEC), clouds, and the like) over the network.
- MEC mobile edge computing
- 6G communication systems in hyper-connectivity, including person to machine (P2M) as well as machine to machine (M2M), will allow the next hyper-connected experience.
- services such as truly immersive extended reality (XR), high-fidelity mobile hologram, and digital replica could be provided through 6G communication systems.
- services such as remote surgery for security and reliability enhancement, industrial automation, and emergency response will be provided through the 6G communication system such that the technologies could be applied in various fields such as industry, medical care, automobiles, and home appliances.
- the present disclosure relates to scheduling and beam design in JPTAs.
- a base station includes a processor configured to identify a set of user equipments (UEs) to schedule, a plurality of resource blocks (RBs), and a UE beam map.
- the UE beam map maps one or more beams from a plurality of beams to one or more UEs in the set of UEs.
- the processor is further configured to allocate, for a UE in the set of UEs, one or more RBs from the plurality of RBs based the UE beam map and a beam gain on the one or more RBs in a direction of the UE.
- the processor is further configured to determine a joint phase time array (JPTA) beam for the UE.
- the BS further includes a transceiver operably coupled to the processor. The transceiver is configured to transmit scheduling information indicating the allocated one or more RBs and the determined one or more JPTA beams.
- a method for operating a BS includes identifying a set of UEs to schedule, a plurality of RBs, and a UE beam map.
- the UE beam map maps one or more beams from a plurality of beams to one or more UEs in the set of UEs.
- the method further includes allocating, for a UE in the set of UEs, one or more RBs from the plurality of RBs based the UE beam map and a beam gain on the one or more RBs in a direction of the UE.
- the method further includes determining a JPTA beam for the UE.
- the method further includes transmitting scheduling information indicating the allocated one or more RBs and the determined one or more JPTA beams.
- a non-transitory computer readable medium includes program code that, when executed by a processor of a BS, causes the BS to identify a set of UEs to schedule, a plurality of RBs, and a UE beam map.
- the UE beam map maps one or more beams from a plurality of beams to one or more UEs in the set of UEs.
- the non-transitory computer readable medium further includes program code that, when executed by a processor of a BS, causes the BS to: allocate, for a UE in the set of UEs, one or more RBs from the plurality of RBs based the UE beam map and a beam gain on the one or more RBs in a direction of the UE; determine a JPTA beam for the UE; and transmit scheduling information indicating the allocated one or more RBs and the determined one or more JPTA beams.
- Couple and its derivatives refer to any direct or indirect communication between two or more elements, whether or not those elements are in physical contact with one another.
- transmit and “communicate,” as well as derivatives thereof, encompass both direct and indirect communication.
- the term “or” is inclusive, meaning and/or.
- controller means any device, system, or part thereof that controls at least one operation. Such a controller may be implemented in hardware or a combination of hardware and software and/or firmware. The functionality associated with any particular controller may be centralized or distributed, whether locally or remotely.
- phrases "at least one of,” when used with a list of items, means that different combinations of one or more of the listed items may be used, and only one item in the list may be needed.
- “at least one of: A, B, and C” includes any of the following combinations: A, B, C, A and B, A and C, B and C, and A and B and C.
- the present disclosure provides a method and apparatus relates to scheduling and beam design in JPTAs.
- FIG. 1 illustrates an example wireless network according to embodiments of the present disclosure
- FIG. 2 illustrates an example BS according to embodiments of the present disclosure
- FIG. 3 illustrates an example of a UE according to embodiments of the present disclosure
- FIG. 4 illustrates an example of a transmitter structure for beamforming according to embodiments of the present disclosure
- FIG. 5 illustrates an example of a JPTA beamforming according to embodiments of the present disclosure
- FIG. 6 illustrates an example of a BS JPTA architecture with one radio frequency (RF) chain and single phase-shifter per antenna element according to embodiments of the present disclosure
- FIG. 7 illustrates a flow diagram of a JPTA scheduler interfacing between the medium access control (MAC) and physical (PHY) layers according to embodiments of the present disclosure
- FIG. 8 illustrates a flow diagram of a JPTA scheduler according to embodiments of the present disclosure
- FIG. 9 illustrates a flow diagram of a JPTA scheduler according to embodiments of the present disclosure.
- FIG. 10 illustrates a flow diagram of a JPTA scheduler according to embodiments of the present disclosure
- FIG. 11 illustrates a flow diagram of a JPTA scheduler according to embodiments of the present disclosure
- FIG. 12 illustrates a flow diagram of a JPTA scheduler according to embodiments of the present disclosure.
- FIG. 13 illustrates an example method performed by a BS in a wireless communication system according to embodiments of the present disclosure.
- FIGS. 1-13 discussed below, and the various, non-limiting embodiments used to describe the principles of the present disclosure in this patent document are by way of illustration only and should not be construed in any way to limit the scope of the disclosure. Those skilled in the art will understand that the principles of the present disclosure may be implemented in any suitably arranged system or device.
- the 5G or pre-5G communication system is also called a “beyond 4G network" or a "post LTE system.”
- the 5G communication system is implemented in higher frequency (mmWave) bands, e.g., 60GHz bands, to accomplish higher data rates.
- mmWave e.g., 60GHz bands
- MIMO massive multiple-input multiple-output
- FD-MIMO full dimensional MIMO
- array antenna an analog beam forming, large scale antenna techniques and the like are discussed in 5G communication systems.
- RANs cloud radio access networks
- D2D device-to-device
- wireless backhaul communication moving network
- cooperative communication coordinated multi-points (CoMP) transmission and reception, interference mitigation and cancelation and the like.
- CoMP coordinated multi-points
- 5G systems and frequency bands associated therewith are for reference as certain embodiments of the present disclosure may be implemented in 5G systems.
- the present disclosure is not limited to 5G systems, or the frequency bands associated therewith, and non-limiting embodiments of the present disclosure may be utilized in connection with any frequency band.
- aspects of the present disclosure may also be applied to the deployment of 5G communication systems, 6G or even later releases which may use terahertz (THz) bands.
- THz terahertz
- FIGS. 1-3 describe various embodiments implemented in wireless communications systems and with the use of orthogonal frequency division multiplexing (OFDM) or orthogonal frequency division multiple access (OFDMA) communication techniques.
- OFDM orthogonal frequency division multiplexing
- OFDMA orthogonal frequency division multiple access
- FIG. 1 illustrates an example wireless network according to embodiments of the present disclosure.
- the embodiment of the wireless network 100 shown in FIG. 1 is for illustration only. Other embodiments of the wireless network 100 could be used without departing from the scope of this disclosure.
- the wireless network 100 includes a gNB 101 (e.g., base station, BS), a gNB 102, and a gNB 103.
- the gNB 101 communicates with the gNB 102 and the gNB 103.
- the gNB 101 also communicates with at least one network 130, such as the Internet, a proprietary Internet Protocol (IP) network, or another data network.
- IP Internet Protocol
- the gNB 102 provides wireless broadband access to the network 130 for a first plurality of user equipments (UEs) within a coverage area 120 of the gNB 102.
- the first plurality of UEs includes a UE 111, which may be located in a small business; a UE 112, which may be located in an enterprise; a UE 113, which may be a WiFi hotspot; a UE 114, which may be located in a first residence; a UE 115, which may be located in a second residence; and a UE 116, which may be a mobile device, such as a cell phone, a wireless laptop, a wireless PDA, or the like.
- the gNB 103 provides wireless broadband access to the network 130 for a second plurality of UEs within a coverage area 125 of the gNB 103.
- the second plurality of UEs includes the UE 115 and the UE 116.
- one or more of the gNBs 101-103 may communicate with each other and with the UEs 111-116 using 5G/NR, long term evolution (LTE), long term evolution-advanced (LTE-A), WiMAX, WiFi, or other wireless communication techniques.
- LTE long term evolution
- LTE-A long term evolution-advanced
- WiMAX Wireless Fidelity
- the term “base station” or “BS” can refer to any component (or collection of components) configured to provide wireless access to a network, such as transmit point (TP), transmit-receive point (TRP), an enhanced base station (eNodeB or eNB), a 5G/NR base station (gNB), a macrocell, a femtocell, a WiFi access point (AP), or other wirelessly enabled devices.
- TP transmit point
- TRP transmit-receive point
- eNodeB or eNB enhanced base station
- gNB 5G/NR base station
- macrocell a macrocell
- femtocell a femtocell
- WiFi access point AP
- Base stations may provide wireless access in accordance with one or more wireless communication protocols, e.g., 5G/NR 3 rd generation partnership project (3GPP) NR, long term evolution (LTE), LTE advanced (LTE-A), high speed packet access (HSPA), Wi-Fi 802.11a/b/g/n/ac, etc.
- 3GPP 3 rd generation partnership project
- LTE long term evolution
- LTE-A LTE advanced
- HSPA high speed packet access
- Wi-Fi 802.11a/b/g/n/ac Wi-Fi 802.11a/b/g/n/ac
- the term “user equipment” or “UE” can refer to any component such as “mobile station,” “subscriber station,” “remote terminal,” “wireless terminal,” “receive point,” or “user device.”
- the terms “user equipment” and “UE” are used in this patent document to refer to remote wireless equipment that wirelessly accesses a BS, whether the UE is a mobile device (such as a mobile telephone or smartphone) or is normally considered a stationary device (such as a desktop computer or vending machine).
- Dotted lines show the approximate extents of the coverage areas 120 and 125, which are shown as approximately circular for the purposes of illustration and explanation only. It should be clearly understood that the coverage areas associated with gNBs, such as the coverage areas 120 and 125, may have other shapes, including irregular shapes, depending upon the configuration of the gNBs and variations in the radio environment associated with natural and man-made obstructions.
- one or more of the UEs 111-116 include circuitry, programing, or a combination thereof for utilizing scheduling and beam design in JPTAs.
- one or more of the gNBs 101-103 include circuitry, programing, or a combination thereof for supporting scheduling and beam design in JPTAs.
- FIG. 1 illustrates one example of a wireless network
- the wireless network 100 could include any number of gNBs and any number of UEs in any suitable arrangement.
- the gNB 101 could communicate directly with any number of UEs and provide those UEs with wireless broadband access to the network 130.
- each gNB 102-103 could communicate directly with the network 130 and provide UEs with direct wireless broadband access to the network 130.
- the gNBs 101, 102, and/or 103 could provide access to other or additional external networks, such as external telephone networks or other types of data networks.
- FIG. 2 illustrates an example gNB 102 according to embodiments of the present disclosure.
- the embodiment of the gNB 102 illustrated in FIG. 2 is for illustration only, and the gNBs 101 and 103 of FIG. 1 could have the same or similar configuration.
- gNBs come in a wide variety of configurations, and FIG. 2 does not limit the scope of this disclosure to any particular implementation of a gNB.
- the gNB 102 includes multiple antennas 205a-205n, multiple transceivers 210a-210n, a controller/processor 225, a memory 230, and a backhaul or network interface 235.
- the transceivers 210a-210n receive, from the antennas 205a-205n, incoming RF signals, such as signals transmitted by UEs in the network 100.
- the transceivers 210a-210n down-convert the incoming RF signals to generate IF or baseband signals.
- the IF or baseband signals are processed by receive (RX) processing circuitry in the transceivers 210a-210n and/or controller/processor 225, which generates processed baseband signals by filtering, decoding, and/or digitizing the baseband or IF signals.
- the controller/processor 225 may further process the baseband signals.
- Transmit (TX) processing circuitry in the transceivers 210a-210n and/or controller/processor 225 receives analog or digital data (such as voice data, web data, e-mail, or interactive video game data) from the controller/processor 225.
- the TX processing circuitry encodes, multiplexes, and/or digitizes the outgoing baseband data to generate processed baseband or IF signals.
- the transceivers 210a-210n up-converts the baseband or IF signals to RF signals that are transmitted via the antennas 205a-205n.
- the controller/processor 225 can include one or more processors or other processing devices that control the overall operation of the gNB 102.
- the controller/processor 225 could control the transmission of DL channel signals by the transceivers 210a-210n in accordance with well-known principles.
- the controller/processor 225 could support additional functions as well, such as more advanced wireless communication functions.
- the controller/processor 225 could support beam forming or directional routing operations in which outgoing/incoming signals from/to multiple antennas 205a-205n are weighted differently to effectively steer the outgoing signals in a desired direction.
- the controller/processor 225 could support methods for scheduling and beam design in JPTAs as described in greater detail below. Any of a wide variety of other functions could be supported in the gNB 102 by the controller/processor 225.
- the controller/processor 225 is also capable of executing programs and other processes resident in the memory 230, such as processes to support scheduling and beam design in JPTAs as described in greater detail below.
- the controller/processor 225 can move data into or out of the memory 230 as required by an executing process.
- the controller/processor 225 is also coupled to the backhaul or network interface 235.
- the backhaul or network interface 235 allows the gNB 102 to communicate with other devices or systems over a backhaul connection or over a network.
- the interface 235 could support communications over any suitable wired or wireless connection(s).
- the gNB 102 is implemented as part of a cellular communication system (such as one supporting 5G/NR, LTE, or LTE-A)
- the interface 235 could allow the gNB 102 to communicate with other gNBs over a wired or wireless backhaul connection.
- the interface 235 could allow the gNB 102 to communicate over a wired or wireless local area network or over a wired or wireless connection to a larger network (such as the Internet).
- the interface 235 includes any suitable structure supporting communications over a wired or wireless connection, such as an Ethernet or transceiver.
- the memory 230 is coupled to the controller/processor 225. Part of the memory 230 could include a RAM, and another part of the memory 230 could include a Flash memory or other ROM.
- FIG. 2 illustrates one example of gNB 102
- the gNB 102 could include any number of each component shown in FIG. 2.
- various components in FIG. 2 could be combined, further subdivided, or omitted and additional components could be added according to particular needs.
- FIG. 3 illustrates an example UE 116 according to embodiments of the present disclosure.
- the embodiment of the UE 116 illustrated in FIG. 3 is for illustration only, and the UEs 111-115 of FIG. 1 could have the same or similar configuration.
- UEs come in a wide variety of configurations, and FIG. 3 does not limit the scope of this disclosure to any particular implementation of a UE.
- the UE 116 includes antenna(s) 305, a transceiver(s) 310, and a microphone 320.
- the UE 116 also includes a speaker 330, a processor 340, an input/output (I/O) interface (IF) 345, an input 350, a display 355, and a memory 360.
- the memory 360 includes an operating system (OS) 361 and one or more applications 362.
- the transceiver(s) 310 receives, from the antenna(s) 305, an incoming RF signal transmitted by a gNB of the network 100.
- the transceiver(s) 310 down-converts the incoming RF signal to generate an intermediate frequency (IF) or baseband signal.
- IF or baseband signal is processed by RX processing circuitry in the transceiver(s) 310 and/or processor 340, which generates a processed baseband signal by filtering, decoding, and/or digitizing the baseband or IF signal.
- the RX processing circuitry sends the processed baseband signal to the speaker 330 (such as for voice data) or is processed by the processor 340 (such as for web browsing data).
- TX processing circuitry in the transceiver(s) 310 and/or processor 340 receives analog or digital voice data from the microphone 320 or other outgoing baseband data (such as web data, e-mail, or interactive video game data) from the processor 340.
- the TX processing circuitry encodes, multiplexes, and/or digitizes the outgoing baseband data to generate a processed baseband or IF signal.
- the transceiver(s) 310 up-converts the baseband or IF signal to an RF signal that is transmitted via the antenna(s) 305.
- the processor 340 can include one or more processors or other processing devices and execute the OS 361 stored in the memory 360 in order to control the overall operation of the UE 116.
- the processor 340 could control the reception of DL channel signals by the transceiver(s) 310 in accordance with well-known principles.
- the processor 340 includes at least one microprocessor or microcontroller.
- the processor 340 is also capable of executing other processes and programs resident in the memory 360.
- the processor 340 may execute processes for using scheduling and beam design in JPTAs.
- the processor 340 can move data into or out of the memory 360 as required by an executing process.
- the UE 116 uses JPTA beamforming for DL receptions from eNB 102 and/or 103 for mobility robustness.
- the processor 340 is configured to execute the applications 362 based on the OS 361 or in response to signals received from gNBs or an operator.
- the processor 340 is also coupled to the I/O interface 345, which provides the UE 116 with the ability to connect to other devices, such as laptop computers and handheld computers.
- the I/O interface 345 is the communication path between these accessories and the processor 340.
- the processor 340 is also coupled to the input 350 and the display 355.
- the operator of the UE 116 can use the input 350 to enter data into the UE 116.
- the display 355 may be a liquid crystal display, light emitting diode display, or other display capable of rendering text and/or at least limited graphics, such as from web sites.
- the memory 360 is coupled to the processor 340.
- Part of the memory 360 could include a random-access memory (RAM), and another part of the memory 360 could include a Flash memory or other read-only memory (ROM).
- RAM random-access memory
- ROM read-only memory
- FIG. 3 illustrates one example of UE 116
- various changes may be made to FIG. 3.
- the processor 340 could be divided into multiple processors, such as one or more central processing units (CPUs) and one or more graphics processing units (GPUs).
- the transceiver(s) 310 may include any number of transceivers and signal processing chains and may be connected to any number of antennas.
- FIG. 3 illustrates the UE 116 configured as a mobile telephone or smartphone, UEs could be configured to operate as other types of mobile or stationary devices.
- FIG. 4 illustrates an example of a transmitter structure 400 for beamforming according to various embodiments of the present disclosure.
- the non-limiting embodiment of the transmitter structure 400 illustrated in FIG. 4 is for illustration only. FIG. 4 does not limit the scope of this disclosure to any particular implementation of the transmitter structure 400.
- one or more of gNB 102 or UE 116 include the transmitter structure 400.
- one or more of antenna 205 and its associated systems or antenna 305 and its associated systems can be included in transmitter structure 400.
- the transmitter structure 400 includes analog phase shifters 405, an analog beamformer (BF) 410, a hybrid BF 415, a digital BF 420, and one or more antenna arrays 425.
- one antenna port is mapped onto many antenna elements in antenna arrays 425, which can be controlled by the bank of analog phase shifters 405.
- One antenna port can then correspond to one sub-array which produces a narrow analog beam through analog beamforming by analogy BF 410.
- the analog beam can be configured to sweep 430 across a wider range of angles by varying the phase shifter bank 405 across symbols or subframes.
- Analog beamforming relies on analog hardware such as phase-shifters and switches to create the beam shapes. However, these analog hardware components create a frequency-flat response. All components of the input signal frequency undergo a similar transformation after passing through them. This reduces the flexibility of the beamforming.
- Embodiments of the present disclosure recognize that, due to the rising demand for traffic, wireless systems are moving towards higher frequency of operation, such as millimeter-wave (mm-wave) and terahertz (THz) frequencies, where abundant spectrum is available.
- mm-wave millimeter-wave
- THz terahertz
- the higher frequencies also suffer from a high channel propagation loss, and therefore require a large antenna array to create sufficient beamforming gain to ensure sufficient link budget for operation.
- these high frequency systems are usually built with a large antenna array at the transmitter and/or the receiver containing many individual antenna elements.
- ADCs analog-to-digital converters
- DACs digital-to-analog converters
- each antenna element is fed by a dedicated radio-frequency (RF) chain
- RF radio-frequency
- an analog beamforming or hybrid beamforming architecture is adopted where the large antenna array is fed with a much smaller number of RF chains via the use of analog hardware such as phase-shifters. This reduces the number of mixed-signal components which significantly reduces the cost, size, and power consumption of the transceivers.
- phase-shifters When transmitting a signal at the transmitter, a combination of digital beamforming before DAC and analog beamforming using the phase-shifters is used to create the overall beam shape in the desired direction.
- a combination of analog beamforming using phase-shifters and digital beamforming after ADC is used to create the overall beam shape in the desired direction.
- frequency-dependent hybrid beamforming which is referred to as JPTA beamforming.
- frequency-dependent beamforming refers to a technique where different components of the input signal may encounter a differently shaped analog beam based on their frequency.
- FIG. 5 illustrates an example of a JPTA beamforming 500 according to various embodiments of the present disclosure.
- the JPTA beamforming 500 provides an example of the frequency varying linearly over the system bandwidth and the angular direction sweeping linearly over a certain region according to embodiments of the present disclosure.
- the JPTA beamforming 500 may be performed in network 130 by BS 102.
- the JPTA beamforming 500 is for illustration only and other embodiments can be used without departing from the scope of the present disclosure.
- the maximum gain region of the beam sweeps over an angle range as the signal frequency varies.
- the desired beam creates the maximum possible array-gain in one angular direction .
- the angular direction also sweeps linearly over a certain angular region , as shown in FIG 5.
- FIG. 6 illustrates an example of a BS JPTA architecture 600 with one RF chain and single phase-shifter per antenna element according to various embodiments of the present disclosure.
- the BS JPTA architecture 600 may be implemented in BS 102 and, more particularly, in one or more of the transceivers 210.
- the BS JPTA architecture 600 is for illustration only and other embodiments can be used without departing from the scope of the present disclosure.
- the antenna spacing is half-wavelength at the center frequency f 0 .
- Each of the M antennas 605 has a dedicated phase-shifter, and they are connected to the single RF chain 601 via a network of N ⁇ M TTDs as shown in FIG. 6.
- P 603 is a fixed M ⁇ N mapping matrix, where each row m has one non-zero entry and determines which of the N TTDs antenna m is connected to.
- the TTDs are assumed to be configurable, with a delay variation range 602 of 0 ⁇ ⁇ ⁇ ⁇ W, where ⁇ is a design parameter to be selected.
- the phase-shifters 604 are assumed to have unit magnitude and have arbitrarily reconfigurable phase - ⁇ . Transmission in both uplink and downlink directions is performed using OFDM with K subcarriers indexed as . Then, the M ⁇ 1 downlink TX signal on sub-carrier for a representative OFDM symbol can be expressed as:
- s k and ⁇ k are the scalar data and digital beamforming on the k -th subcarrier
- f k is the frequency of the k-th sub-carrier (including the carrier frequency)
- ⁇ n is the delay of the n-th TTD
- ⁇ m is the phase of the m phase-shifter connected to the m-th antenna. Note that from the equation above the total transmit power of the BS 102 can be given by .
- Embodiments of the present disclosure recognize that, despite the recent works on the JPTA beam design and performance analysis, the integration of JPTA with the current workflow in the MAC and PHY layers in the base implementations may not be clear.
- the scheduler has access to the set of backlogged (active) UEs along with contextual information for each UE.
- the information could include: the size of backlogged data, the channel condition, data priority, last time the UE 116 was served, etc.
- This information will be used by the scheduler to select of subset of the UEs and assign a distinct set of resource blocks (RBs) for sub-bands for each UE.
- the output of the scheduler is passed to the PHY layer in an array or a structure of a UE index, allocated RBs for the UE 116, and/or additional configurations.
- the additional configurations include the modulation and coding scheme (MCS) index, the # of streams, hybrid automatic repeat request (HARQ) configurations, etc.
- MCS modulation and coding scheme
- HARQ hybrid automatic repeat request
- the PHY layer is configured to receive data from the UEs in case of uplink or transmit data in the case of the downlink.
- the UE 116 is also informed of these choices through different control signaling.
- the gNB 102 has a UE-Beam map, which indicates the beam associated with each UE.
- the associated beam could be corresponding to a synchronization signal/physical broadcast channels (SSB) or a channel state information reference signal (CSI-RS) resource, or both, depending on the gNB 102 implementation.
- SSB synchronization signal/physical broadcast channels
- CSI-RS channel state information reference signal
- the gNB 102 could only schedule UEs served by the same beam and this needs to be evaluated in the FR2 scheduler.
- the information of the chosen beam has to be passed to the PHY layer to configure the phased array antenna (PAA) RF network, i.e., the phases of the phase shifters.
- the beam information could be the beam index, the pointing direction, the exact phases of the phase shifters, etc.
- the mapping between the beam information to the exact beam parameters (phases) could be done in the high PHY as shown in FIG. 8, or in the MAC layer depending on gNB implementation. Overall, the beam information has to have a direct mapping to unique beam parameters.
- the FR2 scheduler has an additional job in this case: selecting one of the possible beams in UE-Beam map as a serving beam.
- This implementation reuses the same scheduler mentioned herein, and to this end, a separate block beam(s) selector block 805 is used to select the serving beam first.
- the beam(s) selector block 805 could cycle through all the possible beams in a round robin fashion or it could pick the serving beam more carefully by taking into account the load per beam and the UEs info on each beam.
- the beam(s) selector block 805 picks the UEs served by the chosen beam along with their info and pass them to the Scheduler bock 815, which chooses the UEs that will be served simultaneously as well as the RB allocation per UE.
- the beam(s) selector block 805 also passes the beam info to the PHY to configure the PAA RF network.
- the Scheduler block 815 is replaced by a more advanced scheduler that jointly picks the serving beam, the scheduled UEs, and the RB allocation at the same time, which can provide more flexibility and more optimized choices at the expense of higher complexity.
- the gNB 102 Similar to FR2 with a single TRX, the gNB 102 maintains a map (table) between each UE and its serving beam.
- the "FR2 Scheduler" can pick up to N beams and serve UEs on these beams simultaneously, where N ⁇ # of TRXs.
- the desired number of beams could be dynamically determined by the scheduler, preconfigured, or passed from upper layers.
- the scheduler Having multiple serving beams provides the scheduler with the flexibility of assigning the same RB or sub-band to different UEs served by different beams, i.e., the RB allocation per beam can be independent, and hence, the scheduler can reuse the same RB across different beams, which may increase the spectral efficiency (SE).
- SE spectral efficiency
- the "FR2 Scheduler" has to indicate the serving beam for each scheduled UE to the PHY layer, in addition to its RB allocation.
- this implementation focuses on reusing the Scheduler block 815, similar to the for the single TRX case.
- the beam(s) selector block 805 in this case picks up to N beams out the pool of beams in the "UE-Beam” map. It can cycle through the beams in a round-robin fashion, or select the beams based on certain criteria related to the beams and UE info. It could also follow a dedicated sequence of N -tuples indicating the set of beams that could be used together. The sequence could be hardcoded or computed online.
- the set of all UEs served on each of the selected beams is passed to the UE filtering block 820 along with the beams' info for the selected beams.
- the UE filtering block 820 selects all UEs served on the first beam and passes them to the Scheduler block 815, which chooses the scheduled UEs on this beam with the RB allocation.
- the UE filtering block 820 selects all UEs served on the second beam and passes them to the scheduler block 815. Then, the next beam until UEs on all of the selected beams are scheduled.
- the scheduled UEs along with their serving beam and RB allocation is passed to the PHY layer.
- the beam info for each beam is passed to the PHY layer to configure the PAA RF network. Note that in this implementation, the UEs are scheduled on each beam independently, which simplifies the scheduler and allows reusing the scheduler block 815 from FR1.
- the scheduler block 815 and the UE filtering block 820 are replaced by a more advanced scheduler, that jointly picks the serving beams, the scheduled UEs, and the RB allocation at the same time, which can provide more flexibility and more optimized choices.
- Embodiments of the present disclosure provide different ways to extend the FR2 and FR1 to be compatible with JPTA beamforming. Different implementations are provided that ranges in terms of complexity of flexibility. In various embodiments, the FR2 scheduler is rescheduled to accommodate JPTA beamforming by adding three additional blocks.
- a JPTA scheduler inputs the set of backlogged UEs with their info, the UE-Beam map, and outputs the scheduled UE with RB allocation and the JPTA beam info.
- the JPTA scheduler could take the "FR2 Scheduler” and the "Scheduler” as building blocks.
- the RB Partitioner block 825 and JPTA Beam Designer block 830 are combined into a new block "JPTA Beam Designer/RB Partitioner”.
- the UEs are scheduled first and then a JPTA beam could be designed that is specifically tailored for this set of UEs.
- a JPTA Scheduler is configured to input a set of one or more backlogged UEs with their information and a UE-Beam map and configured to output at least one scheduled UE with RB allocation and JPTA beam info as a set of phases and delays to be used to configure the RF, or as a beam index that is mapped to the/a set of phases and delays to be used to configure the RF.
- the JPTA Scheduler could reuse the scheduler for FR1 and FR2 as building blocks and add RB Partitioner block 825 and JPTA Beam Designer block 830.
- the JPTA Scheduler could combine the scheduling, RB partitioning, and beam design into a single block.
- FIG. 7 illustrates a flow diagram 700 of a JPTA scheduler interfacing between the MAC and PHY block layers 710 and 720, respectively, according to embodiments of the present disclosure.
- flow diagram 700 of a JPTA scheduler interfacing between the MAC and PHY layers can be implemented by the BS 102 of FIG. 2. This example is for illustration only and other embodiments can be used without departing from the scope of the present disclosure.
- MAC layer block 710 provides flow control and multiplexing for transmissions.
- PHY block layers 720 supports DL/UL communication.
- a JPTA scheduler inputs the set of backlogged UEs with their info, the UE-Beam map, and outputs the scheduled UE with RB allocation, and the JPTA beam info.
- the "JPTA Scheduler" is given in FIG. 7. Note that the inputs are the same as in the FR2 case which includes the set of backlogged UEs and their info as well as the UE-Beam map.
- the UE-Beam map could be the same as in the FR2 case, where each UE is coupled with its best serving beam (SSB or CSI-RS), meaning that the PAA beamforming is used in the initial access phase.
- the UE-Beam could also include the pointing angle of each beam and/or the estimated Azimuth angle of Arrival (AoA) / Azimuth angle of Departure (AoD) for each UE.
- the "JPTA scheduler" performs two tasks:
- the JPTA beam info could be a beam index that is mapped in the high PHY to the exact delays and phases needed to configure the JPTA RF network, or the exact values for the phases and delays.
- UEs In JPTA, UEs have to be assigned distinct sets of RBs, where in FR2-multi TRX, only UEs served by the same beam should have distinct assigned sets of RBs.
- a UE could only receive high beam gain on a certain set of RBs depending on its location. This fact correlates the JPTA beam design and the RB allocation.
- the beamforming is frequency-independent, and hence, choosing the beam could be done independently from the RB assignment.
- FIG. 8 illustrates a flow diagram of a JPTA scheduler 800 according to embodiments of the present disclosure.
- flow diagram of a JPTA scheduler 800 can be implemented by either BS 102 or BS 103 of FIG. 1. This example is for illustration only and other embodiments can be used without departing from the scope of the present disclosure.
- scheduler block 815 may be the scheduler used in FR1 and FR2 systems. Some embodiments are able to leverage scheduler 815 for greater compatibility with existing systems.
- the JPTA Scheduler 800 could take the "FR2 Scheduler” and the Scheduler block 815 as building blocks and add the new blocks of RB Partitioner block 825 and JPTA Beam Designer block 830. The detailed procedure is shown in FIG. 8.
- the first step is to use the beam(s) selector block 805 to select a set of N beams 810 out of the pool in the "UE-Beam" map.
- N in this case is not determined by the number of TRXs, but a configuration parameter that needs to be specified by the designer or computed dynamically depending on the set of backlogged UEs and their info.
- the process is similar, and the output is passed to UE filtering block 820 which feeds all the UEs served by a single beam to the Scheduler block 815, one beam at a time.
- the Scheduler block 815 does take all RBs as an input in each iteration (beam).
- "JPTA Scheduler” 800 instead, it is fed the RBs allocated to this beam, such that different beams are assigned different set of RBs.
- the RB per beam allocation is performed by the RB Partitioner block 825.
- the RB Partitioner block 825 takes the set of all available RBs and the number of beams ( N ) as inputs and it is tasked with partitioning the set of all RBs into N disjoint sets of RBs. A simple way to achieve this is by equally partitioning the N sets. Then for each beam n, the "RB Filtering" block 835 only feeds the set of RBs assigned for this beam to the Scheduler block 815.
- the output is the set of scheduled UEs and their RB allocation for this beam.
- the set of the scheduled UEs across all the beams along with their RB allocation is passed to the PHY layer block 720. Note that one or more examples described herein, the beam indication per UE is needed in this case.
- JPTA Beam Designer block 830 takes the selected beams from the beam(s) selector block 805 and the RB per Beam allocation from the RB Partitioner block 825 as inputs, and outputs the JPTA beam info.
- the beam info could be the exact phases and the delays needed to configure the phase shifters and delay units, respectively, in the JPTA RF network or a JPTA beam index that could be mapped to these phases and delays in the high PHY through a lookup table.
- the pointing angles of each beam could be stored in the UE-Beam map, and hence the pointing angles of the selected beams could be used to design the JPTA beam. In this case, all UEs served by the same beam are assumed to be on the exact pointing angles of the beam.
- the gNB 102 may estimate the angles for each UE and store it in the UE-Beam map as additional information. This requires extra processing but can result in better JPTA beam designs since different UEs served by the same beam could have different angles of arrival (angles of departure in the downlink).
- JPTA scheduler 800 the JPTA beam designer block 830 is done in parallel to the UE Scheduling, which simplifies the scheduler. However, this also limits the flexibility of the "JPTA Scheduler" 800 since the JPTA beam is designed without knowing which UEs are scheduled and what are their needs in terms of number of RBs. In what follows, other possible implementations of the JPTA Scheduler 800 are provided that gradually increase the complexity of the scheduler and provide with more flexibility at the same time.
- FIG. 9 illustrates a flow diagram 900 of a JPTA scheduler according to embodiments of the present disclosure.
- flow diagram 900 of a JPTA scheduler can be implemented by the BS 103 of FIG. 1. This example is for illustration only and other embodiments can be used without departing from the scope of the present disclosure.
- the RB Partitioner block 825 takes the UE info from the beam(s) selector block 805 as an additional input. This way, the RB partitioning could be relative to the load per beam, i.e., more RBs are assigned to beams that are highly loaded. All the other blocks are similar to the implementation in FIG. 8.
- FIG. 10 illustrates a flow diagram 1000 of a JPTA scheduler according to embodiments of the present disclosure.
- flow diagram 1000 of a JPTA scheduler can be implemented by the BS 102 of FIG. 2. This example is for illustration only and other embodiments can be used without departing from the scope of the present disclosure.
- the RB Partitioner block 825 and JPTA Beam Designer block 830 are combined into a new block JPTA Beam Designer/RB Partitioner block 1050.
- This implementation is important for the case of limited JPTA beams, i.e., it is not feasible to design a JPTA beam with arbitrary sets of RBs per beam.
- a JPTA beam could be designed, then the RB allocation per beam is determined by the RBs with high beam gain in the pointing direction of this beam.
- FIG. 11 illustrates a flow diagram 1100 of a JPTA scheduler according to embodiments of the present disclosure.
- flow diagram 1100 of a JPTA scheduler can be implemented by either BS 102 or BS 103 of FIG. 1. This example is for illustration only and other embodiments can be used without departing from the scope of the present disclosure.
- the previous implementations of the JPTA Scheduler 800 reuse the beam(s) selector block 805 and the Scheduler block 815 in one or more examples described herein. But this is not the only possible implementation.
- the JPTA Beam designer/RB partitioner block 1050 designs a JPTA beam taking into account the spatial distribution of the UEs and their info, then for each UE, it finds the set of RBs over which a high beam gain is achieved.
- These sets of RBs are then fed to the Scheduler 1150, which down-selects the set of UEs that will be scheduled along with their RBs allocation, such that each RB is assigned to a single UE.
- This approach is different than the ones discussed before, in the sense that the loop is over RBs in this case, i.e., for each RB, select the served UE. This approach could increase the complexity of the design, but can potentially enhances the RB utilization.
- This approach is also useful for a codebook-based JPTA beam design, where a finite, possibly small, set of preconfigured JPTA beams are available. Hence, a JPTA beam is found first. The UEs are selected based on the specific chosen beam.
- FIG. 12 illustrates a flow diagram 1200 of a JPTA scheduler according to embodiments of the present disclosure.
- flow diagram 1200 of a JPTA scheduler can be implemented by the BS 103 of FIG. 1. This example is for illustration only and other embodiments can be used without departing from the scope of the present disclosure.
- the UEs are scheduled first, and then a JPTA beam could be designed that is specifically tailored for this set of UEs.
- the UE scheduling is done after the beams are selected or after the JPTA beam is designed.
- FIG. 12 shows the option where the UEs are scheduled first, where the scheduler 1150 output is the set of scheduled UEs and the desired number of RBs per UE. Then a JPTA beam could be designed that is specifically tailored for this set of UEs and their desired number of RBs.
- the JPTA beam designer and RB allocator block 1050 then feeds the exact RBs per UE to the PHY layer block 720.
- This implementation provides the maximum flexibility at the expense of potential high complexity. It also requires a highly flexible beam designer that could find a suitable beam for any arbitrary set of UEs and desired number of RBs.
- the frequency-dependent hybrid beamforming architectures achieved by using JPTA can significantly improve the capabilities of beamforming in high frequency systems like mm-wave and THz systems.
- the additional capabilities can be quite useful at a base station in several use cases and can also help make the beam alignment and tracking easier.
- the architectures can be used to serve multiple users in disconnected regions with full beamforming gain with just one ADC at the base station.
- each user is assigned a bandwidth of , where BW is the total system bandwidth.
- BW is the total system bandwidth.
- Each user gets a high beam gain over its own allocated bandwidth (BW), which allows the BS 102 to multiplex the data for all of these users at the same time with no inter-UE interference and without sacrificing the beam gain for each UE.
- a full performance analysis shows the average throughput per UE at various serving distances for the four scenarios discussed.
- the solid lines represent the benchmark scenario of mmWave beam sweeping by phased antenna array.
- UEs When UEs are located very close to the BS 102, they experience sufficiently high signal to noise ratios (SNRs) that enable them to utilize the highest MCS level across the entire bandwidth. Consequently, in the case of PAA, UEs at these short distances employ the highest MCS with the maximum number of RBs. However, due to the antenna sweeping procedure, each UE can only transmit every N UE time slots. Similarly, UEs with high SNRs in the JPTA scheme can also use the maximum MCS level. Although they have a smaller portion of RBs available, specifically of the total RBs, they are able to transmit on every UL time slot.
- SNRs signal to noise ratios
- JPTA does not yield any throughput enhancement, while the gain increases to N UE ⁇ 100% at the cell edge.
- JPTA may outperform PAA by a significant margin. For instance, in the case of 16 UEs and at a distance of 1500 m, JPTA may deliver a throughput enhancement of 830% compared to the PAA in some examples.
- throughput coverage refers to the maximum distance at which the throughput exceeds a specific threshold. For instance, when evaluating a target throughput of 1 Mbps for a scenario with 8 UEs, only UEs located within a distance of 410m may achieve the desired throughput when using PAA. However, when JPTA is employed, this coverage distance may increase to 790 m.
- MHz 400 Carrier frequency (GHz) 28 FFT size 4096 Sub-carrier spacing (kHz) 120 UE TX power (dBm) 23 UE beam gain (dB) 0 BS peak beam gain (dB) 28 # of analog beams in PAA 16 BS noise figure (dB) 5 Pathloss exponent 3 TTD delay step size (ns) 2.5
- FIG. 13 illustrates an example method 1300 performed by a BS in a wireless communication system according to embodiments of the present disclosure.
- the method 1300 of FIG. 13 can be performed by any of the UEs 111-116 of FIG. 1, such as the UE 116 of FIG. 3.
- the method 1300 is for illustration only and other embodiments can be used without departing from the scope of the present disclosure.
- the method begins in 1310 with the BS identifying a set of UEs to schedule, a plurality of resource blocks, and a UE beam map.
- the UE beam map may map one or more beams from a plurality of beams to one or more UEs in the set of UEs.
- the BS may identify load information about an amount of data to be transmitted or received by the UE.
- the number of RBs per UE to schedule for the set of UEs may occur and then a set of JPTA beams for the set of UEs, respectively, based on the number of RBs per UE may be determined.
- the BS then allocates, for a UE in the set of UEs, one or more RBs from the plurality of RBs based the UE beam map and a beam gain on the one or more RBs in a direction of the UE.
- allocating the one or more RBs may include determining a set of RBs associated with the selected set of beams and allocating the one or more RBs from the determined set of RBs.
- the UE beam map may include a pointing angle for one or more beams from the plurality of beams.
- allocating the one or more RBs for the UE may be based on the load information.
- allocating the one or more RBs may include allocating, for the determined JPTA beam, RBs from the plurality of RBs based on a beam gain of the RBs in a direction associated with the JPTA beam. In various embodiments, allocating the one or more RBs may include identifying a set of RBs based on a beam gain for the JPTA beam and allocating the one or more RBs from the set of RBs to the UE. In various embodiments, the BS may select a set of beams for the UE from the plurality of beams based on the UE beam map and the direction of the UE.
- the BS determines a JPTA beam for the UE.
- the JPTA beam may include determining JPTA beam information for the selected set of beams, the JPTA beam information including (i) phase and time delay information or (ii) a JPTA beam index.
- determining the JPTA beam may be based on the pointing angle.
- determining the JPTA beam for the UE may be based on the direction of the UE.
- the BS then transmits scheduling information indicating the allocated one or more RBs and the determined one or more JPTA beams.
- the user equipment can include any number of each component in any suitable arrangement.
- the figures do not limit the scope of this disclosure to any particular configuration(s).
- figures illustrate operational environments in which various user equipment features disclosed in this patent document can be used, these features can be used in any other suitable system.
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Physics & Mathematics (AREA)
- Mathematical Physics (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Description
| Parameter | Value |
| Bandwidth (MHz) | 400 |
| Carrier frequency (GHz) | 28 |
| FFT size | 4096 |
| Sub-carrier spacing (kHz) | 120 |
| UE TX power (dBm) | 23 |
| UE beam gain (dB) | 0 |
| BS peak beam gain (dB) | 28 |
| # of analog beams in PAA | 16 |
| BS noise figure (dB) | 5 |
| Pathloss exponent | 3 |
| TTD delay step size (ns) | 2.5 |
Claims (15)
- A base station (BS) comprising:a processor configured to:identify a set of user equipments (UEs) to schedule, a plurality of resource blocks (RBs), and a UE beam map, wherein the UE beam map maps one or more beams from a plurality of beams to one or more UEs in the set of UEs;allocate, for a UE in the set of UEs, one or more RBs from the plurality of RBs based the UE beam map and a beam gain on the one or more RBs in a direction of the UE; anddetermine a joint phase time array (JPTA) beam for the UE; anda transceiver operably coupled to the processor, the transceiver configured to transmit scheduling information indicating the allocated one or more RBs and the determined one or more JPTA beams.
- The BS of claim 1, wherein the processor is further configured to:select a set of beams for the UE from the plurality of beams based on the UE beam map and the direction of the UE;determine a set of RBs associated with the selected set of beams;allocate the one or more RBs from the determined set of RBs; anddetermine JPTA beam information for the selected set of beams, the JPTA beam information including (i) phase and time delay information or (ii) a JPTA beam index.
- The BS of claim 1, wherein:the UE beam map further comprises a pointing angle for one or more beams from the plurality of beams; andthe processor is further configured to determine the JPTA beam based on the pointing angle.
- The BS of claim 1, wherein the processor is further configured to:identify load information about an amount of data to be transmitted or received by the UE; andallocate the one or more RBs for the UE based on the load information.
- The BS of claim 1, wherein the processor is further configured to allocate, for the determined JPTA beam, RBs from the plurality of RBs based on a beam gain of the RBs in a direction associated with the JPTA beam.
- The BS of claim 1, wherein the processor is further configured to:determine the JPTA beam for the UE based on the direction of the UE;identify a set of RBs based on a beam gain for the JPTA beam; andallocate the one or more RBs from the set of RBs to the UE.
- The BS of claim 1, wherein the processor is further configured to:determine a number of RBs per UE to schedule for the set of UEs; anddetermine a set of JPTA beams for the set of UEs, respectively, based on the number of RBs per UE.
- A method performed by a base station (BS), the method comprising:identifying a set of user equipments (UEs) to schedule, a plurality of resource blocks (RBs), and a UE beam map, wherein the UE beam map maps one or more beams from a plurality of beams to one or more UEs in the set of UEs;allocating, for a UE in the set of UEs, one or more RBs from the plurality of RBs based the UE beam map and a beam gain on the one or more RBs in a direction of the UE;determining a joint phase time array (JPTA) beam for the UE; andtransmitting scheduling information indicating the allocated one or more RBs and the determined one or more JPTA beams.
- The method of claim 8, further comprising:selecting a set of beams for the UE from the plurality of beams based on the UE beam map and the direction of the UE,wherein allocating the one or more RBs further comprises:determining a set of RBs associated with the selected set of beams, andallocating the one or more RBs from the determined set of RBs; anddetermining the JPTA beam further comprises determining JPTA beam information for the selected set of beams, the JPTA beam information including (i) phase and time delay information or (ii) a JPTA beam index.
- The method of claim 8, wherein:the UE beam map further comprises a pointing angle for one or more beams from the plurality of beams, anddetermining the JPTA beam further comprises determining the JPTA beam based on the pointing angle.
- The method of claim 8, further comprising:identifying load information about an amount of data to be transmitted or received by the UE,wherein allocating the one or more RBs further comprises allocating the one or more RBs for the UE based on the load information.
- The method of claim 8, wherein allocating the one or more RBs further comprises allocating, for the determined JPTA beam, RBs from the plurality of RBs based on a beam gain of the RBs in a direction associated with the JPTA beam.
- The method of claim 8, wherein:determining the JPTA beam further comprises determining the JPTA beam for the UE based on the direction of the UE; andallocating the one or more RBs further comprises:identifying a set of RBs based on a beam gain for the JPTA beam; andallocating the one or more RBs from the set of RBs to the UE.
- The method of claim 8, further comprising:determining a number of RBs per UE to schedule for the set of UEs; anddetermining a set of JPTA beams for the set of UEs, respectively, based on the number of RBs per UE.
- A non-transitory computer readable medium comprising program code that, when executed by a processor of a base station (BS), causes the BS to:identify a set of user equipments (UEs) to schedule, a plurality of resource blocks (RBs), and a UE beam map, wherein the UE beam map maps one or more beams from a plurality of beams to one or more UEs in the set of UEs;allocate, for a UE in the set of UEs, one or more RBs from the plurality of RBs based the UE beam map and a beam gain on the one or more RBs in a direction of the UE;determine a joint phase time array (JPTA) beam for the UE; andtransmit scheduling information indicating the allocated one or more RBs and the determined one or more JPTA beams.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202480011920.5A CN120731562A (en) | 2023-05-01 | 2024-04-30 | Scheduling and Beam Design in JPTA |
| EP24800215.6A EP4620122A4 (en) | 2023-05-01 | 2024-04-30 | PLANNING AND RADIATION DESIGN IN THE PYRIDA |
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US202363463213P | 2023-05-01 | 2023-05-01 | |
| US63/463,213 | 2023-05-01 | ||
| US18/613,049 | 2024-03-21 | ||
| US18/613,049 US20240372598A1 (en) | 2023-05-01 | 2024-03-21 | Scheduling and beam design in jpta |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2024228532A1 true WO2024228532A1 (en) | 2024-11-07 |
Family
ID=93292188
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/KR2024/005831 Ceased WO2024228532A1 (en) | 2023-05-01 | 2024-04-30 | Scheduling and beam design in jpta |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20240372598A1 (en) |
| EP (1) | EP4620122A4 (en) |
| CN (1) | CN120731562A (en) |
| WO (1) | WO2024228532A1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20240121625A1 (en) * | 2022-10-07 | 2024-04-11 | Samsung Electronics Co., Ltd. | Adaptive beamforming based on jpta frequency selective systems for smart repeaters |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20170346611A1 (en) * | 2015-07-31 | 2017-11-30 | Futurewei Technologies, Inc. | System and Method for Transmitting Beamformed Reference/Control Signals |
| US20200252117A1 (en) * | 2015-05-01 | 2020-08-06 | Futurewei Technologies, Inc. | Device, network, and method for csi feedback of hybrid beamforming |
| US20210288704A1 (en) * | 2018-07-05 | 2021-09-16 | Samsung Electronics Co., Ltd. | Method and device for performing beamforming in wireless communication system |
| US20230118482A1 (en) * | 2020-04-06 | 2023-04-20 | Viasat, Inc. | Improving network transmit power profile by randomizing resource grants on a multi-user communications network |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9609648B2 (en) * | 2014-06-16 | 2017-03-28 | Qualcomm Incorporated | Beamform scheduling based on the directionality of UEs |
| WO2017162283A1 (en) * | 2016-03-23 | 2017-09-28 | Telefonaktiebolaget Lm Ericsson (Publ) | Efficient scheduling of beam quality measurement signals to multiple wireless devices |
| PL3566488T3 (en) * | 2017-01-05 | 2022-10-03 | Nokia Technologies Oy | Method, computer program and apparatus for selecting a beam for handover |
| WO2018204863A1 (en) * | 2017-05-04 | 2018-11-08 | Ofinno Technologies, Llc | Beam-based measurement configuration |
| KR102647779B1 (en) * | 2022-04-13 | 2024-03-14 | 알에프코어 주식회사 | Method for rectifying beam squint of active phase array antenna system |
| GB2623303A (en) * | 2022-10-07 | 2024-04-17 | Airspan Ip Holdco Llc | Interference mitigation in multi-user multi-beam wireless communication |
-
2024
- 2024-03-21 US US18/613,049 patent/US20240372598A1/en active Pending
- 2024-04-30 CN CN202480011920.5A patent/CN120731562A/en active Pending
- 2024-04-30 WO PCT/KR2024/005831 patent/WO2024228532A1/en not_active Ceased
- 2024-04-30 EP EP24800215.6A patent/EP4620122A4/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20200252117A1 (en) * | 2015-05-01 | 2020-08-06 | Futurewei Technologies, Inc. | Device, network, and method for csi feedback of hybrid beamforming |
| US20170346611A1 (en) * | 2015-07-31 | 2017-11-30 | Futurewei Technologies, Inc. | System and Method for Transmitting Beamformed Reference/Control Signals |
| US20210288704A1 (en) * | 2018-07-05 | 2021-09-16 | Samsung Electronics Co., Ltd. | Method and device for performing beamforming in wireless communication system |
| US20230118482A1 (en) * | 2020-04-06 | 2023-04-20 | Viasat, Inc. | Improving network transmit power profile by randomizing resource grants on a multi-user communications network |
Non-Patent Citations (2)
| Title |
|---|
| RATNAM VISHNU V., MO JIANHUA, ALAMMOURI AHMAD, NG BOON LOONG, ZHANG JIANZHONG, MOLISCH ANDREAS F.: "Joint Phase-Time Arrays: A Paradigm for Frequency-Dependent Analog Beamforming in 6G", IEEE ACCESS, IEEE, USA, vol. 10, 18 July 2022 (2022-07-18), USA , pages 73364 - 73377, XP093230489, ISSN: 2169-3536, DOI: 10.1109/ACCESS.2022.3190418 * |
| See also references of EP4620122A4 * |
Also Published As
| Publication number | Publication date |
|---|---|
| EP4620122A1 (en) | 2025-09-24 |
| US20240372598A1 (en) | 2024-11-07 |
| CN120731562A (en) | 2025-09-30 |
| EP4620122A4 (en) | 2026-01-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20250310169A1 (en) | Base station, terminal apparatus, communication method and recording medium | |
| WO2023003221A1 (en) | Method and apparatus of interlace based sidelink resource pool | |
| US9414371B2 (en) | Hierarchical channel sounding and channel state information feedback in massive MIMO systems | |
| WO2019226028A1 (en) | Methods of beam codebook generation for 5g terminals | |
| US11622362B2 (en) | Parallel scheduler architecture | |
| WO2023214645A1 (en) | Method and apparatus for communication using joint phase-time arrays | |
| US20210258977A1 (en) | Sdma carrier sharing | |
| US20140313081A1 (en) | Multiple Beam Formation for RF Chip-Based Antenna Array | |
| WO2024155071A1 (en) | A method and an apparatus for group partitioning in a multi-user mimo system in a wireless communication system | |
| US9794040B2 (en) | Pilot signal resource allocation for a cellular MIMO system | |
| EP4620122A1 (en) | Scheduling and beam design in jpta | |
| WO2022055282A1 (en) | An enhanced uplnik power control in a wireless communication system | |
| WO2024181769A1 (en) | Channel state information reference signals for wireless communications | |
| WO2024072126A1 (en) | Method and apparatus for estimating channel state information in advanced mimo antenna systems for cellular communications | |
| US20210399768A1 (en) | Interconnect in multiple-input multiple-output communication system | |
| EP4044728A1 (en) | Resource allocation method and device, communication system and storage medium | |
| WO2024191084A1 (en) | Method and device for scalable 2-d joint phase-time arrays and beamforming operation | |
| AU2017305260A1 (en) | Electronic device and method for use in network control point and central processing node | |
| WO2025005581A1 (en) | Method and apparatus for a s-ssb structure for larger subcarrier spacing in a wireless communication system | |
| WO2025014227A1 (en) | Method and apparatus for a beam utilization with an assistance component in a wireless communication system | |
| WO2025174138A1 (en) | A method and apparatus for managing channel state information feedback in wireless communication system supporting higher number of antenna ports | |
| WO2026043303A1 (en) | Methods and apparatus for performing power amplifier efficiency based resource scheduler | |
| WO2025216580A1 (en) | Apparatus and method for downlink resource allocation in wireless communication system | |
| WO2025101003A1 (en) | Ss/pbch block patterns | |
| CN120090674A (en) | Methods for enhanced measurement and reporting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 24800215 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2024800215 Country of ref document: EP |
|
| ENP | Entry into the national phase |
Ref document number: 2024800215 Country of ref document: EP Effective date: 20250616 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 202480011920.5 Country of ref document: CN |
|
| WWP | Wipo information: published in national office |
Ref document number: 2024800215 Country of ref document: EP |
|
| WWP | Wipo information: published in national office |
Ref document number: 202480011920.5 Country of ref document: CN |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |