AT12187U2 - Verfahren zur errichtung eines turms für eine windkraftanlage sowie turm für eine windkraftanlage - Google Patents
Verfahren zur errichtung eines turms für eine windkraftanlage sowie turm für eine windkraftanlage Download PDFInfo
- Publication number
- AT12187U2 AT12187U2 AT0028911U AT2892011U AT12187U2 AT 12187 U2 AT12187 U2 AT 12187U2 AT 0028911 U AT0028911 U AT 0028911U AT 2892011 U AT2892011 U AT 2892011U AT 12187 U2 AT12187 U2 AT 12187U2
- Authority
- AT
- Austria
- Prior art keywords
- tower
- power plant
- wind power
- establishing
- wind
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/04—Structures made of specified materials of wood
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/91—Mounting on supporting structures or systems on a stationary structure
- F05B2240/912—Mounting on supporting structures or systems on a stationary structure on a tower
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Wood Science & Technology (AREA)
- Civil Engineering (AREA)
- Materials Engineering (AREA)
- Structural Engineering (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Wind Motors (AREA)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102009017586A DE102009017586A1 (de) | 2009-04-19 | 2009-04-19 | Turm für eine Windkraftanlage |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| AT12187U2 true AT12187U2 (de) | 2011-12-15 |
| AT12187U3 AT12187U3 (de) | 2012-09-15 |
Family
ID=42779573
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ATGM289/2011U AT12187U3 (de) | 2009-04-19 | 2011-05-19 | Verfahren zur errichtung eines turms für eine windkraftanlage sowie turm für eine windkraftanlage |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US20120036798A1 (de) |
| EP (1) | EP2422029A2 (de) |
| AT (1) | AT12187U3 (de) |
| CA (1) | CA2759150A1 (de) |
| DE (1) | DE102009017586A1 (de) |
| WO (1) | WO2010121733A2 (de) |
Families Citing this family (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102010047773B4 (de) * | 2010-10-08 | 2012-08-09 | Timber Tower Gmbh | Fundament für eine Windkraftanlage |
| DE102011107804A1 (de) * | 2011-07-17 | 2013-01-17 | Philipp Wagner | Bauprinzip für Turmkonstruktion für Windenergieanlagen |
| ES2408330B1 (es) * | 2011-11-15 | 2014-04-15 | Structural Concrete & Steel,Sl | Torre modular prefabricada |
| BR112014011928A2 (pt) * | 2011-11-18 | 2017-05-30 | Ericsson Telefon Ab L M | método e disposição relacionados a um mastro de antena de um sistema de comunicação sem fio |
| DE102012106321A1 (de) | 2012-07-13 | 2014-01-16 | Green Tower Entwicklungs Gmbh | Holzturm für Windkraftanlage |
| CA2890142C (en) | 2012-11-01 | 2017-07-04 | Marmen Inc. | Wind turbine tower assembly |
| USD760165S1 (en) | 2013-07-01 | 2016-06-28 | Marmen Inc | Tower |
| DE102013002549A1 (de) | 2013-02-15 | 2014-08-21 | Timbertower Gmbh | Turm für eine Windkraftanlage |
| CN103195668B (zh) * | 2013-04-02 | 2015-02-25 | 中国电建集团西北勘测设计研究院有限公司 | 一种新型的风力发电预制混凝土塔架构件接缝结构及方法 |
| EP3056636B1 (de) * | 2015-02-11 | 2019-04-10 | ZÜBLIN Timber Aichach GmbH | Turm für eine Windkraftanlage und Verfahren zu dessen Herstellung |
| ES2552363B1 (es) * | 2015-10-22 | 2016-05-23 | Dreiventum S L U | Torre eólica multi-plataforma |
| DE102015014648A1 (de) | 2015-11-12 | 2017-05-18 | Termino Two Beteiligungsgesellschaft UG | Turm für eine Windkraftanlage |
| DE102016114661A1 (de) * | 2016-08-08 | 2018-02-08 | Wobben Properties Gmbh | Turmsegment, Turmabschnitt, Turm, Windenergieanlage sowie Verfahren zum Herstellen eines Turmsegments und zum Verbinden von Turmsegmenten |
| DE102017000065A1 (de) | 2017-01-05 | 2018-07-05 | Nicolas Hoyer | Flansch für einen Turm für eine Windkraftanlage |
| DK3856485T3 (da) * | 2018-09-28 | 2023-11-13 | Gen Electric | Fremgangsmåde til fremstilling af en teleskoperende vindmølletårnstruktur |
| SE543098C2 (en) | 2019-01-16 | 2020-10-06 | Modvion Ab | Laminated wood tower and method for assembly of a laminated wood tower |
| FR3092628A1 (fr) * | 2019-02-12 | 2020-08-14 | Adhex Technologies | Procédé de protection d’éléments d’éolienne |
| SE545291C2 (en) * | 2019-05-09 | 2023-06-20 | Modvion Ab | Wood connection for laminated veneer lumber modules and a laminated wood tower comprising a plurality of such connections |
| DE102020118181A1 (de) | 2020-07-09 | 2022-01-13 | HolzTurm GmbH | Turm für eine Windkraftanlage |
| DE102021126984A1 (de) | 2021-10-18 | 2023-04-20 | HolzTurm GmbH | Turm für eine Windkraftanlage oder eine Sende- und Empfangsanlage für den Mobilfunk |
| EP4713581A1 (de) * | 2023-05-19 | 2026-03-25 | World Wide Wind Tech As | Stützsäule für eine windenergieanlage, verfahren zur herstellung einer stützsäule für eine windenergieanlage und verwendung einer stützsäule |
Family Cites Families (51)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2016273A (en) * | 1934-09-14 | 1935-10-08 | Harry N Atwood | Built-up composite cellular structure |
| US2049371A (en) * | 1935-08-26 | 1936-07-28 | Christopher J Haley | Stave joint |
| FR1145789A (fr) * | 1956-03-14 | 1957-10-29 | Beton Acier Sa | Tour ou cheminée de grande hauteur en éléments préfabriqués |
| NL256611A (de) * | 1959-10-08 | 1900-01-01 | ||
| SU479863A1 (ru) * | 1964-06-22 | 1975-08-05 | Центральный научно-исследовательский и проектно-экспериментальный институт промышленных зданий и сооружений | Сетчата башн |
| US3331907A (en) * | 1966-08-29 | 1967-07-18 | Samson G Salzinger | Resin curing method |
| US3746776A (en) * | 1968-03-20 | 1973-07-17 | Cascade Pole Co | Resin coated wooden poles and light standards incorporating same |
| US3562403A (en) * | 1968-03-20 | 1971-02-09 | Cascade Pole Co | Resin coated wooden poles and light standards incorporating same |
| US4172175A (en) * | 1978-02-17 | 1979-10-23 | Tillotson-Pearson, Inc. | Pole construction |
| US4248025A (en) * | 1979-08-08 | 1981-02-03 | Unarco Industries, Inc. | Knock down pole construction |
| US4312162A (en) * | 1979-08-15 | 1982-01-26 | Jonas Medney | Reinforced pole |
| DE8634422U1 (de) * | 1986-12-23 | 1987-02-26 | Starkstrom-Anlagen-Gmbh, 6000 Frankfurt | Glasfaserband für eine Reparatur und/oder Ertüchtigung von Masten, insbesondere Betonmasten |
| US5438812A (en) * | 1993-12-23 | 1995-08-08 | Regents Of The University Of Minnesota | Hollow veneered pole |
| US5492579A (en) * | 1994-02-09 | 1996-02-20 | Shakespeare Company | Method for making composite utility pole |
| US6519909B1 (en) * | 1994-03-04 | 2003-02-18 | Norman C. Fawley | Composite reinforcement for support columns |
| US5599599A (en) * | 1995-07-06 | 1997-02-04 | University Of Central Florida | Fiber reinforced plastic ("FRP")-concrete composite structural members |
| US6123485A (en) * | 1998-02-03 | 2000-09-26 | University Of Central Florida | Pre-stressed FRP-concrete composite structural members |
| US6453635B1 (en) * | 1998-07-15 | 2002-09-24 | Powertrusion International, Inc. | Composite utility poles and methods of manufacture |
| JP3715238B2 (ja) * | 1999-07-14 | 2005-11-09 | アロイス・ヴォベン | 閉冷却回路を有する風力利用設備 |
| DE19936602A1 (de) * | 1999-08-04 | 2001-02-08 | Erwin Keller | Verfahren zur Herstellung eines Hochbauwerkes sowie nach dem Verfahren herstellbares Hochbauwerk |
| US6226933B1 (en) * | 1999-08-10 | 2001-05-08 | Robert S. Nelson | Apparatus and method for enhancing the survivability of exposed structures |
| US20020095905A1 (en) * | 2000-02-03 | 2002-07-25 | Fawley Norman C. | Composite reinforced wood structural members |
| US6453636B1 (en) * | 2000-04-24 | 2002-09-24 | Charles D. Ritz | Method and apparatus for increasing the capacity and stability of a single-pole tower |
| DE20013774U1 (de) * | 2000-08-10 | 2000-11-23 | Arand, Wilfried, 14532 Kleinmachnow | Baumodul zum Herstellen von Brücken, Gebäuden und Türmen, z.B. für Windkraftanlagen |
| NL1017360C2 (nl) * | 2001-02-14 | 2002-08-15 | Leonardus Anthonius Ligtenberg | Schip voorzien van een hol rondhout. |
| WO2002070222A1 (en) * | 2001-03-01 | 2002-09-12 | Schroeder Ernest C | Apparatus and method of fabricating fiber reinforced plastic parts |
| US6901717B2 (en) * | 2001-05-16 | 2005-06-07 | Pennsummit Tubular, Llc | Pole reinforcing arrangement |
| NL1019953C2 (nl) | 2002-02-12 | 2002-12-19 | Mecal Applied Mechanics B V | Geprefabriceerde toren of mast, alsmede een methode voor het samenvoegen en/of naspannen van segmenten die één constructie moeten vormen, alsmede een werkwijze voor het opbouwen van een toren of mast bestaande uit segmenten. |
| HUP0201136A2 (hu) * | 2002-04-03 | 2004-04-28 | Meir Silber | Toronyszerkezet |
| US7228672B2 (en) * | 2002-04-19 | 2007-06-12 | Powertrusion International, Inc. | Fiber architecture for a composite pole |
| US7875337B2 (en) * | 2003-01-24 | 2011-01-25 | Glastic Corporation | Fiber and resin composite reinforcement |
| US7253786B1 (en) * | 2003-06-04 | 2007-08-07 | Rocco Logozzo | Reinforced monopole construction |
| DE10341759A1 (de) * | 2003-09-10 | 2005-04-21 | Gen Electric | Windkraftanlage mit äusserer Schallhülle |
| US20050121214A1 (en) * | 2003-12-04 | 2005-06-09 | Gould Len C. | Active electrical transmission system |
| AU2005211457B2 (en) * | 2004-02-04 | 2010-03-18 | Corus Staal Bv | Tower for a wind turbine, prefabricated metal wall part for use in a tower for a wind turbine and method for constructing a tower for a wind turbine |
| US7426807B2 (en) * | 2004-03-03 | 2008-09-23 | Charles E Cadwell | Composite telephone pole |
| US7673432B2 (en) * | 2004-03-11 | 2010-03-09 | The Hong Kong Polytechnic University | Double-skin tubular structural members |
| US7849659B2 (en) * | 2004-06-24 | 2010-12-14 | Kopshever Michael J Sr | Tower reinforcement apparatus and method |
| US20060213145A1 (en) * | 2005-03-22 | 2006-09-28 | Haller Mark E | Lattice-skin hybrid tower |
| WO2007012201A1 (en) * | 2005-07-25 | 2007-02-01 | The University Of Manitoba | Composite wind tower systems and methods of manufacture |
| DE202006006326U1 (de) * | 2005-11-23 | 2007-03-29 | Pfannenberg Gmbh | Schaltschrank mit einem Kühlgerät, der einer Rotation ausgesetzt ist, und ein Kühlgerät hierfür |
| ES2402530T3 (es) * | 2006-01-17 | 2013-05-06 | Vestas Wind Systems A/S | Un ascensor de una torre de turbina eólica y un procedimiento para montar una torre de turbina eólica |
| WO2007137152A2 (en) * | 2006-05-19 | 2007-11-29 | Lancaster Composite, Inc. | Composite structure |
| DE102007006652B4 (de) | 2007-02-06 | 2014-03-06 | Timbertower Gmbh | Windkraftanlage |
| SE532463C2 (sv) * | 2007-06-11 | 2010-01-26 | Vertical Wind Ab | Vindkraftaggregat, stödpelare för detsamma och användning av detsamma |
| US7818894B2 (en) * | 2007-10-15 | 2010-10-26 | Noyes Ronald T | Method and apparatus for low-energy in-bin cross-flow grain and seed air drying and storage |
| EP2217748B1 (de) * | 2007-11-09 | 2011-09-21 | Vestas Wind Systems A/S | Verfahren zur herstellung eines windturbinenblatts und verwendung einer lasttragenden matte zur armierung einer windturbinenblattkonstruktion |
| US20090211173A1 (en) * | 2008-02-27 | 2009-08-27 | General Electric Company | Composite wind turbine tower |
| US8192572B2 (en) * | 2008-04-25 | 2012-06-05 | General Electric Company | Composite wind turbine tower and a method for fabricating same |
| DE202008010515U1 (de) * | 2008-08-07 | 2008-12-11 | Fiber-Tech Products Gmbh | Turm einer Windkraftanlage |
| CA2759148A1 (en) * | 2009-04-19 | 2010-10-28 | Timber Tower Gmbh | Tower for a wind power installation |
-
2009
- 2009-04-19 DE DE102009017586A patent/DE102009017586A1/de not_active Withdrawn
-
2010
- 2010-04-14 CA CA2759150A patent/CA2759150A1/en not_active Abandoned
- 2010-04-14 WO PCT/EP2010/002281 patent/WO2010121733A2/de not_active Ceased
- 2010-04-14 US US13/265,124 patent/US20120036798A1/en not_active Abandoned
- 2010-04-14 EP EP10713586A patent/EP2422029A2/de not_active Withdrawn
-
2011
- 2011-05-19 AT ATGM289/2011U patent/AT12187U3/de not_active IP Right Cessation
Also Published As
| Publication number | Publication date |
|---|---|
| WO2010121733A3 (de) | 2011-10-27 |
| EP2422029A2 (de) | 2012-02-29 |
| CA2759150A1 (en) | 2010-10-28 |
| US20120036798A1 (en) | 2012-02-16 |
| AT12187U3 (de) | 2012-09-15 |
| DE102009017586A1 (de) | 2010-10-28 |
| WO2010121733A2 (de) | 2010-10-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AT12187U2 (de) | Verfahren zur errichtung eines turms für eine windkraftanlage sowie turm für eine windkraftanlage | |
| DE602007002179D1 (de) | Windturbinenturm und Verfahren zur Konstruktion eines Windturbinenturms | |
| DE102008055607A8 (de) | Verfahren zum Errichten eines segmentierten Turms aus Spannbeton für Windkraftanlagen und Turm für Windkraftanlagen | |
| DE602007013140D1 (de) | Verfahren und Vorrichtung für die Gründung einer Windenergieanlage | |
| BRPI0915503A2 (pt) | gerador de turbina de vento e método de estimar a direção do vento no gerador de turbina de vento | |
| PL2403707T3 (pl) | Sposób i linia produkcyjna do wytwarzania łopat turbin wiatrowych | |
| EP2415580A4 (de) | Bahnenpressformverfahren sowie verfahren zur herstellung eines brennstoffzellenseparators | |
| EP3581792C0 (de) | Verfahren zum prüfen einer windturbine in einem windpark auf gierfehlausrichtung, verfahren zur überwachung einer windturbine in einem windpark und überwachungsvorrichtung | |
| SI2279065T1 (sl) | Postopek postavitve stolpa postrojenja na vetrno energijo | |
| DE112008002176A5 (de) | Verfahren und Vorrichtung zur Ausrichtung eines winkelverstellbaren Rotorblattes einer Windenergieanlage sowie Windenergieanlage | |
| EP2647840C0 (de) | Verfahren zum Betreiben einer Windenergieanlage | |
| DE602007007905D1 (de) | Verfahren zur Herstellung eine Windturbinenschaufel | |
| GB2462602B (en) | Method and apparatus for towing offshore wind turbines | |
| EP2475883A4 (de) | Verfahren und vorrichtung zum aufstellen einer windturbine | |
| ATE556794T1 (de) | Verfahren und vorrichtung für eine giess-walz- verbundanlage | |
| PL2556008T3 (pl) | Urządzenie oraz sposób wznoszenia wieży turbiny wiatrowej | |
| DE102006034251B8 (de) | Verfahren zum Betreiben einer Windenergieanlage | |
| EP3997977C0 (de) | Verfahren zum züchten einer pflanze in einer zumindest teilweise konditionierten umgebung | |
| EP3453871C0 (de) | Nabe für eine windturbine und verfahren zur herstellung der nabe | |
| DK2302209T3 (da) | Hybridbremsesystem til en vindmølle og metode | |
| HRP20130604T1 (en) | Tower for a windturbine and method for erecting a tower for a windturbine | |
| BRPI1004557A2 (pt) | gerador de turbina eólica e método de construção para torre de turbina eólica | |
| DE112009001574A5 (de) | Anlage und Verfahren zur Herstellung eines Solarzellenmoduls | |
| DE112008003090A5 (de) | Windenergieanlage und Verfahren zum Betreiben einer Windenergieanlage | |
| EP2506268A4 (de) | Verfahren zur herstellung eines kabelbaums und kabelbaum |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM01 | Lapse because of not paying annual fees |