AT35621B - Process for the extraction of petroleum with the help of water. - Google Patents

Process for the extraction of petroleum with the help of water.

Info

Publication number
AT35621B
AT35621B AT35621DA AT35621B AT 35621 B AT35621 B AT 35621B AT 35621D A AT35621D A AT 35621DA AT 35621 B AT35621 B AT 35621B
Authority
AT
Austria
Prior art keywords
petroleum
water
help
extraction
borehole
Prior art date
Application number
Other languages
German (de)
Inventor
Wiatschesla Mitkewitsch-Joltok
Original Assignee
Wiatschesla Mitkewitsch-Joltok
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wiatschesla Mitkewitsch-Joltok filed Critical Wiatschesla Mitkewitsch-Joltok
Application granted granted Critical
Publication of AT35621B publication Critical patent/AT35621B/en

Links

Landscapes

  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Description

  

   <Desc/Clms Page number 1> 
 
 EMI1.1 
 
 EMI1.2 
 
 EMI1.3 
 
 EMI1.4 
 

 <Desc/Clms Page number 2> 

 eine unterirdische Gallerie 3 vorgeschen, durch welche ein Rohr 4 gelegt wird, das mit dem Wasserdruckrohr 5 im Bohrloch 1 verbunden wird. Befinden sich die Öffnungen der Bohrlöcher in be- 
 EMI2.1 
 Bohrloch 1 führt (Fig. 5) nicht   ausreicht, mu   das Erdöl bis zum oberen Rande des Bohrloches emporzuheben. In diesem Falle wird das Erdöl durch ein besonderes Rohr 6, welches durch dieselbe Gallerie geführt wird, der Oberfläche zugeführt (Fig. 5). 



   Ausser dem oben geschilderten Verfahren, die Bohrlöcher mit Wasser zu füllen, wird man zuweilen einen Heber benützen können, da die Bohrlöcher für gewöhnlich sehr tief sind und 
 EMI2.2 
 des Bohrloches über die   Wasseroberfläche   (etwa   8m) benützt werden.  



   <Desc / Clms Page number 1>
 
 EMI1.1
 
 EMI1.2
 
 EMI1.3
 
 EMI1.4
 

 <Desc / Clms Page number 2>

 an underground gallery 3 is provided through which a pipe 4 is laid which is connected to the water pressure pipe 5 in the borehole 1. Are the openings of the drill holes in
 EMI2.1
 Borehole 1 leads (Fig. 5) is not sufficient, the oil has to be lifted up to the upper edge of the borehole. In this case the petroleum is fed to the surface through a special pipe 6 which is led through the same gallery (Fig. 5).



   In addition to the method described above of filling the boreholes with water, it will sometimes be possible to use a jack, since the boreholes are usually very deep and
 EMI2.2
 of the borehole above the water surface (about 8m).

 

Claims (1)

PATENT-ANSPRUCH : Verfahren zur Gewinnung von Erdöl, dadurch gekennzeichnet, dass in die Lagerstätten desselben Wasser eingeführt wird, welches infolge seines grösseren spezifischen Gewichtes und EMI2.3 PATENT CLAIM: Process for the production of petroleum, characterized in that the same water is introduced into the reservoirs, which due to its greater specific weight and EMI2.3
AT35621D 1907-05-11 1907-05-11 Process for the extraction of petroleum with the help of water. AT35621B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT35621T 1907-05-11

Publications (1)

Publication Number Publication Date
AT35621B true AT35621B (en) 1908-12-28

Family

ID=3552220

Family Applications (1)

Application Number Title Priority Date Filing Date
AT35621D AT35621B (en) 1907-05-11 1907-05-11 Process for the extraction of petroleum with the help of water.

Country Status (1)

Country Link
AT (1) AT35621B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3728738A1 (en) * 1987-08-26 1988-03-17 Norbert Thornagel Exchange process for oil and gas deposits

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3728738A1 (en) * 1987-08-26 1988-03-17 Norbert Thornagel Exchange process for oil and gas deposits

Similar Documents

Publication Publication Date Title
DE3047803C2 (en) Process for the extraction of petroleum from a petroleum-bearing layer, the lower part of which is water-bearing
AT35621B (en) Process for the extraction of petroleum with the help of water.
DE1240787B (en) Procedure for creating underground storage rooms
DE1224231B (en) Process for the extraction of potassium chloride from natural deposits containing KCl and NaCl
DE594473C (en) Process for the dismantling of large deposits
US3572438A (en) Process of plugging perforations in a well casing
AT53713B (en) Method of lifting sludge.
DE388367C (en) Shaft sinking using the petrification process
DE378460C (en) Petrification process for sinking shafts and for sealing shaft linings
DE1944686A1 (en) Method for sinking earth bores and device for carrying out the same
DE362243C (en) Process for the preparation of mining oil production
DE1249191B (en) Process for secondary recovery of oil by flooding with a high density liquid
AT110440B (en) Method for the production of paper templates or the like by means of a mother template.
AT23039B (en) Flushing head for holes.
AT44822B (en) Method for sinking shafts in water-containing mountains.
DE568333C (en) Process for the production of press concrete piles
AT140889B (en) Device for making a concrete pilot.
DE767587C (en) Process for the production of concrete plugs in drowned shafts
AT208305B (en) Method of making drilled wells
DE650130C (en) Method for lowering compressed air caissons arranged one above the other
AT60366B (en) Procedure for the execution of boreholes for prospecting purposes or for the geognostic investigation of areas.
DE476333C (en) Procedure for lowering the water level when creating narrow and deep excavations
DE599787C (en) Process for the production of bored piles with a widened pile base
DE279947C (en)
AT212227B (en) Process for the creation of groundwater wells