AT6559U2 - DRAINAGE SYSTEM FOR BALCONIES AND TERRACES - Google Patents
DRAINAGE SYSTEM FOR BALCONIES AND TERRACES Download PDFInfo
- Publication number
- AT6559U2 AT6559U2 AT0010203U AT1022003U AT6559U2 AT 6559 U2 AT6559 U2 AT 6559U2 AT 0010203 U AT0010203 U AT 0010203U AT 1022003 U AT1022003 U AT 1022003U AT 6559 U2 AT6559 U2 AT 6559U2
- Authority
- AT
- Austria
- Prior art keywords
- gutter
- channel
- balconies
- terraces
- balcony
- Prior art date
Links
- 239000002352 surface water Substances 0.000 claims abstract description 3
- 238000009413 insulation Methods 0.000 claims description 8
- 238000010276 construction Methods 0.000 claims description 6
- 230000003068 static effect Effects 0.000 claims description 5
- 239000002184 metal Substances 0.000 claims description 2
- 239000004567 concrete Substances 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 4
- 230000035515 penetration Effects 0.000 description 3
- 238000007789 sealing Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- VYZAMTAEIAYCRO-UHFFFAOYSA-N Chromium Chemical compound [Cr] VYZAMTAEIAYCRO-UHFFFAOYSA-N 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000654 additive Substances 0.000 description 1
- 238000009833 condensation Methods 0.000 description 1
- 230000005494 condensation Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000009795 derivation Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/0404—Drainage on the roof surface
- E04D13/0445—Drainage channels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/064—Gutters
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/064—Gutters
- E04D13/0641—Gutter ends
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
- Building Environments (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Beschrieben wird eine Fertigteil-Rinne zur Ableitung der Oberflächenwässer auf Balkonen, Terrassen, und dergleichen, welche Rinne sich dadurch auszeichnet, dass sie mit der Tragplatte (3) des Balkones bzw. der Deckenplatte fix und kraftschlüssig verbunden ist. Durch diese Maßnahme kann der Gefälleestrich entfallen. Die Rinne kann in Teilen oder als Ganzes hergestellt werden.A prefabricated gutter is described for draining the surface water from balconies, patios and the like, which gutter is characterized in that it is fixed and non-positively connected to the support plate (3) of the balcony or the ceiling plate. With this measure, the gradient screed can be omitted. The gutter can be made in part or as a whole.
Description
<Desc/Clms Page number 1>
Problemstellung Die konventionelle Herstellung der Entwässerung von Balkonen, Loggien und dergleichen zu freien Rand, führt in der laufenden Baupraxis des öfteren zu Problemen. Die Gründe dafür sind unter anderem in der notwendigen Zusammenarbeit mehrerer Professionisten zu unterschiedlichen Zeitpunkten in der
Bauausführung zu suchen (Estrichleger, Bauspengler, Isolierer, Fliesenleger bzw. Steinmetz).
Nach Fertigstellung der Tragkonstruktion (meist Stahlbetonplatte) erfolgt das Aufbringen des Estriches (u, U. im Gefälle). Vor Herstellung der Feuchtigkeitsabdichtung hat die Anpassung der
Entwässerungselemente (Gully, Rinnen usw. ) zu erfolgen. Fallweise wird die Rinnenaufhängung auch zwischen die einzelnen Abdichtungslagen angeordnet. Den Abschluss der Arbeiten bildet die
Verlegung der gewählten Oberfläche (Fliese, Stein, Holzlatten auf Polsterhölzer usw.).
Bei einer Befestigung des Geländers mittels senkrechter Steher auf die Tragkonstruktion, steigt die
Komplexität der Arbeitsschritte weiter. Zusätzlich zu den eigentlichen Arbeitsvorgängen müssen die notwendigen Erstarrungszeiten und Austrocknungszeiten von Stahlbeton und Estrichbeton beachtet werden.
Insbesondere Probleme sind im Zusammenhang mit Randentwässerungen in der Praxis zu beobachten : * Probleme bei der Koordinierung der einzelnen Gewerke, die sich bei eventuellen
Terminverzögerungen ergeben.
* Schäden durch mangelnde Absprache der Handwerker (Beschädigung der bereits aufgebrachten Abdichtungsbahn durch die Rinnenbefestigung).
. Anfälligkeit der Blechrinnen auf Beschädigung durch andere Professionisten (Vandatismus) * Möglichkeit von Feuchtigkeitsschäden aufgrund der notwendigen Durchdringungen der
Abdichtung bei Anordnung senkrechter Geländesteher.
<Desc/Clms Page number 2>
Technische Beschreibung
Die gegenständliche Lösung sieht die Verwendung von Betonfertigteilrinnen über die gesamte Balkonplattenhöhe vor. Der Einbau erfolgt im Zuge der Herstellung der Schalung für die
Stahlbetontragkonstruktion. Die kraftschlüssige Verbindung wird durch entsprechend dimensionierten und ausgeformten Ankereisen gewährleistet. Durch diese Bewehrung besteht zusätzlich die Möglichkeit der direkten Befestigung von Geländerelementen durch schrauben oder schweissen. Die sichere
Entwässerung wird durch Vorsehen eines entsprechenden Gefälles im Fertigteilelements erreicht ; das Element selbst wird aus optischen Gründen ohne sichtbare Neigung horizontal eingebaut.
Zur Vermeidung von Schlierenbildung durch Abtropfen ist die übliche Wassemase bereits integriert.
Im Folgenden die augenscheinlichen Vorteile : * Wesendliche Erleichterung der Arbeitsablaufes durch Verringerung der beteiligten Gewerke.
* Einfachen und rascher Einbau.
* Geringe Witterungsabhängigkeit durch Vorfertigung.
Geringere Schadensanfälligkeit der Rinnen durch unsachgemässe Nutzung, da sie durch
Einbettung im Beton widerstandsfähig sind.
Minimierung der Arbeiten auf der Baustelle (vor allem Spenglerarbeiten), dadurch Steigerung der Qualität, Vermeidung von Spätschäden und Zeitersparnis.
. Möglichkeit der Befestigung von Gefändestehem an dem Fertilteil von oben oder frontal, dadurch einfache Feuchtigkeitsabdichtung der Balkonfläche, da eine Durchdringung nicht mehr erfolgt.
Fertige Ansichtsflächen, die entsprechende Betonzusatzstoffe auch beliebige Farbgebung und viele Gestaltungsmöglichkeiten ermöglichen (Fliesen, Verblechung, Chrom usw.)
<Desc/Clms Page number 3>
Bautechnische Stellungnahme Statik Eine ausreichende statische Bemessung der Stahlbetonplatte ist bei den vorgesehenen Abmessungen der Fertigteilrinne problemlos zu bewerkstelligen. Es ist jedoch auf eine ausreichende Verankerung der Geländerbefestigung auf der Rinne zu achten.
Bauphysik Bei freier Untersicht und Verwendung eines Isokorbs ist eine Wärmedämmung nicht erforderlich. Soll das Element allerdings zur Entwässerung von Dachterrassen herangezogen werden, oder ist die Balkonplatte rundum zu dämmen, muss die Rinne entsprechend mit einer Wärmedämmung ummantelt werden (fig. 3), um etwaige Kältebrücken insbesonders in Raumecken zu Wasserkondensation führen können, zu vermeiden.
Das beschriebene Produkt stellt mit Sicherheit eine wesentliche Erleichterung derzeitiger Arbeitsbedingungen dar. Eine Erweiterung um Eck- und Ableitungselemente, gedämmte Ausführungsvarianten und verschiedene Farbschattierungen sind denkbar und erhöht die Anwenderfreundlichkeit.
Figurenübersicht Fig. 1 zeigt einen Vertikalschnitt durch die Balkonplatte mit Rinne Fig. 2 zeigt die Draufsicht auf die Rinne Fig. 3 zeigt einen Vertikalschnitt durch eine Terrasse Figurenbeschreibung Fig. 1 zeigt einen Vertikalschnitt durch die Balkonplatte mit Anbindung der Isolierung auf die
Fertigteilrinne. Wahlweise kann die Entwässerung seitlich bzw. durch einen Ablaufstutzen in der
Rinne erfolgen. Auf die Isolierung kann der Fliesenbelag (auch anderer Belag) aufgebracht werden. Somit ist die Konstruktionshöhe der gesamten Balkonplatte nur von der statischen
Bemessung abhängig.
<Desc/Clms Page number 4>
Fig. 2 zeigt eine Rinnendraufsicht mit den Montagebügel für eine Gel nderkonstruktion. Wahlweise
Kann diese angeschweisst oder durch Schraubverbindungen hergestellt werden. Dadurch wird ein Durchdringen der Isolierung vermieden und es entstehen keine Schwachpunkte, die sonst bei schlampiger Ausführung in der Praxis oft zu Problemen führen. Hier ist wahlweise eine
Ableitung des anfallenden Oberflächen wassers mit einer Durchführung oder mit einem
Chromabtropfblech dargestellt.
Fig. 3 zeigt einen Schnitt durch eine Terrasse als Umkehrdach ausgeführt. Dabei wird die Rinne in der
Decke eingelegt und mit einer zusätzlichen Isolierung versehen. Die Rinne kann so ausgebildet werden, dass sie statische Funktionen übernimmt (Bewehrungseisen zur Verbindung mit der umgebenden Betonplatte). Die Breite ist von der anfallenden Wassermenge abhängig. Die
Verankerung mit der Decke erfolgt durch Ankereisen.
<Desc / Clms Page number 1>
Problem The conventional production of drainage of balconies, loggias and the like to free edge often leads to problems in the current building practice. The reasons for this include the necessary cooperation of several professionals at different times in the
To search for construction work (screed layer, construction worker, insulator, tiler or stonemason).
After completion of the supporting structure (usually reinforced concrete slab), the screed is applied (possibly on a slope). Before making the moisture seal, adjust the
Drainage elements (gully, gutters, etc.). In some cases the gutter suspension is also placed between the individual sealing layers. The work is completed by the
Laying the selected surface (tile, stone, wooden slats on upholstery, etc.).
When the railing is fastened to the supporting structure using a vertical post, it increases
Complexity of the work steps further. In addition to the actual work processes, the necessary setting times and drying times of reinforced concrete and screed concrete must be observed.
Problems in connection with edge drainage can be observed in practice in particular: * Problems in the coordination of the individual trades, which can arise in the
Appointment delays result.
* Damage due to a lack of agreement between the craftsmen (damage to the waterproofing membrane already applied due to the gutter fastening).
, Vulnerability of the troughs to damage by other professionals (vandatism) * Possibility of moisture damage due to the necessary penetrations of the
Sealing when vertical upright is installed.
<Desc / Clms Page number 2>
technical description
The objective of the solution is to use precast concrete channels over the entire height of the balcony slab. The installation takes place in the course of the production of the formwork for the
Reinforced concrete supporting structure. The non-positive connection is guaranteed by appropriately dimensioned and shaped anchor bars. With this reinforcement there is also the possibility of directly fastening railing elements by screwing or welding. The safe one
Drainage is achieved by providing a corresponding gradient in the precast element; for visual reasons, the element itself is installed horizontally without any visible inclination.
To avoid streaking due to dripping, the usual water mast is already integrated.
The following are the obvious advantages: * Significant simplification of the workflow by reducing the trades involved.
* Easy and quick installation.
* Low weather dependency through prefabrication.
Less susceptibility to damage of the gutters due to improper use as they run through
Embedding in concrete are resistant.
Minimization of work on the construction site (especially plumbing work), thereby increasing quality, avoiding late damage and saving time.
, Possibility of attaching Gefändestehem to the prefabricated part from above or from the front, thereby easy moisture sealing of the balcony area, since penetration no longer occurs.
Finished visible surfaces, which allow appropriate concrete additives, any color and many design options (tiles, sheet metal, chrome, etc.)
<Desc / Clms Page number 3>
Structural Statement Statics A sufficient static dimensioning of the reinforced concrete slab can be achieved without any problems given the dimensions of the precast channel. However, it must be ensured that the railing attachment is adequately anchored to the gutter.
Building physics Insulation is not required if the ceiling is open and an Isokorb is used. However, if the element is to be used for the drainage of roof terraces, or if the balcony slab is to be insulated all around, the gutter must be covered with thermal insulation accordingly (fig. 3) in order to avoid any cold bridges, especially in room corners, which can lead to water condensation.
The product described is definitely a significant relief from current working conditions. An extension with corner and drainage elements, insulated design variants and different shades of color are conceivable and increase user-friendliness.
1 shows a vertical section through the balcony slab with gutter. FIG. 2 shows the top view of the gutter. FIG. 3 shows a vertical section through a terrace. FIG. 1 shows a vertical section through the balcony slab with connection of the insulation to the
Precast gutter. Optionally, the drainage to the side or through a drain pipe in the
Gutter. The tile covering (also other covering) can be applied to the insulation. Thus, the construction height of the entire balcony slab is only static
Design dependent.
<Desc / Clms Page number 4>
Fig. 2 shows a gutter top view with the mounting bracket for a gel nder construction. Optional
Can this be welded or made by screw connections. This prevents penetration of the insulation and there are no weak points that otherwise often lead to problems in practice with sloppy execution. Here is an option
Derivation of the surface water with a bushing or with a
Chrome drip tray shown.
Fig. 3 shows a section through a terrace designed as an inverted roof. The groove in the
Blanket inserted and provided with additional insulation. The gutter can be designed in such a way that it takes on static functions (reinforcing bars for connection to the surrounding concrete slab). The width depends on the amount of water. The
It is anchored to the ceiling using anchor bolts.
Claims (6)
Priority Applications (6)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AT0010203U AT6559U3 (en) | 2003-02-20 | 2003-02-20 | DRAINAGE SYSTEM FOR BALCONIES AND TERRACES |
| AT04712444T ATE366341T1 (en) | 2003-02-20 | 2004-02-19 | METHOD FOR PRODUCING A BALCONY OR TERRACE, PRECAST CONCRETE PART AND PRECAST CONCRETE SYSTEM |
| EP04712444A EP1606466B1 (en) | 2003-02-20 | 2004-02-19 | Method for the production of a balcony or a terrace, precast concrete unit, and system of precast concrete units |
| DE502004004236T DE502004004236D1 (en) | 2003-02-20 | 2004-02-19 | METHOD FOR PRODUCING A BALCONY OR A TERRACE, CONCRETE PRODUCT AND CONCRETE PRODUCT SYSTEM |
| PCT/AT2004/000052 WO2004074588A2 (en) | 2003-02-20 | 2004-02-19 | Method for the production of a balcony or a terrace, precast concrete unit, and system of precast concrete units |
| ES04712444T ES2290672T3 (en) | 2003-02-20 | 2004-02-19 | PROCEDURE FOR THE CONSTRUCTION OF A BALCONY OR A TERRACE, PREFABRICATED CONCRETE PART AND PREFABRICATED CONCRETE PARTS SYSTEM. |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AT0010203U AT6559U3 (en) | 2003-02-20 | 2003-02-20 | DRAINAGE SYSTEM FOR BALCONIES AND TERRACES |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| AT6559U2 true AT6559U2 (en) | 2003-12-29 |
| AT6559U3 AT6559U3 (en) | 2004-01-26 |
Family
ID=29274035
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AT0010203U AT6559U3 (en) | 2003-02-20 | 2003-02-20 | DRAINAGE SYSTEM FOR BALCONIES AND TERRACES |
| AT04712444T ATE366341T1 (en) | 2003-02-20 | 2004-02-19 | METHOD FOR PRODUCING A BALCONY OR TERRACE, PRECAST CONCRETE PART AND PRECAST CONCRETE SYSTEM |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AT04712444T ATE366341T1 (en) | 2003-02-20 | 2004-02-19 | METHOD FOR PRODUCING A BALCONY OR TERRACE, PRECAST CONCRETE PART AND PRECAST CONCRETE SYSTEM |
Country Status (5)
| Country | Link |
|---|---|
| EP (1) | EP1606466B1 (en) |
| AT (2) | AT6559U3 (en) |
| DE (1) | DE502004004236D1 (en) |
| ES (1) | ES2290672T3 (en) |
| WO (1) | WO2004074588A2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2006012661A1 (en) * | 2004-08-02 | 2006-02-09 | Walter Baumgartner | Method for in-situ production of a flat roof or terrace |
| AT524807A3 (en) * | 2021-03-05 | 2025-03-15 | Aco Ahlmann Se & Co Kg | Balcony or terrace element with a drainage device, drainage device for such a balcony or terrace element and manufacturing method |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102007017612A1 (en) * | 2007-04-12 | 2008-10-16 | Panzer Bauunternehmen Gmbh | Frame for a balcony or a terrace and method for its production |
| CN101775880A (en) * | 2010-02-22 | 2010-07-14 | 王庭法 | Roof drainage structure and manufacturing method thereof |
| AU2021221765A1 (en) * | 2020-10-09 | 2022-04-28 | Creative Drain Solutions Pty Ltd | Drainage channel assembly |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE1264727B (en) * | 1962-01-13 | 1968-03-28 | Vepa Vorrichtungsbau Emil Pfis | Balcony slab |
| DE2606865C2 (en) * | 1976-02-20 | 1982-06-24 | Schneider & Klippel Kg, 4190 Kleve | Step for spectator stands |
| SE430265B (en) * | 1982-09-01 | 1983-10-31 | Curt Willy Persson | MAKE SITTING BALCONGS |
| NO177800C (en) * | 1993-05-04 | 1995-11-22 | Helge Schjaerve | Profile for water drainage and, for example, handrails on balconies |
-
2003
- 2003-02-20 AT AT0010203U patent/AT6559U3/en not_active IP Right Cessation
-
2004
- 2004-02-19 ES ES04712444T patent/ES2290672T3/en not_active Expired - Lifetime
- 2004-02-19 EP EP04712444A patent/EP1606466B1/en not_active Expired - Lifetime
- 2004-02-19 WO PCT/AT2004/000052 patent/WO2004074588A2/en not_active Ceased
- 2004-02-19 DE DE502004004236T patent/DE502004004236D1/en not_active Expired - Lifetime
- 2004-02-19 AT AT04712444T patent/ATE366341T1/en not_active IP Right Cessation
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2006012661A1 (en) * | 2004-08-02 | 2006-02-09 | Walter Baumgartner | Method for in-situ production of a flat roof or terrace |
| AT524807A3 (en) * | 2021-03-05 | 2025-03-15 | Aco Ahlmann Se & Co Kg | Balcony or terrace element with a drainage device, drainage device for such a balcony or terrace element and manufacturing method |
Also Published As
| Publication number | Publication date |
|---|---|
| EP1606466B1 (en) | 2007-07-04 |
| DE502004004236D1 (en) | 2007-08-16 |
| WO2004074588A3 (en) | 2004-12-23 |
| ES2290672T3 (en) | 2008-02-16 |
| EP1606466A2 (en) | 2005-12-21 |
| AT6559U3 (en) | 2004-01-26 |
| WO2004074588A2 (en) | 2004-09-02 |
| ATE366341T1 (en) | 2007-07-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE102015001891B4 (en) | Edging for balcony and terrace floors | |
| DE9004119U1 (en) | Drain end profile | |
| DE69715044T2 (en) | INSULATION AND MOUNTING FRAME FOR A SKYLIGHT AND METHOD FOR INSTALLING A SKYLIGHT WITH THIS FRAME | |
| DE102009040531B4 (en) | Thermal bridge-free attic | |
| AT6559U2 (en) | DRAINAGE SYSTEM FOR BALCONIES AND TERRACES | |
| CH702922B1 (en) | Closure component for balcony or facade of building, has dewatering channel element running parallel to hand rail, which is attached at closure component, and fastening elements connected with dewatering channel elements by junction plate | |
| DE8815671U1 (en) | Sealing flat slats for terraces and balconies | |
| EP1980675B1 (en) | Frame for a balcony or terrace and method for its manufacture | |
| AT17586U1 (en) | Pre-assembled insulated window sill system | |
| AT502807B1 (en) | METHOD FOR PRODUCING A FLAT ROOF OR TERRACE | |
| DE202017002357U1 (en) | Barrier-free drainage channel with plaster rail and sealing level for the door area for setting concrete in exposed-concrete balcony blocks, pergolas and terraces. | |
| DE9307724U1 (en) | Parapet element | |
| CH716033B1 (en) | End module for a flat roof with external thermal insulation for attaching a railing. | |
| DE29815325U1 (en) | Metal construction as a balcony in system construction | |
| CH717631B1 (en) | Pre-assembled insulated window sill system. | |
| DE10118598B4 (en) | Balcony structure | |
| DE102013102617A1 (en) | Method for shielding a free area | |
| DE3247053A1 (en) | External curtain wall | |
| EP1108823B1 (en) | Prefabricated cellar | |
| DE843595C (en) | Concrete roof with roof panels laid between the rafters | |
| JPH0522571Y2 (en) | ||
| DE10223851C1 (en) | Roof construction unit is for flats in a block that have roofs and an application deck that reduces the height of the roof | |
| DE102005014545A1 (en) | Renovating system for balconies uses two part frame with guide part with L or U profile connected to building and with insert with stays for holding sealed step covering | |
| DE29909073U1 (en) | Support profile for parapet cover | |
| DE29700083U1 (en) | Floor plan enlarging and parapet-forming component for loggia widening and bay construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM9K | Lapse due to non-payment of renewal fee |