AT87529B - Control device for the transfer of steam from an electrically heated boiler to a steam consumption point. - Google Patents

Control device for the transfer of steam from an electrically heated boiler to a steam consumption point.

Info

Publication number
AT87529B
AT87529B AT87529DA AT87529B AT 87529 B AT87529 B AT 87529B AT 87529D A AT87529D A AT 87529DA AT 87529 B AT87529 B AT 87529B
Authority
AT
Austria
Prior art keywords
steam
boiler
control device
electrically heated
valve
Prior art date
Application number
Other languages
German (de)
Inventor
Ernst Constam
Original Assignee
Ernst Constam
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ernst Constam filed Critical Ernst Constam
Application granted granted Critical
Publication of AT87529B publication Critical patent/AT87529B/en

Links

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Regelungsvorrichtung für die Überleitung des Dampfes von einem elektrisch geheizten Kessel zu einer Dampfverbrauchsstelle. 
 EMI1.1 
 

 <Desc/Clms Page number 2> 

   Überströmventil   eingeschaltet. Dasselbe besteht in der Hauptsache aus einem Gehäuse 15, einem darin eingesetzten   Doppelsitzventil-M, welches   mittels der Membrane 17 gesteuert wird. Diese Membrane ist von unten durch den im elektrischen Kessel 1 herrschenden Dampfdruck von oben durch die für einen gewissen Betriebsdruck einstellbare Feder 18 belastet. Weil das Ventil 16 als Doppelsitzventil ausgebildet ist, kann der hinter dem Ventil bzw. im Grosswasserraumkessel 14 herrschende Druck während des Betriebes nur einen geringen Einfluss auf die Stellung des Ventils 16 ausüben.

   Ist das Überströmventil beispielsweise für eine Betriebsspannung von 10 kg cm2 eingestellt, so bewirkt es, dass im elektrischen Kessel dieser Betriebsdruck aufrecht erhalten wird, auch wenn im grossen Kessel   14   anfänglich nur ein ganz geringer Druck herrscht und sich verändert, indem er beispielsweise gegen den Betrag 10 kg cm2 ansteigt. Auf diese Weise ist es möglich, in dem elektrischen Kessel eine nahezu gleichbleibende Dampferzeugung und damit einen gleichbleibenden Stromverbrauch zu erzielen, auch wenn der im grossen Kessel 14 herrschende Gegendruck sich innerhalb weiter Grenzen ändert. 



   Wird nun gemäss Fig. 2 zwischen den elektrischen Kessel 1 und das   Überströmventil 75   ein von Hand einstellbares Drosselventil eingebaut, so kann dadurch erreicht werden, d"ss zwischen dem Innern des Kessels 1 und dem Einlaufraum des Ventilgehäuses 15 ein gewisses Druckgefälle herrscht, während gleichzeitig das Drosselventil 21 einen bestimmten 
 EMI2.1 
 bewirken, dass in der Zeiteinheit nur ein ganz bestimmtes Dampfgewicht durchströmt. Wird das Ventil 21 beispielsweise etwas mehr geschlossen, so wird einerseits das Druckgefälle vergrössert, andrerseits der Durchflussquerschnitt verkleinert, und dies hat zur Folge, dass   die Durchflussmenge   sinkt. Bei der neuen Stellung braucht es also mehr Zeit, um den Grosswasserkessel zu füllen, als wenn das Ventil 21 auf die vorige grössere Öffnung eingestellt wäre.

   So kann bewirkt werden, dass die Auffüllung des grossen Kessels entweder innerhalb weniger Stunden erfolgt, oder dass hierzu beispielsweise die ganze Nacht erforderlich ist. Statt des in der Fig. 2 beispielsweise mittels Handrädchen 22 einstellbaren Ventils kann natürlich irgendeine andere von Hand einstellbare Drosselvorrichtung angewendet werden. 



   Fig. 3 zeigt, wie das als Mengenregler dienende Drosselventil 31 mittels Zahnradtrieb 32 von einem kleinen Elektromotor 34 und des Schneckenvorgeleges 35 verstellt wird. Die eigene Einstellung des Motors 34 wird in an sich bekannter Weise von der im Stromnetz verfügbaren elektrischen Energiemenge abhängig gemacht und zu diesem Behuf der Motor 34 durch besondere, in der Zeichnung nicht ersichtliche Vorrichtungen gesteuert. Wenn die verfügbare Energiemenge beispielsweise steigt, so wird der Motor 34 für kurze Zeit so in 
 EMI2.2 
 stellt sich der Kessel selbsttätig auf eine grössere Verdampfung ein, und so kann seine Leistung der im Stromnetz verfügbaren grösseren Energie angepasst werden. 



   PATENT-ANSPRÜCHE : 
 EMI2.3 
 geheizten Kessel mit ununterbrochen gleichbleibender Speisung und Regelung des Wasserstandes durch den Kesseldruck zu einer Dampfverbrauchsstelle, dadurch gekennzeichnet, dass in die Verbindungsleitung ausser dem Dampfabsperrventil ein vom Dampfdruck im elektrisch geheizten Kessel in Tätigkeit gesetzter Druckregler eingebaut ist.



   <Desc / Clms Page number 1>
 



  Control device for the transfer of steam from an electrically heated boiler to a steam consumption point.
 EMI1.1
 

 <Desc / Clms Page number 2>

   Overflow valve switched on. The same consists mainly of a housing 15, a double seat valve M inserted in it, which is controlled by means of the membrane 17. This membrane is loaded from below by the steam pressure prevailing in the electric boiler 1 from above by the spring 18 which is adjustable for a certain operating pressure. Because the valve 16 is designed as a double seat valve, the pressure prevailing downstream of the valve or in the large water chamber 14 can only have a slight influence on the position of the valve 16 during operation.

   If the overflow valve is set, for example, for an operating voltage of 10 kg cm2, it has the effect that this operating pressure is maintained in the electric boiler, even if there is initially only a very low pressure in the large boiler 14 and changes, for example by counteracting the amount 10 kg cm2 increases. In this way it is possible to achieve almost constant steam generation in the electric boiler and thus constant power consumption, even if the back pressure prevailing in the large boiler 14 changes within wide limits.



   If, according to FIG. 2, a manually adjustable throttle valve is installed between the electric boiler 1 and the overflow valve 75, it can thereby be achieved that a certain pressure gradient prevails between the interior of the boiler 1 and the inlet chamber of the valve housing 15, while at the same time the throttle valve 21 a certain
 EMI2.1
 cause only a certain weight of steam to flow through the unit of time If the valve 21 is closed a little more, for example, then on the one hand the pressure gradient is increased, on the other hand the flow cross-section is reduced, and this has the consequence that the flow rate decreases. In the new position it therefore takes more time to fill the large water boiler than if the valve 21 were set to the previous larger opening.

   In this way it can be ensured that the filling of the large boiler takes place either within a few hours or that, for example, the whole night is required for this. Instead of the valve which can be adjusted by means of handwheels 22, for example, in FIG. 2, any other manually adjustable throttle device can of course be used.



   3 shows how the throttle valve 31 serving as a flow regulator is adjusted by means of a gear drive 32 from a small electric motor 34 and the worm gear 35. The own setting of the motor 34 is made dependent, in a manner known per se, on the amount of electrical energy available in the power supply system, and for this purpose the motor 34 is controlled by special devices not shown in the drawing. For example, if the amount of energy available increases, the motor 34 will be so in for a short time
 EMI2.2
 the boiler automatically adjusts itself to greater evaporation and so its output can be adapted to the greater energy available in the power grid.



   PATENT CLAIMS:
 EMI2.3
 heated boiler with uninterrupted constant supply and regulation of the water level by the boiler pressure to a steam consumption point, characterized in that in the connecting line, in addition to the steam shut-off valve, a pressure regulator activated by the steam pressure in the electrically heated boiler is installed.

 

Claims (1)

2. Regelungsvorrichtung nach Anspruch 1. dadurch gekennzeichnet, dass zur Regelung der Dampfmenge das Dampfabsperrventil mittels eines Elektromotors in Abhängigkeit von der zur Dampferzeugung im elektrisch geheizten Kessel verfügbaren elektrischen Energiemenge gesteuert ist. 2. Control device according to claim 1, characterized in that to control the amount of steam, the steam shut-off valve is controlled by means of an electric motor as a function of the amount of electrical energy available for generating steam in the electrically heated boiler.
AT87529D 1919-10-31 1920-10-19 Control device for the transfer of steam from an electrically heated boiler to a steam consumption point. AT87529B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH87529X 1919-10-31

Publications (1)

Publication Number Publication Date
AT87529B true AT87529B (en) 1922-03-10

Family

ID=4344316

Family Applications (1)

Application Number Title Priority Date Filing Date
AT87529D AT87529B (en) 1919-10-31 1920-10-19 Control device for the transfer of steam from an electrically heated boiler to a steam consumption point.

Country Status (1)

Country Link
AT (1) AT87529B (en)

Similar Documents

Publication Publication Date Title
DE1401548A1 (en) Absorption cooling device
DE1758221B1 (en) DEVICE FOR HEATING A MEDIUM IN A PIPING SYSTEM THROUGH AN OVEN
DE330817C (en) Control device for the transfer of steam from an electrically heated boiler to a point of consumption
DE710188C (en) Electrode-heated steam boiler with automatic power regulation
DE2014338B2 (en)
DE408757C (en) Feed water regulator for steam boiler
DE324883C (en) Steam heating system
DE729073C (en) Boiler system for central heating with a directly heated hot water boiler and a water heater assigned to it
AT121285B (en) Control arrangement for steam generation systems with forced circulation of the working medium.
DE470033C (en) Heat converter system for steam power plants with fluctuating power requirements
AT104932B (en) Process for the operation of steam power plants.
DE357849C (en) Device for regulating the output of electrode steam boilers
DE427032C (en) Large dining room boiler, in which both the filling of the dining room to compensate for the boiler output and the highest and lowest water level are controlled mechanically
DE429995C (en) Device for regulating the boiler feed in steam boiler systems with preheater
DE723059C (en) Electrode heater for flowing media
DE536630C (en) Steam system with single or multi-stage tapping machine
DE413290C (en) Turbine system with a main controller of the usual design and a hydraulic brake controller
DE341391C (en) Device for heating, vaporizing or decomposing fluids, in which they themselves form the heating resistance
DE700219C (en) Extended steam turbine plant
AT54301B (en) Steam power plant with heat storage.
AT73970B (en) Water level regulator for steam boilers.
DE1176818B (en) Overflow storage system with several draw-off points
AT105258B (en) System for preheating feed water.
AT61443B (en) Control device for vacuum steam heating.
AT95086B (en) Device for regulating the speed of electric prime movers.