ATE209273T1 - METHOD FOR PLACING FILLING MATERIAL UNDER A SOLID ROAD AND DEVICE FOR IMPLEMENTING THE METHOD - Google Patents
METHOD FOR PLACING FILLING MATERIAL UNDER A SOLID ROAD AND DEVICE FOR IMPLEMENTING THE METHODInfo
- Publication number
- ATE209273T1 ATE209273T1 AT97110956T AT97110956T ATE209273T1 AT E209273 T1 ATE209273 T1 AT E209273T1 AT 97110956 T AT97110956 T AT 97110956T AT 97110956 T AT97110956 T AT 97110956T AT E209273 T1 ATE209273 T1 AT E209273T1
- Authority
- AT
- Austria
- Prior art keywords
- track
- implementing
- filling material
- material under
- solid road
- Prior art date
Links
- 239000000463 material Substances 0.000 title abstract 3
- 239000007787 solid Substances 0.000 title 1
- 239000012876 carrier material Substances 0.000 abstract 1
- 239000000945 filler Substances 0.000 abstract 1
- 230000037431 insertion Effects 0.000 abstract 1
- 238000003780 insertion Methods 0.000 abstract 1
- 239000002184 metal Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
- E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/03—Injecting, mixing or spraying additives into or onto ballast or underground
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/06—Height or lateral adjustment means or positioning means for slabs, sleepers or rails
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
- Road Repair (AREA)
- Railway Tracks (AREA)
- Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)
- Crystals, And After-Treatments Of Crystals (AREA)
Abstract
The mixed materials are delivered or injected on site via openings in the track (6). After most of the filler material has precipitated, the liberated carrier material is allowed to drain off either through further openings in the track (12), or at the sides between the track and the foundation (3). The filling openings can be formed when initially laying the track, typically consisting of vertical round or polygonal passages lined with plastic or metal tubes, or they can be drilled at the time of insertion.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE19631430A DE19631430C2 (en) | 1996-08-03 | 1996-08-03 | Method for introducing filler material under a solid carriageway and device for carrying out the method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| ATE209273T1 true ATE209273T1 (en) | 2001-12-15 |
Family
ID=7801729
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AT97110956T ATE209273T1 (en) | 1996-08-03 | 1997-07-02 | METHOD FOR PLACING FILLING MATERIAL UNDER A SOLID ROAD AND DEVICE FOR IMPLEMENTING THE METHOD |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP0822293B1 (en) |
| AT (1) | ATE209273T1 (en) |
| DE (2) | DE19631430C2 (en) |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE19848655B4 (en) * | 1998-05-12 | 2009-09-17 | Ed. Züblin Ag | Renovation of slab tracks |
| DE50006215D1 (en) | 1999-06-16 | 2004-06-03 | Hochtief Ag Hoch Tiefbauten | Method for compensating vertical track body displacements of a fixed road |
| DE10064748B4 (en) * | 2000-09-12 | 2014-10-16 | Max Bögl Bauunternehmung GmbH & Co. KG | Method and device for correcting the position of a slab construction made of precast concrete slabs |
| DE10248037B3 (en) * | 2002-10-15 | 2004-05-06 | Walter - Heilit Verkehrswegebau Gmbh | Secondary treatment method for railway track with extraction of fastening bolts from sleepers, drilling of sleeper, and filling of space with synthetic resin or cement suspension |
| DE102005013947A1 (en) * | 2005-03-26 | 2006-10-05 | Pfleiderer Infrastrukturtechnik Gmbh & Co Kg | Method for height correction of a fixed rail track and fixed rail track |
| RU2334839C1 (en) * | 2007-03-27 | 2008-09-27 | Государственное образовательное учреждение высшего профессионального образования Иркутский государственный университет путей сообщения (ИрГУПС) | Method of tunnel railway base repair |
| DE102007048214A1 (en) * | 2007-10-08 | 2009-04-09 | Rte Technologie Gmbh | Prefabricated supporting concrete slab aligning method for rail track for rail-mounted vehicle, involves adjusting concrete slabs and two beam elements in desired height, side and inclination positions by using lifting leveling elements |
| RU2604749C2 (en) | 2011-09-01 | 2016-12-10 | Байер Интеллектуэль Проперти Гмбх | Method of ballast prisms forming |
| CZ304730B6 (en) * | 2013-07-16 | 2014-09-10 | České vysoké učenà technické v Praze, Fakulta stavebnà | Prefabricate for construction of roads with concrete surface and method of making the same |
| CN116876263B (en) * | 2023-02-03 | 2025-09-19 | 中南大学 | Automatic adjusting device for settlement of rail bearing groove of railway fastener |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2068714A (en) * | 1932-01-11 | 1937-01-26 | Stedefeld Curt | Elastic permanent way |
| US4451180A (en) * | 1978-05-09 | 1984-05-29 | Duval Henry H | Method for restructuring railway roadbeds |
| JPH0657339B2 (en) * | 1989-12-02 | 1994-08-03 | コッホ・マーモリート・ゲーエムベーハー | Method and apparatus for applying multi-component resin and use thereof |
| AT400338B (en) * | 1991-06-17 | 1995-12-27 | Plasser Bahnbaumasch Franz | MACHINE FOR CORRECTING THE POSITION OF A TRACK ON A SUPPORTING LAYER |
| DE4319470C1 (en) * | 1993-06-11 | 1994-08-11 | Zueblin Ag | Method of compensating for subsidence below a continuously laid solid roadway |
-
1996
- 1996-08-03 DE DE19631430A patent/DE19631430C2/en not_active Expired - Fee Related
-
1997
- 1997-07-02 DE DE59705452T patent/DE59705452D1/en not_active Expired - Fee Related
- 1997-07-02 EP EP97110956A patent/EP0822293B1/en not_active Expired - Lifetime
- 1997-07-02 AT AT97110956T patent/ATE209273T1/en not_active IP Right Cessation
Also Published As
| Publication number | Publication date |
|---|---|
| DE19631430C2 (en) | 2000-03-23 |
| DE59705452D1 (en) | 2002-01-03 |
| EP0822293A1 (en) | 1998-02-04 |
| DE19631430A1 (en) | 1998-02-05 |
| EP0822293B1 (en) | 2001-11-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3764066A (en) | Concrete railroad tie product | |
| DE3769074D1 (en) | METHOD FOR PRODUCING A PILE IN THE GROUND, AND DRILLING MACHINE, AND DEVICE FOR CARRYING OUT THIS METHOD. | |
| DE59705452D1 (en) | Method for introducing filling material under a solid roadway and device for carrying out the method | |
| DE69429901D1 (en) | Method and device for regulating underground storage | |
| DE69804017D1 (en) | DEVICE AND METHOD FOR INJECTING TREATMENT LIQUIDS IN AN UNDERGROUND FORMATION | |
| AT399551B (en) | REPLACEMENT PIPE FOR INSTALLATION IN AN EXISTING PIPE AND METHOD AND DEVICE FOR PRODUCING THE SAME | |
| DE68918962D1 (en) | Method and device for carrying out analyzes with the possibility of quantity. | |
| ATA224287A (en) | METHOD FOR GROWING CRYSTALS AND DEVICE FOR CARRYING OUT THE METHOD | |
| ATA197088A (en) | METHOD AND DEVICE FOR PLANTING PLANT PLANTS WITH BALLS | |
| DE69416401D1 (en) | METHOD AND DEVICE FOR PRODUCING AND FILLING PACKAGES | |
| ATA83885A (en) | DEVICE AND METHOD FOR DISTRIBUTING LIQUIDS WITHIN AN UNDERGROUND DRILL HOLE | |
| DE69020547D1 (en) | METHOD AND DEVICE FOR CONTROLLING DRILLING LIQUID PARAMETERS. | |
| ATE293718T1 (en) | METHOD FOR MAKING A TRACK SURFACE | |
| DE69406155D1 (en) | Method and device for driving pipes into the ground | |
| DE3481929D1 (en) | METHOD AND DEVICE FOR FRAGMENTING ASPHALT. | |
| DE3855107D1 (en) | Floating sand and / or gravel extracting device and method of using the plant | |
| DE3578580D1 (en) | METHOD AND DEVICE FOR PLANNING CONCRETE DURING THE CASTING OF LARGE AREAS. | |
| DE3861842D1 (en) | METHOD FOR MIXING FUEL AND WATER, AND DEVICE FOR CARRYING OUT THE METHOD. | |
| DE69720199D1 (en) | METHOD AND DEVICE FOR PRODUCING CEMENT BLOCKS | |
| DE69004040D1 (en) | Method and device for manufacturing earthen blocks. | |
| DE69017415D1 (en) | Method and device for electro-optical modulation using the low-energy oblique transition in a strongly coupled superlattice. | |
| CA2237346A1 (en) | Method for restoring used railroad ties and the restored railroad ties formed thereby | |
| ATE219237T1 (en) | METHOD AND DEVICE FOR FILLING BOREHOLES | |
| DE69928848D1 (en) | Method and device for producing ground piles with extended pile heads | |
| DE68914311D1 (en) | Method for the automatic production of a container lined with a label, in particular a container with a round cross section, and device for carrying out this method. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| REN | Ceased due to non-payment of the annual fee |