On-Site Construction Work That Accompanies The Preparation And Application Of Concrete
(AREA)
Abstract
A REINFORCED PRE- CAST CONCRETE PILE INCLUDES AN INTERMEDIATE CAST-IN PLATE 5' ATTACHED TO CAST- IN REINFORCEMENTS 3, 9, 9' OF THE PILE. FOLLOWING DRIVING OF A COLUMN OF THE PILES, IF THE PLATE 5' OF THE UPPERMOST PILE IS ABOVE A REFERENCE TERRAIN LEVEL THEN THE UPWARDLY PROJECTING PART IS CUT OFF AND THAT PART SEVERED AT THE LOWER FACE OF ITS PLATE 5' AND THE PORTION THEREOF ABOVE THAT LOWER FACE IS RE-USED IN A SUBSEQUENT COLUMN OF PILES.(FIG. 3)