|
US8145463B2
(en)
*
|
2005-09-15 |
2012-03-27 |
Schlumberger Technology Corporation |
Gas reservoir evaluation and assessment tool method and apparatus and program storage device
|
|
FR2894672B1
(fr)
*
|
2005-12-12 |
2008-01-18 |
Inst Francais Du Petrole |
Methode de determination des capacites de stockage de gaz acides d'un milieu geologique a l'aide d'un modele de transport reactif multiphasique
|
|
US7877246B2
(en)
*
|
2006-09-22 |
2011-01-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
|
US7895241B2
(en)
*
|
2006-10-16 |
2011-02-22 |
Schlumberger Technology Corp. |
Method and apparatus for oilfield data repository
|
|
US8352227B2
(en)
*
|
2006-10-30 |
2013-01-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
|
BRPI0806213A2
(pt)
*
|
2007-01-05 |
2016-07-12 |
Landmark Graphics Corp |
dispositivos e métodos para exibir objetos seletivamente numa tela de múltiplos dados - objetos tridimencionais
|
|
US20080319726A1
(en)
|
2007-06-19 |
2008-12-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
|
US8775141B2
(en)
*
|
2007-07-02 |
2014-07-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
|
US8046314B2
(en)
*
|
2007-07-20 |
2011-10-25 |
Schlumberger Technology Corporation |
Apparatus, method and system for stochastic workflow in oilfield operations
|
|
US8244509B2
(en)
*
|
2007-08-01 |
2012-08-14 |
Schlumberger Technology Corporation |
Method for managing production from a hydrocarbon producing reservoir in real-time
|
|
US7900700B2
(en)
*
|
2007-08-02 |
2011-03-08 |
Schlumberger Technology Corporation |
Method and system for cleat characterization in coal bed methane wells for completion optimization
|
|
US8156131B2
(en)
*
|
2007-08-27 |
2012-04-10 |
Schlumberger Technology Corporation |
Quality measure for a data context service
|
|
US9070172B2
(en)
*
|
2007-08-27 |
2015-06-30 |
Schlumberger Technology Corporation |
Method and system for data context service
|
|
US20090083006A1
(en)
*
|
2007-09-20 |
2009-03-26 |
Randall Mackie |
Methods and apparatus for three-dimensional inversion of electromagnetic data
|
|
US8099267B2
(en)
*
|
2008-01-11 |
2012-01-17 |
Schlumberger Technology Corporation |
Input deck migrator for simulators
|
|
US9074454B2
(en)
|
2008-01-15 |
2015-07-07 |
Schlumberger Technology Corporation |
Dynamic reservoir engineering
|
|
CA2713948C
(en)
*
|
2008-02-05 |
2016-02-16 |
Schlumberger Canada Limited |
Integrating field data
|
|
US8155942B2
(en)
*
|
2008-02-21 |
2012-04-10 |
Chevron U.S.A. Inc. |
System and method for efficient well placement optimization
|
|
US8560969B2
(en)
*
|
2008-06-26 |
2013-10-15 |
Landmark Graphics Corporation |
Systems and methods for imaging operations data in a three-dimensional image
|
|
US8499829B2
(en)
*
|
2008-08-22 |
2013-08-06 |
Schlumberger Technology Corporation |
Oilfield application framework
|
|
US8280709B2
(en)
*
|
2008-10-03 |
2012-10-02 |
Schlumberger Technology Corporation |
Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations
|
|
US9228415B2
(en)
*
|
2008-10-06 |
2016-01-05 |
Schlumberger Technology Corporation |
Multidimensional data repository for modeling oilfield operations
|
|
AU2009320119B2
(en)
|
2008-11-03 |
2015-11-26 |
Schlumberger Technology B.V. |
Methods and apparatus for planning and dynamically updating sampling operations while drilling in a subterranean formation
|
|
WO2010071701A1
(en)
*
|
2008-12-16 |
2010-06-24 |
Exxonmobil Upstream Research Company |
Systems and methods for hydrocarbon reservoir development and management optimization
|
|
US8612195B2
(en)
|
2009-03-11 |
2013-12-17 |
Exxonmobil Upstream Research Company |
Gradient-based workflows for conditioning of process-based geologic models
|
|
AU2009341852B2
(en)
*
|
2009-03-11 |
2015-08-20 |
Exxonmobil Upstream Research Company |
Adjoint-based conditioning of process-based geologic models
|
|
CA2753544A1
(en)
*
|
2009-03-27 |
2010-09-30 |
Exxonmobil Upstream Research Company |
Reservoir quality characterization using heterogeneity equations with spatially-varying parameters
|
|
US8600717B2
(en)
|
2009-05-14 |
2013-12-03 |
Schlumberger Technology Corporation |
Production optimization for oilfields using a mixed-integer nonlinear programming model
|
|
EP2465073A4
(de)
*
|
2009-08-12 |
2014-09-03 |
Exxonmobil Upstream Res Co |
Optimierte richtlinien für bohrlochmanagement
|
|
WO2011043862A1
(en)
*
|
2009-10-07 |
2011-04-14 |
Exxonmobil Upstream Research Company |
Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
|
|
CA2776487C
(en)
*
|
2009-11-12 |
2017-02-14 |
Exxonmobil Upstream Research Company |
Method and apparatus for generating a three-dimentional simulation grid for a reservoir model
|
|
AU2010246382A1
(en)
*
|
2009-11-23 |
2011-06-09 |
The University Of Manchester |
Method and apparatus for valuation of a resource
|
|
CN102640163B
(zh)
|
2009-11-30 |
2016-01-20 |
埃克森美孚上游研究公司 |
用于储层模拟的适应性牛顿法
|
|
EP2542914A4
(de)
*
|
2010-03-01 |
2017-01-04 |
LESKIW, Chris |
System und verfahren zur verwendung orthogonal kodierter aktiver quellsignale zur analyse reflektierter signale
|
|
BR112012025995A2
(pt)
|
2010-04-30 |
2016-06-28 |
Exxonmobil Upstream Res Co |
método e sistema para simulação de fluxo de volume finito
|
|
US10087721B2
(en)
|
2010-07-29 |
2018-10-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine—learning based simulation of flow
|
|
AU2011283193B2
(en)
|
2010-07-29 |
2014-07-17 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
|
CA2803068C
(en)
|
2010-07-29 |
2016-10-11 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
|
CA2807300C
(en)
*
|
2010-09-20 |
2017-01-03 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
|
US9031674B2
(en)
*
|
2010-10-13 |
2015-05-12 |
Schlumberger Technology Corporation |
Lift-gas optimization with choke control
|
|
US8437999B2
(en)
*
|
2011-02-08 |
2013-05-07 |
Saudi Arabian Oil Company |
Seismic-scale reservoir simulation of giant subsurface reservoirs using GPU-accelerated linear equation systems
|
|
CN103959233B
(zh)
|
2011-09-15 |
2017-05-17 |
埃克森美孚上游研究公司 |
在执行eos计算的指令受限算法中最优化矩阵和向量运算
|
|
AU2013324162B2
(en)
|
2012-09-28 |
2018-08-09 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
|
US20140222403A1
(en)
*
|
2013-02-07 |
2014-08-07 |
Schlumberger Technology Corporation |
Geologic model via implicit function
|
|
US10319143B2
(en)
|
2014-07-30 |
2019-06-11 |
Exxonmobil Upstream Research Company |
Volumetric grid generation in a domain with heterogeneous material properties
|
|
US10443358B2
(en)
|
2014-08-22 |
2019-10-15 |
Schlumberger Technology Corporation |
Oilfield-wide production optimization
|
|
US9951601B2
(en)
|
2014-08-22 |
2018-04-24 |
Schlumberger Technology Corporation |
Distributed real-time processing for gas lift optimization
|
|
US10184320B2
(en)
|
2014-09-02 |
2019-01-22 |
Saudi Arabian Oil Company |
Systems, methods, and computer medium to enhance hydrocarbon reservoir simulation
|
|
AU2015339883B2
(en)
|
2014-10-31 |
2018-03-29 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
|
WO2016069171A1
(en)
|
2014-10-31 |
2016-05-06 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
|
US10280722B2
(en)
|
2015-06-02 |
2019-05-07 |
Baker Hughes, A Ge Company, Llc |
System and method for real-time monitoring and estimation of intelligent well system production performance
|
|
AU2015408224A1
(en)
|
2015-09-04 |
2018-02-08 |
Halliburton Energy Services, Inc. |
Time-to-finish simulation forecaster
|
|
HUE064459T2
(hu)
|
2016-12-23 |
2024-03-28 |
Exxonmobil Technology & Engineering Company |
Eljárás és rendszer stabil és hatékony tározó szimulációhoz stabilitási proxyk alkalmazásával
|
|
CN108729911A
(zh)
*
|
2017-04-24 |
2018-11-02 |
通用电气公司 |
用于资源生产系统的优化装置、系统和方法
|
|
US11486235B2
(en)
*
|
2017-05-16 |
2022-11-01 |
Bp Corporation North America Inc. |
Tools for selecting and sequencing operating parameter changes to control a hydrocarbon production system
|
|
US11755795B2
(en)
*
|
2017-09-22 |
2023-09-12 |
ExxonMobil Technology and Engineering Company |
Detecting and mitigating flow instabilities in hydrocarbon production wells
|
|
CN109763809B
(zh)
*
|
2017-11-01 |
2022-05-03 |
中国石油化工股份有限公司 |
一种优化水平井分段液流控制完井段内参数的方法
|
|
GB2593355B
(en)
*
|
2019-03-05 |
2022-09-07 |
Landmark Graphics Corp |
Reservoir simulation systems and methods to dynamically improve performance of reservoir simulations
|
|
US11401786B2
(en)
*
|
2019-03-06 |
2022-08-02 |
Saudi Arabian Oil Company |
Systems and methods for hydrocarbon reservoir well connectivity graph optimization, simulation and development
|
|
WO2020185809A1
(en)
|
2019-03-11 |
2020-09-17 |
Schlumberger Technology Corporation |
Formation analysis incorporating identification of immovable and viscous hydrocarbons
|
|
WO2021062748A1
(zh)
*
|
2019-09-30 |
2021-04-08 |
西门子股份公司 |
综合能源系统的优化方法、装置和计算机可读存储介质
|
|
EP4024279A4
(de)
*
|
2019-09-30 |
2023-05-10 |
Siemens Aktiengesellschaft |
Verfahren zur simulation eines integrierten energiesystems, vorrichtung und computerlesbares speichermedium
|
|
EP4150490A4
(de)
*
|
2020-05-15 |
2024-06-26 |
Services Pétroliers Schlumberger |
Stabilitätsprüfung für thermische zusammensetzungssimulation
|
|
CN112580861B
(zh)
*
|
2020-12-11 |
2022-11-01 |
西南石油大学 |
一种针对非常规油气藏生产优化问题的控制方法及系统
|
|
CN115358167B
(zh)
*
|
2022-08-30 |
2023-03-28 |
西北工业大学 |
一种考虑发动机参数的飞发一体气动伴随优化设计方法
|
|
WO2026060150A1
(en)
*
|
2024-09-11 |
2026-03-19 |
Bp Corporation North America Inc. |
Fossil fuel production optimization
|