BE392931A - - Google Patents

Info

Publication number
BE392931A
BE392931A BE392931DA BE392931A BE 392931 A BE392931 A BE 392931A BE 392931D A BE392931D A BE 392931DA BE 392931 A BE392931 A BE 392931A
Authority
BE
Belgium
Prior art keywords
discs
annular discs
tubular
annular
brought
Prior art date
Application number
Other languages
French (fr)
Publication of BE392931A publication Critical patent/BE392931A/fr

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, rods, wire, tubes, profiles or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, rods, wire, tubes, profiles or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/15Making tubes of special shape; Making tube fittings
    • B21C37/22Making finned or ribbed tubes by fixing strip or like material to tubes
    • B21C37/24Making finned or ribbed tubes by fixing strip or like material to tubes annularly-ribbed tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Turbine Rotor Nozzle Sealing (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



  PROCEDE DE FABRICATION DE TUYAUX EN FER FORGE A AILETTES CIRCULAIRES. 



   La présente invention a pour objet un procédé et un dispositif de fabrioation de tuyaux en fer forgé à ailettes circulaires, 
Deux dispositifs appropriés à la réalisation du procédé sont représentés au dessin annexé. 



   La   Fig.I   est une coupe transversale suivant la ligne C- D de la   Fig.2   et 
La Fig.2 est une coupe longitudinale suivant la ligne A -B de la Fig.I du premier exemple. 



   La Fig.3 est une coupe transversale suivant la ligne E- F de la Fig.4,et 
La Fig. 4 est une vue de dessus du deuxième dispositif. 



   Dans l'exemple représenté par les Fig.I et 2,la partie 

 <Desc/Clms Page number 2> 

 supérieure b du bâti ou corps de maintien en deux parties est articulée sur la partie inférieure a du bâti double au moyen d'un axe c,de sorte que la partie supérieure b peut être amenée dans la position indiquée en trait mixte, f est un oeil- leton destiné à recevoir un câble métallique portant un con- trepoids servant à équilibrer la partie supérieure b.Les par- ties a et b du bâti peuvent être chauffées à l'électricité,au   gaz,à   la vapeur à haute pression ou à l'eau chaude sous une haute pression.Après que la partie supérieure b du bâti dou- ble aété amenée à la position indiquée en trait mixte,on in-   roduit   des disques annulaires d dans les logements ménagés à cet effet dans la partie inférieure a,

  puis on ramène dans sa position primitive la partie supérieure b pourvue d'évidements correspondants,de façon que les disques annulaires d se trouvent entièrement noyés dans la masse.on fait ensuite fonctionner le chauffage,Dès que la température nécessaire est atteinte, on introduit le corps tubulaire e,de sorte que tous les dis- ques annulaires d viennent s'appliquer sur ce corps tubulaire e. 



  On ramène ensuite la partie supérieure b dans sa position in- diquée en trait   mixte.On   retire le tuyau terminé comportant les ailettes circulaires,et on le met de côté pour le laisser refroidir;pendant le refroidissement,les disques annulaires d se frettent fortement sur le corps tubulaire e;

   
Dans les   Fig.3   et 4,a est la partie inférieure et b la partie supérieure du bâti constitué par différentes lames maintenues au moyen de boulons filetés    ;des   anneaux   d'écar-.     tement   servent à ménager l'intervalle nécessaire pour l'in- troduction des disques annulaires d.La partie supérieure b est articulée sur la partie inférieure a au moyen de l'axe c, ce qui permet d'amener cette partie supérieure b dans la po- sition indiquée en trait mixte. f est un oeilleton auquel peut être fixé un câble métallique avec contrepoids servant équi- librer la partie supérieure b, h sont des tuyaux à gaz.Des aju- 

 <Desc/Clms Page number 3> 





   <Desc / Clms Page number 1>
 



  METHOD OF MANUFACTURING WROUGHT-IRON PIPES WITH CIRCULAR FINS.



   The present invention relates to a method and a device for manufacturing wrought iron pipes with circular fins,
Two devices suitable for carrying out the process are shown in the accompanying drawing.



   Fig. I is a cross section taken along the line C- D of Fig. 2 and
Fig.2 is a longitudinal section along the line A -B of Fig.I of the first example.



   Fig. 3 is a cross section taken along the line E- F of Fig. 4, and
Fig. 4 is a top view of the second device.



   In the example represented by Figs. I and 2, the part

 <Desc / Clms Page number 2>

 upper part b of the frame or holding body in two parts is hinged to the lower part a of the double frame by means of an axis c, so that the upper part b can be brought into the position shown in phantom, f is a eye designed to receive a metallic cable carrying a counterweight serving to balance the upper part b. Parts a and b of the frame can be heated by electricity, gas, high pressure steam or hot water under high pressure.After the upper part b of the double frame has been brought to the position shown in phantom, annular discs d are inserted into the housings provided for this purpose in the lower part a ,

  then the upper part b provided with corresponding recesses is brought back to its original position, so that the annular discs d are completely embedded in the mass. The heating is then operated, As soon as the necessary temperature is reached, the tubular body e, so that all the annular discs d come to rest on this tubular body e.



  The upper part b is then brought back to its position shown in phantom. The finished pipe with the circular fins is removed, and it is put aside to let it cool; during cooling, the annular discs d shrink strongly on the tubular body e;

   
In Figs. 3 and 4, a is the lower part and b the upper part of the frame made up of different blades held by means of threaded bolts; spacer rings. The upper part b is articulated on the lower part a by means of the axis c, which makes it possible to bring this upper part b into the position indicated in phantom. f is an eyelet to which can be attached a metal cable with counterweight to balance the upper part b, h are gas pipes.

 <Desc / Clms Page number 3>




    

Claims (1)

tages g débouchent directement sur les disques annulaires d, Après que la partie supérieure b a été amenée dans la posi- tion indiquée en trait interrompu, on introduit les disques annulaires dans la partie inférieure appuis on ramène la par- tie supérieure b dans sa position primitive,le contact entre les bords des anneaux d'écaratement c et des disques annulaires d assurant un centrage exact de ces disques.on allume alors les ajutages à gaz g et on porte les disques annulaires d à la température nécessaire.on introduit ensuite le corps tubu- laire e et on éteint les ajutages à gaz ±. ou on les met en veilleuse,de sorte que, pendant le refroidissement,les disques annulaires se frettent fortement sur le corps tubulaire e, RESUME. stages g open directly onto the annular discs d, After the upper part b has been brought to the position indicated in broken lines, the annular discs are introduced into the lower part, supported by the upper part b in its original position. , the contact between the edges of the spreading rings c and the annular discs d ensuring an exact centering of these discs. the gas nozzles g are then ignited and the annular discs d are brought to the necessary temperature. the body is then introduced tubular e and the gas nozzles ± are turned off. or they are put on the back burner, so that, during cooling, the annular discs shrink strongly on the tubular body e, ABSTRACT. I.Prooédé de fabrication de tuyaux en fer forgé à ai- lettes circulaires,procédé caractérisé par le fait que les disques annulaires sont introduits,à intervalle les uns des autres, dans un corps de maintien dans lequel ils sont chauffés, et que le corps tubulaire est introduit ensuite à travers les perforations des disques annulaires,de façon que, pendant le refroidissement ultérieur,ces disques se trouvent frettés for- tement sur le corps tubulaire. I. Method for manufacturing wrought iron pipes with circular fins, characterized by the fact that the annular discs are introduced, at intervals from one another, into a holding body in which they are heated, and that the body tubular is then introduced through the perforations of the annular discs, so that, during subsequent cooling, these discs are tightly wrapped on the tubular body. 3.Dispositif pour l'exécution du procédé suivant I, ca- ractérisé par un corps de maintien,divisé en deux parties sui- vant sa longueur,pouvant être chauffé,et pourvu d'évidements servant de logements aux disques annulaires qu'on introduit dans la position respective oorrespondant à la position de ces disques sur le tube,le corps de maintien étant établi de façon que le tube à munir de disques puisse être engagé dans le sens de sa longueur à travers les disques qui se trouvent dans le corps de maintien. 3. Device for carrying out the following process I, charac- terized by a holding body, divided into two parts along its length, which can be heated, and provided with recesses serving as housings for the annular discs which are introduced. in the respective position corresponding to the position of these discs on the tube, the holding body being established so that the tube to be provided with discs can be engaged in the direction of its length through the discs which are in the body of maintenance.
BE392931D BE392931A (en)

Publications (1)

Publication Number Publication Date
BE392931A true BE392931A (en)

Family

ID=60462

Family Applications (1)

Application Number Title Priority Date Filing Date
BE392931D BE392931A (en)

Country Status (1)

Country Link
BE (1) BE392931A (en)

Similar Documents

Publication Publication Date Title
FR2558933A1 (en) STEAM GENERATOR FOR PRESSURE WATER REACTOR COMPRISING ANTI-VIBRATION BARS FOR STABILIZING HEAT TRANSFER TUBES
EP0364330B1 (en) Sealing plug for a steam generator tube
EP0271739B1 (en) Process for the repair or protection of one extremity of a metallic heat exchanger tube, and sleeve for carrying it out
FR2494609A1 (en) METALLURGICAL POUCH FOR THE INDUCTIVE TREATMENT OF METALS
BE392931A (en)
EP0196971B1 (en) Repairing method by way of a steam generator tube
EP0078728A1 (en) Antivibration support for a tube bundle, particularly for a steam generator, and assembly method for this support
FR2514099A1 (en) METHOD FOR FIXING A SLEEVE WITHIN A TUBE, PARTICULARLY A NUCLEAR POWER PLANT VAPOR TUBE
FR2588788A1 (en) CONTINUOUSLY MOVING BRAZING PROCESS FOR WELDING A SLEEVE IN A TUBE
EP0496665A1 (en) Valve
CH608182A5 (en) Deep-fat fryer
BE449817A (en)
BE637182A (en)
EP0216667B1 (en) Apparatus to retain liquid in a substantially horizontal conduit, open at one end, when the liquid flow rate drops below a given level
BE448968A (en)
FR2669255A1 (en) Method and device for extracting a cylindrical element, such as a plug, from a small-diameter tube
FR2692972A1 (en) Localised repair of heat exchanger tubes - uses neutral atmos. during welding of replacement section to prevent oxidn. in weld
BE365086A (en)
BE441113A (en)
CH334732A (en) Method for bending a tube and device for implementing this method
FR2560962A1 (en) Method for repairing tubes of exchangers having a multitubular calendar
BE560695A (en)
BE496143A (en)
CH178471A (en) Process for indirectly heating the contents of a boiler, and installation for implementing this process.
BE473532A (en)