Publication of BE424767A publication Critical patent/BE424767A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/08Vaulted roofs
    • E04B7/10Shell structures, e.g. of hyperbolic-parabolic shape; Grid-like formations acting as shell structures; Folded structures
    • E04B7/102Shell structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



  Couverture 'en béton armé et procédé de fabrication y relatif. 



    La présente invention a pour objet une couverture en béton )armé et le procédé de fabrication y relatif.   



   La couverture suivant l'invention se caractérise essentiel- lement par le fait qu'elle comporte au moins une nappe en forme de surface lignée, de préférence en forme de paraboloïde hyperbo- lique ou de conoïde, dont l'armature comprend des barres de fer disposées suivant les génératrices de la surface lignée et mainte- nues tendues dans la coulée, des 'éléments métalliques de préféren- ce en forme de filet étant en outre orientés suivant les lignes isostatiques de la voûte. 



   Le procédé pour la construction.de la couverture suivant l'invention se caractérise essentiellement par le fait que   l'on   dispose (avant tout) les moyens pour la réalisation des lignes di- rectrices de la surface lignée à réaliser, ensuite les barres mé- talliques suivant les génératrices de la surface lignée, de façon à les maintenir tendues et   qu'on   applique éventuellement les arma- 

 <Desc/Clms Page number 2> 

 tures complémentaires matérialisant les lignes isostatiques et éventuellement d'autres armatures et qu'on procède ensuite, sans utiliser de coffrages ou similaires, à l'application de la couche de beton noyant l'armature, soit par crépissage par le dessous, 
 EMI2.1 
 cr.l.L jmtt' CUI 1 ,<: }1,11' ¯l.c.. lr.;i;,trià vU ,ii<Li<:i>i<;i<t.. 



   On obtient de cette façon des couvertures à très grande ré- sistance et de poids minime, aptes à couvrir aussi des espaces très grands, particulièrement utiles pour les constructions des garages d'avions et similaires. 



   L'invention sera maintenant expliquée, seulement à titre d'exemple indicatif et non limitatif, en se référant au dessin annexé, lequel montre d-ux formes d'exécution de l'invention. 



   Les figures 1-2 montrent une première forme d'exécution.de la couverture ou voûte, respectivement en plan partiel et vue en élévation correspondante. 



   La figure 3 en est une coupe à l'endroit des bords, montrant le procédé d'exécution de la couverture. 



   La figure 4 est la coupe du faite. 



   La figure 5 montre un détail de   l' appui.   



   Les figures 6 et 7 sont respectivement une élévation d'extré- mité et une section transversale d'une couverture pour grand gara- ge d'avions exécutée suivant l'invention. 



   En se référant aux figures 1 à 5, la surface portante A est formée par quatre nappes en forme de paraboloide hyperbolique reliées deux à deux par montage convenable. 



   Les longerons et les tirants du pourtour sont, par simplicité, faits d'une pièce, 1 respectivement 2. 



   Les systèmes de longerons et tirants du pourtour et la croi- sée médiane B sont formés et coulés, par exemple, avec les systè- mes habituels, jusqu'à la hauteur de l'intrados de la voûte, c'est- à-dire en prédisposant un coffrage convenable, par exemple en bois, avec l'armature métallique et en y coulant ensuite le béton. 



   Les longerons du pourtour et la croisée qui suivent la   forme   

 <Desc/Clms Page number 3> 

 du périmètre de la surface, sont divisés en un nombre convena- ble de parties égales ;ensuite entre chaque couple de points 3 correspondants, on tend des fils métalliques 4 qui prennent la position des différentes génératrices de la voûte, celle-ci étant ainsi une surface lignée. 



   Les fils 4, qui pourront être dénommés "directeurs", peuvent être disposés dans les deux sens, et dans ce cas, on formera un réseau réticulé qui prendra la forme exacte de la voûte à cons- truire. 



   Pour tendre les fils on peut se servir aussi de tendeurs 5 (figure 3) mécaniques. On attache ou superpose ensuite aux fils directeurs 4 un filet métallique 6 du type à mailles le plus con- venable et tel que sa section métallique avec celle des fils di- recteurs corresponde à la quantité de fer nécessitée suivant¯ le calcul de la voûte. 



   Au filet métallique 6 on pourra donner la direction des li- gnes isostatiques, lesquelles, dans le cas particulier, font un angle de 45  avec les fils directeurs. 



   On procédera, ensuite directement au bétonnage de la dalle de la voûte, qui peut être exécutée par crépissage par le dessous ou par coulée par le dessus, ainsi qu'à la. coulée des parties qui n'ont pas été encore faites de la croisée et des longerons ou som- miers d'appui. 



   Le décoffrage des sommiers et des tirants du pourtour ainsi que de   la.   croisée a lieu suivant les   régles   habituelles : en même temps on coupe les bouts saillants des fils directeurs, en les libérant des tendeurs. 



   La formation,et le bétonnage de la voûte pourront être exécu- tés, naturellement, après le bétonnage des parties du pourtour et de croisée ou bien en même temps. 



   Dans le cas de grandes portées,. où on pourrait   craindre   que les fils directeurs cèdent pendant et après le bétonnage, ce qui entraînerait une déformation permanente de la voûte, les fils di- 

 <Desc/Clms Page number 4> 

 recteurs ou le filet ou les deux ensemble pourront être soutenus à distances convenables moyennant des suspensions caténaires ou autre système situé à la partie supérieure, ou bien par des sup- ports placés inférieurement. Pour le bétonnage de la voûte on pourra aussi procéder à la formation d'une première couche de mince épaisseur qui, une fois que la prise aura eu lieu, fonction- nera comme un coffrage pour une deuxième couche d'épaisseur telle à obtenir au total l'épaisseur déterminée par le calcul. 



   L'exécution pratique des couches pourra être obtenue soit à la main, soit par moyens mécaniques. 



   Dans le cas où il n'est pas possible ou pas utile de fournir toute la surface métallique déterminée par le calcul, par la sur- face des fils directeurset du filet, on procédera à la pose d'un complément de fer, directement sur le système fils directeurs- filet, ou (quand le bétonnage de la voûte est fait en deux temps) sur la première couche de béton ; à ces fers complémentaires on pourra également donner la. direction des lignes isostatiques. 



   Il est bien entendu qu'en pratique les détails d'exécution de l'invention ainsi que ses applications pourront varier de n'importe quelle façon sans sortir du domaine de l'invention. 



   REVENDICATIONS. 



   1. Couvertureen béton armé, caractérisée par le fait qu'elle comporte au moins une nappe, en forme de surface lignée ou striée, de préférence en forme de paraboloide hyperbolique ou de condoide, dont. l'armature comprend des barres en fer (4) disposées suivant les génératrices de la surface lignée ou striée et maintenues tendues dans la coulée, des éléments métalliques (6) de préférence en forme de filet, étant orientés suivant les lignes isostatiques de la voûte.



   <Desc / Clms Page number 1>
 



  Reinforced concrete roofing and related manufacturing process.



    The present invention relates to a reinforced concrete roof and the related manufacturing process.



   The covering according to the invention is essentially characterized by the fact that it comprises at least one sheet in the form of a lined surface, preferably in the form of a hyperbalic paraboloid or of a conoid, the reinforcement of which comprises iron bars. arranged along the generatrices of the lined surface and kept taut in the casting, metal elements preferably in the form of a net being further oriented along the isostatic lines of the vault.



   The method for the construction of the roofing according to the invention is essentially characterized by the fact that one has (above all) the means for the realization of the guiding lines of the lined surface to be produced, then the measuring bars. according to the generatrices of the lined surface, so as to keep them taut and that the reinforcements may be applied.

 <Desc / Clms Page number 2>

 complementary tures materializing the isostatic lines and possibly other reinforcements and which then proceeds, without using formwork or the like, to the application of the concrete layer embedding the reinforcement, or by plastering from below,
 EMI2.1
 cr.l.L jmtt 'CUI 1, <:} 1,11' ¯l.c .. lr.; i;, trià vU, ii <Li <: i> i <; i <t ..



   In this way, covers of very great strength and of minimal weight are obtained, able to cover also very large spaces, particularly useful for constructions of aircraft garages and the like.



   The invention will now be explained, only by way of indicative and non-limiting example, with reference to the accompanying drawing, which shows two embodiments of the invention.



   Figures 1-2 show a first embodiment of the roof or vault, respectively in partial plan and corresponding elevation view.



   Figure 3 is a sectional view at the edges, showing the method of making the cover.



   Figure 4 is the cross section.



   Figure 5 shows a detail of the support.



   Figures 6 and 7 are respectively an end elevation and a cross section of a large aircraft garage cover made in accordance with the invention.



   Referring to Figures 1 to 5, the bearing surface A is formed by four sheets in the form of a hyperbolic paraboloid connected two by two by suitable mounting.



   The side members and tie rods of the perimeter are, for simplicity, made of one piece, 1 respectively 2.



   The systems of side members and tie-rods of the perimeter and the median crossing B are formed and cast, for example, with the usual systems, up to the height of the lower surface of the vault, that is to say by providing a suitable formwork, for example in wood, with the metal reinforcement and then pouring the concrete into it.



   The side members of the perimeter and the crossing which follow the shape

 <Desc / Clms Page number 3>

 of the perimeter of the surface, are divided into a suitable number of equal parts; then between each pair of corresponding points 3, metal wires 4 are stretched which take the position of the different generatrices of the vault, the latter thus being a lined surface.



   The wires 4, which could be called “directors”, can be arranged in both directions, and in this case, a reticulated network will be formed which will take the exact shape of the arch to be constructed.



   To tension the son, one can also use mechanical tensioners 5 (FIG. 3). A metallic net 6 of the most suitable type of mesh is then attached to or superimposed on the guiding wires 4, such that its metallic section with that of the guiding wires corresponds to the quantity of iron required according to the calculation of the arch.



   With the metal net 6, the direction of the isostatic lines can be given, which, in the particular case, form an angle of 45 with the guiding wires.



   We will then proceed directly to the concreting of the slab of the vault, which can be carried out by plastering from below or by casting from above, as well as. casting of the parts that have not yet been made of the crossing and of the side members or support bases.



   The stripping of the box springs and tie-rods from the perimeter as well as the. crossing takes place according to the usual rules: at the same time the protruding ends of the guide wires are cut, freeing them from the tensioners.



   The formation and the concreting of the vault can be carried out, of course, after the concreting of the parts of the perimeter and crossing or at the same time.



   In the case of large spans ,. where one could fear that the guide wires will give way during and after concreting, which would cause a permanent deformation of the vault, the di-

 <Desc / Clms Page number 4>

 rectifiers or the net or both together may be supported at suitable distances by means of catenary suspensions or other system located at the top, or by supports placed below. For the concreting of the vault, we can also proceed to the formation of a first layer of thin thickness which, once the setting has taken place, will function as a formwork for a second layer of thickness such as to be obtained in total. the thickness determined by the calculation.



   The practical execution of the layers can be obtained either by hand or by mechanical means.



   In the event that it is not possible or not useful to provide all the metallic surface determined by the calculation, by the surface of the guiding wires and of the net, one will proceed to the installation of an additional iron, directly on the wire-net system, or (when the vault is concreted in two stages) on the first layer of concrete; these complementary irons can also be given the. direction of isostatic lines.



   It is understood that in practice the details of the execution of the invention as well as its applications may vary in any way without departing from the scope of the invention.



   CLAIMS.



   1. Reinforced concrete roofing, characterized in that it comprises at least one sheet, in the form of a lined or ridged surface, preferably in the form of a hyperbolic paraboloid or of a condoid, of which. the reinforcement comprises iron bars (4) arranged along the generatrices of the lined or ridged surface and kept taut in the casting, metal elements (6) preferably in the form of a net, being oriented along the isostatic lines of the vault .


    

Claims (1)

2. Procédé pour l'exécution de la couverture suivant la revendication 1, caractérisé par le fait que l'on dispose (avant. tout) les moyens pour la réalisation des lignes directrices de la surface lignée à réaliser, puis les barres métalliques suivant <Desc/Clms Page number 5> les génératrices de la surface lignée, de façon à les maintenir tendues, qu'on applique alors éventuellement les armatures com- plémentaires matérialisant les lignes'isostatiques et éventuelle- ment d'autres armatures et qu'on procède ensuite, sans utiliser de coffrages ou similaires, à l'application de la couche de béton noyant l'armature, soit par crépissage par le dessous, soit par jet ou coulée par le dessus ou autrement.. 2. Method for the execution of the covering according to claim 1, characterized in that one has (before all) the means for the realization of the guidelines of the lined surface to be produced, then the following metal bars <Desc / Clms Page number 5> the generatrices of the lined surface, so as to keep them stretched, so that if necessary the additional reinforcements materializing the isostatic lines and possibly other reinforcements are applied and then proceeded without using formwork or similar to the application of the concrete layer embedding the reinforcement, either by plastering from below, or by spraying or pouring from above or otherwise. 3. Procédé. suivant la. revendication 2, caractérisé en ce que l'on forme les systèmes de longerons ou sommiers et les ti- rants du pourtour ainsi que la croisée avec les systèmes habituels jusqu'à la hauteur de l'intrados de la voûte, qu'on les partage en un nombre convenable de parties égales et qu'entre chaque cou- ple de points correspondants, on tend des fils métalliques maté- rialisant les génératrices de la voûte, ensuite de quoi on appli- que un filet métallique puis on procède au bétonnage de la dalle de la voûte et éventuellemont à l'achèvement de la coulée des longerons, des tirants, de la croisée et similaires. 3. Process. following the. claim 2, characterized in that one forms the systems of side members or springs and the ties of the perimeter as well as the crossing with the usual systems up to the height of the lower surface of the vault, that they are shared in a suitable number of equal parts and that between each pair of corresponding points, metal wires materializing the generatrices of the vault are stretched, then a metal net is applied and then the concrete is carried out. slab of the vault and eventuellemont upon completion of the casting of the spars, tie rods, cross and the like. 4. Procédé, suivant la revendication 2 , caractérisé par le fait que la formation et le bétonnage de la voûte sont exécutés en même temps que la coulée des autres parties. 4. Method according to claim 2, characterized in that the formation and concreting of the vault are carried out at the same time as the casting of the other parts. 5. Procédé. suivant les revendications précédentes, caracté- risé en ce que, dans le cas de grandes portées, afin d'éviter que les fils directeurs cèdent pendant et après le bétonnage, ces derniers ou les armatures complémentaires, ou même les uns et les autres, peuvent être soutenus à distances convenables. 5. Process. according to the preceding claims, characterized in that, in the case of large spans, in order to prevent the guide wires from giving way during and after concreting, the latter or the additional reinforcements, or even both, can be supported at suitable distances. 6. Procédé suivant les revendications précédentes, caracté- risé en ce que pour le bétonnage de la voûte on forme une première couche de mince épaisseur qui, après la prise, agit comme coffrage pour une deuxième couche d'épaisseur telle à obtenir au total l'épaisseur déterminée par calcul. 6. Method according to the preceding claims, characterized in that for the concreting of the vault a first layer of thin thickness is formed which, after setting, acts as formwork for a second layer of thickness such as to obtain in total l 'thickness determined by calculation. 7. Procédé suivant les revendications précédentes, caracté- risé en ce que l'exécution des couches est effectuée par des moyens mécaniques. <Desc/Clms Page number 6> 7. Method according to the preceding claims, characterized in that the execution of the layers is effected by mechanical means. <Desc / Clms Page number 6> 8. Procédé suivant les revendications précédentes, caracté- risé en ce que l'exécution des couches est effectuée du moins en partie à la main. 8. Process according to the preceding claims, characterized in that the execution of the layers is carried out at least partly by hand. 9. Procédé suivant les revendications précédentes, caracté- risé par le fait que dans le cas où il n'est pas possible ou utile de fournir toute la section métallique demandée par le calcul par la surface des @ils dirocteurs et du Filet, on procède à la pose d'un complément de fer, directement sur le système fils directeurs- filet, ou (quand le bétonnage de la voûte est fait en deux temps) sur la première couche de béton. 9. Method according to the preceding claims, characterized in that in the case where it is not possible or useful to provide all the metal section requested by the calculation by the area of the @ils dirocteurs and of the Thread, one proceeds the installation of additional iron, directly on the guiding wire-net system, or (when the concreting of the vault is done in two stages) on the first layer of concrete.
BE424767D BE424767A (en)

Publications (1)

Publication Number Publication Date
BE424767A true BE424767A (en)

Family

ID=85921

Family Applications (1)

Application Number Title Priority Date Filing Date
BE424767D BE424767A (en)

Country Status (1)

Country Link
BE (1) BE424767A (en)

Similar Documents

Publication Publication Date Title
US5526629A (en) Composite building panel
FR3130300A1 (en) Prefabricated composite facade panel and method of constructing a facade of a building
KR100760393B1 (en) Precast concrete panel and slab construction method
FR2554156A1 (en) Improved fence made of welded wire netting
KR101982596B1 (en) Seismic rehabilitation of structural concrete columns for building structures
CN106337512B (en) Bottom reinforced steel pipe concrete frame high-strength concrete compound shear wall and production method
KR102284278B1 (en) Precast double wall structure construction method using non-connection steel beam and wall structure construction method therewith
FR2939817A1 (en) Prefabricated elementary block for constructing e.g. outer insulating wall of building, has connection elements connecting reinforcement structures to fix inner bearing wall and outer protective shell to maintain constant transversal gap
FR2925088A1 (en) Construction element e.g. bridge span, fabricating method for e.g. roadway, involves flowing concrete in reinforcement case by partially countersinking case to fabricate metallic outer beam that contains inner beam
KR102173788B1 (en) Double composite box girder with gradual stiffness reduction, and construction method thereof
CN211421478U (en) Connection structure of in-line prefabricated wall panels
EP1674631B1 (en) Floor support assembly and production process for such a floor
CN114016395A (en) Rapid construction system and construction method of bridge substructure
JP2005030195A (en) Structure and its construction method
FR2873727A1 (en) Thermal bridges limiting process for e.g. slab and outer wall junction, involves erecting wall by forming positioning abutments for insulating units for localized concreting zones of another erected wall, and installing units between zones
JPH08128151A (en) Precast form board
FR2724680A1 (en) Lost shuttering panel, e.g. for wall of swimming pool or water tank
CN115538588B (en) UHPC (ultra high pressure concrete) connected precast prestressed concrete frame structure system and design and construction method thereof
FR2879559A1 (en) METHOD FOR PRODUCING A CHASSIS FOR CONSTRUCTION AND CHASSIS THUS OBTAINED
KR200434622Y1 (en) Precast concrete panels
CN218374052U (en) A construction structure used for basement shear wall post-pouring belt
EP4343079B1 (en) Wall connection fitting with integrated formwork
KR102482691B1 (en) Foundation structures using strut-tie reinforcement and its construction method
BE708221A (en)
FR3096995A1 (en) Self-supporting prefabricated wood frame panel, process, extension and construction using this prefabricated panel