BE426679A - - Google Patents

Info

Publication number
BE426679A
BE426679A BE426679DA BE426679A BE 426679 A BE426679 A BE 426679A BE 426679D A BE426679D A BE 426679DA BE 426679 A BE426679 A BE 426679A
Authority
BE
Belgium
Prior art keywords
construction method
floor
slabs
plates
construction
Prior art date
Application number
Other languages
French (fr)
Publication of BE426679A publication Critical patent/BE426679A/fr

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/08—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of metal
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



  NOUVEAU   PROCEDE   DE CONSTRUCTION EN ACIER
APPLICABLE A TOUS GENRES   D'IMMEUBLES     La.   présente invention a pour objet un nouveau   pmcédé   de construction qui peut s'appliquer à n'importe quel genre d'immeubles. il ce caractérise principalement de par le fait que toutes les parties essentielles de la construction,telles que l'ossature générale,les gitages,les   murs,1       hourdis,les   escaliess, etc;;sont constituées soit en poutrelles légères d'acier, soit en tôles du même métal,toutes ces pièces d'acier étant assemblées suivant une methode de montage spéciale,constituant l'objet de l'invention. 



   Cette méthode,qui constitue une rationalisation dans la réalisation des constructions,a pour double avantage de réaliser un   sérieux   abaissement du prix de revient de celles-ci et une réduction importante du temps nécessaire pour les mettre en état complet d'habitabilité; en même   temps,les   habitations construites en acier suivant le procédé,objet de la présente invention,ne se différencient ni intérieurement ni extérieurement d'une maison construite en pierres ou en briques 

 <Desc/Clms Page number 2> 

 suivant lee anciennes méthodes.Elle permet en outre de réaliser tout es les conceptions architecturales en faveur dans notre pays. 



   L'une des caractéristiques principales   du@   procédé objet de   l'invention,rédide   dans le fait que tous les matériaux étant posés à   sec,l'énorme   quantité d'eau qui entre dans les mélanges nécessaires à une construction en briques devient complètement   inutile;il   en résulte que les maisons construites suivant ce procédé sont prêtes à être habitées dès que les opérations du parachèvement sont terminées. 



   L'une des modalités d'application les plus courantes du procédé faisant l'objet de l'invention consiste en l'exécution des opérations suivantes:
Les piliers de l'ossature de l'immeuble sont enchâssés ians des massifs en béton,et ensuite dressés étage par étage au moyen de poutrelles Grey soudées à l'arc électrique pour former l'ossature complète au moyen de poutrelles horizontales posées à la hauteur de chaque gîtage. En soudant les ossa-   tures,l'on   assure la suppression des multiples forages exigés pour un montage par boulons et rivets, ce qui permet d'obtenir un gain de temps considérable et une notable économie en maind'oeuvre. 



   Dès que l'ossature a formé un étage,les parois extérieures de la construction seront aussitôt constituées par le pla-   cement,sut   tout le pourtour de cet étage,de tôles d'acier spécialement ondulées suivant un profil ad hoc. 



   Les hourdis sont généralement constitués au moyen de caissons métalliques en tôle de I à 2 =,pliée en forme de Z.souaés les uns aux autres,d'une part, et aux poutrelles, d' autre   lart;cet   assemblage nonne donc un plancher composé de deux surfaces superposées, espacées d'environ 10 à 15 cm,et reliées   entr' ell es   tous les 20 à 25 cm par des âmes vertical   Fe.Par   exem ple:pour des planchers de 4,5m de portée la surcharge permise est, d'après mesurage, de 750 Ks/m2, poids mort non compris. 



   Le poids au m2 de ces hourdis est de 20 à 40 Kgs.Une dalle de béton aurait pesé 225 Kgs,un hourdis creux environ 

 <Desc/Clms Page number 3> 

 150   Kgs,d'où   économie de poids très conséquente qui,'vide meat, a allégé considérablement l'ossature. 



   Dès que ces différents éléments ont été convenablement   soudés, l'étage, qui   est devenu un monobloc   d'acier,peut,au   point de vue du gros-oeuvre, être considéré   comme   achevé et prêt pour le parachèvement. 



   Afin de permettre une circulation aisée des différents corps de métier à travers les différents étages du bâtiment, et ce,sans avoir à construire des échafaudages provisoires d' un emploi malaisé et dangereux,le parachèvement commence par la construction de l'escalier en tôles d'acier   soudées.Ensui-   te,l'on pose les   châssis   métalliques de toutes les portes in.. térieures. 



   Pendant que  s'accomplit   de travail. d'aménagement intérieur,il est déja procédé à l'enduit de la   façade.   



   A cet effet,les tôles d'obturation constituant   les   murs extérieurs sont. recouverts d'un enduit recevant lui-mêmele revêtement dessiré. tel que du simili-pierre de France,du crépi dit "Tyrclien", des plaquettes de briques,marbre,etc..revêtement architectural comme s'il s'agissait du revêtement extérieur d'une façade en briques localess. Dès ce moment donc, l'acier est complètement enrobé extérieurement et est complè-   t ement   invisible. 



   A l'intérieur, leparachèvement du mur a lieu comme suit: la tôle d'acier reçoit elle-même un enduit protecteur,mince,   à   base de   ciment;puis,à.   l'alignement   intéri eur   des poutrelles est construit un mur au moyen d'agglomérés,de telle   açon   qu'entre ce mur et la tôle soit maintenue une chambre d'air d'enviton 10 cm.

   Comme agglomérés,il est fait usage de l'un ou de l'autre de ceux se trouvant dansle commerce, et dont les qualités d'isolation thermique   etacoustique   ont été nettement reconnues.Si l'aggloméré ainsi utilisé a été choisi avec une surface extérieure suffisamment lisse,et si le mur a été construit au   moyen:'   de grandes plaques comme on le fait couramment, la paroi intérieure de tout l'étage est prète à être abandonnée au tapissier et au peintre-décorateur sans 

 <Desc/Clms Page number 4> 

 qu'il soit nécessaire d'attendre un long sèchage. 



   Au point de vue  confort, l'isolation   thermique et acoustique d'un mur construit comme nous venons de le décrire sous une épaisseur de 16 cm offre au passage du bruit,de la chaleur et du froid une résistance égaleà celle d'un mur en briques de 70 cm d'épaisseur. 



   Quant à la construction des parois horizontales, il a été déjà. décrit   précédemment   que les éléments tôlés constituaient hourdis entre les poutrelles Grey de l'ossature formant   gitage  
Ces éléments tôlés peuvent,ou bien recevoir directement un mélange formant carrelage mondlithe,ou bien une aire de sable nécessaire pour la pose d'un carrelage, ou bien encore un enduit au bitume destiné à fixer le sous-plancher sur lequel devra être placé le parquetage, La face   intérieure   de ces   meme   éléments tôlés devra faire office de plafond pour l'étage du   dessous .A   cet effet,il suffira de la recouvrir de plaques isolantes en bois synthétique ou d'un autre genre analogue;

   les dites plaques étant suspendues à un   contre-gitage   de bois ou bien à un chevronnage enserré entre les éléments tôles formant   hourdis.Le   fait que le plafond est ainsi indépendant du plancher le met à   l'abri   des réactions de ce dernier et supprime la formation de crevasses ou fissures. 



   Il est évident que le maintien d'un matelas d'air suffisant entre les plaques formant plafond et les tôles formant hourdis constituera une garantie d'isolation acoustique de toute première valeur. 



   Toutes les canalisations   d'eau,de   gaz, d'électricité, de chauffage sont simultanément installées, avant la pose des cloisons, dans des   logeas   spécialement prévues des surfaces verticales ou norizontales de la construction,de   fqçon   que toutes soient à la fois invisibles et restent accessibles en cas d'avaries. 



   Une fois tous ces différente travaux terminés,le travail s'achèvera par la construction des refends auxquels les écrasements d'acier des portée; intérieures et les parais de l'étage feront office de gabarit. 

 <Desc/Clms Page number 5> 

 



  Voilà comment,d'étage en étage,la construction atteindra la toiture,qui pourra ètre établie, en tuiles, de terre cuite ou de fonte, comme s'il s'agissait d'une maison en briques, ou bien en tous autres matériaux,voire en terrasses de zinc,de cuivre ou de béton. 



   Les parois extérieures de ces constructions pourront ètre traitées de différentes façons, et entre autres,pour l'édifications de bungalows et villas. La tôle employée en   façade   sera découpée préalablement à dimensions standard et   constitu-   era armature pour des plaques de béton vibré exécutées en usine. Celles-ci ont leur fac intérieure pourvue de pattes d'assemblage posées suivant gabarit. La fixation de ces plaques à l'ossature se fait par soudure des pattes ci-dessus décrites sur filières en L soudées aux montants de la charpente.- 
REVENDICATIONS. 



    @ )   Nouveau procédé de construction d'immeubles en acier, carac-   térisé   de par le fait. que non seulement l'ossature générale de   l'immeuble,mais   également toutes les autres parties essentielles telles que gltages,murs extérieurs,hourdis,escaliers, chassis dé portes et de fenètres, etc, sont constitués soit en poutrelles ou en tôles d'acier,le mode d'assemblage de ces différentes parties étant principalement la soudure à l'arc élactrique, permettant d'obtenir ainsi un gain de temps considérable par 1.'élimination des anciennes méthodes, et une ha-   bitabilité   de l'immeuble presque immédiate après montage, due au fait de l'élimination des énormes quantités d'eau employ- ées dans les mélanges pour les constructions en maçonnerie. 



  2 ) Mode de construction d'immeubles en acier suivant revend:I caractérisé, de par le fait que dès que l'ossature   @   formé un   étage,les   parois extérieures de la construction seront aussitôt formées par le montage sur tout le pourtour de cet étage de tôles d'acier spécialement ondulées suivant un profil ad   @oc.   

**ATTENTION** fin du champ DESC peut contenir debut de CLMS **.



   <Desc / Clms Page number 1>
 



  NEW STEEL CONSTRUCTION PROCESS
APPLICABLE TO ALL KIND OF BUILDINGS The present invention relates to a new construction method which can be applied to any kind of buildings. it is mainly characterized by the fact that all the essential parts of the construction, such as the general framework, the gitages, the walls, 1 slabs, the stairs, etc ;; are made either of light steel beams, or in sheets of the same metal, all these steel parts being assembled according to a special assembly method, constituting the object of the invention.



   This method, which constitutes a rationalization in the realization of constructions, has the double advantage of achieving a serious lowering of the cost price thereof and a significant reduction in the time necessary to put them in a complete state of habitability; at the same time, the houses built of steel according to the process, object of the present invention, do not differ either internally or externally from a house built of stones or bricks

 <Desc / Clms Page number 2>

 following the old methods. It also allows to realize all the architectural designs in favor in our country.



   One of the main characteristics of the process which is the subject of the invention is that, since all the materials are laid dry, the enormous quantity of water which enters into the mixtures necessary for a brick construction becomes completely unnecessary; it follows that the houses built according to this process are ready to be inhabited as soon as the completion operations are completed.



   One of the most common methods of application of the method forming the subject of the invention consists in carrying out the following operations:
The pillars of the building's framework are set in concrete blocks, and then erected floor by floor by means of Gray joists welded to the electric arc to form the complete frame by means of horizontal joists laid at the height. of each lodging. Welding the frames eliminates the need for multiple drilling required for bolt-and-rivet mounting, which saves considerable time and saves manpower.



   As soon as the framework has formed a storey, the exterior walls of the construction will immediately be formed by the placement, around the entire perimeter of this storey, of specially corrugated steel sheets according to an ad hoc profile.



   The slabs are generally constituted by means of metal boxes in sheet metal from I to 2 =, folded in the shape of Z. sloped to each other, on the one hand, and to the joists, on the other hand; this assembly therefore gives a floor composed of two superimposed surfaces, spaced about 10 to 15 cm apart, and connected together every 20 to 25 cm by vertical webs Fe.For example: for floors with a span of 4.5m the permitted overload is , according to measurement, of 750 Ks / m2, dead weight not included.



   The weight per m2 of these slabs is 20 to 40 Kgs. A concrete slab would have weighed 225 Kgs, a hollow slab approximately

 <Desc / Clms Page number 3>

 150 Kgs, hence very substantial weight saving which, 'empty meat, considerably lightened the framework.



   As soon as these different elements have been suitably welded, the floor, which has become a single piece of steel, can, from the point of view of the structural work, be considered as completed and ready for completion.



   In order to allow easy movement of the different trades through the different floors of the building, without having to construct temporary scaffolding which is difficult and dangerous to use, the completion begins with the construction of the steel sheet staircase. welded steel. Next, the metal frames of all the interior doors are installed.



   While work is being done. interior design, the facade has already been coated.



   For this purpose, the shutter sheets constituting the exterior walls are. covered with a plaster itself receiving the drawn coating. such as imitation stone from France, plaster called "Tyrclien", brick slabs, marble, etc. architectural coating as if it were the exterior coating of a local brick facade. From this moment, therefore, the steel is completely coated on the outside and is completely invisible.



   Inside, the wall is completed as follows: the steel sheet itself receives a protective, thin, cement-based coating; then, to. the internal alignment of the joists is built a wall by means of agglomerates, in such a way that between this wall and the sheet metal is maintained an air chamber of about 10 cm.

   As agglomerates, use is made of one or other of those commercially available, and whose thermal and acoustic insulation qualities have been clearly recognized. If the agglomerate thus used has been chosen with an external surface sufficiently smooth, and if the wall has been constructed by means of: 'large slabs as is commonly done, the interior wall of the entire floor is ready to be left to the upholsterer and the painter-decorator without

 <Desc / Clms Page number 4>

 that it is necessary to wait for a long drying.



   From the comfort point of view, the thermal and acoustic insulation of a wall constructed as we have just described it under a thickness of 16 cm offers the passage of noise, heat and cold a resistance equal to that of a wall in bricks 70 cm thick.



   As for the construction of the horizontal walls, it was already. previously described that the sheet metal elements formed slabs between the Gray joists of the frame forming heeling
These sheet elements can either directly receive a mixture forming mondlithe tiling, or an area of sand necessary for the laying of a tiling, or even a bitumen coating intended to fix the sub-floor on which the floor will have to be placed. parquetage, The inside face of these same sheet metal elements will have to act as ceiling for the floor below. For this purpose, it will suffice to cover it with insulating sheets of synthetic wood or of another similar kind;

   the said plates being suspended from a wooden counter-heeling or else from a rafter clamped between the sheet elements forming slabs. The fact that the ceiling is thus independent of the floor protects it from the reactions of the latter and eliminates the formation crevices or cracks.



   It is obvious that the maintenance of a sufficient air mattress between the plates forming the ceiling and the sheets forming the slabs will constitute a guarantee of sound insulation of the highest value.



   All the water, gas, electricity and heating pipes are simultaneously installed, before the installation of the partitions, in specially provided lodges on the vertical or norizontal surfaces of the building, so that all are both invisible and remain accessible in the event of damage.



   Once all these different works are finished, the work will be completed by the construction of the slits to which the steel crushes of the span; interior and the parais of the floor will act as template.

 <Desc / Clms Page number 5>

 



  This is how, from floor to floor, the construction will reach the roof, which can be established, in tiles, terracotta or cast iron, as if it were a brick house, or any other materials. , even in terraces of zinc, copper or concrete.



   The outer walls of these constructions can be treated in different ways, and among others, for the construction of bungalows and villas. The sheet used on the facade will be cut to standard dimensions beforehand and will constitute the reinforcement for the vibrated concrete slabs produced in the factory. These have their inner face provided with assembly legs placed according to the template. These plates are fixed to the framework by welding the tabs described above on L-shaped dies welded to the uprights of the framework.
CLAIMS.



    @) New construction process for steel buildings, characterized by the fact. that not only the general framework of the building, but also all the other essential parts such as gltages, external walls, slabs, stairs, door and window frames, etc., are made either of beams or of steel sheets , the method of assembling these different parts being mainly electric arc welding, thus making it possible to obtain a considerable saving of time by eliminating the old methods, and an almost immediate habitability of the building after assembly, due to the elimination of the enormous quantities of water used in the mixtures for masonry constructions.



  2) Method of construction of steel buildings according to resells: I characterized by the fact that as soon as the framework @ forms a storey, the exterior walls of the construction will be immediately formed by the assembly around the entire perimeter of this storey of specially corrugated steel sheets following an ad @oc profile.

** ATTENTION ** end of DESC field can contain start of CLMS **.


    

Claims (1)

30)Mode de construction suivant revend.I. caractérisée de par <Desc/Clms Page number 6> le fait que les hourdis sont constitués d'éléments tôlés spéciaux ayant généralement la forme de caissons métalliques en forme de Z,les dits éléments étant soudés les uns aux autres,d'une part, et au poutrellage, d'autre part,de façon à constituer ainsi un plancher composé de deux surfaces de tôles superposées, espacées d'environ 15 cm et reliées entre elles tous les 25 cm par des âmes verticales. 30) Construction method according to res. I. characterized by <Desc / Clms Page number 6> the fact that the slabs consist of special sheet metal elements generally having the form of Z-shaped metal boxes, said elements being welded to each other, on the one hand, and to the beams, on the other hand, so thus constituting a floor made up of two superimposed sheet surfaces, spaced approximately 15 cm apart and connected to each other every 25 cm by vertical webs. 4 Mode de construction suivant revend.I. caractérisé de par le fait que, pour permettre une circulation aisée des corps de métier dans l'immeuble, le parachèvement commence par la construction de l' escalier en tôles d'acier soudées. 4 Construction method according to vendor I. characterized in that, to allow easy movement of trades in the building, the completion begins with the construction of the staircase in welded steel sheets. 5 Mode de construction suivant revend.1 et 2,caractérisé de par @e fait que lees tôles d'obturation formant murs extérieure sont recouvertes d'un enduit spécial,ou de tels revètements, suivant l'effet architecturai que l'on désire obtenir. 5 Construction method according to revend.1 and 2, characterized by @e the fact that the shutter sheets forming exterior walls are covered with a special coating, or such coatings, depending on the architectural effect that is desired to obtain . 6 ) Mode de construction suivant revendications I et 2,caractérisé de par le fait que le parachèvement des murs extérieurs. est obtenu par l' application, sur la tôle, d'un enduit protecteur à case de ciment et qu'à l'alignement intérieur des poutrelles on construit un mur au moyen dagglomérés appropriés, de préférence livrésen plaques,de façon qu'entre ce mur et et la tôle soit maintenue une chambre d'air d'environ 10 cm, ce apres quoi la eurfece de ce mur d'agglomérés est abandonnéeaux décorateurs pour l'achèvement,sans qu'il soit néces- saire d'attendre un long séchage. 6) Construction method according to claims I and 2, characterized in that the completion of the exterior walls. is obtained by the application, on the sheet, of a protective coating with cement box and that the internal alignment of the joists a wall is built by means of suitable agglomerates, preferably delivered in plates, so that between this wall and the sheet is maintained an air chamber of about 10 cm, after which the eurfece of this chipboard wall is left to the decorators for completion, without having to wait a long time. drying. 7 ) Mode de construction suivant revend.1,2,et 6,caractérisé de par le fait qules murs ainsi construits offrent une résis tance au passage du bruit,de la chaleur et du froid, égale à celle d'un mur en briques de 70 cm. 7) Construction method according to resells 1,2, and 6, characterized by the fact that the walls thus constructed offer resistance to the passage of noise, heat and cold, equal to that of a brick wall of 70 cm. 8 ) Mode de construction suivant revend.I et 3,caractérisé de par lefait que les éléments tôlée constituant les hourdis peuvent recevoir,suivant le cas,soit directement un carrelage monolitheou une aire de sable pour la pose d'un carrelage ordinaire, ou encore un enduit bitumé pour la pose d'un sous- plancher pour un parquetage @ 9 Mode de construction suivant revend. 8) Construction method according to resells I and 3, characterized in that the sheet metal elements constituting the slabs can receive, depending on the case, either directly a monolithic tiling or a sand area for the installation of ordinary tiling, or else a bitumen coating for laying a sub-floor for a parquet @ 9 Construction method according to resells. 1, 3 et 8, caractérisé de <Desc/Clms Page number 7> par le fait que la face intérieure des dits éléments tôlés fera office de plafond pour l'étage du dessous,et qu'à cet effet elle pourra être recouverte de plaques isolantes en bois synthétique ou similaire, les dites plaques étant suspendues à un contre-gltage,ou bien à un chevronnage enserré entre les élémentsformant hourdis. 1, 3 and 8, characterized by <Desc / Clms Page number 7> by the fact that the inner face of said sheet metal elements will serve as a ceiling for the floor below, and that for this purpose it may be covered with insulating plates of synthetic wood or similar, said plates being suspended from a counter- gltage, or to a rafter clamped between the elements forming slabs. 10 ) Méthode de construction suivant revend.9,caractérisé de par le fait que le maintien d'un matelas d'air entre les pla- ques formant plafond et les tôles formant hourdis constituera une garantie d'isolation acoustique de première valeur, et que, grâce à l'indépendance du plafond par rapport au plancher, il est mis à l'abri des réactions de ce dernier, et de toute for- mation de crevasses ou de fissures. 10) Construction method according to revend.9, characterized in that the maintenance of an air mattress between the plates forming the ceiling and the sheets forming the slabs will constitute a guarantee of sound insulation of first value, and that , thanks to the independence of the ceiling in relation to the floor, it is protected from the reactions of the latter, and from any formation of crevices or cracks. Il )Mode de construction suivant revendications précédentes, caractérisé de par lefait quetoutes les canalisations d'eau, de gaz, d'électricité, de chauffage,etc,sont installées,avant la pose de cloisons,dans des loges spécialement prévues à cet ef- fet dans les surfaces verticales ou horizontales de la cons- truction, de façon qu'elles soient toutes invisibles,et acces- sibles en cas d'avaries. II) Construction method according to the preceding claims, characterized in that all the pipes for water, gas, electricity, heating, etc., are installed, before the installation of partitions, in boxes specially provided for this ef- fet in the vertical or horizontal surfaces of the building, so that they are all invisible, and accessible in case of damage. 120)Mode de construction suivant revendications précédentes, caractérisé de par le fait qu'après l'exécution des opérations constructives faisant l'objet des dites revendications,l'on procède à la construction des refends auxquels les ébrasements de portes et les parois de l'étage feront office de gabarits . 120) Construction method according to the preceding claims, characterized in that after carrying out the constructive operations which are the subject of said claims, one proceeds to the construction of the slits to which the door frames and the walls of the 'floor will serve as templates. 13 ) Mode de construction suivant revendication I,caractérisé de par le fait que,dans certains cas, d'application, tels: que villas et bungalows,les tôles des parois extérieures pourront ètre découpées préalablement à dimensions,pour constituer ar- mature de plaques en béton vibré,exécutées à l'usine,ces der- nières ayant leur face intérieure pourvue de pattes d'assem- blage,posées suivant gabarit, lesquelles sont fixées à l'os- sature par soudure à des filières fixées au montant de la char .pente.le tout comme décrit.- 13) Construction method according to claim I, characterized in that, in certain cases of application, such as: villas and bungalows, the sheets of the outer walls may be cut to size beforehand, to constitute a frame of plates in vibrated concrete, executed in the factory, the latter having their inner face provided with assembly brackets, placed according to the template, which are fixed to the framework by welding to dies fixed to the upright of the frame. all as described.
BE426679D BE426679A (en)

Publications (1)

Publication Number Publication Date
BE426679A true BE426679A (en)

Family

ID=87420

Family Applications (1)

Application Number Title Priority Date Filing Date
BE426679D BE426679A (en)

Country Status (1)

Country Link
BE (1) BE426679A (en)

Similar Documents

Publication Publication Date Title
FR2950638A1 (en) Constructive system for building, has wall elements equipped with two concrete strips spaced and connected together by vertical spacers, where parts of strips blades external to spacers form walls of slide boxes of framework of building
EP3333332A1 (en) Structural wall with a structure exogenous to the longitudinal axis thereof for enabling the inside of the wall to be filled on site
US20070175159A1 (en) wall panel and wall structure
FR3017889A1 (en) COMPOSITE BUILDING PANEL
AU2006246443B2 (en) A Wall Panel and Wall Structure
BE1028666B1 (en) Prefabricated three-dimensional constructive module
FR2891290A1 (en) Hollow framework element forming plates fixing device for forming e.g. wall of single family house, has posts assembled by transverse struts, where each post is inserted into one of plates and has length greater than or equal to two meters
FR2694774A1 (en) Method for making partition panels spaced by cross-bars - and filled with poured or injected insulation materials
EP3824150B1 (en) System for assembling building blocks in the form of a kit intended for the construction of buildings
FR2610022A1 (en) CONSTRUCTIVE SYSTEM, BY MODULAR WOOD FRAMES, FORMING STRUCTURES, AND METHOD OF MOUNTING
FR2716689A1 (en) Construction system to form walls, ceilings, floors, partitions
FR3152280A1 (en) BUILDING PANEL IN INSULATING MATERIAL
FR2627791A1 (en) Load-bearing insulated wall - with air spaces between its faces and insulation retained by PVC rails
WO1999002793A1 (en) Method for constructing individual houses using modular panels made of composite synthetic materials
BE463824A (en)
BE832167A (en) REDUCED HEIGHT BUILDING CONSTRUCTION SYSTEM.
BE892095A (en) INDUSTRIALIZED CONSTRUCTIONS IN THREE-DIMENSIONAL CELLS COMPLETELY COMPLETED IN THE FACTORY, FOR SCHOOLS, OFFICES, Cribs, MOTELS, HOUSES, ETC ...
FR2709504A1 (en) Acoustically-insulated and thermally-insulated multilayer prefabricated inside wall, outside wall, and iso-cement compound wall
BE679938A (en)
CH257656A (en) Building construction process and building constructed using this process, in particular prefabricated chalet.
BE475590A (en)
EP1382759A1 (en) Prefabricated construction elements for a building and building with such elements
FR2602532A1 (en) CONSTRUCTION WITH PREFABRICATED MODULAR ELEMENTS WITH LIGHT PRIMARY FRAMEWORK AND PERIPHERAL MASONRY
CH442676A (en) Method of constructing a building using prefabricated elements
FR2554487A1 (en) One-storey insulating modular formwork element for walls and floors, used in erecting a building