BE570664A - - Google Patents
Info
- Publication number
- BE570664A BE570664A BE570664DA BE570664A BE 570664 A BE570664 A BE 570664A BE 570664D A BE570664D A BE 570664DA BE 570664 A BE570664 A BE 570664A
- Authority
- BE
- Belgium
- Prior art keywords
- beams
- enclosed
- concrete
- prestressing
- rods
- Prior art date
Links
- 239000004568 cement Substances 0.000 claims description 3
- 239000004567 concrete Substances 0.000 claims description 3
- 238000009415 formwork Methods 0.000 claims description 2
- 238000000034 method Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 claims 1
- 239000010425 asbestos Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 229910052895 riebeckite Inorganic materials 0.000 description 2
- 239000004677 Nylon Substances 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/08—Members specially adapted to be used in prestressed constructions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Rod-Shaped Construction Members (AREA)
Description
<Desc/Clms Page number 1> De uitvinding heeft betrekking op het fabriceren in prefab van balk- jes, die in doorsnede bijv. rechthoekig, rond of ovaal kunnen zijn, welke balk- jes dezelfde functie verrichten als het thans nog gebezigde voorgespannen beton. In deze balkjes worden het voor een bepaald doel vereiste aantal staafjes of snaren van bijv. staal, nylon of soortgelijke materialen aangebracht. De staaf- jes of snaren worden omsloten door een snelwerkend cement, al dan niet voorzien van een toeslag, o. a. bestaande uit hollith, asbestvezel of anderstins. De op deze wijze geprefabriceerde voorspanningsbalkjes kunnen in verschillende lengten gefabriceerd en geleverd worden. Eén der voordelen van deze werkwijze is o.a., dat op elk willekeurig werk deze balkjes in de bekisting kunnen worden gelegde welke daarna omsloten wordt door de beton, zodat de sparingen waarin normaal de staven voorgespannen worden, niet meer door vloeibaar cement geïnjecteerd behoeven te worden. Een ander voordeel is, dat bij toepassing van asbestoement als om- sluiting van de staafjes en snaren, de balk bestand is tegen zeer hoge tempera- turen. **WAARSCHUWING** Einde van DESC veld kan begin van CLMS veld bevatten **.
Claims (1)
- SAMENVATTING Werkwijze tot de fabricage van voorspanningsbalkjes, welke in de bekisting bijv. geplaatst worden en omsloten zijnde door beton, dienst doen als voorspanning van het beton, met als kenmerk dat de balkjes in prefab worden ge- fabriceerd, waarbij zij voorzien worden van een voor het gestelde doel bestemde aantal staafjes of snaren en omsloten worden door een snelwerkend cement. **WAARSCHUWING** Einde van CLMS veld kan begin van DESC veld bevatten **.
Publications (1)
| Publication Number | Publication Date |
|---|---|
| BE570664A true BE570664A (nl) |
Family
ID=189139
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BE570664D BE570664A (nl) |
Country Status (1)
| Country | Link |
|---|---|
| BE (1) | BE570664A (nl) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0628675A1 (de) * | 1993-06-07 | 1994-12-14 | Horst Dr.-Ing. Kinkel | Verfahren zur Bewehrung eines Betonbauwerks und Bewehrungselemente hierfür |
-
0
- BE BE570664D patent/BE570664A/nl unknown
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0628675A1 (de) * | 1993-06-07 | 1994-12-14 | Horst Dr.-Ing. Kinkel | Verfahren zur Bewehrung eines Betonbauwerks und Bewehrungselemente hierfür |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Nadir et al. | Structural behavior of hybrid reinforced concrete beam-column joints under cyclic load: State of the art review | |
| Nouri et al. | Evaluation of beam-column joints made of HPFRCC composites to reduce transverse reinforcements | |
| ATE234977T1 (de) | Umlaufende bügel und binder zur verstärkung von bauelementen, durch umlaufenden bügel oder binder verstärkte bauelemente und verfahren zur konstruktion solcher bauelemente | |
| Alkhalil et al. | Finite element modelling and testing of two-span concrete slab strips strengthened by externally-bonded composites and mechanical anchors | |
| Al-Rousan et al. | The behavior of heat-damaged RC beams reinforced internally with CFRP strips | |
| Aules et al. | Effect of shape modification on the confinement effectiveness of CFRP strengthened square concrete compression members: Experimental study | |
| Kpo et al. | Strength and deformation characteristics of concrete beams reinforced with glass fibre reinforced polymer bars | |
| Aydın et al. | The mechanical behavior of thermally enhanced polypropylene concrete | |
| Ayoub et al. | Effect of CFRP strip tie configurations on the behavior of GFRP reinforced concrete columns under different loading conditions | |
| Ochieng et al. | Effectiveness of Carbon Fibre Reinforced Polymer (CFRP) & Textile Reinforced Mortar (TRM) Strengthening on Circularised Non-Slender Reinforced Concrete Columns | |
| Fehling et al. | Experimental investigations on UHPC structural elements subject to pure torsion | |
| Hameed et al. | A State of the Art on Composite Steel-Reactive Powder Concrete Structures | |
| Liu et al. | Study on bonding properties of iron-based shape memory alloys rebar and ultra-high performance concrete after resistive heating | |
| Al-Hassani et al. | Effect of lap splicing high tensile steel bars in reactive powder concrete beams exposed to repeated loading | |
| Mhd Haitham et al. | Behaviour of Circular RC Column Confined with Textile Reinforced Mortar under Compression Load | |
| Hama | Behavior of Different Ferrocement Structural Elements under Different Condition of Loading | |
| Gąćkowski et al. | Assessment of the effect of the pre-cast beams IG axial spacing on the effort bridge span | |
| Sundar et al. | PSC Bridge Subjected to Combined Post Tension and Post Compression—A Case Study | |
| Wong et al. | Uniaxial Compressive Performance of Concrete Cylinders Confined with Fe-SMA Strips: Comparative Study of Anchorage Techniques | |
| Bayrak | A Crack Is Not a Crack: End Region Cracking in Prestressed Concrete Components | |
| Meenakshi et al. | Retrofitting of Predamaged RC Columns using Precast Steel Reinforced Grout | |
| John et al. | Feasibility study of steel-concrete composite two-way slabs | |
| Khan et al. | Structural behavior of engineered cementitious composite (ECC)-concrete encased steel composite columns under axial compression | |
| JPH01290403A (ja) | コンクリート部材の製造方法 | |
| Tadros et al. | OPTIMIZED ULTRA-HIGH PERFORMANCE CONCRETE (UHPC) DECKED I--BEAMS IN ONTARIO |