BE623155A - - Google Patents

Info

Publication number
BE623155A
BE623155A BE623155DA BE623155A BE 623155 A BE623155 A BE 623155A BE 623155D A BE623155D A BE 623155DA BE 623155 A BE623155 A BE 623155A
Authority
BE
Belgium
Prior art keywords
cell
hole
pile
mortar
diameter
Prior art date
Application number
Other languages
French (fr)
Publication of BE623155A publication Critical patent/BE623155A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

       

   <Desc/Clms Page number 1> 
 pour :   Procéda     d'exécution   do pieux   moulas     On   sait que la force portante d'un pieu moulé dépend de deux éléments majeurs, à savoir les caractéristiques mécaniques du sol porteur et l'exécution du fût porteur. Dans le cas des sols hétérogènes avec couchée compressibles et, plus particulièrement, dans les couches alluvionnaires parcourues par des courants d'eau souterrains,   l'opération   de bétonnage est particulièrement délicate. 



   Aussi est-on parfois conduit à protéger le béton frais par un chemisage constitué par un tube en acier ou par des anneaux en béton préfabriqué. Ce chemisage, généralement onéreux, a l'inconvénient de réduire le frottement latéral entre le pieu et le terrain. 



   Le procédé selon l'invention permet, notamment, d'augmenter l'adhérence entre le pieu et le sol tout en protégeant efficacement l'ossature du pieu. 

 <Desc/Clms Page number 2> 

 



   Conformément à l'invention, on exécute un trou ayant pour diamètre le diamètre nominal du pieu, on maintient en place les parois du trou en coulant dans   celui-ci,   au fur et à mesure de son   avancement ,   un mortier liquide, on place selon l'axe du trou, une fois la perforation terminée, une cellule dilatable radialement et ayant approximativement la longueur du pieu, on accroît progressivement le diamètre de la cellule dilatable en envoyant dans celle-ci un fluide    ou    pression et l'on maintient la pression jusqu'à la prise du mortier, puis on dégonfle la cellule de manière à la décoller des parois du pieu, et à l'enlever complètement, et l'on remplit la cavité cylindrique ainsi   formée   avec du béton. 



   La mise en place et le gonflage de la cellule dilatable, selon l'invention, permettent de former selon l'axe du pieu un trou central qui, après prise de l'anneau périphé-   rique,   sera rempli d'un béton de haute qualité Le béton peut  en effet, être coulé à sec dans des conditions très favorables pour sa résistance structural** Par ailleurs, un examen rapide du trou central (contrôle de l'étanchéité, *tasse) permet de   s'assurer   de la continuité et de la qualité de l'anneau périphérique. 



   Le   gonflage   de la cellule permet d'essorer le mortier et d'augmenter ainsi sec   caractéristiques   mécaniques. 



  Il accroît l'adhérence entre le Mortier et le terrain naturel grâce à la précontrainte normale ainsi réalisée et maintenue pendant le temps de prise du mortier. Enfin, ce mortier reconsolide le terrain lui-même dans la zone périphérique ce qui augmente   les     caractéristiques     mécaniques*   
Suivant l'invention, on peut aussi mettre en place, en même temps que la cellule et autour de   celle-ci,   une frotte par exemple hélicoïdale de diamètre légèrement inférieur au trou, ce qui permet, notamment, de maintenir la cellule en position. 

 <Desc/Clms Page number 3> 

 



   Le rôle de la frette hélicoïdale   n'est   pas essentiel en lui-même mais il permet d'accroître   l'efficacité   du système. Sans sa présence, la pression maximale de précontrainte serait limitée par la résistance de la   coucha   de terrain ayant les caractéristiques les plus faibles et   l'on   risquerait de voir se   forcer   des sortes de hernies pouvant amener un éclatement de la cellule.

   A cet effet, on pourra utiliser soit des feuilles de métal déployé enroulées   hélicoïdalement,   soit un ferraillage étudié avec une   section   d'acier et un espacement tels qu'il puisse   s'opposer   à une surdilatation locale de la cellule à sa pression de   servies   et quelle que soit la qualité du terrain. 



   Suivant un mode de réalisation de   l'invention,   on ajoute au mortier liquide, coulé dans le trou au fur et à mesure de son avancement, un faible   pourcentage     d'argile.,   en vue de rendre le   mélange   thixotropique, ce qui évite l'emploi de   tubages.     Toutefois,   l'emploi d'un tubage extérieur peut parfois   s'imposer,   auquel cas   celui-ci   sera en place de la manière usuelle mais sera retiré   après     introduction   de   :LA   cellule dilatable et avant non   Gonflage.   



     Conformément   à   l'invention,   il est   également   possible, avant de retirer la cellule, de la   ramener   à   @ou   diamètre nominal, d'ajouter de la laitance   autour   de   :La   cellule, par exemple en pompant dans le   tond   du   trou,     puis   de regonfler la cellule pour serrer le mortier contre la paroi, cette opération pouvant être répétée, éventuellement, plusieurs   fois.   



   En outre, le procédé de l'invention peut être complété par la formation d'un ou plusieurs   bulbes, 4   la base ou en des points   intermédiaires   de la   longueur   du   pieu*   Ce bulbe sera réalisé une fois que la cavité cylindrique aura été obtenue et avant que cette cavité soit remplie de béton. Dans ce but, on pourra utiliser une cellule   dilatable   

 <Desc/Clms Page number 4> 

 descendue à la hauteur voulue ou tout autre moyen, tel que des moyens mécaniques classiques comme un éclateur de roche ou un dilateur constitué, par exemple, par deux dorai-coquilles écartées par un jeu de vérins. Ce bulbe sera rempli avec le béton introduit dans la cavité cylindrique et permettra d'augmenter l'adhérence du béton avec le sol et/ou le mortier périphérique. 



   Par ailleurs,on utilisera avantageusement de l'eau comme fluide de gonflage de la cellule. Le dégonflage de la cellule se fera alors soit en ouvrant la cellule, de telle sorte que, par inerties l'eau s'échappera   d'elle-même,   soit par pompage, soit encore en envoyant de   l'air   sous pression, notamment dans le cas de pieux très longs, 
De préférence, la cellule sera descendue remplie d'eau et avec une légère dilatation. Son introduction dans la laitance sera facilitée par la présence de la frotte   hélicoïdale.   Sinon, on pourra prévoir divers moyens pour faciliter cette introduction.

   Par exemple, une pièce   oonique   pourra être engagée dans l'extrémité inférieure de la cellule, l'extrémité d'une barre rigide da longueur sensiblement égale à la longueur du pieu étant   accrochée   à cette pièce conique, Une fois que l'extrémité de la cellule aura été descendue au fond du trou, il suffira de décrocher la barre de la pièce conique et de la sortir du trou. 



   La mise en oeuvre du procédé de l'invention procure, en outre, divers avantages aussi bien techniques qu'économiques. C'est ainsi qu'on a l'assurance d'avoir un fût continu et constitué par du béton d'aussi bonne qualité que dans la superstructure de l'ouvrage, grâce à la présence de l'anneau protecteur en mortier. En fait, des mouvements de terrain et dos courants souterrains peuvent   éventuellement   provoquer des étranglements ou détériorations de   l'enveloppe   extérieure tout comme dans un pieu ordinaire, mais coa 

 <Desc/Clms Page number 5> 

 déformations seront plus faibles en raison de l'effet de précontrainte sur la paroi, et surtout seront immédiatement contrôlables après le retrait de la   cellule :  on pourra donc y remédier avant de couler au centre le béton porteur. 



   Il résulte, en outre, de l'emploi du procédé de l'invention une amélioration très importante de l'adhérence entre le pieu et le terrain par augmentation des contraintes normales à la paroi et reconsolidation du sol périphérique. 



  Cet avantage est particulièrement sensible dans le cas des pieux pour lesquels le frottement latéral constitue un élément important de la force portante et dans le cas des ancrages. 



   Par ailleurs, les tassements sont diminuas grâce à l'accroissement du module de déformation du terrain sur la paroi latérale et la base du pieu. 



   Un autre avantage du procédé de l'invention réside dans le fait quo la mise en pression de la cellule et le relevé des déformations correspondantes constituent un essai pressiométrique à grande échelle de la mesure des caractéris- tiques mécaniques du terrain, comme décrit dans le brevet français n  1.117.983 du 19 Janvier 1955. 



   D'autres avantages, surtout d'ordre économique, sont les suivants - Les possibilités d'essorage qui permettent le gonflage de la cellule peuvent être mises à profit an coulant un mortier très maniable et pouvant être très facilement pompé à partir d'un centre de fabrication ; - Possibilité d'éviter l'emploi de tubage grâce à l'utilisation d'un mortier thixotropique. Il faut noter cependant que l'emploi d'un tubage extérieur peut parfois   s'imposer   auquel cas le tubage extérieur sera mis en place de la manière usuelle mais sera retiré après introduction de la cellule dilatable et avant gonflage de celle-ci ; - Facilité de mise en place du béton central par simple déversement et vibration, par exemple ; 

 <Desc/Clms Page number 6> 

 -   Meilleure   liaison en tête avec la structure. 



   La description qui va suivreen regard des   dessins   annexés fera bien comprendre comment le procédé de l'invention peut   Atre   mis en oeuvre dans la pratique. 



   Les fig. 1a - 1b et 2 à 4 montrent les étapes successives du procédé dans un mode de réalisation de l'invention la fig. 5 est une coupe suivant la   ligne     V-V   de. la fig. 2 montrant l'accrochage de la cellule à la frotte lors de sa descente dans le trou ; et la fig. 6 est une vue de détail schématique de l'extrémité inférieure d'une cellule. 



   Pour réaliser un pieu moulé selon l'invention, on commence par exécuter un trou 1 ayant pour diamètre le diamètre nominal du pieu. A cet effet, on peut, par exemple, soit utiliser des engins 2 (fig.   lA)   tels qu'une benne   Bénoto,   soit battre une pointe en béton 3 (fig. 1b) avec des éléments successifs tels que des rails, des poutres,   etc...     4,   au moyen d'une sonnette 5.. 



   Au fur et à mesure de l'avancement du trou, on maintient les parois du trou en place en coulant dans celui-ci une laitance de ciment épaisse 6 à laquelle on ajoute, de préférence, un certain pourcentage de bentonite de façon à avoir un mélange   thixotropique.   La laitance est mise en place de manière appropriée, par exemple par pompage directement en fond de forage. A cet effet, une simple pompe à boue actionnée à la main peut être suffisante. On pourrait aussi, le cas échéant, utiliser un tubage extérieur (non représenté). 



   Une fois que la perforation est terminée, on peut mettre en place, selon   l'axe   du fond (fige 2), un ferraillage 
7 et une cellule dilatable radialement 8. Le ferraillage est avantageusement constitué par une frotte hélicoïdale qui doit laisser passer le mortier lorsque celui-ci, sous l'action de 

 <Desc/Clms Page number 7> 

 la cellule dilatable, sera progressivement serré contre la paroi en partant du c entre du pieu. La frette doit aussi éviter que la cellule placée intérieurement se dilate localement au-delà d'un certain diamètre. A titre d'exemple, le ferraillage pourra être constitué par une frette de 5 mm de diamètre avec une distance entre les spires de   4   à 6 cm. 



  On peut aussi employer des feuilles de métal déployé enroulées   hélicoldalement   et qui constituent une solution économique. 



   La cellule 8, que l'on place dans la frette,est entièrement souple, ce qui facilite son transport et sa miss en place. Elle a, de préférence, une longueur standard, par exemple deux   mètre;3,   quatre mètres, six mètres, etc..., de manière que la surlongueur de la cellule par rapport au pieu soit faible, par exemple inférieure à doux métros. On empêche d'ailleurs tout gonflement de la   surlonguour   en plaçant cette dernière dans un tuyau souple 8a non dilatable de diamètre légèrement supérieur à la cellule. 



   Four descendre la cellule dilatatle, on la remplit d'un fluide, de préférence   'le   l'eau, en lui donnant une légère dilatation. Si, comme dans le cas   représenté,   on utilise une frette, on pourra se servir de cette frette pour descendre la cellule remplie   d'eau.   Par exemple, on maintiendra la   cellule   8 par des fers légers 9 fixés à la frotte 7, comme représenté sur la   fig.   5. Bien entendu, ces fers devront pouvoir se déformer lorsqu'on dilatera la cellule. 



     Si,  par contre, on n'emploie pas de frette,il sera commode de descendre la cellule à l'aide d'un dispositif tel que représenté sur la fig. 6 :l'extrémité inférieure de la cellule est engagée sur une pièce d'allure géniale conique 
10 et elle est fixée sur cette pièce par un moyen quelconque   11.   La pièce 10 comporte un trou oblique dans lequel est engagée l'extrémité coudée d'une barre rigide 12 ayant une longueur au moins égale à la profondeur du trou. Il suffira 

 <Desc/Clms Page number 8> 

 alors de descendre la cellule remplie d'eau, à l'aide de cette barre rigide et, lorsque la pièce conique 10 aura atteint le fond du trou, de décrocher la barre 12 pour la retirer du trou. 



   La mise en pression de la cellule se fait avec une pompa de type quelconque approprié qui envoie de l'eau dans ladite cellule, et l'on mesure le volume en fonction de la pression. Sous l'effet de la pression, le mortier est serré contre le terrain et est progressivement essoré ; on maintient la pression jusqu'à la prise du mortier (de 2 à 24 heures,selon la composition). 



   Dès quo le mortier a fait prise, on dégonfle la cellule, soit par simple ouverture libérant le fluide contenu dans la cellule, soit par pompage, soit encore, lorsque le fluide est de l'eau et, notamment, dens le cas de pieux très longs, en envoyant dû l'air sous pression. On retire aloro la cellule et on obtient un vide central   13   que l'on peut examiner et dont on peut contrôler la bonne exécution (fig.3). 



   Il est également possible, avant de retirer la cellule, de la ramener à son diamètre nominal (approximativement celui qu'elle a lorsqu'on la descend remplie d'eau), d'ajouter de la laitance autour de la cellule, par exemple en pompant dans le fond du trou, puis de regonfler la cellule pour serrer le mortier contre la paroi du trou. 



   On remplit ensuite le vide central 13 avec du béton 14 selon les règles de l'art avec ou sans ferraillage et l'on obtient un pieu (fig. 4) ayant les propriétés énoncées plus haut. 
 EMI8.1 
 



  J#VEUD,IOATIONS 

**ATTENTION** fin du champ DESC peut contenir debut de CLMS **.



   <Desc / Clms Page number 1>
 for: Procedure for the execution of molded piles It is known that the bearing strength of a cast pile depends on two major elements, namely the mechanical characteristics of the bearing soil and the execution of the supporting shaft. In the case of heterogeneous soils with compressible layers and, more particularly, in alluvial layers traversed by underground water currents, the concreting operation is particularly delicate.



   It is therefore sometimes necessary to protect the fresh concrete by a liner made up of a steel tube or of prefabricated concrete rings. This generally expensive lining has the drawback of reducing the lateral friction between the pile and the ground.



   The method according to the invention makes it possible, in particular, to increase the adhesion between the pile and the ground while effectively protecting the framework of the pile.

 <Desc / Clms Page number 2>

 



   In accordance with the invention, a hole is made having the nominal diameter of the pile as its diameter, the walls of the hole are kept in place by flowing in the latter, as it advances, a liquid mortar, one places according to the axis of the hole, once the perforation is completed, a radially expandable cell and having approximately the length of the pile, the diameter of the expandable cell is gradually increased by sending a fluid or pressure therein and the pressure is maintained until the mortar sets, then the cell is deflated so as to detach it from the walls of the pile, and to remove it completely, and the cylindrical cavity thus formed is filled with concrete.



   The installation and inflation of the expandable cell, according to the invention, make it possible to form a central hole along the axis of the pile which, after setting the peripheral ring, will be filled with high quality concrete. Concrete can in fact be poured dry under conditions which are very favorable for its structural strength ** In addition, a rapid examination of the central hole (check for tightness, * cup) makes it possible to ensure continuity and the quality of the peripheral ring.



   The inflation of the cell makes it possible to wring out the mortar and thus increase dry mechanical characteristics.



  It increases the adhesion between the Mortar and the natural ground thanks to the normal prestressing thus achieved and maintained during the setting time of the mortar. Finally, this mortar consolidates the ground itself in the peripheral zone, which increases the mechanical characteristics *
According to the invention, it is also possible to put in place, at the same time as the cell and around the latter, a helical wiper for example with a diameter slightly smaller than the hole, which makes it possible, in particular, to keep the cell in position.

 <Desc / Clms Page number 3>

 



   The role of the helical hoop is not essential in itself but it makes it possible to increase the efficiency of the system. Without its presence, the maximum pre-stressing pressure would be limited by the resistance of the ground layer having the weakest characteristics and there would be a risk of seeing the force of kinds of hernias which could cause the cell to burst.

   For this purpose, we can use either sheets of expanded metal wound helically, or a reinforcement studied with a steel section and a spacing such that it can oppose a local over-expansion of the cell at its service pressure and whatever the quality of the terrain.



   According to one embodiment of the invention, a small percentage of clay is added to the liquid mortar, poured into the hole as it advances, in order to make the mixture thixotropic, which avoids the use of casings. However, the use of an external casing may sometimes be necessary, in which case it will be in place in the usual way but will be removed after the introduction of: THE expandable cell and before not inflation.



     According to the invention, it is also possible, before removing the cell, to bring it back to @or nominal diameter, to add laitance around: The cell, for example by pumping in the mow of the hole, then to re-inflate the cell to tighten the mortar against the wall, this operation being able to be repeated, if necessary, several times.



   In addition, the method of the invention can be completed by forming one or more bulbs, 4 at the base or at intermediate points along the length of the pile * This bulb will be produced once the cylindrical cavity has been obtained and before this cavity is filled with concrete. For this purpose, we can use an expandable cell

 <Desc / Clms Page number 4>

 lowered to the desired height or any other means, such as conventional mechanical means such as a rock splitter or a dilator consisting, for example, of two dorai-shells separated by a set of jacks. This bulb will be filled with the concrete introduced into the cylindrical cavity and will increase the adhesion of the concrete with the soil and / or the peripheral mortar.



   Furthermore, water will advantageously be used as the fluid for inflating the cell. The deflation of the cell will then be done either by opening the cell, so that, by inertia, the water will escape by itself, or by pumping, or by sending air under pressure, in particular in the case of very long piles,
Preferably, the cell will be lowered filled with water and with a slight expansion. Its introduction into the laitance will be facilitated by the presence of the helical friction. Otherwise, various means could be provided to facilitate this introduction.

   For example, an oonic part could be engaged in the lower end of the cell, the end of a rigid bar of length substantially equal to the length of the pile being hooked to this conical part, Once the end of the cell will have been lowered to the bottom of the hole, it will suffice to unhook the bar from the conical part and to remove it from the hole.



   The implementation of the method of the invention also provides various advantages, both technical and economic. This is how we have the assurance of having a continuous barrel made of concrete of as good a quality as in the superstructure of the structure, thanks to the presence of the protective mortar ring. In fact, ground movements and back underground currents can eventually cause constrictions or deterioration of the outer shell just as in an ordinary pile, but coa

 <Desc / Clms Page number 5>

 deformations will be lower due to the effect of prestressing on the wall, and above all will be immediately controllable after removal of the cell: this can therefore be remedied before the load-bearing concrete is poured in the center.



   Furthermore, the use of the method of the invention results in a very significant improvement in the adhesion between the pile and the ground by increasing the stresses normal to the wall and reconsolidation of the peripheral soil.



  This advantage is particularly noticeable in the case of piles for which the lateral friction constitutes an important element of the load-bearing force and in the case of anchorages.



   In addition, settlements are reduced thanks to the increased modulus of soil deformation on the side wall and the base of the pile.



   Another advantage of the method of the invention lies in the fact that the pressurization of the cell and the recording of the corresponding deformations constitute a large-scale pressuremeter test of the measurement of the mechanical characteristics of the ground, as described in the patent. French n.1117.983 of January 19, 1955.



   Other advantages, especially of an economic nature, are as follows - The possibilities of wiping which allow the inflation of the cell can be exploited by pouring a mortar which is very manageable and which can be very easily pumped from a center Manufacturing ; - Possibility of avoiding the use of casing thanks to the use of a thixotropic mortar. It should be noted, however, that the use of an outer casing may sometimes be necessary in which case the outer casing will be put in place in the usual manner but will be removed after introduction of the expandable cell and before inflation thereof; - Ease of placing the central concrete by simple pouring and vibration, for example;

 <Desc / Clms Page number 6>

 - Better connection at the head with the structure.



   The description which will follow with regard to the accompanying drawings will make it clear how the process of the invention can be carried out in practice.



   Figs. 1a - 1b and 2 to 4 show the successive steps of the method in one embodiment of the invention, FIG. 5 is a section along the line V-V of. fig. 2 showing the attachment of the cell to the rub during its descent into the hole; and fig. 6 is a schematic detail view of the lower end of a cell.



   To produce a molded pile according to the invention, one begins by making a hole 1 having the nominal diameter of the pile as a diameter. For this purpose, one can, for example, either use machines 2 (fig. LA) such as a Bénoto tipper, or beat a concrete point 3 (fig. 1b) with successive elements such as rails, beams. , etc ... 4, by means of a bell 5 ..



   As the hole progresses, the walls of the hole are kept in place by pouring therein a thick cement laitance 6 to which is added, preferably, a certain percentage of bentonite so as to have a thixotropic mixture. The laitance is placed in an appropriate manner, for example by pumping directly from the bottom of the borehole. A simple hand operated mud pump may be sufficient for this purpose. One could also, where appropriate, use an outer casing (not shown).



   Once the perforation is completed, we can set up, along the axis of the bottom (pin 2), a reinforcement
7 and a radially expandable cell 8. The reinforcement is advantageously constituted by a helical friction which must allow the mortar to pass when the latter, under the action of

 <Desc / Clms Page number 7>

 the expandable cell, will be gradually tightened against the wall starting from the center of the pile. The hoop must also prevent the cell placed internally from expanding locally beyond a certain diameter. By way of example, the reinforcement could be constituted by a 5 mm diameter hoop with a distance between the turns of 4 to 6 cm.



  It is also possible to use sheets of expanded metal coiled helically and which constitute an economical solution.



   Cell 8, which is placed in the hoop, is completely flexible, which facilitates its transport and its miss in place. It preferably has a standard length, for example two meters; 3, four meters, six meters, etc ..., so that the excess length of the cell relative to the pile is small, for example less than soft metros. Any swelling of the suture is also prevented by placing the latter in a non-expandable flexible pipe 8a with a diameter slightly greater than the cell.



   To lower the dilatatle cell, it is filled with a fluid, preferably water, giving it a slight expansion. If, as in the case shown, a hoop is used, this hoop can be used to lower the cell filled with water. For example, the cell 8 will be maintained by light irons 9 fixed to the shoe 7, as shown in FIG. 5. Of course, these irons must be able to deform when the cell is dilated.



     If, on the other hand, a hoop is not used, it will be convenient to lower the cell using a device as shown in FIG. 6: the lower end of the cell is engaged on a piece of brilliant conical appearance
10 and it is fixed to this part by any means 11. The part 10 has an oblique hole in which is engaged the bent end of a rigid bar 12 having a length at least equal to the depth of the hole. It will suffice

 <Desc / Clms Page number 8>

 then lower the cell filled with water, using this rigid bar and, when the conical part 10 has reached the bottom of the hole, unhook the bar 12 to remove it from the hole.



   The cell is pressurized with a pump of any suitable type which sends water into said cell, and the volume is measured as a function of the pressure. Under the effect of the pressure, the mortar is pressed against the ground and is gradually wrung out; the pressure is maintained until the mortar sets (from 2 to 24 hours, depending on the composition).



   As soon as the mortar has set, the cell is deflated, either by simple opening releasing the fluid contained in the cell, or by pumping, or again, when the fluid is water and, in particular, in the case of very high piles. long, sending the air under pressure. Aloro is removed from the cell and a central vacuum 13 is obtained which can be examined and whose correct execution can be checked (fig.3).



   It is also possible, before removing the cell, to bring it back to its nominal diameter (approximately the one it has when it is lowered filled with water), to add milt around the cell, for example by pumping into the bottom of the hole, then re-inflating the cell to squeeze the mortar against the wall of the hole.



   The central void 13 is then filled with concrete 14 according to the rules of the art with or without reinforcement and a pile is obtained (FIG. 4) having the properties stated above.
 EMI8.1
 



  J # VEUD, IOATIONS

** ATTENTION ** end of DESC field can contain start of CLMS **.


    

Claims (1)

Ayant ainsi décrit mon invention et me réservant d'y apporter tous perfectionnements ou modifications qui me paraîtraient nécessaires, je revendique comme ma propriété exclusive e t privative : <Desc/Clms Page number 9> 1.- Procédé d'exécution de pieux moulés consistant à exécuter un trou ayant pour diamètre le diamètre nominal du pieu, à maintenir en place les parois du trou en coulant dans celui-ci, au fur et à mesure de son avancement, un mortier liquide, à placer selon l'axe du trou, une fois la perforation terminée, une cellule dilatable radialement et ayant approxi- mativament la longueur du lieu, à accroître progressivement le diamètre de la cellule dilatable en envoyant dans celle-ci un fluide sous pression, et à maintenir la pression jusqu'à la prise du mortier, Having thus described my invention and reserving the right to make any improvements or modifications that may appear necessary to me, I claim as my exclusive and private property: <Desc / Clms Page number 9> 1.- A method of making molded piles consisting in making a hole having the nominal diameter of the pile as its diameter, in keeping the walls of the hole in place by pouring in it, as it advances, a mortar liquid, to be placed along the axis of the hole, once the perforation is completed, a radially expandable cell and having approximately the length of the site, to gradually increase the diameter of the expandable cell by sending a pressurized fluid therein , and to maintain the pressure until the mortar sets, puis à dégonfler la cellule de manière à la décoller des parois du pieu et à l'enlever complètement, et à remplir la cavité cylindrique ainsi obtenue, 2.- Procédé selon 1, caractérisé en ce qu'on ajoute au mortier liquide, coulé dans le trou au fur et à mesure de son avancement, un faible pourcentage d'argile, en vue de rendre le mélange thixotropique. then to deflate the cell so as to detach it from the walls of the pile and to remove it completely, and to fill the cylindrical cavity thus obtained, 2.- Method according to 1, characterized in that one adds to the liquid mortar, poured into the hole as it progresses, a small percentage of clay, in order to make the mixture thixotropic. 3.- Procédé selon 1 ou 2, caractérisé en ce qu'on met en place, en même temps que la cellule et autour de celle- ci, une frotte de diamètre légèrement inférieur à celui du trou et susceptible de laisser passer le mortier et d'éviter que la cellule se dilate localement au-delà d'un certain diamètre . 3.- Method according to 1 or 2, characterized in that one puts in place, at the same time as the cell and around the latter, a friction material of diameter slightly smaller than that of the hole and capable of allowing the mortar to pass and to prevent the cell from expanding locally beyond a certain diameter. Procédé selon 3, caractérisé en ce que la frette est constituée par un ferraillage hélicoïdal ayant une section d'acier et un espacement entre les spires tels qu'il puisse s'opposer à une surdilatation locale de la cellule à sa pression de service et quelle que soit la qualité du terrain. Method according to 3, characterized in that the hoop is constituted by a helical reinforcement having a steel section and a spacing between the turns such that it can oppose a local over-expansion of the cell at its operating pressure and which whatever the quality of the land. 5.- Procédé selon 3, caractérisé en ce que la frette est constituée par des feuilles de métal déployé enroulées EMI9.1 hélicoldalomant, 6.- Procédé selon l'une des revendications précédentes, caractérisé en ce qu'on utilise une cellule entièrement souple delongueur standard. <Desc/Clms Page number 10> 5.- Method according to 3, characterized in that the hoop is formed by rolled-up sheets of expanded metal EMI9.1 helicoldalomant, 6.- Method according to one of the preceding claims, characterized in that a fully flexible cell standard length is used. <Desc / Clms Page number 10> 7.- Procédé salon 6, caractérisé en ce qu'on empêche tout gonflement de la surlongueur éventuelle de la cellule par rapport au pieu en plaçant cette surlongueur dans un tuyau souple non dilatable de diamètre légèrement supérieur à la cellule. 7.- Salon method 6, characterized in that any swelling of the possible excess length of the cell relative to the pile is prevented by placing this excess length in a non-expandable flexible pipe of diameter slightly greater than the cell. 8.- Procédé selon l'une des revendications précédentes, caractérisé en ce que la fluide employé pour gonfler la cellule est de l'eau. 8.- Method according to one of the preceding claims, characterized in that the fluid used to inflate the cell is water. 9.- Procédé selon l'une des revendications précédentes, caractérisé en ce que pour descendre la cellule on la remplie d'eau avec une légère dilatation. 9.- Method according to one of the preceding claims, characterized in that to lower the cell is filled with water with a slight expansion. 10.- Procédé selon l'une des revendications précédentes, caractérisé en ce que des fers légers maintiennent la cellule dans la frotte, au cours de sa descente. 10.- Method according to one of the preceding claims, characterized in that light irons maintain the cell in the friction, during its descent. 11.- Procédé selon l'une des revendications précédentes, caractérisé en ce que l'extrémité inférieure de la cellule est engagée sur une pièce conique à laquelle elle est attachée par un moyen quelconque, l'extrémité d'une barre rigide ayant une longueur sensiblement égale à celle du pieu est accrochée cette pièce conique et, une fois que l'extrémité de la cellule est au fond du trou, on décroche la barre et on la retire du trou. 11.- Method according to one of the preceding claims, characterized in that the lower end of the cell is engaged on a conical part to which it is attached by any means, the end of a rigid bar having a length substantially equal to that of the pile is hooked this conical piece and, once the end of the cell is at the bottom of the hole, the bar is unhooked and it is withdrawn from the hole. 12.- Procédé selon l'une dos revendications précédentes, caractérisé en ce qu'avant de retirer la cellule on la ramène à son diamètre nominal, on ajoute de la laitance dans le trou autour de la cellule, puis on regonfle la cellule pour serrer le mortier contre la paroi. 12.- Method according to one of the preceding claims, characterized in that before removing the cell it is brought back to its nominal diameter, laitance is added in the hole around the cell, then the cell is re-inflated to tighten. the mortar against the wall. 13.- Procédé selpn l'une des revendications précédentes, caractérisé en ce qu'une fois que la cavité cylindrique a été réalisée et avant de la remplir de béton, on tome un ou plusieurs bulbes à la base ou en des points intermédiaires de la longueur du pieu. <Desc/Clms Page number 11> 13.- Method selpn one of the preceding claims, characterized in that once the cylindrical cavity has been produced and before filling it with concrete, one or more bulbs are tome at the base or at intermediate points of the pile length. <Desc / Clms Page number 11> 14.- Procédé selon 13, caractérisé en ce que, pour former le bulbe, on utilise une cellule dilatable descendue à la profondeur voulue, 15. - Procédé selon 13, caractérisé en ce qu'on forme le bulbe par des moyens nécaniques. 14.- Method according to 13, characterized in that, to form the bulb, an expandable cell is used which is lowered to the desired depth, 15. - Method according to 13, characterized in that the bulb is formed by nechanical means. 16.- Procédé selon l'une des revendications précédons tes, caractérisé en ce qu'on dégonfle la cellule par simple ouverture ou par pompage. 16.- Method according to one of the preceding claims, characterized in that the cell is deflated by simple opening or by pumping. 17.- Procédé selon l'une des revendications 1 15, caractérisé en ce que, la cellule étant gonflée avec de l'eau, on la dégonfle en envoyant de l'air sous pression. le.- Procédé selon l'une des revendications, précéder tes, caractérisé en ce qu'on relève les déformations de la cellule,lors de sa mise en pression,pour obtenir =ci moeurs des caractéristiques mécaniques du terrain. 17.- Method according to one of claims 1 15, characterized in that, the cell being inflated with water, it is deflated by sending air under pressure. the.- Method according to one of claims, preceding thy, characterized in that the deformations of the cell are noted, when it is pressurized, to obtain = ci mores of the mechanical characteristics of the ground. 19.- Les pieux moulés réalisés à l'aide d'un procédé selon l'une des revendications précédentes. 19. The molded piles produced using a method according to one of the preceding claims.
BE623155D BE623155A (en)

Publications (1)

Publication Number Publication Date
BE623155A true BE623155A (en)

Family

ID=195410

Family Applications (1)

Application Number Title Priority Date Filing Date
BE623155D BE623155A (en)

Country Status (1)

Country Link
BE (1) BE623155A (en)

Similar Documents

Publication Publication Date Title
WO1996001937A1 (en) Preform, device and method for casing a well
CN107386281B (en) Screw rod uplift pile and its construction method under a kind of upper straight rod suitable for seasonal frozen soil region
WO2018206627A1 (en) Method and device for freezing a mass of soil
BE623155A (en)
FR2648839A1 (en) FOUNDATION PILES, METHODS, TOOLS AND MACHINES FOR CONSTRUCTING THESE PILES
EP0633965B1 (en) Cut expansion joint sealing device for concrete dams and method for fitting same
FR2610652A1 (en) PROCESS FOR REINFORCING A PITCHED TUBULAR PIEU, PIEU OBTAINED BY THIS METHOD, DEVICE FOR CARRYING OUT THE METHOD
EP0413676A1 (en) Process for fixing anchors
EP0532441A1 (en) Method for consolidating tunnel walls, gallery walls, or the like, anchoring bolt for carrying out the method, and method for making such anchoring bolts
EP2900875B1 (en) Method of making a foundation
BE498717A (en)
WO2017137702A1 (en) Method for producing an anchoring tie rod and anchoring tie rod
CN223523052U (en) Novel rapid restoration device for river channel root stones
FR2574442A1 (en) Method for the compacting of soils and the construction of works in the ground embedded in compacted or decompacted soil
FR2889574A1 (en) TUBULAR STRUCTURE DEPLIABLE
EP0131562B1 (en) Method for casting piles by means of a drive-out screw
FR2601706A1 (en) Method for anchoring a foundation pile in the ground and device for the implementation of this method
WO2025083019A1 (en) Method for stabilizing foundations that have undergone ground settlement
BE488032A (en) Method and device for producing pre-stressed hollow structures radially applicable in particular to underground works
JP2006063526A (en) Expanded rooting method using friction piles
EP1407085B1 (en) Method and device for creating a reinforced concrete wall in the ground
BE1006194A5 (en) Drilling device and process for the formation of piles or the like
FR3101651A1 (en) Reinforcing rod for a structural element of reinforced concrete, Assembly of structural elements, and Method of manufacturing an assembly of structural elements
BE632024A (en)
BE349910A (en)