BE901814R - Underground road tunnel formation system - forms intermediate layer between rock and intermediate formwork before lining - Google Patents

Underground road tunnel formation system - forms intermediate layer between rock and intermediate formwork before lining

Info

Publication number
BE901814R
BE901814R BE85214564A BE214564A BE901814R BE 901814 R BE901814 R BE 901814R BE 85214564 A BE85214564 A BE 85214564A BE 214564 A BE214564 A BE 214564A BE 901814 R BE901814 R BE 901814R
Authority
BE
Belgium
Prior art keywords
formwork
intermediate layer
shield
covering
digging
Prior art date
Application number
BE85214564A
Other languages
French (fr)
Original Assignee
Dyckerhoff & Wildmann Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE19843407384 external-priority patent/DE3407384A1/en
Priority claimed from BE0/213598A external-priority patent/BE900510A/en
Application filed by Dyckerhoff & Wildmann Ag filed Critical Dyckerhoff & Wildmann Ag
Priority to BE85214564A priority Critical patent/BE901814R/en
Application granted granted Critical
Publication of BE901814R publication Critical patent/BE901814R/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0635Tail sealing means, e.g. used as end shuttering
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/22Pipes composed of a plurality of segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The underground tunnel is for road traffic etc. and is formed using a pasty material to constitute an intermediate layer between the rock and the lining. This layer supports the thrust from the ground and is placed in position during excavation. - The intermediate layer is formed in advance of the lining and in the space between the rock and intermediate formwork on the onside, and covering at least the section which is to receive the layer. The lining is formed in-situ by concreting between this intermediate formwork, which is moved as concreting progresses, and internal formwork.

Description

       

  " Installation tubulaire souterraine, telle que tunnel

  
de circulation, canalisation tubulaire ou analogue,

  
procédé de fabrication et dispositif pour la mise

  
en oeuvre du procédé" L'invention concerne un procédé pour réaliser une cavité souterraine de forme tubulaire, par exemple un tunnel de circulation, dans lequel,..au cours du creusement, une matière pâteuse est introduite en vue de la formation d'une

  
 <EMI ID=1.1> 

  
portant la poussée de la roche, ainsi qu'un dispositif pour la mise en oeuvre de ce procédé.

  
L'objet du brevet principal no 900.510 est une cavité souterraine de forme tubulaire, telle qu'un tunnel de circulation, une conduite tubulaire ou analogue, dans laquelle est disposée entre la surface extérieure du revêtement qui supporte la poussée de la roche et la roche une couche en une matière qui limite, par déformation plastique, la transmission mutuelle de forces lorsqu'il y a des déplacements relatifs entre la roche et le revêtement. Cette couche est avantageusement constituée d'un mélange pâteux formé par un minéral argileux, par exemple de la bentonite et de l'eau, qui est mis en place lors de la progression de la réalisation du revêtement.

  
Du fait de l'imperméabilité à l'eau de cette couche,

  
on obtient un effet d'étanchéité favorable qui a-pour conséquence, pour des conditions normales de la roche, de permettre d'imposer des conditions nettement moins sévères à la limite de la largeur des fissures d'un revêtement de tunnel en béton armé. La conséquence est que même pour une épaisseur relativement faible mais constante de cette couche, il est possible d'économiser partiellement ou même complètement l'armature.

  
L'utilisation de béton non armé pour constituer le revêtement d'un tunnel suppose que la résultante des efforts de cisaillement dans tous les cas de charge s'applique à l'intérieur de la région centrale de la section. L'importance des moments de flexion est influencée par le facteur de poussée des terres et par le ballast. Les moments de flexion sont donc d'autant plus faibles que le facteur de poussée des

  
terres se rapproche de 1. La couche, constituée en un minéral argileux et qui est prévue selon le brevet principal entre le revêtement et la roche, présente des propriétés excellentes de glissement et se comporte comme un fluide quand la déformation est empêchée, ce qui fait que le facteur de poussée des terres devient 1. Ceci constitue une autre condition favorable permettant d'utiliser un revêtement de tunnel non armé.

  
L'invention a pour but de proposer une possibilité économique de réalisation d'un revêtement de tunnel non armé compre-. nant une couche intermédiaire conformément au brevet principal.

  
Selon l'invention, ce but est atteint du fait que la couche intermédiaire est réalisée en avance par rapport au revêtement dans l'espace intermédiaire compris entre la roche et un coffrage intermédiaire servant de limite interne et recouvrant au moins la section destinée à cette couche préalable; et du fait que le revêtement est réalisé sur place

  
par apport de béton dans la cavité située entre le coffrage intermédiaire qui est entraîné en même temps que progresse

  
le bétonnage et un coffrage interne.

  
La couche intermédiaire et le revêtement peuvent être réalisés au cours d'étapes de travail séparées et successives. La couche intermédiaire est de préférence réalisée de façon continue en même temps que le creusement.

  
Le concept de l'invention consiste dans le fait de coupler la mise en place de la couche intermédiaire en une matière pâteuse à la mise en place du béton du revêtement de manière que la couche intermédiaire soit réalisée avant le revêtement et de prévoir un coffrage entraîné en même temps que progresse le bétonnage pour séparer la couche intermé-

  
 <EMI ID=2.1> 

  
couche intermédiaire que du revêtement se fait donc directement à la suite de l'avance du bouclier de creusement, le béton frais du revêtement parvenant le long d'une ligne limite en contact direct avec le matériau de la couche intermédiaire à mesure-qu'avance le coffrage intermédiaire.

  
L'invention concerne également un dispositif pour la mise en oeuvre de ce procédé. Dans un bouclier de creusement. équipé de vérins de creusement et se prolongeant sur le côté qui est à l'opposé du front de taille en une queue ou arrièrebec de bouclier, est moulé,sur le côté intérieur de l'arrièrebec du bouclier, un coffrage frontal de forme annulaire et destiné à la couche intermédiaire, comprenant des ouvertures d'introduction sous pression de la matière pâteuse, le coffrage intermédiaire limitant la couche intermédiaire étant constitué sous forme d'une enveloppe cylindrique, coopérant avec le côté intérieur du coffrage frontal de la couche intermédiaire et comprenant, sur son côté intérieur, un coffrage frontal de forme annulaire destiné au revêtement et qui, pour sa part, est rendu étanche par rapport au coffrage intermédiaire du revêtement.

  
Le coffrage intermédiaire peut être déplacé par rapport à l'arrière-bec du bouclier et guidé de façon étanche contre le côté intérieur du coffrage frontal de la couche intermédiaire.

  
Le coffrage frontal de la couche intermédiaire est avantageusement décalé par rapport à l'extrémité de l'arrièrebec du bouclier et le coffrage frontal du revêtement est décalé par rapport à l'extrémité du coffrage intermédiaire.

  
L'extrémité du coffrage intermédiaire qui fait saillie au-delà du coffrage frontal peut être constitué en forme de coin allant en diminuant en direction de son extrémité; il peut comprendre des fentes orientées en direction longitudinale et/ou être constitué en une matière flexible telle que du caoutchouc, de la matière synthétique ou analogues.

  
Le coffrage frontal du revêtement est avantageusement muni d'ouvertures d'introduction sous pression.

  
Le coffrage intermédiaire peut être soutenu contre le bouclier au moyen d'unités à cylindre et piston et être guidé par glissement contre la surface extérieure du coffrage interne au moyen d'éléments d'écartement.

  
Un mode d'exécution de ce dispositif est décrit ciaprès en référence au dessin schématique annexé dans lequel :
Figure 1 est une vue en coupe longitudinale de ce dispositif ; <EMI ID=3.1>  agrandie ; Figure 3 est une vue similaire à celle de la figure 2 mais dans une autre position de fonctionnement.; Figure 4 est une vue en coupe transversale selon la ligne IV-IV de la figure 1, et Figure 5 est une vue en coupe transversale selon la ligne V-V de la figure 1.

  
Sur le dessin, l'invention est représentée au moyen d'un dispositif de creusement d'un tunnel à l'aide d'un bouclier. Comme montré à là figure 1, ce dispositif comprend un bouclier de creusement (1) sur le côté frontal duquel sont montés les outils de creusement (2) destinés à l'abattage de la roche ou du terrain. Les matériaux extraits sont transportés, d'une façon connue en soi, à partir d'une chambre d'abattage (3) éventuellement remplie d'eau ou d'une fluide thixotrope. Le bouclier de creusement (1) s'appuie pour avancer au moyen de vérins de creusement (4) contre le coffrage interne (5) du revêtement (6) du tunnel. Le coffrage interne (5) est constitué de sections individuelles de tubbings ou cuvelages, qui sont déplacées en fonction de la progression. On utilise alors un élément télescopique (31) qui ne fait pas non plus l'objet de l'invention.

  
La partie arrière du bouclier de creusement (1) est indiquée par l'arrière-bec (7) du bouclier. Sur le côté intérieur de l'arrière-bec (7) est fixé, à une certaine distance de son extrémité (8), un coffrage frontal de forme annulaire (9) destiné au mélange pâteux d'un minéral argileux, qui est amené pour former une couche intermédiaire (10) dans l'espace intermédiaire compris entre la roche et le coffrage interne (5). Le coffrage frontal (9) comporte, à cet effet, des ouvertures d'introduction sous pression (12), qui sont raccordées à des conduites tubulaires (13).

  
A l'intérieur de 1'arrière-bec (7) du bouclier se trouve le coffrage interne (14), sous forme d'une enveloppe cylindrique, qui peut être déplacée en direction axiale au moyen de vérins (15) montés sur le bouclier de creusement (1), en s'appuyant contre le coffrage frontal de forme annulaire (9)
(figure 2). Le coffrage frontal (9) est de forme courbe sur sa surface périphérique intérieure (16) en vue d'obtenir un meilleur guidage du coffrage intermédiaire-(14) et d'autoriser de petits mouvements de basculement dans les courbes.

  
Sur le côté intérieur du coffrage intermédiaire (14)

  
se trouve le coffrage frontal de forme annulaire (17) destiné au béton du revêtement (6) de telle sorte que le coffrage intermédiaire dépasse du coffrage (17) dans une zone (18). Dans le coffrage frontal (17) sont prévues des ouvertures d'introduction sous pression (19) pour le béton du revêtement (6), qui est amené par des conduites (20). Comme il ressort surtout de la figure 2, le coffrage intermédiaire (14) est maintenu dans la région du coffrage frontal (17) par des entretoises (21), qui peuvent se déplacer en glissant sur le coffrage interne. Le joint annulaire situé entre le coffrage frontal (17) et le coffrage interne (5) est rendu étanche par une garniture (22) comparable à une garniture d'arrièrebec de bouclier; l'espace intermédiaire compris entre la garniture (22) et les entretoises peut être rempli/de graisse

  
(23).

  
A la figure 4 est une vue en coupe transversale selon la ligne IV-IV de la figure 1, montrant la répartition des ouvertures d'introduction sous pression (12) et (19), respectivement de la matière pâteuse et du béton du revêtement

  
(6). Pour des raisons de clarté, les conduites d'amenée ne  <EMI ID=4.1> 

  
l'avance du coffrage interne (14) et de l'élément télescopique de poussée (31).

  
En fonctionnement du dispositif de creusement, pendant et à la suite de l'avance en direction de la flèche (24) montrée à la figure 2 , au moyen des vérins d'avance (4) qui s'appuient dans le sens de la flèche (25) contre le coffrage interne (5), le mélange pâteux de minéral argileux est amené par les conduites (13) dans le sens de la flèche (26) et

  
 <EMI ID=5.1> 

  
pression (12) prévues dans le coffrage frontal (9), dans l'espace compris entre la roche (11) et le coffrage intermédiaire

  
(14). Le minéral argileux constitue donc la couche (10) entre la roche (11) et le coffrage intermédiaire (14). Le creusement est arrêté dès que le coffrage frontal (9) parvient en appui contre une butée (27) à l'extrémité intérieure du coffrage intermédiaire (14). La position d'extrémité de la butée est représentée en pointillés à la figure 3.

  
L'opération suivante est représentée à la figure 3. Le bouclier de creusement (1) étant arrêté, on fait avancer le coffrage intermédiaire (14) au moyen des vérins (15) dans le sens de la flèche (28), par rapport au bouclier (1), et à la suite de l'avance, du béton est simultanément introduit sous pression par les conduites d'amenée (20) (dans le sens de laflèche (30))et-les ouvertures d'introduction sous pression (19) dans l'espace compris entre la couche intermédiaire (10) préalablement réalisée - et le coffrage intermédiaire (5) en vue de former le revêtement (6) du tunnel.

  
La zone en débord (18) du coffrage intermédiaire.(14) empêche, à l'arrêt, qu'un mélange pâteux encore frais du minéral argileux pénètre dans une cavité quelconque s'étant formée avant l'introduction du béton frais. Pour éviter que

  
le coffrage intermédiaire adhère dans cette région contre le béton qui prend, pendant les durées d'arrêt du bouclier de creusement, par exemple pendant des interruptions du travail, b

  
la zone (18) peut être réalisée sous la forme d'un coin de section allant en diminuant en direction de son extrémité, être munie de fentes longitudinales ou encore être constituée en un matériau flexible. Dans la partie restante, il se forme une ligne de séparation relativement régulière (29) entre la couche de minéral- argileux (10) et le béton du revêtement (6). La garniture d'étanchéité (22) rend alors l'espace annulaire étanche par rapport au côté extérieur du coffrage interne (5), qui est maintenu constant par les éléments d'écartement (21).

  
La figure 5 est une autre vue partielle en coupe transversale du revêtement de tunnel terminé comprenant une couche intermédiaire, avant le retrait du coffrage interne (5). 

- REVENDICATIONS -

  
1. Procédé pour réaliser une cavité souterraine de forme annulaire, par exemple un tunnel de circulation, selon l'une quelconque des revendications du brevet principal, selon lequel une matière pâteuse destinée à la formation d'une'couche intermédiaire entre la roche et le revêtement qui supporte la poussée des terres est mise en place pendant le creusement, caractérisé en ce que la couche intermédiaire (10) est réalisée en avance par rapport au revêtement (6), dans l'espace intermédiaire compris entre la roche et un coffrage intermédiaire (14) servant de limite interne et recouvrant au moins la section destinée à cette couche préalable, et.en ce que le revêtement (6) est réalisé sur place par apport de béton dans la cavité située entre le coffrage intermédiaire (14) qui est entraîné en même temps que progresse le bétonnage, et un coffrage interne (5).



  "Underground tubular installation, such as tunnel

  
circulation, tubular pipe or the like,

  
manufacturing process and device for placing

  
implementation of the process "The invention relates to a process for producing an underground cavity of tubular shape, for example a circulation tunnel, into which, during digging, a pasty material is introduced with a view to forming a

  
 <EMI ID = 1.1>

  
carrying the thrust of the rock, as well as a device for the implementation of this process.

  
The subject of main patent No. 900.510 is an underground cavity of tubular shape, such as a circulation tunnel, a tubular pipe or the like, in which is disposed between the outer surface of the covering which supports the thrust of the rock and the rock a layer of a material which limits, by plastic deformation, the mutual transmission of forces when there are relative displacements between the rock and the coating. This layer advantageously consists of a pasty mixture formed by a clay mineral, for example bentonite and water, which is put in place during the progress of the production of the coating.

  
Because of the waterproofing of this layer,

  
a favorable sealing effect is obtained which has the consequence, for normal rock conditions, of making it possible to impose clearly less severe conditions at the limit of the width of the cracks of a reinforced concrete tunnel lining. The consequence is that even for a relatively small but constant thickness of this layer, it is possible to partially or even completely save the reinforcement.

  
The use of unreinforced concrete to constitute the lining of a tunnel supposes that the result of the shear forces in all load cases applies inside the central region of the section. The importance of bending moments is influenced by the earth push factor and by the ballast. The bending moments are therefore lower when the push factor of the

  
earth approaches 1. The layer, made up of a clay mineral and which is provided according to the main patent between the coating and the rock, has excellent sliding properties and behaves like a fluid when deformation is prevented, which makes that the earth push factor becomes 1. This is another favorable condition for using an unarmoured tunnel lining.

  
The object of the invention is to propose an economic possibility of producing a compressed unarmoured tunnel lining. providing an intermediate layer in accordance with the main patent.

  
According to the invention, this object is achieved because the intermediate layer is produced in advance with respect to the coating in the intermediate space between the rock and an intermediate formwork serving as internal limit and covering at least the section intended for this layer. prior; and the fact that the coating is carried out on site

  
by adding concrete into the cavity between the intermediate formwork which is driven at the same time as it progresses

  
concreting and internal formwork.

  
The intermediate layer and the coating can be produced during separate and successive working steps. The intermediate layer is preferably carried out continuously at the same time as the digging.

  
The concept of the invention consists in coupling the installation of the intermediate layer of a pasty material with the installation of the concrete of the coating so that the intermediate layer is produced before the coating and to provide a driven formwork at the same time as the concreting progresses to separate the intermediate layer

  
 <EMI ID = 2.1>

  
intermediate layer of the coating therefore takes place directly following the advance of the digging shield, the fresh concrete of the coating arriving along a boundary line in direct contact with the material of the intermediate layer as it advances the intermediate formwork.

  
The invention also relates to a device for implementing this method. In a digging shield. equipped with digging cylinders and extending on the side which is opposite the cutting face in a tail or rear of shield, is molded, on the inside side of the rear of the shield, a frontal formwork of annular shape and intended for the intermediate layer, comprising openings for introducing the pasty material under pressure, the intermediate formwork limiting the intermediate layer being formed in the form of a cylindrical envelope, cooperating with the inner side of the front formwork of the intermediate layer and comprising , on its inner side, an annular formwork intended for the covering and which, for its part, is made watertight relative to the intermediate formwork of the covering.

  
The intermediate formwork can be moved relative to the rear beak of the shield and guided in a sealed manner against the inside of the front formwork of the intermediate layer.

  
The front formwork of the intermediate layer is advantageously offset relative to the end of the rear of the shield and the front formwork of the coating is offset relative to the end of the intermediate formwork.

  
The end of the intermediate formwork which projects beyond the front formwork can be made in the form of a wedge, tapering towards its end; it may include slots oriented in the longitudinal direction and / or be made of a flexible material such as rubber, synthetic material or the like.

  
The front formwork of the covering is advantageously provided with pressurized introduction openings.

  
The intermediate formwork can be supported against the shield by means of cylinder and piston units and can be guided by sliding against the external surface of the internal formwork by means of spacers.

  
An embodiment of this device is described below with reference to the attached schematic drawing in which:
Figure 1 is a longitudinal sectional view of this device; <EMI ID = 3.1> enlarged; Figure 3 is a view similar to that of Figure 2 but in another operating position .; Figure 4 is a cross-sectional view along line IV-IV of Figure 1, and Figure 5 is a cross-sectional view along line V-V of Figure 1.

  
In the drawing, the invention is represented by means of a device for digging a tunnel using a shield. As shown in FIG. 1, this device comprises a digging shield (1) on the front side of which are mounted the digging tools (2) intended for cutting down the rock or the ground. The extracted materials are transported, in a manner known per se, from a slaughter chamber (3) possibly filled with water or a thixotropic fluid. The digging shield (1) is pressed to advance by means of digging cylinders (4) against the internal formwork (5) of the lining (6) of the tunnel. The internal formwork (5) consists of individual sections of tubbings or casings, which are moved according to the progression. A telescopic element (31) is then used which is not the subject of the invention either.

  
The rear part of the digging shield (1) is indicated by the rear spout (7) of the shield. On the inner side of the rear spout (7) is fixed, at a certain distance from its end (8), a front formwork of annular shape (9) intended for the pasty mixture of a clay mineral, which is brought for forming an intermediate layer (10) in the intermediate space between the rock and the internal formwork (5). The front formwork (9) has, for this purpose, pressurized introduction openings (12), which are connected to tubular conduits (13).

  
Inside the rear spout (7) of the shield is the internal formwork (14), in the form of a cylindrical envelope, which can be moved in the axial direction by means of jacks (15) mounted on the shield. digging (1), pressing against the annular front formwork (9)
(figure 2). The front formwork (9) is curved on its inner peripheral surface (16) in order to obtain better guidance of the intermediate formwork (14) and to allow small tilting movements in the curves.

  
On the inside of the intermediate formwork (14)

  
there is the annular formwork (17) for the concrete facing (6) so that the intermediate form protrudes from the formwork (17) in an area (18). In the front formwork (17) are provided pressurized introduction openings (19) for the concrete of the covering (6), which is brought by pipes (20). As is clear above from FIG. 2, the intermediate formwork (14) is held in the region of the front formwork (17) by spacers (21), which can move by sliding on the internal formwork. The annular seal located between the front formwork (17) and the internal formwork (5) is sealed by a gasket (22) comparable to a rear shield gasket; the intermediate space between the lining (22) and the spacers can be filled / with grease

  
(23).

  
In Figure 4 is a cross-sectional view along line IV-IV of Figure 1, showing the distribution of the pressurized introduction openings (12) and (19), respectively of the pasty material and the concrete of the coating

  
(6). For reasons of clarity, the supply lines do not <EMI ID = 4.1>

  
the advance of the internal formwork (14) and the telescopic pushing element (31).

  
In operation of the digging device, during and following the advance in the direction of the arrow (24) shown in Figure 2, by means of the advance cylinders (4) which bear in the direction of the arrow (25) against the internal formwork (5), the pasty mixture of clay mineral is brought through the pipes (13) in the direction of the arrow (26) and

  
 <EMI ID = 5.1>

  
pressure (12) provided in the front formwork (9), in the space between the rock (11) and the intermediate formwork

  
(14). The clay mineral therefore constitutes the layer (10) between the rock (11) and the intermediate formwork (14). Digging is stopped as soon as the front formwork (9) comes to bear against a stop (27) at the inner end of the intermediate formwork (14). The end position of the stop is shown in dotted lines in Figure 3.

  
The following operation is represented in FIG. 3. The digging shield (1) being stopped, the intermediate formwork (14) is advanced by means of the jacks (15) in the direction of the arrow (28), relative to the shield (1), and following the advance, concrete is simultaneously introduced under pressure by the supply lines (20) (in the direction of the arrow (30)) and-the pressure introduction openings ( 19) in the space between the intermediate layer (10) previously produced - and the intermediate formwork (5) in order to form the lining (6) of the tunnel.

  
The overhanging zone (18) of the intermediate formwork (14) prevents, when stationary, a pasty mixture, still fresh, of the clay mineral penetrating into any cavity which has formed before the introduction of the fresh concrete. To prevent

  
the intermediate formwork adheres in this region against the concrete which takes, during the shutdown times of the digging shield, for example during work interruptions, b

  
the area (18) can be made in the form of a corner of a section which tapers towards its end, may be provided with longitudinal slots or may be made of a flexible material. In the remaining part, a relatively regular separation line (29) is formed between the layer of clay mineral (10) and the concrete of the coating (6). The seal (22) then seals the annular space with respect to the external side of the internal formwork (5), which is kept constant by the spacer elements (21).

  
FIG. 5 is another partial view in cross section of the finished tunnel lining comprising an intermediate layer, before the removal of the internal formwork (5).

- CLAIMS -

  
1. A method for producing an annular underground cavity, for example a circulation tunnel, according to any one of the claims of the main patent, according to which a pasty material intended for the formation of an intermediate layer between the rock and the covering which supports the thrust of the earth is put in place during digging, characterized in that the intermediate layer (10) is produced in advance with respect to the covering (6), in the intermediate space between the rock and an intermediate formwork (14) serving as an internal limit and covering at least the section intended for this preliminary layer, and. In that the covering (6) is produced on site by adding concrete into the cavity located between the intermediate formwork (14) which is driven at the same time as the concreting progresses, and an internal formwork (5).


    

Claims (1)

2. Procédé selon la revendication 1, caractérisé en ce que la couche intermédiaire (10) et le revêtement (6) sont réalisés au cours d'étapes de travail séparées et successives. 2. Method according to claim 1, characterized in that the intermediate layer (10) and the coating (6) are produced during separate and successive working steps. 3. Procédé selon la revendication 2, caractérisé en ce que la couche intermédiaire (10) est réalisée de façon continue en même temps que le creusement. 3. Method according to claim 2, characterized in that the intermediate layer (10) is produced continuously at the same time as the digging. 4. Dispositif pour.la mise en oeuvre du procédé selon l'une quelconque des revendications 1 à 3, comprenant un bouclier de creusement équipé de vérins de creusement et se prolongeant sur le côté tourné à l'opposé du front de taille par un arrière-bec de bouclier, caractérisé en ce qu'il comprend, sur le côté intérieur de l'arrière-bec (7) du bouclier, un coffrage frontal (9) de forme annulaire et destiné à la couche intermédiaire (10), comprenant des ouvertures d'introduction sous pression (12) de la matière pâteuse, et en ce que le coffrage intermédiaire (14) limitant la couche intermédiaire 4. Device pour.la implementation of the method according to any one of claims 1 to 3, comprising a digging shield equipped with digging cylinders and extending on the side facing away from the face by a rear -bec shield, characterized in that it comprises, on the inner side of the rear spout (7) of the shield, a front formwork (9) of annular shape and intended for the intermediate layer (10), comprising pressure introduction openings (12) of the pasty material, and in that the intermediate formwork (14) limiting the intermediate layer (10) est constitué sous forme d'une enveloppe cylindrique coopérant avec le côté intérieur du coffrage frontal (9) de (10) is formed in the form of a cylindrical envelope cooperating with the inner side of the front formwork (9) of la couche intermédiaire et comprenant sur son côté intérieur un coffrage frontal (17) de forme annulaire destiné au revêtement (6) qui, de son côté, est rendu étanche par rapport the intermediate layer and comprising on its inner side a frontal formwork (17) of annular shape intended for the covering (6) which, for its part, is sealed against au coffrage intermédiaire (5) du revêtement (6). to the intermediate formwork (5) of the covering (6). 5. Dispositif selon la revendication 4, caractérisé en ce que le coffrage intermédiaire (14) est déplaçable par rapport à l'arrière-bec (7) du bouclier et guidé de façon étanche contre le côté intérieur du coffrage frontal (9) de 5. Device according to claim 4, characterized in that the intermediate formwork (14) is movable relative to the rear spout (7) of the shield and guided sealingly against the inner side of the front formwork (9) la couche intermédiaire (10). the intermediate layer (10). 6. Dispositif selon l'une quelconque des revendications 4 et 5, caractérisé en ce que le coffrage frontal (9) de la couche intermédiaire (10) est décalé vers-l'arrière par rapport à l'extrémité de l'arrière-bec (8) du bouclier. 6. Device according to any one of claims 4 and 5, characterized in that the front formwork (9) of the intermediate layer (10) is offset rearwardly relative to the end of the rear spout (8) of the shield. 7. Dispositif selon l'une quelconque des revendications 4 à 6, caractérisé en ce que le coffrage frontal (17) du revêtement (6) est décalé vers l'arrière par rapport à l'extrémité (18) du coffrage intermédiaire (14). 7. Device according to any one of claims 4 to 6, characterized in that the front formwork (17) of the covering (6) is offset rearward relative to the end (18) of the intermediate formwork (14) . 8. Dispositif selon la revendication 7, caractérisé en ce que l'extrémité du coffrage intermédiaire (14) qui fait saillie au-delà du coffrage frontal (17) est en forme de coin dont la section diminue en direction de son extrémité. 8. Device according to claim 7, characterized in that the end of the intermediate formwork (14) which projects beyond the front formwork (17) is wedge-shaped, the section of which decreases towards its end. 9. Dispositif selon l'une quelconque des revendications 7 et 8, caractérisé en ce que l'extrémité (18) du coffrage intermédiaire (14), qui fait saillie au-delà du coffrage frontal comprend des fentes orientées en direction longitudinale. 9. Device according to any one of claims 7 and 8, characterized in that the end (18) of the intermediate formwork (14), which projects beyond the front formwork comprises slots oriented in the longitudinal direction. 10. Dispositif selon l'une quelconque des revendications 7 à 9, caractérisé en ce que l'extrémité (18) du coffrage intermédiaire, qui fait saillie au-delà du coffrage frontal, est réalisée en une matière flexible telle que du caoutchouc, de la matière synthétique ou analogues. 10. Device according to any one of claims 7 to 9, characterized in that the end (18) of the intermediate formwork, which projects beyond the front formwork, is made of a flexible material such as rubber, of synthetic material or the like. 11. Dispositif selon l'une quelconque des revendications 4 à 10, caractérisé en ce que le coffrage frontal (17) du revêtement (6) est muni d'ouvertures d'introduction sous pression (19). 11. Device according to any one of claims 4 to 10, characterized in that the front formwork (17) of the covering (6) is provided with pressurized introduction openings (19). 12. Dispositif selon l'une quelconque des revendications 4 à 11, caractérisé en ce que le coffrage intermédiaire (14) s'appuie contre le bouclier (1) au moyen de vérins .(15). 12. Device according to any one of claims 4 to 11, characterized in that the intermediate formwork (14) bears against the shield (1) by means of jacks. (15). 13. Dispositif selon l'une quelconque des revendications 4 à 12, caractérisé en ce que le coffrage intermédiaire (14) est guidé par glissement contre la surface extérieure du coffrage interne (5) au moyen d'entretoises (21). 13. Device according to any one of claims 4 to 12, characterized in that the intermediate formwork (14) is guided by sliding against the external surface of the internal formwork (5) by means of spacers (21).
BE85214564A 1984-02-29 1985-02-25 Underground road tunnel formation system - forms intermediate layer between rock and intermediate formwork before lining BE901814R (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BE85214564A BE901814R (en) 1984-02-29 1985-02-25 Underground road tunnel formation system - forms intermediate layer between rock and intermediate formwork before lining

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
DE19843407384 DE3407384A1 (en) 1983-09-07 1984-02-29 Method of producing a tubular underground hollow space, e.g. a traffic tunnel, and apparatus for carrying out the method
BE0/213598A BE900510A (en) 1983-09-07 1984-09-06 Tubular underground installation - comprises envelope positioned about tunnel, which absorbs forces of surrounding earth during subsidence
BE900510 1984-09-06
BE85214564A BE901814R (en) 1984-02-29 1985-02-25 Underground road tunnel formation system - forms intermediate layer between rock and intermediate formwork before lining

Publications (1)

Publication Number Publication Date
BE901814R true BE901814R (en) 1985-06-17

Family

ID=27424718

Family Applications (1)

Application Number Title Priority Date Filing Date
BE85214564A BE901814R (en) 1984-02-29 1985-02-25 Underground road tunnel formation system - forms intermediate layer between rock and intermediate formwork before lining

Country Status (1)

Country Link
BE (1) BE901814R (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61294098A (en) * 1985-06-19 1986-12-24 デイツカ−ホツフ・ウント・ウイドマン・アクチエンゲゼルシヤフト Method and device for manufacturing tubular underground hollow section, such as tunnel, heading or similar article through shielding excavation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61294098A (en) * 1985-06-19 1986-12-24 デイツカ−ホツフ・ウント・ウイドマン・アクチエンゲゼルシヤフト Method and device for manufacturing tubular underground hollow section, such as tunnel, heading or similar article through shielding excavation

Similar Documents

Publication Publication Date Title
KR101944262B1 (en) Simultaneous propulsion construction method using double pipe
US3994139A (en) Apparatus for and a method of laying a pipe line
FR2560635A2 (en) Underground road tunnel formation system
BE901814R (en) Underground road tunnel formation system - forms intermediate layer between rock and intermediate formwork before lining
JPS5995962A (en) Pig for repairing inside surface of installed pipe
BE1008489A3 (en) Process for producing a coated tunnel.
FR2579294A1 (en) Device for repairing pipelines in situ, in particular for drainage channels which cannot be visited
FR2679295A1 (en) Method and device for in situ concreting of an underground kerf and corresponding cutting blade
WO2021151289A1 (en) Underwater tunnel, construction method thereof and water blocking machine for construction
US4059965A (en) Apparatus for and a method of laying a pipe line
CA1283785C (en) Ballasting method and device for a continuously laid and buried pipe in a trench with temporarily shored sidewalls
AU1399700A (en) A pipe liner, a liner product and methods for forming and installing the liner
JP3701157B2 (en) Underground joining method of shield excavator
JP3439341B2 (en) Propulsion method
JP3299904B2 (en) Wife formwork in shielded excavators
JPH0232438B2 (en)
CN214662454U (en) A drag reduction device for pipe jacking construction of sandy soil foundation in construction engineering
SU1057659A1 (en) Arrangement for laying monolithic concrete pipelineswithout soil removal
CN213926355U (en) A prefabricated and assembled integrated pipe gallery waterproof structure
CN212744003U (en) Hydraulic mould and automatic molding system for traction connection of cement pipeline
JP3507174B2 (en) Tunnel excavation wall lining method and apparatus
JPH035596A (en) Back-filling application
JPS60203800A (en) Tubular underground hollow part such as traffic tunnel, pipeor similar ones, method and apparatus for producing the same
JP2508966Y2 (en) Tail seal for cast-in-place lining shield method
CN118007810A (en) A method for treating wall surface impermeability in a pre-buried water pipe area and an impermeability structure

Legal Events

Date Code Title Description
RE Patent lapsed

Owner name: DYCKERHOFF & WILDMANN A.G.

Effective date: 19940930