BRPI0409645A - método para completar uma zona subterránea não consolidada, e, aparelho para completar furo de poço não consolidado - Google Patents

método para completar uma zona subterránea não consolidada, e, aparelho para completar furo de poço não consolidado

Info

Publication number
BRPI0409645A
BRPI0409645A BRPI0409645-2A BRPI0409645A BRPI0409645A BR PI0409645 A BRPI0409645 A BR PI0409645A BR PI0409645 A BRPI0409645 A BR PI0409645A BR PI0409645 A BRPI0409645 A BR PI0409645A
Authority
BR
Brazil
Prior art keywords
completing
unconsolidated
underground zone
wellbore
underground
Prior art date
Application number
BRPI0409645-2A
Other languages
English (en)
Inventor
Philip D Nguyen
Michael W Sanders
Ron A Gibson
David L Lord
David E Mcmechan
Ronald G Dusterhoft
Original Assignee
Halliburton Energy Serv Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Serv Inc filed Critical Halliburton Energy Serv Inc
Publication of BRPI0409645A publication Critical patent/BRPI0409645A/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/04Gravelling of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/04Gravelling of wells
    • E21B43/045Crossover tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/08Screens or liners
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/08Screens or liners
    • E21B43/086Screens with preformed openings, e.g. slotted liners
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

"MéTODO PARA COMPLETAR UMA ZONA SUBTERRáNEA NãO CONSOLIDADA, E, APARELHO PARA COMPLETAR FURO DE POçO NãO CONSOLIDADO". São proporcionados métodos e aparelhos melhorados para completar zonas subterrâneas não consolidadas penetradas por furos de poços. Os métodos compreendem basicamente as etapas de colocar um tubo com fenda possuindo aberturas formadas nele que variam de tamanho e em número de aberturas, ou ambos os casos, ao longo de todo o comprimento do tubo com fenda, na zona subterrânea, isolar o espaço anular entre o tubo com fenda e o furo do poço, e injetar material particulado no espaço anular, pelo que a material particulado fica, de modo uniforme, ali compactado.
BRPI0409645-2A 2003-04-25 2004-04-15 método para completar uma zona subterránea não consolidada, e, aparelho para completar furo de poço não consolidado BRPI0409645A (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/423,126 US20040211559A1 (en) 2003-04-25 2003-04-25 Methods and apparatus for completing unconsolidated lateral well bores
PCT/GB2004/001646 WO2004097166A1 (en) 2003-04-25 2004-04-15 Method and apparatus for completing unconsolidated lateral well bores

Publications (1)

Publication Number Publication Date
BRPI0409645A true BRPI0409645A (pt) 2006-04-25

Family

ID=33299036

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0409645-2A BRPI0409645A (pt) 2003-04-25 2004-04-15 método para completar uma zona subterránea não consolidada, e, aparelho para completar furo de poço não consolidado

Country Status (5)

Country Link
US (1) US20040211559A1 (pt)
BR (1) BRPI0409645A (pt)
GB (1) GB2416558B (pt)
NO (1) NO20054938L (pt)
WO (1) WO2004097166A1 (pt)

Families Citing this family (66)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7343973B2 (en) 2002-01-08 2008-03-18 Halliburton Energy Services, Inc. Methods of stabilizing surfaces of subterranean formations
US7216711B2 (en) 2002-01-08 2007-05-15 Halliburton Eenrgy Services, Inc. Methods of coating resin and blending resin-coated proppant
US7267171B2 (en) 2002-01-08 2007-09-11 Halliburton Energy Services, Inc. Methods and compositions for stabilizing the surface of a subterranean formation
US6691780B2 (en) 2002-04-18 2004-02-17 Halliburton Energy Services, Inc. Tracking of particulate flowback in subterranean wells
US20040211561A1 (en) 2003-03-06 2004-10-28 Nguyen Philip D. Methods and compositions for consolidating proppant in fractures
US7114570B2 (en) 2003-04-07 2006-10-03 Halliburton Energy Services, Inc. Methods and compositions for stabilizing unconsolidated subterranean formations
US6978836B2 (en) 2003-05-23 2005-12-27 Halliburton Energy Services, Inc. Methods for controlling water and particulate production
US7413010B2 (en) 2003-06-23 2008-08-19 Halliburton Energy Services, Inc. Remediation of subterranean formations using vibrational waves and consolidating agents
US7114560B2 (en) 2003-06-23 2006-10-03 Halliburton Energy Services, Inc. Methods for enhancing treatment fluid placement in a subterranean formation
US7013976B2 (en) * 2003-06-25 2006-03-21 Halliburton Energy Services, Inc. Compositions and methods for consolidating unconsolidated subterranean formations
US7021379B2 (en) 2003-07-07 2006-04-04 Halliburton Energy Services, Inc. Methods and compositions for enhancing consolidation strength of proppant in subterranean fractures
US7066258B2 (en) 2003-07-08 2006-06-27 Halliburton Energy Services, Inc. Reduced-density proppants and methods of using reduced-density proppants to enhance their transport in well bores and fractures
US7059406B2 (en) 2003-08-26 2006-06-13 Halliburton Energy Services, Inc. Production-enhancing completion methods
US7237609B2 (en) 2003-08-26 2007-07-03 Halliburton Energy Services, Inc. Methods for producing fluids from acidized and consolidated portions of subterranean formations
US7156194B2 (en) 2003-08-26 2007-01-02 Halliburton Energy Services, Inc. Methods of drilling and consolidating subterranean formation particulate
US7017665B2 (en) 2003-08-26 2006-03-28 Halliburton Energy Services, Inc. Strengthening near well bore subterranean formations
US7032667B2 (en) 2003-09-10 2006-04-25 Halliburtonn Energy Services, Inc. Methods for enhancing the consolidation strength of resin coated particulates
US7345011B2 (en) 2003-10-14 2008-03-18 Halliburton Energy Services, Inc. Methods for mitigating the production of water from subterranean formations
US7063150B2 (en) 2003-11-25 2006-06-20 Halliburton Energy Services, Inc. Methods for preparing slurries of coated particulates
US7131493B2 (en) 2004-01-16 2006-11-07 Halliburton Energy Services, Inc. Methods of using sealants in multilateral junctions
US20050173116A1 (en) 2004-02-10 2005-08-11 Nguyen Philip D. Resin compositions and methods of using resin compositions to control proppant flow-back
US7211547B2 (en) 2004-03-03 2007-05-01 Halliburton Energy Services, Inc. Resin compositions and methods of using such resin compositions in subterranean applications
US7063151B2 (en) 2004-03-05 2006-06-20 Halliburton Energy Services, Inc. Methods of preparing and using coated particulates
US7541318B2 (en) 2004-05-26 2009-06-02 Halliburton Energy Services, Inc. On-the-fly preparation of proppant and its use in subterranean operations
US7299875B2 (en) 2004-06-08 2007-11-27 Halliburton Energy Services, Inc. Methods for controlling particulate migration
US7073581B2 (en) 2004-06-15 2006-07-11 Halliburton Energy Services, Inc. Electroconductive proppant compositions and related methods
US7255169B2 (en) 2004-09-09 2007-08-14 Halliburton Energy Services, Inc. Methods of creating high porosity propped fractures
US7281580B2 (en) 2004-09-09 2007-10-16 Halliburton Energy Services, Inc. High porosity fractures and methods of creating high porosity fractures
US7757768B2 (en) 2004-10-08 2010-07-20 Halliburton Energy Services, Inc. Method and composition for enhancing coverage and displacement of treatment fluids into subterranean formations
US7281581B2 (en) 2004-12-01 2007-10-16 Halliburton Energy Services, Inc. Methods of hydraulic fracturing and of propping fractures in subterranean formations
US7273099B2 (en) 2004-12-03 2007-09-25 Halliburton Energy Services, Inc. Methods of stimulating a subterranean formation comprising multiple production intervals
US7398825B2 (en) 2004-12-03 2008-07-15 Halliburton Energy Services, Inc. Methods of controlling sand and water production in subterranean zones
US7883740B2 (en) 2004-12-12 2011-02-08 Halliburton Energy Services, Inc. Low-quality particulates and methods of making and using improved low-quality particulates
US7334635B2 (en) 2005-01-14 2008-02-26 Halliburton Energy Services, Inc. Methods for fracturing subterranean wells
US7334636B2 (en) 2005-02-08 2008-02-26 Halliburton Energy Services, Inc. Methods of creating high-porosity propped fractures using reticulated foam
US7318473B2 (en) 2005-03-07 2008-01-15 Halliburton Energy Services, Inc. Methods relating to maintaining the structural integrity of deviated well bores
US7673686B2 (en) 2005-03-29 2010-03-09 Halliburton Energy Services, Inc. Method of stabilizing unconsolidated formation for sand control
US7448451B2 (en) 2005-03-29 2008-11-11 Halliburton Energy Services, Inc. Methods for controlling migration of particulates in a subterranean formation
US20070044957A1 (en) * 2005-05-27 2007-03-01 Oil Sands Underground Mining, Inc. Method for underground recovery of hydrocarbons
US7318474B2 (en) 2005-07-11 2008-01-15 Halliburton Energy Services, Inc. Methods and compositions for controlling formation fines and reducing proppant flow-back
US8287050B2 (en) 2005-07-18 2012-10-16 Osum Oil Sands Corp. Method of increasing reservoir permeability
US8613320B2 (en) 2006-02-10 2013-12-24 Halliburton Energy Services, Inc. Compositions and applications of resins in treating subterranean formations
US7926591B2 (en) 2006-02-10 2011-04-19 Halliburton Energy Services, Inc. Aqueous-based emulsified consolidating agents suitable for use in drill-in applications
US7819192B2 (en) 2006-02-10 2010-10-26 Halliburton Energy Services, Inc. Consolidating agent emulsions and associated methods
US7665517B2 (en) 2006-02-15 2010-02-23 Halliburton Energy Services, Inc. Methods of cleaning sand control screens and gravel packs
US7407010B2 (en) 2006-03-16 2008-08-05 Halliburton Energy Services, Inc. Methods of coating particulates
CA2649850A1 (en) 2006-04-21 2007-11-01 Osum Oil Sands Corp. Method of drilling from a shaft for underground recovery of hydrocarbons
US20070246212A1 (en) * 2006-04-25 2007-10-25 Richards William M Well screens having distributed flow
US7500521B2 (en) 2006-07-06 2009-03-10 Halliburton Energy Services, Inc. Methods of enhancing uniform placement of a resin in a subterranean formation
CA2666506A1 (en) 2006-10-16 2008-04-24 Osum Oil Sands Corp. Method of collecting hydrocarbons using a barrier tunnel
WO2008064305A2 (en) * 2006-11-22 2008-05-29 Osum Oil Sands Corp. Recovery of bitumen by hydraulic excavation
US7934557B2 (en) 2007-02-15 2011-05-03 Halliburton Energy Services, Inc. Methods of completing wells for controlling water and particulate production
US7783145B2 (en) * 2007-10-15 2010-08-24 Hewlett-Packard Development Company, L.P. Electrode having nanofilaments
US8167960B2 (en) 2007-10-22 2012-05-01 Osum Oil Sands Corp. Method of removing carbon dioxide emissions from in-situ recovery of bitumen and heavy oil
WO2009098597A2 (en) 2008-02-06 2009-08-13 Osum Oil Sands Corp. Method of controlling a recovery and upgrading operation in a reservor
CA2718885C (en) 2008-05-20 2014-05-06 Osum Oil Sands Corp. Method of managing carbon reduction for hydrocarbon producers
US7762329B1 (en) 2009-01-27 2010-07-27 Halliburton Energy Services, Inc. Methods for servicing well bores with hardenable resin compositions
US9057251B2 (en) 2010-10-28 2015-06-16 Weatherford Technology Holdings, Llc Gravel pack inner string hydraulic locating device
US9260950B2 (en) 2010-10-28 2016-02-16 Weatherford Technologies Holdings, LLC One trip toe-to-heel gravel pack and liner cementing assembly
US10082007B2 (en) 2010-10-28 2018-09-25 Weatherford Technology Holdings, Llc Assembly for toe-to-heel gravel packing and reverse circulating excess slurry
US8770290B2 (en) 2010-10-28 2014-07-08 Weatherford/Lamb, Inc. Gravel pack assembly for bottom up/toe-to-heel packing
US9068435B2 (en) 2010-10-28 2015-06-30 Weatherford Technology Holdings, Llc Gravel pack inner string adjustment device
US9085960B2 (en) 2010-10-28 2015-07-21 Weatherford Technology Holdings, Llc Gravel pack bypass assembly
US9447661B2 (en) 2010-10-28 2016-09-20 Weatherford Technology Holdings, Llc Gravel pack and sand disposal device
US9689235B1 (en) 2014-04-16 2017-06-27 The United States Of America As Represented By The Secretary Of The Department Of The Interior Safe, directional, drought-resistant dug well (SDDW)
CN108457627B (zh) * 2018-03-02 2019-03-26 中国石油大学(华东) 一种适用于粉细砂防砂的多层多粒级复合预充填筛管

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4046198A (en) * 1976-02-26 1977-09-06 Exxon Production Research Company Method and apparatus for gravel packing wells
US5058676A (en) * 1989-10-30 1991-10-22 Halliburton Company Method for setting well casing using a resin coated particulate
SU1723312A1 (ru) * 1990-03-15 1992-03-30 Всесоюзный научно-исследовательский институт гидрогеологии и инженерной геологии Способ оборудовани фильтровальной скважины
US5165476A (en) * 1991-06-11 1992-11-24 Mobil Oil Corporation Gravel packing of wells with flow-restricted screen
US5636691A (en) * 1995-09-18 1997-06-10 Halliburton Energy Services, Inc. Abrasive slurry delivery apparatus and methods of using same
AU713643B2 (en) * 1997-05-06 1999-12-09 Baker Hughes Incorporated Flow control apparatus and methods
EP0909875A3 (en) * 1997-10-16 1999-10-27 Halliburton Energy Services, Inc. Method of completing well in unconsolidated subterranean zone
US6003600A (en) * 1997-10-16 1999-12-21 Halliburton Energy Services, Inc. Methods of completing wells in unconsolidated subterranean zones
CA2292278C (en) * 1999-12-10 2005-06-21 Laurie Venning A method of achieving a preferential flow distribution in a horizontal well bore
GB2371319B (en) * 2001-01-23 2003-08-13 Schlumberger Holdings Completion Assemblies
US6516881B2 (en) 2001-06-27 2003-02-11 Halliburton Energy Services, Inc. Apparatus and method for gravel packing an interval of a wellbore
US6516882B2 (en) 2001-07-16 2003-02-11 Halliburton Energy Services, Inc. Apparatus and method for gravel packing an interval of a wellbore
US6830104B2 (en) * 2001-08-14 2004-12-14 Halliburton Energy Services, Inc. Well shroud and sand control screen apparatus and completion method
CA2357883C (en) * 2001-09-28 2010-06-15 Noetic Engineering Inc. Slotting geometry for metal pipe and method of use of the same
US6857475B2 (en) * 2001-10-09 2005-02-22 Schlumberger Technology Corporation Apparatus and methods for flow control gravel pack
US6626241B2 (en) * 2001-12-06 2003-09-30 Halliburton Energy Services, Inc. Method of frac packing through existing gravel packed screens

Also Published As

Publication number Publication date
GB2416558A (en) 2006-02-01
WO2004097166A1 (en) 2004-11-11
NO20054938L (no) 2005-11-25
GB2416558B (en) 2007-02-21
NO20054938D0 (no) 2005-10-24
US20040211559A1 (en) 2004-10-28
GB0521402D0 (en) 2005-11-30

Similar Documents

Publication Publication Date Title
BRPI0409645A (pt) método para completar uma zona subterránea não consolidada, e, aparelho para completar furo de poço não consolidado
NO984801L (no) FremgangsmÕte for komplettering av br°nner i ikke-konsolliderte, underjordiske soner
BR0108418B1 (pt) método para perfurar e tratar múltiplos intervalos de uma ou mais formações subterráneas interceptadas por um furo de poço, e, aparelho para uso na perfuração e tratamento de múltiplos intervalos de uma ou mais formações subterráneas interceptadas por um furo de poço.
BR0307686A (pt) Aparelho para formar um revestimento do furo de poço em um furo de sondagem, método e sistema para formar um revestimento de furo de poço em uma formação subterrânea, e, revestimento de furo de poço posicionado em um furo de sondagem dentro de uma formação subterrânea
BRPI0414964A (pt) método e sistema para completar um poço subterráneo
BR0100543A (pt) Processo de término de uma zona de produção subterrânea contendo areias não-consolidadas penetradas por um furo de poço
ECSP055794A (es) Métodos para completar pozos en formaciones no consolidadas
DK0524183T3 (da) Borehul og fremgangsmåde og apparat til at forme dette
EA200100092A1 (ru) Способ и инструмент для разрыва подземного пласта
BR9911865A (pt) Aparelho e método para estimular uma formação subterrânea
NO20042726L (no) Fremgangsmate og blanding for a tette en underjordisk sone som er penetrert av en borebronn
MXPA02007794A (es) Incorporacion de cortes de perforacion en estructuras estables que soportan carga.
WO2004013448A3 (en) Method for using coconut coir as a lost circulation material for well drilling
BR9305232A (pt) Processo de cimentação de um poço com uma composição de cimentação, processo de cimentação de uma zona subterrânea penetrada por um furo de poço, e processo de cimentação de um conjunto de tubulações em um furo de poço contendo fluido de perfuração
BRPI0802170A2 (pt) método de abandonar pelo menos uma porção de poço e sistema de abandonar pelo menos uma porção de poço
BR0108612B1 (pt) fluido viscoso para uso em operações de furo de sondagem, método de fraturamento de formação subterránea e método para reduzir a quantidade de água produzida de uma formação de produção de óleo subterránea.
EP1693547A3 (en) Method and apparatus for well testing
NZ612773A (en) High temperature temporary diverter and lost circulation material
AR042562A1 (es) Metodos de terminacion de pozos en zonas subterraneas no consolidadas
NO884211L (no) Smelteboringsmetode.
NO991666D0 (no) Apparat og fremgangsmÕte for ekspandering av en liner patch; en slagindikator; og en tubulµr patch
BR0112148A (pt) Método de reparar um empacotamento em cascalho obstruìdo em um furo de poço e método de, consolidação de uma formação subterrânea penetrada por um furo de poço
PL2235321T3 (pl) Stymulowanie przez szczelinowanie podczas wiercenia
ZA200709749B (en) Method and device for drilling, particularly percussion or rotary percussion drilling, a hole in soil or rock material
MXPA01013162A (es) Metodo y aparato para perforar y completar un pozo.

Legal Events

Date Code Title Description
B08F Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette]

Free format text: REFERENTE AS 7A E 8A ANUIDADES.

B08K Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette]

Free format text: REFERENTE AO DESPACHO 8.6 PUBLICADO NA RPI 2159 DE 22/05/2012.