BRPI0605923A2 - sistema é método para produção de fluidos a partir de uma formação subterrránea - Google Patents
sistema é método para produção de fluidos a partir de uma formação subterrráneaInfo
- Publication number
- BRPI0605923A2 BRPI0605923A2 BRPI0605923-6A BRPI0605923A BRPI0605923A2 BR PI0605923 A2 BRPI0605923 A2 BR PI0605923A2 BR PI0605923 A BRPI0605923 A BR PI0605923A BR PI0605923 A2 BRPI0605923 A2 BR PI0605923A2
- Authority
- BR
- Brazil
- Prior art keywords
- flow line
- well
- underground
- subterranean formation
- fluids
- Prior art date
Links
- 239000012530 fluid Substances 0.000 title abstract 5
- 230000015572 biosynthetic process Effects 0.000 title abstract 4
- 238000004519 manufacturing process Methods 0.000 title abstract 2
- 238000005755 formation reaction Methods 0.000 abstract 3
- 238000011084 recovery Methods 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Earth Drilling (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Heterocyclic Carbon Compounds Containing A Hetero Ring Having Nitrogen And Oxygen As The Only Ring Hetero Atoms (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
Abstract
SISTEMA E MéTODO PARA PRODUçãO DE FLUIDOS A PARTIR DE UMA FORMAçãO SUBTERRáNEA. A presente invenção refere-se ao sistema de poços subterrâneos que inclui uma linha de fluxo abaixo da superfície 20 possuindo pelo menos uma parte dentro ou abaixo de uma ou mais formações subterrâneas 12. Um ou mais poços de drenagem 26, 28, 30, 32 e 34 se estendem, cada um, a partir da superfície e interceptam pelo menos uma das formações subterrâneas em um local de interceptação respectivo. Uma parte inferior de cada poço de drenagem está em comunicação por fluido com a linha de fluxo abaixo da superfície. Um poço de recuperação 42 se estende a partir da superfície e também está em comunicação por fluido com a linha de fluxo abaixo da superfície, de forma que os fluidos que entram no poço de drenagem fluem para dentro da linha de fluxo abaixo da superfície e então para dentro do poço de recuperação.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US64438505P | 2005-01-14 | 2005-01-14 | |
| US60/644,385 | 2005-01-14 | ||
| PCT/US2006/001180 WO2006076547A2 (en) | 2005-01-14 | 2006-01-12 | System and method for producing fluids from a subterranean formation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| BRPI0605923A2 true BRPI0605923A2 (pt) | 2009-06-02 |
| BRPI0605923B1 BRPI0605923B1 (pt) | 2018-07-03 |
Family
ID=36678218
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BRPI0605923-6A BRPI0605923B1 (pt) | 2005-01-14 | 2006-01-12 | "Sistema de poços subterrâneos, sistema para produção de fluidos a partir de duas ou mais formações subterrâneas, método de construção de um sistema de poço, método de construção de um sistema de poço em um campo contendo um ou mais poços existentes, método de produção de fluidos a partir de duas ou mais formações subterrâneas separadas verticalmente por uma ou mais camadas impermeáveis, sistema de poços subterrâneos para produzir fluidos, sistema para produção de fluidos a partir de uma ou mais formações subterrâneas, método de produção de fluidos a partir de uma ou mais formações subterrâneas" |
Country Status (8)
| Country | Link |
|---|---|
| US (2) | US7451814B2 (pt) |
| CN (1) | CN101395338B (pt) |
| BR (1) | BRPI0605923B1 (pt) |
| CA (1) | CA2595018C (pt) |
| MX (1) | MX2007008515A (pt) |
| MY (1) | MY143983A (pt) |
| NO (1) | NO341183B1 (pt) |
| WO (1) | WO2006076547A2 (pt) |
Families Citing this family (44)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8760657B2 (en) * | 2001-04-11 | 2014-06-24 | Gas Sensing Technology Corp | In-situ detection and analysis of methane in coal bed methane formations with spectrometers |
| US7451814B2 (en) | 2005-01-14 | 2008-11-18 | Halliburton Energy Services, Inc. | System and method for producing fluids from a subterranean formation |
| CA2626923A1 (en) * | 2005-11-16 | 2007-05-24 | Shell Canada Limited | Wellbore system |
| US20090090499A1 (en) * | 2007-10-05 | 2009-04-09 | Schlumberger Technology Corporation | Well system and method for controlling the production of fluids |
| US7775277B2 (en) | 2007-10-19 | 2010-08-17 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US7793714B2 (en) * | 2007-10-19 | 2010-09-14 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US7789139B2 (en) * | 2007-10-19 | 2010-09-07 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US7913755B2 (en) * | 2007-10-19 | 2011-03-29 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US7775271B2 (en) * | 2007-10-19 | 2010-08-17 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US20090101336A1 (en) * | 2007-10-19 | 2009-04-23 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US7784543B2 (en) | 2007-10-19 | 2010-08-31 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US8898017B2 (en) * | 2008-05-05 | 2014-11-25 | Bp Corporation North America Inc. | Automated hydrocarbon reservoir pressure estimation |
| US8555958B2 (en) | 2008-05-13 | 2013-10-15 | Baker Hughes Incorporated | Pipeless steam assisted gravity drainage system and method |
| US8113292B2 (en) | 2008-05-13 | 2012-02-14 | Baker Hughes Incorporated | Strokable liner hanger and method |
| US8171999B2 (en) | 2008-05-13 | 2012-05-08 | Baker Huges Incorporated | Downhole flow control device and method |
| US7789152B2 (en) | 2008-05-13 | 2010-09-07 | Baker Hughes Incorporated | Plug protection system and method |
| WO2009148723A1 (en) * | 2008-06-04 | 2009-12-10 | Exxonmobil Upstream Research Company | Inter and intra-reservoir flow controls |
| CA2749591C (en) * | 2009-02-05 | 2017-04-18 | Cft Technologies (Hk) Limited | Recovery or storage process |
| US8151881B2 (en) | 2009-06-02 | 2012-04-10 | Baker Hughes Incorporated | Permeability flow balancing within integral screen joints |
| US8132624B2 (en) | 2009-06-02 | 2012-03-13 | Baker Hughes Incorporated | Permeability flow balancing within integral screen joints and method |
| US8056627B2 (en) | 2009-06-02 | 2011-11-15 | Baker Hughes Incorporated | Permeability flow balancing within integral screen joints and method |
| US8196655B2 (en) | 2009-08-31 | 2012-06-12 | Halliburton Energy Services, Inc. | Selective placement of conformance treatments in multi-zone well completions |
| EP2513418A1 (en) * | 2009-12-15 | 2012-10-24 | Chevron U.S.A. Inc. | System, method and assembly for wellbore maintenance operations |
| US8347960B2 (en) | 2010-01-25 | 2013-01-08 | Water Tectonics, Inc. | Method for using electrocoagulation in hydraulic fracturing |
| US8490695B2 (en) * | 2010-02-08 | 2013-07-23 | Apache Corporation | Method for drilling and fracture treating multiple wellbores |
| AU2010348348B2 (en) * | 2010-03-15 | 2015-02-26 | Landmark Graphics Corporation | Systems and methods for positioning horizontal wells within boundaries |
| US8561704B2 (en) * | 2010-06-28 | 2013-10-22 | Halliburton Energy Services, Inc. | Flow energy dissipation for downhole injection flow control devices |
| US8672034B2 (en) * | 2011-04-19 | 2014-03-18 | Saudi Arabian Oil Company | Well system with lateral main bore and strategically disposed lateral bores and method of forming |
| CN103174191A (zh) * | 2011-12-20 | 2013-06-26 | 袁波 | 联井结构 |
| EP2820239A4 (en) * | 2012-03-02 | 2016-07-20 | Halliburton Energy Services Inc | UNDERGROUND WELL SYSTEMS WITH MULTIPLE DRAINAGE WELLS EXTENDING FROM A PRODUCTION WELL AND METHODS OF USE THEREOF |
| US9388668B2 (en) * | 2012-11-23 | 2016-07-12 | Robert Francis McAnally | Subterranean channel for transporting a hydrocarbon for prevention of hydrates and provision of a relief well |
| CN103867179B (zh) * | 2012-12-11 | 2016-08-24 | 中国石油化工股份有限公司 | U型井水力喷射压裂方法 |
| CN103628848B (zh) * | 2013-12-02 | 2016-09-07 | 中国地质大学(武汉) | 多方位层间注水驱替采油方法和系统 |
| WO2016094506A1 (en) * | 2014-12-09 | 2016-06-16 | Clarens Andres F | System and related method to seal fractured shale |
| CN104790931A (zh) * | 2015-03-10 | 2015-07-22 | 中国海洋石油总公司 | 一种海上低渗油藏薄互层注采分枝井增控方法 |
| CN104947741A (zh) * | 2015-07-03 | 2015-09-30 | 张清才 | 一种地下微量山泉水引水装置 |
| US11168542B2 (en) * | 2015-11-16 | 2021-11-09 | Halliburton Energy Services, Inc. | Scheduling treatment fluid placement and fluid diversion in a subterranean formation |
| US10875209B2 (en) | 2017-06-19 | 2020-12-29 | Nuwave Industries Inc. | Waterjet cutting tool |
| CN107387056A (zh) * | 2017-08-22 | 2017-11-24 | 陕西省煤田地质集团有限公司 | 一种换热型水平对接地热井的井身结构 |
| CN107605455A (zh) * | 2017-08-22 | 2018-01-19 | 陕西省煤田地质集团有限公司 | 一种基于直井负位移水平对接型地热井井眼轨道及设计方法 |
| CN107366531B (zh) * | 2017-08-22 | 2019-08-27 | 陕西省煤田地质集团有限公司 | 一种基于斜井水平对接型地热井井眼轨道及设计方法 |
| CN107476797A (zh) * | 2017-08-22 | 2017-12-15 | 陕西省煤田地质集团有限公司 | 一种换热型水平对接地热井的井身结构的施工方法 |
| US11988081B2 (en) * | 2021-03-22 | 2024-05-21 | Ghw Solutions, Llc | Gravity assisted reservoir drainage systems and methods |
| US20240026863A1 (en) * | 2022-07-25 | 2024-01-25 | Gti Energy | Vertical and helical well designs for enhanced geothermal systems |
Family Cites Families (33)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2970826A (en) * | 1958-11-21 | 1961-02-07 | Texaco Inc | Recovery of oil from oil shale |
| US3386508A (en) | 1966-02-21 | 1968-06-04 | Exxon Production Research Co | Process and system for the recovery of viscous oil |
| US4016942A (en) | 1972-06-10 | 1977-04-12 | Trunkline Gas Company | Method and apparatus for indicating the position of one well bore with respect to a second well bore |
| FR2398874A1 (fr) * | 1977-07-25 | 1979-02-23 | Inst Francais Du Petrole | Utilisation de mouts de fermentation pour la recuperation assistee du petrole |
| US4248302A (en) | 1979-04-26 | 1981-02-03 | Otis Engineering Corporation | Method and apparatus for recovering viscous petroleum from tar sand |
| US4343363A (en) * | 1981-01-02 | 1982-08-10 | Marathon Oil Company | Process for cleaning a subterranean injection surface and for selectively reducing the permeability of a subterranean formation |
| US4390067A (en) | 1981-04-06 | 1983-06-28 | Exxon Production Research Co. | Method of treating reservoirs containing very viscous crude oil or bitumen |
| US4393939A (en) * | 1981-04-20 | 1983-07-19 | Halliburton Services | Clay stabilization during oil and gas well cementing operations |
| US4458945A (en) | 1981-10-01 | 1984-07-10 | Ayler Maynard F | Oil recovery mining method and apparatus |
| US4460483A (en) * | 1981-10-09 | 1984-07-17 | Halliburton Company | Methods and hydrocarbon base treating fluids for stabilizing water sensitive clay containing formations |
| US4501674A (en) * | 1982-09-01 | 1985-02-26 | Phillips Petroleum Company | Method for reducing corrosiveness of aqueous fluids |
| US4532986A (en) * | 1983-05-05 | 1985-08-06 | Texaco Inc. | Bitumen production and substrate stimulation with flow diverter means |
| US4519463A (en) | 1984-03-19 | 1985-05-28 | Atlantic Richfield Company | Drainhole drilling |
| US4646836A (en) | 1984-08-03 | 1987-03-03 | Hydril Company | Tertiary recovery method using inverted deviated holes |
| US4676313A (en) * | 1985-10-30 | 1987-06-30 | Rinaldi Roger E | Controlled reservoir production |
| US4682652A (en) | 1986-06-30 | 1987-07-28 | Texaco Inc. | Producing hydrocarbons through successively perforated intervals of a horizontal well between two vertical wells |
| US5074360A (en) | 1990-07-10 | 1991-12-24 | Guinn Jerry H | Method for repoducing hydrocarbons from low-pressure reservoirs |
| US5054551A (en) * | 1990-08-03 | 1991-10-08 | Chevron Research And Technology Company | In-situ heated annulus refining process |
| US5258755A (en) | 1992-04-27 | 1993-11-02 | Vector Magnetics, Inc. | Two-source magnetic field guidance system |
| US5402851A (en) | 1993-05-03 | 1995-04-04 | Baiton; Nick | Horizontal drilling method for hydrocarbon recovery |
| US5450902A (en) | 1993-05-14 | 1995-09-19 | Matthews; Cameron M. | Method and apparatus for producing and drilling a well |
| US5732776A (en) * | 1995-02-09 | 1998-03-31 | Baker Hughes Incorporated | Downhole production well control system and method |
| US6729394B1 (en) | 1997-05-01 | 2004-05-04 | Bp Corporation North America Inc. | Method of producing a communicating horizontal well network |
| US6119776A (en) | 1998-02-12 | 2000-09-19 | Halliburton Energy Services, Inc. | Methods of stimulating and producing multiple stratified reservoirs |
| US6263965B1 (en) | 1998-05-27 | 2001-07-24 | Tecmark International | Multiple drain method for recovering oil from tar sand |
| US6681855B2 (en) | 2001-10-19 | 2004-01-27 | Cdx Gas, L.L.C. | Method and system for management of by-products from subterranean zones |
| US6280000B1 (en) * | 1998-11-20 | 2001-08-28 | Joseph A. Zupanick | Method for production of gas from a coal seam using intersecting well bores |
| US7048049B2 (en) | 2001-10-30 | 2006-05-23 | Cdx Gas, Llc | Slant entry well system and method |
| US7360595B2 (en) * | 2002-05-08 | 2008-04-22 | Cdx Gas, Llc | Method and system for underground treatment of materials |
| US7264048B2 (en) | 2003-04-21 | 2007-09-04 | Cdx Gas, Llc | Slot cavity |
| US20050241834A1 (en) | 2004-05-03 | 2005-11-03 | Mcglothen Jody R | Tubing/casing connection for U-tube wells |
| BRPI0518347B1 (pt) | 2004-11-19 | 2017-12-19 | Halliburton Energy Services, Inc. | Method for connecting a underground road, and, well hole network |
| US7451814B2 (en) | 2005-01-14 | 2008-11-18 | Halliburton Energy Services, Inc. | System and method for producing fluids from a subterranean formation |
-
2006
- 2006-01-12 US US11/331,293 patent/US7451814B2/en active Active
- 2006-01-12 WO PCT/US2006/001180 patent/WO2006076547A2/en not_active Ceased
- 2006-01-12 CA CA2595018A patent/CA2595018C/en not_active Expired - Fee Related
- 2006-01-12 MX MX2007008515A patent/MX2007008515A/es active IP Right Grant
- 2006-01-12 BR BRPI0605923-6A patent/BRPI0605923B1/pt not_active IP Right Cessation
- 2006-01-12 MY MYPI20060141A patent/MY143983A/en unknown
- 2006-01-12 CN CN2006800022220A patent/CN101395338B/zh not_active Expired - Fee Related
-
2007
- 2007-07-17 NO NO20073658A patent/NO341183B1/no not_active IP Right Cessation
-
2008
- 2008-10-23 US US12/256,720 patent/US7819187B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| US7451814B2 (en) | 2008-11-18 |
| CA2595018C (en) | 2011-08-16 |
| NO20073658L (no) | 2007-08-13 |
| US7819187B2 (en) | 2010-10-26 |
| NO341183B1 (no) | 2017-09-04 |
| BRPI0605923B1 (pt) | 2018-07-03 |
| CN101395338A (zh) | 2009-03-25 |
| CN101395338B (zh) | 2013-12-11 |
| MY143983A (en) | 2011-07-29 |
| MX2007008515A (es) | 2007-11-09 |
| WO2006076547B1 (en) | 2008-11-06 |
| WO2006076547A2 (en) | 2006-07-20 |
| US20060157242A1 (en) | 2006-07-20 |
| CA2595018A1 (en) | 2006-07-20 |
| US20090038792A1 (en) | 2009-02-12 |
| WO2006076547A3 (en) | 2008-10-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| BRPI0605923A2 (pt) | sistema é método para produção de fluidos a partir de uma formação subterrránea | |
| CN106194131B (zh) | 多级压裂水平井缝间间隔co2驱采油方法 | |
| US5520247A (en) | Method of producing a fluid from an earth formation | |
| US20090283255A1 (en) | Strokable liner hanger | |
| Miskimins | Design and life-cycle considerations for unconventional-reservoir wells | |
| WO2011143639A3 (en) | Materials and methods for temporarily obstructing portions of drilled wells | |
| WO2009009445A3 (en) | Heated fluid injection using multilateral wells | |
| WO2010033716A3 (en) | Method for optimizing well production in reservoirs having flow barriers | |
| NO20082625L (no) | Brønnboresystem | |
| US20150096748A1 (en) | Systems and methods for enhancing steam distribution and production in sagd operations | |
| Brien et al. | Using real-time downhole microseismic to evaluate fracture geometry for horizontal packer-sleeve completions in the Bakken Formation, Elm Coulee Field, Montana | |
| RU2386804C1 (ru) | Способ разработки залежей нефти с газовой шапкой и подошвенной водой | |
| CN109403957B (zh) | 一种高压地层压力获取方法 | |
| RU2007148901A (ru) | Система буровых скважин с полостью | |
| RU2001122000A (ru) | Способ разработки газонефтяных залежей | |
| CN103670353B (zh) | 一种双分支水平井的蒸汽辅助重力泄油工艺 | |
| Jin et al. | Performance analysis of wells with downhole water loop installation for water coning control | |
| MY172789A (en) | Downhole multiple well | |
| EA201592089A1 (ru) | Узел аварийного клапана для откачивающих скважин, скважина, снабженная указанным клапаном, и способ управления откачивающей скважиной посредством указанного клапана в чрезвычайных условиях | |
| RU2153064C1 (ru) | Способ разработки нефтяной залежи | |
| RU2524703C1 (ru) | Способ разработки мелких нефтяных залежей | |
| RU2536523C1 (ru) | Способ разработки многопластового месторождения газа | |
| Quintero et al. | Dynamics of Multiphase Flow Regimes in Toe-Up and Toe-Down Horizontal Wells | |
| BR112014019864A8 (pt) | Sistema de poço de subsuperfície, e, método para perfurar um sistema de poço de subsuperfície | |
| RU2667210C1 (ru) | Способ эксплуатации месторождения углеводородов |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| B07A | Application suspended after technical examination (opinion) [chapter 7.1 patent gazette] | ||
| B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
| B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] | ||
| B21F | Lapse acc. art. 78, item iv - on non-payment of the annual fees in time |
Free format text: REFERENTE A 16A ANUIDADE. |
|
| B24J | Lapse because of non-payment of annual fees (definitively: art 78 iv lpi, resolution 113/2013 art. 12) |
Free format text: EM VIRTUDE DA EXTINCAO PUBLICADA NA RPI 2653 DE 09-11-2021 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDA A EXTINCAO DA PATENTE E SEUS CERTIFICADOS, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |