BRPI0804542A2 - recycled water hydroelectric plant - Google Patents

recycled water hydroelectric plant Download PDF

Info

Publication number
BRPI0804542A2
BRPI0804542A2 BRPI0804542-9A BRPI0804542A BRPI0804542A2 BR PI0804542 A2 BRPI0804542 A2 BR PI0804542A2 BR PI0804542 A BRPI0804542 A BR PI0804542A BR PI0804542 A2 BRPI0804542 A2 BR PI0804542A2
Authority
BR
Brazil
Prior art keywords
water
meters
turbine
reservoir
turbines
Prior art date
Application number
BRPI0804542-9A
Other languages
Portuguese (pt)
Inventor
Edison Jose Ustulin
Original Assignee
Edison Jose Ustulin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Edison Jose Ustulin filed Critical Edison Jose Ustulin
Priority to BRPI0804542-9A priority Critical patent/BRPI0804542A2/en
Publication of BRPI0804542A2 publication Critical patent/BRPI0804542A2/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

Patente de invenção para geração de energia elétrica através do uso de água reciclada em usinas hidrelétricas verticalizadas, ou seja, com estágios sobrepostos de queda d'água onde a mesma será recalcada através de bombas hidráulicas (5 e 7) fig 1 e 2 respectivamente, e adutoras (6 para fig. 1 e 8 para fig.2) nas alturas projetadas de acordo com a necessidade de cada projeto. Nos desenhos das figs 1 e 2, as alturas consideradas foram de 70 metros e 105 metros respectivamente, utilizando-se de duas turbinas hidráulicas na fig. 1 (1 e 2) e três turbinas na fig. 2 (1,2 e 3) e dois geradores de energia na fig. 1 (3 e 4) e na fig. 2, três geradores (4, 5 e 6) e um reservatório/caixa d'água (12 e 13) correspondentes a fig. 1 e 2. A quebra do paradigma é factível. A segurança estratégica de um pais é a sua independência energética, dentro dos preceitos da responsabilidade sócio-ambiental.Patent for electric power generation through the use of recycled water in vertical hydroelectric power plants, ie, with overlapping stages of water fall where it will be repressed by hydraulic pumps (5 and 7) fig 1 and 2 respectively, and water mains (6 for fig. 1 and 8 for fig.2) at the projected heights according to the needs of each project. In the drawings of Figs 1 and 2, the heights considered were 70 meters and 105 meters respectively, using two hydraulic turbines in Fig. 1 (1 and 2) and three turbines in fig. 2 (1,2 and 3) and two power generators in fig. 1 (3 and 4) and in fig. 2, three generators (4, 5 and 6) and a reservoir / water tank (12 and 13) corresponding to fig. 1 and 2. Breaking the paradigm is feasible. The strategic security of a country is its energy independence, within the precepts of socio-environmental responsibility.

Description

"USINA HIDRELÉTRICA DE ÁGUA RECICLADA""RECYCLED WATER HYDROELECTRIC PLANT"

A presente patente de invenção tem porobjetivo um projeto de geração de energia hidrelétrica utilizando-se de água reciclada, atendendo a demanda crescente de energiaelétrica no mundo, sendo esta energia, limpa, renovável e infinita,em conformidade com a responsabilidade ambiental.The present invention has as its objective a hydroelectric power generation project using recycled water, meeting the growing demand for electric power in the world, which energy is clean, renewable and infinite, in accordance with the environmental responsibility.

O projeto fundamental consiste emutilizar-se de duas ou mais quedas d'água, em dois ou maisestágios sobrepostos de altura, com duas ou mais turbinashidráulicas, dois ou mais geradores de energia, adutoras (tubos)de recalque, adutora de sangradouro (descarga), bombashidráulicas de recalque e uma caixa/reservatório de água.The fundamental design is to use two or more waterfalls, two or more overlapping stages of height, two or more hydraulic turbines, two or more power generators, downpipe (adduct), downstream adduct. , booster pumps and a water box / reservoir.

As construções de usinas hidrelétricasconvencionais, além de exigir altíssimos investimentos, causamgrande impacto sócio-ambiental, ou seja, na fauna, flora ecomunidades, submergindo grandes áreas de terras, que poderiamter uma exploração sustentável ou fontes de biodiversidade, alémde exigir a construção em locais distantes do consumo, com altosinvestimentos em transmissão.The construction of conventional hydroelectric plants, in addition to requiring very high investments, has a great socio-environmental impact, that is, on fauna, flora and communities, submerging large areas of land that could have sustainable exploitation or sources of biodiversity, as well as requiring construction in distant places. consumption, with high investments in transmission.

O projeto, objeto da presente patente deinvenção, que utiliza usinas hidrelétricas de águas recicladas,permite a sua instalação em todos os pontos existentes do planeta,mesmo onde não exista água, transportando até lá a águanecessária.The project, object of the present invention patent, which uses recycled water hydroelectric plants, allows its installation in all existing points of the planet, even where there is no water, transporting the necessary water there.

Outra possibilidade da instalação dessausina, seria próxima a um lago existente, ou rio caudaloso,tornando desnecessário a construção da caixa/reservatório d'água,sendo que as desvantagens poderão estar na qualidade e pureza daágua, onde exigiria sistema de limpeza e as oscilações da alturado nível de água, principalmente dos rios.Another possibility of the installation of such a plant would be near an existing lake, or flowing river, making the construction of the water box / reservoir unnecessary, and the disadvantages may be the quality and purity of the water, where it would require a cleaning system and the oscillations of the water. high water level, especially of rivers.

Os desenhos anexos, através das figuras 1e 2, objeto da presente patente, mostram as descrições de doisexemplos hipotéticos, sem escala.The accompanying drawings, through figures 1 and 2, object of the present patent, show the descriptions of two hypothetical examples, without scale.

A fig. 1 ilustra uma usina com doisestágios de sobreposição, sendo reservado um espaço de 5 metrosao nível do chão (0-5) para a instalação da 2a turbina, de 5-35metros (30 metros livre) para queda d* água da 2a turbina,constituindo uma primeira coluna de 35 metros de altura total; 35-40 metros, espaço para a instalação da Ia turbina; 40-70 metros(30 metros livre) para a queda d'água da Ia turbina, constituindouma segunda coluna de 35 metros. A soma das duas colunastotalizam 70 metros de altura. Entre a primeira, e a segundacoluna, colunas estas por onde passará a água, que podemoschamar de tubos ou adutoras, haverá uma distância suficiente paraser interligada por adutora de concreto ou metálica que permite aconstrução de dois registros de gaveta, sendo um para desvio daágua que iria para a 2a turbina, encaminhando a água para acaixa/reservatório e o outro, para interrupção do acesso de água à2o turbina. A caixa/reservatório d'água e as bombas hidráulicasserão instaladas na saída da adutora (descarga) da 2a turbina, omais próximo possível, reduzindo o comprimento das adutoras derecalque que elevarão a água das caixa/depósito d'água até a bocada tubulação de recepção da Ia turbina. Os dois geradoreselétricos ficarão ao lado das duas turbinas. Haverá doze registrosde gaveta nas seis adutoras de recalque, possibilitando a elevaçãod'água para a Ia ou 2a turbina. Resumindo:Fig. 1 illustrates a power plant with two overlapping stages, with a floor space of 5 meters (0-5) being reserved for the installation of the 2nd turbine, of 5-35 meters (30 meters free) for water fall of the 2nd turbine, constituting a first column of 35 meters in total height; 35-40 meters, space for the installation of the 1st turbine; 40-70 meters (30 meters free) to the 1st turbine waterfall, constituting a second column of 35 meters. The sum of the two columnar totals 70 meters in height. Between the first and the second column, these columns through which water will pass, which we may call pipes or mains, there will be a sufficient distance to be interconnected by concrete or metallic water mains that allows the construction of two drawer registers, one for diversion of water that would go to the 2nd turbine, directing the water to the box / reservoir and the other to interrupt the water access to the 2nd turbine. The water box / reservoir and hydraulic pumps will be installed as close as possible to the 2nd turbine water discharge (discharge) outlet, reducing the length of the downstream water mains that will raise the water from the box / water tank to the receiving pipe bit. from the 1st turbine. The two electric generators will be next to the two turbines. There will be twelve drawer registers in the six discharge mains, allowing the elevation of water to the 1st or 2nd turbine. Summing up:

- número de turbinas igual a duas: Ia turbina (1), 2a turbina (2);- number of turbines equal to two: 1st turbine (1), 2nd turbine (2);

- geradores elétricos igual a dois: Io gerador (3), 2o gerador (4);- electric generators equal to two: 1st generator (3), 2nd generator (4);

- bombas hidráulicas de recalque igual a seis (5);- hydraulic booster pumps equal to six (5);

- adutoras metálicas de recalque igual a seis (6);- metallic water mains of six (6);

- diâmetro das adutoras de recalque igual a 40 cm;- diameter of the downstream mains 40 cm;

- diâmetro da tubulação de entrada de água nas turbinas igual a 1metro;- turbine water inlet pipe diameter equal to 1 meter;

- registros de gavetas igual a quatorze (7);- drawer records equal to fourteen (7);

- adutora final de descarga igual a uma (8);- final discharge mains equal to one (8);

- adutora intermediária das duas colunas igual a uma (9);- intermediate adductor of the two columns equal to one (9);

- altura total da usina igual a 70 metros, sendo 10 metros para ainstalação das duas turbinas e 60 metros de quedas d'água.- a coluna da 2a turbina terá um total de 35 metros (10);- total plant height equal to 70 meters, being 10 meters for the installation of the two turbines and 60 meters of waterfalls. - the second turbine column will have a total of 35 meters (10);

- a coluna da Ia turbina terá um total de 35 metros (11);- the 1st turbine column will have a total of 35 meters (11);

- caixa/reservatório d'água igual a uma (12);- water box / reservoir equal to one (12);

- volume aproximado de água no circuito igual a 150 m ;- approximate volume of water in the circuit equal to 150 m;

- volume aproximado total de água na caixa/reservatório d'águaigual a 250 m3;- approximate total volume of water in the water tank / reservoir equal to 250 m3;

- dimensão aproximada da caixa/reservatório d'água igual a 5metros de profundidade/5 metros de largura/10 metros decomprimento;- approximate size of box / water reservoir equal to 5 meters deep / 5 meters wide / 10 meters long;

- profundidade aproximada do tubo de sucção igual a 4 metros;- approximate depth of suction pipe equal to 4 meters;

- após ligada as bombas hidráulicas sobrarão aproximadamente100 m3 de água na caixa/reservatório d'água.- After the hydraulic pumps are turned on, approximately 100 m3 of water will be left in the water tank / reservoir.

- a dimensão, e cálculo da estrutura de concreto armado quesuportarão as colunas d'águas, turbinas, geradores, etc deverão serfeitos conforme as especificações do projeto.- The size and calculation of the reinforced concrete structure that will support the water columns, turbines, generators, etc. shall be made according to the project specifications.

Como se observa, estas turbinasfuncionariam concomitantemente ou individualmente, em caso demanutenção de uma ou outra, o sistema possibilitaria a nãointerrupção do recalque da água e do abastecimento do circuito,evitando-se um novo "start". Este modelo de usina seria maisapropriado para regiões que não tenham redes públicas de energiapara dar o "start", evitando-se novamente a contratação de gruposde mo to-geradores. É importante salientar que o projeto idealdeveria contemplar que a geração de energia individual de cadaturbina seja suficiente para suportar o gasto da soma das energiasdas bombas hidráulicas, para que o sistema não seja interrompido.As it can be seen, these turbines would work concomitantly or individually, in case of maintenance of one or the other, the system would allow the non-interruption of the water pressure and the circuit supply, avoiding a new start. This model of plant would be more appropriate for regions that do not have public energy networks to start, again avoiding the hiring of generator sets. It is important to stress that the ideal design should contemplate that the individual power generation of each turbine is sufficient to support the expenditure of the sum of the hydraulic pump energies, so that the system is not interrupted.

A fig. 2 ilustra uma usina hidrelétrica deágua reciclada, objeto da presente patente, constituindo-se de trêsestágios sobrepostos, sendo cada estágio de 35 metros, totalizando105 metros, em uma única coluna de 1 metro de diâmetro, dealvenaria, utilizando-se de três turbinas hidráulicas, três geradoresde energia, seis bombas hidráulicas, seis adutoras metálicas derecalque de 40 cm de diâmetro, uma caixa/reservatório cTágua de250 m , uma adutora (tubo) de descarga após a terceira turbina,indo até a caixa/reservatório cTágua, Resumindo:Fig. 2 illustrates a recycled water hydroelectric power plant, object of the present patent, consisting of three overlapping stages, each stage of 35 meters, totaling 105 meters, in a single column of 1 meter in diameter, using three hydraulic turbines, three power generators, six hydraulic pumps, six 40 cm diameter metallic water mains, one 250 m water box / reservoir, one discharge turbine (tube) after the third turbine, going to the water box / reservoir, To summarize:

- número de turbinas igual a três: Ia turbina (1), 2a turbina (2), 3aturbina (3);- number of turbines equal to three: 1st turbine (1), 2nd turbine (2), 3 turbine (3);

- geradores elétricos igual a três: Io gerador (4), 2o gerador (5), 3ogerador (6);- electric generators equal to three: 1st generator (4), 2nd generator (5), 3 generator (6);

- bombas hidráulicas de recalque igual a seis (7);- hydraulic booster pumps of six (7);

- adutoras metálicas de recalque igual a seis (8);- metallic water mains of six (8);

- diâmetro das adutoras de recalque igual a 40 cm;- diameter of the downstream mains 40 cm;

- diâmetro da tubulação de entrada de água nas turbinas igual a 1metro;- turbine water inlet pipe diameter equal to 1 meter;

- adutora final de descarga igual a uma (9);- altura total da usina igual a 105 metros, sendo 15 metros para ainstalação das três turbinas e 90 metros de quedas d'água.- final discharge mains equal to one (9) - total plant height equal to 105 meters, being 15 meters for the installation of the three turbines and 90 meters of waterfalls.

- a coluna equivalente ao primeiro estágio da 3a turbina terá umtotal de 35 metros, sendo 5 metros reservado para a instalação daprópria turbina e 30 metros para queda d*água livre (10);- the column equivalent to the first stage of the 3rd turbine will have a total of 35 meters, with 5 meters reserved for the installation of the turbine itself and 30 meters for free water fall (10);

- a coluna da 2a turbina terá um total de 35 metros, sendo 5 metrosreservado para a Instalação da turbina e 30 metros de quedad* água livre (11);- the 2nd turbine column will have a total of 35 meters, 5 meters being reserved for the installation of the turbine and 30 meters of free water (11);

- a coluna da Ia turbina terá um total de 35 metros, sendo 5 metrosreservado para a instalação da turbina e 30 metros de quedad'água livre (12);- the 1st turbine column will have a total of 35 meters, with 5 meters reserved for the turbine installation and 30 meters of free water (12);

- caixa/reservatório d'água igual a uma (13);- water box / reservoir equal to one (13);

- volume aproximado de água no circuito igual a 150 m ;- approximate volume of water in the circuit equal to 150 m;

- volume aproximado total de água na caixa/reservatório d*águaigual a 250 m3;- approximate total volume of water in the water tank / reservoir equal to 250 m3;

- dimensão aproximada da caixa/reservatório d'água igual a 5metros de profundidade/5 metros de largura/10 metros decomprimento;- approximate size of box / water reservoir equal to 5 meters deep / 5 meters wide / 10 meters long;

- profundidade aproximada do tubo de sucção igual a 4 metros;- approximate depth of suction pipe equal to 4 meters;

- após ligada as bombas hidráulicas sobrarão aproximadamente100mJde água na caixa/reservatório d'água.- a dimensão, e cálculo da estrutura de concreto armado quesuportarão a coluna d*água, turbinas, geradores, etc deverão serfeitos conforme as especificações do projeto.- After the hydraulic pumps are turned on, there will be approximately 100mJ of water left in the water box / reservoir. - The size and calculation of the reinforced concrete structure that will support the water column, turbines, generators, etc. must be made according to the project specifications.

Como ilustrado nas figuras 1 e 2, asalturas das quedas d'águas, número de turbinas, diâmetro enúmero de adutoras de recalque, diâmetro dos tubos, adutoras oucoluna de acesso das águas as turbinas, número de geradores deenergia, diâmetro dos tubos de descarga ou sangradouro, númerode bombas hidráulicas, registros de gavetas, dimensão dacaixa/reservatório/d' água, suas potências, etc estão todoscondicionados as especificações do projeto, compatibilizando-osde maneira a haver um sincronismo perfeito.As illustrated in figures 1 and 2, the heights of the waterfalls, number of turbines, diameter and number of water mains, diameter of pipes, water mains or access column of turbines, number of power generators, diameter of discharge pipes or Hydraulic pumps, number of hydraulic pumps, drawer registers, box / reservoir / water dimension, their powers, etc. are all conditioned to the project specifications, making them compatible for perfect timing.

Na dimensão das alturas das instalaçõesdas turbinas poderão ter quedas d'águas iguais ou diferentes.Turbine installation heights may have the same or different waterfalls.

O "start" dos recalques das águas efuncionamento das turbinas poderão ser feitos pela rede públicade energia ou por grupos de moto-geradores. O cálculo do volumede água necessário para o dimensionamento dascaixas/reservatório d*água leva-se em consideração a água quecircula no circuito acrescido de um volume maior para facilitar asucção e a entrada d* água da tubulação de descarga. Deve ternessa caixa/reservatório d* água quebradores de onda e a suaprofundidade deve ser o suficiente para atender o volume que seráusado no circuito após o "starf* e com sobra para não expor forad5 água o tubo da sucção.Start-up of water discharge and turbine operation may be done by the public power grid or by generator sets. The calculation of the volume of water required for the sizing of the water boxes / reservoir takes into account the quirculating water in the circuit plus a larger volume to facilitate suction and the entry of water from the discharge pipe. It must have a box / reservoir of water breakers and its depth must be sufficient to meet the volume that will be used in the circuit after the starf * and with plenty to not expose the suction tube to water.

O número de bombas hidráulicas e odiâmetro das adutoras de sucção/recalque estará condicionado aotubo de entrada da água nas turbinas. Um maior número debombas hidráulicas e adutoras, ao invés de uma só, facilitará oprocesso do "start" bem como a manutenção das mesmascolocando-se uma ou duas bombas de reserva ou estepe.The number of hydraulic pumps and the diameter of the suction / discharge mains shall be conditioned to the turbine water inlet pipe. More, instead of just one, hydraulic and mains pumps will facilitate start-up as well as maintenance by placing one or two spare pumps or spare parts.

O modelo das turbinas e sua forma defixação dependerá de cada projeto. E importante lembrar que naprimeira turbina como a água é recalcada, mesmo despejadadireto na turbina ou no tubo de entrada da turbina, ela terá umapressão.The model of the turbines and their shape will depend on each project. It is important to remember that in the first turbine, as water is repressed, even if directly discharged into the turbine or turbine inlet pipe, it will have a pressure.

A construção das usinas pode ser emalvenaria (concreto armado), metálica ou uso combinado dasduas.The construction of the plants can be masonry (reinforced concrete), metal or combined use of two.

Na figura 2, por exemplo, nos últimos 30metros de queda d*água livre, acima da Ia turbina, foi projetadocomo sendo a coluna ou tubo da entrada d'água na turbina, dealvenaria, mas poderia ser utilizado o próprio tubo metálico derecalque em que o mesmo faria uma curva na altura dos 105metros em direção direta à boca da turbina, diminuindo nessecaso, a construção de 30 metros de alvenaria.Como se observa, existem infinitaspossibilidades de combinações e uso de acordo com cada projeto.In Figure 2, for example, in the last 30 meters of free water fall above the 1st turbine, it was designed as the column or pipe of the turbine water inlet, but the actual metal pipe in which the it would make a curve at the height of 105 meters towards the turbine mouth, reducing in this case the construction of 30 meters of masonry. As can be seen, there are infinite possibilities of combinations and use according to each project.

Para se colocar as turbinas, geradores eacessório nas alturas, poderia-se utilizar de caminhões guindastesgigantes, elevadores especiais, plataforma metálica móvel edesmontáveí com trilhos para deslocamento com inclinação de45° e munido de guincho em sua extremidade mais alta, etc. Outrapossibilidade seria para esses lugares muito alto, ao invés defundir a turbina em uma única peça, fundir-se, por exemplo, emquatro partes iguais e ser fixada uma a outra no local comparafusos especiais ou soldas especiais, o mesmo acontecendocom os geradores de energia que poderão ser montados no local.In order to place the turbines, generators and accessories at heights, one could use crane trucks, special lifts, movable and detachable metal platform with 45 ° inclination travel rails and winch at its highest end, etc. The likelihood would be for these places to be very high, rather than melting the turbine into one piece, merging, for example, four equal parts and being fixed to one another in place by special bolts or special welds, as would the power generators that can be mounted on site.

Utilizando-se do exemplo da fig. 2poderia-se construir varias usinas anexas ou uma ao lado da outrae em caso de manutenção de uma aonde não haja rede publica deenergia, as outras supririam a energia suficiente para reinicia-ía.Using the example of fig. 2 Several adjacent plants could be built next to each other, and if one were to be maintained where there was no public power grid, the others would supply enough power to restart it.

Claims (9)

1.1. "USINA "POWER PLANT HIDRELÉTRICA Hydroelectric DE IN ÁGUA RECICLADA"compreendida por uma caixa/reservatório d'água (12 RECYCLED WATER "comprised of a water tank / reservoir (12 e 13),respectivamente das fíg.and 13), respectively of Figs. 1 e 2, onde será instalado bombashidráulicas (5 e 7) das fíg.1 and 2, where hydraulic pumps (5 and 7) of FIGS. 1 e 2, e adutoras de recalque (6 e 8) dasfíg.1 and 2, and downstream mains (6 and 8) of FIGS. 1 e 25 cujas águas adentrarão nas tubulações das colunas quelevarão águas até a Ia turbina (35-40 metros de altura) (1), e águaaté a 2a turbina (0-5 metros de altura) (2), correspondente a fíg.l ena Ia turbina, que está instalada na altura de 70-75 metros (1), na-2o turbina na altura de 35-40 metros (2) e na 3a turbina na alturade 0-5 metros (3), conforme fíg. 2 e geradores elétricos (3 e 4) deacordo com a fíg. 1 e (4,5,6) correspondente a fíg. 2 de umaadutora final de descarga (8) na fíg. 1 e (9) na fíg. 2, registros degaveta (7) na fíg. 1, constituindo-se todo esse conjunto em umausina de 70 metros de altura (fíg, 1) e 105 metros de altura (fíg.-2), caracterizada por gerar energia elétrica limpa, renovável einfinita com água reciclada, utilizando-se de estágiosverticaiizados ou sobreposto, onde poderão ser projetadostambém em alturas, dimensões e potências variáveis, bem comomaterial de construção diversos de acordo com especificações dosprojetos.1 and 25 whose waters will enter the column pipes with water rising to the 1st turbine (35-40 meters high) (1), and water to the 2nd turbine (0-5 meters high) (2), corresponding to fig. The 1st turbine, which is installed at a height of 70-75 meters (1), the 2nd turbine at a height of 35-40 meters (2) and the 3rd turbine at a height of 0-5 meters (3), as shown in fig. 2 and electric generators (3 and 4) according to fig. 1 and (4,5,6) corresponding to fig. 2 of a final discharge duct (8) on FIG. 1 and (9) in fig. 2, drawer registers (7) in FIG. 1, constituting this whole set in a 70-meter-high (Fig. 1) and 105-meter-high (Fig. 2) machine, characterized by generating clean, renewable and infinite electric energy with recycled water, using vertical stages or overlap, where they can also be designed in varying heights, dimensions and powers, as well as various construction material according to project specifications.
BRPI0804542-9A 2008-10-29 2008-10-29 recycled water hydroelectric plant BRPI0804542A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BRPI0804542-9A BRPI0804542A2 (en) 2008-10-29 2008-10-29 recycled water hydroelectric plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BRPI0804542-9A BRPI0804542A2 (en) 2008-10-29 2008-10-29 recycled water hydroelectric plant

Publications (1)

Publication Number Publication Date
BRPI0804542A2 true BRPI0804542A2 (en) 2010-07-20

Family

ID=42335315

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0804542-9A BRPI0804542A2 (en) 2008-10-29 2008-10-29 recycled water hydroelectric plant

Country Status (1)

Country Link
BR (1) BRPI0804542A2 (en)

Similar Documents

Publication Publication Date Title
US8823195B2 (en) Hydro electric energy generation and storage structure
Pasalli et al. Design planning of micro-hydro power plant in hink river
ES2582311T3 (en) Procedure and installation of supplementary electric power production
US20120061967A1 (en) Ocean water run and vertical drop is green power generation
ES2841349T3 (en) A set to generate electricity
Sarkar et al. Energy generation from grey water in high raised buildings: The case of India
JP2021535978A (en) Pumped storage power generation tower through multi-stage installation of pipeline turbines
Niebuhr et al. Development of a design and implementation process for the integration of hydrokinetic devices into existing infrastructure in South Africa
WO2012177182A1 (en) Diversion hydropower plant cascade
CN202139576U (en) Water energy generating system
Dhakal et al. Prospects of off grid energy generation through low head screw turbine in Nepal
BRPI0804542A2 (en) recycled water hydroelectric plant
ES2334750B1 (en) REVERSIBLE HYDROELECTRIC MINICENTRAL OF HIGH ENERGETIC PERFORMANCE AND NULL ENVIRONMENTAL IMPACT.
CN105422361A (en) Lifting type guiding and shielding device for tidal current energy
BE1026570B1 (en) Device for generating electricity
WO2014190448A1 (en) Method and apparatus for generating electricity by using river water
WO2011047456A1 (en) Power storage and regeneration facility
CN201627676U (en) Pipeline diversion type power generation device
ES2362851B1 (en) METHOD FOR THE GENERATION OF ENERGY, AND INSTALLATION TO CARRY OUT THAT METHOD.
JP7606655B1 (en) Water turbine power generation and water circulation system
TWM495385U (en) High building power-generating device
Hwee et al. Converting dam: From water supply to hydropower generation
JP2015105651A (en) Underground hydroelectric generator
JP2015048781A (en) Head drop type division replacement small-sized hydroelectric generator
RU69089U1 (en) RECYCLING HYDRO POWER PLANT

Legal Events

Date Code Title Description
B03A Publication of an application: publication of a patent application or of a certificate of addition of invention
B08F Application fees: dismissal - article 86 of industrial property law

Free format text: REFERENTE A 3A ANUIDADE.

B08K Lapse as no evidence of payment of the annual fee has been furnished to inpi (acc. art. 87)

Free format text: NAO APRESENTADA A GUIA DE CUMPRIMENTO DE EXIGENCIA. REFERENTE A 3A ANUIDADE.