BRPI0819935A2 - Restauração de carga para automação de alimentador em sistemas de distribuição de energia elétrica - Google Patents

Restauração de carga para automação de alimentador em sistemas de distribuição de energia elétrica

Info

Publication number
BRPI0819935A2
BRPI0819935A2 BRPI0819935-3A BRPI0819935A BRPI0819935A2 BR PI0819935 A2 BRPI0819935 A2 BR PI0819935A2 BR PI0819935 A BRPI0819935 A BR PI0819935A BR PI0819935 A2 BRPI0819935 A2 BR PI0819935A2
Authority
BR
Brazil
Prior art keywords
power distribution
distribution systems
feeder automation
load restoration
restoration
Prior art date
Application number
BRPI0819935-3A
Other languages
English (en)
Inventor
Fang Yang
Vaibhav Donde
Zhenyuan Wang
James Stoupis
Original Assignee
Abb Research Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Abb Research Ltd filed Critical Abb Research Ltd
Publication of BRPI0819935A2 publication Critical patent/BRPI0819935A2/pt
Publication of BRPI0819935B1 publication Critical patent/BRPI0819935B1/pt

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operations
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1415Saving, restoring, recovering or retrying at system level
    • G06F11/1441Resetting or repowering
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • H02H7/28Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured for meshed systems
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2201/00Indexing scheme relating to error detection, to error correction, and to monitoring
    • G06F2201/805Real-time
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/06Details with automatic reconnection
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/26Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to difference between voltages or between currents; responsive to phase angle between voltages or between currents
    • H02H3/265Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to difference between voltages or between currents; responsive to phase angle between voltages or between currents responsive to phase angle between voltages or between currents
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Power Engineering (AREA)
  • Electromagnetism (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Automation & Control Theory (AREA)
  • Quality & Reliability (AREA)
  • General Engineering & Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
BRPI0819935A 2007-12-12 2008-12-10 método de restaurar energia em uma rede de distribuição de energia BRPI0819935B1 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US1296907P 2007-12-12 2007-12-12
PCT/US2008/086175 WO2009076410A1 (en) 2007-12-12 2008-12-10 Load restoration for feeder automation in electric power distribution systems

Publications (2)

Publication Number Publication Date
BRPI0819935A2 true BRPI0819935A2 (pt) 2015-05-26
BRPI0819935B1 BRPI0819935B1 (pt) 2019-01-08

Family

ID=40491003

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0819935A BRPI0819935B1 (pt) 2007-12-12 2008-12-10 método de restaurar energia em uma rede de distribuição de energia

Country Status (5)

Country Link
US (2) US9088160B2 (pt)
EP (1) EP2232664B1 (pt)
CN (1) CN101911421B (pt)
BR (1) BRPI0819935B1 (pt)
WO (1) WO2009076410A1 (pt)

Families Citing this family (88)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009076410A1 (en) 2007-12-12 2009-06-18 Abb Research Ltd. Load restoration for feeder automation in electric power distribution systems
US8068937B2 (en) * 2008-02-09 2011-11-29 Stephen Spencer Eaves Power distribution system with fault protection using energy packet confirmation
US8121741B2 (en) * 2008-05-09 2012-02-21 International Business Machines Corporation Intelligent monitoring of an electrical utility grid
US8180481B2 (en) * 2008-08-06 2012-05-15 Consolidated Edison Company Of New York, Inc. Autoloop system and method of operation
EP2194656B1 (en) * 2008-12-03 2014-06-25 ABB Research Ltd. Electrical power network management system
JP5618511B2 (ja) * 2009-09-08 2014-11-05 株式会社東芝 スマートグリッド及びマイクログリッド向け総合監視制御システム
US8838282B1 (en) * 2009-11-16 2014-09-16 Comverge, Inc. Method and system for providing a central controller that can communicate across heterogenous networks for reaching various energy load control devices
WO2011068989A1 (en) * 2009-12-04 2011-06-09 Abb Research Ltd Restoration switching analysis with modified genetic algorithm
CN102648477B (zh) * 2009-12-04 2016-10-19 Abb研究有限公司 用遗传算法的恢复开关分析
CA2787502C (en) * 2010-01-19 2021-10-12 S&C Electric Company Method and apparatus for control of a commodity distribution system
US8706309B2 (en) * 2010-04-10 2014-04-22 Schweitzer Engineering Laboratories Inc Systems and method for obtaining a load model and related parameters based on load dynamics
CN103180164B (zh) 2010-10-29 2016-04-20 Abb研究有限公司 调度移动能源以响应电力网状态
US20120215479A1 (en) * 2011-02-21 2012-08-23 General Electric Company System for testing intelligent electronic devices
US9293920B2 (en) * 2011-03-30 2016-03-22 General Electric Company Systems and methods for synchronizing switching within a power distribution network
CN102184203B (zh) * 2011-04-27 2014-11-19 中国电力科学研究院 一种构建网络重构数据库的方法
CN102185297B (zh) * 2011-05-10 2014-12-03 中国电力科学研究院 一种基于网络重构的系统恢复控制方法
US20120290103A1 (en) * 2011-05-11 2012-11-15 Quang Binh Dam Systems and methods for use in improving operation of utility equipment
CN102195279A (zh) * 2011-05-16 2011-09-21 中国电力科学研究院 一种电力系统事故处理的典型故障重构方法
EP2721702B8 (en) 2011-06-20 2019-09-25 ABB Schweiz AG Method and device for protection zone selection in a multiple busbar arrangement
US20130024033A1 (en) * 2011-07-20 2013-01-24 General Electric Company Systems and methods for a power distribution transfer capacity calculator
US8914247B2 (en) * 2011-08-01 2014-12-16 General Electric Company Systems and methods to monitor the operation of a power generation system
US8725305B2 (en) 2011-08-29 2014-05-13 General Electric Company Power distribution network fault management
US20130066444A1 (en) * 2011-09-12 2013-03-14 Bogdan Cristian Popescu Systems and methods for use in responding to faults in a utility system
EP2575230B1 (en) 2011-09-30 2018-11-07 ABB Research Ltd. Systems and methods for integrating demand response with service restoration in an electric distribution system
US9698616B2 (en) 2011-10-31 2017-07-04 Abb Research Ltd. Systems and methods for restoring service within electrical power systems
EP2756575B1 (de) * 2011-11-07 2018-06-13 Siemens Aktiengesellschaft Energieverteilnetz
CN102496937B (zh) * 2011-11-28 2013-10-09 山东工商学院 一种适用于智能配电网的基于负荷均衡故障恢复方法
US20130158972A1 (en) * 2011-12-14 2013-06-20 Southern Company Services, Inc. Automated Recovery System Verification
CN202817896U (zh) * 2012-05-23 2013-03-20 浙江省电力公司电力科学研究院 一种馈线自动化系统
CN102769338B (zh) * 2012-07-20 2014-04-30 国家电网公司 配电网合环运行控制方法
CN102882196B (zh) * 2012-10-23 2014-12-10 江苏省电力公司扬州供电公司 一种含分布式电源的配网故障隔离方法
US9251298B2 (en) 2012-11-28 2016-02-02 Abb Technology Ag Electrical network model synchronization
CN102999674A (zh) * 2012-12-05 2013-03-27 清华大学 基于应用集成的电力和通信系统耦合仿真平台及方法
CN103022994B (zh) * 2012-12-10 2015-05-13 上海市电力公司 一种实现渗透分布式电源的配电网故障隔离和恢复方法
CN103051059B (zh) * 2012-12-13 2014-10-29 上海市电力公司 一种智能配网小区的馈线自动化实现方法
US9250674B2 (en) * 2013-01-18 2016-02-02 General Electric Company Methods and systems for restoring power based on forecasted loads
US9577435B2 (en) 2013-03-13 2017-02-21 Abb Research Ltd. Method and apparatus for managing demand response resources in a power distribution network
CN103227450B (zh) * 2013-04-26 2015-05-20 国家电网公司 在线故障恢复方法及系统
CN103401241B (zh) * 2013-08-15 2015-09-16 中国能源建设集团广东省电力设计研究院有限公司 一种基于分布式电源自组网策略的微电网供电恢复方法
US20150074260A1 (en) * 2013-09-11 2015-03-12 Cisco Technology, Inc. Auto discovery and topology rendering in substation networks
DE102014202723B4 (de) * 2014-02-14 2025-02-20 Siemens Aktiengesellschaft Anlage zur Verteilung von elektrischer Energie mit einer Anzeigeeinheit
US20150350260A1 (en) * 2014-05-30 2015-12-03 General Electric Company Systems and methods for managing infrastructure systems
KR101614208B1 (ko) * 2014-06-11 2016-04-20 한국전력공사 디지털변전소의 지능형 시스템 운영을 위한 에이전트 시스템 및 이의 동작 방법
US10063280B2 (en) 2014-09-17 2018-08-28 At&T Intellectual Property I, L.P. Monitoring and mitigating conditions in a communication network
CN104200051B (zh) * 2014-09-22 2017-10-31 哈尔滨工程大学 一种船舶电力系统故障状态评估和应对策略的仿真方法
US9952612B2 (en) * 2015-03-03 2018-04-24 Caterpillar Inc. Power system having zone-based load sharing
CN104734352B (zh) * 2015-03-10 2017-06-20 国家电网公司 一种配电线路合环操作控制方法
US9912027B2 (en) 2015-07-23 2018-03-06 At&T Intellectual Property I, L.P. Method and apparatus for exchanging communication signals
CN105388882B (zh) * 2015-11-05 2018-05-11 国网浙江省电力公司杭州供电公司 一种电网事故预案确定方法和装置
US10680430B2 (en) * 2016-06-14 2020-06-09 Tikla Com Inc. Fault recovery systems and methods for electrical power distribution networks
CN106385013B (zh) * 2016-09-30 2018-07-20 国网江苏省电力公司扬州供电公司 自适应配电网运行方式的故障定位隔离系统及其工作方法
US10811767B2 (en) 2016-10-21 2020-10-20 At&T Intellectual Property I, L.P. System and dielectric antenna with convex dielectric radome
CN106684871B (zh) * 2017-03-29 2019-04-19 华东交通大学 一种基于容错思想的智能配电网自愈控制方法
US10483754B2 (en) * 2017-05-01 2019-11-19 Abb Schweiz Ag Fault detection and location in nested microgrids
ES2945538T3 (es) * 2017-06-05 2023-07-04 Abb Spa Un método implementado por ordenador para configurar un relé electrónico
CN107293173B (zh) * 2017-06-06 2019-08-23 积成电子股份有限公司 基于隔离信息阵的配电网故障仿真培训建模方法
CN107294070B (zh) * 2017-06-13 2019-12-27 上海电力学院 基于就地保护逻辑设备的智能分布式系统故障处理方法
CN108493922A (zh) * 2018-02-27 2018-09-04 广东电网有限责任公司河源供电局 一种基准风险下电网事故快速导图方法
CN108564252B (zh) * 2018-03-15 2022-05-10 广西大学 一种考虑多功能配电自动化的配电网供电可靠性计算方法
CN109787276B (zh) * 2018-12-12 2020-11-10 博锐尚格科技股份有限公司 一种分布式能源系统、能源智能终端及其控制方法
EP3678269A1 (en) * 2019-01-02 2020-07-08 Siemens Aktiengesellschaft System, method and a computer program product for configuring a protection system of a power network
CN110350511B (zh) * 2019-05-23 2023-04-25 国网河南省电力公司郑州供电公司 一种基于转供电亲和度的配电网故障恢复方法
WO2021037357A1 (en) 2019-08-28 2021-03-04 Abb Schweiz Ag Restoration of fault insulated feeder
CA3092041C (en) * 2019-09-24 2023-04-25 S&C Electric Company Utility distribution fault restoration system
US20210102986A1 (en) * 2019-10-07 2021-04-08 G & W Electric Company Single phase fault isolation and restoration for loss of voltage fault in power distribution network
US11251606B2 (en) 2019-10-07 2022-02-15 G & W Electric Company Single phase fault isolation and restoration for power distribution network
CN110967564B (zh) * 2019-10-28 2022-04-01 许昌开普检测研究院股份有限公司 换相开关型三相负荷不平衡自动调节装置的自动测试系统
CN110739688A (zh) * 2019-10-31 2020-01-31 中国南方电网有限责任公司 基于scada大数据的城市电网负载均衡方法
CN111541236B (zh) * 2020-03-30 2023-03-28 国网江西省电力有限公司电力科学研究院 一种馈线自动化功能提升及终端精准定位方法
US11112815B1 (en) 2020-03-30 2021-09-07 Schweitzer Engineering Laboratories, Inc. Fault isolation and restoration scheme
CN111313416B (zh) * 2020-03-31 2022-04-15 北京交通大学 一种多源协同的智能配电网故障恢复次序优化决策方法
CN111753385B (zh) * 2020-07-03 2023-07-25 石家庄科林电气股份有限公司 基于仿水流路径算法的寻找电源方法
US11646603B2 (en) 2020-07-20 2023-05-09 G & W Electric Company Single phase fault isolation and restoration with loop avoidance for multiple tie-in devices
US11588347B2 (en) * 2020-07-20 2023-02-21 G & W Electric Company Single phase fault isolation and restoration with load estimation
US11626753B2 (en) 2020-07-20 2023-04-11 G & W Electric Company Single phase fault isolation and restoration with loop avoidance
CN113422387A (zh) * 2020-08-10 2021-09-21 谭世克 配电网设备故障处理方法
WO2022072570A1 (en) * 2020-10-01 2022-04-07 S&C Electric Company Radial restoration
CN112969344B (zh) * 2021-02-08 2022-10-11 哈尔滨工业大学 基于单个水箱液位监控的电负载散热水循环控制方法
US20220268826A1 (en) * 2021-02-25 2022-08-25 S&C Electric Company Loading calculation
CN113363987B (zh) * 2021-05-11 2024-05-03 国网上海市电力公司 一种配电网主从式故障自愈控制方法及系统
CN114357726B (zh) * 2021-12-13 2025-08-19 上海科梁信息科技股份有限公司 实时仿真机、馈线终端的特性测试方法
CN114268083B (zh) * 2021-12-23 2024-05-28 广东电网有限责任公司 恢复供电方法、装置、电子设备及存储介质
CN115862405B (zh) * 2022-11-25 2025-08-01 福建省电力有限公司泉州电力技能研究院 一种用于馈线自动化实训的多态缺陷自动加载系统及方法
US12288983B2 (en) 2022-12-14 2025-04-29 Google Llc Controlling feeder units for self-restoration of power
US12573839B2 (en) 2023-09-29 2026-03-10 Google Llc Distributed main-tie-tie-main transfer control scheme
US20250392158A1 (en) * 2024-06-21 2025-12-25 Ge Infrastructure Technology Llc Power grid systems and methods with zonal autonomous control
CN119001281B (zh) * 2024-08-12 2025-07-15 广东电网有限责任公司 一种馈线自动化测试方法、装置、设备以及存储介质
CN121097971B (zh) * 2025-11-13 2026-02-24 华控(洛阳)工业装备有限公司 基于物联网技术的配电网状态实时监测系统

Family Cites Families (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3668351A (en) 1969-07-30 1972-06-06 Kearney National Inc Sectionalizing and protective apparatus for single house transformer
US5303112A (en) 1990-10-26 1994-04-12 S & C Electric Company Fault detection method and apparatus
US5572438A (en) * 1995-01-05 1996-11-05 Teco Energy Management Services Engery management and building automation system
US5734586A (en) * 1995-05-05 1998-03-31 Cornell Research Foundation, Inc. System for achieving optimal steady state in power distribution networks
US5784237A (en) * 1996-11-29 1998-07-21 S&C Electric Company Control method and apparatus for power distribution network
US5883796A (en) * 1997-04-07 1999-03-16 Wisconsin Alumni Research Foundation Dynamic series voltage restoration for sensitive loads in unbalanced power systems
US5973899A (en) 1998-09-10 1999-10-26 Pacificorp Automated power feeder restoration system and method
US6172432B1 (en) * 1999-06-18 2001-01-09 Gen-Tran Corporation Automatic transfer switch
US20040010350A1 (en) * 2000-05-31 2004-01-15 Per-Anders Lof Distributed power generation system protection scheme
US6867958B2 (en) * 2000-12-27 2005-03-15 Abb Technology Ag Loop restoration scheme for distribution feeders
US6804616B2 (en) * 2001-12-13 2004-10-12 Intel Corporation Method to estimate power and cooling requirements of systems
US6816757B1 (en) * 2002-09-19 2004-11-09 Abb Technology Ag Control unit for a power-distribution network
EP2511997A3 (en) * 2002-10-25 2013-11-20 S & C Electric Company Method and apparatus for control of an electric power system in response to circuit abnormalities
US6907321B2 (en) * 2003-01-31 2005-06-14 Viserge Limited Fault control and restoration in a multi-feed power network
US7149605B2 (en) * 2003-06-13 2006-12-12 Battelle Memorial Institute Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices
JP4017161B2 (ja) * 2004-01-22 2007-12-05 日本アイ・ビー・エム株式会社 区間特定システム、配電系統モニタリングシステム、その方法及びプログラム
US7627453B2 (en) * 2005-04-26 2009-12-01 Current Communications Services, Llc Power distribution network performance data presentation system and method
WO2006119113A2 (en) * 2005-04-29 2006-11-09 Fat Spaniel Technologies, Inc. Computer implemented systems and methods for improving sales and marketing effectiveness
US7705487B2 (en) * 2006-05-18 2010-04-27 Virelec Ltd. Power restoration system for electrical power network
CA2589635C (en) * 2006-05-18 2017-02-14 Virelec Ltd. Power restoration system for electrical power network
US7652396B2 (en) * 2006-07-21 2010-01-26 Florida State University Research Foundation Systems and methods for improving the ability of a power delivery system to withstand multiple failure events
US8010336B2 (en) 2006-11-08 2011-08-30 Virelec Ltd. Power restoraton system for electrical power network
US7751166B2 (en) * 2007-03-16 2010-07-06 Abb Technology Ag Advanced feeder architecture with automated power restoration
US7844568B2 (en) * 2007-09-19 2010-11-30 Fein Gene S System and method for data processing and transferring in a multi computer environment for energy reporting and forecasting
US9917436B2 (en) * 2007-10-30 2018-03-13 General Electric Company System and method for control of power distribution
WO2009076410A1 (en) 2007-12-12 2009-06-18 Abb Research Ltd. Load restoration for feeder automation in electric power distribution systems
US8000913B2 (en) * 2008-01-21 2011-08-16 Current Communications Services, Llc System and method for providing power distribution system information
US7979222B2 (en) * 2008-10-14 2011-07-12 Abb Research Ltd. Short-term load forecasting based capacity check for automated power restoration of electric distribution networks
US8121740B2 (en) * 2008-12-18 2012-02-21 Abb Research Ltd. Feeder automation for an electric power distribution system
WO2011068989A1 (en) * 2009-12-04 2011-06-09 Abb Research Ltd Restoration switching analysis with modified genetic algorithm
JP5101675B2 (ja) * 2010-09-09 2012-12-19 株式会社東芝 需給バランス制御装置
US20120296711A1 (en) * 2011-05-20 2012-11-22 Lee Huffman Methods for reducing the peak demand of electric utilities during air conditioning season
US8872389B2 (en) * 2011-08-09 2014-10-28 Creston Electronics Inc. Intelligent backup power system
WO2013039553A1 (en) * 2011-09-17 2013-03-21 Narayam Amit Load forecasting from individual customer to system level

Also Published As

Publication number Publication date
WO2009076410A1 (en) 2009-06-18
US9088160B2 (en) 2015-07-21
US20150293550A1 (en) 2015-10-15
US9733659B2 (en) 2017-08-15
CN101911421A (zh) 2010-12-08
EP2232664B1 (en) 2019-10-09
EP2232664A1 (en) 2010-09-29
CN101911421B (zh) 2015-05-06
BRPI0819935B1 (pt) 2019-01-08
US20110029148A1 (en) 2011-02-03

Similar Documents

Publication Publication Date Title
BRPI0819935A2 (pt) Restauração de carga para automação de alimentador em sistemas de distribuição de energia elétrica
BRPI0910412A2 (pt) sistemas e metodologia para distribuição de energia
DK2312744T3 (da) Effektfordelingssystemer
GB2526964B (en) Decentralized load distribution in an event-driven system
BRPI0922404A2 (pt) automação de alimentador para um sistema de distribuição de potência elétrica
DK2327134T3 (da) Metoder og systemer til fordeling af belastningsoverførsler i strømforsyningssystemer
GB201009605D0 (en) System and method for power management and load shedding
BR112012005207A2 (pt) sistemas de transmissão e distribuição de energia
BRPI0919891A2 (pt) alimentadores de potência paralelos para aplicações de hev
GB201005724D0 (en) Efficient systems and methods for consuming and providing power
EP2350446A4 (en) DRIVE SYSTEM WITH TRANSIENTER CONTROL
DK2137800T3 (da) Laststyringskontroller
GB2453733B (en) Power generation system
GB0710057D0 (en) Power system
BRPI0822590A2 (pt) Sistema de computador para gerenciamento do consumo de energia em um ambiente de computador
EP2476182A4 (en) Power demand management in inductive power transfer systems
GB0700260D0 (en) Power systems
GB2445988B (en) Load distribution
GB2462180B (en) Power demand management
GB2503532B (en) Power distribution system having priority Load Control
GB0820030D0 (en) Power supply systems
DE602007008652D1 (de) Modulares Energieverteilungssystem
GB2464573B (en) Load distribution system
GB201200041D0 (en) Power distribution to computer systems
GB0816844D0 (en) Redundant Power Supply

Legal Events

Date Code Title Description
B06A Notification to applicant to reply to the report for non-patentability or inadequacy of the application according art. 36 industrial patent law
B09A Decision: intention to grant
B16A Patent or certificate of addition of invention granted

Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 08/01/2019, OBSERVADAS AS CONDICOES LEGAIS.

B21F Lapse acc. art. 78, item iv - on non-payment of the annual fees in time

Free format text: REFERENTE A 12A ANUIDADE.

B24J Lapse because of non-payment of annual fees (definitively: art 78 iv lpi, resolution 113/2013 art. 12)

Free format text: EM VIRTUDE DA EXTINCAO PUBLICADA NA RPI 2607 DE 22-12-2020 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDA A EXTINCAO DA PATENTE E SEUS CERTIFICADOS, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.