BRPI0919368A2 - dispositivos e métodos para planejar localizações de poços com critérios dinâmicos de produção - Google Patents

dispositivos e métodos para planejar localizações de poços com critérios dinâmicos de produção

Info

Publication number
BRPI0919368A2
BRPI0919368A2 BRPI0919368A BRPI0919368A BRPI0919368A2 BR PI0919368 A2 BRPI0919368 A2 BR PI0919368A2 BR PI0919368 A BRPI0919368 A BR PI0919368A BR PI0919368 A BRPI0919368 A BR PI0919368A BR PI0919368 A2 BRPI0919368 A2 BR PI0919368A2
Authority
BR
Brazil
Prior art keywords
methods
devices
well locations
dynamic production
production criteria
Prior art date
Application number
BRPI0919368A
Other languages
English (en)
Inventor
Alvin Stanley Cullick
Dan Colvin
Original Assignee
Landmark Graphics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Landmark Graphics Corp filed Critical Landmark Graphics Corp
Publication of BRPI0919368A2 publication Critical patent/BRPI0919368A2/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
BRPI0919368A 2009-01-09 2009-12-07 dispositivos e métodos para planejar localizações de poços com critérios dinâmicos de produção BRPI0919368A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US12/351,754 US10060245B2 (en) 2009-01-09 2009-01-09 Systems and methods for planning well locations with dynamic production criteria
PCT/US2009/066913 WO2010080270A1 (en) 2009-01-09 2009-12-07 Systems and methods for planning well locations with dynamic production criteria

Publications (1)

Publication Number Publication Date
BRPI0919368A2 true BRPI0919368A2 (pt) 2016-01-05

Family

ID=42316700

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0919368A BRPI0919368A2 (pt) 2009-01-09 2009-12-07 dispositivos e métodos para planejar localizações de poços com critérios dinâmicos de produção

Country Status (8)

Country Link
US (1) US10060245B2 (pt)
EP (1) EP2377017A4 (pt)
CN (2) CN104196515A (pt)
AU (3) AU2009336057A1 (pt)
BR (1) BRPI0919368A2 (pt)
CA (1) CA2745880A1 (pt)
MX (1) MX2011006840A (pt)
WO (1) WO2010080270A1 (pt)

Families Citing this family (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8301382B2 (en) * 2009-03-27 2012-10-30 Schlumberger Technology Corporation Continuous geomechanically stable wellbore trajectories
US8931580B2 (en) 2010-02-03 2015-01-13 Exxonmobil Upstream Research Company Method for using dynamic target region for well path/drill center optimization
EP2545461A4 (en) 2010-03-12 2017-09-27 Exxonmobil Upstream Research Company Dynamic grouping of domain objects via smart groups
GB2479989A (en) * 2010-04-26 2011-11-02 Schlumberger Holdings Optimizing a borehole trajectory based on a stress model
US8768671B2 (en) 2010-04-26 2014-07-01 Schlumberger Technology Corporation System for optimizing a drilling operation and method for using same
US9134454B2 (en) 2010-04-30 2015-09-15 Exxonmobil Upstream Research Company Method and system for finite volume simulation of flow
AU2011283196B2 (en) 2010-07-29 2014-07-31 Exxonmobil Upstream Research Company Method and system for reservoir modeling
CA2805446C (en) 2010-07-29 2016-08-16 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
US10087721B2 (en) 2010-07-29 2018-10-02 Exxonmobil Upstream Research Company Methods and systems for machine—learning based simulation of flow
BR112013002114A2 (pt) 2010-09-20 2016-05-17 Exxonmobil Upstream Res Co formulações flexíveis e adaptáveis para simulações de reservatório complexas
US20120143577A1 (en) * 2010-12-02 2012-06-07 Matthew Szyndel Prioritizing well drilling propositions
EP2668641B1 (en) 2011-01-26 2020-04-15 Exxonmobil Upstream Research Company Method of reservoir compartment analysis using topological structure in 3d earth model
CA2822810A1 (en) * 2011-02-21 2012-08-30 Exxonmobil Upstream Research Company Method and system for field planning
FR2979724B1 (fr) * 2011-09-06 2018-11-23 Ifp Energies Now Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forer
BR112014005794A2 (pt) 2011-09-15 2017-03-28 Exxonmobil Upstream Res Co operações matriciais e vetoriais otimizadas em algoritmos de instrução limitada que executam cálculos de equação de estado
AU2012381103B2 (en) * 2012-05-30 2016-06-30 Landmark Graphics Corporation System and method for reservoir simulation optimization
EP2901363A4 (en) 2012-09-28 2016-06-01 Exxonmobil Upstream Res Co ERROR REMOVAL IN GEOLOGICAL MODELS
US10495782B2 (en) 2012-12-13 2019-12-03 Landmark Graphics Corporation System, method and computer program product for determining placement of perforation intervals using facies, fluid boundaries, geobodies and dynamic fluid properties
US20140303951A1 (en) * 2013-04-09 2014-10-09 Schlumberger Technology Corporation Integrated system for production design assistance
US20160078378A1 (en) * 2013-04-22 2016-03-17 Landmark Graphics Corporation Systems and Methods for Adjusting Existing Well Plans
ES2660432T3 (es) 2013-06-06 2018-03-22 Repsol, S.A. Método para evaluar planes de estrategia de producción
EP3008281A2 (en) * 2013-06-10 2016-04-20 Exxonmobil Upstream Research Company Interactively planning a well site
US9864098B2 (en) 2013-09-30 2018-01-09 Exxonmobil Upstream Research Company Method and system of interactive drill center and well planning evaluation and optimization
SG11201604577VA (en) 2014-01-24 2016-07-28 Landmark Graphics Corp Determining appraisal locations in a reservoir system
US11414975B2 (en) 2014-07-14 2022-08-16 Saudi Arabian Oil Company Quantifying well productivity and near wellbore flow conditions in gas reservoirs
US9816366B2 (en) 2014-07-14 2017-11-14 Saudi Arabian Oil Company Methods, systems, and computer medium having computer programs stored thereon to optimize reservoir management decisions
CA2948667A1 (en) 2014-07-30 2016-02-04 Exxonmobil Upstream Research Company Method for volumetric grid generation in a domain with heterogeneous material properties
US10221659B2 (en) 2014-10-08 2019-03-05 Chevron U.S.A. Inc. Automated well placement for reservoir evaluation
CA2963092C (en) 2014-10-31 2021-07-06 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
US10803534B2 (en) 2014-10-31 2020-10-13 Exxonmobil Upstream Research Company Handling domain discontinuity with the help of grid optimization techniques
US11319780B2 (en) 2015-04-03 2022-05-03 Schlumberger Technology Corporation Wellsite system services
CN106156933B (zh) * 2015-04-17 2022-01-28 普拉德研究及开发股份有限公司 设计井规划及预测钻井性能
CN106156934B (zh) * 2015-04-17 2022-06-28 普拉德研究及开发股份有限公司 分布式井工程和规划
US20180094514A1 (en) * 2015-04-30 2018-04-05 Landmark Graphics Corporation Shale geomechanics for multi-stage hydraulic fracturing optimization in resource shale and tight plays
WO2016178666A1 (en) * 2015-05-05 2016-11-10 Schlumberger Canada Limited Method and system for production analysis using data analytics
US10060227B2 (en) 2016-08-02 2018-08-28 Saudi Arabian Oil Company Systems and methods for developing hydrocarbon reservoirs
WO2018118374A1 (en) 2016-12-23 2018-06-28 Exxonmobil Upstream Research Company Method and system for stable and efficient reservoir simulation using stability proxies
RU2685005C1 (ru) * 2017-11-07 2019-04-16 Публичное акционерное общество "Газпром нефть" Способ и компьютерная система для проектирования размещения кустовых площадок на месторождении
WO2021081706A1 (en) 2019-10-28 2021-05-06 Schlumberger Technology Corporation Drilling activity recommendation system and method
CA3175274A1 (en) * 2020-03-09 2021-09-16 Schlumberger Canada Limited Fast front tracking in eor flooding simulation on coarse grids
US11586790B2 (en) * 2020-05-06 2023-02-21 Saudi Arabian Oil Company Determining hydrocarbon production sweet spots

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8297377B2 (en) * 1998-11-20 2012-10-30 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US7096172B2 (en) * 2003-01-31 2006-08-22 Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. System and method for automated reservoir targeting
US7546884B2 (en) * 2004-03-17 2009-06-16 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for automatic drill string design based on wellbore geometry and trajectory requirements
EP1759226A1 (en) 2004-06-07 2007-03-07 ExxonMobil Upstream Research Company Method for solving implicit reservoir simulation matrix equation
CA2590767C (en) 2004-12-14 2011-04-19 Schlumberger Canada Limited Geometrical optimization of multi-well trajectories
US8209202B2 (en) * 2005-04-29 2012-06-26 Landmark Graphics Corporation Analysis of multiple assets in view of uncertainties
US7584081B2 (en) * 2005-11-21 2009-09-01 Chevron U.S.A. Inc. Method, system and apparatus for real-time reservoir model updating using ensemble kalman filter
US8776895B2 (en) * 2006-03-02 2014-07-15 Exxonmobil Upstream Research Company Method for quantifying reservoir connectivity using fluid travel times
US7657407B2 (en) * 2006-08-15 2010-02-02 Landmark Graphics Corporation Method and system of planning hydrocarbon extraction from a hydrocarbon formation
US8005658B2 (en) * 2007-05-31 2011-08-23 Schlumberger Technology Corporation Automated field development planning of well and drainage locations
CN101515372B (zh) * 2009-02-04 2011-12-07 北京石油化工学院 基于虚拟地质模型的可视化分析预测方法

Also Published As

Publication number Publication date
CN102272725A (zh) 2011-12-07
EP2377017A1 (en) 2011-10-19
AU2009336057A1 (en) 2011-06-30
WO2010080270A1 (en) 2010-07-15
AU2016222449A1 (en) 2016-09-22
CA2745880A1 (en) 2010-07-15
EP2377017A4 (en) 2018-05-16
AU2018214036A1 (en) 2018-08-23
CN102272725B (zh) 2014-08-27
MX2011006840A (es) 2011-10-24
US20100179797A1 (en) 2010-07-15
US10060245B2 (en) 2018-08-28
CN104196515A (zh) 2014-12-10

Similar Documents

Publication Publication Date Title
BRPI0919368A2 (pt) dispositivos e métodos para planejar localizações de poços com critérios dinâmicos de produção
EP2401367A4 (en) HYPERACTIVE PIGGYBAC TRANSPOSASES
BR112012015322A2 (pt) propante e método para formar o propante
BR112012027159A2 (pt) estrutura e método
BRPI0924349A2 (pt) dispositivos revestidos para produção de poços de petróleo e gás
BR112013014442A2 (pt) micro-organismos para a produção de putrescina e método para a produção de putrescina utilizando o mesmo
IL233095A0 (en) Ratio based biomarkers and methods of use thereof
BR112012000171A2 (pt) composição lubrificante, e, método
PT2606372T (pt) Nós e métodos para melhorar posicionamento
BR112013001592A2 (pt) artigo e método
HRP20160737T1 (hr) Anti-her3-protutijela i njihove uporabe
BR112012019778A2 (pt) dispositivo de produção de hidrogênio e método para produzir hidrogênio
BRPI1006537A2 (pt) método e artigo
DK2529050T3 (da) Jernbane- eller metroskinnestøtte
BR112013010847A2 (pt) artigo e método
BR112013016641A2 (pt) artigo e método
PL2400807T3 (pl) Urządzenie planujące i sposób planowania
EP2412599A4 (en) ROLLING
BR112012002334A2 (pt) sensor com orifício para transcontactação
FI20105414A0 (fi) Menetelmä ja sovitelma rakenteen liikkumisen estämiseksi
FI20090357L (fi) Menetelmä ja järjestely
KR101353700B9 (ko) 혼합 섬유 및 그 제조방법
KR101657083B9 (ko) 전기광학장치 및 이의 제작 방법
JP2012026111A5 (ja) 巾木及びその製造方法
DE112010001133B8 (de) Schmiervorrichtung

Legal Events

Date Code Title Description
B08F Application fees: dismissal - article 86 of industrial property law

Free format text: REFERENTE A 9A ANUIDADE.

B08K Lapse as no evidence of payment of the annual fee has been furnished to inpi (acc. art. 87)

Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2494 DE 23-10-2018 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.