BRPI0919572A2 - método implementado por computador em múltipla escala, sistema implementado por computador, e, método para operar um reservatório de subsuperfície - Google Patents

método implementado por computador em múltipla escala, sistema implementado por computador, e, método para operar um reservatório de subsuperfície

Info

Publication number
BRPI0919572A2
BRPI0919572A2 BRPI0919572A BRPI0919572A BRPI0919572A2 BR PI0919572 A2 BRPI0919572 A2 BR PI0919572A2 BR PI0919572 A BRPI0919572 A BR PI0919572A BR PI0919572 A BRPI0919572 A BR PI0919572A BR PI0919572 A2 BRPI0919572 A2 BR PI0919572A2
Authority
BR
Brazil
Prior art keywords
computer implemented
operating
subsurface reservoir
scale
implemented system
Prior art date
Application number
BRPI0919572A
Other languages
English (en)
Inventor
Bonfigli Giuseppe
Hajibeygi Hadi
Andre Hesse Marc
Jenny Patrick
Original Assignee
Chevron Usa Inc
Eth Zuerich
Logined Bv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chevron Usa Inc, Eth Zuerich, Logined Bv filed Critical Chevron Usa Inc
Publication of BRPI0919572A2 publication Critical patent/BRPI0919572A2/pt

Links

Classifications

    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06F—ELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00—Computer-aided design [CAD]
    • G06F30/20—Design optimisation, verification or simulation
    • G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06F—ELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00—Details relating to CAD techniques
    • G06F2111/10—Numerical modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Complex Calculations (AREA)
  • Geophysics And Detection Of Objects (AREA)
BRPI0919572A 2008-10-09 2009-10-08 método implementado por computador em múltipla escala, sistema implementado por computador, e, método para operar um reservatório de subsuperfície BRPI0919572A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10415408P 2008-10-09 2008-10-09
PCT/US2009/060044 WO2010042746A2 (en) 2008-10-09 2009-10-08 Iterative multi-scale method for flow in porous media

Publications (1)

Publication Number Publication Date
BRPI0919572A2 true BRPI0919572A2 (pt) 2019-09-24

Family

ID=42099688

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0919572A BRPI0919572A2 (pt) 2008-10-09 2009-10-08 método implementado por computador em múltipla escala, sistema implementado por computador, e, método para operar um reservatório de subsuperfície

Country Status (9)

Country Link
US (1) US8301429B2 (pt)
EP (1) EP2361414A2 (pt)
CN (1) CN102224502A (pt)
AU (1) AU2009302317A1 (pt)
BR (1) BRPI0919572A2 (pt)
CA (1) CA2759199A1 (pt)
EA (1) EA201170550A1 (pt)
MX (1) MX2011003802A (pt)
WO (1) WO2010042746A2 (pt)

Families Citing this family (48)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009120409A1 (en) * 2008-03-28 2009-10-01 Exxonmobil Upstream Research Company Computing a consistent velocity vector field from a set of fluxes
MX2011003802A (es) * 2008-10-09 2011-11-01 Chevron Usa Inc Metodo iterativo multi-escala para el flujo en medios porosos.
US8600717B2 (en) 2009-05-14 2013-12-03 Schlumberger Technology Corporation Production optimization for oilfields using a mixed-integer nonlinear programming model
CN102640163B (zh) 2009-11-30 2016-01-20 埃克森美孚上游研究公司 用于储层模拟的适应性牛顿法
EP2534605B1 (en) * 2010-02-12 2020-06-17 Exxonmobil Upstream Research Company Method and system for partitioning parallel simulation models
BR112012025995A2 (pt) 2010-04-30 2016-06-28 Exxonmobil Upstream Res Co método e sistema para simulação de fluxo de volume finito
EP2588952A4 (en) 2010-06-29 2017-10-04 Exxonmobil Upstream Research Company Method and system for parallel simulation models
CA2803068C (en) 2010-07-29 2016-10-11 Exxonmobil Upstream Research Company Method and system for reservoir modeling
CA2803067A1 (en) * 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
US10087721B2 (en) 2010-07-29 2018-10-02 Exxonmobil Upstream Research Company Methods and systems for machine—learning based simulation of flow
AU2011283193B2 (en) 2010-07-29 2014-07-17 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
CA2809580A1 (en) * 2010-08-09 2012-02-16 Jianbing Wu Reservoir upscaling method with preserved transmissibility
CA2807300C (en) 2010-09-20 2017-01-03 Exxonmobil Upstream Research Company Flexible and adaptive formulations for complex reservoir simulations
US8511378B2 (en) 2010-09-29 2013-08-20 Harris Corporation Control system for extraction of hydrocarbons from underground deposits
US9031674B2 (en) 2010-10-13 2015-05-12 Schlumberger Technology Corporation Lift-gas optimization with choke control
US8798977B2 (en) 2010-12-16 2014-08-05 Chevron U.S.A. Inc. System and method for simulating fluid flow in a fractured reservoir
US10113400B2 (en) 2011-02-09 2018-10-30 Saudi Arabian Oil Company Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
US9164191B2 (en) 2011-02-09 2015-10-20 Saudi Arabian Oil Company Sequential fully implicit well model for reservoir simulation
US10175386B2 (en) 2011-02-09 2019-01-08 Saudi Arabian Oil Company Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
CN103959233B (zh) 2011-09-15 2017-05-17 埃克森美孚上游研究公司 在执行eos计算的指令受限算法中最优化矩阵和向量运算
US9378311B2 (en) 2012-02-09 2016-06-28 Saudi Arabian Oil Company Multi-level solution of large-scale linear systems in simulation of porous media in giant reservoirs
WO2013188091A1 (en) * 2012-06-15 2013-12-19 Landmark Graphics Corporation Methods and systems for non-physical attribute management in reservoir simulation
AU2013324162B2 (en) 2012-09-28 2018-08-09 Exxonmobil Upstream Research Company Fault removal in geological models
CN103017167B (zh) * 2012-11-21 2016-06-08 广东电网公司电力科学研究院 多孔介质燃烧器的制造方法
US9322263B2 (en) 2013-01-29 2016-04-26 Landmark Graphics Corporation Systems and methods for dynamic visualization of fluid velocity in subsurface reservoirs
US20140236559A1 (en) 2013-02-18 2014-08-21 Saudi Arabian Oil Company Systems, methods, and computer-readable media for modeling complex wellbores in field-scale reservoir simulation
US9746567B2 (en) * 2013-03-22 2017-08-29 Cgg Services Sas Systems and methods for performing dual-scale interpolation
US9690885B2 (en) 2013-08-16 2017-06-27 Schlumberger Technology Corporation Interactive visualization of reservoir simulation data sets
CN105683494A (zh) * 2013-09-16 2016-06-15 兰德马克绘图国际公司 伪相生产模拟:在储层流动模拟中经由连续相似的阶跃函数相对渗透率受控模型来评估准多相流生产以便对多个岩石物理学实现排序的信号处理方法
US10208577B2 (en) * 2013-10-09 2019-02-19 Chevron U.S.A. Inc. Method for efficient dynamic gridding
US10417354B2 (en) * 2013-12-17 2019-09-17 Schlumberger Technology Corporation Model order reduction technique for discrete fractured network simulation
US10677960B2 (en) 2014-03-17 2020-06-09 Saudi Arabian Oil Company Generating unconstrained voronoi grids in a domain containing complex internal boundaries
US10808501B2 (en) 2014-03-17 2020-10-20 Saudi Arabian Oil Company Modeling intersecting faults and complex wellbores in reservoir simulation
US10914864B2 (en) 2014-07-16 2021-02-09 Schlumberger Technology Corporation Multiscale method for reservoir models
US10319143B2 (en) 2014-07-30 2019-06-11 Exxonmobil Upstream Research Company Volumetric grid generation in a domain with heterogeneous material properties
WO2016069171A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
AU2015339883B2 (en) 2014-10-31 2018-03-29 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
US10534877B2 (en) * 2015-05-19 2020-01-14 Schlumberger Technology Corporation Adaptive multiscale multi-fidelity reservoir simulation
US10280722B2 (en) 2015-06-02 2019-05-07 Baker Hughes, A Ge Company, Llc System and method for real-time monitoring and estimation of intelligent well system production performance
US20180320493A1 (en) * 2015-12-01 2018-11-08 Landmark Graphics Corporation Automated upscaling of relative permeability using fractional flow in systems comprising disparate rock types
CN106934185B (zh) * 2017-04-27 2019-08-06 中国石油大学(华东) 一种弹性介质的流固耦合多尺度流动模拟方法
EP3679221A1 (en) * 2017-09-08 2020-07-15 Roxar Software Solutions AS Well fracture modelling
US10913901B2 (en) 2017-09-12 2021-02-09 Saudi Arabian Oil Company Integrated process for mesophase pitch and petrochemical production
US10822925B2 (en) * 2018-04-26 2020-11-03 Saudi Arabian Oil Company Determining pressure distribution in heterogeneous rock formations for reservoir simulation
WO2020212721A1 (en) * 2019-04-16 2020-10-22 Total Se A method for upscaling of relative permeability of the phase of a fluid
EP4073347A1 (en) * 2019-12-11 2022-10-19 Exxonmobil Upstream Research Company (EMHC-N1-4A-607) Semi-elimination methodology for simulating high flow features in a reservoir
CN111914448B (zh) * 2020-07-16 2023-06-09 青岛海洋地质研究所 基于控制体有限元方法的流固耦合数值模拟方法
CN117059206B (zh) * 2023-08-14 2025-12-05 西安交通大学 一种强化多孔介质传热传质的多尺度拓扑优化方法、系统、设备及介质

Family Cites Families (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4821164A (en) * 1986-07-25 1989-04-11 Stratamodel, Inc. Process for three-dimensional mathematical modeling of underground geologic volumes
US5321612A (en) * 1991-02-26 1994-06-14 Swift Energy Company Method for exploring for hydrocarbons utilizing three dimensional modeling of thermal anomalies
FR2726091B1 (fr) * 1994-10-19 1996-12-20 Elf Aquitaine Methode d'analyse et de traitement de donnees sismiques reflexion pour la determination d'un champ fin de vitesse de correction d'hyperbolicite
US5729451A (en) * 1995-12-01 1998-03-17 Coleman Research Corporation Apparatus and method for fusing diverse data
US5923329A (en) * 1996-06-24 1999-07-13 National Research Council Of Canada Method of grid generation about or within a 3 dimensional object
US6018497A (en) * 1997-02-27 2000-01-25 Geoquest Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore
US6106561A (en) * 1997-06-23 2000-08-22 Schlumberger Technology Corporation Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator
GB2336008B (en) 1998-04-03 2000-11-08 Schlumberger Holdings Simulation system including a simulator and a case manager adapted for organizing data files
AU2950499A (en) 1998-05-04 1999-11-23 Schlumberger Evaluation & Production (Uk) Services Near wellbore modeling method and apparatus
US6185512B1 (en) * 1998-10-13 2001-02-06 Raytheon Company Method and system for enhancing the accuracy of measurements of a physical quantity
US6721694B1 (en) * 1998-10-13 2004-04-13 Raytheon Company Method and system for representing the depths of the floors of the oceans
US6826520B1 (en) * 1999-06-24 2004-11-30 Exxonmobil Upstream Research Company Method of upscaling permeability for unstructured grids
US6266619B1 (en) 1999-07-20 2001-07-24 Halliburton Energy Services, Inc. System and method for real time reservoir management
US7006959B1 (en) 1999-10-12 2006-02-28 Exxonmobil Upstream Research Company Method and system for simulating a hydrocarbon-bearing formation
AU8025000A (en) 1999-10-13 2001-04-23 Trustees Of Columbia University In The City Of New York, The Petroleum reservoir simulation and characterization system and method
AU2001251019A1 (en) * 2000-03-27 2001-10-08 Peter J. Ortoleva Method for simulation of enhanced fracture detection in sedimentary basins
GB0017227D0 (en) * 2000-07-14 2000-08-30 Schlumberger Ind Ltd Fully coupled geomechanics in a commerical reservoir simulator
US6631202B2 (en) * 2000-12-08 2003-10-07 Landmark Graphics Corporation Method for aligning a lattice of points in response to features in a digital image
FR2823877B1 (fr) * 2001-04-19 2004-12-24 Inst Francais Du Petrole Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol
US7805247B2 (en) * 2002-09-09 2010-09-28 Schlumberger Technology Corporation System and methods for well data compression
GB2396448B (en) * 2002-12-21 2005-03-02 Schlumberger Holdings System and method for representing and processing and modeling subterranean surfaces
US6823297B2 (en) * 2003-03-06 2004-11-23 Chevron U.S.A. Inc. Multi-scale finite-volume method for use in subsurface flow simulation
US7496488B2 (en) * 2003-03-06 2009-02-24 Schlumberger Technology Company Multi-scale finite-volume method for use in subsurface flow simulation
GB2409900B (en) * 2004-01-09 2006-05-24 Statoil Asa Processing seismic data representing a physical system
US7401304B2 (en) * 2004-01-28 2008-07-15 Gradient Design Automation Inc. Method and apparatus for thermal modeling and analysis of semiconductor chip designs
FR2870621B1 (fr) * 2004-05-21 2006-10-27 Inst Francais Du Petrole Methode pour generer un maillage hybride conforme en trois dimensions d'une formation heterogene traversee par une ou plusieurs discontinuites geometriques dans le but de realiser des simulations
WO2005120195A2 (en) * 2004-06-07 2005-12-22 Brigham Young University Reservoir simulation
US7480206B2 (en) * 2004-09-13 2009-01-20 Chevron U.S.A. Inc. Methods for earth modeling and seismic imaging using interactive and selective updating
US7516056B2 (en) * 2005-04-26 2009-04-07 Schlumberger Technology Corporation Apparatus, method and system for improved reservoir simulation using a multiplicative overlapping Schwarz preconditioning for adaptive implicit linear systems
FR2886742B1 (fr) * 2005-06-02 2007-07-27 Inst Francais Du Petrole Methode de changement d'echelle des permeabilites absolues pour construire un modele de simulation d'ecoulement
EP1893845A1 (en) * 2005-06-14 2008-03-05 Services Pétroliers Schlumberger Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver
GB0524134D0 (en) * 2005-11-26 2006-01-04 Univ Edinburgh Improvements in and relating to hydrocarbon recovery from a hydrocarbon reservoir
US7765091B2 (en) * 2006-06-18 2010-07-27 Chevron U.S.A Inc. Method, apparatus and system for reservoir simulation using a multi-scale finite volume method including black oil modeling
US7983883B2 (en) * 2006-08-14 2011-07-19 Exxonmobil Upstream Research Company Enriched multi-point flux approximation
EP2100218B1 (en) * 2006-10-31 2013-05-15 ExxonMobil Upstream Research Company Modeling and management of reservoir systems with material balance groups
US8412500B2 (en) * 2007-01-29 2013-04-02 Schlumberger Technology Corporation Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation
US7966273B2 (en) * 2007-07-27 2011-06-21 Schlumberger Technology Corporation Predicting formation fluid property through downhole fluid analysis using artificial neural network
US8510242B2 (en) * 2007-08-31 2013-08-13 Saudi Arabian Oil Company Artificial neural network models for determining relative permeability of hydrocarbon reservoirs
GB2455077A (en) * 2007-11-27 2009-06-03 Polyhedron Software Ltd Estimating the state of a physical system using generalized nested factorisation
US20090164186A1 (en) * 2007-12-20 2009-06-25 Bhp Billiton Innovation Pty Ltd. Method for determining improved estimates of properties of a model
US8136395B2 (en) * 2007-12-31 2012-03-20 Schlumberger Technology Corporation Systems and methods for well data analysis
US8155942B2 (en) * 2008-02-21 2012-04-10 Chevron U.S.A. Inc. System and method for efficient well placement optimization
US8204726B2 (en) * 2008-05-16 2012-06-19 Chevron U.S.A. Inc. Multi-scale method for multi-phase flow in porous media
WO2009142872A1 (en) * 2008-05-22 2009-11-26 Exxonmobil Upstream Research Company Seismic horizon skeletonization
CA2729770C (en) * 2008-07-03 2016-12-13 Chevron U.S.A. Inc. Multi-scale finite volume method for reservoir simulation
MX2011002311A (es) * 2008-09-02 2011-06-21 Chevron Usa Inc Sobrecalado dinamico, basado en error indirecto, de flujo de fase multiple en medio poroso.
MX2011003802A (es) * 2008-10-09 2011-11-01 Chevron Usa Inc Metodo iterativo multi-escala para el flujo en medios porosos.
WO2010062710A1 (en) * 2008-11-03 2010-06-03 Saudi Arabian Oil Company Three dimensional well block radius determiner machine and related computer implemented methods and program products
US8350851B2 (en) * 2009-03-05 2013-01-08 Schlumberger Technology Corporation Right sizing reservoir models
CA2754152A1 (en) * 2009-03-17 2010-09-23 Smith International, Inc. Relative and absolute error models for subterranean wells
GB2482097B (en) * 2009-05-11 2013-09-11 Baker Hughes Inc Apparatus and method for multi-sensor estimation of a property of an earth formation

Also Published As

Publication number Publication date
US20100094605A1 (en) 2010-04-15
AU2009302317A1 (en) 2010-04-15
WO2010042746A2 (en) 2010-04-15
EP2361414A2 (en) 2011-08-31
MX2011003802A (es) 2011-11-01
EA201170550A1 (ru) 2011-12-30
CN102224502A (zh) 2011-10-19
US8301429B2 (en) 2012-10-30
CA2759199A1 (en) 2010-04-15
WO2010042746A3 (en) 2010-07-15

Similar Documents

Publication Publication Date Title
BRPI0823080A2 (pt) Sistema para a utilização de uma interface de usuário baseada em gestos, método para a utilização de uma interface de usuário baseada em gestos e meio legível por computador
BRPI0815494A2 (pt) Método implementado por computador, e, sistema.
BRPI1012023A2 (pt) método implementado por computador, e métodos para operar um sistema de reservatório e para avaliar um esquema de injeção padrão ou um esquema de injeção periférica.
BRPI0919556A2 (pt) método, sistema para perfurar um poço, e, meio legível por computador
BRPI0813734A2 (pt) Sistema informatizado de viagem, método em um sistema de viagem e programa de computador
BRPI1014734A2 (pt) método implementado por computador para controlar aspectos de um ambiente de dados, e , sistema para controlar um ambiente de dados.
BRPI0913517A2 (pt) sistema para a prevenção de queda para um usuário, método de prevenção de quedas por um usuário e produto de programa de computador
BR112012005449A2 (pt) método implementado por computador, e, sistema de computador
BRPI0919207A2 (pt) método e sistema implementado por computador para uso na modelagem de um sistema de reservatório geomecânico, e , método implementado por computador para uso na modelagem de uma ruptura.
BRPI0818423A2 (pt) Sistema, método, e, mídia legível por computador
BRPI0822827A2 (pt) Mídia legível por computador, método e sistema
BRPI1014815A2 (pt) módulo rastreador para uso em uma rede de comunicações não hieráquicas, sistema e método para gerenciar transferências de dados de conteúdo em uma rede de comunicações não hierárquicas, elemento de rede, método para gerenciar dados em uma rede de comunicações não hierárquicas, programa de computador, e, produto de programa de computador.
BRPI0820830A2 (pt) Método para modelar em um computador para região física, e, produto de programa de computador.
BRPI0907054A2 (pt) sistema de aeronave, e, método para operar um sistema de aeronave
BRPI0822004A2 (pt) Sistema de freio e processo para o controle de um sistema de freio.
BRPI1012867A2 (pt) metodo, meio legivel por computador, computador servidor, e, sistema
BRPI0916328A2 (pt) sistema e método para redução de fratura, bem como método para formação de um sistema para redução de fratura
BR112013019329A2 (pt) método e sistema para implementar um simulador de reservatório, e, meio legível por computador.
BRPI1008357A2 (pt) dispositivo de autenticação, método de autenticação, e programa para execução deste por computador
BRPI0822431A2 (pt) Sistema de segurança de dados, método para segurança de dados e meio lido por computador armazenando software
BRPI0820148A2 (pt) Sistema de aberturas, sistema de computador e método para usinar aberturas
BRPI0917120A2 (pt) método, e, meio legível por computador.
BRPI1015473A2 (pt) aparelho de controle, sistema de perfuração, e, método para operar um sistema de perfuração.
BRPI0920253A2 (pt) dispositivo de agulha cirúrgica, sistema de agulha cirúrgica, e, método para usar um dispositivo de agulha cirúrgica.
BRPI0820365A2 (pt) Método, sistema, e, mídia de armazenamento legível por computador.

Legal Events

Date Code Title Description
B08F Application fees: dismissal - article 86 of industrial property law
B08K Lapse as no evidence of payment of the annual fee has been furnished to inpi (acc. art. 87)

Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2543 DE 01-10-2019 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.