|
CN102007485B
(zh)
*
|
2008-04-18 |
2014-06-25 |
埃克森美孚上游研究公司 |
储层开发计划的基于markov决策过程的决策支持工具
|
|
EP2291799A4
(en)
*
|
2008-04-21 |
2013-01-16 |
Exxonmobil Upstream Res Co |
DECISION SUPPORT TOOL BASED ON STOCHASTIC PROGRAMMING FOR TANK DEVELOPMENT PLANNING
|
|
US8159493B2
(en)
*
|
2009-02-03 |
2012-04-17 |
Xerox Corporation |
Adaptive grand tour
|
|
EP2411845A1
(en)
*
|
2009-03-27 |
2012-02-01 |
Exxonmobil Upstream Research Company |
Reservoir quality characterization using heterogeneity equations with spatially-varying parameters
|
|
US8438162B2
(en)
*
|
2009-04-16 |
2013-05-07 |
President And Fellows Of Harvard College |
Method and apparatus for selecting clusterings to classify a predetermined data set
|
|
WO2010151354A1
(en)
*
|
2009-06-26 |
2010-12-29 |
Exxonmobil Upstream Research Company |
Constructing resistivity models from stochastic inversion
|
|
AU2009353036B2
(en)
*
|
2009-09-25 |
2015-04-30 |
Landmark Graphics Corporation |
Systems and methods for the quantitative estimate of production-forecast uncertainty
|
|
EP2507738B1
(en)
|
2009-11-30 |
2019-05-01 |
Exxonmobil Upstream Research Company |
Adaptive newton's method for reservoir simulation
|
|
BR112012025995A2
(pt)
|
2010-04-30 |
2016-06-28 |
Exxonmobil Upstream Res Co |
método e sistema para simulação de fluxo de volume finito
|
|
US8694299B2
(en)
|
2010-05-07 |
2014-04-08 |
Exxonmobil Upstream Research Company |
Artifact reduction in iterative inversion of geophysical data
|
|
US8571842B2
(en)
*
|
2010-06-21 |
2013-10-29 |
Schlumberger Technology Corporation |
Method of determining parameter from sparse measurement data
|
|
US8301385B2
(en)
*
|
2010-06-29 |
2012-10-30 |
Chevron U.S.A. Inc. |
Shot gather data beamer and debeamer
|
|
EP2588952A4
(en)
|
2010-06-29 |
2017-10-04 |
Exxonmobil Upstream Research Company |
Method and system for parallel simulation models
|
|
CA2803068C
(en)
|
2010-07-29 |
2016-10-11 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
|
EP2599029A4
(en)
|
2010-07-29 |
2014-01-08 |
Exxonmobil Upstream Res Co |
METHODS AND SYSTEMS FOR AUTOMATIC LEARNING FLOW SIMULATION
|
|
EP2599023B1
(en)
|
2010-07-29 |
2019-10-23 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
|
US9195783B2
(en)
|
2010-08-16 |
2015-11-24 |
Exxonmobil Upstream Research Company |
Reducing the dimensionality of the joint inversion problem
|
|
US8370774B2
(en)
*
|
2010-08-30 |
2013-02-05 |
Taiwan Semiconductor Manufacturing Company, Ltd. |
Constructing mapping between model parameters and electrical parameters
|
|
WO2012039811A1
(en)
|
2010-09-20 |
2012-03-29 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
|
BR112013002842A2
(pt)
|
2010-09-27 |
2016-06-07 |
Exxonmobil Upstream Res Co |
codificação de fonte e separação de fonte simultâneas como uma solução prática para inversão de campo de onda completa
|
|
US8437998B2
(en)
|
2010-09-27 |
2013-05-07 |
Exxonmobil Upstream Research Company |
Hybrid method for full waveform inversion using simultaneous and sequential source method
|
|
MY160148A
(en)
|
2010-12-01 |
2017-02-28 |
Exxonmobil Upstream Res Co |
Simultaneous source inversion for marine streamer data with cross-correlation objective function
|
|
US8705315B2
(en)
*
|
2011-03-25 |
2014-04-22 |
Saudi Arabian Oil Company |
Simultaneous wavelet extraction and deconvolution in the time domain
|
|
BR112013018994A2
(pt)
|
2011-03-30 |
2017-02-21 |
Exxonmobil Upstream Res Co |
taxa de convergência de inversão de campo de onda completa empregando conformação espectral
|
|
WO2012134609A1
(en)
|
2011-03-31 |
2012-10-04 |
Exxonmobil Upstream Research Company |
Method of wavelet estimation and multiple prediction in full wavefield inversion
|
|
CN102254321B
(zh)
*
|
2011-05-19 |
2014-03-26 |
中国石油集团川庆钻探工程有限公司 |
基于初至波自动识别反极性道的方法
|
|
EP2715603A4
(en)
*
|
2011-06-02 |
2016-07-13 |
Exxonmobil Upstream Res Co |
JOINT INVERSION WITH UNKNOWN LITHOLOGY
|
|
US8843353B2
(en)
*
|
2011-08-25 |
2014-09-23 |
Chevron U.S.A. Inc. |
Hybrid deterministic-geostatistical earth model
|
|
ES2640824T3
(es)
|
2011-09-02 |
2017-11-06 |
Exxonmobil Upstream Research Company |
Utilización de la proyección sobre conjuntos convexos para limitar la inversión del campo de onda completa
|
|
BR112014005794A2
(pt)
|
2011-09-15 |
2017-03-28 |
Exxonmobil Upstream Res Co |
operações matriciais e vetoriais otimizadas em algoritmos de instrução limitada que executam cálculos de equação de estado
|
|
US10429535B2
(en)
|
2011-10-31 |
2019-10-01 |
Schlumberger Technology Corporation |
Statistical analysis of combined log data
|
|
US9176930B2
(en)
|
2011-11-29 |
2015-11-03 |
Exxonmobil Upstream Research Company |
Methods for approximating hessian times vector operation in full wavefield inversion
|
|
US9152740B1
(en)
*
|
2012-01-18 |
2015-10-06 |
Msc.Software Corporation |
Interactive simulation and solver for mechanical, fluid, and electro-mechanical systems
|
|
RU2612896C2
(ru)
|
2012-03-08 |
2017-03-13 |
Эксонмобил Апстрим Рисерч Компани |
Ортогональное кодирование источника и приемника
|
|
CA2871243C
(en)
*
|
2012-04-24 |
2019-05-14 |
Statoil Petroleum As |
Processing data representing a physical system
|
|
CN102722656B
(zh)
*
|
2012-06-08 |
2014-11-12 |
浙江大学 |
基于混合维模型的精密偶件配合间隙泄漏特性预测方法
|
|
EP2877934A4
(en)
*
|
2012-07-27 |
2016-04-06 |
Landmark Graphics Corp |
SYSTEMS AND METHOD FOR ASSESSING POSSIBILITY IN A CONTAINER SYSTEM
|
|
US9020205B2
(en)
*
|
2012-08-24 |
2015-04-28 |
Technoimaging, Llc |
Methods of multinary inversion for imaging objects with discrete physical properties
|
|
US9002766B2
(en)
*
|
2012-08-31 |
2015-04-07 |
Chevron U.S.A. Inc. |
System and method for determining a value of information metric from a posterior distribution generated through stochastic inversion
|
|
US9183182B2
(en)
*
|
2012-08-31 |
2015-11-10 |
Chevron U.S.A. Inc. |
System and method for determining a probability of well success using stochastic inversion
|
|
AU2013324162B2
(en)
|
2012-09-28 |
2018-08-09 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
|
US20140122037A1
(en)
*
|
2012-10-26 |
2014-05-01 |
Schlumberger Technology Corporation |
Conditioning random samples of a subterranean field model to a nonlinear function
|
|
EP2912497B1
(en)
*
|
2012-10-26 |
2024-12-18 |
Landmark Graphics Corporation |
Distributing petrofacies using analytical modeling
|
|
MY178811A
(en)
|
2012-11-28 |
2020-10-20 |
Exxonmobil Upstream Res Co |
Reflection seismic data q tomography
|
|
US9575205B2
(en)
*
|
2013-01-17 |
2017-02-21 |
Pgs Geophysical As |
Uncertainty-based frequency-selected inversion of electromagnetic geophysical data
|
|
GB2510872A
(en)
*
|
2013-02-15 |
2014-08-20 |
Total Sa |
Method of modelling a subsurface volume
|
|
GB2510873A
(en)
|
2013-02-15 |
2014-08-20 |
Total Sa |
Method of modelling a subsurface volume
|
|
US10261215B2
(en)
|
2013-04-02 |
2019-04-16 |
Westerngeco L.L.C. |
Joint inversion of geophysical attributes
|
|
US9846255B2
(en)
|
2013-04-22 |
2017-12-19 |
Exxonmobil Upstream Research Company |
Reverse semi-airborne electromagnetic prospecting
|
|
BR112015025516A2
(pt)
|
2013-05-24 |
2017-07-18 |
Exxonmobil Upstream Res Co |
inversão de multiparâmetros através de fwi elástica dependente de deslocamento
|
|
US9348059B2
(en)
|
2013-06-03 |
2016-05-24 |
Pgs Geophysical As |
Fast modeling using interpolated starting points
|
|
WO2014197156A2
(en)
|
2013-06-03 |
2014-12-11 |
Exxonmobil Upstream Research Company |
Uncertainty estimation of subsurface resistivity solutions
|
|
US10459117B2
(en)
|
2013-06-03 |
2019-10-29 |
Exxonmobil Upstream Research Company |
Extended subspace method for cross-talk mitigation in multi-parameter inversion
|
|
CN104216006B
(zh)
*
|
2013-06-04 |
2017-05-17 |
中国石油化工股份有限公司 |
利用重磁电震同步联合参数模型进行提高成像质量的方法
|
|
US9702998B2
(en)
|
2013-07-08 |
2017-07-11 |
Exxonmobil Upstream Research Company |
Full-wavefield inversion of primaries and multiples in marine environment
|
|
MX359179B
(es)
|
2013-08-23 |
2018-09-18 |
Exxonmobil Upstream Res Co |
Adquisicion de fuentes simultanea durante adquisicion sismica e inversion sismica.
|
|
US10036818B2
(en)
|
2013-09-06 |
2018-07-31 |
Exxonmobil Upstream Research Company |
Accelerating full wavefield inversion with nonstationary point-spread functions
|
|
CN105474046A
(zh)
*
|
2013-09-09 |
2016-04-06 |
兰德马克绘图国际公司 |
产生虚拟生产测井工具剖面以用于改进历史拟合
|
|
CN104516017B
(zh)
*
|
2013-09-29 |
2017-06-20 |
中国石油化工股份有限公司 |
一种碳酸盐岩岩石物理参数地震反演方法
|
|
US9910189B2
(en)
|
2014-04-09 |
2018-03-06 |
Exxonmobil Upstream Research Company |
Method for fast line search in frequency domain FWI
|
|
MX2016013366A
(es)
|
2014-05-09 |
2017-01-26 |
Exxonmobil Upstream Res Co |
Metodos de busqueda de linea eficientes para la inversion de campo de ondas completo de multi-parametros.
|
|
CN104267443B
(zh)
*
|
2014-05-22 |
2016-08-31 |
中国地质科学院矿产资源研究所 |
基于反演模型的大地电磁场静位移校正方法
|
|
US10185046B2
(en)
|
2014-06-09 |
2019-01-22 |
Exxonmobil Upstream Research Company |
Method for temporal dispersion correction for seismic simulation, RTM and FWI
|
|
US10054714B2
(en)
|
2014-06-17 |
2018-08-21 |
Exxonmobil Upstream Research Company |
Fast viscoacoustic and viscoelastic full wavefield inversion
|
|
CN104091050B
(zh)
*
|
2014-06-24 |
2017-01-11 |
西安空间无线电技术研究所 |
一种确定非均匀场分布多载波微放电二次电子数目的方法
|
|
US10838092B2
(en)
|
2014-07-24 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Estimating multiple subsurface parameters by cascaded inversion of wavefield components
|
|
US10422899B2
(en)
|
2014-07-30 |
2019-09-24 |
Exxonmobil Upstream Research Company |
Harmonic encoding for FWI
|
|
US10319143B2
(en)
|
2014-07-30 |
2019-06-11 |
Exxonmobil Upstream Research Company |
Volumetric grid generation in a domain with heterogeneous material properties
|
|
US10386511B2
(en)
*
|
2014-10-03 |
2019-08-20 |
Exxonmobil Upstream Research Company |
Seismic survey design using full wavefield inversion
|
|
US10108762B2
(en)
*
|
2014-10-03 |
2018-10-23 |
International Business Machines Corporation |
Tunable miniaturized physical subsurface model for simulation and inversion
|
|
AU2015337108B2
(en)
|
2014-10-20 |
2018-03-01 |
Exxonmobil Upstream Research Company |
Velocity tomography using property scans
|
|
CA2963416A1
(en)
|
2014-10-31 |
2016-05-06 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
|
CA2963092C
(en)
|
2014-10-31 |
2021-07-06 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
|
CN105569650A
(zh)
*
|
2014-11-07 |
2016-05-11 |
中国石油化工股份有限公司 |
基于马尔科夫链数学模型的井间沉积序列研究方法
|
|
US20160146960A1
(en)
*
|
2014-11-21 |
2016-05-26 |
Schlumberger Technology Corporation |
Method of analysing a subsurface region
|
|
CN104459795A
(zh)
*
|
2014-12-08 |
2015-03-25 |
中国科学院南海海洋研究所 |
一种深度变密度的地壳伸展系数热校正重力异常反演方法
|
|
US11163092B2
(en)
|
2014-12-18 |
2021-11-02 |
Exxonmobil Upstream Research Company |
Scalable scheduling of parallel iterative seismic jobs
|
|
US10520618B2
(en)
|
2015-02-04 |
2019-12-31 |
ExxohnMobil Upstream Research Company |
Poynting vector minimal reflection boundary conditions
|
|
EP3256886B1
(en)
|
2015-02-13 |
2020-01-29 |
Exxonmobil Upstream Research Company |
Efficient and stable absorbing boundary condition in finite-difference calculations
|
|
AU2015383134B2
(en)
|
2015-02-17 |
2018-01-25 |
Exxonmobil Upstream Research Company |
Multistage full wavefield inversion process that generates a multiple free data set
|
|
US20160266275A1
(en)
*
|
2015-03-10 |
2016-09-15 |
Schlumberger Technology Corporation |
Methods for estimating formation parameters
|
|
CN106154323B
(zh)
*
|
2015-04-01 |
2018-08-17 |
中国石油化工股份有限公司 |
基于地震拓频处理的相控随机反演薄储层预测方法
|
|
US10345764B2
(en)
|
2015-04-27 |
2019-07-09 |
Baker Hughes, A Ge Company, Llc |
Integrated modeling and monitoring of formation and well performance
|
|
US10370941B2
(en)
|
2015-04-27 |
2019-08-06 |
Baker Hughes, A Ge Company, Llc |
Well performance index method for evaluating well performance
|
|
CA2983269A1
(en)
|
2015-04-30 |
2016-11-03 |
Schlumberger Canada Limited |
Method to estimate water saturation in electromagnetic measurements
|
|
CN106168679B
(zh)
*
|
2015-05-18 |
2018-03-09 |
中国石油化工股份有限公司 |
地震勘探采集记录极性的处理方法
|
|
SG11201708665VA
(en)
|
2015-06-04 |
2017-12-28 |
Exxonmobil Upstream Res Co |
Method for generating multiple free seismic images
|
|
US10838093B2
(en)
|
2015-07-02 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Krylov-space-based quasi-newton preconditioner for full-wavefield inversion
|
|
DK3121622T3
(da)
*
|
2015-07-24 |
2021-09-13 |
Bergen Teknologioverforing As |
Fremgangsmåde til forudsigelse af parametre af en geologisk formation
|
|
US11410067B2
(en)
|
2015-08-19 |
2022-08-09 |
D-Wave Systems Inc. |
Systems and methods for machine learning using adiabatic quantum computers
|
|
EP3338221A4
(en)
|
2015-08-19 |
2019-05-01 |
D-Wave Systems Inc. |
DISCRETE VARIANT AUTOENCODER SYSTEMS AND METHOD FOR MASCHINELL LEARNING BY ADIABATIC QUANTUM COMPUTERS
|
|
CN105182444B
(zh)
*
|
2015-09-09 |
2017-06-09 |
中国海洋石油总公司 |
一种高分辨率层序地层格架约束的地质统计学反演方法
|
|
EP3356862A1
(en)
|
2015-10-02 |
2018-08-08 |
ExxonMobil Upstream Research Company |
Q-compensated full wavefield inversion
|
|
CN108139498B
(zh)
|
2015-10-15 |
2019-12-03 |
埃克森美孚上游研究公司 |
具有振幅保持的fwi模型域角度叠加
|
|
US11100416B2
(en)
|
2015-10-27 |
2021-08-24 |
D-Wave Systems Inc. |
Systems and methods for degeneracy mitigation in a quantum processor
|
|
EP3171203B1
(en)
*
|
2015-11-18 |
2019-01-02 |
CGG Services SAS |
Adaptive ensemble-based method and device for highly-nonlinear problems
|
|
CN105589108B
(zh)
*
|
2015-12-14 |
2017-11-21 |
中国科学院电子学研究所 |
基于不同约束条件的瞬变电磁快速三维反演方法
|
|
WO2017106513A1
(en)
|
2015-12-18 |
2017-06-22 |
Baker Hughes Incorporated |
Integrated modeling and simulation of formation and well performance
|
|
DE112016005567T5
(de)
|
2016-02-16 |
2018-09-13 |
Halliburton Energy Services, Inc. |
Erzeugen eines Erdmodells anhand räumlicher Korrelationen von äquivalenten Erdmodellen
|
|
GB2547464B
(en)
|
2016-02-19 |
2022-01-05 |
Equinor Energy As |
Method of calculating radiogenic heat production
|
|
US10817796B2
(en)
|
2016-03-07 |
2020-10-27 |
D-Wave Systems Inc. |
Systems and methods for machine learning
|
|
US10768324B2
(en)
|
2016-05-19 |
2020-09-08 |
Exxonmobil Upstream Research Company |
Method to predict pore pressure and seal integrity using full wavefield inversion
|
|
WO2018058061A1
(en)
|
2016-09-26 |
2018-03-29 |
D-Wave Systems Inc. |
Systems, methods and apparatus for sampling from a sampling server
|
|
GB2566223A
(en)
|
2016-09-28 |
2019-03-06 |
Halliburton Energy Services Inc |
Electromagnetic reservoir monitoring systems and methods including earth
|
|
US10678967B2
(en)
*
|
2016-10-21 |
2020-06-09 |
International Business Machines Corporation |
Adaptive resource reservoir development
|
|
CN106522921B
(zh)
*
|
2016-11-10 |
2017-10-27 |
中国石油大学(北京) |
动态约束的随机建模方法及装置
|
|
US11531852B2
(en)
|
2016-11-28 |
2022-12-20 |
D-Wave Systems Inc. |
Machine learning systems and methods for training with noisy labels
|
|
EP3548929B1
(en)
*
|
2016-12-02 |
2023-03-29 |
ExxonMobil Technology and Engineering Company |
Method for estimating petrophysical properties for single or multiple scenarios from several spectrally variable seismic and full wavefield inversion products
|
|
HUE064459T2
(hu)
|
2016-12-23 |
2024-03-28 |
Exxonmobil Technology & Engineering Company |
Eljárás és rendszer stabil és hatékony tározó szimulációhoz stabilitási proxyk alkalmazásával
|
|
CN106932819B
(zh)
*
|
2017-02-23 |
2019-01-01 |
河海大学 |
基于各向异性马尔科夫随机域的叠前地震参数反演方法
|
|
CN106846480B
(zh)
*
|
2017-03-10 |
2021-03-19 |
天衍智(北京)科技有限公司 |
一种不确定性概率场属性分布建模方法与系统
|
|
WO2018217875A1
(en)
*
|
2017-05-23 |
2018-11-29 |
Schlumberger Technology Corporation |
Analogue facilitated seismic data interpretation system
|
|
GB2563048A
(en)
*
|
2017-06-01 |
2018-12-05 |
Equinor Energy As |
Method of calculating temperature and porosity of geological structure
|
|
AR112009A1
(es)
*
|
2017-06-08 |
2019-09-11 |
Total Sa |
Un método para adquirir un conjunto de datos sísmicos en una región de interés
|
|
US10871590B2
(en)
*
|
2017-06-16 |
2020-12-22 |
Pgs Geophysical As |
Electromagnetic data inversion
|
|
EP3669211B1
(en)
*
|
2017-08-15 |
2022-04-20 |
ExxonMobil Upstream Research Company |
Reservoir materiality bounds from seismic inversion
|
|
US10928536B2
(en)
|
2017-12-07 |
2021-02-23 |
Saudi Arabian Oil Company |
Mapping chemostratigraphic signatures of a reservoir with rock physics and seismic inversion
|
|
WO2019118644A1
(en)
|
2017-12-14 |
2019-06-20 |
D-Wave Systems Inc. |
Systems and methods for collaborative filtering with variational autoencoders
|
|
US11163080B2
(en)
|
2018-05-18 |
2021-11-02 |
Repsol Exploración, S.A |
Computer implemented method for generating a subsurface rock and/or fluid model of a determined domain
|
|
US11386346B2
(en)
|
2018-07-10 |
2022-07-12 |
D-Wave Systems Inc. |
Systems and methods for quantum bayesian networks
|
|
US11461644B2
(en)
|
2018-11-15 |
2022-10-04 |
D-Wave Systems Inc. |
Systems and methods for semantic segmentation
|
|
WO2020122892A1
(en)
*
|
2018-12-12 |
2020-06-18 |
Halliburton Energy Services, Inc. |
Borehole gravity analysis for reservoir management
|
|
US11468293B2
(en)
|
2018-12-14 |
2022-10-11 |
D-Wave Systems Inc. |
Simulating and post-processing using a generative adversarial network
|
|
US11900264B2
(en)
|
2019-02-08 |
2024-02-13 |
D-Wave Systems Inc. |
Systems and methods for hybrid quantum-classical computing
|
|
US11625612B2
(en)
|
2019-02-12 |
2023-04-11 |
D-Wave Systems Inc. |
Systems and methods for domain adaptation
|
|
US11268352B2
(en)
*
|
2019-04-01 |
2022-03-08 |
Saudi Arabian Oil Company |
Controlling fluid volume variations of a reservoir under production
|
|
US12093787B2
(en)
|
2019-04-10 |
2024-09-17 |
D-Wave Systems Inc. |
Systems and methods for improving the performance of non-stoquastic quantum devices
|
|
US11460595B2
(en)
|
2019-04-18 |
2022-10-04 |
Saudi Arabian Oil Company |
Unified continuous seismic reservoir monitoring
|
|
EP3990949B1
(en)
|
2019-06-28 |
2025-05-21 |
Services Pétroliers Schlumberger |
Field data acquisition
|
|
GB2600297B
(en)
*
|
2019-07-23 |
2023-07-19 |
Landmark Graphics Corp |
Stochastic realization of parameter inversion in physics-based empirical models
|
|
US12078772B2
(en)
|
2019-07-29 |
2024-09-03 |
Landmark Graphics Corporation |
Gas saturation distribution monitoring in hydrocarbon reservoir
|
|
CN110826180B
(zh)
*
|
2019-09-29 |
2020-09-18 |
北京宇航系统工程研究所 |
一种面向扰动引力场应用的精细计算方法及系统
|
|
US11372123B2
(en)
|
2019-10-07 |
2022-06-28 |
Exxonmobil Upstream Research Company |
Method for determining convergence in full wavefield inversion of 4D seismic data
|
|
CN111175824B
(zh)
*
|
2020-01-06 |
2022-07-12 |
中国石油化工股份有限公司 |
岩相驱动下的时频联合域地震反演方法
|
|
US12299593B2
(en)
|
2020-02-05 |
2025-05-13 |
D-Wave Systems Inc. |
Systems and methods for optimizing annealing parameters
|
|
US11348218B2
(en)
|
2020-03-30 |
2022-05-31 |
Halliburton Energy Services, Inc. |
Hybrid interpretation approach for borehole imaging
|
|
CN112578458B
(zh)
*
|
2020-10-19 |
2022-11-04 |
中国石油大学(华东) |
叠前弹性阻抗随机反演方法、装置、存储介质及处理器
|
|
CN112363243A
(zh)
*
|
2020-10-26 |
2021-02-12 |
中国石油天然气集团有限公司 |
预测页岩油优质储层的方法、装置、计算机设备及介质
|
|
CN112965103B
(zh)
*
|
2021-02-09 |
2022-08-23 |
中国石油大学(华东) |
一种多重孔隙储层叠前地震概率化多道反演方法
|
|
CN113159321B
(zh)
*
|
2021-04-07 |
2022-05-20 |
中南大学 |
重力约束下断裂面形态的贝叶斯推断方法
|
|
WO2022228701A1
(en)
|
2021-04-30 |
2022-11-03 |
Zed Depth Exploration Data Gmbh |
Geophysical data-space mining using a trans-dimensional algorithm
|
|
WO2022245555A1
(en)
*
|
2021-05-21 |
2022-11-24 |
Exxonmobil Upstream Research Company |
Method and system for rock physics constrained data integration of elastic fwi properties and seismic stacks
|
|
CN113436690A
(zh)
*
|
2021-05-25 |
2021-09-24 |
中南建筑设计院股份有限公司 |
基于有限数据的横观各向同性材料参数随机样本生成方法
|
|
CN113221228B
(zh)
*
|
2021-06-04 |
2022-09-16 |
中国电建集团成都勘测设计研究院有限公司 |
水电站地下洞群围岩力学参数反演方法
|
|
CN114200537B
(zh)
*
|
2021-12-13 |
2023-12-22 |
北京环境特性研究所 |
一种卫星下视地球的探测边界确定方法
|
|
CN116338772B
(zh)
*
|
2021-12-23 |
2026-03-27 |
中国石油天然气集团有限公司 |
一种地震空间结构参数预测方法、装置、设备及可读介质
|
|
US12547945B2
(en)
|
2022-03-16 |
2026-02-10 |
Saudi Arabian Oil Company |
Dew point pressure prediction using isothermal constant composition expansion and artificial intelligence
|
|
CN114861565B
(zh)
*
|
2022-05-07 |
2025-10-03 |
广东省重工建筑设计院有限公司 |
空气隔振系统的确定方法及其仿真模型的建立方法
|
|
CN117669116A
(zh)
*
|
2022-08-22 |
2024-03-08 |
中国石油化工股份有限公司 |
基于构形建模的贝叶斯随机反演方法、装置、设备及介质
|
|
US12535606B2
(en)
|
2022-12-19 |
2026-01-27 |
Saudi Arabian Oil Company |
Seismic inversion downscaling and extrapolation for generation of seismic images
|
|
CN117075212B
(zh)
*
|
2023-10-16 |
2024-01-26 |
吉林大学 |
一种隧道磁共振裂隙结构成像方法
|
|
US20250284015A1
(en)
*
|
2024-03-08 |
2025-09-11 |
Chevron U.S.A. Inc. |
Data-driven depth uncertainty estimation using seismic velocity and anisotropy tradeoffs
|
|
CN118520373B
(zh)
*
|
2024-06-13 |
2025-01-24 |
济南大学 |
一种基于点云的mcmc道路不平度检测方法
|
|
US20260111830A1
(en)
*
|
2024-10-23 |
2026-04-23 |
Honeywell International Inc. |
Input evaluations through model inversion
|
|
CN119986830B
(zh)
*
|
2025-04-15 |
2025-06-10 |
中南大学 |
一种基于图像压缩的大地电磁概率反演方法
|
|
CN120931849B
(zh)
*
|
2025-07-30 |
2026-01-06 |
中国自然资源航空物探遥感中心 |
地球物理反演结果中目标体定位误差的切片量化分析方法
|
|
CN120612391B
(zh)
*
|
2025-08-08 |
2025-10-17 |
山东师范大学 |
基于局部mcmc抽样稀疏角度ct图像反演方法及系统
|