BRPI1007431A8 - Aparelho de suporte de operação, método de suporte de operação, e programa de computador - Google Patents
Aparelho de suporte de operação, método de suporte de operação, e programa de computadorInfo
- Publication number
- BRPI1007431A8 BRPI1007431A8 BRPI1007431A BRPI1007431A BRPI1007431A8 BR PI1007431 A8 BRPI1007431 A8 BR PI1007431A8 BR PI1007431 A BRPI1007431 A BR PI1007431A BR PI1007431 A BRPI1007431 A BR PI1007431A BR PI1007431 A8 BRPI1007431 A8 BR PI1007431A8
- Authority
- BR
- Brazil
- Prior art keywords
- proficiency
- task
- worker
- operation support
- time
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Program-control systems
- G05B19/02—Program-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/451—Execution arrangements for user interfaces
- G06F9/453—Help systems
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06398—Performance of employee with respect to a job function
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Forestry; Mining
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/35—Nc in input of data, input till input file format
- G05B2219/35494—Online documentation, manual, procedures, operator, user guidance, assistance
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/28—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture specially adapted for farming
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Software Systems (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Automation & Control Theory (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Human Computer Interaction (AREA)
- Animal Husbandry (AREA)
- Agronomy & Crop Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Marine Sciences & Fisheries (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- User Interface Of Digital Computer (AREA)
Abstract
APARELHO DE SUPORTE DE OPERAÇÃO, MÉTODO DE SUPORTE DE OPERAÇÃO, E PROGRAMA DE COMPUTADOR. A presente invenção refere-se a uma proficiência de um trabalhador com relação a uma tarefa a ser executada que é obtida de um DB de proficiência (120) que armazena as proficiências de trabalhadores com relação às tarefas, para cada uma das tarefas realizadas na operação de equipamento de fabricação. Um tempo de base de orientação (314) determinado com base em uma programação de operação é controlado correspondendo à proficiência do trabalhador, um tempo de controle de orientação (334) que corresponde à proficiência do trabalhador é determinado, e uma orientação é emitida no tempo de controle de orientação (334). A proficiência do trabalhador com relação à tarefa é corrigida com base nas informações de gravação de tarefa (340) que incluem um conteúdo de tarefa e um tempo de tarefa de uma tarefa executada pelo trabalhador e no tempo de controle de orientação (334), e a proficiência do trabalhador com relação à tarefa armazenada no DB de proficiência (120) é atualizada.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009277795 | 2009-12-07 | ||
| PCT/JP2010/071578 WO2011070967A1 (ja) | 2009-12-07 | 2010-12-02 | 操業支援装置、操業支援方法およびコンピュータプログラム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| BRPI1007431A2 BRPI1007431A2 (pt) | 2018-03-06 |
| BRPI1007431A8 true BRPI1007431A8 (pt) | 2018-04-03 |
Family
ID=44145512
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BRPI1007431A BRPI1007431A8 (pt) | 2009-12-07 | 2010-12-02 | Aparelho de suporte de operação, método de suporte de operação, e programa de computador |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US8527315B2 (pt) |
| EP (1) | EP2407844A4 (pt) |
| JP (1) | JP4795498B2 (pt) |
| KR (1) | KR101284505B1 (pt) |
| CN (1) | CN102301294A (pt) |
| BR (1) | BRPI1007431A8 (pt) |
| WO (1) | WO2011070967A1 (pt) |
Families Citing this family (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20140025441A1 (en) * | 2012-07-19 | 2014-01-23 | Sap Ag | Peer support gamification by application knowledge scoring in social networks |
| JP2014178932A (ja) * | 2013-03-15 | 2014-09-25 | Omron Corp | 情報処理装置、および進捗管理方法 |
| JP6124334B2 (ja) * | 2013-03-26 | 2017-05-10 | Necソリューションイノベータ株式会社 | 植物栽培システム |
| US20140304001A1 (en) * | 2013-04-05 | 2014-10-09 | Lg Cns Co., Ltd. | Apparatus and method for patient care documentation |
| JP6349117B2 (ja) * | 2014-03-24 | 2018-06-27 | 株式会社Fuji | オペレータの作業意欲の向上を支援するシステム |
| JP6464358B2 (ja) * | 2014-10-30 | 2019-02-06 | パナソニックIpマネジメント株式会社 | 作業者支援システム、及び作業者支援方法、並びに部品実装装置 |
| KR102047500B1 (ko) | 2014-11-27 | 2019-11-21 | 삼성전자주식회사 | 사용자의 할일 목록을 제공하는 시스템 및 방법 |
| JP2017033457A (ja) * | 2015-08-05 | 2017-02-09 | 富士通株式会社 | スケジューリング支援方法、情報処理装置およびスケジューリング支援プログラム |
| JP6304178B2 (ja) * | 2015-09-02 | 2018-04-04 | 横河電機株式会社 | 機器システムおよび操作提案方法 |
| JP6733222B2 (ja) * | 2016-03-04 | 2020-07-29 | 富士通株式会社 | 情報処理装置、コンテンツ管理方法及びコンテンツ管理プログラム |
| DE102017108710A1 (de) * | 2016-04-26 | 2017-10-26 | Jtekt Corporation | Arbeitsanweisungssystem |
| JP7014643B2 (ja) * | 2018-03-02 | 2022-02-01 | 株式会社日立製作所 | 情報収集システム |
| JP7070252B2 (ja) * | 2018-08-31 | 2022-05-18 | オムロン株式会社 | パフォーマンス計測装置、パフォーマンス計測方法及びパフォーマンス計測プログラム |
| JP7026890B2 (ja) * | 2018-12-26 | 2022-03-01 | オムロン株式会社 | 動作分析装置、動作分析方法及び動作分析プログラム |
| CN111381629B (zh) * | 2018-12-29 | 2024-05-14 | 玳能本股份有限公司 | 作业支援系统及作业支援方法 |
| JP2020149482A (ja) * | 2019-03-14 | 2020-09-17 | 株式会社ニフコ | 施工支援装置及び施工支援プログラム |
| JP6927422B1 (ja) * | 2019-12-18 | 2021-08-25 | 東芝三菱電機産業システム株式会社 | 圧延操業支援システム |
| US11789759B2 (en) * | 2020-08-12 | 2023-10-17 | Baton Simulations | Method, system and apparatus assisting a user of a virtual environment |
| EP4016376A1 (en) * | 2020-12-18 | 2022-06-22 | Toyota Jidosha Kabushiki Kaisha | Computer-implemented process monitoring method |
| JP7368773B2 (ja) * | 2021-10-01 | 2023-10-25 | ダイキン工業株式会社 | 情報処理システム、情報処理方法、情報処理プログラム |
| DE112022008039T5 (de) * | 2022-11-24 | 2025-11-06 | Mitsubishi Electric Corporation | Termindaten-Verwaltungssystem, Termindaten-Verwaltungsverfahren, Termindaten-Verwaltungsvorrichtung und Programm |
Family Cites Families (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS63291111A (ja) * | 1987-05-25 | 1988-11-29 | Fujitsu Ltd | 操作ガイダンス出力制御方法 |
| US20020065702A1 (en) * | 2000-08-25 | 2002-05-30 | Caulfield David L. | Real-time production tracking and scheduling system |
| JP2002224922A (ja) * | 2001-01-31 | 2002-08-13 | Hitachi Ltd | 作業指導システムおよび作業指導用プログラム |
| JP2003271225A (ja) * | 2002-03-18 | 2003-09-26 | Tohoku Ricoh Co Ltd | セル生産作業者支援システム |
| JP2004310210A (ja) * | 2003-04-02 | 2004-11-04 | Nissan Motor Co Ltd | 作業支援システム |
| US7571111B2 (en) * | 2004-03-29 | 2009-08-04 | United Parcel Service Of America, Inc. | Computer system for monitoring actual performance to standards in real time |
| JP2006127224A (ja) | 2004-10-29 | 2006-05-18 | Nippon Steel Corp | 操業支援装置、操業支援方法、コンピュータプログラム及び記録媒体 |
| US7596507B2 (en) * | 2005-06-10 | 2009-09-29 | At&T Intellectual Property, I,L.P. | Methods, systems, and storage mediums for managing accelerated performance |
| US20070192157A1 (en) * | 2006-02-15 | 2007-08-16 | Elizabeth Ann Gooch | Interactive system for managing, tracking and reporting work and staff performance in a business environment |
| JP2007301679A (ja) * | 2006-05-11 | 2007-11-22 | Sharp Corp | 作業指導システム |
| JP2008009834A (ja) | 2006-06-30 | 2008-01-17 | Iwai Kikai Kogyo Co Ltd | プラント作業支援システム |
| JP5015741B2 (ja) | 2006-11-29 | 2012-08-29 | 株式会社神戸製鋼所 | 提示情報決定システム、提示情報決定方法および提示情報決定プログラム |
| JP4351725B2 (ja) | 2007-07-23 | 2009-10-28 | 新日本製鐵株式会社 | 操業支援装置、操業支援システム及びコンピュータプログラム |
| US20090192843A1 (en) * | 2008-01-29 | 2009-07-30 | Ayala John F | Method and system for time-standard development |
| JP4954936B2 (ja) | 2008-04-21 | 2012-06-20 | 新日本製鐵株式会社 | 操業支援装置、操業支援方法及びプログラム |
-
2010
- 2010-12-02 WO PCT/JP2010/071578 patent/WO2011070967A1/ja not_active Ceased
- 2010-12-02 KR KR1020117014115A patent/KR101284505B1/ko not_active Expired - Fee Related
- 2010-12-02 JP JP2011502580A patent/JP4795498B2/ja not_active Expired - Fee Related
- 2010-12-02 US US13/132,848 patent/US8527315B2/en not_active Expired - Fee Related
- 2010-12-02 CN CN2010800062084A patent/CN102301294A/zh active Pending
- 2010-12-02 BR BRPI1007431A patent/BRPI1007431A8/pt not_active Application Discontinuation
- 2010-12-02 EP EP10835888.8A patent/EP2407844A4/en not_active Withdrawn
Also Published As
| Publication number | Publication date |
|---|---|
| US20120004952A1 (en) | 2012-01-05 |
| KR101284505B1 (ko) | 2013-07-16 |
| US8527315B2 (en) | 2013-09-03 |
| BRPI1007431A2 (pt) | 2018-03-06 |
| EP2407844A1 (en) | 2012-01-18 |
| CN102301294A (zh) | 2011-12-28 |
| WO2011070967A1 (ja) | 2011-06-16 |
| JP4795498B2 (ja) | 2011-10-19 |
| KR20110091771A (ko) | 2011-08-12 |
| JPWO2011070967A1 (ja) | 2013-04-22 |
| EP2407844A4 (en) | 2013-06-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| BRPI1007431A8 (pt) | Aparelho de suporte de operação, método de suporte de operação, e programa de computador | |
| BR112013028539A2 (pt) | método e aparelho para controlar um veículo, e, produto de programa de computador para controlar um veículo | |
| BR112014018417A8 (pt) | Aparelho e método de processamento de informação, e, mídia legível pro computador não temporária | |
| BR112013032179A2 (pt) | método e sistema para reduzir carga elétrica em uma instalação com automação predial e meio legível por computador com instruções para controlar a automação predial | |
| BR112018006456A2 (pt) | dispositivo de apresentação de informações e método de apresentação de informações | |
| BR112015008933A2 (pt) | método e sistema para determinar pelo menos uma propriedade de uma junta, método para determinar pelo menos uma propriedade de uma junta de um manipulador, programa de computador e produto de programa de computador | |
| BR112017026293A2 (pt) | sistema para um sistema de construção de sites implementado em um servidor e método para um sistema de construção de sites implementado em um servidor | |
| BR112014029477A2 (pt) | sistema de fornecimento de assistência com relatórios; estação de trabalho; método de fornecimento de assistência com relatórios e produto de programa de computador | |
| BRPI0905206A8 (pt) | Aparelho e método de processamento de informação | |
| BR112016014491A2 (pt) | Dispositivo e método de controle, e, programa de computador | |
| BR112015025150A2 (pt) | método para gerar e exibir uma previsão de curtíssimo prazo em incrementos de tempo selecionáveis | |
| BR112018070530A2 (pt) | processo e dispositivo para planejamento e/ou controle e/ou simulação da operação de uma máquina de construção | |
| BR112015012539A2 (pt) | dispositivo de exibição e método de controle do mesmo | |
| BR112014007679A2 (pt) | sistemas e métodos para a implementação de fluxo de trabalho médico | |
| EP4283596A3 (en) | Learning management system for a real-time simulated virtual reality welding training environment | |
| BR112013018835A2 (pt) | ventilação controlada pelo paciente | |
| BR112012012463A2 (pt) | método e aparelho para apresentação de segmentos de mídia | |
| BR112014000682A2 (pt) | comunicações digitais baseada em sistema de soldagem de controle de arco e método | |
| FI20115466A7 (fi) | Menetelmä ja laitteisto tartuntayksikön liikuttamiseksi ja asemoimiseksi sekä tartuntayksiköllä varustettu robotti | |
| BR112015003760A2 (pt) | dispositivo, sistema e método para controlar uma operação | |
| BR112013007127A2 (pt) | dispositivo e método de transliteração, e, mídia de gravação legível por computador | |
| BR112013001383A2 (pt) | processo par apresentação de conteúdo durante operações em modos de exibição alternativos | |
| BRPI0717497A2 (pt) | Procedimentos de controle funcional de uma central inercial de um veículo móvel | |
| BR112016028995A2 (pt) | método de calibração para um rastreador ocular, dispositivo de calibração para um rastreador ocular, equipamento de controle ocular, método de operação de um equipamento de controle ocular e meios legíveis por um computador | |
| BR112013030089A2 (pt) | sistema de processamento de informação, método de controle de direito de acesso, aparelho de processamento de informação e método de controle e programa de controle destes |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| B25D | Requested change of name of applicant approved |
Owner name: NIPPON STEEL AND SUMITOMO METAL CORPORATION (JP) |
|
| B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
| B25D | Requested change of name of applicant approved |
Owner name: NIPPON STEEL CORPORATION (JP) |
|
| B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
| B11B | Dismissal acc. art. 36, par 1 of ipl - no reply within 90 days to fullfil the necessary requirements |