CA1237705A - Manufacture of concrete rail ties, and devices used for said process - Google Patents

Manufacture of concrete rail ties, and devices used for said process

Info

Publication number
CA1237705A
CA1237705A CA000410927A CA410927A CA1237705A CA 1237705 A CA1237705 A CA 1237705A CA 000410927 A CA000410927 A CA 000410927A CA 410927 A CA410927 A CA 410927A CA 1237705 A CA1237705 A CA 1237705A
Authority
CA
Canada
Prior art keywords
mold
concrete
elements
immobilization
railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CA000410927A
Other languages
French (fr)
Inventor
Frans Matthynssens
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pvba Betonkonstruktie Vd Hemiksem PVBA
Original Assignee
Pvba Betonkonstruktie Vd Hemiksem PVBA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pvba Betonkonstruktie Vd Hemiksem PVBA filed Critical Pvba Betonkonstruktie Vd Hemiksem PVBA
Application granted granted Critical
Publication of CA1237705A publication Critical patent/CA1237705A/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/28Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone
    • E01B3/36Composite sleepers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/005Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with anchoring or fastening elements for the shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

Procédé de fabrication de traverses de chemin de fer en béton armé, comprenant le montage, à travers d'ouverture prévues dans le fond du moule, des parties ou éléments des serre-rails qui servent à supporter l'armature supérieure de la traverse, et l'immobilisation de ces éléments en dehors du moule. Par la suite l'introduction à l'intérieur du moule d'une tige de liaison par une ouverture de la paroi du moule, le remplissage du moule en béton, et l'incorporation d'une armature inférieure dans le béton, et la vibration du béton. Et un élément employé dans la mise en oeuvre de ce procédé.Method for manufacturing railway sleepers in reinforced concrete, comprising mounting, through an opening provided in the bottom of the mold, parts or elements of rail clamps which serve to support the upper reinforcement of the sleeper, and immobilization of these elements outside the mold. Subsequently the introduction inside the mold of a connecting rod by an opening of the mold wall, the filling of the concrete mold, and the incorporation of a lower frame in the concrete, and the vibration concrete. And an element used in the implementation of this process.

Description

'7~

La présente inventlon a trait à un procédé de fabrication de traverses de chemin de fer en béton arrné, ainsi qu'à des traverses de chemin de fer en béton arrné Eabriquées par ledit procédé, et, en particulier, à unprocédé de fabrication de traverses en béton, dans lesquelles est incorporée lors du bétonnage une partie d'un dispositif de serrage combiné pour la fixation de rails.
On sait que la fabrication des traverses de chemin de fer en béton armé s'effectue à l'aide d'un moule, dans lequel sont disposées et dûment immobilisées les susdites parties du dispositif de serrage concerné, après quoi es-t disposée dans la partie inférieure du moule au moins l'arma-ture supérieure de la traverse en béton à réaliser, armature dont l'immobilisation s'effectue à l'aide d'élément de support provisoires, qui sont introduits à travers la paroi du moule et qui sont enlevés seulement au stade de vibration du béton, voire à la fin de ce stade, dans le double but, d'une part, de maintenir cette armature au niveau requis et, d'autre part, d'assurer le remplissage des creux formés par ~0 ces éléments de support à la fin de la vibration.
Inutile de souliyner que ce procédé connu est peu pratique et, en outre, peu economique, par suite non seulement des multiples interventions qu'il requiert, mais également de l'usure à laquelle sont soumis ces éléments de support mo-~5 biles dans le béton.
Des essais ont déjà été faits pour éviter ce procédéconnu et en supprimer donc les inconvénients susmentionnés en munissant le fond du moule d'éléments d'espacement de conception très simple, faits d'un matériau quelconque appro-prié et destinés à immobiliser les éléments de l'armatureaux écarts mutuels voulus, à l'exemple de la constructions routière. Cette solution présente touteEois l'inconvénient que ces éléments d'espacement restent visibles après la finition de la traverse et permettent, dans certains cas, la ~L~3~'7()~

pénétration de l'humidité jusqu'à l'armature avec toutes les conséquences néfastes qui s'ensuivent, à savoir la corrosion de l'armature et, par conséquent, un affaiblissement inadmis-sible de la traverse ainsi fabriquée.
Or, la présente invention concerne un procédé et un dispositif pour sa mise en oeuvre qui se prêtent à la sup-pression des inconvénients des procédés ou dispositifs connus.
Selon la présente invention, il est prévu un pro-cédé de fabrication de traverses de chemin de fer en béton armé, comprenant:
- le montage, à travers des ouvertures prévues dans le fond d'un moule, des éléments des serre-rails qui servent à supporter une armature supérieure de la traverse;
- l'immobilisation de ces éléments en dehors du moule;
- l'introduction à l'intérieur du moule d'une tige de liaison par une ouverture de la paroi du moule;
- le remplissage du moule de béton, - l'incorporation d'une armature inférieure dans le béton, et - la vibration dudit béton.
Selon la présente invention, il est également prévu un procédé de fabrication de traverses de chemin de fer en béton armé, comprenant:
- le montage à travers des ouvertures du fond du moule, des éléments d'un serre-rails auxquels est au préala-ble fixée par soudage une armature supérieure de la traverse, - l'immobilisation de ces éléments en dehors du moule;
- l'introduction à l'intérieur du moule d'une tige de liaison par une ouverture de la paroi du moule, - le remplissage du moule de béton, ' " "

, . .
:

~3~'7~)5 - l'incorporation d'une armature inférieure dans le béton, et - la vibration du béton.
Il est possible et avantageux, après l'irnmo-bilisation des éléments en dehors du moule de disposer d'une armature intermédiaire de renforcement sur l'armature supérieure.
Selon la présente invention il est également prevu une traverse de chemin de fer en béton armé, compre-1~ nant des éléments, chaque élement incluant:
- une partie en forme de U incorporée dans le béton, l'autre partie de cet élément formant des serre-rails, et - des appuis ,pratiqués sur les deux branches de la forme en U pour supporter des armatures de la tra-verse.
De préférence, cette partie en forme de U
est en acier de manière qu'au moins l'armature supérieure est fixée de manière appropriée, par exemple par soudage, à ces éléments.
De préférence, on peut appliquer au moins sur les parties coulées dans le béton des éléments serre-rails, une couche d'une peinture formant un isolateur élec-trique, afin d'éviter tout contact électrique desdites ~5 parties des éléments serre-rails avec soit l'armement du béton, soit la tige de liaison entre les blocs en béton, de la traverse de chemin de fer.
Il est évident qu'on obtient le même résultat en enrobant la susdite tige de liaison d'un revê-temen-t d'isolation électrique.
L'application d'un revêtement isolateur évite, normalement, l'emploi d'une plaque d'isolation, généralement en une matière plastique, entre le rail et le crapand élas-tique du serre-rail.
Par conséquent selon l'invention, on introduit dans un moule, dont le fond présente deux ouvertures avec lesquelles ~ .

:.

,~

7 7~) peuvent coopérer des parties, normalement saillantes de la traverse, des éléments inférieurs d'un serre-rail, afin d'as-surer, de manière aussi simple qu'efficace à l'ex-térieur du moule, leur immobilité dans lesdites ouvertures.
Ces éléments inférieurs des serre-rails sont pour-vus de, et mutuellement solidarisés par, l'armature supérieure de la traverse à fabriquer de manière a maintenir ainsi auto-matiquement l'écartement requis de cette armature par rapport au fond du moule.
La fixation de ladite armature avec lesdites parties inférieures des serre--rails est obtenue par soudage, de pré-férence par soudage par points.
Sur cette armature supérieure est ensuite placée une armature intermédiaire hélicoidale ou similaire, à travers laquelle est insérée une tige de liaison introduite par une ouverture de la paroi concernée du moule et servant à relier deux parties réalisées dans le moule et mutuellement distantes de la valeur voulue.
Le béton coulé dans le moule sera dûment vibré, après quoi une armature inférieure pourra, le cas échéant, y être noyée.
On voit, de ce qui précède, qu'on obtient ainsi non seulement un procédé de fabrication de traverses de chemin de fer en béton armé particulièrement simple et efficace, mais également un moule de bétonnage plus simple et pratique, dans lequel l'armature supérieure est dûment immobilisée, sans le moindre risque de déplacement et en des circonstances optimales, à la distance voulue du fond du moule.
La fixation de l'armature supérieure par soudure par point auxdits éléments serre-rail en dehors du moule peut, par exemple, s'effectuer simplement en plaçant ces éléments dans un support provisoire à côté d'appuis por-tant l'armature à la hauteur requise par rapport auxdits éléments pendant le soudage par points.

' ' 7~5 Afin de mieux faire ressortir les caractéristiques de l'invention, quelques exemples d'exécution sont décrits ci-après avec référence aux dessins annexés dans lesquels:
- les figures 1 et 2 représentent un moule servant à la mise en oeuvre du procédé;
- les figures 3 et 4 représentent le moule après la disposition des armatures;
- les figures 5 et 6 représentent un élément selon l'invention;
- les figures 7 et 8 représentent partiellement une traverse fabriquée conformément au procédé de l'invention.
Les figures 1 et 2 représentent un moule 1 pourvu d'ouvertures 2 et 3 dans lesquelles sont disposées des par-ties 4 des éléments inférieurs 5 d'un serre-rails. Ces élé-ments 5 sont pourvus d'un collet 6 pour assurer leur immobi-lité dans les ouvertures 2 et 3. Les éléments 5 sont également fixés en dehors du moule 1 de manière non repré-sentée.
Ensuite, l'armature supérieure 7 est disposée sur des appuis 8 et 9 des éléments 5. Ces derniers 5 peuvent présenter également d'autres appuis 10 et 11 servant à sou-tenir des armatures pxésentant une autre forme. Une armature hélicoidale intermédiaire 12 est alors placée sur l'armature supérieure 7, une tige de liaison 13 est introduite par une ouverture 14 et le moule est rempli de béton, après quoi une armature inférieure 15 peut y etre noyée.
Selon les figures 5 à 8, les éléments 5 présentent des appuis en forme d'encoches 16 à 19 dans lesquelles pren-nent les parties correspondantes de l'armature 7.
Il va sans dire que l'invention ne se limite pas à
l'exemple de la mise en oeuvre décrite précédemment, mais en prévoit toutes sortes de variations, d'additions et d'adapta-tions à condition que soit respecté son principe général et que ne soient pas dépassées ses limites, définies par les re-vendications formulées ci-après.

: ' ' ' ', .
'7 ~

The present invention relates to a method of manufacture of railway sleepers in arrne concrete, as well as railroad ties made of arrné concrete Made by said process, and, in particular, to a process for manufacturing concrete sleepers, in which is incorporated during the concreting part of a combined clamping device for fixing rails.
We know that the manufacture of railway sleepers of reinforced concrete iron is carried out using a mold, in which are arranged and duly immobilized the above parts of the affected clamping device, after which are arranged in the lower part of the mold at least the arma-upper structure of the concrete sleeper to be made, reinforcement whose immobilization is carried out using element of temporary supports, which are introduced through the wall from the mold and which are removed only at the vibration stage concrete, or even at the end of this stage, for the double purpose, on the one hand, to maintain this reinforcement at the required level and, on the other hand, to ensure the filling of the hollows formed by ~ 0 these support elements at the end of the vibration.
Needless to point out that this known process is little practical and, moreover, not very economical, therefore not only multiple interventions it requires, but also the wear to which these moderate support elements are subjected ~ 5 biles in concrete.
Attempts have already been made to avoid this known procedure and therefore eliminate the aforementioned drawbacks by providing the bottom of the mold with spacing elements very simple design, made of any suitable material prayed and intended to immobilize the elements of the armature desired mutual gaps, with the example of constructions road. This solution has all the disadvantages that these spacers remain visible after the finish of the crosspiece and allow, in some cases, the ~ L ~ 3 ~ '7 () ~

penetration of moisture to the frame with all harmful consequences which follow, namely corrosion of the reinforcement and therefore an inadmissible weakening sible of the sleeper thus manufactured.
The present invention relates to a method and a device for its implementation which lend themselves to the sup-pressure of the disadvantages of known methods or devices.
According to the present invention, there is provided a pro-assigned to the manufacture of concrete railway sleepers armed, comprising:
- mounting, through planned openings in the bottom of a mold, elements of the rail clamps which are used to support an upper frame of the crosspiece;
- the immobilization of these elements outside the mold;
- the introduction inside the mold of a rod connecting through an opening in the mold wall;
- filling the concrete mold, - the incorporation of a lower frame in the concrete, and - the vibration of said concrete.
According to the present invention, there is also provided a process for manufacturing railway sleepers in reinforced concrete, comprising:
- mounting through openings at the bottom of the mold, elements of a rail clamp which is previously ble fixed by welding an upper reinforcement of the cross member, - the immobilization of these elements outside the mold;
- the introduction inside the mold of a rod of connection by an opening of the wall of the mold, - filling the concrete mold, '""

, . .
:

~ 3 ~ '7 ~) 5 - the incorporation of a lower frame in concrete, and - concrete vibration.
It is possible and advantageous, after the irnmo-mobilization of elements outside the mold to have an intermediate reinforcement on the reinforcement superior.
According to the present invention it is also provided with a reinforced concrete railway sleeper, including 1 ~ nant of the elements, each element including:
- a U-shaped part incorporated in concrete, the other part of this element forming greenhouse rails, and - supports, practiced on the two branches of the U-shape to support reinforcements of the tra-pours.
Preferably, this U-shaped part is made of steel so that at least the upper frame is fixed appropriately, for example by welding, to these elements.
Preferably, at least one can apply on the parts cast in concrete of the clamping elements rails, a layer of paint forming an electrical insulator stick, in order to avoid any electrical contact of said ~ 5 parts of the rail-holding elements with either the arming of the concrete, i.e. the connecting rod between the concrete blocks, of the railway sleeper.
Obviously we get the same result by coating the above-mentioned connecting rod with a coating electrical insulation.
The application of an insulating coating avoids, normally the use of an insulating plate, generally in a plastic material, between the rail and the elastic frame rail clamp tick.
Therefore according to the invention, we introduce in a mold, the bottom of which has two openings with which ~.

:.

, ~

7 7 ~) may cooperate with the normally protruding parts of the crosspiece, lower elements of a rail clamp, in order to safe, as simple as it is effective outside the mold, their immobility in said openings.
These lower elements of the rail clamps are for-seen from, and mutually secured by, the upper frame of the crosspiece to be manufactured so as to maintain matically the required spacing of this frame relative to at the bottom of the mold.
The fixing of said frame with said parts rail clamps is obtained by welding, pre-reference by spot welding.
On this upper frame is then placed a helical intermediate frame or the like, through which is inserted a connecting rod introduced by a opening of the relevant wall of the mold and used to connect two parts made in the mold and mutually distant of the desired value.
The concrete poured into the mold will be duly vibrated, after which a lower frame may, if necessary, to be drowned.
We see, from the above, that we thus obtain not only a process for manufacturing railway sleepers iron in reinforced concrete particularly simple and effective, but also a simpler and more practical concreting mold, in which the upper frame is duly immobilized, without the slightest risk of displacement and in circumstances optimal, at the desired distance from the bottom of the mold.
Fixing the upper frame by welding per point to said rail clamp elements outside the mold can, for example, be done simply by placing these elements in a temporary support next to supports both the reinforcement at the required height with respect to said elements during spot welding.

'' '' 7 ~ 5 In order to better highlight the characteristics of the invention, some examples of execution are described below with reference to the accompanying drawings in which:
- Figures 1 and 2 show a mold used the implementation of the method;
- Figures 3 and 4 show the mold after the arrangement of the frames;
- Figures 5 and 6 show an element according to the invention;
- Figures 7 and 8 partially show a cross member manufactured according to the method of the invention.
Figures 1 and 2 show a mold 1 provided openings 2 and 3 in which parts are arranged ties 4 of the lower elements 5 of a rail clamp. These elements 5 are provided with a collar 6 to ensure their immobi-bed in openings 2 and 3. Elements 5 are also fixed outside the mold 1 in a manner not shown smelled.
Then, the upper frame 7 is placed on supports 8 and 9 of elements 5. These 5 can also present other supports 10 and 11 used to support hold reinforcements of another shape. A frame helical intermediate 12 is then placed on the frame upper 7, a connecting rod 13 is introduced by a opening 14 and the mold is filled with concrete, after which a lower frame 15 can be embedded therein.
According to Figures 5 to 8, the elements 5 have supports in the form of notches 16 to 19 in which the corresponding parts of the frame 7.
It goes without saying that the invention is not limited to the example of the implementation described above, but in provides for all kinds of variations, additions and adaptations provided that its general principle is respected and that its limits, defined by the claims formulated below.

: '''', .

Claims (7)

Les réalisations de l'invention, au sujet des-quelles un droit exclusif de propriété ou de privilège est revendiqué, sont définies comme il suit: The embodiments of the invention, concerning the-which an exclusive property or privilege is claimed, are defined as follows: 1. Procédé de fabrication de traverses de chemin de fer en béton armé, comprenant:
- le montage, à travers des ouvertures prévues dans le fond d'un moule, des éléments des serre-rails qui servent à supporter une armature supérieure de la traverse;
- l'immobilisation de ces éléments en dehors du moule;
- l'introduction à l'intérieur du moule d'une tige de liaison par une ouverture de la paroi du moule;
- le remplissage du moule de béton, - l'incorporation d'une armature inférieure dans le béton, et - la vibration dudit béton.
1. Method for manufacturing railway sleepers of reinforced concrete, comprising:
- mounting, through openings provided in the bottom of a mold, elements of the rail clamps that serve supporting an upper frame of the cross member;
- the immobilization of these elements outside the mold;
- the introduction inside the mold of a rod connecting through an opening in the mold wall;
- filling the concrete mold, - the incorporation of a lower frame in the concrete, and - the vibration of said concrete.
2. Procédé de fabrication de traverses de chemin de fer en béton armé, comprenant:
- le montage à travers des ouvertures du fond du moule, des éléments d'un serre-rails auxquels est au préala-ble fixée par soudage une armature supérieure de la traverse, - l'immobilisation de ces éléments en dehors du moule;
- l'introduction à l'intérieur du moule d'une tige de liaison par une ouverture de la paroi du moule, - le remplissage du moule de béton, - l'incorporation d'une armature inférieure dans le béton, et - la vibration du béton.
2. Method for manufacturing railway sleepers of reinforced concrete, comprising:
- mounting through openings at the bottom of the mold, elements of a rail clamp which is previously ble fixed by welding an upper reinforcement of the cross member, - the immobilization of these elements outside the mold;
- the introduction inside the mold of a rod of connection by an opening of the wall of the mold, - filling the concrete mold, - the incorporation of a lower frame in the concrete, and - concrete vibration.
3. Procédé selon la revendication 1 ou 2, dans lequel après, l'immobilisation des éléments en dehors du moule, on dispose d'une armature intermédiaire de renforce-ment sur l'armature supérieure. 3. Method according to claim 1 or 2, in which afterwards, the immobilization of the elements outside the mold, there is an intermediate reinforcement on the upper frame. 4. Procédé selon la revendication 1 ou 2, dans lequel on enrobe ladite tige de liaison d'une matière formant isolateur électrique. 4. Method according to claim 1 or 2, in which said connecting rod is coated with a material forming electrical insulator. 5. Traverse de chemin de fer en béton armé, comprenant des éléments, chaque éléments incluant:
- une partie en forme de U incorporée dans le béton, l'autre partie de cet élément formant des serre-rails, et - des appuis pratiqués sur les deux branches de la forme en U pour supporter des armatures de la tra-verse.
5. Reinforced concrete railway sleeper, comprising elements, each element including:
- a U-shaped part incorporated in concrete, the other part of this element forming greenhouse rails, and - supports practiced on the two branches of the U-shape to support reinforcements of the tra-pours.
6. Traverse de chemin de fer selon la reven-dication 5, dans laquelle lesdits appuis sont des encoches. 6. Railway sleeper according to resale dication 5, in which said supports are notches. 7. Traverse de chemin de fer selon la reven-dication 5 ou 6, dans laquelle ladite partie en forme de U est en acier. 7. Railway sleeper according to resale dication 5 or 6, wherein said shaped portion U is made of steel.
CA000410927A 1981-10-06 1982-09-08 Manufacture of concrete rail ties, and devices used for said process Expired CA1237705A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BEPV2/59402 1981-10-06
BE2/59402A BE890644R (en) 1981-10-06 1981-10-06 Method of realizing concrete sleepers for railways and elements used in this method

Publications (1)

Publication Number Publication Date
CA1237705A true CA1237705A (en) 1988-06-07

Family

ID=3865571

Family Applications (1)

Application Number Title Priority Date Filing Date
CA000410927A Expired CA1237705A (en) 1981-10-06 1982-09-08 Manufacture of concrete rail ties, and devices used for said process

Country Status (3)

Country Link
BE (1) BE890644R (en)
CA (1) CA1237705A (en)
PT (1) PT75556B (en)

Also Published As

Publication number Publication date
BE890644R (en) 1982-04-06
PT75556A (en) 1982-10-01
PT75556B (en) 1984-11-12

Similar Documents

Publication Publication Date Title
KR100692497B1 (en) Pre-assembled board consisting of reinforced concrete
FR2689532A1 (en) Load support structure.
EP0054983B1 (en) Method of manufacturing concrete railway ties and elements used for carrying it out
CA1237705A (en) Manufacture of concrete rail ties, and devices used for said process
EP2090415B1 (en) Method for manufacturing a lattice girder and apparatus to perform such method
BE897563A (en) REINFORCED CONCRETE BODY AND METHOD FOR MANUFACTURING THE SAME
EP2351884B1 (en) Supporting module for a prefabricated railway track, railway track, section and method for mounting railway tracks
BE898692A (en) BENDED BEAM IN PRE-STRESSED CONCRETE OR REINFORCED CONCRETE
KR101985285B1 (en) Construction Method for Elastic Support Layer between Track and Substructure
KR100497805B1 (en) Traversing supporting apparatus for fixing vertical supporting pillars
FR2664307A1 (en) RAIL SUPPORT, AND RAIL TRACK OBTAINED WITH SUCH SUPPORTS.
FR3004737A1 (en) CONCRETE BRIDGE
BE1028455B1 (en) Lag screw sheath for an anchor assembly
BE1014197A3 (en) Rail and elastic jacket assembly e.g. for tramlines is made in a a cavity in a cast constructional material such as concrete
JP3737024B2 (en) Prestressed concrete and method for producing the same
KR102317331B1 (en) Large concrete block
KR200259095Y1 (en) permanent anchor
FR2820154A1 (en) METHOD FOR SEALING A RAIL FOR THE PASSAGE OF RAILWAY EQUIPMENT AND SADDLE FOR SUCH A METHOD
FR2886959A3 (en) Support device for building material fabrication field, has blade crossing load to be supported so as to take support on surface extending below load, where blade is activated by top of load, and support unit fixed to lower side of load
FR2736114A1 (en) Para-seismic vibration damping block used in foundations of buildings or other civil engineering works
JP2807956B2 (en) Method for manufacturing concrete-containing tires
FR2980223A1 (en) Framework of prefabricated concrete building comprises central branch separating two terminal sections including branches, where framework is constituted by assembling series of vertical concrete posts reinforced with rectangular section
FR3115308A1 (en) Method and device for fixing a metal corbel retaining a wall
WO1994006983A1 (en) Anchorage for reinforced concrete
FR2509768A2 (en) Concrete sleeper for railway - comprises rail supports welded to spacing plates cast into body of sleeper

Legal Events

Date Code Title Description
MKEX Expiry