|
US6128577A
(en)
*
|
1996-12-19 |
2000-10-03 |
Schlumberger Technology Corporation |
Modeling geological structures and properties
|
|
US5905657A
(en)
*
|
1996-12-19 |
1999-05-18 |
Schlumberger Technology Corporation |
Performing geoscience interpretation with simulated data
|
|
US6052650A
(en)
*
|
1997-02-27 |
2000-04-18 |
Schlumberger Technology Corporation |
Enforcing consistency in geoscience models
|
|
US6191787B1
(en)
|
1998-02-10 |
2001-02-20 |
Schlumberger Technology Corporation |
Interactively constructing, editing, rendering and manipulating geoscience models
|
|
FR2776393B1
(fr)
*
|
1998-03-20 |
2001-09-07 |
Inst Francais Du Petrole |
Methode pour former automatiquement un modele simulant la structure stratigraphique d'une zone souterraine
|
|
CA2320908C
(fr)
*
|
1998-04-09 |
2007-01-09 |
Schlumberger Canada Limited |
Recherche de coherence dans des modeles geoscientifiques
|
|
US6313837B1
(en)
|
1998-09-29 |
2001-11-06 |
Schlumberger Technology Corporation |
Modeling at more than one level of resolution
|
|
US7177764B2
(en)
*
|
2000-07-14 |
2007-02-13 |
Schlumberger Technology Corp. |
Simulation method and apparatus for determining subsidence in a reservoir
|
|
GB2384304B
(en)
*
|
2002-01-04 |
2003-12-03 |
Nigel Allister Anstey |
Method of distinguishing types of geologic sedimentation
|
|
FR2849211B1
(fr)
*
|
2002-12-20 |
2005-03-11 |
Inst Francais Du Petrole |
Methode de modelisation pour constituer un modele simulant le remplissage multilithologique d'un bassin sedimentaire
|
|
US7200540B2
(en)
*
|
2003-01-31 |
2007-04-03 |
Landmark Graphics Corporation |
System and method for automated platform generation
|
|
US7096172B2
(en)
*
|
2003-01-31 |
2006-08-22 |
Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. |
System and method for automated reservoir targeting
|
|
CA2520135A1
(fr)
*
|
2003-03-31 |
2004-11-04 |
Exxonmobil Upstream Research Company |
Procede pour determiner des proprietes d'un corps sedimentaire a partir de l'epaisseur et de la granulometrie en un point dudit corps
|
|
WO2004106974A2
(fr)
*
|
2003-05-23 |
2004-12-09 |
Exxonmobil Upstream Research Company |
Procede de prediction de la granulometrie a partir de la forme d'un corps sedimentaire
|
|
FR2857758B1
(fr)
*
|
2003-07-15 |
2005-09-30 |
Centre Nat Rech Scient |
Procede de determination de la diffusivite isotrope dans un volume
|
|
FR2860076B1
(fr)
*
|
2003-09-24 |
2005-10-28 |
Inst Francais Du Petrole |
Methode pour simuler le depot d'une sequence sedimentaire dans un bassin
|
|
US7069148B2
(en)
*
|
2003-11-25 |
2006-06-27 |
Thambynayagam Raj Kumar Michae |
Gas reservoir evaluation and assessment tool method and apparatus and program storage device
|
|
WO2005104003A1
(fr)
*
|
2004-03-31 |
2005-11-03 |
Exxonmobil Upstream Research Company |
Procede pour construire un modele geologique d'un reservoir souterrain
|
|
AU2005236775B2
(en)
*
|
2004-03-31 |
2011-03-10 |
Exxonmobil Upstream Research Company |
Method for simulating and estimating sandstone properties
|
|
FR2871897B1
(fr)
*
|
2004-06-21 |
2006-08-11 |
Inst Francais Du Petrole |
Methode pour deformer une image sismique pour interpretation amelioree
|
|
FR2872584B1
(fr)
*
|
2004-06-30 |
2006-08-11 |
Inst Francais Du Petrole |
Methode pour simuler le depot sedimentaire dans un bassin respectant les epaisseurs des sequences sedimentaires
|
|
EP1766439A2
(fr)
|
2004-07-01 |
2007-03-28 |
ExxonMobil Upstream Research Company |
Procede de modelisation geologique utilisant la creation de grilles sur base hydrodynamique (hydro-grilles)
|
|
MX2007000363A
(es)
*
|
2004-07-07 |
2008-03-05 |
Exxonmobil Upstream Res Co |
Prediccion de la composicion de arena-grano y textura de la arena.
|
|
CA2579389A1
(fr)
*
|
2004-09-10 |
2006-04-06 |
Exxonmobil Upstream Research Company |
Procede d'evaluation de proprietes de basins sedimentaires par modelage numerique de processus de sedimentation
|
|
AU2005285360B2
(en)
*
|
2004-09-10 |
2011-02-03 |
Exxonmobil Upstream Research Company |
A method for constructing geologic models of subsurface sedimentary volumes
|
|
FR2875305B1
(fr)
*
|
2004-09-16 |
2006-10-27 |
Inst Francais Du Petrole |
Methode pour generer un modele de reservoir sur maillage flexible
|
|
US7941307B2
(en)
*
|
2004-11-10 |
2011-05-10 |
Exxonmobil Upstream Research Company |
Method for calibrating a model of in-situ formation stress distribution
|
|
FR2885227B1
(fr)
*
|
2005-04-29 |
2007-06-29 |
Inst Francais Du Petrole |
Methode d'interpretation sedimentologique par estimation de differents scenarios chronologiques de mise en place des couches sedimentaires
|
|
US8145463B2
(en)
|
2005-09-15 |
2012-03-27 |
Schlumberger Technology Corporation |
Gas reservoir evaluation and assessment tool method and apparatus and program storage device
|
|
US8776895B2
(en)
*
|
2006-03-02 |
2014-07-15 |
Exxonmobil Upstream Research Company |
Method for quantifying reservoir connectivity using fluid travel times
|
|
WO2007126676A2
(fr)
|
2006-04-21 |
2007-11-08 |
Exxonmobil Upstream Research Company |
Co-dévelopment in situ de schiste bitumineux avec récupération de matières minérales
|
|
EP2372398A3
(fr)
*
|
2006-06-21 |
2012-04-11 |
Terraspark Geosciences, LLC |
Extraction de systèmes sédimentaires
|
|
CA2664316C
(fr)
|
2006-10-13 |
2014-09-30 |
Exxonmobil Upstream Research Company |
Procede ameliore de developpement de zone souterraine gelee
|
|
AU2007313396B2
(en)
|
2006-10-13 |
2013-08-15 |
Exxonmobil Upstream Research Company |
Optimized well spacing for in situ shale oil development
|
|
CA2664321C
(fr)
|
2006-10-13 |
2014-03-18 |
Exxonmobil Upstream Research Company |
Mise en valeur combinee de schistes bitumineux par chauffage in situ avec une ressource d'hydrocarbures plus profonde
|
|
WO2008115359A1
(fr)
|
2007-03-22 |
2008-09-25 |
Exxonmobil Upstream Research Company |
Connexions électriques par matériau granulaire pour le chauffage d'une formation in situ
|
|
US8622133B2
(en)
|
2007-03-22 |
2014-01-07 |
Exxonmobil Upstream Research Company |
Resistive heater for in situ formation heating
|
|
WO2008143745A1
(fr)
|
2007-05-15 |
2008-11-27 |
Exxonmobil Upstream Research Company |
Puits de forage équipé d'un brûleur utilisé dans la conversion in situ de formations rocheuses riches en matières organiques
|
|
AU2008253753B2
(en)
|
2007-05-15 |
2013-10-17 |
Exxonmobil Upstream Research Company |
Downhole burners for in situ conversion of organic-rich rock formations
|
|
US8146664B2
(en)
|
2007-05-25 |
2012-04-03 |
Exxonmobil Upstream Research Company |
Utilization of low BTU gas generated during in situ heating of organic-rich rock
|
|
BRPI0810590A2
(pt)
|
2007-05-25 |
2014-10-21 |
Exxonmobil Upstream Res Co |
Método in situ de produzir fluidos de hidrocarboneto de uma formação rochosa rica em matéria orgânica
|
|
US8244509B2
(en)
|
2007-08-01 |
2012-08-14 |
Schlumberger Technology Corporation |
Method for managing production from a hydrocarbon producing reservoir in real-time
|
|
US8082995B2
(en)
|
2007-12-10 |
2011-12-27 |
Exxonmobil Upstream Research Company |
Optimization of untreated oil shale geometry to control subsidence
|
|
CA2721008A1
(fr)
*
|
2008-04-11 |
2009-10-15 |
Terraspark Geosciences, Llc |
Visualisation de caracteristiques geologiques a l'aide de representations de donnees leur appartenant
|
|
WO2009137181A1
(fr)
*
|
2008-05-05 |
2009-11-12 |
Exxonmobil Upstream Research Company |
Systèmes, procédés et produits de programme informatique pour modéliser des systèmes dynamiques en visualisant un espace de paramètres et en réduisant cet espace de paramètres
|
|
US8230929B2
(en)
|
2008-05-23 |
2012-07-31 |
Exxonmobil Upstream Research Company |
Methods of producing hydrocarbons for substantially constant composition gas generation
|
|
WO2010056427A1
(fr)
|
2008-11-14 |
2010-05-20 |
Exxonmobil Upstream Research Company |
Formation d’un modèle d’une région du sous-sol
|
|
WO2010071722A1
(fr)
|
2008-12-18 |
2010-06-24 |
Exxonmobil Upstream Reseach Company |
Modèle à recouvrement multicouche moyenné sur la profondeur d'écoulement d'un courant de turbidité
|
|
US8838428B2
(en)
*
|
2009-01-13 |
2014-09-16 |
Exxonmobil Upstream Research Company |
Methods and systems to volumetrically conceptualize hydrocarbon plays
|
|
AU2010216407B2
(en)
|
2009-02-23 |
2014-11-20 |
Exxonmobil Upstream Research Company |
Water treatment following shale oil production by in situ heating
|
|
WO2010104537A1
(fr)
|
2009-03-11 |
2010-09-16 |
Exxonmobil Upstream Research Company |
Conditionnement par modèle adjoint de modèles géologiques à base de processus
|
|
WO2010104536A1
(fr)
|
2009-03-11 |
2010-09-16 |
Exxonmobil Upstream Research Company |
Flux de travail à base de gradient pour le conditionnement de modèles géologiques à base de processus
|
|
WO2010123596A1
(fr)
|
2009-04-20 |
2010-10-28 |
Exxonmobil Upstream Research Company |
Procédé de prédiction d'un écoulement de fluide
|
|
US8540020B2
(en)
|
2009-05-05 |
2013-09-24 |
Exxonmobil Upstream Research Company |
Converting organic matter from a subterranean formation into producible hydrocarbons by controlling production operations based on availability of one or more production resources
|
|
US9418182B2
(en)
|
2009-06-01 |
2016-08-16 |
Paradigm Sciences Ltd. |
Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume
|
|
US8600708B1
(en)
|
2009-06-01 |
2013-12-03 |
Paradigm Sciences Ltd. |
Systems and processes for building multiple equiprobable coherent geometrical models of the subsurface
|
|
US9536022B1
(en)
|
2009-06-01 |
2017-01-03 |
Paradigm Sciences Ltd. |
Systems and methods for modeling faults in the subsurface
|
|
US8711140B1
(en)
|
2009-06-01 |
2014-04-29 |
Paradigm Sciences Ltd. |
Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume
|
|
EP2491516B1
(fr)
|
2009-10-23 |
2018-09-12 |
Exxonmobil Upstream Research Company |
Procédé d'optimisation avec des informations de gradient
|
|
US8743115B1
(en)
|
2009-10-23 |
2014-06-03 |
Paradigm Sciences Ltd. |
Systems and methods for coordinated editing of seismic data in dual model
|
|
US8863839B2
(en)
|
2009-12-17 |
2014-10-21 |
Exxonmobil Upstream Research Company |
Enhanced convection for in situ pyrolysis of organic-rich rock formations
|
|
US9134454B2
(en)
|
2010-04-30 |
2015-09-15 |
Exxonmobil Upstream Research Company |
Method and system for finite volume simulation of flow
|
|
CA2805446C
(fr)
|
2010-07-29 |
2016-08-16 |
Exxonmobil Upstream Research Company |
Procedes et systemes de simulation d'ecoulement basee sur un apprentissage machine
|
|
AU2011283196B2
(en)
|
2010-07-29 |
2014-07-31 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
|
US10087721B2
(en)
|
2010-07-29 |
2018-10-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine—learning based simulation of flow
|
|
BR112013001022A2
(pt)
|
2010-08-30 |
2016-05-24 |
Exxonmobil Upstream Res Compony |
redução de olefina para geração de óleo por pirólise in situ
|
|
CN103069104A
(zh)
|
2010-08-30 |
2013-04-24 |
埃克森美孚上游研究公司 |
原位热解的井筒机械完整性
|
|
BR112013002114A2
(pt)
|
2010-09-20 |
2016-05-17 |
Exxonmobil Upstream Res Co |
formulações flexíveis e adaptáveis para simulações de reservatório complexas
|
|
WO2012071090A1
(fr)
|
2010-11-23 |
2012-05-31 |
Exxonmobil Upstream Research Company |
Procédé de discrétisation variable pour la simulation d'écoulement sur des modèles géologiques complexes
|
|
FR2968443A1
(fr)
*
|
2010-12-03 |
2012-06-08 |
Total Sa |
Procede de simulation de formation geologique d'une zone fluviale
|
|
CN102359862B
(zh)
*
|
2011-08-12 |
2013-05-15 |
河海大学 |
粉沙质和淤泥质海岸泥沙运动数值模拟方法
|
|
BR112014005794A2
(pt)
|
2011-09-15 |
2017-03-28 |
Exxonmobil Upstream Res Co |
operações matriciais e vetoriais otimizadas em algoritmos de instrução limitada que executam cálculos de equação de estado
|
|
CA2845012A1
(fr)
|
2011-11-04 |
2013-05-10 |
Exxonmobil Upstream Research Company |
Connexions electriques multiples pour l'optimisation du chauffage pour la pyrolyse in situ
|
|
FR2982901B1
(fr)
*
|
2011-11-17 |
2013-11-22 |
IFP Energies Nouvelles |
Procede d'exploitation d'un bassin sedimentaire a partir d'une simulation stratigraphique du remplissage multilithologique prenant en compte le transport de sediments fins
|
|
GB2511228B
(en)
*
|
2011-12-20 |
2017-06-14 |
Shell Int Research |
Automated calibration of a stratigraphic forward modelling (sfm) tool using a neighborhood algorithm with explicit escape clauses
|
|
US10114134B2
(en)
|
2012-03-02 |
2018-10-30 |
Emerson Paradigm Holding Llc |
Systems and methods for generating a geological model honoring horizons and faults
|
|
WO2013148021A1
(fr)
|
2012-03-28 |
2013-10-03 |
Exxonmobil Upstream Research Company |
Procédé de mise à l'échelle d'écoulement multiphase
|
|
US9759826B2
(en)
|
2012-04-03 |
2017-09-12 |
Paradigm Sciences Ltd. |
System and method for generating an implicit model of geological horizons
|
|
WO2013165711A1
(fr)
|
2012-05-04 |
2013-11-07 |
Exxonmobil Upstream Research Company |
Systèmes et procédés de détection d'une intersection entre un puits de forage et une structure souterraine qui comprend un matériau de marqueur
|
|
WO2014051904A1
(fr)
|
2012-09-26 |
2014-04-03 |
Exxonmobil Upstream Research Company |
Modélisation statistique à points multiples facilitée par un traitement conditionnel
|
|
EP2901363A4
(fr)
|
2012-09-28 |
2016-06-01 |
Exxonmobil Upstream Res Co |
Suppression des failles dans des modèles géologiques
|
|
EP3418778B1
(fr)
|
2013-03-15 |
2020-07-15 |
Emerson Paradigm Holding LLC |
Systèmes et procédés pour construire des attributs sédimentaires
|
|
US11067475B2
(en)
*
|
2013-04-01 |
2021-07-20 |
United States Of America As Represented By The Secretary Of The Army |
Bedload transport methodology and method of use
|
|
WO2015060919A1
(fr)
|
2013-10-22 |
2015-04-30 |
Exxonmobil Upstream Research Company |
Systèmes et procédés pour réguler un processus de pyrolyse in situ
|
|
EP2869096B1
(fr)
|
2013-10-29 |
2019-12-04 |
Emerson Paradigm Holding LLC |
Systèmes et procédés de maillage multi-échelle pour modélisation de temps géologique
|
|
US9394772B2
(en)
|
2013-11-07 |
2016-07-19 |
Exxonmobil Upstream Research Company |
Systems and methods for in situ resistive heating of organic matter in a subterranean formation
|
|
US10422923B2
(en)
|
2014-03-28 |
2019-09-24 |
Emerson Paradigm Holding Llc |
Systems and methods for modeling fracture networks in reservoir volumes from microseismic events
|
|
CA2948667A1
(fr)
|
2014-07-30 |
2016-02-04 |
Exxonmobil Upstream Research Company |
Procede de generation de maillage volumetrique dans un domaine ayant des proprietes de materiau heterogenes
|
|
US10359523B2
(en)
|
2014-08-05 |
2019-07-23 |
Exxonmobil Upstream Research Company |
Exploration and extraction method and system for hydrocarbons
|
|
CN104199124B
(zh)
*
|
2014-08-26 |
2017-03-08 |
中国石油天然气股份有限公司 |
混相地层分析方法和装置
|
|
CA2963092C
(fr)
|
2014-10-31 |
2021-07-06 |
Exxonmobil Upstream Research Company |
Procedes de gestion de discontinuite dans la construction d'espace de conception de modele de subsurface faillee a l'aide de moindres carres mobiles
|
|
US10803534B2
(en)
|
2014-10-31 |
2020-10-13 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity with the help of grid optimization techniques
|
|
US10107938B2
(en)
|
2014-10-31 |
2018-10-23 |
Exxonmobil Upstream Research Company |
Managing discontinuities in geologic models
|
|
AU2015350480A1
(en)
|
2014-11-21 |
2017-05-25 |
Exxonmobil Upstream Research Company |
Mitigating the effects of subsurface shunts during bulk heating of a subsurface formation
|
|
US9690002B2
(en)
|
2015-06-18 |
2017-06-27 |
Paradigm Sciences Ltd. |
Device, system and method for geological-time refinement
|
|
US10287858B2
(en)
|
2015-10-20 |
2019-05-14 |
Chevron U.S.A. Inc. |
System and method for modeling coupled systems of hydrodynamics and sediment transport
|
|
US10466388B2
(en)
|
2016-09-07 |
2019-11-05 |
Emerson Paradigm Holding Llc |
System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles
|
|
WO2018118374A1
(fr)
|
2016-12-23 |
2018-06-28 |
Exxonmobil Upstream Research Company |
Procédé et système de simulation de réservoir stable et efficace à l'aide d'indicateurs de stabilité
|
|
CN106960076A
(zh)
*
|
2017-02-28 |
2017-07-18 |
长江大学 |
一种基于水动力学的沉积相预测方法
|
|
CA3005356A1
(fr)
|
2017-03-09 |
2018-09-09 |
Shell Internationale Research Maatschappij B.V. |
Construction d'images stratigraphiques de distribution de sediments dans une surface souterraine de la terre
|
|
FR3067500B1
(fr)
*
|
2017-06-13 |
2021-04-16 |
Ifp Energies Now |
Procede d'exploitation d'un bassin sedimentaire comportant des hydrocarbures, au moyen d'une modelisation de l'accumulation de la matiere organique terrestre
|
|
CN109521178B
(zh)
*
|
2017-09-18 |
2021-07-20 |
中国石油化工股份有限公司 |
一种地质沉积过程波动分析方法及系统
|
|
US10969507B2
(en)
|
2018-10-25 |
2021-04-06 |
Saudi Arabian Oil Company |
Seismic channel geobody extraction for basin fairway simulation
|
|
US10520644B1
(en)
|
2019-01-10 |
2019-12-31 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
|
US11156744B2
(en)
|
2019-01-10 |
2021-10-26 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
|
CN110045431B
(zh)
*
|
2019-04-19 |
2022-03-04 |
成都理工大学 |
一种基于伽马数据体的海相沉积地层古地貌校正方法
|
|
CN111190223B
(zh)
*
|
2020-01-08 |
2022-10-04 |
中国石油天然气股份有限公司 |
河流相沉积分散油砂体的识别和开采方法、及其应用
|
|
US11668847B2
(en)
|
2021-01-04 |
2023-06-06 |
Saudi Arabian Oil Company |
Generating synthetic geological formation images based on rock fragment images
|
|
CN114722649B
(zh)
*
|
2021-01-05 |
2025-05-27 |
中国石油天然气股份有限公司 |
曲流河连续型变量建模方法、装置、设备及存储介质
|
|
WO2023034875A1
(fr)
|
2021-08-31 |
2023-03-09 |
Saudi Arabian Oil Company |
Surveillance quantitative de fracturation hydraulique à partir d'une détection par fibre optique à l'aide de l'apprentissage automatique
|
|
CN114059999B
(zh)
*
|
2021-09-29 |
2023-06-06 |
成都理工大学 |
一种重力流沉积成因测井识别方法
|